DSC Delivery Sub Group
|
|
- Claribel Martin
- 5 years ago
- Views:
Transcription
1 DSC Delivery Sub Group 17 th December 2018 at 10:30am G.02, Xoserve Limited, Lansdowne Gate, 65 New Road, Solihull, B91 3DL Meeting Minutes Industry Attendees Swetta Coopamah Centrica SC Eleanor Laurence EDF EL Daemon Mark Ovo Energy DM Claire Louise Roberts Scottish Power CLR Shane Preston Utilita Group SP James Barlow Npower JB Xoserve Attendees Linda Whitcroft (Chair) Simon Harris Tom Lineham Paul Orsler Rachel Taggart Chan Singh Eamonn Darcy Megan Laki Richard Hadfield Alison Cross Leanne Jackson LW SH TL PO RT CS ED ML RH AC LJ 1. Welcome and Introductions Linda Whitcroft (LW) started the meeting and informed all attendees of the following agenda: DSC Delivery Sub Group Agenda Meeting s Minutes 03 rd December 2018 LW asked for feedback on the minutes for the previous Delivery Sub-Group (DSG) occurrence; no comments were received. The minutes were approved. 3. AQ Defects (Replaced by Options Update for XRN AQ Calculation for Class 4 sites with AMR Fitted)
2 Eamonn Darcy (ED) presented slides 6 to 8 to DSG. ED started that all of the outstanding AQ defects have been profiled and the MPRN s have been sent to shippers on the 12 th December. Regarding XRN4740, ED explained that the options had been given at the last DSG and was going to update on the progression. ED presented the background information using slide 6 and went over the options presented in slide 7. Following feedback from Shippers, ED stated that option 2 was most popular with an implementation date of 07/01/19 to get all the MPRN s and AQ corrected. They are currently in testing phase and this is on schedule for 07 th January implementation. Option 1, for the enduring fix, testing will continue and scheduled for implementation in February Portfolio Delivery Overview POAP Richard Hadfield (RH) presented slides 9 to 14 to DSG. On slide 10, RH presented a 36 month view of UK Link related change. This timeline includes Major Releases, Minor Releases, RETRO, UIG, CSSC and MOD621 GB Charging. RH confirmed that ChMC had approved scope for November 19 release and all other releases were on placeholder. Swetta confirmed the update on MOD621 was useful and questioned if there was any indication of what systems will be affected. PO informed SC that there was a Change Pack sent out on Friday 14 th December named EUC GB Charging which included MOD621 and other changes in Gemini with areas of regression and some of the processes that are likely to be impacted. SC was conscious of timescales given the holiday period to give feedback. PO advised that we have extended the consultation period to exclude the non-working days which closes out before the next ChMC meeting. In regards to CSS, SC wanted to know what if there could be an extra line of information as there will be a lot to do on this which they want to see. RH advised that presently it is displayed under one banner. There is also CSS Consequential which is isolated from CSS. LW stated that she believes that CSS Consequential is bigger that the switching service itself and agreed that there should be a separate line on the POAP Action: RH to create separate line on the R&N Delivery Timeline for CSS Consequential. The content on slide 11 shows the End to End stages for each of the UK Link related changes. The governance milestones on slide 12 are yet to be finalised. RH presented slide 13 and 14 detailing a breakdown of changes per Release and changes that are presently unallocated. RH explained that from feedback given we have produced a POAP that covers all changes from all platforms at project stage view. LW advised that this was still being worked on at the end of last week and that it will be published after the meeting. Action: RH to indicate in another colour where milestones completed on R&N Governance slide and on the Portfolio POAP. Also to put a Key on the POAP for acronyms. 5. UIG Update Leanne Jackson presented slides 15 to 20 starting with an overview of the background to why the Taskforce was put in place. LJ explained that slide 17 is a high level dashboard and that the left column is completed and the right is either completed or on track.
3 LJ had presented the POAP at the ChMC had advised the DSG members that they had recommended a one off meeting for a full day to go through proposed for 28 th January. The tasks in the POAP will be finished in December, updated and published on the website - UIG website link Slide 19 depicts the funding and LJ confirmed the spend to forecast is on track. LJ explained that the spreadsheet tracker had grown so slide 20 is an overview of where they are to date with all findings being published on the web page. LW recommended that DSG member attend the meeting to have an understanding of the MOD/Changes that will come from this. 6. Release 3 Update 6a. Release 3 Dashboard and 6b. XRN4534 (Amendment to RGMA Validation Rules for Meter Asset Installation Date) Tom Lineham presented the Release 3 Dashboard to DSG (slides 21 to 23). About the 13 changes within Track 1, five minor defects were reported in PIS, fixes have been deployed into production. For Track 2, progress in on track. Regarding XRN4534 the Production team have resolved all defects. There is a high risk plan in place which may have further defects for 1st Feb implementation date. Contingency date has been agreed at ChMC for 1 st March. Shane Preston suggested that it would be better to work to March implementation, due to tight turn around if fails. LW confirmed that if the date was changed, ChMC would need to vote to do this. PO gave an overview of the change and LW confirmed that there is currently a work around which will continue, and we will send out a comms straight away to advise customers if the 1 st February cannot be met. 7. New Change Proposals (For Ratification of the Prioritisation Scores) 7a. XRN4803 Amend AQI file validation/processing for reason 4 when the meter point was previously Shipperless or unregistered SH presented the Change Proposal to DSG. SH explained that this Change Proposal was approved at the ChMC meeting in December to proceed to DSG. The Change Proposal was raised by Npower. SH provided an overview of the requirements specified in the Change Proposal; its purpose is to amend the system from rejecting reads when a site was previously Shipperless or unregistered, and will then allow the User to submit future reads. SH advised some Shippers may need to update their system and that there is a current work around. Swetta Coopamah asked for more detail and SH confirmed that there will be more options to discuss once in Capture. 7b. XRN4801 Additional Information to be made available on DES (Moved to section 8) 7c. XRN4806 Additional Data at National Level to support UIG Allocation Validation LW presented the Change Proposal to DSG. LW explained we went through this at the last meeting and that no one has come back with feedback for any specific data items. LW advised that this will be developed in the UIG workshop.
4 d. XRN XRN Provision of an alternative Consumer Enquiry Service (M Number) PHASE TWO Non-Web Portal Implementation* (Removed) 7e. XRN Chat bot automated Gemini assistant PO presented the Change Proposal to DSG and stated that Xoserve has been working with National Grid Transmission IS Team on this initiative. PO provided an overview of the requirements specified in the Change Proposal, which effectively are looking to reduce the need for Shippers to raise tickets with the Service Desk to answer general queries relating to UK Link Gemini via an automated Chat Box assistant. PO noted that this would be new technology, which is being introduced to improve Shipper customers experience with UK Link Gemini systems.. PO stated this change won t have any impact on Shipper customers and has been brought to DSG for information purposes only. 7f. XRN Migration of Xoserve Interfaces (Removed) 8. Change Proposal Initial View Representations 8a. XRN4789 Updating Shipper Reporting Pack AC presented slides This change has been split into 2 parts at the request from ChMC in November. Part A is for Shippers only to review the existing Reporting Pack; 5 responses were received and approved in principle. Part B has been included in the CP for all customers with regards to completing a full review of Management Information. Part B will be reviewed separately and may require a separate Change Proposal to progress. Action: DSG to review the Change Proposal and give feedback on requirements within Part A. 8b. XRN4801 Additional Information to be made available on DES SH presented slides and confirmed ChMC approved to proceed on 12 th December. SH stated that there had been several requirements listed on the Change Proposal and we received additional requirements which SH presented to DSG. The requirements will need to be prioritised, timelines given and understand which have system impacts; then discuss with DSG the rationale behind the decisions. Action: DSG to consider Which of the requested data items should be treated as higher priority? Can any of the proposed data items be de-scoped? What considerations or system impacts do you foresee as a result of these data items to be added to DES? 9. Undergoing Solution Options Impact Assessment Review 9a. XRN4747 Npower Smart Meter Upgrade Notification Report
5 PO explained that Npower approached Xoserve several months ago with the view of procuring this particular service. It was later suggested that other customers may benefit from this change so it was recommended a Change Proposal was raised. However, Npower and British Gas (who require the equivalent service) identified a need to progress these services urgently to support Smart Meter Programme activities, In order to take these services forward it has been confirmed that these should be undertaken under commercial arrangements. As a consequence, XRN4747 will now be moved out of the Change Proposal process. To ensure we adopt a consist approach going forward we would like to advise any other customer that requires this service to contact our Commercial Services team - commercial.enquiries@xoserve.com 10. Solution Options Impact Assessment Review Completed 10a. XRN4753 CMS Increase Information Provided in.qcl Response File PO advised this change was originally requested by IGT customers to increase the data provided to individual users following contacts being closed within CMS. PO went through the 3 solution options (detailed in slides 39-47) covering impacts and costs. PO confirmed that Change Management Committee have kept XRN4753 as a candidate for November 19 Release. XRN4753 High Level Solution option Assessment went out in a Change Pack on Friday 14 th December for customers to review and provide representations. PO noted that the change is currently seen as being beneficial to multiple customer classes, with costs being split between these customers. DSC Change Management representatives will be asked to approve the preferred solution option, along with agreeing the appropriate charging basis at Change Management Committee in January b. XRN4790 Introduction of winter read/consumption reports and associated obligation (MOD0652) LW presented and stated that this change was raised by Npower, supporting MOD0652. LW explained that although the MOD wasn t implemented, the UIG Taskforce was already developing War Band Reports. There are 8 reports in the change; the first report has been sent out to tell Shippers where they haven t procured a read in November. The War band needs a read to be procured in December before the next 2 reads in the New Year. If you don t procure the read in December it will defer to the following year. LW confirmed that we will keep DSG updated with solutions 10. Defect Dashboard LW advised that defects are being reviewed internally to understand; if when deployed is there any impact on customers. LW asked members to bring any specific defects to DSG that they would like to discuss. (Defects summary on slides 49-54) James Barlow requested information on defect Action: Xoserve to supply JB with details of defect Miscellaneous 11a. XRN4686 Smart Metering Report AC presented change which was raised by CNG requesting a monthly report to show the churn of Smart Meters throughout the industry. No additional requirements confirmed by DSG and a report were developed. Once BER completed it will go to ChMC (February) for approval.
6 Action: DSG Decision required - In what location would DSG prefer this report to be published monthly? 11b. XRN4534 Amendment to RGMA Validation Rules for Meter Asset Installation Date Removed 11c. JMDG/MIS Overview SH stated that there has not been any change and the slides (58-70) are there for information. The only update which can t be displayed on the slides is that the Map asset data report has been finished and is due to go out this week. MIS is now included on the Portfolio POAP. SH explained to Elly Laurence details of what is included in phase 1 and 2 on slide 61 which are delivery points. 11d. ChMC Update LW presented slides giving DSG members an overview of the content covered in the ChMC meeting on 12 th December. LW went through the graph of the number of solution options presented at DSG meetings in 2018, as we had received feedback that Xoserve are only giving 1 solution option. Members agreed that we were bringing enough solution options for each change. 11e. XRN4665 New EUC categories SH presented slides stating that it was agreed at ChMC new EUC s will only change as per current system rules e.g. AQ Calc, Confirmation Start/Change, Gas Year Reassigning. However, following on from detail design the potential need for a new Rec Variance code has been identified to show where an EUC has been amended. SH went through the Back Billing on Greenfield Scenario. SH addressed all questions asked and confirmed this as an extreme case scenario and went through the scenario again and pointed out the triggers, risks and how it works. Xoserve are proposing not to introduce a new Rec Variance Code as part of this change, due to A new variance code would incur Shipper system changes Add additional complexity regarding the production of supporting information files BAU precedent exists for EUC changes as part of Gas Year Additional regression testing would be needed SH then went through the current Reconciliation Variance Codes and what needs to be considerations are needed to implement this change. LW clarified that all members understood. JB said he was not really concerned considering what it impacts. Urgent Action: DSG to consider the Greenfield Back Billing Scenario and advise if a new Rec Variance Code is needed or would the existing Variance Code (UGR Monthly Variance) be enough? If yes, are there any other instances where EUC Rec Variance Code would take priority over any current codes? A separate comms went out to customers in regards to this action as we need the feedback by COP 20 th December.
7 12. Action Updates All DSG actions can be found on the following spreadsheet: DSG Action Update xlsx The action updates were issued to the industry in communication RT - ES 13. AOB LW suggested that we split the agenda in future meetings; items on the agenda every meeting, that have no changes, could be put on the Agenda once a month. It was agreed with members to leave as Agenda item and only discuss if there is a need. LW stated that there will be a Change survey going out in January and in the past we have only received a few responses. LW reiterated the importance of sending it back with both positive and developmental feedback. This way we can understand what we can continue to do as well as what we can change/develop. This was the end of December 17 th DSC Delivery Sub Group meeting. Next Meeting: 7 th January 2019 If you have any questions relating to the above meeting minutes, please uklink@xoserve.com
DSC Delivery Sub-Group Meeting Minutes Monday 16 th July 2018 Face-to-face meeting & Webex
DSC Delivery Sub-Group Meeting Minutes Monday 16 th July 2018 Face-to-face meeting & Webex Industry Attendees James Barlow JB Npower Carl Whitehouse CW First Utility Blanka Caen BC Centrica Helen Bevan
More informationUser Pays User Group Minutes Wednesday 19 January 2011 (via teleconference)
User Pays User Group Minutes Wednesday 19 January 2011 (via teleconference) Attendees Tim Davis (Chair) TD Joint Office Lorna Dupont (Secretary) LD Joint Office Claire Blythe CB Southern Electric Gas Ltd
More informationUK Link Committee Meeting. Xoserve Report Pack. Meeting Date: 12 th January 2017 Reporting Month: December 2016
UK Link Committee Meeting Xoserve Report Pack Meeting Date: 12 th January 2017 Reporting Month: December 2016 Authors (for this version): Amjad Hussain Version: V1.0 Date: 10 th January 2017 Xoserve Reports
More informationUNC Distribution Workgroup Agenda. 10:30 Thursday 26 May at Consort House, 6 Homer Road, Solihull. B91 3QQ
UNC Distribution Workgroup Agenda 10:30 1. Introduction and Status Review 1.1. Approval of s (28 April 2016) 1.2. Modifications with Ofgem 1.3. Pre-Modification discussions 2. Workgroups 1.3.1. Review
More informationDemand Estimation Sub Committee Ad-hoc Work Plan
Demand Estimation Sub Committee Ad-hoc Work Plan Background The DESC Ad-hoc Work Plan was established in 2012 to capture any issues and ideas which arise during the year that DESC decide they may like
More informationDM READ REJECTIONS FOR CLASS 1 SITES Version 1.0 Author: Xoserve
DM READ REJECTIONS FOR CLASS 1 SITES Version 1.0 Author: Xoserve 1 Contents 2 Introduction... 4 2.1 Purpose of document... 4 3 Process Overview... 5 3.1 Read Validation... 5 3.1.1 Read Validation: Energy
More informationHigh Level UKL Data Migration Approach Bulk Load, IDRs and Cutover Activity. April 2016
High Level UKL Data Migration Approach Bulk Load, IDRs and Cutover Activity April 2016 Data Migration Approach Objective The objective of the slides is to detail the data migration approach for Bulk Load,
More informationThe Proposer recommends that this modification should be assessed by a Workgroup
Stage 01: At what stage is this document in the process? : Supply Point Registration Facilitation of Faster Switching! This modification seeks to reduce the Supply Point confirmation period following the
More informationMeeting Details. Shipperless and Unregistered (S&U) Sites Working Group. Conference Rooms 5&6, 31 Homer Road, Solihull.
Meeting Details Meeting Description: Venue Shipperless and Unregistered (S&U) Sites Working Group Conference Rooms 5&6, 31 Homer Road, Solihull Meeting Date: 9 th November 2015 Name Organisation Thomas
More informationOperational Services Procurement. Vendor Engagement Event 28 th March 2018
Operational Services Procurement Vendor Engagement Event 28 th March 2018 Agenda Introductions from the Chair Alt HAN Company Technology Services Update Operational Services Procurement Process Scope and
More informationDemand Estimation Sub-Committee. Ad-hoc Work Areas. 30 July 2014
Demand Estimation Sub-Committee Ad-hoc Work Areas 30 July 2014 2 Background The adhoc work areas log captures all the issues that naturally get raised through discussions at DESC and/or DESC TWG Xoserve
More informationUNC Distribution Workgroup Agenda. 10:30 Thursday 28 September at The Arden Hotel and Leisure Club, Coventry Road, Solihull, B92 0ED
UNC Distribution Workgroup Agenda 10:30 1. Introduction and Status Review 1.1. Approval of s (24 August 2017) 1.2. Modifications with Ofgem 1.3. Pre-Modification discussion 2. Workgroups 1.3.1 Amending
More informationElectricity Balancing System (EBS) IT Subgroup
Minutes Meeting name Meeting number 5 Date of meeting 5 th December 2012 Time 10:00-15:00 Location Electricity Balancing System (EBS) IT Subgroup National Grid Wokingham Attendees Name Initials Company
More informationContact Management. User Guide. Shipper Edition. Version Approved - 1st August
Contact Management User Guide Shipper Edition 1 Contents Page 1. Introduction 2. Log onto Contact Management 2.1 Log onto the Contact Management system 2.2 Contact Management Services Page 2.3 Contact
More informationMilk Support Service Level Agreement
Milk Support Service Level Agreement Document Owner: Milk (Student Planner System) Service Level Agreement (SLA) for: (CUSTOMER NAME) Revision History Version Date Contributor Modifications 1.0 May 2018
More informationProgramme Headlines. Project Headlines. Appendix - Watford 2020 Progress Update Report 8 November 2017
Completed by: Liam Hornsby Period from: 23 October 2017 Date completed: 6 November 2017 Period to: 6 November 2017 Current Programme Status Trend since last report Programme Headlines R R/A A/G G Worse
More informationXOSERVE LIMITED SERVICES SCHEDULE FOR THE PROVISION OF NON-CODE USER PAYS SERVICES (REFERENCE NUMBER XNCUP(SS)05) DATED 20 INTRODUCTION
XOSERVE LIMITED SERVICES SCHEDULE FOR THE PROVISION OF NON-CODE USER PAYS SERVICES (REFERENCE NUMBER XNCUP(SS)05) DATED 20 INTRODUCTION 1 This services schedule forms part of the framework contract for
More informationFebruary Please return completed form to:
Customer Application Form for a Shipper User (Users involved in the conveyance of gas, or arranging for the conveyance of gas, under the terms of the UNC) February 2018 Please return completed form to:
More informationGuidance Document. UNC Modification Proposals Guidance for Proposers
Guidance Document UNC Modification Proposals Guidance for Proposers Guidance Document Page 1 of 7 Version 0.1 Introduction This document is the UNC Modification Guidance Document referenced in the Uniform
More informationGemini Consequential Changes UK Link Committee Presentation 12/03/2015
Gemini Consequential Changes UK Link Committee Presentation 12/03/2015 Introduction to GCC The UKLink Programme is divided into multiple Workstreams. The Gemini Consequential Changes (GCC) Workstream is
More informationUKLink Release 3 Briefing Pack
UKLink Release 3 Briefing Pack 1 Introduction and Purpose of Document Subsequent to Nexus project and the UK Link implementation in 2017, additional requirements have been agreed with the industry are
More informationJoint Office of Gas Transporters xxxx: <Introduction of a Discretionary Release Mechanism for Non-Obligated Annual NTS Exit (Flat) Capacity>
CODE MODIFICATION PROPOSAL No xxxx
More informationUK LINK DESCRIPTION UK LINK DESCRIPTION DOCUMENT
DOCUMENT Version Control Version COR Date of Change Changes 1 Draft - June 2017 Update to reflect implementation of UNC Modification 0565A. Author David Addison 1.1.For Approval July 2017 Minor amendment
More informationGC0102 Mod Title: EU Connection Codes GB Implementation Mod 3
Stage 01: Modification Proposal Grid Code GC0102 Mod Title: EU Connection Codes GB Implementation Mod 3 Purpose of Modification: This modification (3/4) will set out within the Grid Code the following
More informationNHSmail Managed Migrations Implementation Guide
Document filename: NHSmail Managed Migrations Implementation Guide Status Final Owner Tom Hewitt Version 1.2 Author Tom Hewitt Version issue date 07/06/2017 NHSmail Managed Migrations Implementation Guide
More informationTest Strategy for the June 11 BSC Systems Release
This involves the following Test Participants: for the June 11 BSC Systems Release ELEXON Engage Industry Logica This describes the testing approach used to ensure the quality of the changes included in
More informationUKLINK MANUAL IS SERVICE DEFINITION. May 2017 Version 11 For Approval IS SERVICE DEFINITION
UKLINK MANUAL May 2017 Version 11 For Approval May 2017 Page 1 of 20 Version 11 FA David Addison 30/1/2017 19:40 January Rachel Hinsley 10/5/2017 10:44 July David Addison 23/9/2015 15:37 2006 David Addison
More informationEuropean Developments
European Developments Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line. Transmission Workgroup
More informationUNC Transmission Workgroup Agenda 10:00 Thursday 07 March 2019 at Elexon, 350 Euston Road, London, NW1 3AW
UNC Transmission Workgroup Agenda 10:00 Thursday 07 March 2019 at Elexon, 350 Euston Road, London, NW1 3AW (Teleconference: 0203 582 4515, Conference ID 401-706-701) screen sharing https://join.me/jointoffice
More informationAudit Report. Chartered Management Institute (CMI)
Audit Report Chartered Management Institute (CMI) 10 October 2012 Note Restricted or commercially sensitive information gathered during SQA Accreditation monitoring activities is treated in the strictest
More informationSTANDARD (PAY AS YOU GO) PRE-PAID SUPPORT PACKAGE SERVICE LEVEL AGREEMENT
Standard Service Level Agreement STANDARD (PAY AS YOU GO) & PRE-PAID SUPPORT PACKAGE SERVICE LEVEL AGREEMENT Prepared and effective as of Monday, 5th September 2016 By Daniel Herr Director of Tech Help
More informationAuction Calendar 2017/2018 for Capacity Allocation Mechanism Network Code
CAP682-16 Version date: October 07 2016 Calendar 2017/2018 for Capacity Allocation Mechanism Network Code EXPLANATORY NOTE/DISCLAIMER The Network Code on Capacity Allocation Mechanisms in Gas Transmission
More informationThe Project Charter. Date of Issue Author Description. Revision Number. Version 0.9 October 27 th, 2014 Moe Yousof Initial Draft
The Project Charter Project Title: VDI Data Center Design and Build Project Sponsor: South Alberta Data Centers Inc. (SADC Inc.) Project Customer: The City of Calgary Project Manager: Moe Yousof Document
More informationCouncil, 26 March Information Technology Report. Executive summary and recommendations. Introduction
Council, 26 March 2014 Information Technology Report Executive summary and recommendations Introduction This report sets out the main activities of the Information Technology Department since the last
More information0522S: Governance of the use of as a valid UNC communication
Stage 03: Final Modification Report 0522S: Governance of the use of email as a valid UNC communication At what stage is this document in the process? This modification proposes business rules to ensure
More informationEasiPC Helpdesk. What is ITIL? m. 28 Charter Gate, Northampton, NN3 6QB e. t
EasiPC Helpdesk A different approach to supporting your school EasiPC currently provides class leading ICT support to schools and academies across Northamptonshire and beyond. To complement our growing
More information0522: Governance of the use of as a valid UNC communication
Stage 01: Modification 0522: Governance of the use of email as a valid UNC communication At what stage is this document in the process? This Modification proposes business rules to ensure that appropriate
More informationGrid Code Planner EU Code Modifications GC0100/101/102/104
Grid Code Planner EU Code Modifications GC0100/101/102/104 Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a
More informationDESCRIPTION OF UK LINK. July Version 1.1 For Approval. Deleted: June Formatted: Highlight. Formatted: Highlight
DESCRIPTION OF UK LINK July 2017 Version 1.1 For Approval Deleted: June Formatted: Highlight Formatted: Highlight Version Control Version COR Date of Change Changes 1 Draft - June 2017 Update to reflect
More informationUNC Shrinkage Forum Minutes Thursday 31 March 2016 Via Teleconference
Attendees UNC Shrinkage Forum Minutes Thursday 31 March 2016 Via Teleconference Helen Cuin (Chair) (HC) Joint Office Karen Visgarda (Secretary) (KV) Joint Office Angela Love (AL) ScottishPower Colette
More informationPROJECT INITIATION DOCUMENT
PROJECT INITIATION DOCUMENT Project name Email client replacement Release Approved 1.0 Date: 18 May 2006 PRINCE2 Author: Owner: Document Number: John Richards Tim Phillips ICT008-pid-01 Document History
More informationBSCP128 Production, Submission, Audit and Approval of Line Loss Factors Version 3.0. Balancing and Settlement Code. BSC Procedure DRAFT
Balancing and Settlement Code BSC Procedure Production, Submission, Audit and Approval of Line Loss Factors BSCP128 Version 3.0- Effective Date: 30 June 2011 Balancing and Settlement Code Page 1 of 32
More informationWorkgroup Terms of Reference and Membership
Workgroup Terms of Reference and Membership TERMS OF REFERENCE FOR CMP281 WORKGROUP CMP281 aims to remove liability from storage facilities for Balancing Services Use of System (BSUoS) charges on imports.
More informationDCC Connection Guidance
DCC Connection Guidance Guidance to assist SEC Parties understand the connections and connection types that are required to connect to the DCC Service Author: Operations Date: 19/01/2015 DCC PUBLIC Page
More informationBSCP128 Production, Submission, Audit and Approval of Line Loss Factors Version 3.0. Balancing and Settlement Code. BSC Procedure DRAFT
Balancing and Settlement Code BSC Procedure Production, Submission, Audit and Approval of Line Loss Factors BSCP128 Version 3.0 Effective Date: 30 June 2011 Balancing and Settlement Code Page 1 of 33 30
More informationBK-CSR-IG-0150 On-Line Meter Point Search Facility GTC User Guide
BK-CSR-IG-0150 On-Line Meter Point Search Facility GTC User Guide Revised October 2010 CONTENTS 1. Introduction...3 2. User Access...4 2.1 Successful Login...5 2.2 Failed Login...6 3. Services...7 3.1
More informationNon-Standard Sites Processes Agent Guide
Non-Standard Sites Processes Agent Guide Chapter Index 1. Introduction 3 2. Shared Supply Meter Point Nomination Template 5 3. Telemetered Energy 14 4. Datalogged Energy 15 Appendix Index 1. Submission
More informationAdopting Agile Practices
Adopting Agile Practices Ian Charlton Managing Consultant ReleasePoint Software Testing Solutions ANZTB SIGIST (Perth) 30 November 2010 Tonight s Agenda What is Agile? Why is Agile Important to Testers?
More informationHARTREE CENTRE SERVICE NOW SELF- SERVICE PORTAL
HARTREE CENTRE SERVICE NOW SELF- SERVICE PORTAL User Guide Name Amendment Version Reviewed by. Approved by. Lisa Whimperley Initial document Peter Kane Peter Kane creation. 31/10/2017 The Hartree Centre
More informationData Enquiry Service. User Guide
Data Enquiry Service User Guide Table of Contents 1. Introduction... 2 2. Getting Started with Data Enquiry... 3 2.1 Xoserve Service Portal Login 3 2.2 Industrial and Commercial Customer Users Only 5 2.3
More information0522: Governance of the use of as a valid UNC communication
Stage 01: Modification 0522: Governance of the use of email as a valid UNC communication At what stage is this document in the process? This modification proposes business rules to ensure that appropriate
More informationUK Link Testing System and Procedures
UK Link Testing System and Procedures Enduring Approach Table of Contents 1. INTRODUCTION... 2 1.1 PURPOSE OF THIS DOCUMENT... 2 2. CONTEXT... 4 3. TEST SYSTEM SPECIFICATION... 6 3.1 IN SCOPE... 6 OUT
More informationAppendix 3 Central Matching Service ElectronicRegulatory Reporting
Appendix 3 Central Matching Service ElectronicRegulatory Reporting Service Definition Service Definition Electronic Regulatory Reporting (err) is a subset of the services offered by the CentralMatching
More informationMarket Participant Client Platform
PUBLIC IESO_ISTD_0017 Market Participant Client Platform Information Technology Standard Issue 2.0 This document is intended to clearly and concisely present the standards and guidelines for the upgrade
More informationWelcome to the latest edition of your PCSE cervical screening bulletin
Welcome to the latest edition of your PCSE cervical screening bulletin In this bulletin you will find updates on: Ceasing forms for use in GP practices Planned downtime of Exeter systems Christmas opening
More informationCouncil, 8 February 2017 Information Technology Report Executive summary and recommendations
Council, 8 February 2017 Information Technology Report Executive summary and recommendations Introduction This report provides the Council with an update into the work of the Information Technology Directorate
More informationSmart Metering Implementation Programme. Consultation on transitional arrangements in the Smart Energy Code
Smart Metering Implementation Programme Consultation on transitional arrangements in the Smart Energy Code Page 1 of 9 Contents 1 Executive Summary... 3 2 Communications Hubs... 5 3 Service Management...
More informationThis section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective.
Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed
More informationAnnual Industry Consultation
nd Annual Industry Consultation Proposed revisions to the Balancing Services Adjustment Data Methodology Statement Procurement Guidelines System Management Action Flagging Methodology Statement Balancing
More informationAudit Report. Mineral Products Qualifications Council (MPQC) 31 March 2014
Audit Report Mineral Products Qualifications Council (MPQC) 31 March 2014 Note Restricted or commercially sensitive information gathered during SQA Accreditation s quality assurance activities is treated
More informationUK LINK Committee Meeting Minutes Thursday 11 December Homer Road, Solihull B91 3LT
UK LINK Committee Meeting Minutes Thursday 11 December 2014 31 Homer Road, Solihull B91 3LT Attendees Helen Cuin (Chair) (HC) Joint Office Lorna Dupont (Secretary) (LD) Joint Office Alison Neild* (AN)
More informationOn Premise. Service Pack
On Premise Service Pack 02.0.01 - This Documentation, which includes embedded help systems and electronically distributed materials, (hereinafter referred to as the Documentation ) is for your informational
More informationFedRAMP: Understanding Agency and Cloud Provider Responsibilities
May 2013 Walter E. Washington Convention Center Washington, DC FedRAMP: Understanding Agency and Cloud Provider Responsibilities Matthew Goodrich, JD FedRAMP Program Manager US General Services Administration
More informationESB Networks Market Release. Meeting of the IGG, 12 th October 2010
ESB Networks Market Release Meeting of the IGG, 12 th October 2010 ESB Networks Market Release : MCR Update MCR0161 Increase the threshold for connection agreement ver 1.1 - Implementation effective from
More informationMARKET PROCESS DESIGN. MPD 15 - Market Process for Data Processing for QH Meters
MARKET PROCESS DESIGN MPD 15 - Market Process for Data Processing for QH Meters TABLE OF CONTENTS 1. INTRODUCTION... 3 1.1 SCOPE... 3 1.2 HISTORY OF CHANGES... 3 2. PROCESS MAP... 5 2.1 PROCESS DESCRIPTION...
More informationService Level Agreement
General This document is a (SLA) setting out the indicative levels of services to be provided to you by Luminet. This document must be read in conjunction with our standard Terms and Conditions of Service
More informationInstructions for Using Online Plan of Work Timeline Builder
Instructions for Using Online Plan of Work Timeline Builder Access the online PTB system at which is available through either of the following links: http://pars.dasnr.okstate.edu then choose the PTB 2018
More informationEmbracing Competition Stakeholder Engagement Workshop no May 2018
Embracing Competition Stakeholder Engagement Workshop no. 26 22 May 2018 Welcome and opening remarks Mark Adolphus, Director of Connections 2 Agenda 09:45 10:00 Coffee and registration 10:00 10:05 Welcome
More information12 Approval of a New PRESTO Agreement Between York Region and Metrolinx
Clause 12 in Report No. 7 of Committee of the Whole was adopted, without amendment, by the Council of The Regional Municipality of York at its meeting held on April 20, 2017. 12 Approval of a New PRESTO
More informationUKL Future Release 3 Track 1 File Level Transition Plan
UKL Future Release 3 Track 1 File Level Transition Plan Background At the Delivery Sub Group (DSG) on 17 rd Sept, there was an action on the Release 3 Implementation Plan to confirm file exchange and processing
More informationFair and Effective Management of DNO Connection Queues: Treatment of Requests to Change Connection Applications. Good Practice Guide
Fair and Effective Management of DNO Connection Queues: Treatment of Requests to Change Connection Applications Good Practice Guide November 2018 Contents Fair and Effective Management of DNO Connection
More informationDESC Technical Workgroup Presentation of Models for nd June 2016
DESC Technical Workgroup Presentation of Models for 2016 22 nd June 2016 Agenda 2 Recap on Timetable Summary of 2016 Modelling and Smoothed Model Outcomes Summary of TWG responses to proposed Algorithms
More informationUK LINK DESCRIPTION OF UK LINKDOCUMENT
UKLINK DESCRIPTION UK LINK DESCRIPTION OF UK LINKDOCUMENT July 2017 Version 1.1 For Approval Version Control Version COR Date of Change Changes 1 Draft - June 2017 Update to reflect implementation of UNC
More informationNHSmail Migration Communications Plan Template
NHSmail Migration Communications Plan Template June 2018 Version 2 Copyright 2017Health and Social Care Information Centre. The Health and Social Care Information Centre is a non-departmental body created
More informationREQUEST FOR QUOTATION UNIT ITEM DESCRIPTION QUANTITY
RFQ NO.: 2018-005 DATE: February 22, 2018 RFQ TYPE: Services REQUEST FOR QUOTATION 1. The John Hay Management Corporation (JHMC), through its Bids and Awards Committee (BAC) and approved Annual Procurement
More informationOn Premise. Service Pack
On Premise Service Pack 02.0.01 - This Documentation, which includes embedded help systems and electronically distributed materials, (hereinafter referred to as the Documentation ) is for your informational
More informationSchedule document N4MDM. PUBLIC Node4 limited 31/11/2018. Node4 Limited Millennium Way Pride Park Derby DE24 8HZ
Schedule document N4MDM PUBLIC Node4 limited 31/11/2018 Schedule document N4MDM This Schedule contains additional terms, Service Description & Service Level Agreement applicable to the N4 End Point Management
More informationSCHEDULE DOCUMENT N4MDM PUBLIC NODE4 LIMITED 13/07/2017. Node4 Limited Millennium Way Pride Park Derby DE24 8HZ
SCHEDULE DOCUMENT N4MDM PUBLIC NODE4 LIMITED 13/07/2017 SCHEDULE This Schedule contains additional terms, Service Description & Service Level Agreement applicable to the N4 End Point Management Service
More informationDCC SMETS1 PROGRAMME SMETS1 USER INTERFACE FORUM. March 2017 DCC PUBLIC
DCC SMETS1 PROGRAMME SMETS1 USER INTERFACE FORUM March 2017 DCC PUBLIC AGENDA Agenda Item Times Coffee / Breakfast From 09:00 Welcome and introduction Agenda walkthrough UI Options Recap Breakout 1: Impact
More informationStandard INT Dynamic Transfers
Standard INT-004-3.1 Dynamic Transfers A. Introduction 1. Title: Dynamic Transfers 2. Number: INT-004-3.1 3. Purpose: To ensure Dynamic Schedules and Pseudo-Ties are communicated and accounted for appropriately
More informationPhysical Security Reliability Standard Implementation
Physical Security Reliability Standard Implementation Attachment 4b Action Information Background On March 7, 2014, the Commission issued an order directing NERC to submit for approval, within 90 days,
More informationService Level Agreement Domain Registration Services
Domain Registration Services 15 th March 2016 Not just another IT company Why? Because we think, react and deliver differently. Advise, Build, Support & Protect. It s what we do best, simple as that. We
More informationBCS Specialist Certificate in Change Management Syllabus
BCS Specialist Certificate in Change Management Syllabus Version 2.0 April 2017 This qualification is not regulated by the following United Kingdom Regulators - Ofqual, Qualification in Wales, CCEA or
More informationCode Administration Code of Practice
Code Administration Code of Practice As part of the energy Codes Governance Review Ofgem proposed that a Code of Practice be established to facilitate convergence and transparency in code Modification
More informationNHS Fife. 2015/16 Audit Computer Service Review Follow Up
NHS Fife 2015/16 Audit Computer Service Review Follow Up Prepared for NHS Fife April 2016 Audit Scotland is a statutory body set up in April 2000 under the Public Finance and Accountability (Scotland)
More informationevery Website Packages
every every Website Packages So you ve decided you need a new website.. Congratulations! It s a big step venturing into the rabbit hole of the interwebs and you don t want to take a wrong turn. We love
More informationREX: An External Guide for Electrical Contractors
REX: An External Guide for Electrical Contractors Effective from 1 December 2017 Version 1.1 SA Power Networks Page 1 of 13 Contents General Overview... 3 Getting Started... 3 New Users - Information you
More informationTechnical Qualifications How to book assessments
Technical Qualifications How to book assessments Version 2.0 August 2018 Technicals and Moderation Support 1 Contents 2 Introduction This guide provides you with all the information you need when booking
More informationMinutes: Data Management and Security Committee
Minutes: Data Management and Security Committee Date, time and place Date: November 29, 2007 Time: 2:00 p.m. Place: JET 387 Attendees Connie Adams, Advancement Services Linda Atkinson, BARS Toni Becvinovski,
More informationConsultation on: Queue Management. Consultation Period. Opens: 16 th February 2016
Consultation on: Queue Management Consultation Period Opens: 16 th February 2016 Closes: 16 th March 2016 SP Energy Networks SP Energy Networks provide power on behalf of supply companies through a network
More informationComplaint Handling Procedure and Escalation Policy
Complaint Handling Procedure and Escalation Policy COPYRIGHT STATEMENT This document is the property of Nottingham Rehab Ltd. and may not, without our express written consent, be copied in whole or in
More informationGovernance of the use of as a valid UNC communication
Stage 01: : u Governance of the use of email as a valid UNC communication At what stage is this document in the process? This modification proposes business rules to ensure that appropriate assurance is
More informationEnd User Terminal Service
Service Definition End User Terminal Service V1.0 Signoff Name Role Signature & Date Jim Leeper Acting, Delivery Services Manager Page 1 24/04/2012 Document Control Information Document Change History
More information2012 Microsoft Corporation. All rights reserved. Microsoft, Active Directory, Excel, Lync, Outlook, SharePoint, Silverlight, SQL Server, Windows,
2012 Microsoft Corporation. All rights reserved. Microsoft, Active Directory, Excel, Lync, Outlook, SharePoint, Silverlight, SQL Server, Windows, Windows Server, and other product names are or may be registered
More informationObtain Energy Meter Usage Data - CenterPoint
Obtain Energy Meter Usage Data - CenterPoint You will need energy data that covers all of the energy used by all building systems and occupants during the time period from January 1 to December 31 of the
More informationRepresentation Matrices for 20/03/15 Change Pack! Date! 08/04/2015!!!!! Dear Colleague,!
Communication Ref 1394 RH - SN Subject Representation Matrices for 20/03/15 Change Pack Date 08/04/2015 Dear Colleague, Further to the Change Pack, UK Link Change Pack March 2015 Part 2 of 2 issued on
More informationSupplier Rating System Training Guide
Supplier Rating System Training Guide 1 SRS is a tool that allows Beechcraft (BC) and BC Suppliers to easily access the Quality and Delivery performance data of our Supply base and drives continuous improvement.
More informationAneurin Bevan Health Board
Aneurin Bevan Health Board Information Governance Committee Minutes of the meeting held on 10 February 2010, 2pm, in the Small Boardroom, Mamhilad House Present: Prof Janet Wademan - Independent Member
More informationSME License Order Working Group Update - Webinar #3 Call in number:
SME License Order Working Group Update - Webinar #3 Call in number: Canada Local: +1-416-915-8942 Canada Toll Free: +1-855-244-8680 Event Number: 662 298 966 Attendee ID: check your WebEx session under
More informationIT Governance: Shared IT Infrastructure Advisory Committee (SIAC)
IT Governance: Shared IT Infrastructure Advisory Committee (SIAC) Notes Members Attending: Blanchard, Cromer, Kirmse (Chair), Frey, Lander, Robinson, Sallot Others Attending: Burdette, P. Cook, Easley,
More information