SCADA Upgrades to Otay Water Treatment Plant
|
|
- Matilda Merritt
- 5 years ago
- Views:
Transcription
1 SCADA Upgrades to Otay Water Treatment Plant Standards Certification Education & Training Publishing Conferences & Exhibits Speaker: Dr. Noune Garounts 2012 ISA Water & Wastewater and Automatic Controls Symposium August 7-9, 2012 Orlando, Florida, USA
2 Presenter Electrical and Control Engineer for MWH Global Company. More than thirteen years of electrical engineering experience working in Generating stations and electrical substation from 500kV to 4kV, electrical power transmission & distribution, substation & industrial automation projects. Completed several water/wastewater projects that include design, engineering, and contraction support. MWH Global is an organization providing strategic planning, design, construction and engineering program management services for projects around the world. 2
3 Presentation Outline About the Project Responsibilities Existing Otay WTP Existing SCADA Control Room Otay WTP Upgrades Instrumentation and Control Design Network Diagram Upgrade Work in Progress SCADA Control Room in Operation Control System Transition Construction Challenges Lessons Learned Feedback From the Operators Conclusion 3
4 About the Project Client City of San Diego Lower Otay Water Treatment Plant Started from 2000 to Ongoing MWH: Project Managment, Engineering services, and Service During Construction EMA: Instrumentation System Architecture Design and SCADA Integration Constructor Western Summitt: Construction Services 4
5 Responsibilities Design the Otay Water Treatment Plant Upgrades Sub-consultant coordination, including completion of design work within budgetary and schedule parameters. Planning, final design, bid support and engineering services during construction. This $25 million project, necessitated to meet and exceed stricter Federal and State drinking water regulations, will provide a state of the art facility with increased performance, capacity, quality and reliability. It will sustain a clean drinking water supply for the ever growing San Diego population. 5
6 Existing Otay WTP The Otay water treatment plant (WTP) was originally built in 1979 and the plant was last upgraded and expanded in MGD Conventional 2 Flocculation/ Sedimentation Basins 16 Self-Backwashing Filters (6 gpm/sf) MG Clearwells Free chlorine added at end of sedimentation basin Ammonia added at end of filters 6
7 Existing SCADA Control Room 7
8 Otay WTP Upgrades The current process improvements were designed and implemented during the Otay WTP Upgrades Phase 1 and Phase 2 project. The plant was designed for a future upgrade to 40 million gallons per day (MGD), with ultimate capacity up to 60 MGD. Phase I 3 rd Flocculation/Sedimentation Basin Filter Upgrades Pumped Backwash New Underdrains and Media Filter to Waste Inlet Meter SCADA System Upgrades Phase II Chlorine Dioxide Generator and Contactor PAC Feed System Chemical Feed System SCADA System Upgrades 8
9 Otay Water Treatment Plant Phases Chlorine Vapor Scrubber Clearwell Storage Phase I Phase II 9
10 Instrumentation and Control Design Developed P&IDs Coordinated with Process, Mechanical, Electrical, and SCADA Integrators (EMA) Coordinated with Operators at Otay Water Treatment Plant current conditions of the SCADA. Specifying Hardware and Software for SCADA Design new SCADA Room with Architects Technology selection All PLCs were replaced with newest version of standardized PLCs 10
11 Network Diagram Upgrade New redundant PLC and remote I/O panels Fiber Optic communication system backbone Communication equipment upgrades. Replacing relays for backwash control for the new filter operations and existing plant facilities. New package system PLCs: PAC and chlorine dioxide generator feed systems. Signals to the existing antiquated plant Main Control Board were integrated into the new PLC system and incorporated into the new plant SCADA system. 11
12 Work in Progress 12
13 Work in Progress 13
14 SCADA Control Room in Operation 14
15 Control System Transition From Chart recorders, lights and switches to server and HMI PCS will enable operators to access components of the new system from all HMI workstations Improving plant operation by providing multiple access points to the new system Provide a fully functional historical database that better prepares the City to meet regulatory requirements, and provide adequate backup and redundancy for the connection point between the existing and new control system Filter operation during construction, manual backwash. 15
16 Construction Challenges Maintaining Operation throughout Construction Major Rehabilitation to Existing Filters SCADA System Upgrades/Transition Extensive Electrical Relocations 16
17 Lessons Learned Needed to coordinate number of the conduits/conductors for I/O Existing plant facilities main control board coordination Computer system locations of servers, workstations, monitors, UPS, fiber optics, etc. and provide power source and CAT6 cabling Keep low voltage instrumentation equipment out of high voltage MCCs and panels Plan shutdowns required for electrical work, loss of safety alarms Provide monitoring for UPS on critical 17
18 Feedback From the Operators Main Control Room improvement was great change for the operators. The operation of the Plant is more efficient and effective. Otay WTP operator comments during construction on filter performance improvements with new pumped backwash system. It would appear from these data that the new pumped backwash system is providing a significant improvement in filtered water quality. This is definitely a HUGE step in the right direction. 18
19 Conclusion Transition plan was implemented successfully One server-grade machine has been purchased and installed. This machine replaced the existing control room HMI workstation as the connection-point between the existing and new control systems. Connected to the Modbus Ethernet ring as well as the TI system, this station was configured for both the Modicon and TI controls. This station configured as an interim control system server hosting all HMI workstations, as well as an SQL-based Historian provided robust historian functionality. Connected all HMI workstations onto the Ethernet control backbone and synchronize operational displays. All PLCs and Workstations were installed, configured, and operated as it was planned. 19
20 Phase I and II Upgrades Project Completion 20
21 Questions 21
Municipality Moves SCADA System from Desktop Computers to Terminal Services
Municipality Moves SCADA System from Desktop Computers to Terminal Services Standards Certification Education & Training Publishing Conferences & Exhibits Speakers: Bosko Bob Loncar 2014 ISA Water / Wastewater
More informationGetting the Most from Your SCADA Data
Getting the Most from Your SCADA Data Standards Certification Education & Training Publishing Conferences & Exhibits Speaker: Emile Richard 2015 ISA Water / Wastewater and Automatic Controls Symposium
More informationAuthorized Systems Integrator. Automation Systems Telemetry & SCADA
Authorized Systems Integrator Automation Systems Telemetry & SCADA Horizons Engineering Switchgear Manufacturing Co. plc. is an Authorized System Integrator, Automation Partner for Schneider Electric Automation.
More informationDNP3 for Water Systems
DNP3 for Water Systems United Water New Jersey Use Case Standards Certification Education & Training Publishing Conferences & Exhibits Speaker: Keith Kolkebeck 2015 ISA Water / Wastewater and Automatic
More informationComprehensive Networking Solutions
Comprehensive Networking Solutions End to End Networking Solutions in the Water and Wastewater Sectors Standards Certification Education & Training Publishing Conferences & Exhibits Aug 5-7, 2014 Orlando,
More informationNetwork Architectural Design for Cybersecurity in a Virtual World
Network Architectural Design for Cybersecurity in a Virtual World Standards Certification Education & Training Publishing Conferences & Exhibits Kenneth Frische aesolutions 2016 ISA Water / Wastewater
More informationPresentation Overview
Upgrading Wilmette s SCADA System How to Keep Your Plant Up and Running during a Major Control System Overhaul Presented at T-CON 2013 Wednesday June 5, 2013 Ray S. Ames Jr., Senior Project Manager, Stanley
More informationCity of Toledo WTP SCADA System Upgrade 2015
City of Toledo WTP SCADA System Upgrade 2015 Dmytryka Jacobs Engineers, Inc. Selected to provide the required services for the WTP SCADA Upgrade Project Local Consulting Engineering Firm (Toledo Cleveland)
More informationPLC 23 DUAL MEDIA FILTERS 5 AND 6 SCADA SYSTEM OPERATION MANUAL. Revision 1.0 April 18, 2006
PLC 23 DUAL MEDIA FILTERS 5 AND 6 SCADA SYSTEM OPERATION MANUAL Revision 1.0 April 18, 2006 PLC 23 DUAL MEDIA FILTERS 5 AND 6 SCADA SYSTEM OPERATION MANUAL Revision 1.0 April 18, 2006 Table of Contents
More informationSCADA Systems for Water and Wastewater Applications
SCADA Systems for Water and Wastewater Applications TMACOG Water/Wastewater Training Event, May 9 th 2018 Presenter Alex Gyurgyak P.E. Presented by Dmytryka Jacobs Engineers, Inc. Toledo, Ohio SCADA Systems
More informationMEETING THE CHALLENGES OF UPGRADING THE PLANT CONTROL SYSTEM YIELDS MAJOR OPERATIONS BENEFITS
MEETING THE CHALLENGES OF UPGRADING THE PLANT CONTROL SYSTEM YIELDS MAJOR OPERATIONS BENEFITS Mike Richardson Water Resources Manager, Cape Fear Public Utility Authority Nan Johnson VP Municipal Business,
More informationProject Life Cycle Support (SCADA)
Project Life Cycle Support (SCADA) Texas Association of Clean Water Agencies Garland, TX March 26, 2010 Yehuda Morag CH2M HILL, Austin TX WBG030410171936AUS Agenda Introduction to SCADA Utility Managers
More informationVirtualizing SCADA. Improving Control System Reliability with proven IT Technology. Speakers: Jason Hamlin Carter Farley
Virtualizing SCADA Improving Control System Reliability with proven IT Technology Standards Certification Education & Training Publishing Conferences & Exhibits Speakers: Jason Hamlin Carter Farley 2014
More informationWindsor Water Treatment Plant SCADA and Power Upgrades
Windsor Water Treatment Plant SCADA and Power Upgrades John Stuart COO Windsor Utilities Commission Copyright 2011 Rockwell Automation, Inc. All rights reserved. Copyright 2011 Rockwell Automation, Inc.
More informationSCADA Control and Monitoring Of Groundwater Remediation Facilities: Past, Present and Planning For the Future
SCADA Control and Monitoring Of Groundwater Remediation Facilities: Past, Present and Planning For the Future Standards Certification Education & Training Publishing Conferences & Exhibits Speakers: Obadiah
More informationSmall hydro power plant automation. Oswaldo Kaschny Schneider Electric Brazil CDI Power
Small hydro power plant automation Oswaldo Kaschny Schneider Electric Brazil CDI Power Small Hydroelectric: Power and Control solution Operation Centre Turbine Measurement board Power meters And quality
More informationWater Treatment Plant Upgrades to Open Secure Automation on Filter Controls
Case Study Water Treatment Plant Upgrades to Open Secure Automation on Filter Controls The city of Hot Springs, Arkansas projected that its antiquated filter controls would not be adequate to meet anticipated
More informationWireless Mesh Infrastructure Networks for Supporting Water Districts Data, SCADA and Video Requirements
Wireless Mesh Infrastructure Networks for Supporting Water Districts Data, SCADA and Video Requirements Standards Certification Education & Training Publishing Conferences & Exhibits Speaker: Matthew Selby
More informationBenefits of a SCADA Master Plan for Utilities
Benefits of a SCADA Master for Utilities Standards Certification Education & Training Publishing Conferences & Exhibits Speakers: Manoj Yegnaraman, Carollo Engineers, Inc. Norman Anderson, Polk County
More informationGE Enterprise Solutions. Digital Energy
GE Enterprise Solutions Digital Energy g Digital Energy we protect and connect the world s critical equipment to ensure safe, reliable power Our strength lies in the innovative people who deliver solutions
More informationPLC 22 WETLANDS & NITRIFYING BIO TOWERS SCADA SYSTEM OPERATION MANUAL. Revision 1.0 May 30, 2006
PLC 22 WETLANDS & NITRIFYING BIO TOWERS SCADA SYSTEM OPERATION MANUAL Revision 1.0 May 30, 2006 PLC 22 WETLANDS & NITRIFYING BIO TOWERS SCADA SYSTEM OPERATION MANUAL Revision 1.0 May 30, 2006 Table of
More informationMinutes - Standing Policy Committee on Finance - April 9, 2015 REPORTS
Minutes - Standing Policy Committee on Finance - April 9, 2015 REPORTS Item No. 4 Water Supervisory Control and Data Acquisition (SCADA) Upgrade Financial Status Report No. 1 for the Period from November
More informationDesigning a new IEC substation architecture
Designing a new IEC 61850 substation architecture Gerrit Dogger Senior Product and Application Specialist Cooper Power Systems gerrit.dogger@cybectec.com Garry Tennese Station Integration Specialist Manitoba
More informationNew concept in automation: epac. November 2015
New concept in automation: epac November 2015 21 st century megatrends are significantly changing the industrial world Connectivi ty Safety and Security Agility Scarcity of Resources 2 Connectivity 50
More informationThe Connected Water Plant. Immediate Value. Long-Term Flexibility.
The Connected Water Plant Immediate Value. Long-Term Flexibility. The Water Industry is Evolving Reliable, safe and affordable access to water is not solely on the minds of water and wastewater managers.
More informationReinventing the Role of the SCADA Historian
Reinventing the Role of the SCADA Historian Distributed Redundancy, Centralized Access Standards Certification Education & Training Publishing Conferences & Exhibits Speakers: Blair Sooley, M. B. A., P.
More informationINDUSTRIAL CONTROL SYSTEMS & COMPUTER PROCESS CONTROL
1 INDUSTRIAL CONTROL SYSTEMS & COMPUTER PROCESS CONTROL INDUSTRIAL CONTROL - DEFINED The automatic regulation of unit operations and their associated equipment as well as the integration and coordination
More informationCentralized Control System Architecture
Centralized Control System Architecture Standards Certification Education & Training Publishing Conferences & Exhibits Speakers: Hassan Ajami, PE CAP Anil Gosine 2016 ISA Water / Wastewater and Automatic
More informationCity of Detroit PlantPAx Process Library and WWW Accelerator Toolkit Save $ for Integrator and City of Detroit
Copyright 2012 Rockwell Automation, Inc. Inc. All All rights rights reserved. reserved. City of Detroit PlantPAx Process Library and WWW Accelerator Toolkit Save $ for Integrator and City of Detroit Hassan
More informationSCADA. Features and Benefits for Small to Medium Sized Communities. Presented by: Rick Alvarez
SCADA Features and Benefits for Small to Medium Sized Communities Presented by: Rick Alvarez What is SCADA? Why do you need it? What types of SCADA are available? What communication options are available?
More informationT66 Central Utility Building (CUB) Control System Reliability, Optimization & Demand Management
T66 Central Utility Building (CUB) Control System Reliability, Optimization & Demand Management Name Doug Demian Title Application Engineer Date November 7 & 8, 2012 Rev 5058-CO900C Copyright 2012 Rockwell
More informationMOSCAD WIRELESS MONITORING AND CONTROL SOLUTIONS FOR THE WATER/WASTEWATER INDUSTRY
MOSCAD WIRELESS MONITORING AND CONTROL SOLUTIONS FOR THE WATER/WASTEWATER INDUSTRY MOSCAD is a product born of Motorola s 60-year commitment to cutting edge technology. This quest for communications of
More informationOPTIMIZED AND RELIABLE AUTOMATION AND CONTROL, ELECTRICAL DISTRIBUTION SYSTEMS HELP SUPPLY AWARD-WINNING DRINKING WATER
Schneider Electric Award-Winning Water: CLCJAWA Case Study April 3, 2007 OPTIMIZED AND RELIABLE AUTOMATION AND CONTROL, ELECTRICAL DISTRIBUTION SYSTEMS HELP SUPPLY AWARD-WINNING DRINKING WATER by Grant
More informationUSERS CONFERENCE Copyright 2016 OSIsoft, LLC
HRSD - Bringing Time and Space Together for Operational Awareness in Waste Water Presented by Kimberly Peterson, Data Analysis Manager, HRSD Clay Wise, Chief of IT Operations & Support, HRSD Agenda Outline
More informationCity Council Agenda Memo
City Council Agenda Memo City Council TO: David A. Vela, Interim City Manager Meeting Date: March 26, 2015 FROM: SUBJECT: Tommy O Brien, Director of Water Utilities Award of Bid to Cardinal Contractors
More informationData Diode Cybersecurity Implementation Protects SCADA Network and Facilitates Transfer of Operations Information to Business Users
Data Diode Cybersecurity Implementation Protects SCADA Network and Facilitates Transfer of Operations Information to Business Users Standards Certification Education & Training Publishing Conferences &
More informationWater Treatment >>> Core Business B
Water Treatment >>> Core Business B Siu Ho Wan Backup Telemetry System Davenham Engineering Limited Use Allen Bradley PLC 5 w/controlnet capability (~300 I/O) Provide the newest available communication
More information. SECTION SUPERVISORY CONTROL AND DATA ACQUISITION SYSTEM
. SECTION 13380 - SUPERVISORY CONTROL AND DATA ACQUISITION SYSTEM PART 1 - GENERAL 1.01 WORK OF THIS SECTION A. The CONTRACTOR shall furnish, install, configure, program, test and put into operation the
More informationPLC 24 FERRIC CHLORIDE AND POLYMER SYSTEM SCADA SYSTEM OPERATION MANUAL. Revision 1.0 May 3, 2006
PLC 24 FERRIC CHLORIDE AND POLYMER SYSTEM SCADA SYSTEM OPERATION MANUAL Revision 1.0 May 3, 2006 PLC 24 FERRIC CHLORIDE AND POLYMER SYSTEM SCADA SYSTEM OPERATION MANUAL Revision 1.0 May 3, 2006 Table of
More informationBy Raymond Grosch Senior System Analyst IntelliSys Inc.
IntelliSys Inc. White Paper 09 W. Washington Chicago, IL 60606 800.7.9977 www.intellisyssoftware.com Keywords: SystemVIEW, process visualization, SCADA (Supervisory Control And Data Acquisition), HMI (Human
More informationSCADA Solutions Since 1981 DATA FLOW SYSTEMS
SCADA Solutions Since 1981 DATA FLOW SYSTEMS SCADA System Overview SCADA SYSTEM SECURITY The HT3 SCADA Software program is password protected to prevent unauthorized access to the system. All passwords
More informationSCADA Network & Data Redundancy at Guelph Water
SCADA Network & Data Redundancy at Guelph Water Ensuring Security of Supply for Operations and Compliance Graham Nasby Water SCADA & Security Specialist, Guelph Water Services Derek Wong Principal Consultant,
More informationService Plan for Infrastructure Engineering
Service Plan for Infrastructure 2016-2019 Capital Regional District Date submitted: Revised: August 14, 2017 Table of Contents 1 Overview... 1 1.1 Division & Service Summary... 1 1.2 Organization Chart...
More informationSCADA Solutions for Water and Wastewater Treatment Plants
SCADA Solutions for Water and Wastewater Treatment Plants Features Centralized control Increased reliability Improved management of treatment processes Reduced costs Preserved equipment investments Flexible
More informationFLORIDA STATE UNIVERSITY MASTER PLAN 10 Utilities
UTILITIES ELEMENT NOTE: Unless otherwise noted, the goals, objectives and policies contained in this element shall guide development of the Main Campus and Southwest Campus in Tallahassee as well as the
More informationMinimum Support Needed for a Reliable SCADA System
Minimum Support Needed for a Reliable SCADA System Speaker Bio Jeff Miller, PE, ISI ENV SP Dewberry Automation Manager MEP Service Line Raleigh, NC 22 years experience in Electrical / Instrumentation &
More informationProject Profiles. Refinery & Chemical Systems
Project Profiles Refinery & Chemical s Able-Baker Automation, Inc. P.O. Box 6368 Moraga, CA 94570 (USA) 1-510-601-9396 Fax: 1-510-601-9398 1-877-444-ABLE (2253) Home Page: www.able-baker.com Titanium Dioxide
More informationPLC Training - Intermediate
PLC Training - Intermediate Contact us Today for a FREE quotation to deliver this course at your company?s location. https://www.electricityforum.com/onsite-training-rfq This Intermediate PLC Training
More information2. Volume II, paragraph 1.2.2: Replace the following first paragraph and Table 1-4: Table 1-4: Number of GWA/SCADA Upgraded Facilities
2. Volume II, paragraph 1.2.2: Replace the following first paragraph and Table 1-4: GWA has a few facilities upgraded with supervisory control and data acquisition systems and are presently operating as
More informationServer/ Engineering Station. Filed Instrument. Filed Instrument. Filed Instrument. Switches. Fig1: Scheme for micro PLC to Master PLC Interface
PC Micro PLC HMI HMI Master PLC Server/ Engineering Station Filed Instrument Switches Filed Instrument Filed Instrument Fig1: Scheme for micro PLC to Master PLC Interface PC Historian Server Communication
More informationUse Case: Data Diode Cybersecurity Implementation Protects Water Utility OT Network
Use Case: Data Diode Cybersecurity Implementation Protects Water Utility OT Network Four Step Process to Network Cybersecurity & Providing Remote User/Data Access Standards Certification Education & Training
More informationHow ISA Technical Divisions Benefited my Career
How ISA Technical Divisions Benefited my Career also known as. Introduction to ISA Technical Divisions Standards Certification Education & Training Publishing Conferences & Exhibits Speaker: Graham Nasby
More informationPLC 4 PRIMARY SEDIMENTATION SYSTEM SCADA SYSTEM OPERATION MANUAL. Revision 1.0 May 15, 2006
PLC 4 PRIMARY SEDIMENTATION SYSTEM SCADA SYSTEM OPERATION MANUAL Revision 1.0 May 15, 2006 PLC 4 PRIMARY SEDIMENTATION SYSTEM SCADA SYSTEM OPERATION MANUAL Revision 1.0 May 15, 2006 Table of Contents 1
More informationModicon M580 MUCH MORE than a PLC. the first epac!
Modicon M580 MUCH MORE than a PLC the first epac! The new Modicon M580 is MUCH MORE than a simple PAC it is the epac with Ethernet built right into its core. Developed on the back of our latest innovations
More informationSCADA System Failure Impact Study at Lorne Park and Lakeview WTPs
SCADA System Failure Impact Study at Lorne Park and Lakeview WTPs OWWA Conference 2014 May 5 th London, ON Shawn Xiong - Cole Engineering Jeff Hennings, Jason Little, Claudio Cuffolo - Region of Peel Dale
More informationLowering Lifecycle Costs
Lowering Lifecycle Costs with Intelligent Motor Control Centers Standards Certification Education & Training Publishing Conferences & Exhibits Speakers: Presented and Authored by Jeff M. Miller, PE, ENV
More informationUtility System Infrastructure
Utility System Infrastructure THE COLLEGE OF 2015 Campus Master Plan WILLIAM & MARY SUPPORTING DOCUMENTATION TABLE OF CONTENTS 3 4 4 4 4 5 Electrical Utility Infrastructure Emergency Power Generators
More informationVirtualized PlantPAx System adds Process Flexibility
Virtualized PlantPAx System adds Process Flexibility Jeff Moore Sr. Electrical Engineer Gallus BioPharmaceuticals Steven Schneebeli Lead Systems Engineer Malisko Engineering, Inc. Copyright 2012 Rockwell
More informationA Long and Successful Public-Private Partnership. Town of Gilbert AZ and Severn Trent Services
A Long and Successful Public-Private Partnership Town of Gilbert AZ and Severn Trent Services 9 October 2012 ICMA Annual Conference Solutions Track Presented by: Patrick Banger and Martin Kane Our discussion
More informationCity of Oxnard. Public Works Integrated Master Plan WATER PROJECT MEMORANDUM 2.8 SCADA ASSESSMENT. FINAL DRAFT December 2015
This document is released for the purpose of information exchange review and planning only under the authority of Hugh Steve McDonald, December 2015, State of California, PE No. 44074 and Tracy Anne Clinton,
More informationSCADA System Specification. Vantage Pipeline Project # May 2013
SCADA System Specification Vantage Pipeline Project #201011 May 2013 Revision 0 Issued for Approval May 24, 2013 TABLE OF CONTENTS REVISION HISTORY:...2 1 PROJECT OVERVIEW...3 2 SCOPE AND PURPOSE...4 3
More informationLeveraging Real-time Data for Intelligent, Utility Management
Leveraging Real-time Data for Intelligent, Utility Management 16 th Canadian National Conference on Drinking Water October 20, 2014, Gatineau, QC Presented by: Gary Wong, OSIsoft, LLC. 2014 ISA Water /
More informationObject Oriented SCADA
Object Oriented SCADA Nate Powell PE Custom Controls Unlimited Inc. Robert Shull PE CAP Custom Controls Unlimited Inc. 2017 ISA Water/Wastewater and Automatic Controls Division Symposium (WWAC) photocopying,
More informationHMI Development. Techniques for Reduction of Development Time. Speakers: Lucas Jordan, PE
HMI Development Techniques for Reduction of Development Time Standards Certification Education & Training Publishing Conferences & Exhibits Speakers: Lucas Jordan, PE 2014 ISA Water / Wastewater and Automatic
More informationTelemetry & SCADA Solutions in the Water Industry. Presented by: Amir Amini, Business Development Manager, Process Automation, EMEA
Telemetry & SCADA Solutions in the Water Industry Presented by: Amir Amini, Business Development Manager, Process Automation, EMEA +34% Growingworld population +40% World population living under water
More informationIE102: SCADA Programming, Maintenance & Troubleshooting
IE102: SCADA Programming, Maintenance & Troubleshooting IE102 Rev.001 CMCT COURSE OUTLINE Page 1 of 5 Training Description: This course is designed to provide a thorough understanding of the fundamental
More informationCampus Electrical System Renewal, Reliability & Safety Presented by Andrew Hay, PE
Campus Electrical System Renewal, Reliability & Safety Presented by Andrew Hay, PE Campus Electrical System Renewal, Reliability & Safety Presented by Andrew Hay, PE Key Factors of Resilient Electrical
More informationDevelopment Of EMCS In Power Plants
Development Of EMCS In Power Plants Eng. H.S.Mohamed, Dr. S.A.Nagy,Dr. S.K.EL-Sayed Dept. of Electrical Engineering Al-Azhar University Cairo, Egypt h_alazhary@yahoo.com Abstract Recently improvement of
More informationPower System Network Simulator (PSNsim)
The PSNsim is hardware simulator that simulates all parts of power system from generation to utilization. The PSNsim is a scaled down model of the real power system that provides an experimental environment
More informationAutomation Intelligence Enlighten your automation mind..!
Friends, It brings us immense pleasure to introduce Automation intelligence a knowledge series about automation, innovation, solutions & Technology. This series will discuss about PLC, DCS, Drives, SCADA,
More informationAGENDA ITEM EXECUTIVE SUMMARY
202 AGENDA ITEM EXECUTIVE SUMMARY Agenda Item: Presenter & Title: Wastewater Treatment Plant SCADA System and Fiber Optic Communication System Upgrades Richard Babica, Director of Public Works Date: May
More informationReport. Diemer Plant Improvements Program Audit Report. Internal Audit Report for January 2011
Report Office of the General Auditor January 31, 2011 Internal Audit Report for January 2011 Summary Three reports were issued during the month: Diemer Plant Improvements Program Audit Report Business
More information18.0 CONTROLS PLATFORM AND AUTOMATION
SEWPCC Upgrading/Expansion Conceptual Design Report SECTION 18 - Table of Contents 18.0 CONTROLS PLATFORM AND AUTOMATION...18.1 18.1 INTRODUCTION...18.1 18.2 SYSTEM INFORMATION...18.1 18.3 FUNCTIONAL REQUIREMENTS
More informationSDG&E s Accomplishments and Future Plans
SDG&E s Accomplishments and Future Plans Tariq Raman and Subbu Sankaran San Diego Gas & Electric Work Group Meeting October 23-24, 2018 San Diego Gas & Electric San Francisco SDG&E Los Angeles San Diego
More informationPLC 5 BIOTOWERS SCADA SYSTEM OPERATION MANUAL. Revision 1.0 May 15, 2006
PLC 5 BIOTOWERS SCADA SYSTEM OPERATION MANUAL Revision 1.0 May 15, 2006 PLC 5 BIOTOWERS SCADA SYSTEM OPERATION MANUAL Revision 1.0 May 15, 2006 Table of Contents 1 Introduction... 4 2 Revision History...
More informationAirfield Lighting Control System
Airfield Lighting Control System ALCS Style 2 ALCS Style 3 Reference to Standards ICAO: Annex 14, Volume I, current edition Aerodrome Design Manual, Part 5 FAA: AC 150/5345-56 (current edition) L-890 Airfield
More informationSecure Water Treatment (SWaT) Testbed
Secure Water Treatment (SWaT) Testbed Version: 4.2 Last updated: 5 October 2018 Contact information: itrust@sutd.edu.sg Website: https://itrust.sutd.edu.sg/ INTRODUCTION Aim This documentation provides
More informationREPORT TO COUNCIL City of Sacramento
REPORT TO COUNCIL City of Sacramento 915 I Street, Sacramento, CA 95814-2604 www. CityofSacramento.org 14 Consent November 10, 2009 Honorable Mayor and Members of the City Council Agreement: Supervisory
More informationAdvances in Telemetry. Finding out what is really going on in your system
Advances in Telemetry { Finding out what is really going on in your system Dr. David Mundie President of High Tide Technologies Involved in telemetry design for over 30 years Space, Air and Ground Telemetry
More informationCybersecurity. Can Standards Bring Clarity from the Confusion? Speaker: David Doggett
Cybersecurity Can Standards Bring Clarity from the Confusion? Standards Certification Education & Training Publishing Conferences & Exhibits Speaker: David Doggett 2014 ISA Water / Wastewater and Automatic
More informationRequest for Proposals For WWTP SCADA Upgrade CIP 74121
For WWTP SCADA Upgrade CIP 74121 By the City of Tracy December 12, 2017 Response Due: Wednesday, January 17, 2018 @ 3:00 PM City of Tracy Utilities Department Attention: Ripon Bhatia 3900 Holly Drive Tracy,
More informationOil, Gas, Power Plant & Others>>> Core Business D
Oil, Gas, Power Plant & Others>>> Core Business D China Light & Power Waste Water Management System Siemens Limited Use Hot Standby Siemens PLC processors (~ 1000 I/O) Provide dual link communication by
More informationCommittee on Water and Task Force on Innovation
Committee on Water and Task Force on Innovation Using IIoT to Drive Business Insights John Kuchmek American Water Krishna Kumar App Orchid WHO WE ARE We are the largest and most geographically diverse
More informationSCADA Security at. City of Guelph Water Services
SCADA Security at City of Guelph Water Services Graham Nasby, P.Eng., PMP, CAP Water SCADA & Security Specialist City of Guelph Water Services 1 1 Rationale Our Reliance on SCADA for Operations & Compliance
More informationFIGURE 1. Five Logical Levels of a SCADA System
SCADA AND TELEMETRY IN NATURAL GAS OPERATIONS Russel W. Treat EnerSys Corporation Introduction SCADA systems provide are combinations of field devices, communications infrastructure and software integrated
More informationSubstation SCADA Monitoring
Substation SCADA Monitoring Contact us Today for a FREE quotation to deliver this course at your company?s location. https://www.electricityforum.com/onsite-training-rfq Substations are a critical component
More informationDECEMBER 11, PLC-Based Waste Water Lift Station with Demo Box. by Lance McParlan Advisor & Instructor: Paul Lin. Outline
DECEMBER 11, 2015 PLC-Based Waste Water Lift Station with Demo Box by Lance McParlan Advisor & Instructor: Paul Lin Outline This presentation will cover: What a Lift Station is Why they are being upgraded
More informationHPP Kidatu (4x50 MW) - Control System Upgrade AUTOMATION
HPP Kidatu (4x50 MW) - Control System Upgrade AUTOMATION Location - Plant - End User About Location Kidatu is a town in southern Tanzania, located in Kilombero district, Morogoro region. The local population
More information1/22/2014. Introduction to IT Networking for Facilities Managment. Overview. Overview
Introduction to IT Networking for Facilities Managment Roberto Del Real, P.E. Control Systems Manager University of Texas at Austin Overview Introduction to UT Austin Understanding basic network structure
More informationPart 1 SCADA Technology Update
Part 1 SCADA Technology Update 2015 Joint Annual Meeting West Virginia AWWA West Virginia WEA Mark Place John P. Place, Inc. mplace@johnplaceinc.com Brief Historical Overview of SCADA Landmarks (Supervisory
More informationIndustrial Wide-temperature UPS Systems Increase Wastewater Facility Reliability and Lower Maintenance Costs
3Sixty Mission Critical www.3sixtymc.com Industrial Wide-temperature UPS Systems Increase Wastewater Facility Reliability and Lower Maintenance Costs Industrial Wide-temperature UPS Systems Increase Wastewater
More informationWind Plant Systems Grid Integration Plant and Turbine Controls SCADA
GE Energy Wind Plant Systems Grid Integration Plant and Turbine Controls SCADA Mahesh Morjaria Manager, Wind Plant Systems Platform Adopted for Wind Power Management class http://www.icaen.uiowa.edu/ edu/~ie_155/
More informationGeneration Interconnection Impact Study Report. For. Interconnection Customer Q0022
Generation Interconnection Impact Study Report For Interconnection Customer Q0022 Prepared by: PacifiCorp Date: 10/29/2003 Generation Interconnection System Impact Study Report Interconnection Customer
More informationSMART SENSORS. Water quality sensors with built in digital & analog microtransmitters
SMART SENSORS Water quality sensors with built in digital & analog microtransmitters WHAT IS A SMART SENSOR? Electrochemical water quality sensors, like the ones we make at Sensorex, detect the concentrations
More informationIndustry Standards Utilities Engineering Technician
Industry Standards Utilities Engineering Technician Utilities engineering technicians create and test technological equipment for consumer and commercial use. In the utilities industry, engineering technicians
More informationMaster Metering Using Your SCADA System
0 1 0 1 1 0 10 1 1 0 1 0 0 1 0 COPYRIGHT SCADAMETRICS Master Metering Using Your SCADA System Jim Mimlitz SCADAmetrics Why Integrate Master Meter Data Into The SCADA System? Track Distribution System Flows
More informationDesign of Coal Mine Power Supply Monitoring System
2nd International Conference on Electronics, Network and Computer Engineering (ICENCE 2016) Design of Coal Mine Power Supply Monitoring System Lei Shi 1, Guo Jin 2 and Jun Xu 3 1 2 Department of electronic
More informationENGINEERING AND SERVICES FIRM THAT SPECIALIZES IN HYDROELECTRIC POWER AND CONTROL SYSTEM DESIGN, OUR TEAM OF PROFESSIONALS HAVE WORKED TOGETHER
smallhydro PRIME ENGINEERING LIMITED IS AN ELECTRICAL ENGINEERING AND SERVICES FIRM THAT SPECIALIZES IN HYDROELECTRIC POWER AND CONTROL SYSTEM DESIGN, IMPLEMENTATION AND MAINTENANCE. OUR TEAM OF PROFESSIONALS
More informationT52: Case Study: How FactoryTalk Products Created Success. Steve Marino Ryan Campbell Jeremy Hammons
T52: Case Study: How FactoryTalk Products Created Success Steve Marino Ryan Campbell Jeremy Hammons Copyright 2011 Rockwell Automation, Inc. All rights reserved. Copyright 2011 Rockwell Automation, Inc.
More informationMeasuring and Managing a Data Center Cooling Shutdown
Measuring and Managing a Data Center Cooling Shutdown Columbia University Information Technology - August 24, 2012 Table of Contents Overview Timeline Cricket Graphs What s being graphed Mechanical Electrical
More information