DISTRIBUTION OF QUANTITIES
|
|
- Liliana Lawrence
- 5 years ago
- Views:
Transcription
1 DISTRIBUTION OF QUANTITIES
2 Index: 1 Table of Contents - Distribution of Quantities R.I. Contract CB-109 Description Page REMOVE AND DISPOSE SIDEWALKS REMOVE AND DISPOSE PAVEMENT AND RIGID BASE REMOVE AND STOCKPILE ON SITE GRANITE CURB REMOVE AND DISPOSE DIRECTIONAL, WARNING, REGULATORY, 1 SERVICE, AND STREET SIGNS REMOVE AND DISPOSE CONDUIT - ALL SIZES EARTH EXCAVATION STRUCTURAL EXCAVATION EARTH PERVIOUS FILL TRIMMING AND FINE GRADING SAND BAG EROSION DIKE STANDARD INLET PROTECTION CLEANING AND MAINTENANCE OF EROSION CONTROLS CRUSHED STONE OR CRUSHED GRAVEL BASE MODIFIED GRAVEL BORROW SUBBASE COURSE CLASS 19.0 HMA CLASS 12.5 HMA ASPHALT EMULSION TACK COAT CLEANING AND FLUSHING PIPE ALL SIZES CLEANING CATCH BASINS ALL TYPES AND SIZES PARTIAL REMOVAL AND DISPOSAL OF EXISTING CONCRETE MASONRY CONCRETE SUBSTRUCTURE CLASS HP 3/4'' WALL STEMS CONCRETE SUBSTRUCTURE CLASS HP 3/4'' PIERS, COL, CAP FIBER WRAP BRIDGE 577 PIER 1 FOR STRENGHTENING FIBER WRAP BRIDGE 577 PIER 1 FOR PROTECTION GALVANIZED BAR REINFORCEMENT GRADE REPAIRS TO STRUCTURAL CONCRETE MASONRY (PNEUMATIC MORTAR) REPAIRS TO STRUCTURAL CONCRETE MASONRY (PATCHING MORTAR) REPAIRS TO STRUCTURAL CONCRETE MASONSRY FORM AND CAST IN 6 PLACE DRILL AND GROUT REINFORCING DOWELS ADHESIVE ANCHOR FOR DOWEL BARS (1-1/4") CONCRETE SURFACE TREATMENT (PROTECTIVE COATING) TEMPORARY JACKING AND SHORING OF BEAMS BRIDGE 579 PIER TEMPORARY JACKING AND SHORING OF BEAMS BRIDGE 579 PIER TEMPORARY JACKING AND SHORING OF BEAMS BRIDGE 583 PIER TEMPORARY JACKING AND SHORING OF BEAMS BRIDGE 583 PIER REMOVE STOCKPILE AND REINSTALL 4 BAR RAIL STRUCTURAL CONCRETE CRACK REPAIR BY EPOXY-RESIN BASE 8 ADHESIVE INJECTION TEMPORARY CHAIN LINK FENCE TEMPORARY CHAIN LINK GATE REMOVE AND RESET FENCE AND/OR RAILING CHAIN LINK PORTLAND CEMENT SIDEWALK MONOLITHIC STANDARD GRANITE CURB PROVIDENCE STANDARD 7" STRAIGHT REMOVE, HANDLE, HAUL TRIM RESET CURB EDGING, STRAIGHT, 9 CIRCULAR ALL TYPES '-0" GRANITE TRANSITION CURB STANDARD MODIFIED, 7" 9 WIDTH GRANITE WHEELCHAIR RAMP TRANSITION CURB MODIFIED, 7" WIDTH GRANITE RAMP STONE STRAIGHT STANDARD MODIFIED, 7" 10 WIDTH FLAGPERSONS FLAGPERSONS - OVERTIME 10
3 Index: 2 Table of Contents - Distribution of Quantities R.I. Contract CB-109 Description Page NARROW CONDITION IMPACT ATTENUATOR FOR TRAFFIC CONTROL PLACED STONE RIPRAP R-3, R-4, R-5 STANDARD TEMPORARY CONSTRUCTION SIGNS STANDARD AND DRUM BARRICADE STANDARD PLASTIC PIPE BARRICADE STANDARD FLUORESCENT TRAFFIC CONES STANDARD ANCHORED SINGLE-FACE PRECAST CONCRETE BARRIER FOR 12 TEMPORARY TRAFFIC CONTROL SHADOW OR ADVANCED WARNING VEHICLE WITH IMPACT ATTENUATOR 12 AND FLASHING ARROW BOARD OR CHANGEABLE MESSAGE SIGN FIELD OFFICE FULL DEPTH SAWCUT OF BITUMINOUS PAVEMENT AND RIGID BASE FULL DEPTH SAWCUT OF PORTLAND CEMENT CONCRETE 13 SIDEWALK/DRIVEWAY MOBILIZATION MAINTENANCE AND MOVEMENT TRAFFIC PROTECTION DETECTABLE WARNING PANEL STANDARD T '2' STRANDED COPPER CONDUCTOR 600V INSULATION 13 T '6' STRANDED COPPER CONDUCTOR 600V INSULATION 14 T '10' STRANDED COPPER CONDUCTOR 600V INSULATION 14 T IN-LINE FUSED DISCONNECT DEVICE WITH FUSE WEATHERPROOF 14 T IN-LINE UNFUSED DISCONNECT DEVICE 14 T SPLICE KIT 15 T PRECAST TYPE A HANDHOLE STANDARD T ADJUST HANDHOLE TO GRADE 15 T INCH SCHEDULE 40 POLYVINYL CHLORIDE PLASTIC CONDUIT - 15 UNDERGROUND T REMOVE AND RELOCATE LIGHT STANDARD 15 T LIGHT STANDARD FOUNDATION WITH ANCHOR BOLTS STANDARD T ORNAMENTAL POLE/LUMINAIRE - REMOVAL, TEMPORARY 16 INSTALLATION PERMANENT & RE-INSTALLATION T DIRECTIONAL REGULATORY AND WARNING SIGNS 16 T REMOVE EXISTING PAVEMENT MARKINGS 16 T REMOVE EXISTING PAVEMENT MARKINGS 16 T INCH EPOXY RESIN PAVEMENT MARKINGS WHITE 17 T INCH EPOXY RESIN PAVEMENT MARKINGS WHITE 17 T INCH EPOXY RESIN PAVEMENT MARKINGS YELLOW 17 T EPOXY RESIN PAVEMENT ARROW - STRAIGHT, LEFT, RIGHT, OR 17 COMBINED STANDARD T EPOXY RESIN PAVEMENT MARKING WORD "ONLY" STANDARD T INCH TEMPORARY EPOXY RESIN PAVEMENT MARKINGS WHITE 18 T TEMPORARY EPOXY RESIN PAVEMENT MARKING - YIELD LINE SYMBOL 18 T INCH TEMPORARY EPOXY RESIN PAVEMENT MARKINGS YELLOW 18
4 Page 1 of 18 R.I. Contract CB-109 Description UM Qty. Pay REMOVE AND DISPOSE SIDEWALKS SY SIDEWALK NEAR PIER Total: REMOVE AND DISPOSE PAVEMENT AND SY RIGID BASE PROMENADE STREET PROVIDENCE PLACE Total: REMOVE AND STOCKPILE ON SITE LF GRANITE CURB PROVIDENCE PLACE Total: REMOVE AND DISPOSE DIRECTIONAL, EACH WARNING, REGULATORY, SERVICE, AND STREET SIGNS PROVIDENCE PLACE Total: REMOVE AND DISPOSE CONDUIT - ALL LF SIZES PROMENADE & PROVIDENCE PLACE Total: EARTH EXCAVATION CY
5 Page 2 of 18 R.I. Contract CB-109 Description UM Qty. Pay Cont. PROMENADE STREET - ROADWAY PROMENADE STREET - SIDEWALK PROVIDENCE PLACE - ROADWAY PROVIDENCE PLACE - SIDEWALK Total: STRUCTURAL EXCAVATION EARTH CY PIER PIER Total: PERVIOUS FILL CY PROMENADE STREET PROVIDENCE PLACE Total: TRIMMING AND FINE GRADING SY PROMENADE STREET - ROADWAY PROMENADE STREET - SIDEWALK PROVIDENCE PLACE - ROADWAY PROVIDENCE PLACE - SIDEWALK Total: SAND BAG EROSION DIKE STANDARD PBAG NEAR PIER 5 SHORING TOWER NEAR PIER 6 SHORING Total:
6 Page 3 of 18 R.I. Contract CB-109 Description UM Qty. Pay INLET PROTECTION EACH PROMENADE STREET - EAST PROVIDENCE PLACE - WEST Total: CLEANING AND MAINTENANCE OF LS EROSION CONTROLS Total: CRUSHED STONE OR CRUSHED GRAVEL CY BASE MODIFIED PROMENADE STREET - BETWEEN RAIL & WALL AREA PROMENADE STREET - SIDEWALK Total: GRAVEL BORROW SUBBASE COURSE CY PROMENADE STREET - ROADWAY PROMENADE STREET - SIDEWALK PROVIDENCE PLACE - ROADWAY PROVIDENCE PLACE - SIDEWALK Total: CLASS 19.0 HMA TON PROMENADE STREET PROVIDENCE PLACE Total: 10.00
7 Page 4 of 18 R.I. Contract CB-109 Description UM Qty. Pay CLASS 12.5 HMA TON PROMENADE STREET PROVIDENCE PLACE Total: ASPHALT EMULSION TACK COAT SY PROMENADE STREET PROVIDENCE PLACE Total: CLEANING AND FLUSHING PIPE ALL LF SIZES PROMENADE STREET - CB TO CB PROMENADE STREET - CB TO MH PROMENADE STREET - MH TO RIVER PROVIDENCE PLACE - CB TO RIVER Total: CLEANING CATCH BASINS ALL TYPES EACH AND SIZES PROMENADE STREET PROVIDENCE PLACE Total: PARTIAL REMOVAL AND DISPOSAL OF CY EXISTING CONCRETE MASONRY
8 Page 5 of 18 R.I. Contract CB-109 Description UM Qty. Pay Cont. BRIDGE NO 579 PIER 3, EAST CANTILEVER PIER 6, FULL PIER WALL NEAR PIER Total: CONCRETE SUBSTRUCTURE CLASS HP CY 3/4'' WALL STEMS BRIDGE 583 RETAINING WALLS AT PROMENADE AND PROV PLACE Total: CONCRETE SUBSTRUCTURE CLASS HP CY 3/4'' PIERS, COL, CAP BRIDGE NO 579 PIER 3, EAST CANTILEVER PIER 6, FULL PIER Total: FIBER WRAP BRIDGE 577 PIER 1 FOR SF STRENGHTENING BRIDGE NO 577 PIER Total: FIBER WRAP BRIDGE 577 PIER 1 FOR SF PROTECTION BRIDGE NO 577 PIER Total:
9 Page 6 of 18 R.I. Contract CB-109 Description UM Qty. Pay GALVANIZED BAR REINFORCEMENT GRADE LBS 60 BRIDGE NO 579 PIER 3 1, PIER 6 21, WALL 4, Total: 27, REPAIRS TO STRUCTURAL CONCRETE CF MASONRY (PNEUMATIC MORTAR) Total: REPAIRS TO STRUCTURAL CONCRETE CF MASONRY (PATCHING MORTAR) Total: REPAIRS TO STRUCTURAL CONCRETE CF MASONSRY FORM AND CAST IN PLACE Total: DRILL AND GROUT REINFORCING DOWELS EACH BRIDGE NO 579 PIER 3, EAST CANTILEVER PIER 6, EAST COLUMN Total: ADHESIVE ANCHOR FOR DOWEL BARS EACH
10 Page 7 of 18 R.I. Contract CB-109 Description UM Qty. Pay Cont. (1-1/4") BRIDGE NO 579 PIER Total: CONCRETE SURFACE TREATMENT SF (PROTECTIVE COATING) BRIDGE NO 579 PIER PIER Total: TEMPORARY JACKING AND SHORING OF LS BEAMS BRIDGE 579 PIER 3 BRIDGE NO 579 PIER Total: TEMPORARY JACKING AND SHORING OF LS BEAMS BRIDGE 579 PIER 6 BRIDGE 579 PIER Total: TEMPORARY JACKING AND SHORING OF LS BEAMS BRIDGE 583 PIER 5 BRIDGE 583 PIER Total: TEMPORARY JACKING AND SHORING OF ACRE BEAMS BRIDGE 583 PIER 6
11 Page 8 of 18 R.I. Contract CB-109 Description UM Qty. Pay Cont. PIER Total: REMOVE STOCKPILE AND REINSTALL 4 LF BAR RAIL PROMENADE PROVIDENCE PLACE Total: STRUCTURAL CONCRETE CRACK REPAIR LF BY EPOXY-RESIN BASE ADHESIVE INJECTION BRIDGE NO Total: TEMPORARY CHAIN LINK FENCE LF BRIDGE NO 577 UNDER BRIDGE NO PHASE PHASE Total: TEMPORARY CHAIN LINK GATE EACH BRIDGE NO 577 UNDER BRIDGE NO PHASE PHASE Total: 3.00
12 Page 9 of 18 R.I. Contract CB-109 Description UM Qty. Pay REMOVE AND RESET FENCE AND/OR LF RAILING CHAIN LINK BRIDGE NO 577 UNDER BRIDGE NO Total: PORTLAND CEMENT SIDEWALK CY MONOLITHIC STANDARD PROVIDENCE PLACE - SIDEWALK PROVIDENCE PLACE - WCR Total: GRANITE CURB PROVIDENCE STANDARD LF 7" STRAIGHT PROVIDENCE PLACE Total: REMOVE, HANDLE, HAUL TRIM RESET LF CURB EDGING, STRAIGHT, CIRCULAR ALL TYPES PROMENADE STREET PROVIDENCE PLACE Total: '-0" GRANITE TRANSITION CURB EACH STANDARD MODIFIED, 7" WIDTH PROVIDENCE PLACE Total: 1.00
13 Page 10 of 18 R.I. Contract CB-109 Description UM Qty. Pay GRANITE WHEELCHAIR RAMP TRANSITION EACH CURB MODIFIED, 7" WIDTH PROVIDENCE PLACE Total: GRANITE RAMP STONE STRAIGHT EACH STANDARD MODIFIED, 7" WIDTH PROVIDENCE PLACE Total: FLAGPERSONS MHRS AS NEEDED Total: FLAGPERSONS - OVERTIME MHRS AS NEEDED Total: NARROW CONDITION IMPACT ATTENUATOR EACH FOR TRAFFIC CONTROL AS NEEDED Total: PLACED STONE RIPRAP R-3, R-4, R-5 SY STANDARD NEAR PIER
14 Page 11 of 18 R.I. Contract CB-109 Description UM Qty. Pay Cont Total: TEMPORARY CONSTRUCTION SIGNS SF STANDARD AND AS NEEDED E5-2A (36"x48") G20-2 (36"x18") G20-2 (48"x24") R.I. STANDARD (24"x36") R.I. STANDARD (48"x72") R11-2(MOD) (30"x48") R1-2 (36"x36"x36") R9-11R (24"x18") R9-9 (24"x12") R9-9(MOD) (24"x18") W1-4B (36"x36") W16-7P (12"X24") W20-1 (36"x36") W20-1 (48"x48") W20-5(MOD) (36"x36") W20-5AR (48"x48") W20-5R (48"x48") W3-2 (36"x36") W5-1 (36"x36") W9-2(MOD) (36"x36") Total: DRUM BARRICADE STANDARD BDAY AS NEEDED 2,
15 Page 12 of 18 R.I. Contract CB-109 Description UM Qty. Pay Cont Total: 2, PLASTIC PIPE BARRICADE STANDARD EACH AS NEEDED Total: FLUORESCENT TRAFFIC CONES STANDARD EACH AS NEEDED Total: ANCHORED SINGLE-FACE PRECAST LF CONCRETE BARRIER FOR TEMPORARY TRAFFIC CONTROL PHASE PHASE Total: SHADOW OR ADVANCED WARNING VEHICLE HRS WITH IMPACT ATTENUATOR AND FLASHING ARROW BOARD OR CHANGEABLE MESSAGE SIGN AS NEEDED Total: FIELD OFFICE PMO
16 Page 13 of 18 R.I. Contract CB-109 Description UM Qty. Pay Cont Total: FULL DEPTH SAWCUT OF BITUMINOUS LF PAVEMENT AND RIGID BASE PROMENADE STREET PROVIDENCE PLACE Total: FULL DEPTH SAWCUT OF PORTLAND LF CEMENT CONCRETE SIDEWALK/DRIVEWAY PROVIDENCE PLACE - SIDEWALK Total: MOBILIZATION LS Total: MAINTENANCE AND MOVEMENT TRAFFIC LS PROTECTION Total: DETECTABLE WARNING PANEL STANDARD SF PROVIDENCE PLACE - SIDEWALKS Total: T '2' STRANDED COPPER CONDUCTOR 600V LF
17 Page 14 of 18 R.I. Contract CB-109 Description UM Qty. Pay 063 T Cont. INSULATION PROMENADE PROVIDENCE PLACE T Total: T '6' STRANDED COPPER CONDUCTOR 600V LF INSULATION PROMENADE PROVIDENCE PLACE T Total: T '10' STRANDED COPPER CONDUCTOR LF 600V INSULATION PROMENADE PROVIDENCE PLACE T Total: T IN-LINE FUSED DISCONNECT DEVICE EACH WITH FUSE WEATHERPROOF PROMENADE PROVIDENCE PLACE T Total: T IN-LINE UNFUSED DISCONNECT DEVICE EACH PROMENADE PROVIDENCE PLACE T Total: 8.00
18 Page 15 of 18 R.I. Contract CB-109 Description UM Qty. Pay 068 T SPLICE KIT EACH PROMENADE PROVIDENCE PLACE T Total: T PRECAST TYPE A HANDHOLE STANDARD EACH PROMENADE PROVIDENCE PLACE T Total: T ADJUST HANDHOLE TO GRADE EACH PROVIDENCE PLACE T Total: T INCH SCHEDULE 40 POLYVINYL LF CHLORIDE PLASTIC CONDUIT - UNDERGROUND PROMENADE PROVIDENCE PLACE T Total: T REMOVE AND RELOCATE LIGHT STANDARD EACH PROMENADE PROVIDENCE PLACE T Total: T LIGHT STANDARD FOUNDATION WITH EACH
19 Page 16 of 18 R.I. Contract CB-109 Description UM Qty. Pay 073 T Cont. ANCHOR BOLTS STANDARD PROMENADE & PROVIDENCE PLACE T Total: T ORNAMENTAL POLE/LUMINAIRE - EACH REMOVAL, TEMPORARY INSTALLATION PERMANENT & RE-INSTALLATION PROMENADE & PROVIDENCE PLACE T Total: T DIRECTIONAL REGULATORY AND WARNING SF SIGNS PROVIDENCE PLACE W11-2L (36"X36") X 2 SIGNS W11-2R (36"X36") X 2 SIGNS W16-7PL (24"X12") W16-7PR (24"X12") W16-9P (24"X12") X 2 SIGNS T Total: T REMOVE EXISTING PAVEMENT MARKINGS LF PHASE PHASE 1 REMOVAL 1, PHASE T Total: 1, T REMOVE EXISTING PAVEMENT MARKINGS EACH PHASE PHASE 2 REMOVAL
20 Page 17 of 18 R.I. Contract CB-109 Description UM Qty. Pay 077 T Cont. T Total: T INCH EPOXY RESIN PAVEMENT LF MARKINGS WHITE PHASE PHASE T Total: T INCH EPOXY RESIN PAVEMENT LF MARKINGS WHITE PHASE PROVIDENCE PLACE T Total: T INCH EPOXY RESIN PAVEMENT LF MARKINGS YELLOW PHASE PHASE PROMENADE STREET PROVIDENCE PLACE T Total: T EPOXY RESIN PAVEMENT ARROW - EACH STRAIGHT, LEFT, RIGHT, OR COMBINED STANDARD PHASE T Total: T EPOXY RESIN PAVEMENT MARKING WORD EACH
21 Page 18 of 18 R.I. Contract CB-109 Description UM Qty. Pay 082 T Cont. "ONLY" STANDARD PHASE T Total: T INCH TEMPORARY EPOXY RESIN LF PAVEMENT MARKINGS WHITE PHASE T Total: T TEMPORARY EPOXY RESIN PAVEMENT EACH MARKING - YIELD LINE SYMBOL PHASE T Total: T INCH TEMPORARY EPOXY RESIN LF PAVEMENT MARKINGS YELLOW PHASE T Total:
DISTRIBUTION OF QUANTITIES
DISTRIBUTION OF QUANTITIES Index: 1 Table of Contents - Distribution of Quantities R.I. Contract - 2018-CB-059 Description Page 201.0415 REMOVE AND DISPOSE GUARDRAIL AND POST ALL TYPES 1 201.9901 REMOVE
More informationKarvo Paving Company Hudson Drive Stow, OH Unit Price Labor & Material Total Unit Price Labor Unit Price Material
ITEM SPEC CMS DESCRIPTION QUANTITY Labor Labor Labor 1 201 ODOT CLEARING AND GRUBBBING 1 $13,000.00 $0.00 $13,000.00 $13,000.00 $6,800.00 $10,200.00 $17,000.00 $17,000.00 $75,000.00 $0.00 $75,000.00 $75,000.00
More informationGranite Shoals, TX San Antonio, TX 78251
Water Bid Items 1 226.00 LF (103) Remove Concrete Curb $2.00 $452.00 $1.05 $237.30 $5.00 $1,130.00 $5.00 $1,130.00 2 672.00 SF (103) Remove Sidewalks and Driveways $3.00 $2,016.00 $1.75 $1,176.00 $5.00
More informationGriffin Construction Co Inc. Midwest Contracting, LLC JB Holland Constr. Inc.
ABSTRACT OF BIDS SAP 023-601-027 April 25, 2016 ENGINEER'S ESTIMATE Griffin Construction Co Inc. Midwest Contracting, LLC JB Holland Constr. Inc. Estimated 14070 Hwy 52S 2948 271st Ave. 2092 Hwy 9W Total
More informationTown North Sanitary Sewer Renewal PROJECT NO. WUSR09002 Gra-Tex Utilities, Inc Jackson Construction LTD ARK Conracting Services, LLC Tri-Tech Constru
PROJECT NO. WUSR09002 Gra-Tex Utilities, Inc Jackson Construction LTD ARK Conracting Services, LLC Tri-Tech Constru Bids Opened: Ju uly 19 Arlington, TX Fort Worth, TX Kennedale, TX Kennedale, TX Item
More informationU.S. Trade Connection at Eagle Pass Project Appendix B: Cost Estimate
U.S. Trade Connection at Eagle Pass Project Appendix B: Cost Estimate TIGER FY17 Grant Application October 2017 Appendix B Cost Estimate B-1 FY17 TIGER U.S. Trade Connection at Eagle Project Preliminary
More informationVista del Sol Drive Improvements Bid Date: February 23, 2017 Camino Real Regional Mobility Authority ATKINS NORTH AMERICA
Vista del Sol Drive Improvements Bid Date: February 23, 2017 Camino Real Regional Mobility Authority ATKINS NORTH AMERICA BAIN CONSTRUCTION CMD ENDEAVORS, INC. DAN WILLIAMS JORDAN FOSTER CONSTRUCTION Key
More informationODOT TOTAL LABOR MATERIAL LABOR/MAT'L ITEM NO. DESCRIPTION ITEM QTY. UNIT ONLY ONLY ONLY TOTAL
CITY OF BRECKSVILLE BID TABULATION CARRIAGE HILL DRIVE PUMP STATION ABANDONMENT AND SANITARY IMPROVEMENTS PROJECT NO. 3810-224 BID OPENING: SEPTEMBER 19, 2014 10:00 a.m. Present were: Becki Burlingham,
More informationSAN ANTONIO WATER SYSTEM CENTRAL SEWERSHED PACKAGE 3. SAWS Job No SAWS Solicitation No. CO ADDENDUM NO. 1 September 27, 2017
SAN ANTONIO WATER SYSTEM CENTRAL SEWERSHED PACKAGE 3 SAWS Job No. 17-4528 SAWS Solicitation No. CO-00139 September 27, 2017 To Bidder of Record: This addendum, applicable to work referenced above, is an
More informationCONSTRUCTION & DEVELOPMENT MANUAL SUMTER COUNTY, FLORIDA
CONSTRUCTION & DEVELOPMENT MANUAL SUMTER COUNTY, FLORIDA Original: June 1, 2004 Revised: May 31, 2005 Revised: August 8, 2006 Revised: September 1, 2006 Revised: August 20, 2007 Revised: November 1, 2011
More informationTABLE OF CONTENTS. Section 2.0 GENERAL PLAN REQUIREMENTS 05/2011. Section 100 ROADWAY DESIGN 01/2016
TABLE OF CONTENTS The City Standard Manual was revised in 2010. Please see dates in the revised column for details that have been modified after 2010. PART 1 - DESIGN STANDARDS Section 1.0 ENGINEERING
More informationNEXT Beam Bridge & Innovative Materials. Darren Conboy, PE & David Massenzio, PE
NEXT Beam Bridge & Innovative Materials Darren Conboy, PE & David Massenzio, PE Presentation topics Overview of existing & new bridges MATERIAL / DESIGN ELEMENT HUDSON BRIDGE PROJECT USE 10,000 psi Mix
More informationDIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT
TABLE OF CONTENTS INTRODUCTORY INFORMATION 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Notice to Bidders
More informationChapman Fence Company, Inc. (OC) UNIT PRICE
BID TABULATION Page 1 of 6 SECTION A - GALVANIZED CHAIN LINK FENCE 1 3 tall complete fence installation 10 lf $9.00 $90.00 $9.25 $92.50 $11.15 $111.50 2 4 tall complete fence installation 260 lf $10.72
More informationOTTAWA COUNTY ROAD COMMISSION Bid Comparison
OTTAWA COUNTY ROAD COMMISSION Bid Comparison Contract ID: 481-013-5357 Description: 1.00 mi of road reconstruction Location: Projects(s): Buchanan St - 136th Ave to 128th Ave 481-013-5357 Rank Bidder Total
More informationBID ISSUE DATE: JUNE 2016
July 11, 2016 To All Plan Holders: ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS FOR CHATHAM COUNTY SOLID WASTE AND RECYCLING RECYCLING STATION BID ISSUE DATE: JUNE 2016 The following revisions, additions and
More informationNCHRP 350 IMPLEMENTATION ARTBA May 11, 2001
NCHRP 350 IMPLEMENTATION ARTBA May 11, 2001 1 The Road to New Crashworthy Requirements NCHRP Report 350 2 NCHRP REPORT 350 Pick Up Truck Six Test Levels Includes Work Zone Devices 3 NCHRP REPORT 350 Adopted
More informationWire Communications Design jfm 07. An Inside Look at Outside Plant
An Inside Look at Outside Plant BICSI Region Meeting 2007 Agenda What is CO-OSP? A close look at the 758-A standard Available Resources What is CO-OSP? Customer Owned Outside Plant Telecommunications infrastructure
More informationOperating Instructions
CS202S CarSense Vehicle Motion Detector Operating Instructions CAUTIONS AND WARNINGS Never use the CS202 as a safety reversing or presence detection system. The CS202 requires that a vehicle be moving
More informationSection 7.I: Estimates Backup. 7.I Estimates Back-Up
Section 7.I: Estimates Backup 1 7.I Estimates Back-Up March 29, 2013 Kathy Wallace, AIA Principal - Cuningham Group St. Anthony Main 201 Main Street SE, Suite 325 Minneapolis MN 55414 RE: Minnesota State
More informationAppendix C.6. Best Management Practices for Construction Activities
Appendix C.6 Best Management Practices for Construction Activities In accordance with Section F.2 of San Diego Regional Water Quality Control Board (RWQCB) Order 2001-01 (Permit), the City of La Mesa has
More informationUGA DESIGN & CONSTRUCTION SUPPLEMENTAL GENERAL REQUIREMENTS & STANDARDS TABLE OF CONTENTS
Table of Contents Introduction Changes from September 16, 2013 version to January 16, 2015 version Supplemental General Requirements (asterisk * indicates revised) 00 00 02 Terms * 00 00 03 Modifications
More informationCarSense202 O P E R A T I N G I N S T R U C T I O N S V E HI C L E M O T I O N D E T E C T O R Johnston Parkway, Cleveland, Ohio 44128
O P E R A T I N G I N S T R U C T I O N S CarSense202 V E HI C L E M O T I O N D E T E C T O R 4564 Johnston Parkway, Cleveland, Ohio 44128 P. 800 426 9912 F. 216 518 9884 Sales Inquiries: salessupport@emxinc.com
More informationNATIONAL DEMOLITION ASSOCIATION PROJECT PRE-START SURVEY
NATIONAL DEMOLITION ASSOCIATION PROJECT PRE-START SURVEY PROJECT INFORMATION Project Name Project Number Project Location City Legal Description: Plat # State Zip Code County Client Client Address Contact(s)
More informationREVISION INFORMATION SHEET ONTARIO PROVINCIAL STANDARDS FOR ROADS AND PUBLIC WORKS
Ontario Provincial Standards Unit 301 St. Paul St., 2 nd Floor North St. Catharines, ON L2R 7R4 REVISION INFORMATION SHEET ONTARIO PROVINCIAL STANDARDS FOR ROADS AND PUBLIC WORKS VOLUME 7 MUNICIPAL-ORIENTED
More informationJune 1, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA
June 1, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA REVISED AMENDMENT NO.3/ CONTRACT NO. Y16-182 TERM CONTRACT FOR COUNTY WIDE ROOF MAINTENANCE AND REPAIR ADVANCED ROOFING, INC. 200 Northstar
More informationKully Reference Book
Kully Reference Book Serving the Greater Mid-West since 1946 Angles Channels Beams Rounds Sheets Squares Flats Rebar Wire Mesh Black & Galvanized Pipe Anchor Bolts Plastic, Copper, Black, Galvanized Pipe
More informationDESCRIPTION SITE SUITABILITY. Advantages. Disadvantages. Alternative Names: Fiber Roll Barriers, Sediment Log, Coir Roll and Coir Log
4.5-q FIBER ROLL Alternative Names: Fiber Roll Barriers, Sediment Log, Coir Roll and Coir Log DESCRIPTION Fiber rolls are sediment control devices made from fibrous organic material, such as rice or coconut
More informationINTRODUCTION TO VOLUME MEASUREMENTS Volume measurements are needed for three different categories of pay items:
INTRODUCTION TO VOLUME MEASUREMENTS Volume measurements are needed for three different categories of pay items: Earthwork --items such as borrow excavation, and subsoil excavation Concrete -- the various
More informationCONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF TRAFFIC SIGNAL CONTROLLERS
ONTARIO PROVINCIAL STANDARD SPECIFICATION METRIC OPSS 622 SEPTEMBER 1993 CONSTRUCTION SPECIFICATION FOR THE INSTALLATION OF TRAFFIC SIGNAL CONTROLLERS 622.01 SCOPE 622.02 REFERENCES 622.03 DEFINITIONS
More informationUGA DESIGN & CONSTRUCTION SUPPLEMENTAL GENERAL REQUIREMENTS & STANDARDS TABLE OF CONTENTS
Table of Contents Introduction Changes from August 1, 2016 version to April 30, 2018 Supplemental General Requirements (asterisk * indicates revised) 00 00 02 Terms 00 00 03 Modifications to General Requirements
More informationSKC-049 RESIDENCE. NMSD Site Improvements Phase 2 Santa Fe, New Mexico Scale: 1" = 20'-0" ADD-002 ISSUED FOR: MB/GSB PW/R
RESIDENCE O/R /R W/R W/R /R /R /R /R /R NMSD Site Improvements Phase Scale: " = 0'-0" 06.0.05 MB/GSB BO ISSUED FOR: 4-000 REF: C-306 W/R W/R W/RW/R W/R W/R W/R W/R FO ADD-00 SKC-049 W/R W FO T R NMSD Site
More informationTOWN OF MANCHESTER GENERAL SERVICES DEPARTMENT 494 MAIN STREET P.O. BOX 191 MANCHESTER, CONNECTICUT
TOWN OF MANCHESTER GENERAL SERVICES DEPARTMENT 494 MAIN STREET P.O. BOX 191 MANCHESTER, CONNECTICUT 06045-0191 TRAFFIC SIGNAL INSTALLATIONS MIDDLE TURNPIKE EAST AT SUMMIT STREET MIDDLE TURNPIKE EAST AT
More informationSummary Listing of Ohio LTAP elearning Courses
Summary Listing of Ohio LTAP elearning Courses In recent years, the Ohio Local Technical Assistance Program (LTAP) Center has added many online courses also called elearning, or Web-based training (WBT)
More informationSolicitation Information
Solicitation Information Kansas Turnpike Authority Solicitation Number 7048 Deadline 10/11/2016 02:00 PM CDT Advertised 09/08/2016 01:46 PM CDT Revised 10/11/2016 12:14 PM CDT Description Construction
More information# I-2. Date of Meeting: May 2, 2017 BOARD OF SUPERVISORS BUSINESS MEETING INFORMATION ITEM. Quarterly Metrorail Construction Status Report
BOARD OF SUPERVISORS BUSINESS MEETING INFORMATION ITEM Date of Meeting: May 2, 2017 # I-2 SUBJECT: Quarterly Metrorail Construction Status Report ELECTION DISTRICTS: Ashburn/Broad Run STAFF CONTACTS: Alan
More informationAnchor Systems. Anchoring Systems. Leading-edge Technology. Outstanding Service.
Anchoring Systems Leading-edge Technology. Outstanding Service. 90 Introduction Application overview for chemical anchors Page 92-93 Application overview for mechanical anchors Page 94-95 Adhesive anchors
More informationTarget Interface / Construction Compliance Inspection Checklist
A. Targets Quantities meet DD9, applicable TC 5-, and CEHNC Design Guide 0-- Oriented to face firing line or firing positions/points B. Roads-Service, Lanes Number of lanes meets DD 9, applicable TC 5-,
More informationThat CAD Girl. J ennifer dib ona. Carlson 2008 Creating Roadway Templates. Website:
That CAD Girl J ennifer dib ona Website: www.thatcadgirl.com Email: thatcadgirl@aol.com Phone: (919) 417-8351 Fax: (919) 573-0351 Carlson 2008 Creating Roadway Templates Defining roadway templates can
More informationTarget Interface / Construction Compliance Inspection Checklist
A. Targets Quantities meet DD9, applicable TC -, and CEHNC Design Guide 0-- Oriented to face firing line or firing positions/points B. Roads-Service, Lanes Number of lanes meets DD 9, applicable TC -,
More informationTarget Interface / Construction Compliance Inspection Checklist
A. Targets Quantities meet DD9, applicable TC -, and CEHNC Design Guide 0-- Oriented to face firing line or firing positions/points B. Roads-Service, Lanes Number of lanes meets DD 9, applicable TC -,
More informationMICHIGAN DEPARTMENT OF TRANSPORTATION
MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR GROUNDING, BONDING, LIGHTNING PROTECTION AND SURGE PROTECTION FOR INTELLIGENT TRANSPORTATION SYSTEM EQUIPMENT ITS:CLC 1 of 5 APPR:LWB:DBP:07-31-13
More informationTremco FX 130 Heavy Duty Chemical Anchor
Description FX 130 is a heavy duty 2 component vinylester styrene free injection system specially formulated for anchoring threaded bars, reinforcing bars (rebars) and sockets into concrete and most other
More information29 June Termination of Tables 2, 3 and 4 P0151
29 June 2017 Termination of Tables 2, 3 and 4 P0151 The price indices for materials used in certain industries (Table 3) and selected materials (Table 4) were temporarily suspended from publication in
More informationING CITY COUNCIL AGENDA REPORT. Honorable Mayor and City Council Members. Director of Public Works - Utilities. Final Payment Applications
City of RED W1' ING CITY COUNCIL AGENDA REPORT TO: Honorable Mayor and City Council Members FROM: Bob Stark Deputy Director of Public Works - Utilities Agenda Item No.: 8- M Meeting Date: September 25,
More informationCity of Regina Standard Construction Specification SECTION 1499 LISTING OF SEWER STANDARD DRAWINGS
City of Regina Standard Construction Specification SECTION 1499 LISTING OF SEWER STANDARD DRAWINGS S-1 Removed Feb/10 S-2 Precast Manhole 1050mm Dia. July/10 S-3 Precast Concrete Deep Manhole Jan/11 S-4
More informationMICHIGAN DEPARTMENT OF TRANSPORTATION
MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR GROUNDING, BONDING, LIGHTNING PROTECTION AND SURGE PROTECTION FOR INTELLIGENT TRANSPORTATION SYSTEM EQUIPMENT ITS:CLC 1 of 6 APPR:MDW:JVG:06-08-18
More informationTECHKNOW, INC. Kiosk Order Confirmation System INSTALLATION MANUAL. Revision Date: July 11, 2012 Part # Version 3.2
document Page 1 of 18 TECHKNOW, INC Kiosk Order Confirmation System INSTALLATION MANUAL Revision Date: July 11, 2012 Part # Version 3.2 Techknow, Inc. 393 Mayfield Road Duncan, SC 29334 www.gotechknow.com
More informationChapter 08: Diamond Tools
Technologý + Services for Building Professionals Chapter : Diamond Tools Diamond Saw Blades for Angle Grinders Cutting Discs Pot Discs Abrasive Disks, Grinding Disks and Sharpening Plates Saw Blades for
More informationTarget Interface / Construction Compliance Inspection Checklist
TES A. Roads-Service, Lanes Common Items Trails and service roads provide adequate access to buildings for maintenance B. Testing Results-provided to the local government construction representative Data
More informationPavement Preservation and the Role of Bituminous Surface Treatments A Washington State View. Minnesota Pavement Conference February 14, 2008
Pavement Preservation and the Role of Bituminous Surface Treatments A Washington State View Minnesota Pavement Conference February 14, 2008 1 The Situation 2 WSDOT policy, in essence, mandated use of BSTs
More informationTarget Interface / Construction Compliance Inspection Checklist
A. Targets Date: Quantities meet DD9, applicable TC -, and CEHNC Design Guide 0-- Oriented to face firing line or firing positions/points B. Roads-Service, Lanes Number of stations meets DD 9, applicable
More informationChapter 7 - Consultants TABLE OF CONTENTS
Chapter 7 - Consultants TABLE OF CONTENTS CHAPTER 7... 2 7.1 Using Custom Line Styles... 2 7.1.1 Line Weights and Thickness... 4 7.1.2 Default Line Styles... 5 7.1.3 Standard Custom Line Styles for Proposed
More informationCITY OF FREMONT SPECIFICATIONS 2017 WATER & SEWER MAINTENANCE SUPPLIES
CITY OF FREMONT SPECIFICATIONS 2017 WATER & SEWER MAINTENANCE SUPPLIES All bidders MUST submit product specifications, literature describing items, manufacturers name, product code and part numbers with
More informationSPOS (Station Point of Sale) 200. SFTP (Station Fare Transaction Processor) 35. CQD (Card Query Device) 35. HCR (Handheld Card Reader) Cradles 120
DESIGN GUIDELINES PRESTO INSTALLATION & CONNECTIVITY PAGE 1 of 4 ELECTRICAL CONNECTIVITY AND WIRING Communications Conduits Conduits designated for Presto equipment data wiring shall be clearly identified
More informationOptical Fiber Assemblies
Optical Fiber Assemblies Installation and Operation Instructions Overview Ocean Optics offers an extensive line of standard and premium grade optical fibers and accessories including patch cords, bifurcated
More informationSpecLink-E Catalog Listing As Of: June, 2015
DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS Catalog Updated 00 0101 - BSD Project Title Page This document is intentionally blank. Add the specifics needed for the project. ASCLME# Feb 2009 00
More informationONE SD-LAN Wall Mount Splitter Housing (1LAN-SPLT C)
CMA-477-AEN 1 General Figure 1 STANDARD RECOMMENDED PROCEDURE 000-000-AEN ISSUE 1 MARCH 2018 I Page 1 2 Carton Contents Installation instruction Wall Mount Splitter housing Cable installation hardware
More informationApplication of Petrography to Highway Materials
Application of Petrography to Highway Materials Hosted by Andrew Dawson University of Nottingham, UK chair, TRB Committee AFP70 Aggregates Your presenters Steven J. Stokowski, P.G. Principal Petrographer,
More informationSECTION IDENTIFICATION FOR ELECTRICAL SYSTEMS
SECTION 26 05 53 IDENTIFICATION FOR ELECTRICAL SYSTEMS PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Nameplates. 2. Labels. 3. Wire markers. 4. Conduit markers. 5. Underground Warning Tape. 6. Lockout
More informationBS EN Class H, BS 7430 UL467 (CR105) Tightening torque 15 Nm mm mm kg CR525
Rod to tape clamp (type A) Nominal rod Max. conductor 1 2 12.7 mm 26 x 12 mm 0.1 kg CR10 8 16 mm 26 x 12 mm 0.1 kg CR10 4 20 mm 26 x 10 mm 0.1 kg CR10 8 16 mm 0 x 2 mm 0.16 kg CR108 4 20 mm 0 x 2 mm 0.16
More informationAlong the toe, top, face, and at grade breaks of exposed and erodible slopes to shorten slope length and spread runoff as sheet flow.
Categories EC Erosion Control SE Sediment Control TC Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Category
More informationCRL AWS - ALUMINUM WINDSCREEN SYSTEM TYPICAL PLANS & ELEVATIONS - RECTANGULAR POSTS
CRL AWS - ALUMINUM WINDSCREEN S & S - POSTS Revisions By: SURFACE APPLIED TOP CAP 7 (888 mm) SQ FT MAX PANEL SIZE FOR 8" (MAX 7) x ALUMINUM ATTACHMENT WILL DEPEND ON MOUNTING AND INSTALLATION LOCATION
More information3.37 SECURITY FENCING GERALDTON PORT
1.0 INTRODUCTION Security fencing protects the Port of Geraldton Landside Restricted Zone (MWPA LRZ commonly known MSIC area) assets from intrusion and potential attacks of vandalism and terrorism. This
More informationSECTION TAPER-LOC DRY GLAZE GLASS RAILING SYSTEMS. A. Monolithic Tempered Glass Dry Glazed Railing Assemblies.
1 SECTION 05 7310 TAPER-LOC DRY GLAZE GLASS RAILING SYSTEMS PART 1 GENERAL 1.1 SECTION INCLUDES A. Monolithic Tempered Glass Dry Glazed Railing Assemblies. 1.2 RELATED SECTIONS A. Section 05 5000 - Metal
More informationConverting Sewer and Stormwater. Why, how and what did the City of Portland, ME get out of it?
Converting Sewer and Stormwater assets to Esri s LGIM Why, how and what did the City of Portland, ME get out of it? Jessica Gooch Asset Management Technician City of Portland Maine, Water Resources Division
More informationMinistry of Transportation Ministry of Transportation. Warm Mix Asphalt OHMPA Fall Seminar December 11, Seyed Tabib
Warm Mix Asphalt 2013 OHMPA Fall Seminar December 11, 2013 Seyed Tabib Bituminous Section of Ontario Overview WMA Definition Benefits of WMA Challenges of WMA MTO WMA Contracts QA Results Energy Savings
More informationAIR TERMINALS: COPPER
AIR TERMINALS: COPPER A ADAPTER TYPE B LESS ADAPTER LA TYPE A B C A B C A B C 3 8 COPPER POINTS (CLASS I ONLY) 1 2 COPPER POINTS (CLASS I OR II) 5 8 COPPER POINTS (CLASS I OR II) THE 3 8 COPPER AND ALUMINUM
More informationUniversity of Maryland UB USPS Maintenance Facility Remaining Bid Packages
University of Maryland UB USPS Maintenance Facility Remaining Bid Packages Procurement Office: University of Maryland, Baltimore Owner: University of Baltimore Design-Build Contractor: The Whiting-Turner
More informationGeometric Layout for Roadway Design with CAiCE Visual Roads
December 2-5, 2003 MGM Grand Hotel Las Vegas Geometric Layout for Roadway Design with CAiCE Visual Roads Mathews Mathai CV32-3 This course describes and demonstrates various tools for defining horizontal
More informationSection 20 Distribution (Underground)
PREVIOUS SEARCH NEXT Section Distribution (Underground) Table of Contents Page Underground Connectors...-2 Padmount Transformer Connectors...-3 Pedestal Connectors...-4 Pedestal Block Connector...-6 Street
More informationComputer Network Design Guide Existing Systems 1 / 6
COMPUTER NETWORK DESIGN GUIDELINE FOR EXISTING SYSTEMS DOCUMENT NUMBER: 16765 APPLICATION: ELEMENTARY, MIDDLE AND HIGH SCHOOL DATE OF ISSUE: 11-27-06 - First Issued NOTES: The attached guideline should
More informationSUB-CONTRACTOR PRE-QUALIFICATION FORM
CONTACT INFORMATION Company Contact Person: Title: Street Address: Suite No.: EXPERIENCE City: Zip: 1. Please check the CSI Codes applicable to your business: 02 00 00 Existing Conditions 02 20 00 Assessment
More informationW Dr Roseville Rd Station Dr Public Works Engineering 311 Vernon Street Roseville, California 95678-2649 INTERSECTION RED FLASH APPROVAL With stamped approval of this letter by the Traffic Section,
More informationLIGHTING OVERVIEW. 170 Adagio PRO LED Lights and Controls. 174 Underwater Lights. 177 LED Replacement Bulbs, 300 W Replacement Bulbs
LIGHTING Put your pool in the right light and realize changing moods above or below the water line. Your imagination has no limits. With classic bulbs or modern LED lights, each pool shines in a wide color
More informationBID TABULATION SHEET. Garden State Highway Products, Inc 1740 E. Oak Road Vineland, NJ X X X 4831 X X Y Y N
Title: Traffic Control Signs, Supports, Hardware & Safety Devices Opening Date: Tuesday, August, 05 :0pm Contract #: CC-0099-5 Total Bids Received: Signed Proposal Stock Disclose Non- Collusion BID TABULATION
More informationModel: CAM430MV Wired Multi-View Camera with License Plate / Rear Surface Mount Installation Manual Features
Model: CAM430MV Wired Multi-View Camera with License Plate / Rear Surface Mount Installation Manual Features Fully Adjustable, Multiple Viewing Angle Smart Camera. High Resolution, 1/2 CMOS Color Camera
More informationPROline Floor Marking Tape, 50mmW Product description page 3. PROline Floor Marking Tape, 75mmW Product description page 3
PROline Floor Marking Tape, 50mmW Product description page 3 33m long, Tape width 50mm white 261.16.606 yellow 261.13.796 blue 261.19.771 red 261.13.752 green 0.5 261.18.249 orange 261.16.322 red/white
More informationLocal Road Surface Selection Tool Technical Report
Department Publication No. 293 April 2017 Local Road Surface Selection Tool Technical Report Prepared by: Andrew Wrucke, P.E. Brad Wentz, P.E. Kimberly Vachal, Ph.D. Program development for this project
More informationElectrical Interconnection
Electrical Interconnection Edition 208/ Rail-Mount Terminal Block Systems Full Line Catalog, Volume Edition 207/208 PCB Terminal Blocks and Connectors Full Line Catalog, Volume 2 Edition 207/208 2 Automation
More informationV660 Series Analog Camera Dome Accessories Wall-Mount Arm V660-HDB243 Wall-mount adapter for indoor and outdoor camera domes Die-cast aluminum construction with polyester powder-coat finish Mounts to 4
More informationINDOOR SPORTS SCOREBOARD INSTALLATION RECOMMENDATIONS REV
INDOOR SPORTS SCOREBOARD INSTALLATION RECOMMENDATIONS 98-0001-23 REV 1805.03 TABLE OF CONTENTS DISCLAIMER The suggestions and recommendation within this document are intended as a guide for the installation
More informationCapital Rail Constructors: Quarterly Update to MWAA Board of Directors
Dulles Corridor Metrorail Project Phase 2, Package A Capital Rail Constructors: Quarterly Update to MWAA Board of Directors Keith Couch Capital Rail Constructors January 2017 Agenda 1. Safety 2. Schedule
More informationTempofor. Mobile fences
Tempofor Mobile fences Betafence Quality Betafence strives relentlessly for optimum quality, without losing sight of users own particular requirements. Quality is of prime importance: it begins at the
More informationNOTE ON PERFORMANCE TESTING
NOTE ON PERFORMANCE TESTING Performance Profile Sheet(s) are included in a format that can be easily photocopied for each trainee. This examination is designed to measure competency in the tasks taught
More informationQCOLVCZ4M/Z6M SV Series Interface Cable Kit for Z4M and Z6M
QCOLVCZ4M/Z6M SV Series Interface Cable Kit for Z4M and Z6M The enclosed kit contains all of the parts necessary to connect a Model Z4M or Z6M (ZxM) printer to an external Hand Held Products SV type scanner/verifier.
More informationInstructions for Update 12 page 1 Volume V Traffic Control Devices Update 1 July 2000
Instructions for Update 12 page 1 Volume V Traffic Control Devices Update 1 Introductory Pages Half-title and cataloguing data (Part 1 and 2) Half-title and cataloguing data (Part 1 and 2) Half-title and
More informationUtilization of TSMO Practices in Highway Construction Work Zones: A Case Study
Utilization of TSMO Practices in Highway Construction Work Zones: A Case Study James Webb, P.E., Iowa Department of Transportation Liz Finarty, P.E., Iowa Department of Transportation James Armstrong,
More informationSPECIAL SPECIFICATION 6027 Lane Control Signal Equipment
2004 Specifications SPECIAL SPECIFICATION 6027 Lane Control Signal Equipment 1. Description. Furnish and install Lane Control Signal (LCS) equipment. 2. Material. Provide new, corrosion resistant materials
More informationIVR15-SPI 1.5 Solid State Illuminated Rail 2 Post Integral Power Supply
1.5 Solid State Illuminated Rail 2 Post Integral Power Supply 1.50 RECOGNIZED 0.3 90 APERTURE Ends of Illuminated rail field cuttable to a minimum of 2 1/8 in length. Illuminated rail is available with
More information* 28" 2'-0" NUT ROUTED 6" x 8" WOOD BLOCK GROUND LINE SHEET APPROVED BY: DIRECTOR, BUREAU OF DEVELOPMENT DATE: VERT.
6'-" 2 3'- WITH WITH 6'-" 2 2'- EFFECTIVE AND TYPICAL 3'- WITH ROUND 6'-" 2 TOE NAIL BLOCK TO POST WITH A MINIMUM LONG HOT-DIP ZINC COATED NAIL x OFFSET BLOCK 3'- x LINE POST * 2 x LINE POST * 2 OPTIONAL
More informationMEDIUM DUTY Anchoring Systems MEDIUM DUTY ANCHORING SYSTEMS 13
2 ANCHORING SYSTEMS 13 14 04B06036 6.5 36 6 30 100 082690 21.58 masonbolt Anchor: Hex Head 5.8 Grade Steel MASONBOLT application & use SLEEVE ANCHOR designed to GIVE OPTIMAL PERFORMANCE IN CONCRETE, MASONRY
More informationBentley OpenRoads Workshop 2017 FLUG Fall Training Event
Bentley OpenRoads Workshop 2017 FLUG Fall Training Event F-1E - QuickStart using OpenRoads ConceptStation Bentley Systems, Incorporated 685 Stockton Drive Exton, PA 19341 www.bentley.com Practice Workbook
More informationEmergency Luminaire for Fluorescent Lamps Series EXLUX 6009
> As wall, ceiling and pendant light fitting or pole mounted light fitting > Version with 2 lamps: 18 W and 36 W > Central locking > All-pole disconnection via N/C switch when opening light fitting or
More informationV660 Series Camera Dome Accessories Wall-Mount Arm V660-HDB243 Wall-mount adapter for indoor and outdoor camera domes Die-cast aluminum construction with polyester powder-coat finish Maximum load is 11
More informationAvanti HP Series Centrifuges Preinstallation
J3HP-TB-001AC May 2009 Avanti HP Series Centrifuges Preinstallation INTRODUCTION Purchase of an Avanti HP series high performance centrifuge includes installation and Basic Instrument Training for two
More informationSPECIAL PROVISION Scope of Work
2004 Specifications CSJ 0914-00-301 & 0914-00-314 SPECIAL PROVISION 004---018 Scope of Work For this project, Item 004, Scope of Work, of the Standard Specifications, is hereby amended with respect to
More informationInstallation Notes TII Model 341 Protector
Installation Notes TII Model 341 Protector (ATT-IS PEC 32918) for MERLIN Communications System In Range Out of Building (IROB) Station Installation By Trained Technician Only WARNING: Failure to follow
More informationIC CONES TRAFFIC CONES TRAFFIC CONES CONES TRAFFIC TRAFFIC C ONES TRAFFIC CONES TRAFFIC CONES TRAFFIC CONES TRAFFIC CONES TRAFFIC CONE
IC CONES TRAFFIC CONES TRAFFIC CONES TRAFFIC CONES TRAFFIC CONES TRAFFIC C FFIC CONES TRAFFIC CONES TRAFFIC CONES TRAFFIC CONES TRAFFIC CONES TRAFFI TRAFFIC CONES TRAFFIC CONES TRAFFIC CONES TRAFFIC CONES
More informationANSI/TIA-568-C Cat 6A Field Test Specifications
This document has been prepared to aid consultants or engineers in developing contractual specifications covering the certification of Category 6A Permanent Links. It is offered as a general guide. Suitability
More information