1 PROJECT NO. WUSR09002 Gra-Tex Utilities, Inc Jackson Construction LTD ARK Conracting Services, LLC Tri-Tech Constru Bids Opened: Ju uly 19 Arlington, TX Fort Worth, TX Kennedale, TX Kennedale, TX Item Qty Unit Description Unit Cost Total Unit Cost Total Unit Cost Total Unit Cost LF 6" PVC C900 Water Pipe $48.00 $152, $25.00 $79, $70.00 $222, $ LF 6" PVC C900 Water Pipe / w18" Steel Cassing Pipe $95.00 $3, $ $5, $ $9, $ LF 6" PVC C900 Water Pipe by Bore $ $4, $ $10, $ $9, $ LF 12" PVC C900 Water Pipe $90.00 $188, $49.00 $102, $78.00 $163, $ LF 12" PVC C900 Water Pipe By Bore $ $6, $ $4, $ $9, $ EA 6" Gate Valve and Valve Box $ $14, $ $14, $ $14, $1, EA 12" Gate Valve and Valve Box $2, $10, $2, $10, $2, $11, $2, EA R & R of Existing 6", *8" or 12" Gate Valve $ $1, $50.00 $ $ $7, $ EA Fire Hydrant $2, $9, $2, $10, $2, $8, $2, EA Remove & Salvage Fire Hydrant $ $ $ $2, $ $ $ EA F & I 1" Water Service (Long Side) $ $29, $ $29, $ $41, $1, EA F & I 1" Water Service (Short Side) $ $15, $ $15, $ $21, $ EA F & I 2" Water Service (Long Side) $1, $11, $1, $13, $2, $15, $2, EA F & I 2" Water Service (Short Side) $1, $10, $1, $12, $1, $11, $2, EA F & I 6" Blow Off Valve $4, $4, $4, $4, $6, $6, $4, EA Connect to exist. 6" water line $ $8, $1, $10, $1, $18, $1, EA Connect to exist. 12" water line $1, $6, $1, $7, $2, $11, $3, EA Cut and Plug exist. water line $ $4, $ $4, $ $4, $ LF Trench Safety $5.00 $35, $0.10 $ $4.00 $28, $ LF F & I Concrete Encasement $40.00 $6, $30.00 $5, $45.00 $7, $ LF Temporary Pavement Repair (Collector) $7.00 $23, $25.00 $83, $15.00 $50, $ LF Temporary Pavement Repair (Residential) $7.00 $24, $20.00 $69, $15.00 $51, $ LF Permanent Asphalt Repair (Collector) $45.00 $2, $43.00 $2, $45.00 $2, $ LF Permanent Pavement Repair (Residential) $35.00 $1, $35.00 $1, $35.00 $1, $ LF F & I Sodding $8.00 $2, $5.00 $1, $10.00 $3, $ LF F & I HydroMulch Seeding $2.00 $1, $5.00 $4, $6.00 $5, $ CY F & I 2:27 Concrete Backfill $2.00 $ $75.00 $7, $38.00 $3, $ LF Repair Concrete Curb and Gutter $30.00 $8, $24.00 $6, $18.00 $5, $ SY Concrete Driveway Pavement Repair $65.00 $13, $60.00 $12, $35.00 $7, $ CY Rock Cushion $1.00 $ $36.00 $3, $32.00 $3, $ LS F & I 2" Temporary Water Service $1, $1, $27, $27, $12, $12, $15, Sub-Total Amount of Water (Items ) $602, $563, $767, $0.00 $2, LS Mobilization $60, $60, $310, $310, $205, $205, $140, LS F & I Traffic Control $10, $10, $33, $33, $16, $16, $40, LS Prepare, Install, Maintain & Remove SWPPP $40, $40, $40, $40, $40, $40, $40, LS Provide GPS Data $5, $5, $45, $45, $6, $6, $10, LF F & I 6" PVC SDR 26 Open Cut $43.00 $1, $29.00 $ $88.00 $2, $ LF F & I 8" PVC SDR 26 Open Cut $65.00 $136, $32.00 $67, $72.00 $150, $ LF F & I 8" PVC SDR 26 w/18" Steel Casing $ $15, $ $22, $ $18, $ LF F & I 10" PVC SDR 26 $75.00 $120, $49.00 $78, $76.00 $121, $ LF F & I 10" PVC SDR 26 w 20" Steel Casing $ $3, $ $5, $ $8, $ LF F & I 10" PVC SDR 26 w 20" Steel Casing $ $23, $ $34, $ $30, $ LF F & I Cured-in-Place Pipe $69.00 $17, $82.00 $20, $65.00 $16, $ LF F & I 12" PVC SDR 26 $75.00 $71, $78.00 $74, $82.00 $78, $ LF F & I 12" PVC SDR 26 By Short Bore w/24" Steel Casing $ $15, $ $22, $ $16, $ LF F & I 12" SDR 26 By Short Bore $ $14, $ $16, $ $16, $200.00

2 LF F & I 15" PVC SDR 26 Open Cut $85.00 $272, $67.00 $214, $ $400, $ LF F & I 15" PVC SDR 26 w/ 24" Steel Casing Pipe $ $72, $ $91, $ $77, $ LF F & I 15" PVC SDR 26 By Short Bore $ $9, $ $17, $ $18, $ LF F & I 18" PVC SDR 26 Open Cut $ $1, $ $3, $ $4, $ LF F & I 18" PVC SDR 26 w/ 30" Steel Casing $ $197, $ $214, $ $137, $ EA F & I 4" Concrete Manhole w/water tight cover $3, $66, $2, $46, $3, $83, $3, VF F & I Extra Depth for 4' Manhole $ $4, $ $7, $ $3, $ EA F & I 5' Manhole $4, $48, $3, $39, $4, $57, $8, VF F & I Extra Depth for 5' Manhole $ $16, $ $30, $ $15, $ EA F & I 5' Drop Manhole $4, $87, $4, $76, $4, $87, $9, VF F & I Extra Depth for 5' Drop Manhole $ $31, $ $59, $ $24, $ EA Remove and Dispose of Existing Manhole $ $16, $ $5, $1, $24, $ EA Remove and Dispose Main Line Cleanout $ $ $ $ $1, $1, $ EA Abandon Existing Manhole $ $7, $ $5, $ $7, $1, EA Cut & Plug Existing Sanitary Sewer $ $11, $ $8, $1, $26, $ EA Connect to Existing Manhole & Rework Invert $1, $3, $ $2, $ $1, $2, VF F & I Interior Coating for Manhole $ $21, $ $18, $ $19, $ EA Connect to Existing 18" Sanitary Sewer $2, $2, $ $ $2, $2, $5, EA Renew 4" PVC Sewer Service $ $72, $ $90, $ $93, $1, EA F & I Two Way Cleanout $ $9, $ $8, $ $10, $ LF Relocate and Install 4" PVC Sewer Service $16.00 $35, $27.00 $59, $12.00 $26, $ EA F & I 4" Sewer Service On Private Property $ $20, $ $9, $ $24, $ LF Repair 12" RCP Storm Sewer $14.00 $2, $60.00 $9, $90.00 $13, $ LF Repair 18" RCP Storm Sewer $20.00 $ $77.00 $1, $ $1, $ LF Repair 24" RCP Storm Sewer $25.00 $1, $81.00 $3, $ $6, $ LF Repair 30" RCP Storm Sewer $35.00 $ $98.00 $1, $ $3, $ LF Repair 36" RCP Storm Sewer $50.00 $1, $ $2, $ $4, $ EA F & I Grate Inlet $1, $3, $2, $4, $2, $5, $3, SY Asphalt Parking Lot/ Repair to Match $12.00 $30, $25.00 $64, $19.00 $49, $ SY F & I 6" Reinforced Concrete Drive Approaches $65.00 $97, $60.00 $90, $35.00 $52, $ LF Temporary Pavement Repair (Collector) $9.00 $30, $36.00 $123, $18.00 $61, $ LF Temporary Pavement Repair (Residential) $8.00 $43, $29.00 $156, $15.00 $80, $ LF Permanent Pavement Repair (Collector) $36.00 $1, $51.00 $2, $45.00 $2, $ LF Permanent Pavement Repair (Residentiall) $25.00 $1, $39.00 $1, $35.00 $1, $ LF Repair Concrete Curb and Gutter $30.00 $21, $24.00 $17, $16.00 $11, $ EA Exploratory Excavation $ $6, $ $11, $1, $19, $ LF Remove & Replace Existing Fencing All types $2.00 $1, $20.00 $17, $18.00 $16, $ LF F & I Temporary 6' Chain Link Fence $5.00 $2, $20.00 $11, $8.00 $4, $ LF Concrete Encasement $50.00 $6, $26.00 $3, $65.00 $7, $ CY F & I Gabion Mattress $ $9, $ $10, $ $9, $ SY F & I Filter Fabric Under Gabiion $12.00 $ $5.00 $ $2.00 $ $ SY Repair Concrete Channel $78.00 $1, $70.00 $1, $45.00 $1, $ EA Remove Existing Sanitary Sewer Line $4, $4, $1, $1, $3, $3, $2, LF F & I HydroMulch Seeding $2.00 $2, $5.00 $6, $4.00 $5, $ LF F & I Sodding $10.00 $36, $5.00 $18, $6.00 $21, $ SY Repair Concrete Sidewalk $40.00 $8, $34.00 $7, $34.00 $7, $ SY Gravel Driveway Repair $1.00 $50.00 $5.00 $ $12.00 $ $ EA F & I Power Pole Bracing $ $2, $ $10, $ $8, $ EA Remove, Salvage and Replace Bushes $ $9, $50.00 $ $ $3, $ CY F & I 2:27 Concrete Backfill $1.00 $ $75.00 $7, $45.00 $4, $ CY F & I Rock Cushion $1.00 $ $36.00 $3, $34.00 $3, $30.00

3 LF Television Inspection $2.25 $16, $2.00 $14, $2.00 $14, $ LF F & I Trench Safety Systems $5.00 $52, $1.00 $10, $3.00 $31, $ LF F & I 6' Pre Fabricated Masonry Fence $10.00 $4, $75.00 $33, $60.00 $27, $ LS Construction Contingency $300, $300, $300, $300, $300, $300, $300, Subtotsal Sanitary Sewer Items $2,241, $2,729, $2,658, SY Pulvermix to Minimum of 12" $4.90 $18, $7.00 $25, $5.00 $18, $ SY F & I 4" HMAC Type D & Prime Coat $17.28 $63, $18.00 $66, $18.00 $66, $ TN F & I Cement at Minimum 30 Pounds per Square Yard $99.00 $5, $ $5, $ $5, $ TN F & I Lime at Minimuym 36 Pounds per Square Yard $ $10, $ $12, $ $9, $ LF Remove and Replace Concrete Curb & gutter $27.00 $6, $26.00 $6, $18.00 $4, $35.00 Subtotal Pavement Items $104, $116, $104, SY Pulvermix to Minimum of 12" entire width of street $4.90 $2, $7.00 $3, $5.00 $2, $ SY F & I 4" HMAC Type D & Prime Coat $17.28 $9, $18.00 $9, $18.00 $9, $ TN F & I Cement at Minimum 30 Pounds per Square Yard $99.00 $ $ $ $ $ $ TN F & I Lime at Minimum 36 Pounds per Square Yard $ $1, $ $1, $ $1, $ LF Remove & Replace Copncrete Curb & Gutter $27.00 $1, $26.00 $1, $18.00 $ $35.00 Subtotal Pavement Items $15, $17, $15, SY Pulvermix to Minimum of 12" entire width of street $4.90 $13, $7.00 $19, $5.00 $13, $ SY F & I 4" HMAC Type D $17.28 $47, $18.00 $49, $17.00 $46, $ TN F & I Cement at Minimum 30 Pounds $99.00 $4, $ $4, $ $4, $ TN Furnish & Install Lime at Minimum 36 Pounds per Square Yard $ $7, $ $9, $ $7, $ LF R & I Concrete Curb & Gutter $27.00 $5, $26.00 $5, $18.00 $3, $ SY Remove & Repalce or furnish & Install Concrete Valley Gutter $72.00 $5, $67.00 $4, $40.00 $2, $60.00 Subtotal Pavement Items $84, $92, $78, SY Pulvermix to Minimum of 12" entire width of street $4.90 $7, $7.00 $10, $5.00 $7, $ SY F & I 4" HMAC Type D & Prime Coat $17.28 $25, $18.00 $27, $18.00 $27, $ TN F & I Cement at Minimum 30 Pounds $99.00 $2, $ $2, $ $2, $ TN Furnish & Install Lime $ $4, $ $4, $ $3, $ LF Remove & Replace Concrete Curb & Gutter $27.00 $3, $26.00 $2, $18.00 $2, $35.00 Subtotal Pavement Items $42, $47, $42, SY Pulvermix to Minimum of 12" entire width of street $4.90 $4, $7.00 $6, $5.00 $4, $ SY F & I 4" HMAC Type D & Prime Coat $17.28 $15, $18.00 $16, $18.00 $16, $ TN F & I Cement at Minimum 30 Pounds $99.00 $1, $ $1, $ $1, $ TN F & I Lime at Minimum 36 Pounds $ $2, $ $3, $ $2, $ LF Remove & Replace Concrete Curb & Gutter $27.00 $2, $26.00 $2, $18.00 $1, $ SY Remove & Replace ConcreteValley Gutter $72.00 $10, $67.00 $9, $40.00 $5, $60.00 Subtotal Pavement Items $36, $38, $31, SY Pulvermix to Mimimum of 12" entire width of street $4.90 $34, $7.00 $49, $5.00 $35, $ SY F & I 4" HMAC Type D & Prime Coat $17.28 $120, $18.00 $126, $17.00 $119, $ TN F & I Cement at Minimum 30 Pounds per Square Yard $99.00 $10, $ $11, $ $10, $ TN F & I Lime at Minimum 36 Pounds per square yard $ $19, $ $22, $ $17, $ LF Remove & Replace Concrete Curb & Gutter $27.00 $12, $26.00 $11, $18.00 $8, $ LF F & I Concrete Curb & Gutter $26.00 $36, $24.00 $34, $18.00 $25, $ SY Remove & Replace or Furnish & Install Concrete Valley Gutter $72.00 $25, $67.00 $23, $40.00 $14, $60.00 Subtotal PVMT Items $259, $278, $230,040.00

4 SY Pulvermix to Minimum of 12" Entire Width of Streets $4.90 $7, $7.00 $10, $5.00 $7, $ SY F & I 4" HMAC Type D & Prime Coat $17.28 $25, $18.00 $27, $18.00 $27, $ TN F & I Cement at Minimum 30 Pounds per Square Yard $99.00 $2, $ $2, $ $2, $ TN F & I Lime at Minimum 36 Pounds per Square Yard $ $4, $ $4, $ $3, $ LF Remove & Replace Concrete Curb & Gutter $27.00 $3, $26.00 $2, $18.00 $2, $ SY Remove & Replace or Furnish & Install Concrete Valley Gutter $72.00 $10, $67.00 $9, $18.00 $2, $60.00 Subtotal PVMT Items $53, $57, $45, SY Pulvermix to Minimum of 12" entire Width of Street $4.90 $9, $7.00 $13, $5.00 $9, $ SY F & I 4" HMAC Type D & Prime Coat $17.28 $32, $18.00 $34, $18.00 $34, $ TN F & I Cement at Minimum 30 Pounds per Square Yard $99.00 $2, $ $3, $ $2, $ TN Furnish & Install Lime at Minimum 36 Pounds per Square Yard $ $5, $ $6, $ $4, $ LF Remove & Replace Concrete Curb & Gutter $27.00 $4, $26.00 $3, $18.00 $2, $35.00 Subtotal PVMT Items $54, $60, $54, SY Pulvermix to Minimum of 12" entire Width of Street $4.90 $15, $7.00 $21, $5.00 $15, $ SY F & I 4" HMAC Type D & Prime Coat $17.28 $53, $18.00 $56, $18.00 $56, $ TN F & I Cement at Minimum 30 Pounds per Square Yard $99.00 $4, $ $4, $ $4, $ TN Furnish & Install Lime at Minimum 36 Pounds per Square Yard $ $8, $ $10, $ $7, $ LF Remove & Replace Concrete Curb & Gutter $27.00 $5, $26.00 $5, $18.00 $3, $35.00 Subtotal PVMT Items $87, $98, $87, SY Pulvermix to Minimum of 12" entire Width of Street $4.90 $1, $7.00 $1, $5.00 $1, $ SY F & I 4" HMAC Type D & Prime Coat $17.28 $3, $18.00 $3, $18.00 $3, $ TN F & I Cement at Minimum 30 Pounds per Square Yard $99.00 $ $ $ $ $ $ TN Furnish & Install Lime at Minimum 36 Pounds per Square Yard $ $ $ $ $ $ $ LF Remove & Replace Concrete Curb & Gutter $27.00 $ $26.00 $ $18.00 $ $35.00 Subtotal PVMT Items $6, $7, $6, Subtotal Items $3,588, $4,108, $4,122, Total Amount Bid with Alternate "A-356" Alternate A 356 1LS Additional cost for using Green Cement $1, $1, $0.00 $0.00 $7, $7, $1.00 Alternate B 357 1LS Additional cost for Clean Cosntruction Equipment $50, $50, $150, $150, $27, $27, $285, Total Amount Bid $3,639, $4,258, $4,157, Total Amount Bid with Alternate "A-301"

5 PROJECT NO. WUSR09002 Bids Opened: Ju uly 19 Item Qty Unit Description LF 6" PVC C900 Water Pipe LF 6" PVC C900 Water Pipe / w18" Steel Cassing Pipe LF 6" PVC C900 Water Pipe by Bore LF 12" PVC C900 Water Pipe LF 12" PVC C900 Water Pipe By Bore EA 6" Gate Valve and Valve Box 107 5EA 12" Gate Valve and Valve Box EA R & R of Existing 6", *8" or 12" Gate Valve 109 4EA Fire Hydrant 110 4EA Remove & Salvage Fire Hydrant EA F & I 1" Water Service (Long Side) EA F & I 1" Water Service (Short Side) 113 7EA F & I 2" Water Service (Long Side) 114 7EA F & I 2" Water Service (Short Side) 115 1EA F & I 6" Blow Off Valve EA Connect to exist. 6" water line 117 5EA Connect to exist. 12" water line 118 8EA Cut and Plug exist. water line LF Trench Safety LF F & I Concrete Encasement LF Temporary Pavement Repair (Collector) LF Temporary Pavement Repair (Residential) LF Permanent Asphalt Repair (Collector) LF Permanent Pavement Repair (Residential) LF F & I Sodding LF F & I HydroMulch Seeding CY F & I 2:27 Concrete Backfill LF Repair Concrete Curb and Gutter SY Concrete Driveway Pavement Repair CY Rock Cushion 131 1LS F & I 2" Temporary Water Service 132 Sub-Total Amount of Water (Items ) LS Mobilization 202 1LS F & I Traffic Control 203 1LS Prepare, Install, Maintain & Remove SWPPP 204 1LS Provide GPS Data LF F & I 6" PVC SDR 26 Open Cut LF F & I 8" PVC SDR 26 Open Cut LF F & I 8" PVC SDR 26 w/18" Steel Casing LF F & I 10" PVC SDR LF F & I 10" PVC SDR 26 w 20" Steel Casing LF F & I 10" PVC SDR 26 w 20" Steel Casing LF F & I Cured-in-Place Pipe LF F & I 12" PVC SDR LF F & I 12" PVC SDR 26 By Short Bore w/24" Steel Casing LF F & I 12" SDR 26 By Short Bore uction, Inc. Total $88, $3, $9, $111, $9, $23, $12, $2, $11, $1, $55, $25, $18, $15, $4, $16, $16, $3, $ $11, $53, $55, $3, $3, $3, $2, $6, $9, $12, $3, $15, $606, $0.00 $140, $40, $40, $10, $2, $190, $22, $155, $4, $31, $25, $98, $20, $16,000.00

6 LF F & I 15" PVC SDR 26 Open Cut LF F & I 15" PVC SDR 26 w/ 24" Steel Casing Pipe LF F & I 15" PVC SDR 26 By Short Bore LF F & I 18" PVC SDR 26 Open Cut LF F & I 18" PVC SDR 26 w/ 30" Steel Casing EA F & I 4" Concrete Manhole w/water tight cover VF F & I Extra Depth for 4' Manhole EA F & I 5' Manhole VF F & I Extra Depth for 5' Manhole EA F & I 5' Drop Manhole VF F & I Extra Depth for 5' Drop Manhole EA Remove and Dispose of Existing Manhole 227 1EA Remove and Dispose Main Line Cleanout EA Abandon Existing Manhole EA Cut & Plug Existing Sanitary Sewer 230 3EA Connect to Existing Manhole & Rework Invert VF F & I Interior Coating for Manhole 232 1EA Connect to Existing 18" Sanitary Sewer EA Renew 4" PVC Sewer Service EA F & I Two Way Cleanout LF Relocate and Install 4" PVC Sewer Service EA F & I 4" Sewer Service On Private Property LF Repair 12" RCP Storm Sewer LF Repair 18" RCP Storm Sewer LF Repair 24" RCP Storm Sewer LF Repair 30" RCP Storm Sewer LF Repair 36" RCP Storm Sewer 242 2EA F & I Grate Inlet SY Asphalt Parking Lot/ Repair to Match SY F & I 6" Reinforced Concrete Drive Approaches LF Temporary Pavement Repair (Collector) LF Temporary Pavement Repair (Residential) LF Permanent Pavement Repair (Collector) LF Permanent Pavement Repair (Residentiall) LF Repair Concrete Curb and Gutter EA Exploratory Excavation LF Remove & Replace Existing Fencing All types LF F & I Temporary 6' Chain Link Fence LF Concrete Encasement CY F & I Gabion Mattress SY F & I Filter Fabric Under Gabiion SY Repair Concrete Channel 257 1EA Remove Existing Sanitary Sewer Line LF F & I HydroMulch Seeding LF F & I Sodding SY Repair Concrete Sidewalk SY Gravel Driveway Repair EA F & I Power Pole Bracing EA Remove, Salvage and Replace Bushes CY F & I 2:27 Concrete Backfill CY F & I Rock Cushion $384, $108, $12, $1, $203, $83, $4, $96, $20, $180, $29, $15, $ $32, $6, $6, $27, $5, $230, $9, $121, $12, $10, $1, $3, $2, $3, $7, $103, $90, $136, $215, $5, $4, $25, $11, $26, $2, $11, $14, $ $2, $2, $3, $36, $8, $ $7, $5, $6, $3,000.00

7 LF Television Inspection LF F & I Trench Safety Systems LF F & I 6' Pre Fabricated Masonry Fence 269 1LS Construction Contingency Subtotsal Sanitary Sewer Items $22, $ $22, $300, $3,485, SY Pulvermix to Minimum of 12" SY F & I 4" HMAC Type D & Prime Coat TN F & I Cement at Minimum 30 Pounds per Square Yard TN F & I Lime at Minimuym 36 Pounds per Square Yard LF Remove and Replace Concrete Curb & gutter Subtotal Pavement Items $18, $62, $5, $10, $8, $105, SY Pulvermix to Minimum of 12" entire width of street SY F & I 4" HMAC Type D & Prime Coat 308 9TN F & I Cement at Minimum 30 Pounds per Square Yard TN F & I Lime at Minimum 36 Pounds per Square Yard LF Remove & Replace Copncrete Curb & Gutter Subtotal Pavement Items $2, $9, $ $1, $1, $15, SY Pulvermix to Minimum of 12" entire width of street SY F & I 4" HMAC Type D TN F & I Cement at Minimum 30 Pounds TN Furnish & Install Lime at Minimum 36 Pounds per Square Yard LF R & I Concrete Curb & Gutter SY Remove & Repalce or furnish & Install Concrete Valley Gutter Subtotal Pavement Items $13, $46, $4, $7, $7, $4, $84, SY Pulvermix to Minimum of 12" entire width of street SY F & I 4" HMAC Type D & Prime Coat TN F & I Cement at Minimum 30 Pounds TN Furnish & Install Lime LF Remove & Replace Concrete Curb & Gutter Subtotal Pavement Items $7, $25, $2, $4, $3, $43, SY Pulvermix to Minimum of 12" entire width of street SY F & I 4" HMAC Type D & Prime Coat TN F & I Cement at Minimum 30 Pounds TN F & I Lime at Minimum 36 Pounds LF Remove & Replace Concrete Curb & Gutter SY Remove & Replace ConcreteValley Gutter Subtotal Pavement Items $4, $15, $1, $2, $2, $8, $35, SY Pulvermix to Mimimum of 12" entire width of street SY F & I 4" HMAC Type D & Prime Coat TN F & I Cement at Minimum 30 Pounds per Square Yard TN F & I Lime at Minimum 36 Pounds per square yard LF Remove & Replace Concrete Curb & Gutter LF F & I Concrete Curb & Gutter SY Remove & Replace or Furnish & Install Concrete Valley Gutter Subtotal PVMT Items $35, $119, $10, $18, $15, $42, $21, $263,110.00

8 SY Pulvermix to Minimum of 12" Entire Width of Streets SY F & I 4" HMAC Type D & Prime Coat TN F & I Cement at Minimum 30 Pounds per Square Yard TN F & I Lime at Minimum 36 Pounds per Square Yard LF Remove & Replace Concrete Curb & Gutter SY Remove & Replace or Furnish & Install Concrete Valley Gutter Subtotal PVMT Items $7, $25, $2, $4, $3, $8, $51, SY Pulvermix to Minimum of 12" entire Width of Street SY F & I 4" HMAC Type D & Prime Coat TN F & I Cement at Minimum 30 Pounds per Square Yard TN Furnish & Install Lime at Minimum 36 Pounds per Square Yard LF Remove & Replace Concrete Curb & Gutter Subtotal PVMT Items $9, $32, $2, $5, $5, $55, SY Pulvermix to Minimum of 12" entire Width of Street SY F & I 4" HMAC Type D & Prime Coat TN F & I Cement at Minimum 30 Pounds per Square Yard TN Furnish & Install Lime at Minimum 36 Pounds per Square Yard LF Remove & Replace Concrete Curb & Gutter Subtotal PVMT Items $15, $52, $4, $8, $7, $88, SY Pulvermix to Minimum of 12" entire Width of Street SY F & I 4" HMAC Type D & Prime Coat 353 4TN F & I Cement at Minimum 30 Pounds per Square Yard 354 4TN Furnish & Install Lime at Minimum 36 Pounds per Square Yard LF Remove & Replace Concrete Curb & Gutter Subtotal PVMT Items Subtotal Items $1, $3, $ $ $ $6, $4,841, Total Amount Bid with Alternate "A-356" Alternate A 356 1LS Additional cost for using Green Cement $1.00 Alternate B 357 1LS Additional cost for Clean Cosntruction Equipment $285, Total Amount Bid $5,126, Total Amount Bid with Alternate "A-301"

Granite Shoals, TX San Antonio, TX 78251

Granite Shoals, TX San Antonio, TX 78251 Water Bid Items 1 226.00 LF (103) Remove Concrete Curb $2.00 $452.00 $1.05 $237.30 $5.00 $1,130.00 $5.00 $1,130.00 2 672.00 SF (103) Remove Sidewalks and Driveways $3.00 $2,016.00 $1.75 $1,176.00 $5.00

More information

ODOT TOTAL LABOR MATERIAL LABOR/MAT'L ITEM NO. DESCRIPTION ITEM QTY. UNIT ONLY ONLY ONLY TOTAL

ODOT TOTAL LABOR MATERIAL LABOR/MAT'L ITEM NO. DESCRIPTION ITEM QTY. UNIT ONLY ONLY ONLY TOTAL CITY OF BRECKSVILLE BID TABULATION CARRIAGE HILL DRIVE PUMP STATION ABANDONMENT AND SANITARY IMPROVEMENTS PROJECT NO. 3810-224 BID OPENING: SEPTEMBER 19, 2014 10:00 a.m. Present were: Becki Burlingham,

More information

Vista del Sol Drive Improvements Bid Date: February 23, 2017 Camino Real Regional Mobility Authority ATKINS NORTH AMERICA

Vista del Sol Drive Improvements Bid Date: February 23, 2017 Camino Real Regional Mobility Authority ATKINS NORTH AMERICA Vista del Sol Drive Improvements Bid Date: February 23, 2017 Camino Real Regional Mobility Authority ATKINS NORTH AMERICA BAIN CONSTRUCTION CMD ENDEAVORS, INC. DAN WILLIAMS JORDAN FOSTER CONSTRUCTION Key

More information

Karvo Paving Company Hudson Drive Stow, OH Unit Price Labor & Material Total Unit Price Labor Unit Price Material

Karvo Paving Company Hudson Drive Stow, OH Unit Price Labor & Material Total Unit Price Labor Unit Price Material ITEM SPEC CMS DESCRIPTION QUANTITY Labor Labor Labor 1 201 ODOT CLEARING AND GRUBBBING 1 $13,000.00 $0.00 $13,000.00 $13,000.00 $6,800.00 $10,200.00 $17,000.00 $17,000.00 $75,000.00 $0.00 $75,000.00 $75,000.00

More information

CONSTRUCTION & DEVELOPMENT MANUAL SUMTER COUNTY, FLORIDA

CONSTRUCTION & DEVELOPMENT MANUAL SUMTER COUNTY, FLORIDA CONSTRUCTION & DEVELOPMENT MANUAL SUMTER COUNTY, FLORIDA Original: June 1, 2004 Revised: May 31, 2005 Revised: August 8, 2006 Revised: September 1, 2006 Revised: August 20, 2007 Revised: November 1, 2011

More information

SAN ANTONIO WATER SYSTEM CENTRAL SEWERSHED PACKAGE 3. SAWS Job No SAWS Solicitation No. CO ADDENDUM NO. 1 September 27, 2017

SAN ANTONIO WATER SYSTEM CENTRAL SEWERSHED PACKAGE 3. SAWS Job No SAWS Solicitation No. CO ADDENDUM NO. 1 September 27, 2017 SAN ANTONIO WATER SYSTEM CENTRAL SEWERSHED PACKAGE 3 SAWS Job No. 17-4528 SAWS Solicitation No. CO-00139 September 27, 2017 To Bidder of Record: This addendum, applicable to work referenced above, is an

More information

TABLE OF CONTENTS. Section 2.0 GENERAL PLAN REQUIREMENTS 05/2011. Section 100 ROADWAY DESIGN 01/2016

TABLE OF CONTENTS. Section 2.0 GENERAL PLAN REQUIREMENTS 05/2011. Section 100 ROADWAY DESIGN 01/2016 TABLE OF CONTENTS The City Standard Manual was revised in 2010. Please see dates in the revised column for details that have been modified after 2010. PART 1 - DESIGN STANDARDS Section 1.0 ENGINEERING

More information

U.S. Trade Connection at Eagle Pass Project Appendix B: Cost Estimate

U.S. Trade Connection at Eagle Pass Project Appendix B: Cost Estimate U.S. Trade Connection at Eagle Pass Project Appendix B: Cost Estimate TIGER FY17 Grant Application October 2017 Appendix B Cost Estimate B-1 FY17 TIGER U.S. Trade Connection at Eagle Project Preliminary

More information

DISTRIBUTION OF QUANTITIES

DISTRIBUTION OF QUANTITIES DISTRIBUTION OF QUANTITIES Index: 1 Table of Contents - Distribution of Quantities R.I. Contract - 2018-CB-109 Description Page 201.0403 REMOVE AND DISPOSE SIDEWALKS 1 201.0407 REMOVE AND DISPOSE PAVEMENT

More information

DISTRIBUTION OF QUANTITIES

DISTRIBUTION OF QUANTITIES DISTRIBUTION OF QUANTITIES Index: 1 Table of Contents - Distribution of Quantities R.I. Contract - 2018-CB-059 Description Page 201.0415 REMOVE AND DISPOSE GUARDRAIL AND POST ALL TYPES 1 201.9901 REMOVE

More information

NOTE ACCT #41211 MTR # ACCT #41212 MTR # ACCT #41210 MTR # ACCT #41213 MTR # ACCT #41209 MTR # ACCT #41214 MTR #728841

NOTE ACCT #41211 MTR # ACCT #41212 MTR # ACCT #41210 MTR # ACCT #41213 MTR # ACCT #41209 MTR # ACCT #41214 MTR #728841 The Contractor shall notify the Inspection Division at the LVVWD (702-258-3227) 48 hours prior to the requested removal time to allow the District to take the final meter reading. After the final reading

More information

City of Regina Standard Construction Specification SECTION 1499 LISTING OF SEWER STANDARD DRAWINGS

City of Regina Standard Construction Specification SECTION 1499 LISTING OF SEWER STANDARD DRAWINGS City of Regina Standard Construction Specification SECTION 1499 LISTING OF SEWER STANDARD DRAWINGS S-1 Removed Feb/10 S-2 Precast Manhole 1050mm Dia. July/10 S-3 Precast Concrete Deep Manhole Jan/11 S-4

More information

EX. 8" PVC WATER MAIN EXISTING FIRE HYDRANT TO REMAIN LOS RIOS ST. N02 22' 25"W 43.75' S89 35' 25"E 14.98' N02 16' 42"W ' N02 22' 25"W 42.

EX. 8 PVC WATER MAIN EXISTING FIRE HYDRANT TO REMAIN LOS RIOS ST. N02 22' 25W 43.75' S89 35' 25E 14.98' N02 16' 42W ' N02 22' 25W 42. EX. 8" PVC WATER MAIN EXISTING FIRE HYDRANT TO REMAIN EX. 6" PVC WATER MAIN LOS RIOS ST. N02 22' 25"W 43.75' EX. 8" PVC WATER MAIN N02 02' 43"E 102.62' "W 45.14' 6X6X6 TEE W/ 8" REDUCER AND GATE VALVE

More information

Griffin Construction Co Inc. Midwest Contracting, LLC JB Holland Constr. Inc.

Griffin Construction Co Inc. Midwest Contracting, LLC JB Holland Constr. Inc. ABSTRACT OF BIDS SAP 023-601-027 April 25, 2016 ENGINEER'S ESTIMATE Griffin Construction Co Inc. Midwest Contracting, LLC JB Holland Constr. Inc. Estimated 14070 Hwy 52S 2948 271st Ave. 2092 Hwy 9W Total

More information

USING UNIT COSTS FOR REIMBURSABLE UTILITY RELOCATIONS

USING UNIT COSTS FOR REIMBURSABLE UTILITY RELOCATIONS Quiroga, Ford, Kranc, Kraus, Taylor 1 USING UNIT COSTS FOR REIMBURSABLE UTILITY RELOCATIONS Paper 08-2942 Transportation Research Board 87 th Annual Meeting (January 13-17, 2008) Cesar Quiroga, Ph.D.,

More information

DESCRIPTION SITE SUITABILITY. Advantages. Disadvantages. Alternative Names: Fiber Roll Barriers, Sediment Log, Coir Roll and Coir Log

DESCRIPTION SITE SUITABILITY. Advantages. Disadvantages. Alternative Names: Fiber Roll Barriers, Sediment Log, Coir Roll and Coir Log 4.5-q FIBER ROLL Alternative Names: Fiber Roll Barriers, Sediment Log, Coir Roll and Coir Log DESCRIPTION Fiber rolls are sediment control devices made from fibrous organic material, such as rice or coconut

More information

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT TABLE OF CONTENTS INTRODUCTORY INFORMATION 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Notice to Bidders

More information

CITY OF DRAPER PROPERTY & PUBLIC RIGHTS OF WAY ENCROACHMENT PERMIT APPLICATION & AGREEMENT

CITY OF DRAPER PROPERTY & PUBLIC RIGHTS OF WAY ENCROACHMENT PERMIT APPLICATION & AGREEMENT CITY OF DRAPER PROPERTY & PUBLIC RIGHTS OF WAY ENCROACHMENT PERMIT APPLICATION & AGREEMENT 1020 East Pioneer Road, Draper, UT 84020 Phone (801) 576-6585 Email engineering@draper.ut.us The Following items

More information

Series P. Solvent Weld Sewer Fittings SDR 35. Solvent Weld Sewer Fittings SDR 35 P Series

Series P. Solvent Weld Sewer Fittings SDR 35. Solvent Weld Sewer Fittings SDR 35 P Series Solvent ITEM Weld INCHES NUMBER Sewer QTY Fittings QTY PRICE SDR ITEM 35 INCHES NUMBER QTY QTY PRICE Injection Molded in Sizes 3 12 Fabricated in Sizes 10 27 page 27 Phone: 586-781-2700 Toll Free: 1-800-232-5690

More information

UGA DESIGN & CONSTRUCTION SUPPLEMENTAL GENERAL REQUIREMENTS & STANDARDS TABLE OF CONTENTS

UGA DESIGN & CONSTRUCTION SUPPLEMENTAL GENERAL REQUIREMENTS & STANDARDS TABLE OF CONTENTS Table of Contents Introduction Changes from September 16, 2013 version to January 16, 2015 version Supplemental General Requirements (asterisk * indicates revised) 00 00 02 Terms * 00 00 03 Modifications

More information

BID ISSUE DATE: JUNE 2016

BID ISSUE DATE: JUNE 2016 July 11, 2016 To All Plan Holders: ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS FOR CHATHAM COUNTY SOLID WASTE AND RECYCLING RECYCLING STATION BID ISSUE DATE: JUNE 2016 The following revisions, additions and

More information

Urban Elements Catalogue - standard details revision description (December 2018) Standard Title Revision Revision Description Date Number C Kerb

Urban Elements Catalogue - standard details revision description (December 2018) Standard Title Revision Revision Description Date Number C Kerb Urban Elements Catalogue - standard details revision description (December 2018) Standard Title Revision Revision Description Date Number C111-01 Kerb & Watertable (Type 1) A Reinforcing mesh amended.

More information

ING CITY COUNCIL AGENDA REPORT. Honorable Mayor and City Council Members. Director of Public Works - Utilities. Final Payment Applications

ING CITY COUNCIL AGENDA REPORT. Honorable Mayor and City Council Members. Director of Public Works - Utilities. Final Payment Applications City of RED W1' ING CITY COUNCIL AGENDA REPORT TO: Honorable Mayor and City Council Members FROM: Bob Stark Deputy Director of Public Works - Utilities Agenda Item No.: 8- M Meeting Date: September 25,

More information

Why Barnegat Township Started our GIS/GPS Program. Why Barnegat Township Started our GIS/GPS Program. 10/23/2015

Why Barnegat Township Started our GIS/GPS Program. Why Barnegat Township Started our GIS/GPS Program. 10/23/2015 WATER & WASTEWATER GIS/GPS DATA SYSTEMS Why Barnegat Township Started our GIS/GPS Program. Roger Budd & John Randazzo Barnegat Water & Sewer Utilities Why Barnegat Township Started our GIS/GPS Program.

More information

NATIONAL DEMOLITION ASSOCIATION PROJECT PRE-START SURVEY

NATIONAL DEMOLITION ASSOCIATION PROJECT PRE-START SURVEY NATIONAL DEMOLITION ASSOCIATION PROJECT PRE-START SURVEY PROJECT INFORMATION Project Name Project Number Project Location City Legal Description: Plat # State Zip Code County Client Client Address Contact(s)

More information

UGA DESIGN & CONSTRUCTION SUPPLEMENTAL GENERAL REQUIREMENTS & STANDARDS TABLE OF CONTENTS

UGA DESIGN & CONSTRUCTION SUPPLEMENTAL GENERAL REQUIREMENTS & STANDARDS TABLE OF CONTENTS Table of Contents Introduction Changes from August 1, 2016 version to April 30, 2018 Supplemental General Requirements (asterisk * indicates revised) 00 00 02 Terms 00 00 03 Modifications to General Requirements

More information

CITY OF FREMONT SPECIFICATIONS 2017 WATER & SEWER MAINTENANCE SUPPLIES

CITY OF FREMONT SPECIFICATIONS 2017 WATER & SEWER MAINTENANCE SUPPLIES CITY OF FREMONT SPECIFICATIONS 2017 WATER & SEWER MAINTENANCE SUPPLIES All bidders MUST submit product specifications, literature describing items, manufacturers name, product code and part numbers with

More information

W Dr Roseville Rd Station Dr Public Works Engineering 311 Vernon Street Roseville, California 95678-2649 INTERSECTION RED FLASH APPROVAL With stamped approval of this letter by the Traffic Section,

More information

Sam Roberts & Associates, Inc. South Texas 3300 Capitol Houston, Texas Fax:

Sam Roberts & Associates, Inc.  South Texas 3300 Capitol Houston, Texas Fax: Solvent Weld Sewer Fittings SDR 35 Injection Molded in Sizes 3 12 Fabricated in Sizes 10 36 P Applications Plastic Trends has the broadest product offering of Solvent Weld Sewer fittings in the industry.

More information

REVISION INFORMATION SHEET ONTARIO PROVINCIAL STANDARDS FOR ROADS AND PUBLIC WORKS

REVISION INFORMATION SHEET ONTARIO PROVINCIAL STANDARDS FOR ROADS AND PUBLIC WORKS Ontario Provincial Standards Unit 301 St. Paul St., 2 nd Floor North St. Catharines, ON L2R 7R4 REVISION INFORMATION SHEET ONTARIO PROVINCIAL STANDARDS FOR ROADS AND PUBLIC WORKS VOLUME 7 MUNICIPAL-ORIENTED

More information

CertainTeed. Access Covers and Gratings. SELECTA Curb Units

CertainTeed. Access Covers and Gratings. SELECTA Curb Units CertainTeed Access Covers and Gratings SELECTA Curb Units Advanced Design SELECTA curb units have been developed to complement the technically advanced range of municipal castings now available to the

More information

Newbury Street Water Main Replacement Project

Newbury Street Water Main Replacement Project Newbury Street Water Main Replacement Project Newbury Street Water Main Replacement Project Purpose and Goals Replace existing 1901 1913 water mains on Newbury Street from Arlington Street to Gloucester

More information

Heavy Wall Gasketed Sewer Fittings SDR 26 Injection Molded in Sizes 4" 12" Fabricated in Sizes 15" 36"

Heavy Wall Gasketed Sewer Fittings SDR 26 Injection Molded in Sizes 4 12 Fabricated in Sizes 15 36 eavy Wall Gasketed Sewer Fittings SDR Injection Molded in Sizes " " Fabricated in Sizes " " With a.% thicker wall than SDR and high impact retention ring, Royal Building Product s PVC eavy Wall Gasketed

More information

Appendix C.6. Best Management Practices for Construction Activities

Appendix C.6. Best Management Practices for Construction Activities Appendix C.6 Best Management Practices for Construction Activities In accordance with Section F.2 of San Diego Regional Water Quality Control Board (RWQCB) Order 2001-01 (Permit), the City of La Mesa has

More information

32 sewer jetting & vacuum combination truck, including disposal of debris

32 sewer jetting & vacuum combination truck, including disposal of debris BMC CORP. 32 sewer jetting & vacuum combination truck, including disposal of debris $ 194.00 $ 194.00 $ 194.00 8 1.25 1.25 VAC-CON 2012 TWO UNITS 33 closed circuit television inspection equipment, necessary

More information

Chapman Fence Company, Inc. (OC) UNIT PRICE

Chapman Fence Company, Inc. (OC) UNIT PRICE BID TABULATION Page 1 of 6 SECTION A - GALVANIZED CHAIN LINK FENCE 1 3 tall complete fence installation 10 lf $9.00 $90.00 $9.25 $92.50 $11.15 $111.50 2 4 tall complete fence installation 260 lf $10.72

More information

Section 7.I: Estimates Backup. 7.I Estimates Back-Up

Section 7.I: Estimates Backup. 7.I Estimates Back-Up Section 7.I: Estimates Backup 1 7.I Estimates Back-Up March 29, 2013 Kathy Wallace, AIA Principal - Cuningham Group St. Anthony Main 201 Main Street SE, Suite 325 Minneapolis MN 55414 RE: Minnesota State

More information

SKC-049 RESIDENCE. NMSD Site Improvements Phase 2 Santa Fe, New Mexico Scale: 1" = 20'-0" ADD-002 ISSUED FOR: MB/GSB PW/R

SKC-049 RESIDENCE. NMSD Site Improvements Phase 2 Santa Fe, New Mexico Scale: 1 = 20'-0 ADD-002 ISSUED FOR: MB/GSB PW/R RESIDENCE O/R /R W/R W/R /R /R /R /R /R NMSD Site Improvements Phase Scale: " = 0'-0" 06.0.05 MB/GSB BO ISSUED FOR: 4-000 REF: C-306 W/R W/R W/RW/R W/R W/R W/R W/R FO ADD-00 SKC-049 W/R W FO T R NMSD Site

More information

TRAINING GUIDE. Lucity Mobile In Depth

TRAINING GUIDE. Lucity Mobile In Depth TRAINING GUIDE Lucity Mobile In Depth Lucity Mobile An In Depth Look at our Tablet offering In this booklet, we ll cover how the Lucity Mobile app works, tips on setting it up, and features that are coming

More information

Prime Contractor DBE Solicitation Effort Help Guide

Prime Contractor DBE Solicitation Effort Help Guide Bureau of Clean Water Prime Contractor DBE Solicitation Effort Help Guide The DBE solicitation process does not require you to hire a certain number of DBE firms and does not have goals. The purpose of

More information

ADDENDUM NO. 02 INVITATION NUMBER:

ADDENDUM NO. 02 INVITATION NUMBER: ADDENDUM NO. 02 INVITATION NUMBER: 160190 DATE: TO: PROSPECTIVE BIDDERS REFERENCE: B STREET/NEW JERSEY AVENUE TRUNK SEWER REHABILITATION AND CLEANING PHASE 1 THIS PAGE IS INTENTIONALLY LEFT BLANK DISTRICT

More information

REVISION INFORMATION SHEET ONTARIO PROVINCIAL STANDARDS FOR ROADS AND PUBLIC WORKS

REVISION INFORMATION SHEET ONTARIO PROVINCIAL STANDARDS FOR ROADS AND PUBLIC WORKS Ontario Provincial Standards Unit 301 St. Paul St., 2 nd Floor North St. Catharines, ON L2R 7R4 REVISION INFORMATION SHEET ONTARIO PROVINCIAL STANDARDS FOR ROADS AND PUBLIC WORKS VOLUME 5 PROVINCIAL-ORIENTED

More information

Solvent Weld Sewer Fittings SDR 35 Injection Molded in Sizes 3" 12" Fabricated in Sizes 10" 36"

Solvent Weld Sewer Fittings SDR 35 Injection Molded in Sizes 3 12 Fabricated in Sizes 10 36 Solvent Weld Sewer Fittings SDR 5 Injection Molded in Sizes " " Fabricated in Sizes 0" " Applications Royal Building roducts has the broadest product offering of Solvent Weld Sewer fittings in the industry.

More information

INTRODUCTION TO VOLUME MEASUREMENTS Volume measurements are needed for three different categories of pay items:

INTRODUCTION TO VOLUME MEASUREMENTS Volume measurements are needed for three different categories of pay items: INTRODUCTION TO VOLUME MEASUREMENTS Volume measurements are needed for three different categories of pay items: Earthwork --items such as borrow excavation, and subsoil excavation Concrete -- the various

More information

Solvent Weld Sewer Fittings SDR 35 Injection Molded in Sizes 3 12 Fabricated in Sizes 10 36

Solvent Weld Sewer Fittings SDR 35 Injection Molded in Sizes 3 12 Fabricated in Sizes 10 36 Solvent Weld Sewer Fittings SDR 5 Injection Molded in Sizes Fabricated in Sizes 0 Applications Royal Building roducts has the broadest product offering of Solvent Weld Sewer fittings in the industry. They

More information

Construction Guidelines. for Providing Communications Services

Construction Guidelines. for Providing Communications Services Construction Guidelines for Providing Communications Services TABLE OF CONTENTS Residential Home Wiring...Page 3 Pre-Construction Checklist...Page 4 Line Extensions...Page 4 Mobile Home Parks Basic Requirements...Page

More information

SUB-CONTRACTOR PRE-QUALIFICATION FORM

SUB-CONTRACTOR PRE-QUALIFICATION FORM CONTACT INFORMATION Company Contact Person: Title: Street Address: Suite No.: EXPERIENCE City: Zip: 1. Please check the CSI Codes applicable to your business: 02 00 00 Existing Conditions 02 20 00 Assessment

More information

CONTINUUM PLANNING AND DEVELOPMENT TRUST. Urban Regional Environmental. constant reforms

CONTINUUM PLANNING AND DEVELOPMENT TRUST. Urban Regional Environmental. constant reforms Urban Regional Environmental policy strategy planning design awareness development administration management United Nations International Conference on Space-based Technologies for Disaster Risk Reduction

More information

TRIMBLE WESTMINSTER BUILDING PROJECT / 2013

TRIMBLE WESTMINSTER BUILDING PROJECT / 2013 TRIMBLE WESTMINSTER BUILDING PROJECT - 2012 / 2013 OVERVIEW Outgrowing its current office facility in Westminster, Colorado, Trimble decided to build a larger campus across the street from their current

More information

SAN ANTONIO WATER SYSTEM. Infrastructure Planning GIS / Mapping Division CADD STANDARDS

SAN ANTONIO WATER SYSTEM. Infrastructure Planning GIS / Mapping Division CADD STANDARDS SAN ANTONIO WATER SYSTEM Infrastructure Planning GIS / Mapping Division CADD STANDARDS INFRASTRUCTURE PLANNING CADD STANDARDS SAN ANTONIO WATER SYSTEM 2800 U.S. Hwy. 28 Nth San Antonio, TX 7822 www.saws.g

More information

TECH FACTS WELDED WIRE REINFORCEMENT FOR CIRCULAR CONCRETE PIPE. Excellence Set in Concrete.

TECH FACTS WELDED WIRE REINFORCEMENT FOR CIRCULAR CONCRETE PIPE. Excellence Set in Concrete. TECH FACTS TF 306-R-10 Excellence Set in WIRE REINFORCEMENT INSTITUTE 942 Main Street Suite 300 Hartford, CT 06103 (800) 552-4WRI [4974] WELDED WIRE REINFORCEMENT FOR CIRCULAR CONCRETE PIPE pipe producers

More information

Public Works 2017 Budget Presentation. Public Works What We Do

Public Works 2017 Budget Presentation. Public Works What We Do Public Works 2017 Budget Presentation Public Works What We Do The Public Works Department interacts with all citizens of the county and our visitors for which our work activities have a direct impact.

More information

HEC-22 Inlets in INFOSWMM and H2OMAP SWMM v12

HEC-22 Inlets in INFOSWMM and H2OMAP SWMM v12 HEC-22 Inlets in INFOSWMM and H2OMAP SWMM v12 Table of Contents How the Inlet and Overland Junctions are Defined 3 Why Would You Use the HEC-22 Inlets Option? 4 Types of Inlets 5 Nodes in InfoSWMM and

More information

DUE DILIGENCE REPORT

DUE DILIGENCE REPORT DUE DILIGENCE REPORT PREPARED FOR: TENANT: PROJECT LOCATION: 404 Cooper St. N.E.C Cooper St. & Warren St. Beverly, Burlington County, NJ TABLE OF CONTENTS: I. EXECUTIVE SUMMARY & SITE RISK ASSESSMENT II.

More information

Converting Sewer and Stormwater. Why, how and what did the City of Portland, ME get out of it?

Converting Sewer and Stormwater. Why, how and what did the City of Portland, ME get out of it? Converting Sewer and Stormwater assets to Esri s LGIM Why, how and what did the City of Portland, ME get out of it? Jessica Gooch Asset Management Technician City of Portland Maine, Water Resources Division

More information

OpenRoads Creating Subsurface Utility Models

OpenRoads Creating Subsurface Utility Models OpenRoads Creating Subsurface Utility Models Existing and Proposed Utilities Presenter: Robert Garrett, PE Bentley Systems, Incorporated 685 Stockton Drive Exton, PA 19341 www.bentley.com Before you Begin:...

More information

DRAINAGE PRODUCTS CATALOG

DRAINAGE PRODUCTS CATALOG DRAINAGE PRODUCTS CATALOG 12 Round Drainage Boes 12 Standard Flat Grate Part #: 3017-GE 12 Flat Cover Part #: 3017-C The Polylok Drainage Bo is the most versatile bo on the market today. You can choose

More information

Third Party Tested. Sam Roberts & Associates, Inc.

Third Party Tested. Sam Roberts & Associates, Inc. Perfect Fit Solvent Weld DWV Fittings Injection Molded in Sizes 4 12 Fabricated in Sizes 10 24 D Applications The most complex installations require the most advanced fittings. Injection molded Perfect

More information

FACILITY COMPONENTS - MIDDLE SCHOOL

FACILITY COMPONENTS - MIDDLE SCHOOL SITE AREAS Parking and Access - Buses 4.0 2.0 0.59 Parking and Access - Serv. / Delivery 3.0 1.0 0.22 Parking and Access - Staff 4.0 3.0 0.89 Parking and Access - Visitors 4.0 3.0 0.89 Parking and Access

More information

Traverse City Asset Management Plan

Traverse City Asset Management Plan Utilities and Public Services Larry LaCross, GISP, Asset Management/GIS Analyst Traverse City Department of Public Services Introduction About Traverse City (TC) TC Assets Department of Public Services

More information

REFERENCE. Section 9. Appendix 2-1

REFERENCE. Section 9. Appendix 2-1 REFERENCE Section 9 Appendix 2-1 REFERENCE 2-2 Using Auto Save The Auto Save feature automatically saves your job to ensure data is not lost during an inadvertent termination of Sitework 4D. To edit the

More information

R-4028 Cast Iron Underdrain. R-4030 to R-4040 Series

R-4028 Cast Iron Underdrain. R-4030 to R-4040 Series For a complete listing of FREE OPEN AREAS and PERIMETERS of all grates, refer to pages 306-311. R-4028 Cast Iron Underdrain Drawing demonstrates cast iron underdrain sections used along railroad right-of-way.

More information

UtilityScan. Quick Start Guide. A Fast Check List For Field Operation

UtilityScan. Quick Start Guide. A Fast Check List For Field Operation Quick Start Guide A Fast Check List For Field Operation Section 1: Startup System... 1 Section 2: Data Collection Setup... 2 Section 3: Collecting Data... 5 Section 4: Data Playback and Review... 7 Section

More information

2015 Township Permits and Fees 12/21/2015

2015 Township Permits and Fees 12/21/2015 Berlin $25.00 + $.10 per sq. ft. Swimming Pool Permit $12.50 Variances $150.00 $150.00 $250.00 (2 meetings) $125 additional meeting Zoning Permits $25.00 + $.10 per sq. ft. Brown $150.00 $100.00 Variances

More information

Collections Exam Need to Know Criteria

Collections Exam Need to Know Criteria Equipment Operation & Evaluation Class 1 Class 2 Class 3 Class 4 Operate drives X X X X Operate electronic testing equipment X X X X Operate hand and power tools X X X X Operate heavy equipment X X X X

More information

PROJECT CONSTRUCTION SUMMARY

PROJECT CONSTRUCTION SUMMARY 1 Estimate #: 1586 Due Date: 11/13/15 Location: Coralville, Iowa Architect: JLG PROJECT CONSTRUCTION SUMMARY Description Quantity Total Cost Unit Cost Variance 10/20/2015 Estimate Sports Performance Building

More information

Hydraulics and Floodplain Modeling Modeling with the Hydraulic Toolbox

Hydraulics and Floodplain Modeling Modeling with the Hydraulic Toolbox v. 9.1 WMS 9.1 Tutorial Hydraulics and Floodplain Modeling Modeling with the Hydraulic Toolbox Learn how to design inlet grates, detention basins, channels, and riprap using the FHWA Hydraulic Toolbox

More information

SpecLink-E Catalog Listing As Of: June, 2015

SpecLink-E Catalog Listing As Of: June, 2015 DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS Catalog Updated 00 0101 - BSD Project Title Page This document is intentionally blank. Add the specifics needed for the project. ASCLME# Feb 2009 00

More information

BGE Service Application Guidelines Residential Development Projects

BGE Service Application Guidelines Residential Development Projects BGE Service Application Guidelines Residential Development Projects To the Developer Following is important information to assist you in applying for BGE gas and/or electric service and completing the

More information

SYLLABUS FOR PLUMBING & SANITARY TRADE

SYLLABUS FOR PLUMBING & SANITARY TRADE SYLLABUS FOR PLUMBING & SANITARY TRADE Duration at Skills Training Institute (Spread in three months) : 600 Hrs 1. Introduction to ITI : 3 Hrs 2. Introduction to the Trade : 3 Hrs 3. Introduction to Trade

More information

Asset Management Plan

Asset Management Plan Water Town of Englehart Asset Management Plan Prepared by: AECOM 2 1 Station Road, PO Box 736 705 679 5979 tel Cobalt, ON, Canada P0J 1C0 705 679 5750 fax www.aecom.com Project Number: 60286316 Date: January

More information

City of San Antonio Utilizing Advanced Technologies for Stormwater System Mapping and Condition Assessments

City of San Antonio Utilizing Advanced Technologies for Stormwater System Mapping and Condition Assessments City of San Antonio Utilizing Advanced Technologies for Stormwater System Mapping and Condition Assessments Prepared for: Prepared by Noelle Gaspard, PE, GISP, CFM Agenda Purpose Project Overview Challenges

More information

UtilityScan TM. Locate and Map Underground Utilities with GPR. Typical Uses. Designate Targets.

UtilityScan TM. Locate and Map Underground Utilities with GPR. Typical Uses.   Designate Targets. UtilityScan TM Locate and Map Underground Utilities with GPR UtilityScan is the industry standard ground penetrating radar solution for the designation of subsurface utilities. With UtilityScan, users

More information

BALTIMORE UTILITY ASSET MANAGEMENT DIVISION

BALTIMORE UTILITY ASSET MANAGEMENT DIVISION BALTIMORE UTILITY ASSET MANAGEMENT DIVISION Baltimore City s Asset Management Program Sustainable Best Management Practices in Transportation Workshop July 16, 2013 Rudy S. Chow, P.E. Bureau Head Alfred

More information

LEARN INSTA COST A Software for Estimating Project Cost & Tender SOQ Instantly

LEARN INSTA COST A Software for Estimating Project Cost & Tender SOQ Instantly LEARN INSTA COST A Software for Estimating Project Cost & Tender SOQ Instantly By : Y.A. Agboatwala & Fatima.Y. Agboatwala 1802, Jamuna Amrut, 219, Patel Estate, S.V.Road, Jogeshwari(W), Mumbai - 400102

More information

PVC SOLVENT WELD DRAIN WASTE & VENT

PVC SOLVENT WELD DRAIN WASTE & VENT PVC-17R PAGE 1 november 007 COUPLING (Hub x Hub) 0 110 11 11 11 1171 1 1/ 0 7 00 00 0 10.9.79 1.0.. 1. REDUCER BUSHING (Spigot x Hub) Style 17 x TRAP ADAPTER (Spigot x Slip Joint ) 1 19.71 REDUCER COUPLING

More information

the City of Palm Bay Brevard County Florida held on November

the City of Palm Bay Brevard County Florida held on November RESOLUTION NO 2018-60 A RESOLUTION OF THE CITY OF PALM BAY, BREVARD COUNTY, FLORIDA, AMENDING RESOLUTION NO 2018-45, ADOPTING RATES, CHARGES, AND FEES, FOR FISCAL YEAR 2018-2019, PURSUANT TO THE CITY OF

More information

Operating Instructions

Operating Instructions CS202S CarSense Vehicle Motion Detector Operating Instructions CAUTIONS AND WARNINGS Never use the CS202 as a safety reversing or presence detection system. The CS202 requires that a vehicle be moving

More information

Post Office Box Tampa, FL (813) FAX (813)

Post Office Box Tampa, FL (813) FAX (813) Post Office Box 16039 - Tampa, FL 33687-6039 (813) 740-1144 - FAX (813) 627-9387 August 13, 2008 Contractor Attn: Estimating EXAMPLE TAKE-OFF Project: CENTRAL PASCO WATER SYSTEM IMPROVEMENTS - BOYETTE

More information

Gabion Box. Selvedge Wire (mm) 6x Mesh Wire (mm) Mesh Opening (cm) Lacing Wire (mm) LxWxH (m) Plastics Coated.

Gabion Box. Selvedge Wire (mm) 6x Mesh Wire (mm) Mesh Opening (cm) Lacing Wire (mm) LxWxH (m) Plastics Coated. Gabion Box LxWxH (m) 2x1x0.5 Opening (cm) Selvedge Lacing Square meter Material 8x10 2.00-3.05 2.7-3.8 Hot dip galvanized 2.2-3.0 10x12 2.00-3.20 2.7-4.0 High galvanized 7.5 12x15 2.00-3.80 2.7-4.2 5%

More information

Good Morning. ELAN Technologies Profile

Good Morning. ELAN Technologies Profile Good Morning Today s Presentation by: Tom Kirkland President ELAN Technologies Credits: Dave Weakley, City of Palos Hills, IL Ben Kinney, City of Palos Hills, IL ELAN Technologies Profile ELAN Technologies

More information

Director of Public Works/City Engineer. Secretary. Word Processor. Streets and Facilities Supervisor. Traffic Signal Technician.

Director of Public Works/City Engineer. Secretary. Word Processor. Streets and Facilities Supervisor. Traffic Signal Technician. PUBLIC WORKS ORGANIZATIONAL CHART Director of Public Works/City Engineer Secretary Word Processor Transit Services Manager Fleet Services Supervisor Streets and Facilities Supervisor Principal Principal

More information

If this page is not signed and included with your bid, it will be disqualified.

If this page is not signed and included with your bid, it will be disqualified. If this page is not signed and included with your bid, it will be disqualified. Form BO2 Date: CITY OF SAGINAW PURCHASING OFFICE 1315 S. WASHINGTON AVENUE SAGINAW, MICHIGAN 48601 TO: PROSPECTIVE BIDDERS

More information

SANITATION PROJECTS. Current Year Project Future Year Project. 2 10" to 14" Sewerline Rehab (Various Locations - Not Mapped)

SANITATION PROJECTS. Current Year Project Future Year Project. 2 10 to 14 Sewerline Rehab (Various Locations - Not Mapped) SANITATION PROJECTS Sanitation projects represent three categories of capital improvements: facilities replacement projects, sewerline replacement projects, and capital projects to expand or upgrade the

More information

AGENDA. 11. Finance, License and Regulation Committee Recommendations of January 2, 2018 Ald. Kordus

AGENDA. 11. Finance, License and Regulation Committee Recommendations of January 2, 2018 Ald. Kordus City of Lake Geneva 626 Geneva St Lake Geneva, WI 53147 (262) 248-3673 www.cityoflakegeneva.com 1. Mayor Kupsik calls the meeting to order REGULAR CITY COUNCIL MEETING MONDAY, JANUARY 08, 2018 6:00 PM

More information

June 1, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA

June 1, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA June 1, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA REVISED AMENDMENT NO.3/ CONTRACT NO. Y16-182 TERM CONTRACT FOR COUNTY WIDE ROOF MAINTENANCE AND REPAIR ADVANCED ROOFING, INC. 200 Northstar

More information

CarSense202 O P E R A T I N G I N S T R U C T I O N S V E HI C L E M O T I O N D E T E C T O R Johnston Parkway, Cleveland, Ohio 44128

CarSense202 O P E R A T I N G I N S T R U C T I O N S V E HI C L E M O T I O N D E T E C T O R Johnston Parkway, Cleveland, Ohio 44128 O P E R A T I N G I N S T R U C T I O N S CarSense202 V E HI C L E M O T I O N D E T E C T O R 4564 Johnston Parkway, Cleveland, Ohio 44128 P. 800 426 9912 F. 216 518 9884 Sales Inquiries: salessupport@emxinc.com

More information

CONTRACT ITEM NO. PROJECT TOTALS. Plan. As Const Inlet Type C (15 Foot) 5,586 5,103 70, , ,861

CONTRACT ITEM NO. PROJECT TOTALS. Plan. As Const Inlet Type C (15 Foot) 5,586 5,103 70, , ,861 6 6 6 6 6 6 6 6 6 6 66 66 66 66 66 66 66 66 66 66 68 68 69 69 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 6 67 68 68 6 6 6 6 65 66 67 67 6 7 7 7 7 7 7 nlet Type C ( oot) nlet Type C (5

More information

HAYSVILLE USD 261 Preliminary Project Timeline

HAYSVILLE USD 261 Preliminary Project Timeline HAYSVILLE USD 261 Preliminary Project Timeline 2015 2016 2017 2018 Package J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D June 9th Election 1 Campus High School ##

More information

DUKE UNIVERSITY CONSTRUCTION STANDARDS

DUKE UNIVERSITY CONSTRUCTION STANDARDS 1 00 01 10 Table of Contents DIVISION 00: PROCUREMENT AND CONTRACTING REQUIREMENTS 00 01 10 Table of Contents 06.17.2014 00 21 13 Instructions to Bidders 11.08.2013 00 22 13 Supplementary Instructions

More information

TOWN OF FARMINGTON FEE SCHEDULE 2017

TOWN OF FARMINGTON FEE SCHEDULE 2017 TOWN OF FARMINGTON FEE SCHEDULE 2017 Adopted by Town Board Resolution # of 2017 All of the following town fees are to be paid at the Town Clerk s Office during normal business hours, Monday through Friday,

More information

NEXT Beam Bridge & Innovative Materials. Darren Conboy, PE & David Massenzio, PE

NEXT Beam Bridge & Innovative Materials. Darren Conboy, PE & David Massenzio, PE NEXT Beam Bridge & Innovative Materials Darren Conboy, PE & David Massenzio, PE Presentation topics Overview of existing & new bridges MATERIAL / DESIGN ELEMENT HUDSON BRIDGE PROJECT USE 10,000 psi Mix

More information

Linus L. Smith, GIS Supervisor, Engineering Public Works Department, City of Winfield, Kansas

Linus L. Smith, GIS Supervisor, Engineering Public Works Department, City of Winfield, Kansas Challenges in Developing a City GIS Wastewater Geo Database System Linus L. Smith, GIS Supervisor, Engineering Public Works Department, City of Winfield, Kansas OVERVIEW The City of Winfield Kansas recognized

More information

TOWN OF FARMINGTON FEE SCHEDULE 2018 Adopted by Town Board Resolution #80 of 2018

TOWN OF FARMINGTON FEE SCHEDULE 2018 Adopted by Town Board Resolution #80 of 2018 TOWN OF FARMINGTON FEE SCHEDULE 2018 Adopted by Town Board Resolution #80 of 2018 All of the following town fees are to be paid at the Town Clerk s Office during normal business hours, Monday through Friday,

More information

C L A Y D O N CCTV DRAIN SURVEY REPORT

C L A Y D O N CCTV DRAIN SURVEY REPORT C L A Y D O N 64 CLINTON ROAD NORTHAMPTON NN4 8LF Tel 01604 760111 Fax 01604 760222 email: bob-claydon@btconnect.com CCTV DRAIN SURVEY REPORT Client: Location: Details: Daventry District Council MIDDLEMORE

More information

Storm Drain Modeling HY-12 Rational Design

Storm Drain Modeling HY-12 Rational Design v. 10.1 WMS 10.1 Tutorial Learn how to design storm drain inlets, pipes, and other components of a storm drain system using FHWA's HY-12 storm drain analysis software and the WMS interface Objectives Define

More information

Manzanita Pubic Works. 10/16/2018 Special Meeting

Manzanita Pubic Works. 10/16/2018 Special Meeting Manzanita Pubic Works 10/16/2018 Special Meeting Agenda Items CO2 Project Update Water Meter System Update Highway 101 Project Manzanita and 3 rd Project CO2 Project Current Status CO2 Project Current

More information

FDOT Crossing Horizontal Directional Drill (HDD) Frac-Out Plan

FDOT Crossing Horizontal Directional Drill (HDD) Frac-Out Plan FDOT Crossing Horizontal Directional Drill (HDD) Frac-Out Plan Introduction Controlling and maintaining fluid flow within the HDD bore during all installation stages is critical to the success of an HDD

More information

BID RESULTS BID OPENING DATE: OCTOBER 15, 2015 NAME OF BIDDER CHERRY VALLEY TRACTOR SALES ROORK'S FARM SUPPLY, INC.

BID RESULTS BID OPENING DATE: OCTOBER 15, 2015 NAME OF BIDDER CHERRY VALLEY TRACTOR SALES ROORK'S FARM SUPPLY, INC. CK09MERCER2015-14B REBID VEHICLES AND EQUIPMENT FOR THE MERCER COUNTY PARK COMMISSION AND THE MERCER COUNTY COOPERATIVE CONTRACT PURCHASING SYSTEM BID OPENING DATE: OCTOBER 15, 2015 REBID AS NO BIDS WERE

More information

9500 Belmont Avenue ٠ Franklin Park, Illinois (847) , FAX # (847)

9500 Belmont Avenue ٠ Franklin Park, Illinois (847) , FAX # (847) DEPARTMENT OF INSPECTIONAL SERVICES FEE STRUCTURE 11-1-1: SCHEDULE A; ACTIVITIES REGULATED BY DEPARTMENT OF INSPECTIONAL SERVICES: The following is a fee schedule relative to construction, improvements

More information