1 DARPA Blackjack Pit Boss Reference: HR001119S0012 Question & Answer #3 Question 53: Please clarify the WBS level the cost volume and Excel file should presented. Page 8 says Phase 1 should be broken down to WBS level 4 and Phases 2 & 3 should be at WBS level 3. Page 41 says cost should be provided at the major task. We anticipate pricing at major task level with BOE substantiation to the level 4 and level 3, respectively. Answer 53: Page 8 requests that Proposals for Phase 1 Base and Phase 1 Options 1 and 2 should provide task-level descriptions (typically Level 4) in the Integrated Master Schedule (IMS) and Statement of Work (SOW) to provide the Government adequate insight into the task breakdown and resources proposed to accomplish the work. Because the Government intends to ask for proposal updates for Phases 2 and 3 during Phase 1 options, proposers should submit a SOW and Rough Order of Magnitude (ROM) costs for Phases 2 and 3 at one higher level (e.g. Work Breakdown Structure (WBS) Level 3) at this time. As stated on page 38, part C. SOW the major Phase 1 tasks / subtasks to be performed including major hardware and software component development and test activities shall be detailed to Level 4. Per BAA page 41, part B. Cost Breakdown, the costs should be broken down by major cost items (direct labor, including labor categories; subcontracts; materials; other direct costs; overhead charges, etc.) and further broken down by task and Base or future phases. Proposers should provide sufficient WBS breakdown and substantiation in the cost volume to allow full understanding of how cost relates to SOW tasks. Question 54: Please clarify the expectation for HMSI HW delivery of 1 EDU and 2x flight units at the end of Phase 2 and 18 flight units to be delivered at the end of Phase 3 (CDRL 16). It is our expectation that we will deliver a single ground station HMSI and an unquantified number of 'user' HMSI terminals that will be available for procurement. Please quantify the number of HMSI terminals required for Phase 3 demonstrations and the cost per terminal. Answer 54: A single HMSI design is envisioned to serve all 3 roles from the BAA (subscribers, commanders, satellite managers). Proposers should include their estimate for HMSI terminals in their Phase 2 and 3 ROM costs. It is expected that there will be 5 HMSI EDUs delivered as soon as possible in Phase 2 and 2 final units at the end of Phase 2. In Phase 3, there will be an additional 25 final units for a total of 27 final units and 5 EDUs. In Table 3, Item 16: HMSI Hardware Option, will change from stating EDU + 2 Flight Units and 18 Flight Units under End of Phase 2 and End of Phase 3 respectively, to state 5 EDU + 2 Final Units and 25 Final Units. An updated BAA will be released incorporating this change. The user terminals described in TA3 refer to the compact antenna/radios developed by commercial companies to provide user up and downlinks into the CDDTL. These will be March 14,

2 available for the Pit Boss performer to procure from commercial companies and will be integrated with the HMSI to provide a complete Blackjack ground terminal. Question 55: Please clarify the need to deliver Encryption and IA Approach Flight Units (CDRL 21) in addition to the Encryption Hardware (CDRL 22). It is unclear why an Encryption and IA Approach would have a hardware component. Answer 55: Proposers are encouraged to offer innovative solutions to the Encryption and IA approach, if a hardware based solution was proposed then the corresponding hardware would be requested as a required deliverable. Question 56: Table 4 Indicates the HMSI is a deliverable, including optional hardware. Page 23 (Phase 3 section) indicates the "performer will support the deployment of the HMSI to a ground control facility" and indicates they will need to be in a facility capable of handling data up to TS/SCI. Given those stipulations is the Government intending to allow the use of a commercial facility to host the required deliverable HMSI or intending for it to be hosted in an existing Government facility? If the latter, many existing Government Ground Control Facilities have very explicit and comprehensive site integration/interfacing documents to govern introduction of hardware to their facility. Some of these may even have a direct bearing on design approaches. If a Government facility is intended, can DARPA provide the intended Ground Control Facility site integration documentation? Answer 56: At this time, a ground support facility has not been selected and no related site integration documentation can be provided. Proposers should document their approach to supporting the deployment of the HMSI to a ground control facility in their technical volume, including any information that would be requested of the government to facilitate that deployment. Question 57: What is the expected level of data processing to be achieved by the Payloads prior to hand off to massless payload processing? Proposer's day material suggested the data to be passed from the Payload would be detected observations not simply raw sensor data, is that still the anticipated model? Answer 57: It is anticipated that the payload would pass detected observations and raw sensor data to the Pit Boss, although the final answer to this question is dependent on yet to be completed payload designs. Proposers should document what level of data processing their massless payload processing capability can achieve documenting any assumptions about the incoming data. Question 58: Table 1 includes a reference in the Payload provider column to a Scene Simulator. Will the payload providers be providing sample sensor output data to the Pit Boss providers at a particular point in the schedule? Answer 58: Data will be provided as it becomes available and releasable. It is anticipated that Pit Boss performers will work Non-Disclosure (or similar) agreements with the other Blackjack performers to facilitate sharing of needed information. Assume all payload providers will provide sample sensor output data by the end of 4QFY19. March 15,

3 Question 59: Does DARPA require that ground elements, including HMSI, adhere to ICD 503 requirements for accreditation including encryption (at rest and in motion) as well as multiplelevel security operations? Answer 59: All encryption elements should provide a path to NSA accreditation, however, no specific requirements have been levied in Phase 1. Question 60: Please confirm the number of HMSI hardware options to be delivered (reference Table 3, Item 16). Answer 60: Please see Answer 54. Question 61: The BAA implies (Figure 2 Notional diagram and TA3 description) that there are multiple types of HMSI. TA3 describes a Commanders Interface, a Satellite Manager, and a Tactical Interface with Figure 2 showing a ground station and a handheld terminal. Is there a breakout of for the number of each of those elements that are to be delivered in Phases 2 & 3 and which of those elements the EDU should be representative of? Answer 61: Please see Answer 54. Question 62: Table 3- Primary Deliverables of the BAA lists 5 deliverables that are due upon proposal delivery. Section B. Content and Form of Application Submission though does not state where most of these deliverables should be placed. Should Item 3: Risk Management Plan, Item 5: Pit Boss Metric Table, Item 8: Pit Boss Software Module Development Plan and Item 21: Encryption and Information Assurance Approach be attached as appendices to the proposal? The proposal format section does not call out deliverables regarding format or page count. Can we assume there is no page count? Can we assume these deliverables are submitted as 1 additional attachment? Answer 62: Item 3: Risk Management Plan, Item 5: Pit Boss Metric Table, Item 8: Pit Boss Software Module Development Plan and Item 21: Encryption and Information Assurance Approach should be included within Volume 1, but are not subject to the Volume 1 page limit. A single attachment to the Technical Volume is acceptable. Question 63: What type of communication interface is envisioned for the "Data thru Bus" payload parameter in Table 2? Answer 63: The communication interface is dependent on the selected Blackjack Bus. Proposers should provide insight into their CONOP to handling the types of representative payload missions. Question 64: What is the concept of operations of the link between the massless payload and payloads to the bus and its envisioned function? Answer 64: Please see answer to question 63. Question 65: Is the Pit Boss Satellite Manager HMSI station the only means by which bus TT&C commands can be sent and data can be received? Does DARPA plan to have the Bus providers March 15,

4 (or another party via a new BAA) provide conventional TT&C ground support during satellite tipoff, initialization, on-orbit checkout, and anomaly resolution? Answer 65: It is envisioned that the HMSI would support all aspects of the mission including bus TT&C commands, however proposers are encouraged to provide innovative solutions to the Pit Boss BAA. Should a proposer have a different approach, it should be clearly documented in their proposal. Question 66: Appendix A specifies (in Table 1) a data rate range for the satellite bus network link. That range substantially exceeds what would be possible with the gigabit Ethernet interface discussed at the September proposer's day. What does this data rate mean? Does it specify the maximum available speed for the CDDTL? Does it specify total data rate (for both directions) or is this rate required in both directions simultaneously? Is this data rate required for the initial Pit Boss delivery, or is it an objective for the nominal 90-satellite configuration? Does the program have a desired common hardware interface to support this network interface? Answer 66: This question appears to be referencing Appendix C (Table 1). Proposers should provide substantiation to how their proposed approach would address representative bus parameters. If there is a limit to the proposed solution, it should be documented in Volume 1 of the proposal response. Specific numbers provided in Appendix C are provided as guidelines not definitive requirements. Question 67: Appendix C specifies a data rate for the potential inter-satellite link payload in Table 2. That rate seems rather low for such a payload. Is this anticipated to change for the 2-satellite or 18-satellite demo configurations? Answer 67: Table 2 in Appendix C provides representative payload missions. These are not anticipated to change for the various demo configurations. Question 68: Appendix A calls for a capacity of network nodes. This exceeds the subscriber count specified for HMSI in the BAA (page 18, TA3). Which specification is definitive? Answer 68: Proposers should provide substantiation to how many subscribers their approach can handle. Specific numbers in the BAA related to this topic are provided as guidelines not definitive requirements. Question 69: Appendix A specifies key management for tactical data at a classification that differs from the classification level for ground terminal use specified in the BAA (page 18, TA3). Which specification is definitive? Are there security and data handling distinction between HMSI terminals for constellation operators and for field use? Answer 69: Proposers should document the capabilities of their proposed systems. Information in the Appendix is provided as supplemental information to the BAA. Question 70: FOUO details for this question have been removed. Summary: Appendix A provides additional detail on TA6, which raised questions about several aspects of management and HMSI design. March 15,

5 Answer 70: Proposers should document their approach to meeting TA6 Encryption and Information Assurance for Autonomous Tactical Systems. Proposals should document capabilities and limitations of the proposed approach in meeting TA6. Question 71: How does DARPA envision that the demo constellations can obtain definitive information about security clearances of HMSI user in order for the on-orbit MLS mechanisms to be able make appropriate classification-based decisions for releasing data products to those users? For example, would DARPA consider it sufficient for demo purposes that the constellation operators (using their HMSI terminals) would assert clearances for commander and subscriber users as an aspect of authorizing those users to communicate with the constellation? Answer 71: The approach to protection of multiple levels of classified data through the Pit Boss and HMSI should be provided in the proposal. Question 72: Section IV.B.2.b, Volume II, Pit Boss Subsystem Interfaces, asks that the proposal "identify and document the payload interface". Identifying and characterizing the interfaces is practical, but it seems out of scope to require that the interfaces be documented in the proposal. That task, for detailed interface documentation, would seem to be the province of the ICDs that are to be developed during the execution phase, in significant part through joint analysis and development activities performed in concert with the payload (and bus) performers. What is the correct interpretation of this specification of proposal content? Answer 72: Content for Volume II should identify and document the payload interface and related resources to be controlled between the Pit Boss edge processor and up to three interfacing payloads (e.g. mechanical, electrical, thermal, command and telemetry, user data, environments, as applicable) using the example parameters referenced in HR001119S0012 Appendix C Payload Information. Question 73: In table 3, Primary Deliverables, line 15 refers to the HMSI Hardware Option. Is it correct to interpret this as the physical hardware of the ground terminal, which is responsible for presenting the HMSI interface as well as protecting the HMSI data and providing cryptographic protection for HMSI communication? Also, line 15 calls for EDU + 2 Flight Units (and also 18 flight units ) for the HMSI hardware option. Since the HMSI hardware is presumed to be a ground-based terminal, can DARPA clarify what flight units means in this context? Is this just a copy-and-paste error from line 18, and if so, what should line 15 call for? Answer 73: Please see answer 54. Question 74: Is Pit Boss required to implement red-black power separation and/or supply red power to the Blackjack payloads? Answer 74: Yes. Question 75: During the 60 day outage, what tasks shall Pit Boss handle that the operations center and/or spacecraft bus would normally be responsible for? March 15,

6 Answer 75: The primary functions of the operations center are provided in Part II.I.C Design Reference Mission. Proposers should detail the capabilities and limitations of their approach, operating without operations center input for up to 60 days. Question 76: Can you please clarify the content for Volume II, Pit Boss Subsystem Interfaces to be submitted with the proposal given that the Pit Boss ICD isn t a deliverable until SRR and associate agreements have not been established with all the Blackjack payload contractors? Answer 76: Please see Answer 72. Question 77: Figure 2 shows the presence of a Comm Antenna as subsystem in the Ground Segment and the TA3 description mentions that user terminals providing links will be available for procurement. Can you confirm our assumption that purchase of CDDTL user terminals are part of the Pit Boss scope and not the integrator scope? Does the Government have a preferred CDDTL vendor? Answer 77: Any required hardware for the HMSI should be included in the Pit Boss scope. The government does not have a preferred CDDTL vendor, however the proposer should consider that the CDDTL will need to work with the selected Blackjack bus. Question 78: Can the autonomy/crop seedling results be made available to bidders? Or are the results currently available and if so can the Government provide guidance on where the information can be found? Answer 78: No additional information on the autonomy/crop seedling is required to provide a response to this BAA. Question 79: What will the contractor receive from the payload in terms of data? Answer 79: See answer to question 57. Question 80: What level of processed data will the payload provide to the Pit Boss hardware? Answer 80: See answer to question 57. March 15,

Question & Answer #2

Question & Answer #2 DARPA Blackjack Reference: HR001118S0032 Link: https://www.fbo.gov/spg/oda/darpa/cmo/hr001118s0032/listing.html Question & Answer #2 Question 9: Table 5 Thermal requirement shows a Nominal Requirement

More information

Question & Answer #3

Question & Answer #3 DARPA Blackjack Reference: HR001118S0032 Link: https://www.fbo.gov/spg/oda/darpa/cmo/hr001118s0032/listing.html Question & Answer #3 Question 80: Is there any guidance on how to plan for material procurement?

More information

DARPA-BAA Hierarchical Identify Verify Exploit (HIVE) Frequently Asked Questions (FAQ) August 18, 2016

DARPA-BAA Hierarchical Identify Verify Exploit (HIVE) Frequently Asked Questions (FAQ) August 18, 2016 DARPA-BAA-16-52 Hierarchical Identify Verify Exploit (HIVE) Frequently Asked Questions (FAQ) August 18, 2016 DARPA-BAA-16-52 Hierarchical Identify Verify Exploit (HIVE) Frequently Asked Questions (FAQ)

More information

System F6: Progress to Date Small Satellite Conference 2012 Monday August 13, 2012 Session I: The Horizon

System F6: Progress to Date Small Satellite Conference 2012 Monday August 13, 2012 Session I: The Horizon System F6: Progress to Date Small Satellite Conference 2012 Monday August 13, 2012 Session I: The Horizon LtCol (Sel) John Losinski, DARPA/TTO Dr. Owen Brown, Kinsey Technical Services, Inc. Dr. Elwin

More information

Nanosatellite Communication Constellation Testbed for Autonomous Scheduling Algorithms to Enable Mission Performance Analysis and Demonstration

Nanosatellite Communication Constellation Testbed for Autonomous Scheduling Algorithms to Enable Mission Performance Analysis and Demonstration SSC17-S2-07 Nanosatellite Communication Constellation Testbed for Autonomous Scheduling Algorithms to Enable Mission Performance Analysis and Demonstration Alonzo E. Jenkins, Peter J. Yoo, and Cherry Y.

More information

BCS Examination Guidance for the Practitioner Software Asset Management Examination

BCS Examination Guidance for the Practitioner Software Asset Management Examination BCS Examination Guidance for the Practitioner Software Asset Management Examination Version 1.2 August 2011 Contents Introduction...3 Entry Requirements For The Examination...3 Structure of the Examination...3

More information

Service Description: Cisco Security Implementation Services. This document describes the Cisco Security Implementation Services.

Service Description: Cisco Security Implementation Services. This document describes the Cisco Security Implementation Services. Page 1 of 12 Service Description: Cisco Security Implementation Services This document describes the Cisco Security Implementation Services. Related Documents: This document should be read in conjunction

More information

Architecting OneWeb s Massive Satellite Constellation Ground System

Architecting OneWeb s Massive Satellite Constellation Ground System Architecting OneWeb s Massive Satellite Constellation Ground System GROUND SEGMENT ARCHITECTURE WORKSHOP 2017 Information included herein has been determined to not contain any controlled technical data

More information

The Internet Society. on behalf of. The IETF Administrative Oversight Committee. Request for Proposal. RFC Editor RFC Format CSS Design

The Internet Society. on behalf of. The IETF Administrative Oversight Committee. Request for Proposal. RFC Editor RFC Format CSS Design The Internet Society on behalf of The IETF Administrative Oversight Committee Request for Proposal RFC Editor RFC Format CSS Design Date of Issuance: July 22, 2016 Proposal Submission Deadline: September

More information

ADDENDUM #1 RFP # , Districtwide Network Refresh Design

ADDENDUM #1 RFP # , Districtwide Network Refresh Design ADDENDUM #1 RFP #1718-03, Districtwide Network Refresh Design This Addendum forms a part of the Contract Documents and modifies the original Contract Documents. Acknowledge receipt of this Addendum in

More information

WHAT IS IRIDIUM PRIME?

WHAT IS IRIDIUM PRIME? WHAT IS IRIDIUM PRIME? Iridium PRIME / EuroPRIME is a payload accommodation service that leverages the Iridium NEXT spacebased global mesh network, ground infrastructure, and flexible bus design. 1 Iridium

More information

H2020 Space Robotic SRC- OG4

H2020 Space Robotic SRC- OG4 H2020 Space Robotic SRC- OG4 2 nd PERASPERA workshop Presentation by Sabrina Andiappane Thales Alenia Space France This project has received funding from the European Union s Horizon 2020 research and

More information

FedRAMP Digital Identity Requirements. Version 1.0

FedRAMP Digital Identity Requirements. Version 1.0 FedRAMP Digital Identity Requirements Version 1.0 January 31, 2018 DOCUMENT REVISION HISTORY DATE VERSION PAGE(S) DESCRIPTION AUTHOR 1/31/2018 1.0 All Initial document FedRAMP PMO i ABOUT THIS DOCUMENT

More information

COMMON CRITERIA CERTIFICATION REPORT

COMMON CRITERIA CERTIFICATION REPORT COMMON CRITERIA CERTIFICATION REPORT WorkCentre 7525/7530/7535/7545/7556 with FIPS 140-2 Compliance over SNMPv3 25 July 2016 v1.0 383-4-371 Government of Canada. This document is the property of the Government

More information

Figure 1: Summary Status of Actions Recommended in June 2016 Committee Report. Status of Actions Recommended # of Actions Recommended

Figure 1: Summary Status of Actions Recommended in June 2016 Committee Report. Status of Actions Recommended # of Actions Recommended Chapter 3 Section 3.05 Metrolinx Regional Transportation Planning Standing Committee on Public Accounts Follow-Up on Section 4.08, 2014 Annual Report In November 2015, the Standing Committee on Public

More information

REQUEST FOR PROPOSALS

REQUEST FOR PROPOSALS REQUEST FOR PROPOSALS The City of Somerset is requesting proposals for migration to, and implementation of, the Office 365 hosted environment for its Exchange email system and the full suite of existing

More information

A Model of the AFSCN Common Core TT&C System Using the Rapide ADL

A Model of the AFSCN Common Core TT&C System Using the Rapide ADL A Model of the AFSCN Common Core TT&C System Using the Rapide ADL by by Charles B. B. Simmons Information Technology Department Computer Systems Division The Aerospace Corporation El El Segundo, CA 90245

More information

Comprehensive Professional Energy Services Blanket Purchase Agreements Ordering Guide

Comprehensive Professional Energy Services Blanket Purchase Agreements Ordering Guide U.S. General Services Administration Comprehensive Professional Energy Services Blanket Purchase Agreements Ordering Guide www.gsa.gov/energyservicesbpa Pub Number: 5-10-00416 Date Posted: 3/02/2011 Version:

More information

<PROJECT NAME> IMPLEMENTATION PLAN

<PROJECT NAME> IMPLEMENTATION PLAN IMPLEMENTATION PLAN Version VERSION HISTORY [Provide information on how the development and distribution of the Project Implementation Plan was controlled and tracked.

More information

Question. Answer. Question

Question. Answer. Question 1 The following questions were submitted from potential bidders to ITCA s solid waste Request for Proposal RFP EQP GAP-01. The Inter Tribal Council s responses to the questions are listed below. In 1.2

More information

COMMON CRITERIA CERTIFICATION REPORT

COMMON CRITERIA CERTIFICATION REPORT COMMON CRITERIA CERTIFICATION REPORT Dell Data Protection Encryption Personal Edition Version 8.14.0 383-4-416 2 October 2017 v1.1 Government of Canada. This document is the property of the Government

More information

OG0-091 Q&As TOGAF 9 Part 1

OG0-091 Q&As TOGAF 9 Part 1 CertBus.com OG0-091 Q&As TOGAF 9 Part 1 Pass The Open Group OG0-091 Exam with 100% Guarantee Free Download Real Questions & Answers PDF and VCE file from: 100% Passing Guarantee 100% Money Back Assurance

More information

ADDENDUM #2 Boulder County Sheriff s Office Electronic Health Record System for the Boulder County Jail RFP #

ADDENDUM #2 Boulder County Sheriff s Office Electronic Health Record System for the Boulder County Jail RFP # ADDENDUM #2 Boulder County Sheriff s Office Electronic Health Record System for the Boulder County Jail RFP # 6822-18 March 26, 2018 The attached addendum supersedes the original Information and Specifications

More information

CMPT E100 Introduction to Software Engineering Spring Assignment 2 (9%) - Requirements and Initial Design 1

CMPT E100 Introduction to Software Engineering Spring Assignment 2 (9%) - Requirements and Initial Design 1 CMPT 276-4 E100 Introduction to Software Engineering Spring 2017 Assignment 2 (9%) - Requirements and Initial Design 1 Deliverables Due Time Requirement Document, Design document + Quality Assurance Plan

More information

MIS Week 9 Host Hardening

MIS Week 9 Host Hardening MIS 5214 Week 9 Host Hardening Agenda NIST Risk Management Framework A quick review Implementing controls Host hardening Security configuration checklist (w/disa STIG Viewer) NIST 800-53Ar4 How Controls

More information

COMMON CRITERIA CERTIFICATION REPORT

COMMON CRITERIA CERTIFICATION REPORT COMMON CRITERIA CERTIFICATION REPORT Dell EMC Unity OE 4.2 383-4-421 22 September 2017 Version 1.0 Government of Canada. This document is the property of the Government of Canada. It shall not be altered,

More information

Guideline for Determining the TOE

Guideline for Determining the TOE Guideline for Determining the TOE in Certification Applications that Do Not Use PPs Version 2.0 This "Guideline for Determining the TOE" describes what kinds of matters to note when determining the scope

More information

European Data Relay Satellite System EDA Workshop

European Data Relay Satellite System EDA Workshop European Data Relay Satellite System EDA Workshop Brussels 7/06/2011 Agenda 1. Rationale for Data Relay Services 2. Potential benefits for Earth Observation systems 3. EDRS Programme principles, targeted

More information

VMware vcloud Air Accelerator Service

VMware vcloud Air Accelerator Service DATASHEET AT A GLANCE The VMware vcloud Air Accelerator Service assists customers with extending their private VMware vsphere environment to a VMware vcloud Air public cloud. This Accelerator Service engagement

More information

STATE OF ALASKA RFP NUMBER 2516H009 AMENDMENT NUMBER ONE (1)

STATE OF ALASKA RFP NUMBER 2516H009 AMENDMENT NUMBER ONE (1) STATE OF ALASKA RFP NUMBER 2516H009 AMENDMENT NUMBER ONE (1) AMENDMENT ISSUING OFFICE: Department of Transportation & Public Facilities Statewide Contracting & Procurement P.O. Box 112500 (3132 Channel

More information

SUBJECT: PRESTO operating agreement renewal update. Committee of the Whole. Transit Department. Recommendation: Purpose: Page 1 of Report TR-01-17

SUBJECT: PRESTO operating agreement renewal update. Committee of the Whole. Transit Department. Recommendation: Purpose: Page 1 of Report TR-01-17 Page 1 of Report TR-01-17 SUBJECT: PRESTO operating agreement renewal update TO: FROM: Committee of the Whole Transit Department Report Number: TR-01-17 Wards Affected: All File Numbers: 465-12, 770-11

More information

HPE Data Center Operations Consulting Service

HPE Data Center Operations Consulting Service Data sheet HPE Data Center Operations Consulting Service HPE Packaged Consulting Services Data centers are large-scale capital investments that may not meet their capacity, availability, and operational

More information

COMMON CRITERIA CERTIFICATION REPORT

COMMON CRITERIA CERTIFICATION REPORT COMMON CRITERIA CERTIFICATION REPORT VMware Horizon 6 version 6.2.2 and Horizon Client 3.5.2 12 August 2016 v1.0 File Number 383-4-356 Government of Canada. This document is the property of the Government

More information

EXHIBIT 3-D Core System Integration Plan Template

EXHIBIT 3-D Core System Integration Plan Template Fairfax County Government / Fairfax County Public Schools RFP System Implementation Services for SAP Software EXHIBIT 3-D Core System Integration Plan Template RFP10-125118-10 Exhibit 3-D - 1 Fairfax County

More information

1.0 Executive Summary

1.0 Executive Summary Statement of Work - 1 - Power and Cooling Assessment for Data Center Professional Services Service 1.0 Executive Summary Table of Contents 1.0 Executive Summary 2.0 Features & Benefits 3.0 Details of Service

More information

Leveraging Adaptive Software Standards to Enable the Rapid Standup of Small Satellite Ground Systems

Leveraging Adaptive Software Standards to Enable the Rapid Standup of Small Satellite Ground Systems Leveraging Adaptive Software Standards to Enable the Rapid Standup of Small Satellite Ground Systems Mike Sotak, Kratos Defense 1 March 2016 2016 by Kratos Defense. Published by The Aerospace Corporation

More information

S&OC System Requirements Review: GSRD Traceability Matrix

S&OC System Requirements Review: GSRD Traceability Matrix STScI-JWST-CI-0099 Space Telescope Science Institute James Webb Space Telescope Mission S&OC System Requirements Review: GSRD Traceability Matrix 20 December 2004 Issue A REVISION HISTORY ISSUE DESCRIPTION

More information

Web Portal Overview 1

Web Portal Overview 1 Web Portal Overview 1 Proposal Submission January 31 February 3 2 Proposal Submission Process As described in more detail in Appendix B, there are two steps to the Proposal Submission Process: Step 1:

More information

ENCORE II REQUIREMENTS CHECKLIST AND CERTIFICATIONS

ENCORE II REQUIREMENTS CHECKLIST AND CERTIFICATIONS ENCORE II REQUIREMENTS CHECKLIST AND CERTIFICATIONS This form is completed by the Task Monitors and forwarded to DISA/DITCO-Scott with a complete ENCORE II Requirements Package. (electronic signatures

More information

Request for Proposal (RFP)

Request for Proposal (RFP) Request for Proposal (RFP) BOK PENETRATION TESTING Date of Issue Closing Date Place Enquiries Table of Contents 1. Project Introduction... 3 1.1 About The Bank of Khyber... 3 1.2 Critical Success Factors...

More information

Incentives for IoT Security. White Paper. May Author: Dr. Cédric LEVY-BENCHETON, CEO

Incentives for IoT Security. White Paper. May Author: Dr. Cédric LEVY-BENCHETON, CEO White Paper Incentives for IoT Security May 2018 Author: Dr. Cédric LEVY-BENCHETON, CEO Table of Content Defining the IoT 5 Insecurity by design... 5 But why are IoT systems so vulnerable?... 5 Integrating

More information

On-site Time and Material Rates for Equipment Not Covered under an HP Service Contract

On-site Time and Material Rates for Equipment Not Covered under an HP Service Contract HPE Per Event U.S. On-Site Services Rate Schedule On-site Time and Material Rates for Equipment Not Covered under an HP Service Contract Equipment Type Enterprise Servers, Associated Storage, Network,

More information

Costing Information Assurance

Costing Information Assurance Costing Information Assurance Marybeth Panock 30 September 2009 The Aerospace Corporation The Aerospace Corporation 2009 1 Costing Information Assurance or Security Called Security for this exercise to

More information

Service Description: Software Support

Service Description: Software Support Page 1 of 1 Service Description: Software Support This document describes the service offers under Cisco Software Support. This includes Software Support Service (SWSS), Software Support Basic, Software

More information

12 Approval of a New PRESTO Agreement Between York Region and Metrolinx

12 Approval of a New PRESTO Agreement Between York Region and Metrolinx Clause 12 in Report No. 7 of Committee of the Whole was adopted, without amendment, by the Council of The Regional Municipality of York at its meeting held on April 20, 2017. 12 Approval of a New PRESTO

More information

Great Northern Corporation Request for Proposal for Network Server Installation and Service

Great Northern Corporation Request for Proposal for Network Server Installation and Service Great Northern Corporation Request for Proposal for Network Server Installation and Service Background Purpose The purpose of this Request for Proposal (RFP) is to invite prospective vendors to submit

More information

IEEE Criteria for Standards Development (CSD)

IEEE Criteria for Standards Development (CSD) IEEE 802.3 Criteria for Standards Development (CSD) The IEEE 802 Criteria for Standards Development (CSD) are defined in Clause 14 of the IEEE 802 LAN/MAN Standards Committee (LMSC) Operations Manual.

More information

COMMON CRITERIA CERTIFICATION REPORT

COMMON CRITERIA CERTIFICATION REPORT COMMON CRITERIA CERTIFICATION REPORT McAfee Data Loss Prevention 11.0 with epolicy Orchestrator 5.9.0 4 January 2018 383-4-429 Version 1.0 Government of Canada. This document is the property of the Government

More information

NIST Security Certification and Accreditation Project

NIST Security Certification and Accreditation Project NIST Security Certification and Accreditation Project An Integrated Strategy Supporting FISMA Dr. Ron Ross Computer Security Division Information Technology Laboratory 1 Today s Climate Highly interactive

More information

CRaTER Scence Operation Center Requirements Document. Dwg. No

CRaTER Scence Operation Center Requirements Document. Dwg. No Rev. ECO Description Author Approved Date 01 32-157 Initial Release for comment RFGoeke 7/27/06 CRaTER Scence Operation Center Requirements Document Dwg. No. 32-01209 Revision 01 July 26, 2006 32-01209

More information

iii) Activity Definitions

iii) Activity Definitions iii) Activity Definitions A0, Preserve Electronic Records Under the control of Archival and Institutional Requirements, and limited by the possibilities available within the State of the Art of Information

More information

Utilization of Internet Protocol-Based Voice Systems in Remote Payload Operations

Utilization of Internet Protocol-Based Voice Systems in Remote Payload Operations Utilization of Internet Protocol-Based Voice Systems in Remote Payload Operations GSAW 2003 Ground System Architectures Workshop March 4-6, 2003 Marshall Space Flight Center Susan Best, IVoDS Lead Kelvin

More information

Building Information Modeling and Digital Data Exhibit

Building Information Modeling and Digital Data Exhibit Document E203 2013 Building Information Modeling and Digital Data Exhibit This Exhibit dated the day of in the year is incorporated into the agreement (the Agreement ) between the Parties for the following

More information

Vendor: The Open Group. Exam Code: OG Exam Name: TOGAF 9 Part 1. Version: Demo

Vendor: The Open Group. Exam Code: OG Exam Name: TOGAF 9 Part 1. Version: Demo Vendor: The Open Group Exam Code: OG0-091 Exam Name: TOGAF 9 Part 1 Version: Demo QUESTION 1 According to TOGAF, Which of the following are the architecture domains that are commonly accepted subsets of

More information

INFORMATION ASSURANCE DIRECTORATE

INFORMATION ASSURANCE DIRECTORATE National Security Agency/Central Security Service INFORMATION ASSURANCE DIRECTORATE CGS Risk Monitoring Risk Monitoring assesses the effectiveness of the risk decisions that are made by the Enterprise.

More information

Number: DI-SESS Approval Date:

Number: DI-SESS Approval Date: DATA ITEM DESCRIPTION Title: Interface Specification Number: DI-SESS-81632 Approval Date: 20020308 AMSC Number: F7475 Limitation: N/A DTIC Applicable: No GIDEP Applicable: No Preparing Activity: F/10 Applicable

More information

Higher National Unit specification: general information. Graded Unit title: Computer Science: Graded Unit 2

Higher National Unit specification: general information. Graded Unit title: Computer Science: Graded Unit 2 Higher National Unit specification: general information This Graded Unit has been validated as part of the HND Computer Science. Centres are required to develop the assessment instrument in accordance

More information

UK EPR GDA PROJECT. Name/Initials Date 30/06/2011 Name/Initials Date 30/06/2011. Resolution Plan Revision History

UK EPR GDA PROJECT. Name/Initials Date 30/06/2011 Name/Initials Date 30/06/2011. Resolution Plan Revision History RP unique number: GI-UKEPR-CI-01-RP 0 30/06/2011 1 of 19 Approved for EDF by: A. PETIT Approved for AREVA by: C. WOOLDRIDGE Name/Initials Date 30/06/2011 Name/Initials Date 30/06/2011 Resolution Plan History

More information

Certification Report

Certification Report Certification Report Issued by: Communications Security Establishment Certification Body Canadian Common Criteria Evaluation and Certification Scheme Government of Canada, Communications Security Establishment,

More information

Managed Security Service National Security Information (MSS-NSI)

Managed Security Service National Security Information (MSS-NSI) Managed Security Service National Security Information (MSS-NSI) 16.1 AT&T MSS-NSI Overview AT&T will provide management, installation, operations, maintenance and upgrade services for U.S Government-owned,

More information

The Order of Precedence of IPC Documents and Requirements Flowdown

The Order of Precedence of IPC Documents and Requirements Flowdown The Order of Precedence of IPC Documents and Requirements Flowdown 1 IPC-A-610 Order of Precedence Per 610 - In the event of conflict, the following order of precedence applies: Procurement as agreed and

More information

QUESTIONS & ANSWERS FOR. ORTHOPHOTO & LiDAR AOT

QUESTIONS & ANSWERS FOR. ORTHOPHOTO & LiDAR AOT QUESTIONS & ANSWERS FOR ORTHOPHOTO & LiDAR AOT Question# 1. Section 3.2 Will the imagery be clipped to the 1000m boundary? If so, what color will be used for null valued pixels? Yes, the imagery will be

More information

MLS for Tactical Soldier, Sensor and Munitions Networks September 10, 2003

MLS for Tactical Soldier, Sensor and Munitions Networks September 10, 2003 MLS for Tactical Soldier, Sensor and Munitions Networks September 10, 2003 2 Outline 0 Purpose / Background 0 Statement of the Challenge 0 Additional Security Discussion 0 Emerging Communication Network

More information

Notes for authors preparing technical guidelines for the IPCC Task Group on Data and Scenario Support for Impact and Climate Analysis (TGICA)

Notes for authors preparing technical guidelines for the IPCC Task Group on Data and Scenario Support for Impact and Climate Analysis (TGICA) Notes for authors preparing technical guidelines for the IPCC Task Group on Data and Scenario Support for Impact and Climate Analysis (TGICA) One of the core activities included within the mandate of the

More information

Service Description: Software Support

Service Description: Software Support Page 1 of 6 Service Description: Software Support This document describes the service offers under Cisco Software Support. This includes Software Support Service (SWSS), Software Support Basic, Software

More information

Quality Assurance Program Addendum for IEC Specific Product Testing

Quality Assurance Program Addendum for IEC Specific Product Testing Quality Assurance Program Addendum for IEC 61850 Specific Product Testing July 15, 2008 Version 1.3 Prepared for the UCA International Users Group - 1-07/15/2008 PREPARED BY: UCA International Users Group

More information

RFQ No C014 Datacenter Colocation and Associated Support Services. December 4, 2017

RFQ No C014 Datacenter Colocation and Associated Support Services. December 4, 2017 RFQ No. 1-18-C014 Datacenter Colocation and Associated Support Services December 4, 2017 Questions and Answers Notice: Questions may have been edited for clarity and relevance. 1. Question: Do you have

More information

IEEE Criteria for Standards Development (CSD)

IEEE Criteria for Standards Development (CSD) IEEE 802.3 Criteria for Standards Development (CSD) The IEEE 802 Criteria for Standards Development (CSD) are defined in Clause 14 of the IEEE 802 LAN/MAN Standards Committee (LMSC) Operations Manual.

More information

DATA ITEM DESCRIPTION TITLE: INTEGRATED MASTER SCHEDULE (IMS) NUMBER: DI-MGMT APPROVAL DATE:

DATA ITEM DESCRIPTION TITLE: INTEGRATED MASTER SCHEDULE (IMS) NUMBER: DI-MGMT APPROVAL DATE: DATA ITEM DESCRIPTION TITLE: INTEGRATED MASTER SCHEDULE (IMS) NUMBER: APPROVAL DATE: 20050330 AMSC NUMBER: D7544 LIMITATION: DTIC APPLICABLE: GIDEP APPLICABLE: PREPARING ACTIVITY: OUSD(AT&L)ARA/AM(SO)

More information

COMMON CRITERIA CERTIFICATION REPORT

COMMON CRITERIA CERTIFICATION REPORT COMMON CRITERIA CERTIFICATION REPORT EMC VPLEX v5.5 Version 1.0 11 May 2016 FOREWORD This certification report is an UNCLASSIFIED publication, issued under the authority of the Chief, Communications Security

More information

HASP Student Payload Interface Manual

HASP Student Payload Interface Manual HASP Student Payload Interface Manual Version 02.08.08 1 I. Introduction This document describes the basic features of your HASP payload mounting plate and provides information on the mechanical, electrical,

More information

After Action Report / Improvement Plan

After Action Report / Improvement Plan After Action Report Improvement Plan PSAP Paralysis A 911 Center COOP Drill June 24, 2015 Holmes County Emergency Management Department 1 Page ADMINISTRATIVE HANDLING INSTRUCTIONS 1. The title of this

More information

Telespazio: a new vision of MILSATCOM. A global player in military satellite communications

Telespazio: a new vision of MILSATCOM. A global player in military satellite communications Telespazio: a new vision of MILSATCOM A global player in military satellite communications Telespazio, a joint venture between Finmeccanica (67%) and Thales (33%), is one of the world s leading operators

More information

SMC/RN Compatible Satellite C2 (Sat C2) GSAW Vinay Swaminathan SMC/RN

SMC/RN Compatible Satellite C2 (Sat C2) GSAW Vinay Swaminathan SMC/RN SMC/RN Compatible Satellite C2 (Sat C2) GSAW 2012 Vinay Swaminathan SMC/RN Background SMC/CC tasker to RN (Spring 2006) Identify Satellite Command & Control architecture based on accepted standards applicable

More information

DFARS Safeguarding Covered Defense Information The Interim Rule: Cause for Confusion and Request for Questions

DFARS Safeguarding Covered Defense Information The Interim Rule: Cause for Confusion and Request for Questions DFARS 252.204.7012 Safeguarding Covered Defense Information The Interim Rule: Cause for Confusion and Request for Questions By Jonathan Hard, CEO And Carol Claflin, Director of Business Development H2L

More information

SEER-H Space Guidance

SEER-H Space Guidance SEER-H Space Guidance Revision 2.2 June 8, 2016 Table of Contents 1. Introduction 2. Mapping SEER to NASA WBS 2.1. NASA Work Breakdown Structure 3. Starting a New Project 4. Project Structure in SEER 4.1.

More information

GOES R Ground Segment Project Update

GOES R Ground Segment Project Update GOES R Ground Segment Project Update Vanessa Griffin Giffi Project Manager, GOES R Ground Segment Project Atlanta, Georgia 2010 GOES R Ground Segment Objectives Support the primary mission operations goals

More information

Virginia State University Policies Manual. Title: Information Security Program Policy: 6110

Virginia State University Policies Manual. Title: Information Security Program Policy: 6110 Purpose Virginia State University (VSU) uses information to perform the business services and functions necessary to fulfill its mission. VSU information is contained in many different mediums including

More information

DARPA Investments in GEO Robotics

DARPA Investments in GEO Robotics DARPA Investments in GEO Robotics Carl Glen Henshaw, Ph.D. Signe Redfield, Ph.D. Naval Center for Space Technology U.S. Naval Research Laboratory Washington, DC 20375 May 22, 2015 Introduction Program

More information

Service Description: Advanced Services Fixed Price Cisco WebEx Advise and Implement Service (0-5,000 Users) (ASF- WBXS-UC-PDIBSE)

Service Description: Advanced Services Fixed Price Cisco WebEx Advise and Implement Service (0-5,000 Users) (ASF- WBXS-UC-PDIBSE) Page 1 of 9 Service Description: Advanced Services Fixed Price Cisco WebEx Advise and Implement Service (0-5,000 Users) (ASF- WBXS-UC-PDIBSE) This document describes Advanced Services Fixed Price Cisco

More information

Terms of Reference (ToR) Supplying ICT Equipment

Terms of Reference (ToR) Supplying ICT Equipment Terms of Reference (ToR) Supplying ICT Equipment 1. Background: Good Neighbors International (GNI) has been working in Nepal since 2002 with the objective of improving lives of poor people, especially

More information

PROPOSED DOCUMENT. International Medical Device Regulators Forum

PROPOSED DOCUMENT. International Medical Device Regulators Forum PROPOSED DOCUMENT International Medical Device Regulators Forum Title: Assembly and Technical Guide for IMDRF Table of Contents (ToC) Submissions (ToC-based submissions) Authoring Group: Regulated Product

More information

Services Summary. Deliverables. Location of Services. Services Assumptions & Exclusions. General Project Management

Services Summary. Deliverables. Location of Services. Services Assumptions & Exclusions. General Project Management Page 1 of 1 SERVICE DESCRIPTION: CISCO DNA CENTER ADVISE AND IMPLEMENT QUICK START ASF-EN1-G-DNAC-QS Services Summary Digital Network Architecture (DNA) Center Advise and Implement Quick Start assists

More information

Cisco Data Center Accelerated Deployment Service for Nexus 9000 (ASF-DCV1-NEX-ADS)

Cisco Data Center Accelerated Deployment Service for Nexus 9000 (ASF-DCV1-NEX-ADS) Page 1 of 6 Service Description: Advanced Services Fixed Price Cisco Data Center Accelerated Deployment Service for Nexus 9000 (ASF-DCV1-NEX-ADS) This document describes Advanced Services Fixed Price:

More information

Certification Report

Certification Report Certification Report EAL 2+ Evaluation of Tactical Network-layer Gateway (2E2 IA): a GD Canada MESHnet G2 Gateway product Issued by: Communications Security Establishment Canada Certification Body Canadian

More information

Air Transport & Travel Industry. Principles, Functional and Business Requirements PNRGOV

Air Transport & Travel Industry. Principles, Functional and Business Requirements PNRGOV Air Transport & Travel Industry Principles, Functional and Business Requirements Version 15.1 Endorsed by WCO Council in July 2016 Table of Contents 1 INTRODUCTION... 3 1.1 PURPOSE... 3 1.2 SCOPE... 3

More information

NEW NETWORK PROTOCOL STANDARD FOR HIGH SPEED CAMERAS

NEW NETWORK PROTOCOL STANDARD FOR HIGH SPEED CAMERAS 7 th International Symposium on NDT in Aerospace We.3.A.1 More Info at Open Access Database www.ndt.net/?id=18958 NEW NETWORK PROTOCOL STANDARD FOR HIGH SPEED CAMERAS Abstract Reto HUBER 1 1 AOS Technologies

More information

Small-satellite Launch Services Market, Quarterly Update Q1 2018, Forecast to 2030

Small-satellite Launch Services Market, Quarterly Update Q1 2018, Forecast to 2030 Small-satellite Launch Services Market, Quarterly Update Q1 2018, Forecast to 2030 State of the Small-satellite Industry in Q1, 2018 Global Aerospace & Defense Research Team at Frost & Sullivan March 2018

More information

National Information Assurance Partnership. Common Criteria Evaluation and Validation Scheme Validation Report

National Information Assurance Partnership. Common Criteria Evaluation and Validation Scheme Validation Report National Information Assurance Partnership TM Common Criteria Evaluation and Validation Scheme Validation Report Delta Security Technologies Sentinel Model III Computer Security System Report Number: CCEVS-VR-02-0023

More information

REQUEST FOR PROPOSAL (RFP) Network Infrastructure Upgrade School/Library Name: Westview School Corporation Issue Date: 2 /20/ #:

REQUEST FOR PROPOSAL (RFP) Network Infrastructure Upgrade School/Library Name: Westview School Corporation Issue Date: 2 /20/ #: REQUEST FOR PROPOSAL (RFP) Network Infrastructure Upgrade School/Library Name: Westview School Corporation Issue Date: 2 /20/2017 470 #: 170066178 The purpose of this Request for Proposal (RFP) is to solicit

More information

CYBER SECURITY BRIEF. Presented By: Curt Parkinson DCMA

CYBER SECURITY BRIEF. Presented By: Curt Parkinson DCMA CYBER SECURITY BRIEF Presented By: Curt Parkinson DCMA September 20, 2017 Agenda 2 DFARS 239.71 Updates Cybersecurity Contracting DFARS Clause 252.204-7001 DFARS Clause 252.239-7012 DFARS Clause 252.239-7010

More information

COMMON CRITERIA CERTIFICATION REPORT

COMMON CRITERIA CERTIFICATION REPORT COMMON CRITERIA CERTIFICATION REPORT WorkCentre 7845/7845i/7855/7855i 2016 Xerox ConnectKey Technology 12 August 2016 v1.0 383-4-382 Government of Canada. This document is the property of the Government

More information

69 th IFIP WG 10.4 Meeting Dependability & IoT

69 th IFIP WG 10.4 Meeting Dependability & IoT 69 th IFIP WG 10.4 Meeting Dependability & IoT Systems of Systems (SoS) RMA&D Requirements Decomposition Aspen / Snowmass, Co Jan 11-15, 2016 John Perazza Lockheed Martin Fellow Biography John Perazza

More information

XXXX. Bear Creek Hydro Generation Project. Interconnection Facilities Study

XXXX. Bear Creek Hydro Generation Project. Interconnection Facilities Study XXXX Bear Creek Hydro Generation Project Interconnection Facilities Study Report No. SPA 2005-33 August 2005 System Planning (Lower Mainland & Vancouver Island) British Columbia Transmission Corporation

More information

RAPTR SAT-X. University of Northern Colorado. Conceptual Design Review. Shiely, Woods, Aken, Adamson 10/4/2011

RAPTR SAT-X. University of Northern Colorado. Conceptual Design Review. Shiely, Woods, Aken, Adamson 10/4/2011 RAPTR SAT-X Conceptual Design Review University of Northern Colorado Shiely, Woods, Aken, Adamson 10/4/2011 Mission Overview - Mission Statement The RAPTR SAT-X team intends to develop a highly reliable,

More information

GOVERNMENT MULTIFUNCTIONAL SATELLITE MARKET SOUNDING. MARKET SOUNDING 6 th June 2018

GOVERNMENT MULTIFUNCTIONAL SATELLITE MARKET SOUNDING. MARKET SOUNDING 6 th June 2018 GOVERNMENT MULTIFUNCTIONAL SATELLITE MARKET SOUNDING MARKET SOUNDING 6 th June 2018 Disclaimer This document is published by the BP3TI for the purpose of Market Sounding of Government Multifunctional Satellite

More information

OCSD-A / AeroCube-7A Status Update

OCSD-A / AeroCube-7A Status Update OCSD-A / AeroCube-7A Status Update Darren Rowen Richard Dolphus Patrick Doyle Addison Faler April 20, 2016 2016 The Aerospace Corporation Agenda Concept of Operations Overview Spacecraft Configuration

More information

Town of Gilmanton, New Hampshire SELECTMENS OFFICE

Town of Gilmanton, New Hampshire SELECTMENS OFFICE TOWN OF GILMANTON SELECTMEN S OFFICE PO Box 550, Gilmanton, NH 03237 Ph. 603-267-6700 Fax 603-267-6701 townadministrator@gilmantonnh.org Town of Gilmanton, New Hampshire SELECTMENS OFFICE REQUEST FOR PROPOSAL

More information

DARPA Perspective on Space

DARPA Perspective on Space DARPA Perspective on Space Ms. Pamela A. Melroy, Deputy Director DARPA Tactical Technology Office Briefing prepared for International Symposium for Personal and Commercial Spaceflight (ISPCS) 2015 October

More information

JOINT MISSION ENVIRONMENT TEST CAPABILITY (JMETC)

JOINT MISSION ENVIRONMENT TEST CAPABILITY (JMETC) JOINT MISSION ENVIRONMENT TEST CAPABILITY (JMETC) Cyber T&E Initiatives AJ Pathmanathan JMETC Deputy PM for Engineering NCR Technical Director November 14, 2013 GET CONNECTED to LEARN, SHARE, and ADVANCE

More information