1 1 SOLAR POWER DEVELOPMENT VGF OPTION UNDER JNNSM Dr. Ashvini Kumar Director (Solar) Solar Energy Corporation of India
2 2 SOLAR ENERGY CORPORATION OF INDIA A Government of India Enterprise under the administrative control of MNRE. Incorporated on 20th September Under Section-25 of the Companies Act, Not for profit company. Authorised capital of Rs 2,000 Cores
3 3 SECI Activities Broad mandate : Implementing & Monitoring agency of JNNSM from Concept to Commissioning Apart from the mission activities SECI is doing the following projects. Solar PV power plants. Solar Mini/Micro Grids Solar Thermal Power Plants Solar Water Heaters Solar Roof-Top Systems Solar Home lighting and Solar Street lights Hybrid projects 1. Solar + Gas 2. Solar + Biomass 3. Solar + Hydro/Pump Storage R&D activities.
4 4 JNNSM Road Map Application Segment Target for Phase I ( ) Cumulative Target for Phase 2 ( ) Cumulative Target for Phase 3 ( ) Grid solar power (large plants, roof top & distribution grid plants) Off-grid solar applications Solar Thermal Collectors (SWHs, solar cooking/ cooling, Industrial process heat applications etc.) 1,100 MW 10,000 MW 20,000 MW 200 MW 1,000 MW 2,000 MW 7 million sq. meters 15 million sq. meters 20 million sq meters Solar Lighting System 5 million 10 million 20 million
5 5 Policy and Regulatory Support Regulatory measures- RPO/REC Supporting grid connected projects to bring volumes and reduce prices Financial support for off-grid Support R&D in India Encourage manufacturing HR development
6 Ground Measurement of Solar Radiation Andhra Pradesh 6 Gujarat 11 Haryana 1 Madhya Pradesh 3 Karnataka 5 Rajasthan 12 Chhattisgarh 1 Ladakh 1 Maharashtra 3 Pudducherry 1 Tamil Nadu 6 C-WET is implementing the project for setting up 51 ground monitoring stations Centralized data collection, analysis and calibration of measuring sensors 6
7 S. No State State Initiatives Solar Specific Programme 1. Gujarat Announced MW Commissioned 857 MW 2. Maharashtra Commissioned 100 MW (includes 40 MW setup in Rajasthan under RPO). Under installation: 150 MW at Sakri/ Dhule 3. Karnataka Commissioned 8 MW, Approved plan for 200 MW Bids invited/allotted 70 MW, Min. tariff Rs. 7.94/unit Bids to be invited-130 MW 4. Rajasthan Tendered 200 MW, 75 MW at Rs. 6.45/Unit awarded 5. Odisha Announced -50 MW Awarded 25 MW, Minimum tariff Rs. 7/unit
8 State Initiatives (2) S. No State 6. Uttar Pradesh Solar Specific Programme Announced 500 MW till March 2017 (10 yr PPA) First Phase 200 MW 7. Andhra Pd. Policy announced in November 2012 for 1000 MW (1 5 MW, Rs.6.49/Unit) 8. Tamil Nadu Announced 3000 MW Tendered-1000 MW Bids received MW (60 MW bids < Rs 7: 200 MW bids - Rs 7 to 8; 141 MW bids between Rs 8 and Rs 10; 75 MW bids > Rs Madhya Pradesh Awarded 200 MW Minimum tariff Rs. 7.90/unit (Alpha-20 MW), Rs 8.05/Unit (Welspun 125MW)
9 Solar Capacity (MW) Growth of Solar Capacity (MW) State MWp % Gujarat Rajasthan Maharashtra Madhya Pradesh Andhra Pradesh Uttar Pradesh Tamil Nadu Jharkhand Karnataka Orissa Punjab Haryana A & N Island Uttarakhand Chhattisgarh Delhi West Bengal Lakshadweep
10 10 MNRE Strategy for Phase II Award of capacity to be spread out over Initial two years of plan period as: It facilitates planning for manufacturers as well as developers Learning from prior development would be available for subsequent bids Benefits of cost reduction could be achieved More states could come up the curve to participate in the process Maximize chances of achieving targets within desired timelines Preferably bidding process for allocation of target capacity to end before Lower dependence on Bundling
11 11 Domestic Content Key for Phase II Development of 4-5 GW of manufacturing capacity is one of the objectives of JNNSM Current manufacturing capacity (SPV): ~2000 MW (Module) Cheaper international loans available with imported components DCR conditions under schemes entailing direct funding support by Central Government could facilitate development of domestic manufacturing capacity base.
12 Policy Initiatives for Further Growth in Solar Power Capacities Policy hallmark during Phase 1 was bundling of solar power with cheap thermal power Phase 2 envisages to reach 10 GW utility scale solar power capacity by March GW under central scheme and 6 GW under various State specific schemes. Other Schemes are Grid Connected Roof Top Solar PV Power systems CSP Pilot Projects Provision of Viability Gap Funding (VGF) Bundling is subject to availability of unallocated thermal power 12
13 13 Draft Features of VGF Scheme Tariff to be paid to the developer : Rs.5.45/kWh, fixed for 25 years 10% less viz., Rs. 4.95/kWh for projects availing benefit of Accelerated Depreciation Payment of VGF up to 30% of project cost limited to Rs. 2.5 cr./ MW, through competitive bidding. Developer s equity Minimum Rs.1.5 cr./mw Balance can be raised as Loan.
14 14 Release of VGF amount VGF to be released in three tranches- 25% at the time of delivery of at least 50% of major equipment at site; Weightage: Modules -40% PCUs -20% Switchgear & Transformer Mounting Structures -20% -20%
15 15 Release of VGF amount 50% on successful commissioning; Balance 25% after 1 year of commissioning meeting requirements of generation If during PPA duration of 25 years: the project fails to function at any time, or its assets are sold, or the project is dismantled, SECI will have right to claim assets equal to VGF paid. Legal documentation to be prepared by SECI.
16 16 Min. & Max. Capacity Min. Capacity of each project 10 MW Max. capacity 50 MW Max. 3 projects at different locations by one developer, subject to a max. of 100 MW. Capacity will be the AC output at the project bus bar located within project premises.
17 17 Grid connectivity Inter-connection with Transmission network of STU/CTU/any other Utility at level of 33 KV or above. Developer to submit along with Bid a letter from STU / CTU/ Transmission Utility confirming technical feasibility of connectivity of plant to substation. Transmission of power up to interconnection point where metering is done for energy accounting, to be responsibility of Developer at own cost.
18 18 Grid connectivity (contd.) Option of Pooling Point where more than one SPV projects may connect Common Transmission Line (CTL) to further connect Pooling Point to the Interconnection/Metering point. CTL to be built and operated by the developer/any third party/by STU on behalf of developer. Metering to be done at the Interconnection Point along with subsidiary meters at the Pooling Point to determine the generation by each project.
19 19 Tentative Schedule No. Event Date 1 Request for Selection (RfS) notice May Receipt of applications against RfS 3 Short-listing of projects based on applications received and evaluation of bids 1 st Week June 2013 Mid August Issue of Letter of Intent (LOI) 1 st Week Sept Signing of PPA 1 st Week Oct Financial Closure By April Commissioning of projects By December 2014
20 Pilot Solar Thermal Power Projects JNNSM document envisages setting up pilot projects to address issues related to optimization and use of improved/advanced technology options - Advanced technology configurations which could lead to cost reduction through higher efficiency and CUF, and scale effect - Reduction in water consumption and footprint land area in solar thermal projects - Potential for replication in commercial projects soon after success of demonstration projects - Potential for indigenous manufacturing MNRE constituted a multi-stakeholders Group in January 2011 to discuss and suggest technology configurations
21 Project Configurations and Sites Based on recommendations of the stakeholders group and site visits by experts, identified pilot projects to have the following configurations: Project Configuration With hybrid cooling Reduced (<= 30%) consumption of water High operating temperature (>=500ºC) Higher efficiency Large thermal storage (about 8 hours) Large thermal storage Base load Identified sites and Broad Specifications Bhadla (Rajasthan) Available Land Area: 150 ha Capacity: 40 MW est. CUF: 29% est. Charanka (Gujarat) Available Land Area: 140 ha Capacity: 35 MW est. CUF : 30% est. Terkuveerapandiyapuram (Tamil Nadu) Available Land Area: 160 ha Capacity: 25 MW est. CUF : 45% est. Nennala (Andhra Pradesh) Available Land Area: 160 ha Capacity: 20 MW est. CUF : 65% est.
22 Project Details Solar Energy Corporation of India to implement the project Target tariff of solar power Rs 5.83/ Unit for 25 Years Project selection through ICB for viability gap funding Framework of Support At least 20% of the project cost to come as equity from the project developer. Debt portion could comprise of at the most 50% of the project cost from CTF / ADB; The maximum amount of VGF would be upto 40% of the project cost. Estimated project cost = Rs. 2,555 Crore NCEF Committee Chaired by Expenditure Secretary approved the project with Rs crore of support
23 Roof Top Solar PV Power Projects Grid connected Rooftop Projects to be supported by grant as capital subsidy for self consumption of Solar Electricity and feeding extra power to grid whenever available. Basic aim is to mitigate consumption of diesel. The scheme is implemented in two modes, viz., Capital 30% of project cost, and RESCO mode with some grant and a provision of tariff from the consumer. Scheme is implemented by SECI through competitive bidding in select cities. Project size to be 100 kw to 500 kw, however, aggregation of capacity from smaller projects is allowed. Balance cost is to be met by the consumer. Grid connectivity and metering is to be in accordance with CEA guidelines or SERC s regulations.
24 Status of Implementation Phase-I already started with the following allocations: Chennai 2 MW Bangalore 2 MW Delhi 1 MW Gurgaon 0.5 MW Phase-II: Bids invited for a capacity of 11.1 MW: Jaipur 3.1 MW Bhubaneswar 1 MW Hyderabad 2 MW Gurgaon 1.5 MW NOIDA/ Gr. NOIDA 1.5 MW Raipur 2 MW
25 25
Mother and Child Tracking System. Achievements and Challenges
Mother and Child Tracking System Achievements and Challenges 17 th November 2011 MCTS- A Path Breaking Initiative MCTS was launched in December 2009 A comprehensive system for improving delivery of health
More informationState-wise Gross State Domestic Product by Industry of Origin (at Prices) % Share to Total State GSDP at Constant Prices
Andhra Pradesh Andaman & N. Islands Arunachal Pradesh Assam State-wise Gross State Domestic Product by of Origin (at 2004-05 25.07 24.28 22.27 23.34 22.00 21.09 19.84 18.61 18.99 19.04 20.58 20.04 18.31
More informationRole of MoWR under NHP Avanish Kant, Sr. Hydrogeologist
Role of MoWR under NHP Avanish Kant, Sr. Hydrogeologist 14 th September, 2015, New Delhi NHP Project Background Achievements of HP-I & HP-II:- establishment of hydro-meteorological equipment in the States
More informationConnectivity for NeGP. Presented By: Anil Kumar Balani Director Department of Information Technology
Connectivity for NeGP Presented By: Anil Kumar Balani Director Department of Information Technology NeGP Connectivity Components SWAN (min 2 Mbps connectivity) Vertical Locations: 7500+ PoPs Horizontal
More informationGOVERNMENT OF INDIA MINISTRY OF COMMUNICATIONS DEPARTMENT OF TELECOMMUNICATIONS
GOVERNMENT OF INDIA MINISTRY OF COMMUNICATIONS DEPARTMENT OF TELECOMMUNICATIONS LOK SABHA UNSTARRED QUESTION NO.2496 TO BE ANSWERED ON 26 TH DECEMBER, 2018 2496. SHRI KAUSHALENDRA KUMAR: SHRIMATI NEELAM
More informationup of SPMU in States/UTs under NeGP A
1/12/2015 Guidelines for Setting up of SPMU in States/UTs under NeGP A Department of Agriculture & Cooperation (DAC), Ministry of Agriculture, New Delhi Contents 1. Introduction... 2 2. Scope of Work of
More information9.Telecommunication. India s first 3G mobile services by the state owned MTNL (Mahanagar Telephone Nigam Limited)
India s first 3G mobile services by the state owned MTNL (Mahanagar Telephone Nigam Limited) 299 300 9. TELECOMMUNICATION Concepts and Definitions Code-Division Multiple Access- refers to any of several
More informationEnergy Efficiency Initiatives in Commercial Buildings. Bureau of Energy Efficiency Government of India
Energy Efficiency Initiatives in Commercial Buildings Bureau of Energy Efficiency Government of India Overview of India s Commercial Building Sector Sector Wise Electricity Consumption Industri al, 45%
More informationNational e-governance Plan: State Data Centre (SDC) DVL Narayana Rao, Additional Director, DeitY
National e-governance Plan: State Data Centre (SDC) DVL Narayana Rao, Additional Director, DeitY Vision of NeGP Make all Government services accessible to the COMMON MAN IN HIS LOCALITY, through Common
More informationMocuba The First Utility Scale PV Project in Mozambique
Scatec Solar ASA Mocuba The First Utility Scale PV Project in Mozambique October 26th, 2017 Scatec Solar - Integrated Independent Power Producer Scatec Solar develops, builds, owns & operates solar plants
More informationEnergy Efficiency Improvements in Commercial Buildings (EECB)
UNDP GEF BEE Project: Energy Efficiency Improvements in Commercial Buildings (EECB) November 2016, New Delhi Dr. S N Srinivas Program Analyst, UNDP India sn.srinivas@undp.org Energy Efficiency Improvements
More informationMonthly changes in the General Indices and CFPIs are given below: Monthly changes (%) in All India CPI (General) and CFPI: Dec over Nov.
Monthly changes in the General Indices and CFPIs are given below: Monthly changes in All India CPI (General) and CFPI: 20 over Nov. 20 Indices Rural Urban Combined Value % Change Nov. Value % Change Nov.
More informationPower Grid Corporation of India Limited. Analysts Presentation February 9, 2011
Power Grid Corporation of India Limited Analysts Presentation February 9, 2011 1 Listed Company with public holding of 30.58% and balance by Government of India Central Transmission Utility of the country
More informationHandout on. Mobile Number Portability. For Sales Channels
Handout on Mobile Number Portability For Sales Channels Contents 1. Introduction of MNP 2. Areas where MNP is permitted 3. Some terminologies related to MNP 4. Why a customer should join BSNL? 5. Porting
More informationTax Information Exchange System (TINXSYS) (For CTD Officials)
Overview Tax Information Exchange System (TINXSYS) (For CTD Officials) Tax Information Exchange System (TINXSYS) is a centralized exchange of all interstate dealers spread across the various states and
More informationEmployer Registration Help File
Employer Registration Help File ONLINE REGISTRATION OF THE EMPLOYERSOVERVIEW: Registration of employers under ESI Act is fully online, without requirement of submission of any physical application documents
More informationBusiness Models and Capacity Development for Energy Efficient Cities in India
Business Models and Capacity Development for Energy Efficient Cities in India Meghraj Capital Advisors Private Limited Rahul Agnihotri Email: rahul@meghrajindia.com 9 th June 2016 Contents Current Government
More informationHighlights of Telecom Subscription Data as on 28 th February, 2018
For immediate release (Press Release No.48/2018) Information Note to the Press TELECOM REGULATORY AUTHORITY OF INDIA New Delhi, 24 th April, 2018 (www.trai.gov.in) 20 Glorious Years (1997-2017) Highlights
More informationThe various functions of an energy control center can be enumerated as under: 1. Load forecasting 6. Automatic generation control
ENERGY CONTROL CENTERS To generated, Transmission and Distribution system, Number of customers and Total investment. Installed capacity in India exceeds 206 GW with annual energy generated energy exceeding
More informationEmployer Registration
Employer Registration Help File ESIC ONLINE REGISTRATION OF THE EMPLOYERS OVERVIEW: Registration of employers under ESI Act is fully online, without requirement of submission of any physical application
More informationEnergy Imbalance Market: PacifiCorp Stakeholder and Tariff Revision Plan
Energy Imbalance Market: PacifiCorp Stakeholder and Tariff Revision Plan Document Version 1.9 Date Updated: January 17, 2014 The following document outlines PacifiCorp s Stakeholder and Tariff Revision
More informationJSONRecharge API Document
JSONRecharge API Document URL : http://domainname/recharge/jsonrechargeapi.asmx Method Name : Recharge Url : http:// DomainName /ReCharge/JsonRechargeApi.asmx?op=Recharge Parameters: Source = (API) For
More informationCAPACITY BUILDING OF DISCOMS UNDER DEMAND SIDE MANAGEMENT SCHEME XII PLAN INITIATED BY
CAPACITY BUILDING OF DISCOMS UNDER DEMAND SIDE MANAGEMENT SCHEME XII PLAN INITIATED BY BUREAU OF ENERGY EFFICIENCY MINISTRY OF POWER 24/11/2014 2 Rationale.. Demand Side Management (DSM) Cost effective
More informationSupporting Strategic Customers Needs
Session: Partnering with Utilities for Energy Resiliency Supporting Strategic Customers Needs Daniel Tunnicliff Southern California Edison August 9, 2016 Rhode Island Convention Center Providence, Rhode
More informationSub: Review of Performance of GRIDCO for the FY held on
ODISHA ELECTRICITY REGULATORY COMMISSION BIDYUT NIYAMAK BHAVAN, PLOT NO. 4, CHUNOKOLI, SHAILASHREE VIHAR, BHUBANESWAR-751021 TEL. No. 2721048, 2721049, FAX : 2721053/2721057 E-mail: orierc@gmail.com, Website:
More informationSUBJECT: PRESTO operating agreement renewal update. Committee of the Whole. Transit Department. Recommendation: Purpose: Page 1 of Report TR-01-17
Page 1 of Report TR-01-17 SUBJECT: PRESTO operating agreement renewal update TO: FROM: Committee of the Whole Transit Department Report Number: TR-01-17 Wards Affected: All File Numbers: 465-12, 770-11
More informationBSES Smart Grid Road Map
BSES Smart Grid Road Map Rajesh Bansal, Head (Network Operations), BSES Delhi BSES Delhi Discoms A Synopsis NDPL BRPL BYPL Reliance Infrastructure Ltd. acquired 51% stake in July 2002 in two Discoms MES
More informationAn End2End (E2E) Operationalized Pipeline for Predictive Analysis for the Intelligent Grid
An End2End (E2E) Operationalized Pipeline for Predictive Analysis for the Intelligent Grid Presented by Peng Li & Yun Zhao China Southern Power Grid EPRI Vijay K Narayanan Microsoft Agenda China Southern
More informationBoard of Directors Meeting. April 27, 2017
Board of Directors Meeting April 27, 2017 2016 Annual Report April 27, 2017 Project Team 2016 Annual Report Lead Kari Lynch Communications & Marketing Specialist Independent Auditors Subject Matter Experts
More informationDistributor Process Manual.
Distributor Process. P R O C E S S M A N U A L EPRSS Prepaid Recharge Services India Pvt. Ltd. C-207 KPCT Commercial Complex, Pune 411013 Phone - 020-26860160. Fax - 020-26860578 Email: info@eprs.co.in
More informationProposed New Jersey Energy Resilience Bank ERB
Proposed New Jersey Energy Resilience Bank ERB Disclaimer The information contained herein is for the purpose of initiating a discussion on the proposed New Jersey Energy Resilience Bank (ERB). Any proposals
More informationExcellence Enhancement Centre (EEC) for Indian Power Sector was : Conceptualised as part of bilateral cooperation between Govt. of India and Govt.
1 Excellence Enhancement Centre (EEC) for Indian Power Sector was : Conceptualised as part of bilateral cooperation between Govt. of India and Govt. of Federal Republic of Germany. Registered as a non-profit
More informationSmart Grid Projects UK Policy and Experience
Smart Grid Projects UK Policy and Experience 17 th March 2016 (Theme C): Smart Grid Project Outcomes Kelly Butler Deputy CEO BEAMA Limited About BEAMA BEAMA is the leading trade association representing
More informationReliance Infrastructure Limited
Reliance Infrastructure Limited Reg. : H Block, 1 st Floor, Dhirubhai Ambani Knowledge City, Navi Mumbai 400 710 Website: www.rinfra.com PUBLIC NOTICE Objections / suggestions on Reliance Infrastructure
More informationElectronic Hardware Sector
Electronic Hardware Sector AGENDA Electronic Hardware : Global scenario Electronic Hardware : Indian scenario Electronic Hardware : Tamil Nadu scenario Investment opportunities Government Support Electronic
More informationHighlights of Telecom Subscription Data as on 31 st October, 2018
For immediate release (Press Release No. 01/2019) Information Note to the Press TELECOM REGULATORY AUTHORITY OF INDIA New Delhi, 2 nd January, 2019 (www.trai.gov.in) 20 Glorious Years (1997-2017) Highlights
More informationCo-deployment of Optical Fibre Highways and Railways: The cases of India and Bangladesh
Workshop on Cross border co deployment of fibre optic infrastructure along road and rail networks, Bangkok, 22 November 2018 Co-deployment of Optical Fibre Highways and Railways: The cases of India and
More informationShyam Indus Power Solutions Pvt. Ltd. June 2014
Shyam Indus Power Solutions Pvt. Ltd June 2014 Index 1. Company Overview 2. Power Sector Overview 3. Vision,Mission & Values 4. Strength 5. Growth Plans 6. Financial Information Introduction Promoted by
More informationNATIONAL BROADBAND POLICY AND IMPLEMENTATION STRATEGY. Task Team Leader
NATIONAL BROADBAND POLICY AND IMPLEMENTATION STRATEGY BY Task Team Leader Outline of Presentation Introduction Broadband and the Economy Broadband for Sustainable Development Ecosystem Driving Broadband
More informationPOWER TRANSMISSION IN INDIA 2018
Now Available POWER TRANSMISSION IN INDIA 2018 Segment Trends and Developments; Outlook and Projections Report (PDF) Data-set (Excel) India Infrastructure Research Power Transmission in India 2018 Table
More informationTERMS OF REFERENCE. Scaling-up Renewable Energy Program (SREP) Joint Mission. Lesotho
TERMS OF REFERENCE Scaling-up Renewable Energy Program (SREP) Joint Mission September 27-29, 2017 Lesotho 1 SUMMARY 1. Mission objectives. The main objective of the Joint Mission ( the Mission ) is to
More informationRenewable Energy Investment Trends in sub-saharan Africa
Renewable Energy Investment Trends in sub-saharan Africa Wikus Kruger MIRA Graduate School of Business, University of Cape Town Nov 2018 Nr of Projects Number of utility-scale RE IPPs in SSA 25 (ex. RSA)
More informationSOLAR ENERGY DEVELOPMENT IN MOROCCO
SOLAR ENERGY DEVELOPMENT IN MOROCCO Economic Forum Morocco / Portugal 20 th of April 2015 Avion solaire 1 AN AMBITIOUS RENEWABLE ENERGY STRATEGY 2 MOROCCO ENERGY CHALLENGES AND AMBITIONS Sustainable economic
More informationTATA POWER TRADING COMPANY LTD. IS A WHOLLY OWNED SUBSIDIARY OF THE TATA POWER COMPANY LTD.
INTRODUCTION TATA POWER TRADING COMPANY LTD. IS A WHOLLY OWNED SUBSIDIARY OF THE TATA POWER COMPANY LTD. Tata Power is India s largest integrated private power company with consolidated revenues es of
More informationThis booklet has been prepared with the support under the GoI-UNDP Disaster Risk Reduction Programme ( )
b Strengthening Disaster Management in India Strengthening Disaster Management in India c This booklet has been prepared with the support under the GoI-UNDP Disaster Risk Reduction Programme (2009-2012)
More informationCopyright 2015, First Solar, Inc.
Copyright 2015, First Solar, Inc. Forward-Looking Statements During the course of this presentation the Company will make projections and other statements that are forward-looking statements within the
More informationCereal Hudson. Tariffs. Anthony S. Campagiorni, Esq. Vice President, Regulatory & Governmental Affairs. Requested Revenue Increases
1 Anthony S. Campagiorni, Esq. Vice President, Regulatory & Governmental Affairs P Power. Possibilities Cereal Hudson A FORTIS COMPANY July 28, 2017 Via Electronic Filing By Hand Honorable Kathleen Burgess,
More informationSmartNet Pilots: The demonstration of the different TSO-DSO coordination schemes and market structures
Smart TSO-DSO interaction schemes, market architectures and ICT Solutions for the integration of ancillary services from demand side management and distributed generation The Global Forum Electricity Ancillary
More informationPerformance Assessment of Electricity Distribution Utilities in India An Insight into Performance for FY 14 FY 16 and Outlook for FY 17
Performance Assessment of Electricity Distribution Utilities in India An Insight into Performance for FY 14 FY 16 and Outlook for FY 17 ICRA Management Consulting Services Limited Contact Mr. V Sriram
More informationCALL LOGGING PROCESS
CALL LOGGING PROCESS 1. TO REGISTER A COMPLAINT, FIRST YOU NEED TO REGISTER YOUR PRODUCT ON VIVITEK WEB SITE. BELOW ARE THE STEPS TO REGISTER YOUR PRODUCT ON VIVTEK WEB SITE. 2. LOG ON TO WWW.VIVITEK.IN
More informationAGNI POWER & ELECTRONICS PVT.LTD.
AGNI POWER & ELECTRONICS PVT.LTD. www.agnipower.com 1 2 Corporate Overview AGNI s Capabilities & Competency Specialist in Solar Photovoltaic Engineering (SPV) Established in 1995 Certifications : ISO 9001:2008
More informationTamil Nadu: Current Power scenario and projects in pipeline
Tamil Nadu: Current Power scenario and projects in pipeline 1. Tamil Nadu per capita consumption is over 1000 Units, which is as against 11 th plan national target of 1000 units. Presently, the national
More informationInvitation of sealed quotations for Renewal of Symantec Back up Executive.
GVK Emergency Management and Research Institute Devar Yamzal, Medchal Road, Secunderbad 500 078 Invitation of sealed quotations for Renewal of Symantec Back up Executive. Dated: 01.12.2017 GVK Emergency
More informationGreen Power Market Development Group - Scaling up Renewable Energy Sector in India 04 th December An initiative supported by
Green Power Market Development Group - Scaling up Renewable Energy Sector in India 04 th December 2018 An initiative supported by Green Power Market Development Group Objective: Scaling up Renewable energy
More informationILLINOIS DISTRIBUTED GENERATION PROCUREMENT PROGRAM APPLICATION INSTRUCTIONS
ILLINOIS DISTRIBUTED GENERATION PROCUREMENT PROGRAM APPLICATION INSTRUCTIONS AGENDA Company Overview Program Overview SRECTrade Registration and Bidding Process Summary and Q&A This document is protected
More informationThe background. Industrializing regions Strategic areas focused upon Less focus on efficiency and performance. Employment
The background 2 1947 Dawn of Independence- agrarian economy Industrial Policy Resolution 1948- certain areas reserved for Government PEs- Commanding Heights of the Economy Emphasized: Employment Industrializing
More informationPublic Disclosure Copy
Public Disclosure Authorized AFRICA Western Africa Transport & ICT Global Practice IBRD/IDA Investment Project Financing FY 2013 Seq No: 9 ARCHIVED on 29-Oct-2017 ISR29795 Implementing Agencies: Ministry
More information12 Approval of a New PRESTO Agreement Between York Region and Metrolinx
Clause 12 in Report No. 7 of Committee of the Whole was adopted, without amendment, by the Council of The Regional Municipality of York at its meeting held on April 20, 2017. 12 Approval of a New PRESTO
More informationFigure 1: Summary Status of Actions Recommended in June 2016 Committee Report. Status of Actions Recommended # of Actions Recommended
Chapter 3 Section 3.05 Metrolinx Regional Transportation Planning Standing Committee on Public Accounts Follow-Up on Section 4.08, 2014 Annual Report In November 2015, the Standing Committee on Public
More informationGRID MODERNIZATION INITIATIVE SMARTGRID INDIA
GRID MODERNIZATION INITIATIVE SMARTGRID INDIA BETHANY SPEER National Renewable Energy Laboratory, a U.S. Department of Energy lab India Smart Grid Forum, 2017 March 16, 2017 1 At a Glance Developing the
More informationRocky Mountain Power Exhibit RMP (RTL-1) Docket No Witness: Rick T. Link BEFORE THE PUBLIC SERVICE COMMISSION OF THE STATE OF UTAH
Exhibit RMP (RTL-1) BEFORE THE PUBLIC SERVICE COMMISSION OF THE STATE OF UTAH ROCKY MOUNTAIN POWER Exhibit Accompanying Direct Testimony of Rick T. Link May 31, 2017 Pre-Issuance Bidders Conference Presentation
More informationADB s Energy Program in Myanmar
ADB s Energy Program in Myanmar March 2014 Chong Chi Nai Director, Energy Division Southeast Asia Regional Department 1 Current Sector Context Low electrification ratio Need to develop cost effective way
More informationSouthern California Edison. Leading the Way in Electricity TM
Southern California Edison Leading the Way in Electricity TM Smart Metering Essentials at SCE End-Use Energy Reductions through Monitoring, Feedback, and Behavior Modification Precourt Institute for Energy
More informationA TEXAS NODAL MARKET: FUNNY NAME, SERIOUS PROBLEM
TEXAS CITY ATTORNEYS ASSOCIATION 2004 Summer Conference June 9-11, 2004 South Padre Island, Texas A TEXAS NODAL MARKET: FUNNY NAME, SERIOUS PROBLEM Thomas L. Brocato Lloyd, Gosselink, Blevins, Rochelle,
More informationAgreements and Queue Management
Agreements and Queue Management Infrastructure Contracts and Management Joanne Bradley, Queue Management Shoukat Ansari, Contract Negotiation PJ Topping, Regulatory Contracts February 27, 2019 Interconnection
More informationINSTALLATION CENTER OF EXCELLENCE
Air Force Civil Engineer Center INSTALLATION CENTER OF EXCELLENCE Kathy Bustos Project Manager 4 April 2013 1 Agenda Overview of EUL Robins AFB Solar PV Energy EUL Opportunity Selection Process Discussion
More informationInnovative/Best Practices in e District MMP. HCM RIPA, Jaipur, Rajasthan October 2015
Innovative/Best Practices in e District MMP HCM RIPA, Jaipur, Rajasthan October 2015 Pre Digital India National egovernance Plan (NeGP) Demographic Diversity Our Journey so far. 1.2+ billion population
More informationRole of CIM in Smart Grid Initiatives and Standards Related Activities in India
Role of CIM in Smart Grid Initiatives and Standards Related Activities in India Bureau Of LITD-10 CIM WG-3 Prof. Khaparde, President BIS LITD-10 CIM WG-3 Jose Thomas, Secretary, BIS LITD-10 CIM WG-3 Pradeep
More informationINFRASTRUCTURE SHARING- An Indian Experience
INFRASTRUCTURE SHARING- An Indian Experience Telecom Regulatory Authority of India New Delhi 20.05.2008 TRAI 1 Background TELECOM GROWTH IN INDIA 1991- Teledensity less than 1% 1991- Telecom sector opened
More informationJoint Japan - India Workshop Annual M2M India Conclave 2013
1.List of devices which needs to be IPv6 ready will be shared by Airtel. DoT M2M initiatives Joint Japan - India Workshop Annual M2M India Conclave 2013 Delhi, 23.09.2013 M2M A long term perspective Future
More informationLais Lona Business Development Africa - SunFunder
Lais Lona Business Development Africa - SunFunder Financing the off-grid sector: An overview of sector growth, challenges, and opportunities Agenda Introduction: GOGLA & SunFunder? Accelerating the growth
More informationFor internal circulation of BSNL only
E4-E5 E5 (CM) BSNL Wi-MAX Deployment Strategies WELCOME This is a presentation for the E4-E5 Technical Module for the Topic : BSNL Wi-MAX Deployment Strategies Eligibility: Those who have got the Upgradation
More information1st IEF-EU Energy Day Preceding the 7th IEA-IEF-OPEC Symposium on Energy Outlooks 14 February 2017
1st IEF-EU Energy Day Preceding the 7th IEA-IEF-OPEC Symposium on Energy Outlooks 14 February 2017 Naif ALRagass Director General Assistant for Technical Affairs The Saudi Energy Efficiency Center (SEEC)
More informationPromoting Quality Infrastructure Investment
Promoting Quality Infrastructure Investment - Japan s contribution to infrastructure development - Mitsutoshi Kajikawa Director, Development Policy Division Ministry of Finance, Japan 1 Quality Infrastructure
More informationSituation and Outlook of PPP Infrastructure Development in Indonesia
Situation and Outlook of PPP Infrastructure Development in Indonesia Dedy S. Priatna, PhD Deputy Minister for Infrastructure National Development Planning Agency (Bappenas) PPP Infrastructure Investment
More informationNEPAD ICT BROADBAND INFRASTRUCTURE PROGRAMME
NEPAD ICT BROADBAND INFRASTRUCTURE PROGRAMME Presentation at the Public & Private Sectors Partnership Forum: Promoting Infrastructure Sharing and Low Cost Solutions for Africa Dr. Edmund Katiti, Policy
More informationFY18 FULL-YEAR RESULTS 31 AUGUST 2018 NEXTDC LIMITED ACN
FY18 FULL-YEAR RESULTS 31 AUGUST 2018 NEXTDC LIMITED ACN 143 582 521 FY18 HIGHLIGHTS REVENUE $161.5m +31% UNDERLYING EBITDA 1 $62.6m +28% UTILISATION 40MW +28% CUSTOMERS 972 +26% PARTNERS 470+ 60+ NETWORKS
More informationWritten Testimony of Rick Gonzales Senior Vice President and Chief Operating Officer New York Independent System Operator
Assembly Standing Committee on Energy Kevin A. Cahill, Chairman Assembly Standing Committee on Corporations, Authorities and Commissions James F. Brennan, Chairman Assembly Standing Committee on Cities
More informationThe Proposer recommends that this modification should be assessed by a Workgroup
Stage 01: At what stage is this document in the process? : Supply Point Registration Facilitation of Faster Switching! This modification seeks to reduce the Supply Point confirmation period following the
More informationPAKISTAN TELECOM SECTOR OVERVIEW
PAKISTAN TELECOM Pakistan Telecom Sector Overview HaidermotaBNR SECTOR OVERVIEW February, 2017 PRACTICE AREAS Banking & Finance Capital Markets Competition / Anti-trust Corporate & Commercial Dispute Resolution
More informationDelaney - Colorado River 500 kv Transmission Line Project Phase 3 Competitive Solicitation
Steve Rutty Director, Grid Assets Lou Fonte Delaney - Colorado River 500 kv Transmission Line Project Phase 3 Competitive Solicitation Lead Engineer, Grid Assets September 3, 2014 Transmission Planning
More informationADDENDUM # 3. To prospective Proposers on RFI # 55144: Solar Energy Development and Community Solar at JFK Long-Term Parking Lot:
PROCUREMENT DEPARTMENT 4 WORLD TRADE CENTER 150 GREENWICH STREET, 21ST FL. NEW YORK, NY 10007 12/7/2018 ADDENDUM # 3 To prospective Proposers on RFI # 55144: Solar Energy Development and Community Solar
More informationOff-Grid Solar Electrification: Business Models and Success Stories from Around the World
Off-Grid Solar Electrification: Business Models and Success Stories from Around the World Leveraging Finance to Deliver Energy Access for the Last Mile Asia Clean Energy Forum June 7, 2017 Koen Peters,
More informationNATIONAL PROGRAMME Chapter 15 Telecommunication and Post. Telecommunication and Post
Introduction Telecommunication and Post The n legislation in the field of telecommunication and post is almost in full incompliance with that of the EU, except for certain legal rules on general legal
More informationPowering the North West s Future: From DNO to DSO. Paul Bircham Commercial Strategy & Support Director
Powering the North West s Future: From DNO to DSO Paul Bircham Commercial Strategy & Support Director 1 Introducing Electricity North West 5 million 2.4 million (45% of demand) 20,000 I&C (55% of demand)
More information4G rollouts - more beneficial to tower companies than 3G rollouts
Moderate BTS growth expected BTS growth in India has plummeted from 38% in FY11 and 20% in FY12 to a mere 4-5% in FY13 and FY14. The robust growth in FY11 and FY12 was driven by heavy rollouts by the new
More informationMoH&FW, Govt. of India, New Delhi
National Medical College Network Health Education Content Delivery, Skill Enhancement and Healthcare Outreach Services Project MoH&FW, Govt. of India, New Delhi 1 VISION & Philosophy Health Education Content
More informationSmart Metering Forum: The DCC Roadmap. Chris Rowell 30 November 2011
Smart Metering Forum: The DCC Roadmap Chris Rowell 30 November 0 The Data & Communications Company What we know about the DCC What we would like to know about the DCC What the DCC will need to do DCC The
More informationBudget Review Process (BRP) Preliminary List of Business Initiatives. Stakeholder Meeting April 10, 2017
2017-18 Budget Review Process (BRP) Preliminary List of Business Initiatives Stakeholder Meeting April 10, 2017 Purpose / Agenda The purpose of this presentation is to: Provide stakeholders with a BRP
More informationBEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA
BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA Order Instituting Rulemaking to Develop a Successor to Existing Net Energy Metering Tariffs Pursuant to Public Utilities Code Section 2827.1,
More informationThe modified file structure for the same is given in Annexure 1 of this circular for reference.
NATIONAL COMMODIT & DERIVATIVES EXCHANGE LIMITED Circular to all trading and clearing Members of the Exchange Circular No : NCDEX/TECHNOLOG-018/2015/353 Date : November 09, 2015 Subject : CTCL Bulk Upload
More informationEfficiency Works Business: 2017 Rebates & Goals. January 17, 2017
Efficiency Works Business: 2017 Rebates & Goals January 17, 2017 Platte River Power Authority provides electricity to Estes Park, Fort Collins, Longmont, and Loveland Substation Generation Coal / Natural
More informationA Background Note. Aadhaar - Issues and Implications
A Background Note On Aadhaar - Issues and Implications Contents Introduction... 3 Aadhaar Act... 3 Targets, Performance and Achievements of the Scheme... 4 1. Aadhaar Enrolment:... 4 2. Authentication
More informationENTSO-E working to fulfill the 3 rd Package
ENTSO-E working to fulfill the 3 rd Package Regulators Role in Developing Infrastructure, Florence February 7 2012 Geoffrey Feasey, ENTSO-E Corporate Affairs Manager ENTSOE s role in implementing European
More informationMalibu Civic Center Stakeholders Meeting. October 25, 2012
Malibu Civic Center Stakeholders Meeting October 25, 2012 Malibu Civic Center Stakeholders Meeting 1. RWQCB Agenda 2. Wastewater Facility Design 3. Formation of the Community Facilities District (CFD)
More informationAddress and Tel.No. of the Director, Legal Metrology GOI
Address and Tel.No. of the Director, Legal Metrology GOI 1) Mr. B.N. Dixit, Director. Deptt. of Consumer Affairs, Room No.461-A, Krishi Bhawan, New Delhi - 110 001. Tel. No. 23389489 Fax No. 23385322 Controllers
More informationGrid Interconnection of Renewable Generation
Grid Interconnection of Renewable Generation Randy Rismiller August 14, 2013 Generator Interconnection Rule Responsibility In the United States, the responsibility for establishing generator interconnection
More informationThe strategic plan of HEDNO for the Non- Interconnected Islands Investments Smart Islands Innovation
The strategic plan of HEDNO for the Non- Interconnected Islands Investments Smart Islands Innovation Ioannis Margaris Vice-Chairman BoD Hellenic Electricity Distribution Network Operator (ΔΕΔΔΗΕ - HEDNO)
More informationSmart Grids Policy Contribution based on EU Donor Funded Programme Presentation to SASGI by Dr. Willie de Beer 22 June 2016
Smart Grids Policy Contribution based on EU Donor Funded Programme Presentation to SASGI by Dr. Willie de Beer 22 June 2016 1 Objective of Presentation To share with the SASGI members the proposed approach
More informationEnergy Services Acquisition Program (ESAP) in Ottawa Case Study
Energy Services Acquisition Program (ESAP) in Ottawa Case Study Presentation Workshop 2: Governance Models and Success Strategies for Developing Thermal Grids Presented by Tomasz Smetny-Sowa, Senior Director,
More information