Oman LNG L.L.C. Pre-Qualification Questionnaire QEN HEATING, VENTILATION & AIR CONDITIONING MAINTENANCE SERVICE CONTRACT (HVAC)

Size: px
Start display at page:

Download "Oman LNG L.L.C. Pre-Qualification Questionnaire QEN HEATING, VENTILATION & AIR CONDITIONING MAINTENANCE SERVICE CONTRACT (HVAC)"

Transcription

1 Oman LNG L.L.C. Pre-Qualification Questionnaire QEN HEATING, VENTILATION & AIR CONDITIONING MAINTENANCE SERVICE CONTRACT (HVAC)

2 GUIDELINES Response to this questionnaire shall be completed in English by a senior member of your company. The requirements of each question shall be addressed comprehensively with all supporting documentation provided in order for this Pre-Qualification to be deemed completed. Responses shall be submitted on or before 11 th August 2014 to the understated address. CONTRACTS ENGINEER (CPL/11X) Oman LNG LLC P.O. Box 888, Sur Postal Code 411 Sultanate of Oman Tel , Fax Rashid.alrashdy@omanlng.co.om All information submitted with this questionnaire shall be treated in strictest confidence by Oman LNG. Oman LNG reserves the right to verify any and all information contained in this form. Oman LNG shall be advised immediately should there be any significant change in the information provided in this document. It should be noted that this document is solely for the Pre-qualification evaluation of the company, for the purposes of inclusion on Oman LNG Tenderers Lists for the stipulated requirements. Submission does not guarantee that the contractor will be invited to Tender.

3 1.0 INTRODUCTION Oman LNG LLC intends shortly to issue a tender for HVAC Maintenance Services contract. Oman LNG LLC wishes to pre-qualify contractor capable of managing and executing this service. You are invited to submit pre-qualification documentation for the above mentioned service. Further details are given below. 1.0 BACKGROUND OMAN LNG LLC located in Qalhat in Sur, has its plant and various buildings supported by Heating, Ventilation and Air Conditioning (HVAC). The HVAC is one of the critical equipment used for providing adequate cooling and heating environment to plant equipment and buildings to sustain operational and reliability of the equipment and systems. The COMPANY is now looking for a qualified CONTRACTOR with professional expertise and experience in relevant system and equipment; to provide maintenance services of its HVAC equipment in line with Oman LNG detailed scope of work, procedures and Permit to Work system (PTW). The Oman LNG s HVAC asset consists of the following systems and equipment. BMS & HVAC Control Panels Chillers Primary and Secondary Pumps Chilled Water Air Handling Units (AHU) Direct Expansion Air handling Equipment (AHU) Fan Coil Units (FCU) Air Cool Condensing Units (ACCU) Package Units Air Cool Splits Window A/Cs Exhaust Fans Gas Tight Damper Air Curtains Pressurisation Units 2.0 BRIEF DESCRIPTION OF SCOPE OF WORK The intended HVAC service maintenance contract shall be executed by competent CONTRACTOR s personnel who shall carry out preventative and corrective maintenances on HVAC equipment list given in appendix 1. The contractor shall be required to provide experienced staff based in Sur to carry out these services on site in a safe and professional manner. The contract duration shall be for three years. 3.0 OBJECTIVE OF PRE-QUALIFICATION The objective of this contract pre-qualification exercise is to invite and identify capable contractors who shall be short listed to participate in subsequent tendering of OMAN LNG HVAC Maintenance Service Contract. Suitable Contractors will be selected based on information received that shall demonstrate the capability of performing the required services on industrial and non-industrial HVAC equipment in line with manufacturer recommendations, company procedures and HSE requirement. Should you wish to be included (if pre-qualified) on the bidders list, kindly confirm that you have firm intension of bidding. If you wish to be included, you are kindly requested to provide us with the following:

4 3.1 GENERAL COMMERCIAL INFORMATION Registration: Submit copies of commercial registration in Oman. Give the name of the Owner(s) and their percentage of ownership. Give the name(s) & position (s) of your authorized representatives. Address and contacts numbers Financial: Submit a copy of your last 2-years Audited Annual Reports and most recent published Accounts. Approximate Turnover. Total Capitalization Current Structure of Tenderers organisation listing: Numbers of personnel directly employed by your company Number of personnel and personnel working in the field that are involved in HVAC Maintenance Services (give job description of each person) Main core business Available Engineering and technical back-up. Also list if sister companies who will be involved in back-up support & how? Key Personnel Submit CV s of the key personnel: Existence: Give below the number of years you have been established as a HVAC maintenance services Company. a) In Oman Years b) In the Middle East Years c) Elsewhere Years Provide type of HVAC products (brand) you represent in Oman. 3.2 Experience: 1. Experience in the Particular Field being tendered. Provide details of your experience in dealing with HVAC maintenance services, particularly those involving international companies and Oil and Gas facilities (if any). 2. List of HVAC related Projects/Contracts completed. Details to be submitted should include list of similar project undertaken in the past 3 years, which at a minimum should include the following detailed information: - Project and / or Contract name - Client name & Country

5 - Project/contract value - Project/contract duration [start and completion date] In addition to the completed projects/contract please provide similar details of current HVAC projects/contracts. 3.3 HEALTH, SAFETY & ENVIRONMENT (HSE) INFORMATION Health safety and Environment based on industrial and oil and gas Plant standards and environment HSE Policy: What is your company s Policy on HSE? If your Company s HSE policy exists as a formal document please submit a copy. Submit copy of your organization chart. Identify who has the HSE role / responsibility and briefly describe their HSE related job / works. If no policy exists, explain how you intend on Handling HSE related issues HSE Training Submit list of training programmers and records of HSE training attended by your staff and clearly indicate if these staff will be working in this contract Safety Records Submit 2 examples of your safety records for the last 2 years 4.4 QUALITY ASSURANCE Submit one copy of the following. If none issued, state so: Quality policy, endorsed by your Managing Director Corporate quality manual and index of your procedures Quality assurance system (e.g. ISO 9000) or equivalent Quality audit reports of your quality assurance system carried out by third parties in the last 2 years Organisation chart detailing the functional responsibility of quality activities. 4.0 TENDERER S CONTACT Give the details below of Tenderer s representative to whom all Tender correspondents shall be addressed Name of Person: Telephone number: Fax number: GSM number: address:

6 APPENDIX I HVAC EQUIPMENT OVERVIEW S.No DESCRIPTIONS QUANTITY 1 ROOF TOP OUTDOOR /CONDENSING UNIT GROUND LEVEL OUTDOOR /CONDENSING UNIT 86 3 INDOOR/AIR CONDITIONING UNITS CHILLER UNITS 19 5 CHILLED WATER PUMPS 37 6 AIR HANDLING UNITS 40 7 FAN COIL UNITS HVAC / BMS PANELS 53 9 EXTRACT FANS WINDOW AC ROOF TOP PACKAGE UNITS 2 12 GROUND LEVEL PACKAGE UNITS PPESSURISATION UNIT 3 14 COLD ROOM 3 15 GAS TIGHT DAMPER AIR CURTAINS ADDITIONAL INSTALLED SPLIT AIR CONDITIONING UNITS 119

7 HVAC EQUIPMENT DETAILS 1. ROOF TOP OUTDOOR /CONDENSING UNIT 1 ADMIN/CU-01 CARRIER / 38DAJ024 ADMIN BUILDING 2 ADMIN/CU-02 CARRIER / 38DAJ024 ADMINISTRATION BUILDING 3 ADMIN/CU-03 CARRIER / 38DAJ024 ADMINISTRATION BUILDING 4 CWSP/CU-03 CARRIER / 38DAJ024 CENTRAL WORKSHOP 5 CWSP/CU-04 CARRIER / 38DAJ024 CENTRAL WORKSHOP 6 CY/CU-01 CARRIER / 38DAJ024 CONTRACTORS YARD 7 CY/CU-02 CARRIER / 38DAJ024 CONTRACTORS YARD 8 CY/CU-03 CARRIER / 38DAJ024 CONTRACTORS YARD 9 CY/CU-04 CARRIER / 38DAJ024 CONTRACTORS YARD 10 CY/CU-05 CARRIER / 38DAJ024 CONTRACTORS YARD 11 CY/CU-06 CARRIER / 38DAJ024 CONTRACTORS YARD 12 CY/CU-07 CARRIER / 38DAJ024 CONTRACTORS YARD 13 CY/CU-08 CARRIER / 38DAJ024 CONTRACTORS YARD 14 CY/CU-09 CARRIER / 38DAJ024 CONTRACTORS YARD 15 CY/CU-10 CARRIER / 38DAJ024 CONTRACTORS YARD 16 CY/CU-11 CARRIER / 38DAJ024 CONTRACTORS YARD 17 CY/CU-12 CARRIER / 38DAJ024 CONTRACTORS YARD 18 CY/CU-13 CARRIER / 38DAJ024 CONTRACTORS YARD 19 CY/CU-14 CARRIER / 38DAJ024 CONTRACTORS YARD 20 CY/CU-15 CARRIER / 38DAJ024 CONTRACTORS YARD 21 CY/CU-16 CARRIER / 38DAJ024 CONTRACTORS YARD 22 CY/CU-17 CARRIER / 38DAJ024 CONTRACTORS YARD 23 CY/CU-18 CARRIER / 38DAJ024 CONTRACTORS YARD 24 CY/CU-19 CARRIER / 38DAJ024 CONTRACTORS YARD 25 CY/CU-20 CARRIER / 38DAJ024 CONTRACTORS YARD 26 CY/CU-21 CARRIER / 38DAJ024 CONTRACTORS YARD 27 CY/CU-22 CARRIER / 38DAJ024 CONTRACTORS YARD 28 CY/CU-23 CARRIER / 38DAJ024 CONTRACTORS YARD 29 CY/CU-24 CARRIER / 38DAJ024 CONTRACTORS YARD 30 CY/CU-25 CARRIER / 38DAJ024 CONTRACTORS YARD 31 CY/CU-26 CARRIER / 38DAJ024 CONTRACTORS YARD 32 CY/CU-27 CARRIER / 38DAJ024 CONTRACTORS YARD 33 CY/CU-28 CARRIER / 38DAJ024 CONTRACTORS YARD 34 CY/CU-29 CARRIER / 38DAJ024 CONTRACTORS YARD 35 CY/CU-30 CARRIER / 38DAJ024 CONTRACTORS YARD 36 CY/CU-31 CARRIER / 38DAJ024 CONTRACTORS YARD 37 CY/CU-32 CARRIER / 38DAJ024 CONTRACTORS YARD 38 CY/CU-33 CARRIER / 38DAJ024 CONTRACTORS YARD 39 CY/CU-34 CARRIER / 38DAJ024 CONTRACTORS YARD 40 CY/CU-35 CARRIER / 38DAJ024 CONTRACTORS YARD 41 CY/CU-36 CARRIER / 38DAJ024 CONTRACTORS YARD 42 CY/CU-37 CARRIER / 38DAJ024 CONTRACTORS YARD 43 CY/CU-38 CARRIER / 38DAJ024 CONTRACTORS YARD 44 CY/CU-39 CARRIER / 38DAJ024 CONTRACTORS YARD 45 CY/CU-40 CARRIER / 38DAJ024 CONTRACTORS YARD 46 CY/CU-41 CARRIER / 38DAJ024 CONTRACTORS YARD 47 CY/CU-42 CARRIER / 38DAJ024 CONTRACTORS YARD 48 CY/CU-43 CARRIER / 38DAJ024 CONTRACTORS YARD 49 CY/CU-44 CARRIER / 38DAJ024 CONTRACTORS YARD 50 CY/CU-45 CARRIER / 38DAJ024 CONTRACTORS YARD 51 CY/CU-46 CARRIER / 38DAJ024 CONTRACTORS YARD 52 CY/CU-47 CARRIER / 38DAJ024 CONTRACTORS YARD

8 53 CY/CU-48 CARRIER / 38DAJ024 CONTRACTORS YARD 54 CY/CU-49 CARRIER / 38DAJ024 CONTRACTORS YARD 55 FSSO/CU-01 CARRIER / 38DAJ018 FIRE STATION 56 FSSO/CU-02 CARRIER / 38DAJ024 FIRE STATION 57 FSSO/CU-03 CARRIER / 38DAJ024 FIRE STATION 58 FSSO/CU-04 CARRIER / 38DAJ024 FIRE STATION 59 MB/CU-01 CARRIER / 38DAJ018 MARINE BASE BUILDING 60 MB/CU-02 CARRIER / 38DAJ018 MARINE BASE BUILDING 61 MB/CU-03 CARRIER / 38DAJ024 MARINE BASE BUILDING 62 MB/CU-04 CARRIER / 38DAJ024 MARINE BASE BUILDING 63 MB/CU-05 CARRIER / 38DAJ024 MARINE BASE BUILDING 64 MB/CU-06 CARRIER / 38DAJ024 MARINE BASE BUILDING 65 MBWS/CU-01 CARRIER / 38DAJ018 MARINE BASE WORKSHOP 66 MBWS/CU-02 CARRIER / 38DAJ018 MARINE BASE WORKSHOP 67 MBWS/CU-03 CARRIER / 38DAJ018 MARINE BASE WORKSHOP 68 MBWS/CU-04 CARRIER / 38DAJ018 MARINE BASE WORKSHOP 69 MBWS/CU-05 CARRIER / 38DAJ018 MARINE BASE WORKSHOP 70 MBWS/CU-06 CARRIER / 38DAJ018 MARINE BASE WORKSHOP 71 MBWS/CU-07 CARRIER / 38DAJ018 MARINE BASE WORKSHOP 72 MBWS/CU-08 CARRIER / 38DAJ018 MARINE BASE WORKSHOP 73 MBWS/CU-09 CARRIER / 38DAJ018 MARINE BASE WORKSHOP 74 MBWS/CU-10 CARRIER / 38DAJ046 MARINE BASE WORKSHOP 75 MBWS/CU-11 CARRIER / 38DAJ046 MARINE BASE WORKSHOP 76 OCC/CU-01 CARRIER / 38DAJ024 OFFICE /COMM. BUILDING 77 OCC/CU-02 CARRIER / 38DAJ018 OFFICE /COMM. BUILDING 78 OCC/CU-03 CARRIER / 38DAJ018 OFFICE /COMM. BUILDING 79 OCC/CU-04 CARRIER / 38DAJ018 OFFICE /COMM. BUILDING 80 OCC/CU-05 CARRIER / 38DAJ024 OFFICE /COMM. BUILDING 81 OCC/CU-06 CARRIER / 38DAJ024 OFFICE /COMM. BUILDING 82 OCC/CU-07 CARRIER / 38DAJ024 OFFICE /COMM. BUILDING 83 OCC/CU-08 CARRIER / 38DAJ024 OFFICE /COMM. BUILDING 84 OCC/CU-09 CARRIER / 38DAJ018 OFFICE /COMM. BUILDING 85 OCC/CU-10 CARRIER / 38DAJ024 OFFICE /COMM. BUILDING 86 OPCN/CU-01 CARRIER / 38DAJ018 OPERATION BUILDING 87 OPCN/CU-02 CARRIER / 38DAJ024 OPERATION BUILDING 88 OPCN/CU-03 CARRIER / 38DAJ024 OPERATION BUILDING 89 SB/CU-01 CARRIER / 38DAJ018 SECURITY BUILDING 90 SB/CU-02 CARRIER / 38DAJ018 SECURITY BUILDING 91 SB/CU-03 CARRIER / 38DAJ024 SECURITY BUILDING 92 SB/CU-04 CARRIER / 38DAJ024 SECURITY BUILDING 93 SB/CU-05 CARRIER / 38DAJ018 SECURITY BUILDING 94 SB/CU-06 CARRIER / 38DAJ018 SECURITY BUILDING 95 SB/CU-07 CARRIER / 38DAJ018 SECURITY BUILDING 96 SB/CU-08 CARRIER / 38DAJ018 SECURITY BUILDING 97 SB/CU-09 CARRIER / 38DAJ018 SECURITY BUILDING 98 SB/CU-10 CARRIER / 38DAJ018 SECURITY BUILDING 99 SOGH/CU-01 CARRIER / 38DAJ024 SECURITY GUARD HOUSE 100 SOGH/CU-02 CARRIER / 38DAJ024 SECURITY GUARD HOUSE 101 SOGH/CU-03 CARRIER / 38DAJ018 SECURITY GUARD HOUSE 102 SOGH/CU-04 CARRIER / 38DAJ018 SECURITY GUARD HOUSE 103 SOGH/CU-05 CARRIER / 38DAJ018 SECURITY GUARD HOUSE 104 SOGH/CU-06 CARRIER / 38DAJ024 SECURITY GUARD HOUSE 105 SOGH/CU-07 CARRIER / 38DAJ024 SECURITY GUARD HOUSE 106 SOGH/CU-08 CARRIER / 38DAJ024 SECURITY GUARD HOUSE 107 SOGH/CU-09 CARRIER / 38DAJ018 SECURITY GUARD HOUSE 108 SOGH/CU-10 CARRIER / 38DAJ018 SECURITY GUARD HOUSE 109 SS1/CU-01 CARRIER / 38HDT070 PLANT BUILDING

9 110 SS1/CU-02 CARRIER / 38HDT070 PLANT BUILDING 111 SS1/CU-03 CARRIER / 38HDT070 PLANT BUILDING 112 SS1/CU-04 CARRIER / 38HDT070 PLANT BUILDING 113 SS1/CU-05 CARRIER / 38HDT070 PLANT BUILDING 114 SS1/CU-06 CARRIER / 38HDT070 PLANT BUILDING 115 SS1/CU-07 CARRIER / 38HDT070 PLANT BUILDING 116 SS1/CU-08 CARRIER / 38HDT070 PLANT BUILDING 117 SS1/CU-09 CARRIER / 38HDT070 PLANT BUILDING 118 SS1/CU-10 CARRIER / 38HDT070 PLANT BUILDING 119 SS1/CU-11 CARRIER / 38HDT070 PLANT BUILDING 120 SS1/CU-12 CARRIER / 38HDT070 PLANT BUILDING 121 SS2/CU-01 CARRIER / 38HDT070 PLANT BUILDING 122 SS2/CU-02 CARRIER / 38HDT070 PLANT BUILDING 123 SS2/CU-03 CARRIER / 38HDT070 PLANT BUILDING 124 SS2/CU-04 CARRIER / 38HDT070 PLANT BUILDING 125 SS2/CU-05 CARRIER / 38HDT070 PLANT BUILDING 126 SS2/CU-06 CARRIER / 38HDT070 PLANT BUILDING 127 SS2/CU-07 CARRIER / 38HDT070 PLANT BUILDING 128 SS3/CU-001 CARRIER / 38HDT070 PLANT BUILDING 129 SS3/CU-002 CARRIER / 38HDT070 PLANT BUILDING 130 SS3/CU-003 CARRIER / 38HDT070 PLANT BUILDING 131 SS3/CU-04 CARRIER / 38HDT070 PLANT BUILDING 132 SS3/CU-05 CARRIER / 38HDT070 PLANT BUILDING 133 SS3/CU-06 CARRIER / 38HDT070 PLANT BUILDING 134 SS3/CU-07 CARRIER / 38HDT070 PLANT BUILDING 135 SS3/CU-08 CARRIER / 38HDT070 PLANT BUILDING 136 SS3/CU-09 CARRIER / 38AKS024 PLANT BUILDING 137 SS3/CU-10 CARRIER / 38AKS024 PLANT BUILDING 138 SS3/CU-11 CARRIER / 38AKS024 PLANT BUILDING 139 SS4/CU-001 CARRIER / 38HDT070 PLANT BUILDING 140 SS4/CU-002 CARRIER / 38HDT070 PLANT BUILDING 141 SS4/CU-003 CARRIER / 38HDT070 PLANT BUILDING 142 SS4/CU-04 CARRIER / 38HDT070 PLANT BUILDING 143 SS4/CU-05 CARRIER / 38HDT070 PLANT BUILDING 144 SS4/CU-06 CARRIER / 38HDT070 PLANT BUILDING 145 SS4/CU-07 CARRIER / 38HDT070 PLANT BUILDING 146 SS4/CU-08 CARRIER / 38HDT070 PLANT BUILDING 147 SS4/CU-09 CARRIER / 38AKS024 PLANT BUILDING 148 SS4/CU-10 CARRIER / 38AKS024 PLANT BUILDING 149 SS4/CU-11 CARRIER / 38AKS024 PLANT BUILDING 150 SS5/CU-01 CARRIER / 38DAJ024 PLANT BUILDING 151 SS5/CU-02 CARRIER / 38DAJ024 PLANT BUILDING 152 SS5/CU-03 CARRIER / 38DAJ024 PLANT BUILDING 153 SS5/CU-04 CARRIER / 38DAJ024 PLANT BUILDING 154 SS5/CU-05 CARRIER / 38DAJ024 PLANT BUILDING 155 SS5/CU-06 CARRIER / 38DAJ024 PLANT BUILDING 156 SS5/CU-07 CARRIER / 38DAJ024 PLANT BUILDING 157 SS5/CU-08 CARRIER / 38DAJ024 PLANT BUILDING 158 SS6/CU-01 CARRIER / 38HDT070 PLANT BUILDING 159 SS6/CU-02 CARRIER / 38HDT070 PLANT BUILDING 160 SS6/CU-03 CARRIER / 38HDT070 PLANT BUILDING 161 SS6/CU-04 CARRIER / 38HDT070 PLANT BUILDING 162 SS6/CU-05 CARRIER / 38HDT070 PLANT BUILDING 163 SS6/CU-06 CARRIER / 38HDT070 PLANT BUILDING 164 SS6/CU-07 CARRIER / 38HDT070 PLANT BUILDING 165 SS8/CU-01 CARRIER / 38DAJ024 PLANT BUILDING 166 SS8/CU-02 CARRIER / 38DAJ024 PLANT BUILDING

10 167 SS8/CU-03 CARRIER / 38DAJ024 PLANT BUILDING 168 SS8/CU-04 CARRIER / 38DAJ024 PLANT BUILDING 169 SS12/CU-001 CARRIER / 38HDT070 PLANT BUILDING 170 SS12/CU-002 CARRIER / 38HDT070 PLANT BUILDING 171 SS12/CU-003 CARRIER / 38HDT070 PLANT BUILDING 172 SS12/CU-004 CARRIER / 38HDT070 PLANT BUILDING 173 SS12/CU-005 CARRIER / 38HDT070 PLANT BUILDING 174 SS12/CU-006 CARRIER / 38HDT070 PLANT BUILDING 175 SS12/CU-007 CARRIER / 38HDT070 PLANT BUILDING 176 SS12/CU-008 CARRIER / 38HDT070 PLANT BUILDING 177 SS12/CU-009 CARRIER / 38AKS028 PLANT BUILDING 178 SS12/CU-010 CARRIER / 38AKS028 PLANT BUILDING 179 SS12/CU-011 CARRIER / 38AKS028 PLANT BUILDING 180 SS13/CU-001 CARRIER / 38HDT070 PLANT BUILDING 181 SS13/CU-002 CARRIER / 38HDT070 PLANT BUILDING 182 SS13/CU-003 CARRIER / 38HDT070 PLANT BUILDING 183 SS13/CU-004 CARRIER / 38HDT070 PLANT BUILDING 184 SS13/CU-005 CARRIER / 38HDT070 PLANT BUILDING 185 SS13/CU-006 CARRIER / 38HDT070 PLANT BUILDING 186 SS13/CU-007 CARRIER / 38HDT070 PLANT BUILDING 187 SS13/CU-008 CARRIER / 38HDT070 PLANT BUILDING 188 SS13/CU-009 CARRIER / 38HDT070 PLANT BUILDING 189 SS14/CU-001 CARRIER / 38HDT070 PLANT BUILDING 190 SS14/CU-002 CARRIER / 38HDT070 PLANT BUILDING 191 SS14/CU-003 CARRIER / 38HDT070 PLANT BUILDING 192 SS14/CU-004 CARRIER / 38HDT070 PLANT BUILDING 193 SS14/CU-005 CARRIER / 38HDT070 PLANT BUILDING 194 SS14/CU-006 CARRIER / 38HDT070 PLANT BUILDING 195 AN/GT5/CU-001 NOVA-THERM / 11A8 PLANT BUILDING 196 AN/GT6/CU-001 NOVA-THERM / 11A8 PLANT BUILDING 197 FSSO/CU-05 CARRIER / 38DAJ024 PLANT BUILDING 198 FSSO/CU-06 CARRIER / 38DAJ024 FIRE STATION BUILDING 199 FSSO/CU-07 CARRIER / 38DAJ024 FIRE STATION BUILDING 200 FSSO/CU-08 CARRIER / 38DAJ024 FIRE STATION BUILDING 2. GROUND LEVEL OUTDOOR /CONDENSING UNIT 1 FAR1/CU-01 DENCO / DCRA 50-6 PLANT BUILDING 2 FAR1/CU-02 DENCO / DCRA 50-6 PLANT BUILDING 3 FAR1/CU-03 DENCO / DCRA 50-6 PLANT BUILDING 4 FAR1/CU-04 DENCO / DCRA 50-6 PLANT BUILDING 5 FAR1/CU-05 DENCO / DCRA 50-6 PLANT BUILDING 6 FAR1/CU-06 DENCO / DCRA 50-6 PLANT BUILDING 7 FAR1/CU-07 DENCO / DCRA 50-6 PLANT BUILDING 8 FAR1/CU-08 DENCO / DCRA 50-6 PLANT BUILDING 9 FAR1/CU-09 CARRIER / 38HDT060 PLANT BUILDING 10 FAR1/CU-10 CARRIER / 38HDT060 PLANT BUILDING 11 FAR2/CU-01 DENCO / DCRA 50-6 PLANT BUILDING 12 FAR2/CU-02 DENCO / DCRA 50-6 PLANT BUILDING 13 FAR2/CU-03 DENCO / DCRA 50-6 PLANT BUILDING 14 FAR2/CU-04 DENCO / DCRA 50-6 PLANT BUILDING 15 FAR2/CU-05 DENCO / DCRA 50-6 PLANT BUILDING 16 FAR2/CU-06 DENCO / DCRA 50-6 PLANT BUILDING 17 FAR2/CU-07 DENCO / DCRA 50-6 PLANT BUILDING 18 FAR2/CU-08 DENCO / DCRA 50-6 PLANT BUILDING 19 FAR2/CU-09 CARRIER / 38HDT060 PLANT BUILDING

11 20 FAR2/CU-10 CARRIER / 38HDT060 PLANT BUILDING 21 FAR3/CU-01 DENCO / DCRA 50-6 PLANT BUILDING 22 FAR3/CU-02 DENCO / DCRA 50-6 PLANT BUILDING 23 FAR3/CU-03 DENCO / DCRA 50-6 PLANT BUILDING 24 FAR3/CU-04 DENCO / DCRA 50-6 PLANT BUILDING 25 FAR3/CU-05 DENCO / DCRA 50-6 PLANT BUILDING 26 FAR3/CU-06 DENCO / DCRA 50-6 PLANT BUILDING 27 FAR3/CU-07 DENCO / DCRA 50-6 PLANT BUILDING 28 FAR3/CU-08 DENCO / DCRA 50-6 PLANT BUILDING 29 FAR3/CU-09 DENCO / DCRA 50-6 PLANT BUILDING 30 FAR3/CU-10 DENCO / DCRA 50-6 PLANT BUILDING 31 FAR3/CU-11 DENCO / DCRA 50-6 PLANT BUILDING 32 FAR3/CU-12 CARRIER / 38HDT048 PLANT BUILDING 33 FAR3/CU-13 CARRIER / 38HDT048 PLANT BUILDING 34 FAR3/CU-14 CARRIER / 38HDT048 PLANT BUILDING 35 FAR3/CU-15 CARRIER / 38HDT048 PLANT BUILDING 36 FAR4/CU-01 DENCO / DCRA 50-6 PLANT BUILDING 37 FAR4/CU-02 DENCO / DCRA 50-6 PLANT BUILDING 38 FAR4/CU-03 DENCO / DCRA 50-6 PLANT BUILDING 39 FAR4/CU-04 DENCO / DCRA 50-6 PLANT BUILDING 40 FAR4/CU-05 DENCO / DCRA 50-6 PLANT BUILDING 41 FAR4/CU-06 DENCO / DCRA 50-6 PLANT BUILDING 42 FAR4/CU-07 DENCO / DCRA 50-6 PLANT BUILDING 43 FAR4/CU-08 DENCO / DCRA 50-6 PLANT BUILDING 44 FAR4/CU-09 CARRIER / 38HDT060 PLANT BUILDING 45 FAR4/CU-10 CARRIER / 38HDT060 PLANT BUILDING 46 FAR5/CU-01 DENCO / DCRA 50-6 PLANT BUILDING 47 FAR5/CU-02 DENCO / DCRA 50-6 PLANT BUILDING 48 FAR5/CU-03 DENCO / DCRA 50-6 PLANT BUILDING 49 FAR5/CU-04 DENCO / DCRA 50-6 PLANT BUILDING 50 FAR5/CU-05 DENCO / DCRA 50-6 PLANT BUILDING 51 FAR5/CU-06 DENCO / DCRA 50-6 PLANT BUILDING 52 FAR5/CU-07 CARRIER / 38HDT036 PLANT BUILDING 53 FAR5/CU-08 CARRIER / 38HDT036 PLANT BUILDING 54 FAR6/CU-01 DENCO / DCRA 50-6 PLANT BUILDING 55 FAR6/CU-02 DENCO / DCRA 50-6 PLANT BUILDING 56 FAR6/CU-03 DENCO / DCRA 50-6 PLANT BUILDING 57 FAR6/CU-04 DENCO / DCRA 50-6 PLANT BUILDING 58 FAR6/CU-05 DENCO / DCRA 50-6 PLANT BUILDING 59 FAR6/CU-06 CARRIER / 50TJS014 PLANT BUILDING 60 FAR6/CU-07 CARRIER / 50TJS014 PLANT BUILDING 61 FAR6/CU-08 CARRIER / 38HDT048 PLANT BUILDING 62 FAR6/CU-09 CARRIER / 38HDT048 PLANT BUILDING 63 FAR11/CU-001 DENCO / DCRA 50-6 PLANT BUILDING 64 FAR11/CU-002 DENCO / DCRA 50-6 PLANT BUILDING 65 FAR11/CU-003 DENCO / DCRA 50-6 PLANT BUILDING 66 FAR11/CU-004 DENCO / DCRA 50-6 PLANT BUILDING 67 FAR11/CU-005 DENCO / DCRA 50-6 PLANT BUILDING 68 FAR11/CU-006 DENCO / DCRA 50-6 PLANT BUILDING 69 FAR11/CU-007 DENCO / DCRA 50-6 PLANT BUILDING 70 FAR12/CU-001 DENCO / DCRA 50-6 PLANT BUILDING 71 FAR12/CU-002 DENCO / DCRA 50-6 PLANT BUILDING 72 FAR12/CU-003 DENCO / DCRA 50-6 PLANT BUILDING 73 FAR12/CU-004 DENCO / DCRA 50-6 PLANT BUILDING 74 FAR12/CU-005 DENCO / DCRA 50-6 PLANT BUILDING 75 FAR12/CU-006 DENCO / DCRA 50-6 PLANT BUILDING 76 FAR12/CU-007 DENCO / DCRA 50-6 PLANT BUILDING

12 77 FAR12/CU-008 DENCO / DCRA 50-6 PLANT BUILDING 78 VSDS/TR1/CU-001 CARRIER / 38DAJ024 PLANT BUILDING 79 VSDS/TR1/CU-002 CARRIER / 38DAJ024 PLANT BUILDING 80 VSDS/TR1/CU-003 CARRIER / 38DAJ024 PLANT BUILDING 81 VSDS/TR1/CU-004 CARRIER / 38DAJ024 PLANT BUILDING 82 VSDS/TR2/CU-001 CARRIER / 38DAJ024 PLANT BUILDING 83 VSDS/TR2/CU-002 CARRIER / 38DAJ024 PLANT BUILDING 84 VSDS/TR2/CU-003 CARRIER / 38DAJ024 PLANT BUILDING 85 VSDS/TR2/CU-004 CARRIER / 38DAJ024 PLANT BUILDING 86 WRHS/VRV/CU-01 DAIKIN/RX24KY1K WAREHOUSE EXTENSION 3. INDOOR/AIR CONDITIONING UNITS 1 ADMIN/ACU-01 CARRIER / 42KQF025 ADMINISTRATION BUILDING 2 ADMIN/ACU-02 CARRIER / 42KQF025 ADMINISTRATION BUILDING 3 ADMIN/ACU-03 CARRIER / 42KQF025 ADMINISTRATION BUILDING 4 CWSP/ACU-01 CARRIER / 42KQF025 CENTRAL WORKSHOP 5 CWSP/ACU-02 CARRIER / 42KQF025 CENTRAL WORKSHOP 6 CWSP/ACU-04 CARRIER / 42KQF025 CENTRAL WORKSHOP 7 CWSP/ACU-05 CARRIER / 42KQF025 CENTRAL WORKSHOP 8 CY/ACU-01 CARRIER / 42KNL024 CONTRACTORS YARD 9 CY/ACU-02 CARRIER / 42KNL024 CONTRACTORS YARD 10 CY/ACU-03 CARRIER / 42KNL024 CONTRACTORS YARD 11 CY/ACU-04 CARRIER / 42KNL024 CONTRACTORS YARD 12 CY/ACU-05 CARRIER / 42KNL024 CONTRACTORS YARD 13 CY/ACU-06 CARRIER / 42KNL024 CONTRACTORS YARD 14 CY/ACU-07 CARRIER / 42KNL024 CONTRACTORS YARD 15 CY/ACU-08 CARRIER / 42KNL024 CONTRACTORS YARD 16 CY/ACU-09 CARRIER / 42KNL024 CONTRACTORS YARD 17 CY/ACU-10 CARRIER / 42KNL024 CONTRACTORS YARD 18 CY/ACU-11 CARRIER / 42KNL024 CONTRACTORS YARD 19 CY/ACU-12 CARRIER / 42KNL024 CONTRACTORS YARD 20 CY/ACU-13 CARRIER / 42KNL024 CONTRACTORS YARD 21 CY/ACU-14 CARRIER / 42KNL024 CONTRACTORS YARD 22 CY/ACU-15 CARRIER / 42KNL024 CONTRACTORS YARD 23 CY/ACU-16 CARRIER / 42KNL024 CONTRACTORS YARD 24 CY/ACU-17 CARRIER / 42KNL024 CONTRACTORS YARD 25 CY/ACU-18 CARRIER / 42KNL024 CONTRACTORS YARD 26 CY/ACU-19 CARRIER / 42KNL024 CONTRACTORS YARD 27 CY/ACU-20 CARRIER / 42KNL024 CONTRACTORS YARD 28 CY/ACU-21 CARRIER / 42KNL024 CONTRACTORS YARD 29 CY/ACU-22 CARRIER / 42KNL024 CONTRACTORS YARD 30 CY/ACU-23 CARRIER / 42KNL024 CONTRACTORS YARD 31 CY/ACU-24 CARRIER / 42KNL024 CONTRACTORS YARD 32 CY/ACU-25 CARRIER / 42KNL024 CONTRACTORS YARD 33 CY/ACU-26 CARRIER / 42KNL024 CONTRACTORS YARD 34 CY/ACU-27 CARRIER / 42KNL024 CONTRACTORS YARD 35 CY/ACU-28 CARRIER / 42KNL024 CONTRACTORS YARD 36 CY/ACU-29 CARRIER / 42KNL024 CONTRACTORS YARD 37 CY/ACU-30 CARRIER / 42KNL024 CONTRACTORS YARD 38 CY/ACU-31 CARRIER / 42KNL024 CONTRACTORS YARD 39 CY/ACU-32 CARRIER / 42KNL024 CONTRACTORS YARD 40 CY/ACU-33 CARRIER / 42KNL024 CONTRACTORS YARD 41 CY/ACU-34 CARRIER / 42KNL024 CONTRACTORS YARD 42 CY/ACU-35 CARRIER / 42KNL024 CONTRACTORS YARD 43 CY/ACU-36 CARRIER / 42KNL024 CONTRACTORS YARD 44 CY/ACU-37 CARRIER / 42KNL024 CONTRACTORS YARD

13 45 CY/ACU-38 CARRIER / 42KNL024 CONTRACTORS YARD 46 CY/ACU-39 CARRIER / 42KNL024 CONTRACTORS YARD 47 CY/ACU-40 CARRIER / 42KNL024 CONTRACTORS YARD 48 CY/ACU-41 CARRIER / 42KNL024 CONTRACTORS YARD 49 CY/ACU-42 CARRIER / 42KNL024 CONTRACTORS YARD 50 CY/ACU-43 CARRIER / 42KNL024 CONTRACTORS YARD 51 CY/ACU-44 CARRIER / 42KNL024 CONTRACTORS YARD 52 CY/ACU-45 CARRIER / 42KNL024 CONTRACTORS YARD 53 CY/ACU-46 CARRIER / 42KNL024 CONTRACTORS YARD 54 CY/ACU-47 CARRIER / 42KNL024 CONTRACTORS YARD 55 CY/ACU-48 CARRIER / 42KNL024 CONTRACTORS YARD 56 CY/ACU-49 CARRIER / 42KNL024 CONTRACTORS YARD 57 FAR1/ACU-01 DENCO / DC160MA PLANT BUILDING 58 FAR1/ACU-02 DENCO / DC160MA PLANT BUILDING 59 FAR1/ACU-03 DENCO / DC160MA PLANT BUILDING 60 FAR1/ACU-04 DENCO / DC160MA PLANT BUILDING 61 FAR1/ACU-05 DENCO / DC160MA PLANT BUILDING 62 FAR1/ACU-06 STOLWAY / STFCH 12 1FP PLANT BUILDING 63 FAR1/ACU-07 STOLWAY / STFCH 12 1FP PLANT BUILDING 64 FAR2/ACU-01 DENCO / DC160MA PLANT BUILDING 65 FAR2/ACU-02 DENCO / DC160MA PLANT BUILDING 66 FAR2/ACU-03 DENCO / DC160MA PLANT BUILDING 67 FAR2/ACU-04 DENCO / DC160MA PLANT BUILDING 68 FAR2/ACU-05 DENCO / DC160MA PLANT BUILDING 69 FAR2/ACU-06 STOLWAY / STFCH 12 1FP PLANT BUILDING 70 FAR2/ACU-07 STOLWAY / STFCH 12 1FP PLANT BUILDING 71 FAR3/ACU-01 DENCO / DC160MA PLANT BUILDING 72 FAR3/ACU-02 DENCO / DC160MA PLANT BUILDING 73 FAR3/ACU-03 DENCO / DC160MA PLANT BUILDING 74 FAR3/ACU-04 DENCO / DC160MA PLANT BUILDING 75 FAR3/ACU-05 DENCO / DC160MA PLANT BUILDING 76 FAR3/ACU-06 DENCO / DC160MA PLANT BUILDING 77 FAR3/ACU-07 DENCO / DC160MA PLANT BUILDING 78 FAR3/ACU-08 STOLWAY / STFCH 10 1FP PLANT BUILDING 79 FAR3/ACU-09 STOLWAY / STFCH 10 1FP PLANT BUILDING 80 FAR3/ACU-10 STOLWAY / STFCH 10 1FP PLANT BUILDING 81 FAR3/ACU-11 STOLWAY / STFCH 10 1FP PLANT BUILDING 82 FAR4/ACU-01 DENCO / DC120MA PLANT BUILDING 83 FAR4/ACU-02 DENCO / DC120MA PLANT BUILDING 84 FAR4/ACU-03 DENCO / DC120MA PLANT BUILDING 85 FAR4/ACU-04 DENCO / DC120MA PLANT BUILDING 86 FAR4/ACU-05 DENCO / DC120MA PLANT BUILDING 87 FAR4/ACU-06 STOLWAY / STFCH 12 1FP PLANT BUILDING 88 FAR4/ACU-07 STOLWAY / STFCH 12 1FP PLANT BUILDING 89 FAR5/ACU-01 DENCO / DT16A PLANT BUILDING 90 FAR5/ACU-02 DENCO / DT16A PLANT BUILDING 91 FAR5/ACU-03 DENCO / DT16A PLANT BUILDING 92 FAR5/ACU-04 DENCO / DT16A PLANT BUILDING 93 FAR5/ACU-06 STOLWAY / STFCH 7 1FP PLANT BUILDING 94 FAR5/ACU-07 STOLWAY / STFCH 7 1FP PLANT BUILDING 95 FAR6/ACU-006 DENCO / DT10A PLANT BUILDING 96 FAR6/ACU-007 DENCO / DT10A PLANT BUILDING 97 FAR6/ACU-01 DENCO / DT10A PLANT BUILDING 98 FAR6/ACU-02 DENCO / DT10A PLANT BUILDING 99 FAR6/ACU-03 DENCO / DT10A PLANT BUILDING 100 FAR6/ACU-04 DENCO / DT10A PLANT BUILDING 101 FAR6/ACU-05 DENCO / DT10A PLANT BUILDING

14 102 FAR6/ACU-08 STOLWAY / STFCH 10 1FP PLANT BUILDING 103 FAR6/ACU-09 STOLWAY / STFCH 10 1FP PLANT BUILDING 104 FSSO/ACU-01 CARRIER / 42KQF018 FIRE STATION 105 FSSO/ACU-02 CARRIER / 42KQF025 FIRE STATION 106 FSSO/ACU-03 CARRIER / 42KQF025 FIRE STATION 107 FSSO/ACU-04 CARRIER / 42KQF025 FIRE STATION 108 MB/ACU-01 CARRIER / 42VKX 018 MARINE BASE BUILDING 109 MB/ACU-02 CARRIER / 42VKX 018 MARINE BASE BUILDING 110 MB/ACU-03 CARRIER / 42VKX 024 MARINE BASE BUILDING 111 MB/ACU-04 CARRIER / 42VKX 024 MARINE BASE BUILDING 112 MB/ACU-05 CARRIER / 42VKX 024 MARINE BASE BUILDING 113 MB/ACU-06 CARRIER / 42VKX 024 MARINE BASE BUILDING 114 MBWS/ACU-01 CARRIER / 42KQF 018 MARINE BASE WORKSHOP 115 MBWS/ACU-02 CARRIER / 42KQF 018 MARINE BASE WORKSHOP 116 MBWS/ACU-03 CARRIER / 42KQF 018 MARINE BASE WORKSHOP 117 MBWS/ACU-04 CARRIER / 42KQF 018 MARINE BASE WORKSHOP 118 MBWS/ACU-05 CARRIER / 42KQF 018 MARINE BASE WORKSHOP 119 MBWS/ACU-06 CARRIER / 42KQF 018 MARINE BASE WORKSHOP 120 MBWS/ACU-07 CARRIER / 42KQF 018 MARINE BASE WORKSHOP 121 MBWS/ACU-08 CARRIER / 42KQF 018 MARINE BASE WORKSHOP 122 MBWS/ACU-09 CARRIER / 42KQF 018 MARINE BASE WORKSHOP 123 OCC/ACU-01 CARRIER / 42KQF 025 OFFICE /COMM. BUILDING 124 OCC/ACU-02 CARRIER / 42KQF 018 OFFICE /COMM. BUILDING 125 OCC/ACU-03 CARRIER / 42KQF 018 OFFICE /COMM. BUILDING 126 OCC/ACU-04 CARRIER / 42KQF 018 OFFICE /COMM. BUILDING 127 OCC/ACU-05 CARRIER / 42KQF 025 OFFICE /COMM. BUILDING 128 OCC/ACU-06 CARRIER / 42KQF 025 OFFICE /COMM. BUILDING 129 OCC/ACU-07 CARRIER / 42KQF 025 OFFICE /COMM. BUILDING 130 OCC/ACU-08 CARRIER / 42KQF 025 OFFICE /COMM. BUILDING 131 OCC/ACU-09 CARRIER / 42KQF 018 OFFICE /COMM. BUILDING 132 OCC/ACU-10 STOLWAY / STFC 4FP OFFICE /COMM. BUILDING 133 OPCN/ACU-01 CARRIER / 42KQF 018 OPERATION BUILDING 134 OPCN/ACU-02 CARRIER / 42KQF 025 OPERATION BUILDING 135 OPCN/ACU-03 CARRIER / 42KQF 025 OPERATION BUILDING 136 SB/ACU-01 CARRIER / 42KQF 018 SECURITY BUILDING 137 SB/ACU-02 CARRIER / 42KQF 018 SECURITY BUILDING 138 SB/ACU-03 CARRIER / 42KQF 025 SECURITY BUILDING 139 SB/ACU-04 CARRIER / 42KQF 025 SECURITY BUILDING 140 SB/ACU-05 CARRIER / 42KQF 018 SECURITY BUILDING 141 SB/ACU-06 CARRIER / 42KQF 018 SECURITY BUILDING 142 SB/ACU-07 CARRIER / 42KQF 018 SECURITY BUILDING 143 SB/ACU-08 CARRIER / 42KQF 018 SECURITY BUILDING 144 SB/ACU-09 CARRIER / 42KQF 018 SECURITY BUILDING 145 SB/ACU-10 CARRIER / 42KQF 018 SECURITY BUILDING 146 SOGH/ACU-01 CARRIER / 42KQF 025 SECURITY GUARD HOUSE 147 SOGH/ACU-02 CARRIER / 42KQF 025 SECURITY GUARD HOUSE 148 SOGH/ACU-03 CARRIER / 42KQF 018 SECURITY GUARD HOUSE 149 SOGH/ACU-04 CARRIER / 42KQF 018 SECURITY GUARD HOUSE 150 SOGH/ACU-05 CARRIER / 42KQF 018 SECURITY GUARD HOUSE 151 SOGH/ACU-06 CARRIER / 42KQF 025 SECURITY GUARD HOUSE 152 SOGH/ACU-07 CARRIER / 42KQF 025 SECURITY GUARD HOUSE 153 SOGH/ACU-08 CARRIER / 42KQF 025 SECURITY GUARD HOUSE 154 SOGH/ACU-09 CARRIER / 42KQF 018 SECURITY GUARD HOUSE 155 SOGH/ACU-10 CARRIER / 42KQF 018 SECURITY GUARD HOUSE 156 SS1/ACU-01 CARRIER / 40LX070 PLANT BUILDING 157 SS1/ACU-02 CARRIER / 40LX070 PLANT BUILDING 158 SS1/ACU-03 CARRIER / 40LX070 PLANT BUILDING

15 159 SS1/ACU-04 CARRIER / 40LX070 PLANT BUILDING 160 SS1/ACU-05 CARRIER / 40LX070 PLANT BUILDING 161 SS1/ACU-06 CARRIER / 40LX070 PLANT BUILDING 162 SS1/ACU-07 CARRIER / 40LX070 PLANT BUILDING 163 SS1/ACU-08 CARRIER / 40LX070 PLANT BUILDING 164 SS1/ACU-09 CARRIER / 40LX070 PLANT BUILDING 165 SS1/ACU-10 CARRIER / 40LX070 PLANT BUILDING 166 SS1/ACU-11 CARRIER / 40LX070 PLANT BUILDING 167 SS1/ACU-12 CARRIER / 40LX070 PLANT BUILDING 168 SS2/ACU-01 CARRIER / 40LX070 PLANT BUILDING 169 SS2/ACU-02 CARRIER / 40LX070 PLANT BUILDING 170 SS2/ACU-03 CARRIER / 40LX070 PLANT BUILDING 171 SS2/ACU-04 CARRIER / 40LX070 PLANT BUILDING 172 SS2/ACU-05 CARRIER / 40LX070 PLANT BUILDING 173 SS2/ACU-06 CARRIER / 40LX070 PLANT BUILDING 174 SS2/ACU-07 CARRIER / 40LX070 PLANT BUILDING 175 SS3/ACU-01 CARRIER / 40LX070 PLANT BUILDING 176 SS3/ACU-02 CARRIER / 40LX070 PLANT BUILDING 177 SS3/ACU-03 CARRIER / 40LX070 PLANT BUILDING 178 SS3/ACU-04 CARRIER / 40LX070 PLANT BUILDING 179 SS3/ACU-05 CARRIER / 40LX070 PLANT BUILDING 180 SS3/ACU-06 CARRIER / 40LX070 PLANT BUILDING 181 SS3/ACU-07 CARRIER / 40LX070 PLANT BUILDING 182 SS3/ACU-08 CARRIER / 40LX070 PLANT BUILDING 183 SS4/ACU-01 CARRIER / 40LX070 PLANT BUILDING 184 SS4/ACU-02 CARRIER / 40LX070 PLANT BUILDING 185 SS4/ACU-03 CARRIER / 40LX070 PLANT BUILDING 186 SS4/ACU-04 CARRIER / 40LX070 PLANT BUILDING 187 SS4/ACU-05 CARRIER / 40LX070 PLANT BUILDING 188 SS4/ACU-06 CARRIER / 40LX070 PLANT BUILDING 189 SS4/ACU-07 CARRIER / 40LX070 PLANT BUILDING 190 SS4/ACU-08 CARRIER / 40LX070 PLANT BUILDING 191 SS5/ACU-01 CARRIER / 42KQF 025 PLANT BUILDING 192 SS5/ACU-02 CARRIER / 42KQF 025 PLANT BUILDING 193 SS5/ACU-03 CARRIER / 42KQF 025 PLANT BUILDING 194 SS5/ACU-04 CARRIER / 42KQF 025 PLANT BUILDING 195 SS5/ACU-05 CARRIER / 42KQF 025 PLANT BUILDING 196 SS5/ACU-06 CARRIER / 42KQF 025 PLANT BUILDING 197 SS5/ACU-07 CARRIER / 42KQF 025 PLANT BUILDING 198 SS5/ACU-08 CARRIER / 42KQF 025 PLANT BUILDING 199 SS6/ACU-01 CARRIER / 40LX070 PLANT BUILDING 200 SS6/ACU-02 CARRIER / 40LX070 PLANT BUILDING 201 SS6/ACU-03 CARRIER / 40LX070 PLANT BUILDING 202 SS6/ACU-04 CARRIER / 40LX070 PLANT BUILDING 203 SS6/ACU-05 CARRIER / 40LX070 PLANT BUILDING 204 SS6/ACU-06 CARRIER / 40LX070 PLANT BUILDING 205 SS6/ACU-07 CARRIER / 40LX070 PLANT BUILDING 206 SS8/ACU-01 CARRIER / 42KQF 025 PLANT BUILDING 207 SS8/ACU-02 CARRIER / 42KQF 025 PLANT BUILDING 208 SS8/ACU-03 CARRIER / 42KQF 025 PLANT BUILDING 209 SS8/ACU-04 CARRIER / 42KQF 025 PLANT BUILDING 210 FAR11/ACU-001 DENCO / DC160MA PLANT BUILDING 211 FAR11/ACU-002 DENCO / DC160MA PLANT BUILDING 212 FAR11/ACU-003 DENCO / DC160MA PLANT BUILDING 213 FAR11/ACU-004 DENCO / DC160MA PLANT BUILDING 214 FAR11/ACU-005 DENCO / DC160MA PLANT BUILDING 215 FAR11/ACU-006 STOLWAY / STFCH 12 1FP PLANT BUILDING

16 216 FAR11/ACU-007 STOLWAY / STFCH 12 1FP PLANT BUILDING 217 FAR12/ACU-001 DENCO / DC160MA PLANT BUILDING 218 FAR12/ACU-002 DENCO / DC160MA PLANT BUILDING 219 FAR12/ACU-003 DENCO / DC160MA PLANT BUILDING 220 FAR12/ACU-004 DENCO / DC160MA PLANT BUILDING 221 FAR12/ACU-005 DENCO / DC160MA PLANT BUILDING 222 FAR12/ACU-006 DENCO / DC160MA PLANT BUILDING 223 FAR12/ACU-007 STOLWAY / STFCH 12 1FP PLANT BUILDING 224 FAR12/ACU-008 STOLWAY / STFCH 12 1FP PLANT BUILDING 225 SS12/ACU-001 CARRIER / 40LX070 PLANT BUILDING 226 SS12/ACU-002 CARRIER / 40LX070 PLANT BUILDING 227 SS12/ACU-003 CARRIER / 40LX070 PLANT BUILDING 228 SS12/ACU-004 CARRIER / 40LX070 PLANT BUILDING 229 SS12/ACU-005 CARRIER / 40LX070 PLANT BUILDING 230 SS12/ACU-006 CARRIER / 40LX070 PLANT BUILDING 231 SS12/ACU-007 CARRIER / 40LX070 PLANT BUILDING 232 SS12/ACU-008 CARRIER / 40LX070 PLANT BUILDING 233 SS13/ACU-001 CARRIER / 40LX070 PLANT BUILDING 234 SS13/ACU-002 CARRIER / 40LX070 PLANT BUILDING 235 SS13/ACU-003 CARRIER / 40LX070 PLANT BUILDING 236 SS13/ACU-004 CARRIER / 40LX070 PLANT BUILDING 237 SS13/ACU-005 CARRIER / 40LX070 PLANT BUILDING 238 SS13/ACU-006 CARRIER / 40LX070 PLANT BUILDING 239 SS13/ACU-007 CARRIER / 40LX070 PLANT BUILDING 240 SS13/ACU-008 CARRIER / 40LX070 PLANT BUILDING 241 SS13/ACU-009 CARRIER / 40LX070 PLANT BUILDING 242 SS14/ACU-001 CARRIER / 40LX070 PLANT BUILDING 243 SS14/ACU-002 CARRIER / 40LX070 PLANT BUILDING 244 SS14/ACU-003 CARRIER / 40LX070 PLANT BUILDING 245 SS14/ACU-004 CARRIER / 40LX070 PLANT BUILDING 246 SS14/ACU-005 CARRIER / 40LX070 PLANT BUILDING 247 SS14/ACU-006 CARRIER / 40LX070 PLANT BUILDING 248 AN/GT5/ACU-001 NOVA-THERM / 11A8 PLANT BUILDING 249 AN/GT6/ACU-001 NOVA-THERM / 11A8 PLANT BUILDING 250 VSDS/TR1/ACU-001 CARRIER / 42KQF 025 PLANT BUILDING 251 VSDS/TR1/ACU-002 CARRIER / 42KQF 025 PLANT BUILDING 252 VSDS/TR1/ACU-003 CARRIER / 42KQF 025 PLANT BUILDING 253 VSDS/TR1/ACU-004 CARRIER / 42KQF 025 PLANT BUILDING 254 VSDS/TR2/ACU-001 CARRIER / 42KQF 025 PLANT BUILDING 255 VSDS/TR2/ACU-002 CARRIER / 42KQF 025 PLANT BUILDING 256 VSDS/TR2/ACU-003 CARRIER / 42KQF 025 PLANT BUILDING 257 VSDS/TR2/ACU-004 CARRIER / 42KQF 025 PLANT BUILDING 258 FSSO/ACU-05 CARRIER / 42KQF 025 PLANT BUILDING 259 FSSO/ACU-06 CARRIER / 42KQF 025 PLANT BUILDING 260 FSSO/ACU-07 CARRIER / 42KQF 025 PLANT BUILDING 261 FSSO/ACU-08 CARRIER / 42KQF 025 PLANT BUILDING 262 WRHS/ACU-01 DAIKIN/FXA63LVE WAREHOUSE EXTENSION 263 WRHS/ACU-02 DAIKIN/FXA63LVE WAREHOUSE EXTENSION 264 WRHS/ACU-03 DAIKIN/FXA63LVE WAREHOUSE EXTENSION 265 WRHS/ACU-04 DAIKIN/FXA63LVE WAREHOUSE EXTENSION 266 WRHS/ACU-05 DAIKIN/FXA63LVE WAREHOUSE EXTENSION 267 WRHS/ACU-06 DAIKIN/FXA63LVE WAREHOUSE EXTENSION 268 WRHS/ACU-07 DAIKIN/FXA63LVE WAREHOUSE EXTENSION 269 WRHS/ACU-08 DAIKIN/FXA63LVE WAREHOUSE EXTENSION 270 WRHS/ACU-09 DAIKIN/FXA63LVE WAREHOUSE EXTENSION 271 WRHS/ACU-10 DAIKIN/FXA63LVE WAREHOUSE EXTENSION

17 4. CHILLER UNITS 1 AN/BOG/CHLR-01 CARRIER / 30GT PLANT BUILDING 2 AN/BOG/CHLR-02 CARRIER / 30GT PLANT BUILDING 3 AN/GMST/CHLR-01 CARRIER / 30GT PLANT BUILDING 4 AN/GMST/CHLR-02 CARRIER / 30GT PLANT BUILDING 5 AN/TR1/CHLR-01 CARRIER / 30GT PLANT BUILDING 6 AN/TR1/CHLR-02 CARRIER / 30GT PLANT BUILDING 7 AN/TR2/CHLR-01 CARRIER / 30GT PLANT BUILDING 8 AN/TR2/CHLR-02 CARRIER / 30GT PLANT BUILDING 9 AN/TR3/CHLR-01 CARRIER / 30GT PLANT BUILDING 10 AN/TR3/CHLR-02 CARRIER / 30GT PLANT BUILDING 11 CNTN/CHLR-01 CARRIER / 30GG245 ADMINISTRATION BUILDING 12 CNTN/CHLR-02 CARRIER / 30GG245 ADMINISTRATION BUILDING 13 CNTN/CHLR-03 CARRIER / 30GG245 ADMINISTRATION BUILDING 14 CWSP/CHLR-01 CARRIER / 30GG145 CENTRAL WORKSHOP 15 CWSP/CHLR-02 CARRIER / 30GG145 CENTRAL WORKSHOP 16 ETP/CHLR-01 TRICOOL EFFULENT TREATMENT 17 ETP/CHLR-02 TRICOOL EFFULENT TREATMENT 18 OPCN/CHLR-01 CARRIER / 30GG170 OPERATION BUILDING 19 OPCN/CHLR-02 CARRIER / 30GG170 OPERATION BUILDING 5. CHILLED WATER PUMPS 1 ADMIN/CHW/SEC/PMP-01 ARMSTRONG, UK ADMINISTRATION BUILDING 2 ADMIN/CHW/SEC/PMP-02 ARMSTRONG, UK ADMINISTRATION BUILDING 3 AN/BOG/CHW-01A GRUNDFOS, DENMARK PLANT BUILDING 4 AN/BOG/CHW-01B GRUNDFOS, DENMARK PLANT BUILDING 5 AN/BOG/CHW-02A GRUNDFOS, DENMARK PLANT BUILDING 6 AN/BOG/CHW-02B GRUNDFOS, DENMARK PLANT BUILDING 7 AN/TR1/CHW-01A GRUNDFOS, DENMARK PLANT BUILDING 8 AN/TR1/CHW-01B GRUNDFOS, DENMARK PLANT BUILDING 9 AN/TR1/CHW-02A GRUNDFOS, DENMARK PLANT BUILDING 10 AN/TR1/CHW-02B GRUNDFOS, DENMARK PLANT BUILDING 11 AN/TR2/CHW-01A GRUNDFOS, DENMARK PLANT BUILDING 12 AN/TR2/CHW-01B GRUNDFOS, DENMARK PLANT BUILDING 13 AN/TR2/CHW-02A GRUNDFOS, DENMARK PLANT BUILDING 14 AN/TR2/CHW-02B GRUNDFOS, DENMARK PLANT BUILDING 15 AN/TR3/CHW-01A GRUNDFOS, DENMARK PLANT BUILDING 16 AN/TR3/CHW-01B GRUNDFOS, DENMARK PLANT BUILDING 17 AN/TR3/CHW-02A GRUNDFOS, DENMARK PLANT BUILDING 18 AN/TR3/CHW-02B GRUNDFOS, DENMARK PLANT BUILDING 19 CNTN/CHW/PRM/PMP-01 ARMSTRONG, UK ADMINISTRATION BUILDING 20 CNTN/CHW/PRM/PMP-02 ARMSTRONG, UK ADMINISTRATION BUILDING 21 CNTN/CHW/SEC/PMP-01 ARMSTRONG, UK ADMINISTRATION BUILDING 22 CNTN/CHW/SEC/PMP-02 ARMSTRONG, UK ADMINISTRATION BUILDING 23 CWSP/CHW/PRM/PMP-01 ARMSTRONG, UK CENTRAL WORKSHOP 24 CWSP/CHW/PRM/PMP-02 ARMSTRONG, UK CENTRAL WORKSHOP 25 OPCN/CHW/GSEC/PMP-01 ARMSTRONG, UK OPERATION BUILDING 26 OPCN/CHW/GSEC/PMP-02 ARMSTRONG, UK OPERATION BUILDING 27 OPCN/CHW/GSEC/PMP-03 ARMSTRONG, UK OPERATION BUILDING 28 OPCN/CHW/GSEC/PMP-04 ARMSTRONG, UK OPERATION BUILDING 29 OPCN/CHW/PRM/PMP-01 ARMSTRONG, UK OPERATION BUILDING 30 OPCN/CHW/PRM/PMP-02 ARMSTRONG, UK OPERATION BUILDING 31 PRTG/CHW/SEC/PMP-01 ARMSTRONG, UK ADMINISTRATION BUILDING 32 PRTG/CHW/SEC/PMP-02 ARMSTRONG, UK ADMINISTRATION BUILDING 33 PRU/CNTN/01/CW ARMSTRONG, UK ADMINISTRATION BUILDING

18 34 PRU/CWSP/01/CW ARMSTRONG, UK ADMINISTRATION BUILDING 35 PRU/OPCN/01/CW ARMSTRONG, UK ADMINISTRATION BUILDING 36 TCCN/SEC/PMP-01 ARMSTRONG, UK TECHNICAL CENTRE 37 TCCN/SEC/PMP-02 ARMSTRONG, UK TECHNICAL CENTRE 6. AIR HANDLING UNITS 1 ADMIN/AHU-01 SAIVER, ITALY ADMINISTRATION BUILDING 2 AN/BOG/AHU-01A SAIVER, ITALY PLANT BUILDING 3 AN/BOG/AHU-01B SAIVER, ITALY PLANT BUILDING 4 AN/GMST/AHU-01A SAIVER, ITALY PLANT BUILDING 5 AN/GMST/AHU-01B SAIVER, ITALY PLANT BUILDING 6 AN/TR1/AHU-01A SAIVER, ITALY PLANT BUILDING 7 AN/TR1/AHU-01B SAIVER, ITALY PLANT BUILDING 8 AN/TR2/AHU-01A SAIVER, ITALY PLANT BUILDING 9 AN/TR2/AHU-01B SAIVER, ITALY PLANT BUILDING 10 AN/TR3/AHU-01A SAIVER, ITALY PLANT BUILDING 11 AN/TR3/AHU-01B SAIVER, ITALY PLANT BUILDING 12 CHRM/AHU-01 SAIVER, ITALY CENTRAL WORKSHOP 13 CHRM/AHU-02 SAIVER, ITALY CENTRAL WORKSHOP 14 CNTN/AHU-01 SAIVER, ITALY CENTRAL WORKSHOP 15 CNTN/AHU-02 SAIVER, ITALY CENTRAL WORKSHOP 16 CNTN/AHU-03 SAIVER, ITALY CENTRAL WORKSHOP 17 CWSP/AHU-01 SAIVER, ITALY CENTRAL WORKSHOP 18 CWSP/AHU-02 SAIVER, ITALY CENTRAL WORKSHOP 19 CWSP/AHU-03 SAIVER, ITALY CENTRAL WORKSHOP 20 CWSP/AHU-04 SAIVER, ITALY CENTRAL WORKSHOP 21 CWSP/AHU-05 SAIVER, ITALY CENTRAL WORKSHOP 22 MBWS/AHU-01 SAIVER, ITALY MARINE BASE WORKSHOP 23 MWHS/AHU-01 SAIVER, ITALY MARINE BASE WORKSHOP 24 OPCN/AHU-01A SAIVER, ITALY OPERATION BUILDING 25 OPCN/AHU-01B SAIVER, ITALY OPERATION BUILDING 26 OPCN/AHU-02A SAIVER, ITALY OPERATION BUILDING 27 OPCN/AHU-02B SAIVER, ITALY OPERATION BUILDING 28 PRTG/AHU-01 SAIVER, ITALY TECHNICAL CENTRE 29 PRTG/AHU-02 SAIVER, ITALY TECHNICAL CENTRE 30 SS3/AHU-01 SAIVER, ITALY PLANT BUILDING 31 SS3/AHU-02 SAIVER, ITALY PLANT BUILDING 32 SS3/AHU-03 SAIVER, ITALY PLANT BUILDING 33 SS4/AHU-01 SAIVER, ITALY PLANT BUILDING 34 SS4/AHU-02 SAIVER, ITALY PLANT BUILDING 35 SS4/AHU-03 SAIVER, ITALY PLANT BUILDING 36 TCCN/AHU-01 SAIVER, ITALY TECHNICAL CENTRE 37 TCCN/AHU-02 SAIVER, ITALY TECHNICAL CENTRE 38 SS12/AHU-001 SAIVER, ITALY PLANT BUILDING 39 SS12/AHU-002 SAIVER, ITALY PLANT BUILDING 40 SS12/AHU-003 SAIVER, ITALY PLANT BUILDING 7. FAN COIL UNITS 1 ADMIN/FCU-01 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 2 ADMIN/FCU-02 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 3 ADMIN/FCU-03 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 4 ADMIN/FCU-04 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 5 ADMIN/FCU-05 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 6 ADMIN/FCU-06 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 7 ADMIN/FCU-07 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING

19 8 ADMIN/FCU-08 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 9 ADMIN/FCU-09 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 10 ADMIN/FCU-10 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 11 ADMIN/FCU-11 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 12 ADMIN/FCU-12 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 13 ADMIN/FCU-13 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 14 ADMIN/FCU-14 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 15 ADMIN/FCU-15 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 16 ADMIN/FCU-16 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 17 ADMIN/FCU-17 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 18 ADMIN/FCU-18 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 19 ADMIN/FCU-19 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 20 ADMIN/FCU-20 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 21 ADMIN/FCU-21 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 22 ADMIN/FCU-22 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 23 ADMIN/FCU-23 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 24 ADMIN/FCU-24 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 25 ADMIN/FCU-25 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 26 ADMIN/FCU-26 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 27 ADMIN/FCU-27 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 28 ADMIN/FCU-28 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 29 ADMIN/FCU-29 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 30 ADMIN/FCU-30 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 31 ADMIN/FCU-31 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 32 ADMIN/FCU-32 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 33 ADMIN/FCU-33 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 34 ADMIN/FCU-34 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 35 ADMIN/FCU-35 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 36 ADMIN/FCU-36 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 37 ADMIN/FCU-37 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 38 ADMIN/FCU-38 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 39 ADMIN/FCU-39 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 40 ADMIN/FCU-40 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 41 ADMIN/FCU-41 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 42 ADMIN/FCU-42 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 43 ADMIN/FCU-43 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 44 ADMIN/FCU-44 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 45 ADMIN/FCU-45 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 46 ADMIN/FCU-46 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 47 ADMIN/FCU-47 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 48 ADMIN/FCU-48 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 49 ADMIN/FCU-49 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 50 ADMIN/FCU-50 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 51 ADMIN/FCU-51 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 52 ADMIN/FCU-52 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 53 ADMIN/FCU-53 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 54 ADMIN/FCU-54 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 55 ADMIN/FCU-55 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 56 ADMIN/FCU-56 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 57 ADMIN/FCU-57 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 58 ADMIN/FCU-58 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 59 ADMIN/FCU-59 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 60 ADMIN/FCU-60 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 61 ADMIN/FCU-61 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 62 ADMIN/FCU-62 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 63 ADMIN/FCU-63 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 64 ADMIN/FCU-64 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING

20 65 ADMIN/FCU-65 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 66 ADMIN/FCU-66 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 67 ADMIN/FCU-67 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 68 ADMIN/FCU-68 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 69 ADMIN/FCU-69 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 70 ADMIN/FCU-70 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 71 ADMIN/FCU-71 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 72 ADMIN/FCU-72 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 73 CNTN/FCU-01 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 74 CNTN/FCU-02 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 75 CNTN/FCU-03 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 76 CNTN/FCU-04 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 77 CNTN/FCU-05 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 78 CNTN/FCU-06 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 79 CNTN/FCU-07 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 80 CNTN/FCU-08 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 81 CNTN/FCU-09 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 82 CNTN/FCU-10 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 83 CNTN/FCU-11 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 84 CNTN/FCU-12 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 85 CNTN/FCU-13 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 86 CNTN/FCU-14 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 87 CNTN/FCU-15 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 88 CNTN/FCU-16 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 89 CNTN/FCU-17 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 90 CNTN/FCU-18 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 91 CNTN/FCU-19 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 92 CNTN/FCU-20 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 93 CNTN/FCU-21 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 94 CNTN/FCU-22 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 95 OPCN/FCU-01 PRECISION UK / BRIO or UTB OPERATION BUILDING 96 OPCN/FCU-02 PRECISION UK / BRIO or UTB OPERATION BUILDING 97 OPCN/FCU-03 PRECISION UK / BRIO or UTB OPERATION BUILDING 98 OPCN/FCU-04 PRECISION UK / BRIO or UTB OPERATION BUILDING 99 OPCN/FCU-05 PRECISION UK / BRIO or UTB OPERATION BUILDING 100 OPCN/FCU-06 PRECISION UK / BRIO or UTB OPERATION BUILDING 101 OPCN/FCU-07 PRECISION UK / BRIO or UTB OPERATION BUILDING 102 OPCN/FCU-08 PRECISION UK / BRIO or UTB OPERATION BUILDING 103 OPCN/FCU-09 PRECISION UK / BRIO or UTB OPERATION BUILDING 104 OPCN/FCU-10 PRECISION UK / BRIO or UTB OPERATION BUILDING 105 OPCN/FCU-11 PRECISION UK / BRIO or UTB OPERATION BUILDING 106 OPCN/FCU-12 PRECISION UK / BRIO or UTB OPERATION BUILDING 107 OPCN/FCU-13 PRECISION UK / BRIO or UTB OPERATION BUILDING 108 OPCN/FCU-14 PRECISION UK / BRIO or UTB OPERATION BUILDING 109 OPCN/FCU-15 PRECISION UK / BRIO or UTB OPERATION BUILDING 110 OPCN/FCU-16 PRECISION UK / BRIO or UTB OPERATION BUILDING 111 OPCN/FCU-17 PRECISION UK / BRIO or UTB OPERATION BUILDING 112 OPCN/FCU-18 PRECISION UK / BRIO or UTB OPERATION BUILDING 113 OPCN/FCU-19 PRECISION UK / BRIO or UTB OPERATION BUILDING 114 OPCN/FCU-20 PRECISION UK / BRIO or UTB OPERATION BUILDING 115 OPCN/FCU-21 PRECISION UK / BRIO or UTB OPERATION BUILDING 116 OPCN/FCU-22 PRECISION UK / BRIO or UTB OPERATION BUILDING 117 PRTG/FCU-01 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 118 PRTG/FCU-02 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 119 PRTG/FCU-03 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 120 PRTG/FCU-04 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 121 PRTG/FCU-05 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING

21 122 PRTG/FCU-06 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 123 PRTG/FCU-07 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 124 PRTG/FCU-08 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 125 PRTG/FCU-09 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 126 PRTG/FCU-10 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 127 PRTG/FCU-11 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 128 PRTG/FCU-12 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 129 PRTG/FCU-13 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 130 PRTG/FCU-14 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 131 PRTG/FCU-15 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 132 PRTG/FCU-16 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 133 PRTG/FCU-17 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 134 PRTG/FCU-18 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 135 PRTG/FCU-19 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 136 PRTG/FCU-20 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 137 PRTG/FCU-21 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 138 PRTG/FCU-22 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 139 PRTG/FCU-23 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 140 PRTG/FCU-24 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 141 PRTG/FCU-25 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 142 PRTG/FCU-26 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 143 PRTG/FCU-27 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 144 PRTG/FCU-28 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 145 PRTG/FCU-29 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 146 PRTG/FCU-30 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 147 PRTG/FCU-31 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 148 PRTG/FCU-32 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 149 PRTG/FCU-33 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 150 PRTG/FCU-34 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 151 PRTG/FCU-35 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 152 PRTG/FCU-36 PRECISION UK / BRIO or UTB ADMINISTRATION BUILDING 153 TCCN-FCU-01 PRECISION UK / BRIO or UTB TECHNICAL CENTRE 154 TCCN-FCU-02 PRECISION UK / BRIO or UTB TECHNICAL CENTRE 155 TCCN-FCU-03 PRECISION UK / BRIO or UTB TECHNICAL CENTRE 156 TCCN-FCU-04 PRECISION UK / BRIO or UTB TECHNICAL CENTRE 157 TCCN-FCU-05 PRECISION UK / BRIO or UTB TECHNICAL CENTRE 158 TCCN-FCU-06 PRECISION UK / BRIO or UTB TECHNICAL CENTRE 159 TCCN-FCU-07 PRECISION UK / BRIO or UTB TECHNICAL CENTRE 160 TCCN-FCU-08 PRECISION UK / BRIO or UTB TECHNICAL CENTRE 161 TCCN-FCU-09 PRECISION UK / BRIO or UTB TECHNICAL CENTRE 162 TCCN-FCU-10 PRECISION UK / BRIO or UTB TECHNICAL CENTRE 163 TCCN-FCU-11 PRECISION UK / BRIO or UTB TECHNICAL CENTRE 164 TCCN-FCU-12 PRECISION UK / BRIO or UTB TECHNICAL CENTRE 165 TCCN-FCU-13 PRECISION UK / BRIO or UTB TECHNICAL CENTRE 166 TCCN-FCU-14 PRECISION UK / BRIO or UTB TECHNICAL CENTRE 167 TCCN-FCU-15 PRECISION UK / BRIO or UTB TECHNICAL CENTRE 168 TCCN-FCU-16 PRECISION UK / BRIO or UTB TECHNICAL CENTRE 169 TCCN-FCU-17 PRECISION UK / BRIO or UTB TECHNICAL CENTRE 170 TCCN-FCU-18 PRECISION UK / BRIO or UTB TECHNICAL CENTRE 171 TCCN-FCU-19 PRECISION UK / BRIO or UTB TECHNICAL CENTRE 172 TCCN-FCU-20 PRECISION UK / BRIO or UTB TECHNICAL CENTRE 173 TCCN-FCU-21 PRECISION UK / BRIO or UTB TECHNICAL CENTRE 174 TCCN-FCU-22 PRECISION UK / BRIO or UTB TECHNICAL CENTRE 175 TCCN-FCU-23 PRECISION UK / BRIO or UTB TECHNICAL CENTRE 176 TCCN-FCU-24 PRECISION UK / BRIO or UTB TECHNICAL CENTRE 177 TCCN-FCU-25 PRECISION UK / BRIO or UTB TECHNICAL CENTRE 178 TCCN-FCU-26 PRECISION UK / BRIO or UTB TECHNICAL CENTRE

NOT PROTECTIVELY MARKED SUPPLIER REGISTRATION FORM

NOT PROTECTIVELY MARKED SUPPLIER REGISTRATION FORM SUPPLIER REGISTRATION FORM Thank you for taking the time to complete the Horizon Supplier Registration form. Please contact suppliers@horizonnuclearpower.com if additional assistance is required. Highlighted

More information

Factsheet. Power Generation Service Energy efficiency in power generation and water

Factsheet. Power Generation Service Energy efficiency in power generation and water Factsheet Power Generation Service Energy efficiency in power generation and water Opportunity identification Opportunity identification overview The opportunity identification phase of Industrial Energy

More information

IN-DEPTH UNDERSTANDING OF HVAC EQUIPMENT & SYSTEM SPECIFICATIONS AND PERFORMANCE 11 & 12 JULY 2016 WISMA IEM

IN-DEPTH UNDERSTANDING OF HVAC EQUIPMENT & SYSTEM SPECIFICATIONS AND PERFORMANCE 11 & 12 JULY 2016 WISMA IEM IEM TRAINING CENTRE SDN. BHD. (127273-K) No. 33-1A (1 st Floor), Jalan 52/18, P.O. Box 224 (Jalan Sultan P.O.) 46720 Petaling Jaya, Selangor Darul Ehsan (GST ID No. 001525395456) Telephone No. 03-79586851

More information

IADC HSE Case Guidelines Reference: Number-Title

IADC HSE Case Guidelines Reference: Number-Title PART 1 - HSE CASE INTRODUCTION X X X X X 1.1 INTRODUCTION TO THESE GUIDELINES 1.2 EXTERNAL STAKEHOLDERS HSE CASE EXPECTATIONS X 1.2.1 Senior Management Demonstration 1.2.2 HSE Case Scope and Arrangements

More information

Ventilation Policy Type: Policy Register No: Status: Public. Developed in response to: Contributes to CQC Outcome number: Outcome 8 and 10

Ventilation Policy Type: Policy Register No: Status: Public. Developed in response to: Contributes to CQC Outcome number: Outcome 8 and 10 Ventilation Policy Type: Policy Register No: 11056 Status: Public Developed in response to: HTM03-01 Contributes to CQC Outcome number: Outcome 8 and 10 Consulted With Post/Committee/Group Date Louise

More information

INFORMATION TO BE GIVEN 2

INFORMATION TO BE GIVEN 2 (To be filled out in the EDPS' office) REGISTER NUMBER: 1181 (To be filled out in the EDPS' office) NOTIFICATION FOR PRIOR CHECKING DATE OF SUBMISSION: 04/11/2013 CASE NUMBER: 2013-1228 INSTITUTION: EASO

More information

Subcontractor Approval Form

Subcontractor Approval Form Page 1 of 7 1. General Information Company / Partnership / Individual Address: Telephone: Email: Website: Main Contact Telephone: Email: Outline scope of company works: 2. Financial Information Bank Account

More information

Modernizing Control Systems for Campuses

Modernizing Control Systems for Campuses Modernizing Control Systems for Campuses APPA 2018 Presented by: James Comte, Commissioning and Controls Manager University of California, San Francisco In November 2013, President Janet Napolitano announced

More information

Full Name of Centre:... Date of establishment:... Address: Telephone No:... Fax No: (Please include area codes)

Full Name of Centre:... Date of establishment:... Address: Telephone No:... Fax No: (Please include area codes) APPLICATION for AIES CENTRE REGISTRATION 2017/18 2512 Chambers Road, Tustin CA 92780, USA Tel: 949-501-3701 Email: info@aiesus.org Website: www.aiesus.org Please read the instructions and terms of contract

More information

Internationally Accredited Coating Applicator Training and Certification Programme

Internationally Accredited Coating Applicator Training and Certification Programme Internationally Accredited Coating Applicator Training and Certification Programme Welcome SSPC Trainthepainter is an internationally recognised Coating Applicator training and certification programme.

More information

Oil & Gas Industry Quality Management System Auditor/ Lead Auditor Training

Oil & Gas Industry Quality Management System Auditor/ Lead Auditor Training An Intensive 2-Week Training Course Oil & Gas Industry Quality Management System Auditor/ Lead Auditor Training 27 Oct - 07 Nov 2019, Dubai 24-OCT-18 This course is Designed, Developed, and will be Delivered

More information

APM Accreditation for training providers Application Guidance Notes

APM Accreditation for training providers Application Guidance Notes APM Accreditation for training providers Application Guidance Notes APM Accreditation for training providers Guidance Notes CONTENTS Overview 2 Application process 3 Guidance on completing your application

More information

Invitation for Expression of Interest (Eol) to Participate as an ACT-Shop Pilot Project

Invitation for Expression of Interest (Eol) to Participate as an ACT-Shop Pilot Project Hong Kong Green Building Council Limited (HKGBC) Invitation for Expression of Interest (Eol) to Participate as an ACT-Shop Pilot Project Background HKSAR Government (HKSARG) has launched an Energy Saving

More information

REQUEST FOR PROPOSAL (RFP)

REQUEST FOR PROPOSAL (RFP) REQUEST FOR PROPOSAL (RFP) Supply of Desktop Computers, Laptops and Multifunction Printers Fiji Electricity Authority Commercial in Confidence Page 1 10 1. Purpose and Description of Project The Fiji Electricity

More information

Returnable Schedules

Returnable Schedules Returnable Schedules Engineering, and Construction of a fixed tilt Solar Photovoltaic Power Facility (Phase I) at the CSIR Campus in Pretoria on building 3, 10, 22, 23 and 33 Date of issue 17 th October

More information

EXPRESSION OF INTEREST

EXPRESSION OF INTEREST EXPRESSION OF INTEREST DELHI METRO RAIL COPRATION LIMTED (A joint Venture of Government of India & Government of NGT of Delhi) First Floor, A wing, Fire Brigade Lane, Barakhamba Road, New Delhi -110001

More information

Indian Institute of Technology Kanpur Samtel Centre for Display Technologies

Indian Institute of Technology Kanpur Samtel Centre for Display Technologies Fax: + 91 0512 2596620 Phones: + 91 0512 2596622, 6592 Indian Institute of Technology Kanpur Samtel Centre for Display Technologies Enquiry No.: SCDT/FlexE/2016 17/25 Opening Date: 23/12/2016 Closing Date:

More information

POWER AND WATER CORPORATION POLICY MANAGEMENT OF EXTERNAL SERVICE PROVIDERS

POWER AND WATER CORPORATION POLICY MANAGEMENT OF EXTERNAL SERVICE PROVIDERS POWER AND WATER CORPORATION POLICY MANAGEMENT OF EXTERNAL SERVICE PROVIDERS Prepared by: Approved by: Chief Procurement Officer John Baskerville Chief Executive File number: D2015/65737 June 2015 MANAGEMENT

More information

HPE Energy Efficiency Certification Service

HPE Energy Efficiency Certification Service Data sheet HPE Energy Efficiency Certification Service HPE Technology Consulting As power consumption and heat generation in the data center increase due to information explosion, big data, e-commerce,

More information

Dykin Engineering Part & Services Sdn. Bhd.

Dykin Engineering Part & Services Sdn. Bhd. Dykin Engineering Part & Services Sdn. Bhd. CHILLED WATER SOLUTIONS Water chillers to custom air handlers to variable air volume terminal systems. We provide PM (Preventative Maintenance) and FM (Full

More information

Visa copy, Qualification Certificate, Photo Visa Dubai. Qualification Refer to the latest circular available on the

Visa copy, Qualification Certificate, Photo Visa Dubai. Qualification Refer to the latest circular available on the Accreditation Course name Required Documents Eligibility Building Regulations and Design Guidelines - Architecture Visa copy, Qualification Certificate, Photo Visa Dubai. Qualification Refer to the latest

More information

A breath of fresh air + YEARS. First-Class Air Conditioning Solutions Design Installation Service Maintenance

A breath of fresh air + YEARS. First-Class Air Conditioning Solutions Design Installation Service Maintenance Providing Excellence in Air Conditioning solutions across the UK 30 A breath of fresh air + YEARS First-Class Air Conditioning Solutions Design Installation Service Maintenance A first class solution specialist

More information

CASE STUDIES. Brevard Community College: Florida Power & Light. Cape Canaveral Air Force Station: NORESCO

CASE STUDIES. Brevard Community College: Florida Power & Light. Cape Canaveral Air Force Station: NORESCO 6 CASE STUDIES Brevard Community College: Florida Power & Light City of Miami Beach: Johnson Controls, Inc. Cape Canaveral Air Force Station: NORESCO Arbor Shoreline Office Park: Progress Energy Solutions

More information

Visa copy, Qualification Certificate, Photo Visa Dubai. Qualification Refer to the latest circular available on the

Visa copy, Qualification Certificate, Photo Visa Dubai. Qualification Refer to the latest circular available on the Accreditation Course name Required Documents Eligibility Building Regulations and Design Guidelines - Architecture Visa copy, Qualification Certificate, Photo Visa Dubai. Qualification Refer to the latest

More information

Centre Approval Application (International Qualifications)

Centre Approval Application (International Qualifications) Centre Approval Application (International Qualifications) This form must be completed by: Centres seeking approval from EDI to offer LCCI international qualifications and examinations Existing centres

More information

CHAPTER/REGIONAL TECHNOLOGY AWARD - SHORT FORM

CHAPTER/REGIONAL TECHNOLOGY AWARD - SHORT FORM CHAPTER/REGIONAL TECHNOLOGY AWARD - SHORT FORM 1. Category (Check one and indicate New or Existing, if applicable) Commercial Buildings New or Existing Institutional Buildings: Educational Facilities New

More information

Beverly D. Grappone Hall Certified LEED Silver Home of NHTI s State-of-the Art Nursing Simulation Center

Beverly D. Grappone Hall Certified LEED Silver Home of NHTI s State-of-the Art Nursing Simulation Center Beverly D. Grappone Hall Certified LEED Silver Home of NHTI s State-of-the Art Nursing Simulation Center Project: Beverly D. Grappone Hall Facility Size: 30,500 sq. ft. Location: Concord, New Hampshire

More information

GUIDELINE. of the European Committee for Welding of Railway Vehicles (ECWRV) ( ) PART 1

GUIDELINE. of the European Committee for Welding of Railway Vehicles (ECWRV) ( ) PART 1 GUIDELINE of the European Committee for Welding of Railway Vehicles (ECWRV) (2016-05-10) PART 1 Procedure for the application of EN 15085 and certification of welding manufacturers for welding railway

More information

Products Services Projects

Products Services Projects Products Services Projects www.hvac-refrigeration.co.uk Company Profile HVAC & Refrigeration Engineering Ltd is an Aberdeen based specialist international provider of heating, ventilation, air conditioning

More information

Visa copy, Qualification Certificate, Photo Visa Dubai. Qualification Refer to the latest circular available on the

Visa copy, Qualification Certificate, Photo Visa Dubai. Qualification Refer to the latest circular available on the Accreditation Course name Required Documents Eligibility Building Regulations and Design Guidelines - Architecture Visa copy, Qualification Certificate, Photo Visa Dubai. Qualification Refer to the latest

More information

IECEx Guide Guidance for Applications from Service Facilities seeking IECEx Certification

IECEx Guide Guidance for Applications from Service Facilities seeking IECEx Certification IECEx Guide Guidance for Applications from Service Facilities seeking IECEx Certification INTERNATIONAL ELECTROTECHNICAL COMMISSION SCHEME FOR CERTIFICATION TO STANDARDS RELATING TO EQUIPMENT FOR USE IN

More information

FLORIDA STATE UNIVERSITY MASTER PLAN 10 Utilities

FLORIDA STATE UNIVERSITY MASTER PLAN 10 Utilities UTILITIES ELEMENT NOTE: Unless otherwise noted, the goals, objectives and policies contained in this element shall guide development of the Main Campus and Southwest Campus in Tallahassee as well as the

More information

Company information PROTEC Facility Solutions PROTEC GmbH » Established: *» General Manager: Ralf Wogawa

Company information PROTEC Facility Solutions PROTEC GmbH » Established: *» General Manager: Ralf Wogawa Company information PROTEC Facility Solutions PROTEC GmbH» Established: 02.2008*» General Manager: Ralf Wogawa» Main Office: Heidelberg» Locations: Baumholder Kaiserslautern Stuttgart Wiesbaden» Employees:

More information

Installation Service. 1.0 Executive Summary. Factory Trained Technician Train Customer Support Staff On Basic Operation Of The Equipment

Installation Service. 1.0 Executive Summary. Factory Trained Technician Train Customer Support Staff On Basic Operation Of The Equipment Installation Service Statement of Work Start-up Service for Cooling Start-up - 1 - Service for Cooling Service 1.0 Executive Summary Table of Contents 1.0 Executive Summary 2.0 Features & Benefits 3.0

More information

Industrial Energy Efficiency

Industrial Energy Efficiency ABB Global Consulting, APW 2011, Orlando Industrial Energy Efficiency Metals Industry Case Study April 19, 2011 Slide 1 Introduction ABB Global Consulting Products Capability Industrial Energy Efficiency

More information

PARK HILL SCHOOL DISTRICT REQUEST FOR PROPOSAL NW Barry Road Kansas City, MO SUMMER HVAC

PARK HILL SCHOOL DISTRICT REQUEST FOR PROPOSAL NW Barry Road Kansas City, MO SUMMER HVAC PARK HILL SCHOOL DISTRICT REQUEST FOR PROPOSAL 7703 NW Barry Road Kansas City, MO 64153 2019 SUMMER HVAC Park Hill South High School Detailed Proposal Information is Available on District Website http://www.parkhill.k12.mo.us

More information

Ecotel Free Cool 5-15kW

Ecotel Free Cool 5-15kW Precision Air Conditioning Free-cooling Ecotel Free Cool 5-15kW + + Self-contained compact outdoor cabin cooler + + 100% free-cooling + + -48V DC supply option + + Easy serviceability (front component

More information

Critical Facilities Existing Building Commissioning (EBCx)

Critical Facilities Existing Building Commissioning (EBCx) Critical Facilities Existing Building Commissioning (EBCx) Tony DiLeonardo LEED AP, CxA President Wick Fisher White Tracey Jumper CCP President Jump Start Building Commissioning, LLC AIA Quality Assurance

More information

UNITED NATIONS INDUSTRIAL DEVELOPMENT ORGANIZATION. The National Quality Infrastructure Project for Nigeria (NQIP) Project ID

UNITED NATIONS INDUSTRIAL DEVELOPMENT ORGANIZATION. The National Quality Infrastructure Project for Nigeria (NQIP) Project ID UNITED NATIONS INDUSTRIAL DEVELOPMENT ORGANIZATION The National Quality Infrastructure Project for Nigeria (NQIP) Project ID 130220 Terms of Reference for the Lead Auditor/ Training of Trainers (ToT) Courses

More information

Driving Proactive Facility Operations with Automated HVAC Diagnostics

Driving Proactive Facility Operations with Automated HVAC Diagnostics Driving Proactive Facility Operations with Automated HVAC Diagnostics Turn HVAC Data into Actionable Information AKA Monitoring Based Commissioning Ongoing Commissioning Automated Fault Detection & Diagnostics

More information

Danfoss Turbocor Learning Center

Danfoss Turbocor Learning Center ue 2011 Danfoss Turbocor Learning Center TRAINING CATALOG 2 Table of Contents 1. Introduction... 4 2. Danfoss Turbocor Learning Center... 4 3. Danfoss Turbocor Instructors Profile... 5 4. Registration...

More information

WE FOCUS, ON PROJECT MANAGEMENT, DESIGN, ENGINEERING, SUPERVISION, TESTING AND COMMISSIONING, SUPPORT SERVICES AND FACILITIES MANAGEMENT

WE FOCUS, ON PROJECT MANAGEMENT, DESIGN, ENGINEERING, SUPERVISION, TESTING AND COMMISSIONING, SUPPORT SERVICES AND FACILITIES MANAGEMENT WE FOCUS, ON PROJECT MANAGEMENT, DESIGN, ENGINEERING, SUPERVISION, TESTING AND COMMISSIONING, SUPPORT SERVICES AND FACILITIES MANAGEMENT THE GROUP OF COMPANIES 4DIMENSION SERVICES AND MANAGEMENT CONSULTANCY

More information

Program Guidelines for Security Fenestration Rating and Certification Program Administered by Architectural Testing

Program Guidelines for Security Fenestration Rating and Certification Program Administered by Architectural Testing Program Guidelines for Security Fenestration Rating and Certification Program Administered by Architectural Testing TABLE OF CONTENTS 1.0 FORWARD...2 2.0 GENERAL...2 3.0 REFERENCED DOCUMENTS...4 4.0 DEFINITION

More information

Site Visitor Requirements Practice

Site Visitor Requirements Practice Health & Safety Site Visitor Requirements Practice Content Owner Custodian H&S Discipline Program COMS Document Number Manager, Health and Safety Solutions Health and Safety Solutions H&S Programs & Projects

More information

APPLICATION FOR ACCREDITATION OF CERTIFICATION BODIES

APPLICATION FOR ACCREDITATION OF CERTIFICATION BODIES For office use: ENAO Acc. No Date of application First Accreditation Renewal of Accreditation 1.THIS FORM SHOULD BE COMPLETED IN FULL AND RETURNED TO : Ethiopian National Accreditation Office Attention:

More information

EU Code of Conduct on Data Centre Energy Efficiency. Endorser Guidelines and Registration Form. Version 3.1.0

EU Code of Conduct on Data Centre Energy Efficiency. Endorser Guidelines and Registration Form. Version 3.1.0 EUROPEAN COMMISSION DIRECTORATE-GENERAL JRC JOINT RESEARCH CENTRE Institute for Energy Renew able Energies Unit Ispra, 1 st January 2016 EU Code of Conduct on Data Centre Energy Efficiency Endorser Guidelines

More information

Chapter 4 EDGE Approval Protocol for Auditors Version 3.0 June 2017

Chapter 4 EDGE Approval Protocol for Auditors Version 3.0 June 2017 Chapter 4 EDGE Approval Protocol for Auditors Version 3.0 June 2017 Copyright 2017 International Finance Corporation. All rights reserved. The material in this publication is copyrighted by International

More information

THE REPUBLIC OF LIBERIA LIBERIA MARITIME AUTHORITY

THE REPUBLIC OF LIBERIA LIBERIA MARITIME AUTHORITY Office of Deputy Commissioner of Maritime Affairs THE REPUBLIC OF LIBERIA LIBERIA MARITIME AUTHORITY Marine Notice SEA-003 Rev. 09/08 TO: SUBJECT: ALL SHIPOWNERS, OPERATORS, MASTERS AND OFFICERS OF MERCHANT

More information

Commercial Retro-Commissioning Program Manual for 2016 SECTION 1

Commercial Retro-Commissioning Program Manual for 2016 SECTION 1 Commercial Retro-Commissioning Program Manual for 2016 SECTION 1 Introduction The Commercial Retro-Commissioning Program (RCx) is designed to achieve demand and energy savings in commercial facilities.

More information

DATA CENTER AIR HANDLING COOLING SOLUTIONS

DATA CENTER AIR HANDLING COOLING SOLUTIONS DATA CENTER AIR HANDLING COOLING SOLUTIONS World-class performance and reliability from YORK As data storage and protection needs grow, so can costs and complexity. That s why having the right partner

More information

Sources of Test Reports for TUV SUD BABT Product Certification BABT766. TUV SUD BABT is a certification body of. TUV SUD BABT 2015 Issue 7

Sources of Test Reports for TUV SUD BABT Product Certification BABT766. TUV SUD BABT is a certification body of. TUV SUD BABT 2015 Issue 7 BABT766 Sources of Test Reports for TUV SUD BABT Product Certification TUV SUD BABT is a certification body of TUV SUD BABT 2015 Page 1 of 5 Contents 1 Introduction... 2 2 Background... 2 3 General...

More information

Energy Efficiency as Competitive Advantage. Houston, TX September 14, 2010

Energy Efficiency as Competitive Advantage. Houston, TX September 14, 2010 Energy Efficiency as Competitive Advantage German American Chamber of Commerce Houston, TX September 14, 2010 Jochen Schäfer EB-Group Worldwide! Hamburg Moscow Washington D.C. Germany Berlin Düsseldorf

More information

Invitation to Tender - Reply Form

Invitation to Tender - Reply Form Invitation to Tender - Reply Form Licence to Sell Uniform and Sportswear You might like to use this as a basis for your form but please note that it should be tailored to your specific requirements. It

More information

GN 6 - THE CONSTRUCTION SKILLS CONSTRUCTION SKILLS CERTIFICATION SCHEME (CSCS) FOR COMMISSIONING SPECIALIST PERSONNEL

GN 6 - THE CONSTRUCTION SKILLS CONSTRUCTION SKILLS CERTIFICATION SCHEME (CSCS) FOR COMMISSIONING SPECIALIST PERSONNEL GUIDANCE NOTE GN6 THE CONSTRUCTION SKILLS CERTIFICATION SCHEME (CSCS) FOR COMMISSIONING SPECIALIST PERSONNEL Written By Ron Oughton 2018 Edit by Darren Harbor COMPILED BY THE TECHNICAL SUB-COMMITTEE OF

More information

APPROVE PROCUREMENT PROCESS FOR EQUIPMENT AND INSTALLATION

APPROVE PROCUREMENT PROCESS FOR EQUIPMENT AND INSTALLATION etro Metropolitan Transportation Authority One Gateway Plaza Los Angeles, CA 90012-2952 213. 922. 20( met,". OPERATIONS COMMITTEE JANUARY 20, 2005 SUBJECT: ACTION~ METRO RED LINE SEGMENT-! REMOTE TERMINAL

More information

ASHRAE CHAPTER TECHNOLOGY AWARD Illinois Chapter, Region VI

ASHRAE CHAPTER TECHNOLOGY AWARD Illinois Chapter, Region VI CHICAGO GRAND RAPIDS PHILADELPHIA DELHI AHMEDABAD ASHRAE CHAPTER TECHNOLOGY AWARD Illinois Chapter, Region VI Chinatown Branch Chicago Public Library 2100 South Wentworth Avenue Chicago, IL 60616 CHAPTER/REGIONAL

More information

BUILDING AUTOMATION AND CONTROL SYSTEM (BACS) IN THE THESSALONIKI METRO EXTENSION TO KALAMARIA RFP-327/17 Α.Σ CLARIFICATIONS DOCUMENT

BUILDING AUTOMATION AND CONTROL SYSTEM (BACS) IN THE THESSALONIKI METRO EXTENSION TO KALAMARIA RFP-327/17 Α.Σ CLARIFICATIONS DOCUMENT TITLE OF THE TENDER: PROCUREMENT AND INSTALLATION OF THE BUILDING THESSALONIKI METRO EXTENSION This Clarifications Document is issued in accordance with the stipulations in paragraph 9.2 of the Invitation

More information

Danfoss Turbocor Learning Center

Danfoss Turbocor Learning Center Danfoss Turbocor Learning Center TRAINING CATALOG A subsidiary of Danfoss A/S 2 Table of Contents 1. Introduction... 5 2. Danfoss Turbocor Learning Center... 5 3. Danfoss Turbocor Instructors Profile...

More information

Course Description. Audience. Prerequisites. : Course CTDC : Certified TIA-942 Design Consultant. Course Outline :: CTDC ::

Course Description. Audience. Prerequisites. : Course CTDC : Certified TIA-942 Design Consultant. Course Outline :: CTDC :: Module Title Duration : Course CTDC : Certified TIA-942 Design Consultant : 3 days Course Description Data centres are at the core of many organisations. Downtime of the data centre could lead to major

More information

VERTIV SERVICE CAPABILITY

VERTIV SERVICE CAPABILITY VERTIV SERVICE CAPABILITY VERTIV SERVICE CAPABILITY Service Offering Manage the health of your entire critical infrastructure with a service partner who can offer you business continuity. Exactly the level

More information

Case Study The University of Warwick

Case Study The University of Warwick Data Centre Solutions...energy efficient by design Case Study The University of Warwick Workspace Technology deploys industry leading Indirect Fresh Air Cooling for the University of Warwick Workspace

More information

Training courses 2018

Training courses 2018 Training courses 2018 The UK s leading specialist air conditioning and refrigeration training provider Get ahead, develop your skills and knowledge Professional training and practical instruction on latest

More information

For use by OMC department only. NEW REGISTRATION REGISTRATION UPDATE SERVICES PROCUREMENT. Number Date/Place of Issue Number Date/Place of Issue

For use by OMC department only. NEW REGISTRATION REGISTRATION UPDATE SERVICES PROCUREMENT. Number Date/Place of Issue Number Date/Place of Issue SUBMIT TO Attn: Procurement Manager Procurement Department Oman Methanol Company L.L.C P.O. Box 474, Falaj Al Qabial, PC:322, Sultanate Of Oman Ph: +968 26865800 Fax: +968 26850540 NEW REGISTRATION REGISTRATION

More information

INFRACON OPERATION PROCEDURE

INFRACON OPERATION PROCEDURE INFRACON OPERATION PROCEDURE Infracon portal has been developed for enabling all the consultancy firms and key personnel to register themselves for procurement of highway consultancy contracts for preparation

More information

Position Title: H V A C T E C H N I C I A N. G.E.D. or High School Diploma required, an Associate s Degree is preferred.

Position Title: H V A C T E C H N I C I A N. G.E.D. or High School Diploma required, an Associate s Degree is preferred. Location Beeville-Primary; All Campuses Hours 40 hours/week minimum Salary $40,000-$50,000 annual, based on KSAs Job Classification Exempt Security Sensitive Y e s Division Physical Plant Department Physical

More information

IECEx International Certification: The way to safety compliance in hazardous areas IEC System for Certification to Standards Relating to Equipment

IECEx International Certification: The way to safety compliance in hazardous areas IEC System for Certification to Standards Relating to Equipment IECEx International Certification: The way to safety compliance in hazardous areas IEC System for Certification to Standards Relating to Equipment for Use in Explosive Atmospheres IECEx International Certification

More information

Policy for Accrediting Assessment Bodies Operating within the Cradle to Cradle Certified Product Certification Scheme. Version 1.2

Policy for Accrediting Assessment Bodies Operating within the Cradle to Cradle Certified Product Certification Scheme. Version 1.2 Policy for Accrediting Assessment Bodies Operating within the Cradle to Cradle Certified Product Certification Scheme Version 1.2 July 2015 Copyright, Cradle to Cradle Products Innovation Institute, 2015

More information

SUPPLY CHAIN MANAGEMENT. MANUAL / INSTRUCTION DATE : 20 August 2015 ONLINE VENDOR REGISTRATION SYSTEM USER MANUAL

SUPPLY CHAIN MANAGEMENT. MANUAL / INSTRUCTION DATE : 20 August 2015 ONLINE VENDOR REGISTRATION SYSTEM USER MANUAL REV. NO. : Page of 48 ONLINE VENDOR REGISTRATION SYSTEM USER MANUAL REV. NO. : Page of 48 IMPORTANT NOTICE: Applicant is advised to read and understand the contents of this user manual before making the

More information

Revised November EFESC Handbook

Revised November EFESC Handbook Revised November 2015 EFESC Handbook 1 Table of Contents EFESC Handbook... 1 Table of Contents... 2 Handbook EFESC... 4 1 Background and objectives... 4 1.1 Sectoral developments... 4 1.1 Objectives...

More information

Nottinghamshire Office of the Police & Crime Commissioner & Nottinghamshire Chief Constable

Nottinghamshire Office of the Police & Crime Commissioner & Nottinghamshire Chief Constable Nottinghamshire Office of the Police & Crime Commissioner & Nottinghamshire Chief Constable Internal Audit Progress Report Audit Committee meeting: December 2014 Nottinghamshire Office of the Police &

More information

A6 Training. A6.1 General. A6.2 Extract from the Health and Safety in Employment Act Training and supervision

A6 Training. A6.1 General. A6.2 Extract from the Health and Safety in Employment Act Training and supervision A6.1 General A6.1.1 Who must complete All personnel who have supervising responsibilities (TC, STMS and STMS- NP) must be trained to the appropriate standard for the: level of road, and tasks that they

More information

CARRIER edesign SUITE NEWS

CARRIER edesign SUITE NEWS Welcome Welcome to the premier issue of EXchange, offering timely, informative and interesting news on the Carrier edesign Suite of Software. Delivered quarterly, each issue will provide a wealth of information

More information

Engineered Energy Solutions An Overview. Controls, Automation and Energy Conservation

Engineered Energy Solutions An Overview. Controls, Automation and Energy Conservation Engineered Energy Solutions An Overview Controls, Automation and Energy Conservation Engineered Energy Solutions Independent Control System Integration and Engineering Firm specializing in the energy efficient

More information

Personnel Certification Program

Personnel Certification Program Personnel Certification Program ISO 9001 (QMS) / ISO 14001 (EMS) Form PC1000 Last Updated 9/11/2017 Page 1 of 14 INDEX Auditor Certification Quality or Environmental Program Pg 3-4 Certification Status

More information

TENDER CONTENTS 1. TECHNICAL BID

TENDER CONTENTS 1. TECHNICAL BID F. No. D-14013/06/2014-G.A. (Pt.-I) O/o the Director General of Civil Aviation Opp. Safdarjung Airport, New Delhi-110003 ******* Dated: 09/10/2014 TENDER Subject:-Limited Tender Enquiry for supply of Module

More information

Further details about this position, including key responsibilities and requisites, are available on our website.

Further details about this position, including key responsibilities and requisites, are available on our website. CAREER OPPORTUNITIES Enemalta plc is the leading energy service provider in the Maltese Islands, entrusted with the generation and distribution of electricity and the development of the national electricity

More information

OFFICIAL COMMISSIONING OF SECURITY SYSTEMS AND INFRASTRUCTURE

OFFICIAL COMMISSIONING OF SECURITY SYSTEMS AND INFRASTRUCTURE Title of document ONR GUIDE COMMISSIONING OF SECURITY SYSTEMS AND INFRASTRUCTURE Document Type: Unique Document ID and Revision No: Nuclear Security Technical Assessment Guide CNS-TAST-GD-4.4 Revision

More information

NIGERIAN NATIONAL PETROLEUM CORPORATION

NIGERIAN NATIONAL PETROLEUM CORPORATION NIGERIAN NATIONAL PETROLEUM CORPORATION NNPC Towers, Herbert Macaulay Way, Central Business District, P.M.B. 190, Garki, Abuja Nigeria. REQUEST FOR EXPRESSION OF INTEREST FOR NNPC DATA CENTRE FACILITY

More information

Continuing Professional Development (CPD)

Continuing Professional Development (CPD) Government of Nepal Continuing Professional Development (CPD) Rural Access Programme (RAP) Phase 3 November 2014 Continuing Professional Development, 1. What is Continuing Professional Development?...

More information

SUPPLIER ACCREDITATION APPLICATION FORM

SUPPLIER ACCREDITATION APPLICATION FORM SUPPLIER ACCREDITATION APPLICATION FORM Company Name: Registered Address: Satellite Office: Warehouse Address: Telephone No.(s) : Fax No: Website Address : E-mail Address: Contact Person: DTI/SEC. Reg.No:

More information

INVITATION FOR AN EXPRESSION OF INTEREST (EOI)

INVITATION FOR AN EXPRESSION OF INTEREST (EOI) INVITATION FOR AN EXPRESSION OF INTEREST (EOI) PetroleumBRUNEI wishes to invite interested Bumiputra contractors to submit an Expression of Interest (EOI) to participate in the following future tender.

More information

REQUEST FOR EXPRESSIONS OF INTEREST

REQUEST FOR EXPRESSIONS OF INTEREST REQUEST FOR EXPRESSIONS OF INTEREST (CONSULTING SERVICES FIRMS SELECTION) Country : INDIA Project : FINANCING PUBLIC PRIVATE PARTNERSHIP THROUGH SUPPORT TO THE INDIA INFRASTRUCTURE FINANCE COMPANY LIMITED

More information

NATIONAL QUALIFICATION AUTHORITY

NATIONAL QUALIFICATION AUTHORITY NATIONAL QUALIFICATION AUTHORITY REPORT OF EXPERT PANELS ON ACCREDITATION OF INSTITUTION PROVIDING AND / OR ASSESSES AND ISSUES APPROVED QUALIFICATIONS PART 1: SUMMARY AND RECOMMENDATIONS NAME OF APPLYING

More information

CERTIFICATION BODY (CB) APPROVAL REQUIREMENTS FOR THE IFFO RESPONSIBLE SUPPLY (IFFO RS) AUDITS AND CERTIFICATION

CERTIFICATION BODY (CB) APPROVAL REQUIREMENTS FOR THE IFFO RESPONSIBLE SUPPLY (IFFO RS) AUDITS AND CERTIFICATION CERTIFICATION BODY (CB) APPROVAL REQUIREMENTS FOR THE IFFO RESPONSIBLE SUPPLY (IFFO RS) AUDITS AND CERTIFICATION Introduction The IFFO RS Certification Programme is a third party, independent and accredited

More information

Policy & Procedure. IT Password Policy. Policy Area. Version Number 2. Approving Committee SMT. Date of Approval 26 September 2017

Policy & Procedure. IT Password Policy. Policy Area. Version Number 2. Approving Committee SMT. Date of Approval 26 September 2017 Policy & Procedure Policy Area IT Password Policy IT Version Number 2 Approving Committee SMT Date of Approval 26 September 2017 Date of Equality Impact Assessment 03 August 2016 Date of Review 01 November

More information

Data Center Consultants for the upcoming IIT Bombay HPC+BYOH Data Center

Data Center Consultants for the upcoming IIT Bombay HPC+BYOH Data Center Data Center Consultants for the upcoming IIT Bombay HPC+BYOH Data Center IIT Bombay Computer Center invites Data Center Consultants to submit their bids for the contract for the design and project management

More information

Guidelines to Contractors filling up the Registration Form

Guidelines to Contractors filling up the Registration Form Annexure-VI Guidelines to Contractors filling up the Registration Form Document No. AA:MM:SR:01 Revision No. 01 Page No. I of II 1. Registration Form may be obtained from BHEL website www.bhel.com. 2.

More information

BSRIA Air Conditioning Worldwide Market Intelligence

BSRIA Air Conditioning Worldwide Market Intelligence 2013 BSRIA Air Conditioning Worldwide Market Intelligence Over 25 years experience researching key markets worldwide market intelligence in 94 Countries integrated technical and market expertise management

More information

Web Page. Advertisement for SCADA System Manager post

Web Page. Advertisement for SCADA System Manager post Web Page Advertisement for SCADA System Manager post SCADA System Manager Closing Date: 9 June 2017 Job Category: Technical Job Location: Sophia, Georgetown Job Schedules: Employed --- Contents ---------------------------------------------------------------------------------------------------------------------

More information

Purchasing Department Finance Group INVITATION TO BID

Purchasing Department Finance Group INVITATION TO BID Purchasing Department Finance Group September 20, 2012 INVITATION TO BID The City of Norwalk, Information Technology Department, is soliciting bids for Computer Software Microsoft Server 2008 plus SQL

More information

SERVICE MANAGEMENT TRAINING PRODUCTS AND SERVICES ENDORSEMENT SCHEME. Rules and Guidance for Providers

SERVICE MANAGEMENT TRAINING PRODUCTS AND SERVICES ENDORSEMENT SCHEME. Rules and Guidance for Providers SERVICE MANAGEMENT TRAINING PRODUCTS AND SERVICES ENDORSEMENT SCHEME Rules and Guidance for Providers Change control: Version Status Author Date Comments 0.1 First Draft Helen Sussex 27 th November First

More information

THE EUROPEAN REFERENCE

THE EUROPEAN REFERENCE THE EUROPEAN REFERENCE Eurovent Certified Performances certification for IT COOLING UNITS Data Centre World 2019 - London Morgane LAJEUNESSE Project Manager m.lajeunesse@eurovent-certification.com Agenda

More information

Your Solution For Energy and Cost Savings. McQuay Packaged Chiller Plant

Your Solution For Energy and Cost Savings. McQuay Packaged Chiller Plant Your Solution For Energy and Cost Savings McQuay Packaged Chiller Plant Innovative Solutions for Your Chiller Plant McQuay packaged chiller plants provide energy efficient chillers integrated with pumps,

More information

LIFE CYCLE COST ANALYSIS, CRITERIA AND DATA SHEETS DOCUMENT NUMBER: APPLICATION: ELEMENTARY, MIDDLE AND HIGH SCHOOL

LIFE CYCLE COST ANALYSIS, CRITERIA AND DATA SHEETS DOCUMENT NUMBER: APPLICATION: ELEMENTARY, MIDDLE AND HIGH SCHOOL LIFE CYCLE COST ANALYSIS, CRITERIA AND DATA SHEETS DOCUMENT NUMBER: 15000 APPLICATION: ELEMENTARY, MIDDLE AND HIGH SCHOOL DATE OF ISSUE: 10-26-11 - Minor revisions to Data Sheets 04-08-10 - Allowed use

More information

TITLE (Mr, Mrs, Ms, Dr, etc) MALE FEMALE SURNAME FIRST NAME DATE OF BIRTH NATIONALITY

TITLE (Mr, Mrs, Ms, Dr, etc) MALE FEMALE SURNAME FIRST NAME DATE OF BIRTH NATIONALITY LMS Academy 1 Anand Dhaam Opposite To Kukrail Picnic Spot Gate Faridi Nagar. Lucknow Pin - 226015. INDIA Phone: +91-9554645464 Mobile: +91-9839960011 Fax: +91-8957101005 Website: http://www.lmsacademy.com

More information

PUR1205/07. Request for Information (RFI) Provision of Lotus Domino environment and Lotus Notes application support service.

PUR1205/07. Request for Information (RFI) Provision of Lotus Domino environment and Lotus Notes application support service. PUR1205/07 Request for Information (RFI) Provision of Lotus Domino environment and Lotus Notes application support service to the European Bank for Reconstruction and Development TABLE OF CONTENTS 1. Introduction...2

More information

Requirements for the Certification of a Welding Quality Control Co-ordinator

Requirements for the Certification of a Welding Quality Control Co-ordinator CERTIFICATION SCHEME FOR PERSONNEL DOCUMENT No. CSWIP- QCC-20-08 Requirements for the Certification of a Welding Quality Control Co-ordinator 2 nd Edition January 2011 Issued under the authority of the

More information

Balancing energy and environmental demands

Balancing energy and environmental demands Balancing energy and environmental demands Solutions that optimise the safety and performance of conventional power plants and power station systems. TÜV SÜD South Asia Meet global energy demands As demand

More information

1. Introduction Adding Users... 4 Editing A Users Details... 5 Deleting Users Configuring network environment as aliases

1. Introduction Adding Users... 4 Editing A Users Details... 5 Deleting Users Configuring network environment as aliases 1. Introduction... 3 2. Adding Users... 4 Editing A Users Details... 5 Deleting Users... 5 3. Configuring network environment as aliases... 6 4. Adding Categories... 7 5. Editing Categories... 8 6. Adding

More information

Media Pack. ENERGY EFFICIENCY BRITISH MANUFACTURER TRAINING

Media Pack.  ENERGY EFFICIENCY BRITISH MANUFACTURER TRAINING Media Pack www.airedale.com BRITISH MANUFACTURER ENERGY EFFICIENCY CONTROLS SERVICE TRAINING 02 About Airedale Providing integrated thermal management solutions Differentiated through innovation and service

More information