ADDENDUM # 7 RFP DARK FIBER OPTIC CABLE INFRASTRUCTURE LEASE

Size: px
Start display at page:

Download "ADDENDUM # 7 RFP DARK FIBER OPTIC CABLE INFRASTRUCTURE LEASE"

Transcription

1 September 25, 2013 ( ed to all proposers on this date) ADDENDUM # 7 RFP DARK FIBER OPTIC CABLE INFRASTRUCTURE LEASE Please note the following answers to questions that were asked prior to the deadline for inquiries date of September 23, Q1: Clarification-- The RFP asks for 2 fiber strands and/or 4 strands initially terminated. ((The RFI contemplated 2 strands +2 spare DF or 4 strands + 2 spare DF to be terminated ). Clarifying that the site locations spreadsheet requesting 2 stands and or 4 strands for initial termination is the accurate requirement.? A1: The Dark Fiber infrastructure termination requirements are the minimum infrastructure ASU requires at each location. Service Providers may terminate additional strands for future use however this is not a requirement. Q2: Clarification The RFP calls out Ciena 6500 / 14 slot chassis with no initial specification for a day 1 configuration for carding, protocols, protection or circuit by circuit bandwidth requirements. Is this specification to be determined post award or are we to use any detailed information as it was spelled out in the RFI for day 1circuit specifications? A2: All the initial requirements for bandwidth are valid. ASU is looking for a 44 wave design with 7 nodes. Q3: Re: Section IV 3., second bullet Does the KMZ file have to be part of the single continuous document? A3: ASU will accept the KMZ file separately. Q4: Re: Section VIII 1-6 What are the point or percentage values of each evaluation criteria in 1-6? A4: Proposals will be evaluated on the criteria as listed in order of their relative priority with most important listed first. Q5: The attachment A shows seven locations without requirements for optics. Will a service provider be considered if these locations are omitted from the proposal? 1

2 A5: Suppliers will be considered if these locations are omitted, but may be considered less favorably to those who do provide solutions for these locations in their proposals. Q6: Page 16 mentions a timeframe of April 30th, while Page 20 mentions a timeframe of May 31st. Can you expand on the timeframe expectations? A6: The Infrastructure must be delivered by April 30th so ASU has 30 days to test/burn in the solution. The overall project must be complete and ready to turn over to ASU by May 31st Q7: Page 17 mentions integration with the Ticketing System. Can you expand upon that? A7: ASU wishes problem management to be as seamless as possible between the supplier and ASU s problem management system. Suppliers who express a commitment to work with ASU to allow their ticketing system to interoperate with ASU s ticketing system will be favorably considered with those who are not willing to make this commitment. Q8: Page 16 mentions University Change Control. Can you expand upon that? A8: ASU employs an ITIL standard change process. Changes to the network which may impact ASU must be planned, coordinated and announced via ASU s change management process. ASU wishes the suppliers change management process to interoperation as seamlessly as possible with ASU s change management system. Suppliers who express a commitment to work with ASU to allow their change management system to interoperate with ASU s change management system will be favorably considered with those who are not willing to make this commitment. Q9: Page 11, Part 29, subsection ii mentions scans, penetration test, malicious code, etc. Is there any expectation that a service provider would be required to fulfill any of these services? A9: We don't see it as the supplier's responsibility to do scans. Since we don't think they would have access to the fiber which we are leasing from them to do so. Q10: Page 18, Section V, Part 8 Arizona State University is requesting a 30 day maintenance notification from the providers, as well as a 48 hour reminder in advance of any maintenance to be performed. Industry standard is 15 days without a 48 hour reminder, that said, is the University willing to accept the 15 day interval for maintenance notifications that all providers are accustomed to providing? A10: ASU is willing to accept supplier proposals which commit to a 15 day interval for maintenance notifications, but suppliers who commit to a 30 day maintenance notification will be favorably considered. 2

3 Q12: Section VII, Page 34, Part 39 A performance bond is not typical in this type of RFP, therefore we request that Section VII, Page 34, Part 39 be removed from the RFP, unless it was intended. If it was intended, please clarify the specifics of the bond. A12: The needs for Bonds will be determined after reviewing the proposals. Q13: Will ASU consider an extension of the due date? A13: At this time no extension is being offered. The close date will remain at 10/1/13 at 3:00PM MST. Q14: Item 11 Small and Disadvantaged Business Will there be any advantages extended to Arizona based, Small or Minority owned Businesses? A14: There will be no advantage provided to small & disadvantaged business. Q15: Is Ciena a mandatory requirement or will ASU accept equal or superior hardware solutions? A15: Cienna is a mandatory requirement. Q16: Does the school already have existing Cienna gear in it s network? A16: Not currently Q17: Item 8, Maintenance ASU is asking for all vendor equipment to be under repair maintenance at no cost to the University for the full duration of the agreement. As ASU will take ownership of the hardware after 3 years, is there a requirement to provide support cost of the hardware specified beyond 3 years? A17: All vendor equipment installed shall be under repair maintenance at no cost to the University for the first three years until transfer of ownership to ASU. Q18: Item 10 As this network traverses several cities, and many, many major streets. Permitting may be the delimiting factor in completion of such a project. Is the a commitment to the May 31st a mandatory requirement or a desired date? A18: May 31st is a mandatory requirement due to the transition schedule. Q19: The pricing table ask for various terms for 3 Year Operating Cost then 5, 7 and 10 year Service Cost and Lease Cost. Please define what cost are to be identified in each of the following categories: A19: a. Operating Cost Service Provider monthly cost to fully maintain and operate the dark fiber infrastructure for a 3 year term b. Monthly Lease Cost Monthly cost to lease dark fiber infrastructure for 5, 7 and 10 year term c. Service Cost Service Provider monthly cost to provide break/fix and maintenance support for the dark fiber infrastructure during lease period. Please 3

4 provide 5, 7 and 10 year term costs that correspond to the dark fiber infrastructure lease options d. Clarify if Total Cost formulas are to include Service Cost + Lease Cost + Operating Cost or Service Cost + Operating Cost Total Cost = Service Cost + Lease Cost + Operating Cost Q20: Item 39 Performance Bond Please Define how ASU plans on calculating Bond Requirements. A210: Whether bonds are required and the dollar value will be determined after review of the proposals. Q21: While the Attachment of locations calls for Dual Entrances at 7 of the locations, it is not specifically define the requirement to have a completely diverse path dark fiber ring. Is a completely diverse path between the 7 locations with dual entrances a mandatory requirement or a desirable requirement? A21: The 7 locations specified to have dual entrances must have dual entrances. Q22: Will proposals that do not include complete path diversity be accepted? A22: Proposals that do not include complete path diversity will be considered against those which do. Q23: The buildings in the downtown area (350, 522, 445, 500, 424, 502, and 600) have no requirements for Ciena DWDM nodes. Does the node at 411 need to include any special cards to feed these locations or ill terminating electronics for all locations out of 411 be the responsibility of ASU? A23: ASU will provide the electronics between 411 and the other downtown locations. Q24: Given the proximity of 411 to 120, would ASU consider removing it from the Dual Entrance and Ciena node requirement? A24: 411 needs to be considered independently from 120 E Van Buren Q25: In the pre-bid it was mentioned that some early conceptual drawing detailing the schools desired topology would be made available, are these drawings going to be made available? A25: ASU may make additional drawings available at ASU s discretion. If we choose to do so, they will be uploaded to the SharePoint site. Suppliers should not assume these drawings will be made available or delay their proposals as a result of not having these additional drawings. Q26: Can a list of desired demarks for each location be provided? A26: ASU will specify and allocate the space for all Demarcs. 4

5 Q27: Is 12 strands a mandatory requirement, if 12 strands are not available on entire rout A27: The infrastructure should be such that it can accommodate at least twelve (12) strands of single-mode fiber that can be brought from the service provider s demarcation point to the various University locations. Q28: Can ASU commit to ensure that there are sufficient space and environmentals for each location requiring Ciena Gear? A28: ASU will provide adequate space, power and cooling for each location requiring Cienna gear. Q29: If not can site surveys of each location be surveyed to determine what will need to be done at each site to make ready for the Ciena deployment? Is there any desire to connect to Skysong? A29: Suppliers may provide a plan to connect to Skysong as a value-add. Otherwise, connectivity to Skysong will continue to be leased from commercial providers. Q30: Would ASU consider a fully managed DWDM network rather than Dark Fiber with a transfer of electronics after 3 years? A30: ASU Is requesting proposals for a dark fiber infrastructure with a three (3) year build, operate, train and transfer of the fiber optic hardware. Q31: What speed is ASU requiring for the Ciena nodes (10G/40G/100G)? It would be desirable for ASU to specify the required speed so that hardware cost will be consistent amongst bidders. A31: 100Gb Q32: Does ASU currently have an outside plant management software that fiber routes will need to be loaded into? A32: Yes Q33: During the Pre Proposal conference your representative said that the Dark fiber services in this RFP needed to be installed by May 31,2014 and not April 30, 2014 as stated on page 16, Item number 2. Can you please confirm? A33: The Infrastructure must be delivered by April 30th so ASU has 30 days to test/burn in the solution. The overall project must be complete and ready to turn over to ASU by May 31st Q34: Does any portion of the provider s service require services beyond Physical Layer 1 as defined below? Physical (Layer 1) This layer conveys the bit stream - electrical impulse, light or radio signal -- through the network at the electrical and mechanical level. It provides the hardware means of sending and receiving data on a carrier, including defining 5

6 cables, cards and physical aspects. Fast Ethernet, RS232, and ATM are protocols with physical layer components. A34: ASU is requesting a Layer 1 Dark Fiber infrastructure that will allow the overlay of various network protocols based on the university s needs/requirements. Q35: Will the Provider be required to operate a Network Operating Center (NOC) to monitor the hardware or, will the Provider receive alarms from ASU? A35: Yes. The provider will be required to operate a Network Operations Center to monitor the health of the network and respond to alarms. Q36: Locations that require dual entrance, will Provider be required to establish entrance(s) if they do not exist? A36: Yes Q37: Will ASU provide the building and room numbers at each location that will house the fiber and electronics? A37: Yes ASU will assign the space for the fiber and electronics Q38: Will ASU provide elevations and precise locations as to where the equipment is to be installed? A38: ASU will provide precise locations within the rooms where equipment is to be installed. It will be the supplier s responsibility to provide drawings, including elevations of the proposed hardware installation. Q39: Will ASU provide all facilities Power, Grounding, Cooling, Racks, and wall mounts where required? A39: ASU will provide power and cooling and the source ground will be identified. It will be the supplier s responsibility to extend the ground as required. The supplier will be responsible for providing racks and wall mounts where required per ASU specifications. Q40: What is the required fiber termination method in each building: Wall mount LIU, Rack mount LIU, other? A40: Wall and or rack mount solutions are acceptable, per ASU guidelines, depending upon available space. Q41: Does the RFP require the bidder to provide any electronics In the 7 location that do not have the Cienna 6500 Node, or is just terminated fiber required? A41: ASU will provide the electronics for the 7 nodes that do not have the Cienna 6500 s specified. Q42: In the locations with no Cienna equipment, is the service demarc the end of the leased fiber? A42: Yes. The fiber distribution panel will be the demarcation point. 6

7 Q43: If electronics are required in the locations with No DWDM Node Locations, what are the specific parts required? A43: ASU will provide the active electronics at the non-dwdm locations. Q44: Contract Schedule and Deliverables Does ASU require that the description of the plan to deliver, test and turn over the dark fiber to each location be included in the Proposal? A44: Yes, the supplier will need to provide a detailed plan that defines how they will deliver, test and turn over the dark fiber to each location. Q45: Moves, Adds, Changes & Deletions (MACD) ASU does not want to pay any costs for early terminations for any and/or all locations? If this is a requirement of this RFP then this is actually a month-to-month lease of the fiber, correct? A45: ASU is requesting a 5, 7 and 10 year lease term for the dark fiber infrastructure. ASU is not requesting a month to month lease. Although ASU does not anticipate making any changes to the core infrastructure design, ASU reserves the right to move services as required without early termination charges being applied. If Service Provider charges for early termination, Service Provider should provide an early service termination schedule for consideration. Q46: Technical Support As a clarification to the uptime guarantee of % averaged over a seven day period. Uptime measured only over a 7-day period of the outage must be less than 30.2 seconds to comply, will there be a financial penalty attached to this guarantee? If so, what is the formula? Does this guarantee include the Cienna equipment? A46: ASU expects suppliers to include in their proposal a plan for how they will guarantee the uptime specified in the RFP and to propose remediation to ASU for non-compliance. The Cienna equipment should be included in the uptime guarantee. ASU reserves the right to further negotiate SLAs/penalties with suppliers at a later in the selection process. Q47: All vendor equipment installed shall be under repair maintenance at no cost to the University for the full duration of the contract agreement. Are you expecting the Provider to continue maintaining at no cost to the ASU after Provider has transferred ownership to ASU and after the equipment warranties have expired? A47: All vendor equipment installed shall be under repair maintenance at no cost to the University for the first three years until transfer of ownership to ASU. Q48: All equipment necessary to provide this connectivity shall be provided with the option of transfer of ownership to the University. Is the University requesting that the transfer of ownership will be optional to the University? 7

8 A48: Yes Q49: Section IX Pricing Schedule: Do you want b. the Three year operating cost as the monthly cost or the total cost for all 3 years stated as one number? The costs are to be identified as follows in each of the following categories: A49: a. Operating Cost Service Provider monthly cost to fully maintain and operate the dark fiber infrastructure for a 3 year term b. Monthly Lease Cost Monthly cost to lease dark fiber infrastructure for 5, 7 and 10 year term c. Service Cost Service Provider monthly cost to provide break/fix and maintenance support for the dark fiber infrastructure during lease period. Please provide 5, 7 and 10 year term costs that correspond to the dark fiber infrastructure lease options d. Total Cost formulas are to include Total Cost = Service Cost + Lease Cost + Operating Cost Q50:If b. is stated as one number are you wanting the Total Price(s) to be stated as combinations of the monthly (5,7&10) cost and the 3 year total costs? A50: Yes Q51: This doesn t answer the question: Q1 There were no indications in the RFP as to what the traffic demands are for this final design. Can you please confirm what the traffic demands are for this RFP? A1: "The dark fiber infrastructure and final design must be able to handle the full throughput of the Ciena 6500 Packet-Optical hardware.".asu provided Ciena with a diagram back in January that identified all the 10GbE circuits and 4Gb Fibre Channel circuits that were required to interconnect the ASU locations. The question has to do with whether those circuit demands (traffic demands) are still valid or have they changed? The network will be designed to handle 44 10G/40G/100G wavelengths. However, we need to know how many wavelengths and circuit types are required for the day 1 deployment. Please advise ASAP as we cannot complete the bill of materials without this information. ASU provided Ciena with a diagram back in January that identified all the 10GbE circuits and 4Gb Fibre Channel circuits that were required to interconnect the ASU locations. The question has to do with whether those circuit demands (traffic demands) are still valid or have they 8

9 changed? The network will be designed to handle 44 10G/40G/100G wavelengths. However, we need to know how many wavelengths and circuit types are required for the day 1 deployment. Please advise ASAP as we cannot complete the bill of materials without this information. A51: All the initial requirements for bandwidth are still valid ASU is looking for a 44 wave design. With 7 nodes. Q52: Section VII: Item 3 Please further define the requirement to be an authorized distributor in the local area. A53: An authorized distributor is person or business certified and trained to sell and service the requested dark fiber products. Service Provider must demonstrate they are directly representing the services being offered or they are an authorized distributor for the services being offered. If you have any questions regarding this notice, please contact me at or Stacie.malekooti@asu.edu. Thank you, Stacie Malekooti, Sr. Buyer Arizona State University Purchasing & Business Services 9

Laredo Independent School District Data Transmission Fiber Services E-Rate Round 20 (FY2017) RFP#16-039

Laredo Independent School District Data Transmission Fiber Services E-Rate Round 20 (FY2017) RFP#16-039 Q&A Summary Laredo Independent School District 1. Please clarify the ownership statement on pg 4 of the RFP? " All equipment and materials required to deliver the service will be owned and maintained by

More information

Managed WAN SLA. Contents

Managed WAN SLA. Contents Managed WAN SLA Contents Terminology... 2 Service Description... 2 General... 2 Levels and Offerings... 2 Private Network Services... 2 Features... 2 Internet Access... 3 Features... 3 Service Level Metrics...

More information

Managed WAN SLA. Contents

Managed WAN SLA. Contents Managed WAN SLA Contents Terminology... 2 Service Description... 2 Service Offerings... 2 Private Network Services... 2 Ethernet Connectivity... 2 T-1 Connectivity... 3 Other Connectivity... 3 Internet

More information

ATTACHMENT A Statement of Work

ATTACHMENT A Statement of Work ATTACHMENT A Statement of Work Albuquerque Public Schools is soliciting proposals for a fiber optic wide area network solution for all locations identified in the Scope of Services below. SCOPE OF SERVICES

More information

MARTINSVILLE CITY PUBLIC SCHOOLS RFP FOR INTERNET SERVICES NOVEMBER 1, 2014

MARTINSVILLE CITY PUBLIC SCHOOLS RFP FOR INTERNET SERVICES NOVEMBER 1, 2014 MARTINSVILLE CITY PUBLIC SCHOOLS RFP FOR INTERNET SERVICES NOVEMBER 1, 2014 Overview Martinsville City Public Schools District (hereafter collectively referred to as MCPS) seeks a Request for Proposal

More information

XO Wide Area Network ( WAN ) Services IP Virtual Private Network Services Ethernet VPLS Services

XO Wide Area Network ( WAN ) Services IP Virtual Private Network Services Ethernet VPLS Services 1.0 PRODUCT AND SERVICES 1.1 Product Descriptions. XO Wide Area Network ( WAN ) Services IP Virtual Private Network Services Ethernet VPLS Services (a) XO IP VPN. XO IP VPN is a layer 3 data networking

More information

Ashland Independent School District Fiber Request. Bid closes January 31, 10:00 am

Ashland Independent School District Fiber Request. Bid closes January 31, 10:00 am Ashland Independent School District Fiber Request Bid closes January 31, 2019 @ 10:00 am SCOPE OF SERVICES Ashland Independent School District wishes to compare leased lit fiber and leased dark fiber.

More information

Wavelength Service Service Description

Wavelength Service Service Description Wavelength Service 1. Service Description GEERAL TARIFF COMPETITIVE SERVICES 1st Revised Page 133 Cancels Original Page 133 Wavelength Service provides point to point data network connectivity using Wavelength

More information

Support Policy and Service Level Commitment

Support Policy and Service Level Commitment Support Policy and Service Level Commitment This Support Policy and Service Level Commitment ( SLC ) is between ZIP Telecom Inc. ( ZIP ) and the Client ( Client ). This SLC describes the terms and conditions

More information

Housekeeping Items. 1. Sign in sheet and business cards. 2. Recording. 3. General Questions. 4. Technical Questions to City (Diana Chang)

Housekeeping Items. 1. Sign in sheet and business cards. 2. Recording. 3. General Questions. 4.  Technical Questions to City (Diana Chang) AGENDA 1. Welcome and Introduction 2. House Keeping Items 3. Project Presentation 4. Special Notes on Request for Proposal 5. Timeline 6. Funding 7. Minimum Technical Requirements 8. Evaluation Criteria

More information

REQUEST FOR PROPOSALS FOR INMATE TELEPHONE AND VIDEO VISITATION SYSTEM FOR THE COLUMBIA COUNTY JAIL. Questions from Vendors

REQUEST FOR PROPOSALS FOR INMATE TELEPHONE AND VIDEO VISITATION SYSTEM FOR THE COLUMBIA COUNTY JAIL. Questions from Vendors Addendum Number 1 REQUEST FOR PROPOSALS FOR INMATE TELEPHONE AND VIDEO VISITATION SYSTEM FOR THE COLUMBIA COUNTY JAIL Questions from Vendors This Addendum Number 1 is issued in response to questions submitted

More information

ROUND ROCK INDEPENDENT SCHOOL DISTRICT Data Center Co-Location Request for Proposal (RFP) Number PE15-116

ROUND ROCK INDEPENDENT SCHOOL DISTRICT Data Center Co-Location Request for Proposal (RFP) Number PE15-116 CONTRACT REQUIREMENTS For establishing the terms and conditions for the contract, the awarded Proposer shall hereby be known as Contractor. 1. DESCRIPTION. This contract shall be for the purchase of Data

More information

ADDENDUM #2 TO REQUEST FOR PROPOSAL (RFP) #2252 Institutional Network Service, Data Center Co-location Service, and High-Speed Internet Service

ADDENDUM #2 TO REQUEST FOR PROPOSAL (RFP) #2252 Institutional Network Service, Data Center Co-location Service, and High-Speed Internet Service CITY OF CONCORD, CALIFORNIA March 13, 2013 ADDENDUM #2 TO REQUEST FOR PROPOSAL (RFP) #2252 Institutional Network Service, Data Center Co-location Service, and High-Speed Internet Service NOTICE TO PROPOSERS

More information

Attachment C Service Level Agreement for WAN and Internet

Attachment C Service Level Agreement for WAN and Internet Attachment C Service Level Agreement for WAN and Internet Overview The Vendor SLA for Owner shall apply to all data transmission and reception on all Vendor provided Owner Wide Area Network (WAN) connectivity,

More information

Open Access. Definitions

Open Access. Definitions Open-IX Data Center Technical Standards Version 2.0, January 1, 2018 Questions: dc-group@open-ix.org The purpose of the Open- IX Data Center Technical Standards document is to establish a recommended standard

More information

FY2018 E-Rate Form 471 Workshop. Lorrie Germann, State E-Rate Coordinator

FY2018 E-Rate Form 471 Workshop. Lorrie Germann, State E-Rate Coordinator FY2018 E-Rate Form 471 Workshop Lorrie Germann, State E-Rate Coordinator Training Agenda Filing Basics Accessing the EPC Portal Updating Entity Profile - Restrictions Connectivity Questions Entering Contracts

More information

E-rate Program Applicant Training Fiber Options

E-rate Program Applicant Training Fiber Options E-rate Program Applicant Training Fiber Options September November 2016 Agenda 1. Identifying Eligible Fiber Services and Charges 2. Requesting Proposals for Fiber Options 3. Selecting the Most Cost-Effective

More information

Anna Independent School District

Anna Independent School District Anna Independent School District 501 S. Sherley Avenue Anna Texas 75409 www.annaisd.org Phone: 972-924-1000 Fax: 972-924-1001 Request for Proposals (RFP) Spring 2015 Computer Hardware Refresh The Technology

More information

FY2016 FCC Form 470 and Competitive Bidding

FY2016 FCC Form 470 and Competitive Bidding and Competitive Bidding Slide 1 Table of Contents Topic Page The E-Rate Process 3 Making a Plan 5 The Basics 11 Filing a Form 470 21 Form Actions 25 Form 470 Section One: Basic Information 29 Form 470

More information

BT Connect Networks that think Optical Connect UK

BT Connect Networks that think Optical Connect UK BT Connect Networks that think Optical Connect UK Fast, reliable, secure and affordable Connecting the heart of your organisation Your organisation and its people rely on its applications email, databases,

More information

Digital Copiers Bid. Response to RFIs/Questions Updated September 11, 2013

Digital Copiers Bid. Response to RFIs/Questions Updated September 11, 2013 Digital Copiers Bid Response to RFIs/Questions Updated September 11, 2013 Please note revised response to Q12, Minimum Annual Guarantee estimates/assumptions. Q1. Will you accept a bid if the bidder takes

More information

REQUEST FOR PROPOSAL (RFP) NO Computer Equipment Desktop, Laptops, Chromebooks, Chromeboxes

REQUEST FOR PROPOSAL (RFP) NO Computer Equipment Desktop, Laptops, Chromebooks, Chromeboxes REQUEST FOR PROPOSAL (RFP) NO. 102717-01 Computer Equipment Desktop, Laptops, Chromebooks, Chromeboxes CONTACT: Brian Wheeler Bremen City School System (BCS) Director of Technology 504 Laurel Street Bremen,

More information

Ashland Independent Schools 1820 Hickman St. Ashland, Kentucky (606) Phone (606) Fax. Date: December 17, 2013

Ashland Independent Schools 1820 Hickman St. Ashland, Kentucky (606) Phone (606) Fax. Date: December 17, 2013 Ashland Independent Schools 1820 Hickman St. Ashland, Kentucky 41101 (606) 327-2706 Phone (606) 327-2705 Fax Request for Proposal Date: December 17, 2013 Customer Information Customer Name: Ashland Independent

More information

RAMP DCIM Data Center Infrastructure Management Software

RAMP DCIM Data Center Infrastructure Management Software RAMP DCIM Data Center Infrastructure Management Software RFP TEMPLATE 1-866-612-3637 SALES@TUANGRU.COM TUANGRU.COM DCIM RFP TEMPLATE Dear Sir or Madam, Your company has been invited to submit your company

More information

Open IX Data Center Technical Standards

Open IX Data Center Technical Standards Open IX Data Center Technical Standards Comments/Questions: dc group@open ix.org Last updated: November 1, 2013 Version: 1.0 Developed by: Open IX Data Center/MMR Standards Committee Gabe Cole RTE Group

More information

City of St. Louis. Treasurer's Office

City of St. Louis. Treasurer's Office City of St. Louis Treasurer's Office Request for Proposals Parking and Revenue Control System Proposals due no later than 3:00 p.m., September 4, 2015 1 1) Opening Statement The City of St. Louis Treasurer

More information

FY2017 FCC Form 470 and Competitive Bidding

FY2017 FCC Form 470 and Competitive Bidding and Competitive Bidding Slide 1 Table of Contents Topic Page The E-Rate Process 3 Making a Plan 5 The Basics 11 Filing a Form 470 21 Form Actions 25 Form 470 Section One: Basic Information 30 Form 470

More information

Request for Proposal George West Independent School District ERate

Request for Proposal George West Independent School District ERate Request for Proposal ERate 2015-2016 Infrastructure for New Wings at George West High School and George West Elementary School Due: March 9, 2015 2:00 PM Superintendent: Ty Sparks ERate 2015 RFP:, George

More information

Hosted VoIP Unified Communications Service

Hosted VoIP Unified Communications Service Request for Proposals: Hosted VoIP Unified Communications Service June 2018 Hosted VoIP Unified Communications Service Published: July 3, 2018 Responses Due: July 27, 2018 Submit bid to: Goleta Union School

More information

SERVICE DESCRIPTION DEDICATED SERVER

SERVICE DESCRIPTION DEDICATED SERVER Contents Service Overview.... 3 Key Features... 3 Implementation... 4 Validation... 4 Implementation Process.... 4 Internal Kick-Off... 4 Customer Kick-Off... 5 Provisioning & Testing.... 5 Billing....

More information

SPECIFIC TERMS METRO ETHERNET SERVICE

SPECIFIC TERMS METRO ETHERNET SERVICE SPECIFIC TERMS METRO ETHERNET SERVICE This Specific Terms form the Agreement between you and SP Telecommunications Pte Ltd (Reg No. 199700517K) and may be amended by the Application Form. It is agreed

More information

Schedule to Data Products Service Appendix Service Level Agreement

Schedule to Data Products Service Appendix Service Level Agreement Schedule to Data Products Service Appendix Service Level Agreement This Service Level Agreement (SLA) is a Schedule to the itel Networks Service Appendix (Appendices) for Data Services and is incorporated

More information

RFP Annex A Terms of Reference UNHCR HQ Data Centre Colocation Service

RFP Annex A Terms of Reference UNHCR HQ Data Centre Colocation Service RFP 2017 845 Annex A Terms of Reference UNHCR HQ Data Centre Colocation Service Version 1 Contents Project objectives... 1 Background... 1 Scope... 1 Timeframe and Cost... 4 Stakeholders, roles and responsibilities...

More information

Peering Concepts and Definitions. Terminology and Related Jargon

Peering Concepts and Definitions. Terminology and Related Jargon Peering Concepts and Definitions Terminology and Related Jargon Presentation Overview Brief On Peering Jargon Peering & Related Jargon BRIEF ON PEERING JARGON Brief On Peering Jargon A lot of terminologies

More information

Eligible Fiber Options for the E-rate Program

Eligible Fiber Options for the E-rate Program Eligible Fiber Options for the E-rate Program 2017 E-rate Training 2017 Universal Service Administrative Co. 1 2017 Universal Service Administrative Co. AGENDA Identifying E-rate eligible fiber services

More information

Service Level Agreement (Broadband - Managed Services - Digital Voice - POTS)

Service Level Agreement (Broadband - Managed Services - Digital Voice - POTS) Service Level Agreement ( - Managed Services - Digital Voice - POTS) Services PERFORMANCE GUARANTEED. At BULLSEYE TELECOM, we back up our promises with industry-leading performance and reliability guarantees

More information

Data Center Applications and MRV Solutions

Data Center Applications and MRV Solutions Data Center Applications and MRV Solutions Introduction For more than 25 years MRV has supplied the optical transport needs of customers around the globe. Our solutions are powering access networks for

More information

VERIZON SELECT SERVICES INC. Page 1 SECTION 10 - EXHIBIT I - ADVANCED OPTICAL SOLUTIONS (AOS) SERVICE

VERIZON SELECT SERVICES INC. Page 1 SECTION 10 - EXHIBIT I - ADVANCED OPTICAL SOLUTIONS (AOS) SERVICE VERIZON SELECT SERVICES INC. Page 1 CBS/CNE Tracking Number: 1) Description of Service. Advanced Optical Solutions ( AOS ) network service (the Service ) provides increases in bandwidth capacity of a single

More information

SCOPE OF SERVICES. Service is expected to be delivered to the district hub, Marlin Junior Academy, at 657 Success Lane, Marlin, TX, 76661

SCOPE OF SERVICES. Service is expected to be delivered to the district hub, Marlin Junior Academy, at 657 Success Lane, Marlin, TX, 76661 INTRODUCTION The Marlin Independent School District (Marlin ISD) is soliciting digitally-delivered written proposals from qualified Contractors to design, furnish and install an interconnecting WAN between

More information

Request for Proposals 2015 Network/Wireless Upgrade & Expansion Riverton USD 404 Riverton, KS

Request for Proposals 2015 Network/Wireless Upgrade & Expansion Riverton USD 404 Riverton, KS Request for Proposals 05 Network/Wireless Upgrade & Expansion Riverton USD 404 Riverton, KS Notice to Vendors Notice is hereby given to interested vendors that the Riverton Unified School District 404

More information

ADDENDUM #1. Date: 12/21/2018

ADDENDUM #1. Date: 12/21/2018 Minnesota State Colleges and Universities Request for Proposals for Architectural and Engineering Services Physical Security Enhancements at St. Cloud State University Date: 12/21/2018 ADDENDUM #1 1. The

More information

Sl # Clause No Existing Clause Revised Clause 1. Page No-18 Section 5.1 Point No-7 EMD & Document Fee

Sl # Clause No Existing Clause Revised Clause 1. Page No-18 Section 5.1 Point No-7 EMD & Document Fee REQUEST FOR PROPOSAL FOR PROCUREMENT OF POINT TO POINT FIBRE OPTIC LINKS BETWEEN OCAC BUILDING AND IT CENTRE, SECRETARIAT, BHUBANESWAR FOR A PERIOD OF 2 YEARS RFP REF NO OCAC-SEGP-INFRA-0010-2017-ENQ-17052

More information

Great Northern Corporation Request for Proposal for Network Server Installation and Service

Great Northern Corporation Request for Proposal for Network Server Installation and Service Great Northern Corporation Request for Proposal for Network Server Installation and Service Background Purpose The purpose of this Request for Proposal (RFP) is to invite prospective vendors to submit

More information

Addendum # 1 Cumberland County, PA CPE RFP Clarifications January

Addendum # 1 Cumberland County, PA CPE RFP Clarifications January . Request for Submittal Extension ANSWER: All date references listed in the document for submittal deadline shall now be FRIDAY FEBRUARY, 20 at 2:00 PM. All other requirements remain the same. 2. Are we

More information

E-RATE PRODUCTIVITY CENTER (EPC)

E-RATE PRODUCTIVITY CENTER (EPC) Last Modified: June 2015 E-RATE PRODUCTIVITY CENTER (EPC) Filing FCC Forms 470 Before you Begin Before you start creating an FCC Form 470 in EPC, you should be familiar with the eligibility rules and filing

More information

This addendum is to provide all potential proponents with the information to the various questions received.

This addendum is to provide all potential proponents with the information to the various questions received. Addendum Number: 1 Request for Proposal: 2014-006 Multifunctional Devices and Print Services Date Issued: January 20, 2015 Issued by: Li Lei This addendum is to provide all potential proponents with the

More information

AAPT Business Dark Fibre. Service Schedule

AAPT Business Dark Fibre. Service Schedule AAPT Business Dark Fibre Service Schedule This Service Schedule forms part of the Agreement between Us and You and cannot be used as a stand-alone agreement. Any terms defined in the Service Agreement

More information

RFP Vendor Questions

RFP Vendor Questions 1) Would it be possible to add a column for special construction costs for each bandwidth option? For Tab 1 Broadband Internet we are not anticipating vendors to bid much, if any, construction cost. For

More information

INTRODUCTION EXISTING DESIGN

INTRODUCTION EXISTING DESIGN INTRODUCTION Syringa Networks clearly sees the Idaho Education Network as a valuable educational asset. Like any asset, the network must be well managed in order to maximize its value for all Stakeholders.

More information

ADDENDUM #1 Boulder Office of Emergency Management Ambulance Services for Boulder County RFS #

ADDENDUM #1 Boulder Office of Emergency Management Ambulance Services for Boulder County RFS # ADDENDUM #1 Boulder Office of Emergency Management Ambulance Services for Boulder County RFS # 6825-18 April 23, 2018 The attached addendum supersedes the original Information and Specifications regarding

More information

AAPT Business Dark Fibre. Service Schedule

AAPT Business Dark Fibre. Service Schedule AAPT Business Dark Fibre Service Schedule This Service Schedule forms part of the Agreement between Us and You and cannot be used as a stand-alone agreement. Any terms defined in the Service Agreement

More information

Clarifications No. 1 to the Queries (Commercial/Technical) Received from the Bidders (13th August 2012)

Clarifications No. 1 to the Queries (Commercial/Technical) Received from the Bidders (13th August 2012) Clarifications No. 1 to the Queries (Commercial/Technical) Received from the Bidders (13th August 2012) (Tender No. NDCL/28/068-69 for Supply, Delivery, Installation and Commissioning of Internet Traffic

More information

ADDENDUM NO. 1. Kansas City Area Transportation Authority (KCATA) 1350 E. 17 th Street Kansas City, Missouri Point to Point Fiber Connection

ADDENDUM NO. 1. Kansas City Area Transportation Authority (KCATA) 1350 E. 17 th Street Kansas City, Missouri Point to Point Fiber Connection Issue Date: December 9, 2016 ADDENDUM NO. 1 Kansas City Area Transportation Authority (KCATA) 1350 E. 17 th Street Kansas City, Missouri 64108 Project #16-7029-25 This Addendum is hereby made a part of

More information

RFP NUMBER: BG-FY BLACK GOLD COOPERATIVE LIBRARY SYSTEM REQUEST FOR PROPOSAL (RFP) MPLS Network Posted: October 28, 2015 Due: November 25, 2015

RFP NUMBER: BG-FY BLACK GOLD COOPERATIVE LIBRARY SYSTEM REQUEST FOR PROPOSAL (RFP) MPLS Network Posted: October 28, 2015 Due: November 25, 2015 RFP NUMBER: BG-FY2016-1 BLACK GOLD COOPERATIVE LIBRARY SYSTEM REQUEST FOR PROPOSAL (RFP) MPLS Network Posted: October 28, 2015 Due: November 25, 2015 1. CONTACT INFORMATION RFP BG-FY2016-1 E-Rate MPLS

More information

COMCAST ENTERPRISE SERVICES PRODUCT-SPECIFIC ATTACHMENT SOFTWARE-DEFINED WIDE AREA NETWORKING (SD-WAN)

COMCAST ENTERPRISE SERVICES PRODUCT-SPECIFIC ATTACHMENT SOFTWARE-DEFINED WIDE AREA NETWORKING (SD-WAN) ATTACHMENT IDENTIFIER: SD-WAN, Ver. 1.0 COMCAST ENTERPRISE SERVICES PRODUCT-SPECIFIC ATTACHMENT SOFTWARE-DEFINED WIDE AREA NETWORKING (SD-WAN) The following additional terms and conditions are applicable

More information

SERVICE DESCRIPTION WAVELENGTH /v1.9

SERVICE DESCRIPTION WAVELENGTH /v1.9 SERVICE DESCRIPTION WAVELENGTH 01.01.2018/v1.9 1 INTRODUCTION 3 2 DEFINITIONS AND ABBREVIATIONS 4 2.1 Definitions 4 2.2 Abbreviations 4 3 SERVICE CHARACTERISTICS 5 4 TECHNICAL DESCRIPTION 6 4.1 Connection

More information

Questions 1-3 relate to Item 4 Data Sheet on page 12:

Questions 1-3 relate to Item 4 Data Sheet on page 12: Florida Division of Emergency Management RFP-DEM-15-16-037 Florida Statewide Emergency Alert and Notification System Questions and Answers (Answers are in bold) Questions 1-3 relate to Item 4 Data Sheet

More information

SUSQUEHANNA COMMUNITY SCHOOL DISTRICT BID REQUEST FOR THE INSTALLATION OF FIBER OPTIC CABLE CAPABLE OF A 10 GIGABIT

SUSQUEHANNA COMMUNITY SCHOOL DISTRICT BID REQUEST FOR THE INSTALLATION OF FIBER OPTIC CABLE CAPABLE OF A 10 GIGABIT SUSQUEHANNA COMMUNITY SCHOOL DISTRICT BID REQUEST FOR THE INSTALLATION OF FIBER OPTIC CABLE CAPABLE OF A 10 GIGABIT CAPACITY WITH OPTION TO SEGMENT CHANNELS FIBER CABLE TO UPGRADE CURRENT BUILDING NETWORK

More information

IBM Commerce Insights

IBM Commerce Insights Service Description IBM Commerce Insights This Service Description describes the Cloud Service IBM provides to Client. Client means the company and its authorized users and recipients of the Cloud Service.

More information

3.4 NON-DOMESTIC SERVICES (L )(C.2.1.9)

3.4 NON-DOMESTIC SERVICES (L )(C.2.1.9) 3.4 NON-DOMESTIC SERVICES (L.34.1.3.4)(C.2.1.9) Qwest uses a combination of owned assets and strategic international partners to deliver non-domestic services ensuring that providers with local knowledge

More information

EXHIBIT A SCOPE OF WORK

EXHIBIT A SCOPE OF WORK EXHIBIT A SCOPE OF WORK Grants/Cibola County Schools is soliciting proposals for wide area network (WAN) connectivity for the locations identified in the Scope of Services below. SCOPE OF SERVICES Grants/Cibola

More information

Punta Gorda eprocurement Site. How to navigate the Bid System

Punta Gorda eprocurement Site. How to navigate the Bid System Punta Gorda eprocurement Site How to navigate the Bid System January 2017 eprocurement Home Page https://punta gorda.ionwave.net Vendor registration Refer to Supplier Instructional Guideline to assist

More information

CTS. Specialist. Certified Technology. Sven Laurik EXAM GUIDE. Mc Graw Hill. Chicago San Francisco Lisbon. New York. London Madrid Mexico City Milan

CTS. Specialist. Certified Technology. Sven Laurik EXAM GUIDE. Mc Graw Hill. Chicago San Francisco Lisbon. New York. London Madrid Mexico City Milan CTS Certified Technology Specialist EXAM GUIDE Sven Laurik Mc Graw Hill New York Chicago San Francisco Lisbon London Madrid Mexico City Milan New Delhi San Juan Seoul Singapore Sydney Toronto McGraw-Hill

More information

Standard mobile phone a mobile device that can make and receive telephone calls, pictures, video, and text messages.

Standard mobile phone a mobile device that can make and receive telephone calls, pictures, video, and text messages. Overview Fiscal Accountability Rule 10.9 Utilizing Mobile Devices to Conduct City Business establishes the mobile device rule for the City and County of Denver. This policy provides mobile device guidelines

More information

This is with regard to your requirement for Document Imaging Services. A: You are not required to attend the bidder's conference on 4/18.

This is with regard to your requirement for Document Imaging Services. A: You are not required to attend the bidder's conference on 4/18. This is with regard to your requirement for Document Imaging Services. Could you please help me with the following questions: Q: Whether companies from Outside USA can apply for this? (Like, from India

More information

PURCHASING DEPARTMENT

PURCHASING DEPARTMENT PURCHASING DEPARTMENT The bid listed below has had addenda issued. Documents are available over the Internet at http://www.bid.ci.norwalk.ct.us. Adobe Acrobat reader is required to view this document.

More information

ADDENDUM NO. 5 DATE: January 14, 2015

ADDENDUM NO. 5 DATE: January 14, 2015 FLORIDA DEPARTMENT OF TRANSPORTATION Procurement Office 605 Suwannee Street, MS 20 Tallahassee, Florida 32399-0450 Phone: (850) 414-4568 Fax: (850) 414-4951 ADDENDUM NO. 5 DATE: January 14, 2015 BID#:

More information

Deadline for bid submissions: 9:00 a.m. CST, Friday, August 31, INTRODUCTION

Deadline for bid submissions: 9:00 a.m. CST, Friday, August 31, INTRODUCTION August 1, 2018 Deadline for bid submissions: 9:00 a.m. CST, Friday, August 31, 2018. INTRODUCTION Colby Community College will replace an existing data Storage Area Network (SAN) with a new one that has

More information

Service Level Agreement

Service Level Agreement This ( ) sets forth the specific terms and conditions under which LightEdge Solutions, Inc. ( LightEdge ) shall supply all Managed Services to Customer. The Master Agreement entered into between LightEdge

More information

REQUEST FOR PROPOSAL (RFP)

REQUEST FOR PROPOSAL (RFP) REQUEST FOR PROPOSAL (RFP) Network Infrastructure Upgrade Issue Date: 11/06/2017 Bids Due 12/04/2017 470 #180003001 The purpose of this Request for Proposal (RFP) is to solicit sealed proposals to establish

More information

How would you like the RFP delivered? (Hard Copies, electronically?)

How would you like the RFP delivered? (Hard Copies, electronically?) Does the city currently have PoE Switches supporting the Cisco 7900 series phones, if so, what model? The POE switches are all Cisco models 3850, 3560, and 2960. How would you like the RFP delivered? (Hard

More information

E-RATE YEAR Request for Proposal Wireless Access Points and Control for Monson-Sultana Joint Union Elementary School District BEN#144060

E-RATE YEAR Request for Proposal Wireless Access Points and Control for Monson-Sultana Joint Union Elementary School District BEN#144060 E-RATE YEAR 2016-2017 Request for Proposal Wireless Access Points and Control for Monson-Sultana Joint Union Elementary School District BEN#144060 470 Application # 160043013 Submission Deadline: Thursday,

More information

QUAID E AZAM THERMAL POWER (PVT.) LTD. First Floor, 7 C 1, Gulberg III, Lahore.

QUAID E AZAM THERMAL POWER (PVT.) LTD. First Floor, 7 C 1, Gulberg III, Lahore. BIDDING DOCUMENTS / TORS FOR PROVISION OF INTERNET SERVICES FOR QUAID-E-AZAM THERMAL POWER (PVT.) LIMITED HEAD OFFICE ( QATPL ) Tender Price: 500/- (Non-Refundable) Receipt No. Dated: - Opening date: At

More information

CONNECTICUT ACCESS SERVICE TARIFF. The Southern New England Original Page 22-1 Telephone Company d/b/a Frontier Communications of Connecticut

CONNECTICUT ACCESS SERVICE TARIFF. The Southern New England Original Page 22-1 Telephone Company d/b/a Frontier Communications of Connecticut The Southern New England Original Page 22-1 22.1 General Description OCN Point-to-Point service is designed to provide the customer with a custom point to point linear network. The Optical Point-to-Point

More information

VERIZON SELECT SERVICES INC. Page 1. SECTION 13 - EXHIBIT M - Network-Based IP VPN SERVICE

VERIZON SELECT SERVICES INC. Page 1. SECTION 13 - EXHIBIT M - Network-Based IP VPN SERVICE VERIZON SELECT SERVICES INC. Page 1 Quote Number or CBS/CNE Tracking Number: 1) Description of Service. Internet Protocol-Virtual Private Network (IP VPN) Service (Service) is a packet-based advanced data

More information

BUSINESS SERVICES. Business services Pricing: Business Broadband & Fibre PRICING DOCUMENTS BROADBAND AND FIBRE SERVICES

BUSINESS SERVICES. Business services Pricing: Business Broadband & Fibre PRICING DOCUMENTS BROADBAND AND FIBRE SERVICES BUSINESS SERVICES PRICING DOCUMENTS BROADBAND AND FIBRE SERVICES Content: A full price list covering the current monthly, one off and time related charges associated to our ADSL Broadband and FTTC Fibre

More information

CAT RFP , Addendum 2 February15, 2013 Page 1

CAT RFP , Addendum 2 February15, 2013 Page 1 CHATHAM AREA TRANSIT AUTHORITY RFP 2013-04, ADDENDUM NO.2 DATE: February 15, 2013 ORIGINAL RFP NUMBER: 2013-04 PROJECT: CHATHAM AREA TRANSIT AUTHORITY VOIP This Addendum forms a part of Chatham Area Transit

More information

Core Network Switch RFP. Harrison School District Two 1060 Harrison Road Colorado Springs, CO

Core Network Switch RFP. Harrison School District Two 1060 Harrison Road Colorado Springs, CO Core Network Switch RFP Harrison School District Two 1060 Harrison Road Colorado Springs, CO 80905 Email: rfp@hsd2.org Technology Supervisor: Mike Peterson Bids DUE DATE: March 15th, 2017 Table of Contents

More information

ADDENDUM #2 Boulder County Sheriff s Office Electronic Health Record System for the Boulder County Jail RFP #

ADDENDUM #2 Boulder County Sheriff s Office Electronic Health Record System for the Boulder County Jail RFP # ADDENDUM #2 Boulder County Sheriff s Office Electronic Health Record System for the Boulder County Jail RFP # 6822-18 March 26, 2018 The attached addendum supersedes the original Information and Specifications

More information

MYO. Residential Internet Access and Telephone Services. Pricing and Services Information Guide. Connecting People Workplaces and Communities

MYO. Residential Internet Access and Telephone Services. Pricing and Services Information Guide. Connecting People Workplaces and Communities MYO New Pivit Advantage Series Make Your Own Internet Access Plans Connecting People Workplaces and Communities Residential Internet Access and Telephone Services Pricing and Services Information Guide

More information

SERVICE TERMS AND SLA FOR LEASE OF DARK FIBER

SERVICE TERMS AND SLA FOR LEASE OF DARK FIBER SERVICE TERMS AND SLA FOR LEASE OF DARK FIBER Dark Fiber Lease. These are the service terms and service level agreement for the lease of Global Crossing Dark Fiber which apply to the provision of Dark

More information

UNL ebid # SCOPE OF WORK (CSN Network Management)

UNL ebid # SCOPE OF WORK (CSN Network Management) UNL has provided the following Scope of Work document in order to provide each bidder with specific and relevant background information related to this bid document. 1. History and Background a. The University

More information

Purchasing Department Finance Group INVITATION TO BID

Purchasing Department Finance Group INVITATION TO BID Purchasing Department Finance Group August 7, 2012 INVITATION TO BID The City of Norwalk, Information Technology Department, is soliciting bids for Computer Server Hardware and VMware vsphere Enterprise

More information

17. Microwave Collocation 17.1 General

17. Microwave Collocation 17.1 General Original Page 1 17.1 General 17.1.1 General A. Unless otherwise specified herein, general regulations contained in Sections 1 through 4 and Sections 14 and 15 apply in addition to the regulations contained

More information

REQUEST FOR PROPOSALS (RFP) UTILITY BILL PRINTING AND MAILING SERVICES FOR THE CITY OF STOCKTON, CALIFORNIA (PUR )

REQUEST FOR PROPOSALS (RFP) UTILITY BILL PRINTING AND MAILING SERVICES FOR THE CITY OF STOCKTON, CALIFORNIA (PUR ) POSTED 4/20/17 REQUEST FOR PROPOSALS (RFP) UTILITY BILL PRINTING AND MAILING SERVICES FOR THE CITY OF STOCKTON, CALIFORNIA (PUR 16-034) The City received the following questions regarding this project.

More information

Data Line Order Form. Vendor Details and Vendor Contact Data. Wiener Börse AG ( WBAG ) Market Data Services Wallnerstraße 8 A-1010 Vienna

Data Line Order Form. Vendor Details and Vendor Contact Data. Wiener Börse AG ( WBAG ) Market Data Services Wallnerstraße 8 A-1010 Vienna Data Line Order Form Wiener Börse AG ( WBAG ) Market Data Services Wallnerstraße 8 A-1010 Vienna Email: datafeed@wienerborse.at FAX: +43.1.53165-140 This order form covers the connection to WBAG s technical

More information

LAS CRUCES SCHOOL DISTRICT NO. 2 PURCHASING DEPARTMENT 505 S. MAIN STREET, SUITE 249 LAS CRUCES, NM OFFICE (575) FAX (575)

LAS CRUCES SCHOOL DISTRICT NO. 2 PURCHASING DEPARTMENT 505 S. MAIN STREET, SUITE 249 LAS CRUCES, NM OFFICE (575) FAX (575) LAS CRUCES SCHOOL DISTRICT NO. 2 PURCHASING DEPARTMENT 505 S. MAIN STREET, SUITE 249 LAS CRUCES, NM 88001 OFFICE (575) 527-5844 FAX (575) 527-6619 AMENDMENT No. 3 Date Mailed/Faxed: 12/20/17 RFP NUMBER:

More information

IBM TotalStorage Enterprise Tape Controller 3590 Model A60 enhancements support attachment of the new 3592 Model J1A Tape Drive

IBM TotalStorage Enterprise Tape Controller 3590 Model A60 enhancements support attachment of the new 3592 Model J1A Tape Drive Hardware Announcement IBM TotalStorage Enterprise Tape Controller 3590 Model A60 enhancements support attachment of the new 3592 Model J1A Tape Drive Overview New levels of performance and cartridge capacity

More information

THE METROPOLITAN WATER DISTRICT OF SOUTHERN CALIFORNIA. Addendum No. 1 REQUEST FOR PROPOSALS TO PROVIDE

THE METROPOLITAN WATER DISTRICT OF SOUTHERN CALIFORNIA. Addendum No. 1 REQUEST FOR PROPOSALS TO PROVIDE THE METROPOLITAN WATER DISTRICT OF SOUTHERN CALIFORNIA Addendum No. 1 REQUEST FOR PROPOSALS TO PROVIDE WATER QUALITY MONITORING AND EVENT DETECTION SYSTEM RFP-PL-912 To all prospective respondents to Request

More information

Request for Quotation RFQ SUBJECT: FT-IR SYSTEM

Request for Quotation RFQ SUBJECT: FT-IR SYSTEM Request for Quotation SUBJECT: FT-IR SYSTEM DATE OF ISSUE: January 31, 2018 TO RESPOND BY: RESPOND TO: February 26, 2018 @ 1400 Hours (2:00 PM Pacific Time) Sandra Shelke Contract & Supply Chain Management

More information

Network Service Description

Network Service Description Network Service Description Applies to: Office 365 Dedicated Topic Last Modified: 2015-09-03 Contents... 1 Network Architecture... 2 Customer Connectivity to Services... 5 Customer-Owned Private Network

More information

SINGLE SPACE ELECTRONIC PARKING METERS RFI NO PAGE

SINGLE SPACE ELECTRONIC PARKING METERS RFI NO PAGE The Philadelphia Parking Authority 701 Market Street, Suite 5400 Philadelphia, PA 19106 Request for Information No. 16-36 Single Space Electronic Parking Meters Introduction: The Philadelphia Parking Authority

More information

THE SCHOOL DISTRICT OF LEE COUNTY

THE SCHOOL DISTRICT OF LEE COUNTY THE SCHOOL DISTRICT OF LEE COUNTY --- PROCUREMENT SERVICES DEPARTMENT Joe Marody, Procurement Coordinator ADDENDUM TO CONTRACT DOCUMENTS ADDENDUM NO.: 1 PROJECT NAME: RFP No. R157215JM - E-Rate Network

More information

Service Definition Internet Service

Service Definition Internet Service Service Definition Internet Service Standard S003 Ver 2 Contents 1 Overview... 1 1.1 Introduction... 1 1.2 Product Overview... 1 2 Service Specification... 1 2.1 Service Options... 2 2.2 Access Service...

More information

In public safety, ESInets are a game changer

In public safety, ESInets are a game changer In public safety, ESInets are a game changer The first step toward NG9-1-1, these broadband-powered networks will make PSAPs dramatically more effective and resilient By Jeff Lupinacci Over the past few

More information

REQUEST FOR PROPOSAL (RFP) Issue Date: January 30, 2015 Wireless Network Infrastructure Upgrade

REQUEST FOR PROPOSAL (RFP) Issue Date: January 30, 2015 Wireless Network Infrastructure Upgrade REQUEST FOR PROPOSAL (RFP) Issue Date: January 0, 015 Wireless Network Infrastructure Upgrade The purpose of this Request for Proposal (RFP) is to solicit sealed proposals to establish a contract through

More information

Service Level Agreement for Microsoft Azure operated by 21Vianet. Last updated: November Introduction

Service Level Agreement for Microsoft Azure operated by 21Vianet. Last updated: November Introduction Service Level Agreement for Microsoft Azure operated by 21Vianet Last updated: November 2017 1. Introduction This Service Level Agreement for Azure (this SLA ) is made by 21Vianet in connection with, and

More information

HKJC Supplier Portal Sourcing

HKJC Supplier Portal Sourcing One Club One Team One Vision FMIS Sourcing Supplier Training Course HKJC Supplier Portal Sourcing Index 1. Sourcing Portal Introduction 2. Sourcing Home Page 3. Quote / Response Submission Process 4. Bid

More information

SULPHUR SPRINGS INDEP SCHOOL DISTRICT. Request for Proposal - CAT2

SULPHUR SPRINGS INDEP SCHOOL DISTRICT. Request for Proposal - CAT2 SULPHUR SPRINGS INDEP SCHOOL DISTRICT Request for Proposal - CAT2 Bid Requirements Bids are Due March 1, 2016 @ 4:00 PM Submission by email or mail Email: rwhite@ssisd.net Subject: RFP 2016-2017 CAT2 Mailing

More information

SERVICE LEVEL AGREEMENTS CALNET 3, Category 7 Network Based Managed Security

SERVICE LEVEL AGREEMENTS CALNET 3, Category 7 Network Based Managed Security SERVICE LEVEL AGREEMENTS CALNET 3, Category 7 Network Based Managed Security 7.3.7 TROUBLE TICKET STOP CLOCK CONDITIONS The following conditions shall be allowed to stop the trouble ticket Outage Duration

More information