- Arron Jones
- 5 years ago
- Views:
Transcription
1 EIM Entity Readiness Criteria May 6, 2015
2 FERC Directive Regarding Readiness Criteria We therefore direct CAISO to submit a compliance filing within 60 days of issuance of this order, to revise the EIM provisions in its tariff to include requirements to ensure readiness prior to new EIM Entities commencing EIM operations. Such revisions should include: (1) a robust market simulation and appropriate period of parallel operation to ensure that new entities joining the EIM have adequate opportunity to identify and resolve operational issues prior to full activation; and (2) a requirement that CAISO and the new entrant each submit a market readiness certificate at least 30 days prior to full activation in the EIM, certifying the readiness of the new EIM Entity s processes and systems. CAISO should develop measurable readiness criteria through a collaborative process with its stakeholders, upon which effectiveness of the new EIM Entity s entry into the EIM can be predicated. The Commission will require that others that are in the process of joining the EIM must certify their market readiness by filing a sworn affidavit from an officer of the company 30 days prior to the company joining the EIM attesting that the new EIM members system is ready, including all communication systems and transparency to CAISO of unit status. California Independent System Operator, 150 FERC 61,191, P 34 (Mar. 16, 2015) (emphasis added). The following readiness criteria are intended to support certification 30 days prior to implementation. The ISO and each EIM Entity reserve the right after certification to revisit that determination based on information available prior to implementation. Page 2
3 Readiness Criteria Categories EIM Entity Full Network Model Integration EIM Entity Scheduling Coordinator Certification Training Forecasts Balanced Schedules Operating Procedures System Readiness System Integration Market Simulation Data Monitoring Readiness Deployment / Parallel Production Plan Page 3
4 EIM Entity Full Network Model Integration Generation, Interchange and Load comparison between ISO Market Model and EIM Entity EMS/SE model. Comparison of SCADA measurement used in EIM Entity AGC/SE and the measurements coming to ISO system. Load, Interchange and Generation definition in ISO market model should mirror the same in exported CIM file of EIM Entity EMS/SE model. SCADA measurement used in EIM Entity AGC and SE model should match measurement seen by ISO Data matches within 10%, measured in MW capacity to start parallel operation, and within 5% before full activation. Discrepancies, if any, are accounted for in terms of imbalance adjustment Critical and used SCADA measurements matches 90% to start parallel operation and 95% before full activation, measured in MW, outside of any exception in EMS/SE model EIM Entity State Estimator solution compared with ISO State Estimator ISO model shall account for Non- Conforming Load, Behind-the- Meter Generation, Pseudo Ties, and Dynamic Schedules, as applicable State Estimator solution of ISO should be close enough or better than State Estimator solution of EIM Entity. Physical representation of EIM Entity network should match ISO market model State Estimator solutions converges >90% of the time in two days before parallel operation and 3 days before full activation. Solution differences within 10% before parallel operation and 5% before full activation measured in MW or justified due to different external BAA modeling EIM Entity major non-conforming loads > 5% of EIM Entity total actual load in MW are modeled separately from conforming load in market model Page 4
5 EIM Entity Scheduling Coordinator Certification EIM Entity Implementation Agreement Executed Agreement Agreement signed by ISO and EIM Entity by Parallel Operations date EIM Entity SC Agreement Executed Agreement Agreement signed by ISO and EIM Entity by Parallel Operations date Established EIM IDs EIM Entity Metering Service Agreement for SC Available Capability Deployment (pending outcome of FERC 206 proceeding) EIM Entity ID EIM Entity Balancing Authority ID EIM Entity Scheduling Coordinator ID EIM Entity Base Scheduling Coordinator for all non-participating Resources including third-party owned resources Executed MSA SC Agreement with all applicable schedules completed Identify participating and nonparticipating resources that have additional capability and could be included in their resource plan to resolve under-gen or over-supply conditions in the EIM Entity BAA IDs are in Master File by Parallel Operations date Agreement signed by ISO and EIM Entity, with Schedules completed as applicable by Parallel Operations date Default energy price registered for available capability from nonparticipating resources Page 5
6 Training Mandatory courses completed Functional Testing Completed EIM Entity Operators complete ISO training modules 100 series introduction/ overview to EIM 200 series specific hourly/daily tasks and duties for normal operation 300 series assessments of market results, response to contingencies, abnormal situations EIM Entity Operators complete functional testing plan EIM Entity Operators complete training and closeof-training assessment for all ISO-identified modules All tasks identified by ISO and EIM Entity for functional testing and in functional testing plan performed and completed Page 6
7 Forecasts Load Forecast Capability Established VER Forecast Capability Established Load area(s) and non-conforming load to be defined, as applicable. ISO load forecasts compared to historical actual data and tags for load area(s) and conforming load. Weather stations used for forecasting defined, if applicable. Determine source of VER forecast (If a participating wind or solar unit requires a CAISO forecast, then BPM/tariff requirements apply). All Plant Information (PI) tags and historical data for defined load area(s), and non-conforming load if applicable, compared with load forecasts provided from ISO (if ISO load forecast used). Forecasting entity must demonstrate delivery of Unit MW forecast at 5 min intervals for at least 3 hours ahead. EIM Entity provides to ISO Real-time MW production PI tags. Flexibility Requirements Capability Established Flex ramp requirements calculated for each BAA and BAA group. ISO has received and stored all historical data from EIM Entity for supporting flex ramp requirement calculation by ISO. Page 7
8 Balanced Schedules before EIM Base Schedule Balancing Capability Established Flexible Ramping Sufficiency Test Capability of Passing Established Capacity Test Capability of Passing Established EIM Entity BSC demonstrates it can balance to load and renewable forecast EIM Entity BSC demonstrates it can pass EIM Entity BSC demonstrates it can pass 90% or greater of base schedules balance tests during monitored hours are within 10% average imbalance of load forecast over one day period before parallel operation, and 5% average over a two day period before full activation Passes 90% of the time or greater over monitored hours of one day before parallel operation and two days before full activation Passes 90% of the time or greater over monitored hours of one day before parallel operation and two days before full activation Page 8
9 Operating Procedures EIM Entity Received and Reviewed ISO Operating Procedures relevant to EIM operations EIM Entity Operating Procedures EIM Entity signs ISO NDA and receives ISO Operating Procedures Operating Procedures defined, completed, and tested for EIM Entity SC Operating Procedures NDA signed by EIM Entity. EIM Entity receives ISO Operating Procedures four months prior to Parallel Operations date Operating Procedures tested and implemented prior to Parallel Operations date Page 9
10 System Readiness All EIM Entity Systems Validated EIM Entity System Access Complete EIM Entity systems tested in Functional Test Plan All EIM Entity employees who require system access to perform EIM-related job functions identified and have necessary certificates ISO and EIM Entity identify significant issues. EIM Entity and ISO develop workarounds as appropriate. EIM Entity and ISO executives to approve exceptions All EIM Employees performing job functions for EIM market identified. All identified employees provided the necessary EIM system access certificates. Page 10
11 System Integration ISO - EIM Entity interfaces tested EIM Entity systems tested as specified ISO and EIM Entity identify significant data interfaces issues. EIM Entity and ISO executives to approve exceptions. Page 11
12 Market Simulation Day in the Life Simulation Structured scenarios Simulation Unstructured scenarios Simulation Market results reports Market quality review EIM Entity Operators able to meet market timelines EIM Entity Operators execute and pass all structured scenarios provided by ISO EIM Entity Operators execute and pass all unstructured scenarios provided by EIM Entity Market results are appropriate based on input Prices are validated based on input data EIM Entity Operators complete end-to-end daily market workflow with no critical defects or workarounds Significant issues resolved or have workaround. EIM Entity and ISO executives approve exceptions. Significant issues resolved or have workarounds. EIM Entity and ISO executives approve exceptions. EIM Entity and ISO executives approve market results Market simulation prices and MWs schedules/dispatches are validated by ISO market quality team for parallel operation Page 12
13 Data Monitoring Readiness Data Monitoring Data availability for market monitoring All required data available during testing and post go-live market monitoring for the key metrics (any exceptions will be addressed). Page 13
14 Deployment / Parallel Production Plan Deployment plan System outage timelines within operational limits Within market disruption tolerances Page 14
CAISO Metering & Telemetry Requirements. Jeremy Laundergan - Director, EnerNex November 8, 2012
CAISO Metering & Telemetry Requirements Jeremy Laundergan - Director, EnerNex November 8, 2012 Background and Overview Both federal and state regulatory authorities are advocating the participation of
More informationForced and Planned Outage Substitution, RAAIM Pre-Calc
Forced and Planned Outage Substitution, RAAIM Pre-Calc RSI 2017 Training January 17, 2018 1:00PM The information contained in these materials is provided for general information only and does not constitute
More informationFNM Expansion Training Webinar
FNM Expansion Training Webinar Cynthia Hinman Lead Client Trainer August 11, 2014 The information contained in these materials is provided for general information only and does not constitute legal or
More informationCalifornia Independent System Operator Corporation Fifth Replacement Electronic Tariff
Table of Contents Appendix M... 2 Dynamic Scheduling Protocol (DSP)... 2 1. DYNAMIC SCHEDULES OF IMPORTS TO THE CAISO BALANCING AUTHORITY AREA... 2 1.2 Contractual Relationships... 2 1.3 Communications,
More informationEXHIBIT A: PROJECT SCOPE AND SCHEDULE The Project consists of the activities and delivery dates identified in this Exhibit A, implemented in accordance with the Agreement. The Parties have included a schedule
More informationLoad Conformance Limiter Enhancement
TECHNICAL BULLETIN December 28, 2016 www.caiso.com 250 Outcropping Way, Folsom, CA 95630 916.351.4400 TECHNICAL BULLETIN Revision History Date Version Description Author December 28, 2016 1.0 Draft Proposal
More informationThis section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective.
Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed
More informationReliability Coordinator Procedure
No. Table of Contents Purpose... 1 1. Responsibilities... 2 2. Scope/ Applicability... 2 2.1. Background... 2 2.2. Scope... 2 2.3. Applicability... 3 3. Detail... 3 3.1. Format and Security Protocols...
More informationExpanding Metering and Telemetry Options Technical Stakeholder Initiative
Expanding Metering and Telemetry Options Technical Stakeholder Initiative April 24, 2013 Todays Agenda Time Topic Presenter 10:00 10:10 Opening Comments/Introductions Khaled Abdul-Rahman 10:10 10:20 Stakeholder
More informationEnergy Imbalance Market Technical Workshop. BAA Real-Time Congestion Balancing Account August 12, 2013
Energy Imbalance Technical Workshop BAA Real-Time Congestion Balancing Account August 12, 2013 Overview BAA Real-Time Congestion Balancing Account Real Time Convergence Bid Settlement Slide 2 BAA Real-Time
More informationStandard INT Dynamic Transfers
A. Introduction 1. Title: Dynamic Transfers 2. Number: INT-004-3 3. Purpose: To ensure Dynamic Schedules and Pseudo-Ties are communicated and accounted for appropriately in congestion management procedures.
More informationResource Adequacy Pre-Market Simulation Training Workshop
Resource Adequacy Pre-Market Simulation Training Workshop Focusing on the following initiatives: Reliability Services Initiative (RSI) Capacity Procurement Mechanism (CPM) Replacement October 21, 2015
More informationExpanding Metering and Telemetry Options Technical Stakeholder Initiative
Expanding Metering and Telemetry Options Technical Stakeholder Initiative August 28th, 2013 9:00 a.m. 12:00 p.m. (Pacific Time) Web Conference Information Web Conference Information Web Address (URL):
More informationEnergy Imbalance Market: PacifiCorp Stakeholder and Tariff Revision Plan
Energy Imbalance Market: PacifiCorp Stakeholder and Tariff Revision Plan Document Version 1.9 Date Updated: January 17, 2014 The following document outlines PacifiCorp s Stakeholder and Tariff Revision
More informationStandard INT Dynamic Transfers
Standard INT-004-3.1 Dynamic Transfers A. Introduction 1. Title: Dynamic Transfers 2. Number: INT-004-3.1 3. Purpose: To ensure Dynamic Schedules and Pseudo-Ties are communicated and accounted for appropriately
More informationNew Resource Implementation & Market Modeling
New Resource Implementation & Market Modeling Resource Interconnection Fair February 24, 2016 Page 1 Topics Discuss the New Resource Implementation (NRI) process. Structure and timeline for any resource
More informationBC Hydro Open Access Transmission Tariff Effective: January 26, 2018 OATT Attachment Q-1 First Revision of Page 1
OATT Attachment Q-1 First Revision of Page 1 ATTACHMENT Q-1 Dynamic Scheduling This attachment contains the eligibility requirements and the terms and conditions for the provision of dynamic scheduling
More information1. Responsibilities. Settlement Quality Meter Data (SQMD) Plan Submission & Approval Process (External) Operating Procedure
Table of Contents Purpose... 1 1. Responsibilities... 2 2. Scope/Applicability... 3 2.1 Background... 3 2.2 Scope / Applicability... 3 3. Detail... 4 3.1 SQMD Plan Imposed by the CAISO Tariff... 4 3.1.1
More informationSmall Hydro Regulatory and Permitting Requirements California
Small Hydro Regulatory and Permitting Requirements California Lon W. House, Ph.D. 530.409.9702 Water & Energy Small Hydro Regulatory and Compliance FERC QF, Small Hydro License or Exemption EIA Generator
More informationTOP/IRO Standards. RC Users Group January 21, Vic Howell Manager, Operations Engineering Support
TOP/IRO Standards RC Users Group January 21, 2016 Vic Howell Manager, Operations Engineering Support Saad Malik Manager, Real-Time Operations Engineering New/Revised TOP & IRO Standards November 19, 2015,
More informationAgreements and Queue Management
Agreements and Queue Management Infrastructure Contracts and Management Emilee Plouff, Contract Negotiation and Regulatory Contracts Joanne Bradley, Queue Management March 6, 2018 Interconnection Process
More informationEnergy Storage and Distributed Energy Resources Phase 2. Customer Partnership Group March 27, p.m. 2 p.m. (Pacific Standard Time)
Energy Storage and Distributed Energy Resources Phase 2 Customer Partnership Group March 27, 2018 1 p.m. 2 p.m. (Pacific Standard Time) Agenda Item Project Schedule Update New Baseline Requests - Submittal
More informationAgreements and Queue Management
Agreements and Queue Management Infrastructure Contracts and Management Joanne Bradley, Queue Management Shoukat Ansari, Contract Negotiation PJ Topping, Regulatory Contracts February 27, 2019 Interconnection
More informationStandards Authorization Request Form
Standards Authorization Request Form When completed, email this form to: sarcomm@nerc.com NERC welcomes suggestions to improve the reliability of the bulk power system through improved reliability standards.
More informationMemorandum. This memorandum requires Board action. EXECUTIVE SUMMARY
California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Keith Casey, Vice President, Market & Infrastructure Development Date: May 21, 2014 Re: Decision on interconnection
More informationRelease Notes. OASIS Fall 2015 Application Release Version 1.0
Release Notes OASIS Fall 2015 Application Release 6.8.0 Version 1.0 September 17, 2015 REVISION HISTORY VERSION NO. DATE DESCRIPTION 1.0 09/17/2015 Initial version Page 2 of 12 Release Identification Application/System
More informationTable of Contents. TOP TOP BA Data Request and Specification Guidelines. Operating Procedure
No. 3140 Table of Contents Purpose... 2 Responsibilities... 2 2. Scope/Applicability... 4 2.1 Background... 4 2.2 Scope / Applicability... 4 3. Detail... 5 3.1... 5 Introduction... 5 3.2 Data Specification
More informationCustomer Inquiry, Dispute & Information (CIDI) User Guide
U S E R G U I D E CALIFORNIA ISO Customer Inquiry, Dispute & Information (CIDI) User Guide Revision History Version Date Description By 1.0 04/26/10 CIDI initial user guide Latisha Collins 1.1 04/27/10
More informationbcuc British Columbia Utilities Commission
January 26, 2018 bcuc British Columbia Utilities Commission Patrick Wruck Commission Secretary Commission.Secretary@bcuc.com bcuc.com Suite 410, 900 Howe Street Vancouver, BC Canada V6Z 2N3 P: 604.660.4700
More informationProposed Improvements for NERC MOD Standards July 10, 2012
Agenda Item 3.6 Planning Committee Meeting September 18-19, 2012 Proposed Improvements for NERC MOD Standards July 10, 2012 Background This paper outlines proposed improvements for NERC Reliability Standards
More informationSOUTHERN CALIFORNIA EDISON COMPANY
SOUTHERN CALIFORNIA EDISON COMPANY COMPLIANCE PROCEDURES IMPLEMENTING FERC ORDER 717C STANDARDS OF CONDUCT Version 1.2 Updated June 14, 2017 Purpose: To provide Southern California Edison s (SCE) overall
More informationWide-Area Reliability Monitoring and Visualization Tools
OE Visualization and Controls Peer Review Wide-Area Reliability Monitoring and Visualization Tools Carlos Martinez CERTS - Electric Power Group 21 October 2008 Washington, D.C. Presentation Outline Research
More informationHetch Hetchy Water and Power of the City and County of San Francisco. Joint Transmission Planning Base Case Preparation Process
California Independent System Operator & Hetch Hetchy Water and Power of the City and County of San Francisco Joint Transmission Planning Base Case Preparation Process This is a living document. Please
More informationScheduling Infrastructure Business Rules (SIBR) User Interface (UI) Update
Scheduling Infrastructure Business Rules (SIBR) User Interface (UI) Update Heidi Carder Senior Client Trainer, Training & Readiness February 21, 2018 The information contained in these materials is provided
More informationFrom: Laura Manz, Vice President of Market & Infrastructure Development
California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Laura Manz, Vice President of Market & Infrastructure Development Date: May 8, 2009 Re: Decision for Conditional
More informationTable of Contents. Purpose. Certification of Metering Facilities. Procedure No Version No. 1.4 Effective Date 2/14/2018. Operating Procedure
No. 5710 Table of Contents Purpose... 1 1. Responsibilities... 2 2. Scope/Applicability... 3 2.1 Background... 3 2.2 Scope / Applicability... 3 3. Detail... 3 3.1 Certifying Metering Facilities... 3 3.1.1
More informationCalifornia Independent System Operator Corporation Fifth Replacement Electronic Tariff
Table of Contents 17. Transmission Ownership Rights (TORs)... 2 17.1 TRTC Instructions... 2 17.1.1 Responsibility to Create TRTC Instructions... 2 17.1.2 TOR Scheduling Coordinator Responsibilities...
More informationERO Certification and Review Procedure
ERO Certification and Review Procedure Reliability Assurance December 15, 2016 3353 Peachtree Road NE Suite 600, North Tower Atlanta, GA 30326 404-446-2560 www.nerc.com 1 of 16 Table of Contents Table
More informationSpecific topics covered in this brief include:
April 2008 Summary Welcome to the Fifteenth National Wind Coordinating Collaborative (NWCC) Transmission Update! Kevin Porter of Exeter Associates, Inc. led the April 28, 2008, Transmission Update conference
More informationContingency Reserve Sharing; Ancillary Services Market. Presented to the JCM Joint Stakeholder Meeting
Contingency Reserve Sharing; Ancillary Services Market Presented to the JCM Joint Stakeholder Meeting 1 Agenda Products and Nature of Current Services Contingency Reserve Sharing Group (CRSG) Agreement
More informationPeak Reliability. Reliability Coordinator Data Request and Specifications for Data Provision
Table of Contents I. Purpose... 2 II. Introduction... 2 III. Peak Roles and Responsibilities... 2 IV. Applicability and Obligations... 3 V. Questions and Comments... 6 VI. Data Request Spreadsheet... 6
More informationSOUTH TEXAS ELECTRIC COOPERATIVE, INC.
SOUTH TEXAS ELECTRIC COOPERATIVE, INC. P.O. Box 119 Nursery, Texas 77976 (361) 575-6491 Fax (361) 576-1433 Transmission Interconnection Requirements Table of Contents I. Introduction II. Interconnection
More informationPowerex EIM Implementation Informational Call. Mark Holman, Powerex Don Tretheway, California ISO October 3, 2017
Powerex EIM Implementation Informational Call Mark Holman, Powerex Don Tretheway, California ISO October 3, 2017 Agenda Time Topic Presenter 9:00 9:05 Introduction Kristina Osborne, ISO 9:05 10:05 Powerex
More informationMarch 15, 2011 VIA ELECTRONIC FILING
California Independent System Operator Corporation VIA ELECTRONIC FILING The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, D.C. 20246 Re: California
More informationCAISO RIG Acceptance Test Procedure
CAISO RIG Acceptance Test Procedure TABLE OF CONTENTS 1.0 PURPOSE... 3 2.0 INTRODUCTION... 3 3.0 TEST PROCEDURE... 8 Market Services/ EDAS CAISO Public Revision History 1.0 PURPOSE The procedure is intended
More information_ Dear Secretary Bose: The attached. Folsom, CA
California Independent System Operator June 29, 2012 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 Re: California Independent System
More informationData Release & Accessibility
Draft Final Proposal Data Release & Accessibility Phase 1: Transmission Constraints January 6, 2010 Jan-08-2010: To correct for minor edits that were inadvertently omitted, this revised copy was posted.
More informationProposed Clean and Redline for Version 2 Implementation Plan
Exhibit A Implementation Plans for CIP-002-2 through CIP-009-2 and CIP-002-3 and CIP-009-3 For Generator Owners and Generator Operators of U.S. Nuclear Power Plants Proposed Clean and Redline for Version
More informationAuthorized Training Provider Application Process
Authorized Training Provider Application QuEST Forum Training Sub-Team 10 August 2015 This document describes the process and provides guidance to organizations that wish to become Authorized Training
More informationSGS INTRON CERTIFICATIE CERTIFICATION AND ATTESTATION REGULATIONS 2015 TABLE OF CONTENT
TABLE OF CONTENT 1. INTRODUCTION...2 2. PROCEDURES...3 2.1 SUMMARY... 3 2.2 ADMISSION PROCEDURES... 4 2.2.1 Information... 4 2.2.2 Quotations... 4 2.2.3 Conclusion of an agreement... 4 2.2.4 Admission
More informationScreening Procedures for Access to ISO Register of Transmission Facilities and Entitlements
Screening Procedures for Access to ISO Register of Transmission Facilities and Entitlements In accordance with the Federal Energy Regulatory Commission (FERC) order issued on January 24, 2003 (as modified
More informationUpper vs. Lower Case BTMG. Resource Adequacy Subcommittee October 11, 2017
Upper vs. Lower Case BTMG Resource Adequacy Subcommittee October 11, 2017 Purpose & Key Takeaways Purpose: Address issue assigned to RASC by SC: Define lower case btmg and/or criteria such as MW threshold
More informationMarket Participant User Guide ISO Reliability Requirements Application (IRR UI)
Market Participant User Guide ISO Reliability Requirements Application (IRR UI) Version 1 Last Revised: November 21, 2011 ISO Public 1 of 84 Table of Contents 1. Introduction... 5 1.1 Resource Adequacy
More informationCertification Body Audit Resources
Certification Body Audit Resources Policy 13 v4.01 Original Issue 20 May 2012 Revision Date Effective Date Policy Applicable To All CertiSource Staff and Certification Body Staff Policy Managed By Approved
More informationBase Schedule Aggregation Portal (BSAP) Interface Specification for BSAP Services
Base Schedule Aggregation Portal (BSAP) Interface Specification for BSAP Services (Business Rules v 9.x(Fall 2018) or later) Version: 1.4 December 5, 2018 Revision History Date Version By Description 1.4
More informationBusiness Practice. 1.2 Resources must meet certain FERC specified requirements in order to qualify as Designated Network Resources.
Business Practice 1. General 1.1 Primary Network Service is a long-term firm service and should only be used by Network Customers when reserving and scheduling delivery of energy from Designated Network
More informationCALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION FERC ELECTRIC TARIFF FIRST REPLACEMENT VOLUME NO. II Original Sheet No. 727 METERING PROTOCOL
FIRST REPLACEMENT VOLUME NO. II Original Sheet No. 727 METERING PROTOCOL FIRST REPLACEMENT VOLUME NO. II Original Sheet No. 728 METERING PROTOCOL Table of Contents MP 1 OBJECTIVES, DEFINITIONS AND SCOPE
More informationJanuary 30, Docket Nos. ER and ER Interconnection Queue Quarterly Progress Report, Q4 2014
California Independent System Operator Corporation The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, NE Washington, DC 20426 January 30, 2015 Re: California
More informationCALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION FERC ELECTRIC TARIFF FIRST REPLACEMENT VOLUME NO. II Original Sheet No. 727 METERING PROTOCOL
FIRST REPLACEMENT VOLUME NO. II Original Sheet No. 727 METERING PROTOCOL FIRST REPLACEMENT VOLUME NO. II Original Sheet No. 728 METERING PROTOCOL Table of Contents MP 1 OBJECTIVES, DEFINITIONS AND SCOPE
More informationDemand Response User Guide DRRS Enhancement Market Simulation. Version 1.0 August 18, 2016
Demand Response User Guide DRRS Enhancement Market Simulation Version 1.0 August 18, 2016 Table of Contents INTRODUCTION... 5 Purpose... 5 Definitions... 6 DEMAND RESPONSE PROVIDER (DRP)... 10 Executing
More informationQuarter 3, 2007 (2007Q3) Generation Deliverability Assessment Study Plan
Quarter 3, (Q3) Generation Deliverability Assessment Study Plan Background and Purpose of Study Phases I & II Generation and Import Deliverability Studies were completed that established the deliverability
More informationThis is a preview - click here to buy the full publication. IEC Quality Assessment System for Electronic Components (IECQ System)
IECQ 03-3-1 Edition 1.0 2013-02 IECQ PUBLICATION IEC Quality Assessment System for Electronic Components (IECQ System) Rules of Procedure Part 3-1: IECQ Approved Component Products, Related Materials &
More informationAppendix 06 - Service Level Agreement (SLA) Version 1.4 of 15 June 2018
Appendix 06 - Service Level Agreement (SLA) Version 1.4 of 15 June 2018 Contents 1. Service Level Agreement Glossary 3 2. GLEIF Services - Service Descriptions 5 2.1. Perform Accreditation 5 2.2. Conduct
More informationCALIFORNIA INDEPENDENT SYSTEM OPERATOR CORPORATION FERC ELECTRIC TARIFF ORIGINAL VOLUME NO. III Original Sheet No. 977 METERING PROTOCOL
ORIGINAL VOLUME NO. III Original Sheet No. 977 METERING PROTOCOL ORIGINAL VOLUME NO. III Original Sheet No. 978 METERING PROTOCOL Table of Contents MP 1 OBJECTIVES, DEFINITIONS AND SCOPE MP 1.1 Objective
More informationOperations ISO Version: 1.6. Effective Date: 8/02/2018. Fieldwork Guide. Fieldwork Guide
REVISION HISTORY VERSION NO. (Must match header) DATE REVISED BY DESCRIPTION 1.0 6/6/2016 EDAS Created Document 1.1 6/29/2016 EDAS Updates to include all Meter Work and instruction 1.2 8/29/2016 EDAS Included
More informationAnnual Policy Initiatives Roadmap Process Straw Proposal
Annual Policy Initiatives Roadmap Process Straw Proposal July 18, 2017 Copyright 2017 Table of Contents 1 Introduction... 2 2 Proposal... 3 2.1 Policy Initiatives Catalog... 3 Stakeholder Comments... 4
More informationOncor Installer Portal Training Guide
Oncor Installer Portal Training Guide 1 Index 1 Introduction to Portal 2 3 Project Workflow 4 5 Introduction to Tabs in Portals 6 All Web Pages Navigation, Buttons, Features & Functionalities New Installer
More informationThe NYISO shall assign a Queue Position based upon the date and time of receipt of the
30.4 Queue Position 30.4.1 General The NYISO shall assign a Queue Position based upon the date and time of receipt of the valid Interconnection Request; provided that, if the sole reason an Interconnection
More informationUser Access Administrator (UAA) Form and Access to Resource Interconnection Management System (RIMS 5)
User Access Administrator (UAA) Form and Access to Resource Interconnection Management System (RIMS 5) Massih Ahmadi 11/28/2017
More informationPierre Sebellin. Systems Technical Officer International Electrotechnical Commission
Pierre Sebellin Systems Technical Officer International Electrotechnical Commission Introduction IEC is a global organization that publishes consensus-based international Standards and manages Conformity
More informationStandards Authorization Request Form
Standards Authorization Request Form When completed, email this form to: sarcomm@nerc.com NERC welcomes suggestions to improve the reliability of the bulk power system through improved reliability standards.
More informationWELCOME. Draft Energy Storage Roadmap. Draft Matrix Stakeholder Call. November 3, 2014 San Francisco SAFER, SMARTER, GREENER
WELCOME Draft Energy Storage Roadmap Draft Matrix Stakeholder Call November 3, 2014 San Francisco SAFER, SMARTER, GREENER Alignment of Proposed Actions to Storage Configuration and Use Cases Robert Anderson,
More informationStakeholder Comments Template. Energy Storage and Distributed Energy Resources (ESDER) Phase 4. Submitted by Organization Date Submitted
Stakeholder Comments Template Energy Storage and Distributed Energy Resources (ESDER) Phase 4 Submitted by Organization Date Submitted Ted Ko ted.ko@stem.com 510-381-6159 Stem, Inc. 2/27/19 The Issue Paper
More informationI. Tariff language for Transmission Losses Applied to Monthly Reported Network Loads: (for tariff)
I. Tariff language for Transmission Losses Applied to Monthly Reported Network Loads: (for tariff) * MISO will add the underlined text provided by the Owners Committee to Section 34.2 of the Tariff with
More informationGenerator Interconnection Process. Wholesale Transmission Overview
1 Generator Interconnection Process Wholesale Transmission Overview 2 This presentation summarizes the FERC-approved Generator Interconnection Procedures (GIP) in Appendix Y of the California Independent
More informationAgreements & Queue Management
Agreements & Queue Management Resource Interconnection Fair February 24, 2016 Page 1 Interconnection Process Map You are here Page 2 Topics 1. Generator Interconnection Agreement (GIA) 2. Affected Systems
More informationLINK System Customer Interface. SERVICE REQUESTER MAINTENANCE (NEW/UP GRADE) Administrators
SERVICE REQUESTER MAINTENANCE (NEW/UP GRADE) Administrators 1 If you are a new user and your entity is not presently setup in the, you must create a new Service Requester. On the LINK Home page select
More informationStandard INT Interchange Authority Distributes Arranged Interchange
Standard INT-005-2 Authority Distributes A. Introduction 1. Title: Authority Distributes 2. Number: INT-005-2 3. Purpose: To ensure that the implementation of between Source and Sink Balancing Authorities
More informationThe ESP Handbook. Chapter 2 Enrolling in Direct Access An Overview. Version 5.0 December 1, 2011
The ESP Handbook Chapter 2 Enrolling in Direct Access An Overview Version 5.0 December 1, 2011 Chapter 2: Enrolling in Direct Access An Overview Providing Direct Access Services in the SCE Service Territory:
More informationResource Interconnection Management System (RIMS) Quick Start Guide
Resource Interconnection Management System (RIMS) Quick Start Guide New Resource Implementation (NRI) Starting a New Project, Document Submission, and Project Information Updates for: Solar Wind/Wind Repower
More informationStandard Development Timeline
Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard is adopted by the NERC Board of Trustees (Board).
More informationCIP Cyber Security Personnel & Training
A. Introduction 1. Title: Cyber Security Personnel & Training 2. Number: CIP-004-6 3. Purpose: To minimize the risk against compromise that could lead to misoperation or instability in the Bulk Electric
More informationCoordinate Interchange
Coordinate Interchange Purpose: The purpose of this standard is to define procedures for market participants to request the implementation of Interchange Transactions. Applicability: This Standard applies
More informationCoordinate Interchange
Coordinate Interchange Purpose: The purpose of this standard is to define procedures for market participants to request the implementation of Interchange Transactions. Applicability: This Standard applies
More informationOutage Management System Customer Partnership Group. November 2017
Outage Management System Customer Partnership Group November 2017 Customer Partnership Group Scope and Objective Created in response to customer s request to have more involvement in the planning, design
More informationRequest for Proposal for Technical Consulting Services
Request for Proposal for Technical Consulting Services The Node.js Foundation is requesting proposals from highly qualified consultants with demonstrated expertise in providing Node.js technical consultation
More informationEntergy Arkansas, Inc. Transition Plan Technical Conference #1
Entergy Arkansas, Inc. Transition Plan Technical Conference #1 May 5, 2010 1 Why Technical Conferences? Complex subject matter Venue for stakeholders to develop an awareness and understanding of the issues
More informationCell and PDAs Policy
Cell and PDAs Policy CHAPTER: 13 Information Services Department SECTION: 13 SUBJECT: Cell Phones and PDAs POLICY #: 13.13.00 Revised OFFICE/DEPARTMENT: Information Services EFFECTIVE DATE: October 1,
More informationState Perspectives on the Midwest ISO regional Stakeholder Process: The Indiana Utility Regulatory Commission
State Perspectives on the Midwest ISO regional Stakeholder Process: The Indiana Utility Regulatory Commission October 21, 2010 Dave Johnston Beth Krogel Roads Indiana Utility Regulatory Commission (IURC)
More informationPhysical Security Reliability Standard Implementation
Physical Security Reliability Standard Implementation Attachment 4b Action Information Background On March 7, 2014, the Commission issued an order directing NERC to submit for approval, within 90 days,
More informationIntroduction: Model Relationships Network Model Overview Example Commercial Model Overview Component Hierarchy & Definitions Example of Structure
1 2 3 Introduction: Model Relationships Network Model Overview Example Commercial Model Overview Component Hierarchy & Definitions Example of Structure MISO Functions Served by the Network Model by the
More informationCIP Cyber Security Systems Security Management
A. Introduction 1. Title: Cyber Security System Security Management 2. Number: CIP-007-5 3. Purpose: To manage system security by specifying select technical, operational, and procedural requirements in
More informationJuly 30, Q2 Quarterly Report on Progress in Processing Interconnection Requests; Docket No. ER
California Independent System Operator Corporation The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 July 30, 2010 Re: Q2 Quarterly
More informationAn Illinois Perspective
Other State Models: An Illinois Perspective SADZI M. OLIVA, ACTING COMMISSIONER ILLINOIS COMMERCE COMMISSION JULY 21, 2017 Disclaimers Any views, statements, and opinions expressed in this presentation
More informationSTCP22-1 Issue 003 Production of Models for GB System Planning
STCP22-1 Issue 003 Production of Models for GB System Planning STC Procedure Document Authorisation Company Name of Party Representative Signature Date National Grid Electricity Transmission plc SP Transmission
More informationJanuary 22, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.
California Independent System Operator Corporation January 22, 2013 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Re: California
More informationPRODUCT CERTIFICATION SCHEME FOR MECHANICAL-CUSTOMIZED VEHICLES
Ref No: RACS/SOP/57 Page 1 of 6 1. Objective: This procedure describes the criteria implemented by RACS as Notified Body of Emirates Authority of Standardization and Metrology (ESMA) that Mechanical Customized
More informationAccreditation Criteria For Conformity Assessment Bodies
Page 1 of 8 Reviewed by: Getnet Tsigemalak Approved by: Araya Fesseha Position: Quality Manager Position: Director General Signature: Signature: Contents Page 1 Purpose and Scope... 2 2 References... 2
More informationSummary of FERC Order No. 791
Summary of FERC Order No. 791 On November 22, 2013, the Federal Energy Regulatory Commission ( FERC or Commission ) issued Order No. 791 adopting a rule that approved Version 5 of the Critical Infrastructure
More informationISO Responses to Questions about the Memorandum of Understanding between Valley Electric Association and the ISO
ISO Responses to Questions about the Memorandum of Understanding between Valley Electric Association and the ISO The following Q & A is based on questions raised by stakeholders on an ISO conference call
More information