CSI Codes for Specialty Detail at ABC of Western Pennsylvania

Size: px
Start display at page:

Download "CSI Codes for Specialty Detail at ABC of Western Pennsylvania"

Transcription

1 CSI Codes for Specialty Detail at ABC of Western Pennsylvania The following is a list of CSI Codes for the Western Pennsylvania Chapter of ABC. In the Membership Directory, your company will be listed under each trade you select. Please choose no more than ten specialties. If you would like to be listed under more than ten specialties, each additional specialty will cost $10.00 each. When you have finished, please return this form to Dawn Gobble via E- mail at dgobble@abcwpa.org, via fax at , or via regular mail at 2360 Venture Drive, Gibsonia, PA If you are unable to complete this information yourself, please forward this to the appropriate person so that we may properly list you in the Membership Directory and Find-a-Contractor (ABC National s Online Membership Directory). This is an abbreviated list of the complete list of CSI Codes. If you would like to choose from the complete list, you may schedule a time to view the code book with Dawn Gobble at the ABC office Monday, Wednesday or Friday from 8:00 am 2:00 pm. For our Associate and Supplier members, you may use your NAISCS Code for non- construction related services. Some of the more common services are listed, but you may add any other services with their associated number as needed (up to 10 at no charge) Procurement and Contracting Requirements PAGE General Requirements PAGE Existing Conditions PAGES Concrete PAGE Masonry PAGE Metals PAGE Woods, Plastics, and Composites PAGE Thermal and Moisture Protection PAGES Openings PAGES Finishes PAGE Specialties PAGE Equipment PAGES Furnishings PAGE Special Construction PAGE Conveying Equipment PAGE Fire Suppression PAGE Plumbing PAGES Heating, Ventilation & Air Conditioning (HVAC) PAGE Integrated Automation PAGES Electrical PAGE Communications PAGE Electronic Safety and Security PAGE Earthwork PAGE Exterior Improvements PAGES Utilities PAGE Transportation PAGE Waterway and Marine Construction PAGES Process Integration PAGE Material Process and Handling Equipment PAGE Process Heating, Cooling and Drying Equipment PAGE Process Gas and Liquid Handling, Purification and Storage Equipment PAGE Pollution and Waste Control Equipment PAGE Electrical Power Generation PAGE 15 NAISCS Codes Miscellaneous Listings PAGE 15 P a g e 1

2 Procurement and Contracting Requirements Procurement and Contracting Requirements Initiation to Bid Instructions for Procurement Infection Control Form Construction Equipment Form General Conditions General Conditions Stipulated Sum (Single-Prime Contract) General Conditions Stipulated Sum (Multiple-Prime Contract) General Conditions Construction Management (Single-Prime Contract) General Conditions Construction Management (Multiple-Prime Contract) General Conditions Design/Build (Single-Prime Contract) General Conditions Design/Build (Multiple-Prime Contract) Insurance Requirements Health and Safety Requirements General Requirements General Requirements Summary Summary of Work Multiple Contract Summary Work Restrictions Project Utility Sources Price and Payment Procedures Allowances Unit Prices Alternates Value Analysis Value Engineering Contract Modification Procedures Payment Procedures Administrative Requirements Project Coordination Construction Progress Documentation Special Procedures Alteration Project Procedures Regulatory Requirements References Quality Assurance Quality Control Temporary Facilities and Controls Temporary Utilities Temporary Construction Vehicular Access and Parking Temporary Controls Project Identification Temporary Project Signage Common Product Requirements Product Options Owner-Furnished Products Product Delivery Requirements Product Storage and Handling Requirements Execution Requirements and Closeout Requirements Examination and Preparation Field Engineering Execution Cleaning and Waste Management Starting and Adjusting Protecting Installed Construction Closeout Procedures Closeout Submittals Demonstration and Training Commissioning Facility Operation Facility Operation Procedures Facility Maintenance Procedures Facility Decommissioning Existing Conditions Existing Conditions Site Surveys Subsurface Investigation Demolition and Structure Moving Demolition Structure Moving Physical Decontamination Chemical Decontamination Thermal Decontamination Biological Decontamination Remediation Soil Stabilization Contaminated Site Material Removal P a g e 2

3 Underground Storage Tank Removal Groundwater Treatment Facility Remediation Transportation and Disposal of Hazardous Material Hazardous Waste Drum Handling Concrete Concrete Concrete Maintenance Resurfacing of Cast-in-Place Concrete Rehabilitation of Cast-in-Place Concrete Cleaning of Precast Concrete Resurfacing of Precast Concrete Rehabilitation of Precast Concrete Concrete Forming and Accessories Concrete Forming Structural Cast-in-Place Concrete Forms Architectural Cast-in-Place Concrete Forms Concrete Accessories Concrete Reinforcing Reinforcement Bars Fabric and Grid Reinforcing Stressed Tendon Reinforcing Fibrous Reinforcing Cast-in-Place Concrete Architectural Concrete Low Density Concrete Concrete Finishing Specialty Placed Concrete Post-Tensioned Concrete Concrete Curing Precast Concrete Precast Structural Concrete Precast Structural Post-Tensioned Precast Architectural Concrete Site-Cast Concrete Tilt-Up Concrete Precast Concrete Specialties Glass-Fiber-Reinforced Concrete Cast Decks and Underlayment Cast Roof Deck Lightweight Concrete Roof Insulation Concrete Topping Cast Underlayment Grouts Masonry Masonry Maintenance of Masonry Unit Masonry Restoration Unit Masonry Cleaning Stone Restoration Stone Cleaning Common Work Results for Masonry Masonry Grouting Masonry Anchorage and Reinforcement Masonry Accessories Unit Masonry Clay Unit Masonry Concrete Unit Masonry Glass Unit Masonry Adobe Unit Masonry Unit Masonry Panels Multiple-Wythe Unit Masonry Stone Assemblies Stone Assemblies Combustion Chamber Masonry Castable Refractory Masonry Refractory Brick Masonry Masonry Fireplaces Corrosion-Resistant Masonry Chemical-Resistant Brick Masonry Vitrified Clay Liner Plate Manufactured Masonry Manufactured Brick Masonry Calcium Silicate Manufactured Brick Masonry Cast Stone Masonry Manufactured Stone Masonry P a g e 3

4 Metals Metals Maintenance of Metals Common Work Results from Metals Shop-Applied Coatings for Metal Metal Fastening Structural Metal Framing Structural Steel Framing Structural Aluminum Framing Wire Rope Assemblies Structural Cabling Structural Metal Stud Framing Cold-Formed Metal Joist Framing Slotted Channel Framing Metal Support Assemblies Metal Fabrications Metal Stairs Metal Ladders Metal Railings Metal Gratings Metal Floor Plates Metal Joists Steel Joists Framing Aluminum Joists Framing Metal Decking Steel Decking Aluminum Decking Acoustical Metal Decking Raceway Deck Assemblies Cold-Formed Metal Framing Metal Stair Treads and Nosings Metal Castings Formed Metal Fabrications Decorative Metal Decorative Metal Stairs Fabricated Metal Spiral Stairs Decorative Metal Railings Decorative Metal Castings Decorative Formed Metal Decorative Forged Metal Wood, Plastics, and Composites Wood, Plastics and Composites Maintenance of Wood, Plastics and Composites Architectural Woodwork Cleaning Plastic Restoration and Cleaning Common Work Results for Wood, Plastics, and Composites Wood, Plastic and Composite Fastenings Wood Treatment Shop-Applied Wood Coatings Rough Carpentry Wood Framing Structural Panels Treated Wood Foundations Wood Decking Sheathing Shop-Fabricated Structural Wood Glued-Laminated Construction Finish Carpentry Millwork Prefinished Paneling Board Paneling Architectural Woodwork Architectural Wood Casework Wood Paneling Wood Stairs and Railings Wood Stairs Ornamental Woodwork Wood Trim Wood Frames Wood Screens and Exterior Wood Shutters Structural Plastics Structural Plastic Shapes and Plates Plastic Structural Assemblies Plastic Fabrications Plastic Simulated Wood Trim Custom Ornamental Simulated Woodwork Thermal and Moisture Protection Thermal and Moisture Protection Maintenance of Membrane Roofing Common Work Results for Thermal and Moisture Protection Dampproofing and Waterproofing Dampproofing Built-Up Bituminous Waterproofing Sheet Waterproofing P a g e 4

5 Fluid-Applied Waterproofing Sheet Metal Waterproofing Cementitious and Reactive Waterproofing Bentonite Waterproofing Traffic Coatings Water Repellents Thermal Protection Thermal Insulation Roof and Deck Insulation Exterior Insulation and Finish Systems Vapor Retarders Air Barriers Steep Slope Roofing Shingles and Shakes Roof Tiles Natural Roof Coverings Roofing and Siding Panels Composite Roof Panels Fabricated Wall Panel Assemblies Faced Panels Fabricated Faced Panel Assemblies Siding Fabricated Panel Assemblies with Siding Membrane Roofing Built-Up Bituminous Roofing Cold-Applied Bituminous Roofing Elastomeric Membrane Roofing Modified Bituminous Membrane Roofing Thermoplastic Membrane Roofing Fluid-Applied Roofing Coated Foamed Roofing Roll Roofing Flashing and Sheet Metal Sheet Metal Roofing Sheet Metal Flashing and Trim Sheet Metal Roofing Specialties Flexible Flashing Roof and Wall Specialties and Accessories Roof Specialties Roof Accessories Roof Pavers Applied Fireproofing Board Fireproofing Firestopping Smoke Seals Smoke Containment Barriers Joint Protection Preformed Joint Seals Joint Sealants Acoustical Joint Sealants Expansion Control Expansion Joint Cover Assemblies Joint Slide Bearings Bridge Expansion Joint Assemblies Openings Openings Operation and Maintenance of Metal Doors and Frames Operation and Maintenance of Wood Doors Operation and Maintenance of Plastic Doors Operation and Maintenance of Wood Windows Operation and Maintenance of Curtain Walls Operation and Maintenance of Door Hardware Maintenance of Glazing Common Work Results for Openings Doors and Frames Metal Doors and Frames Hollow Metal Doors and Frames Metal Screen and Storm Doors and Frames Stainless-Steel Doors and Frames Bronze Doors and Frames Wood Doors Wood Screen Doors Wood Storm Doors Sliding Wood Doors Plastic Doors Plastic Screen Doors Plastic Storm Doors Sliding Plastic Doors Integrated Door Opening Assemblies Integrated Metal Door Opening Assemblies Specialty Doors and Frames Access Panels and Frames Access Doors and Frames Overhead Coiling Doors Special Function Doors Detention Doors and Frames Folding Doors and Grilles Panel Doors Traffic Doors Pressure-Resistant Doors Entrances and Storefronts All-Glass Entrances and Storefronts Automatic Entrances Revolving Door Entrances Balanced Door Entrances P a g e 5

6 Storefronts Sliding Storefronts Curtain Wall and Glazing Assemblies Structural Glass Curtain Walls Sloped Glazing Assemblies Translucent Wall and Roof Assemblies Windows Aluminum Windows Bronze Windows Stainless-Steel Windows Steel Windows Wood Windows Plastic Windows Composite Windows Special Function Windows Skylights Roof Windows Unit Skylights Metal-Framed Skylights Hardware Door Hardware Access Control Hardware Window Hardware Special Function Hardware Hardware Accessories Glazing Glass Glazing Mirrors Plastic Glazing Glazing Accessories Louvers and Vents Louvers Door Louvers Louvered Equipment Enclosures Vents Finishes Finishes Maintenance of Finishes Plaster Restoration Tile Restoration Maintenance of Ceilings Flooring Restoration Paint Restoration Common Work Results for Finishes Plaster and Gypsum Board Gypsum Board Assemblies Supports for Plaster and Gypsum Board Metal Furring Non-Structural Metal Stud Framing Suspension Systems Lath Gypsum Plastering Cement Plastering Plaster Fabrications Gypsum Board Tiling Ceramic Tiling Quarry Tiling Paver Tile Glass Mosaic Tiling Plastic Tiling Metal Tiling Stone Tiling Ceilings Acoustical Ceilings Acoustical Ceiling Suspension Assemblies Specialty Ceilings Suspended Wood Ceilings Suspended Decorative Grids Textured Ceilings Flooring Specialty Flooring Masonry Flooring Wood Flooring Static-Control Resilient Flooring Terrazzo Flooring Portland Cement Terrazzo Flooring Plastic-Matrix Terrazzo Floor Tile Conductive Terrazzo Flooring Fluid-Applied Flooring Carpeting Access Flooring Wall Finishes Wall Coverings Wall Carpeting Flexible Wood Sheets Stone Facing Plastic Blocks Special Wall Surfacing Acoustic Treatment Acoustic Insulation Acoustic Wall Coating Acoustic Room Components Sound-Absorbing Wall Units Painting and Coating Painting P a g e 6

7 Staining and Transparent Finishing Decorative Finishing High-Performance Coatings Steel Coatings Specialties Specialties Operation and Maintenance of Fireplaces and Stoves Operation and Maintenance of Exterior Specialties Chalkboards Marker Boards Tackboards Sliding Visual Display Units Visual Display Conference Units Visual Display Rails Directories Signage Plaques Traffic Signage Telephone Specialties Compartments and Cubicles Cubicle Curtains and Track Metal Toilet Compartments Plastic-Laminate-Clad Toilet Compartments Plastic Toilet Compartments Particleboard Toilet Compartments Stone Toilet Compartments Shower and Dressing Compartments Partitions Wire Mesh Partitions Folding Gates Demountable Partitions Portable Partitions, Screens, and Panels Accordion Folding Partitions Folding Panel Partitions Sliding Partitions Service Walls Wall and Door Protection Toilet, Bath and Laundry Accessories Toilet Accessories Bath Accessories Laundry Accessories Fireplaces and Stoves Manufactured Fireplaces Fireplace Specialties Stoves Fire Protection Specialties Lockers Postal Specialties Storage Assemblies Wardrobe and Closet Specialties Wood Closet and Utility Shelving Exterior Sun Control Devices Exterior Shutters Storm Panels Protective Covers Transportation Stop Shelters Manufactured Exterior Specialties Flagpoles Pest Control Devices Grilles and Screens Scales Equipment Equipment Parking Control Equipment Loading Dock Equipment Pedestrian Control Equipment Vault Equipment Teller and Service Equipment Detention Equipment Mercantile and Service Equipment Cash Registers and Checking Equipment Vending Equipment Checkroom Equipment Commercial Laundry & Dry Cleaning Equipment Maintenance Equipment Unit Kitchens Darkroom Equipment Office Equipment Residential Equipment Food Service Equipment Food Storage Equipment Food Preparation Equipment Food Delivery Carts and Conveyors Food Cooking Equipment Food Dispensing Equipment Ice Machines Cleaning and Disposal Equipment P a g e 7

8 Library Equipment Audio Visual Equipment Laboratory Equipment Planetarium Equipment Observatory Equipment Vocational Shop Equipment Broadcast, Theater, and Stage Equipment Rigging Systems and Controls Musical Equipment Athletic and Recreational Equipment Play Field Equipment and Structures Healthcare Equipment Medical Sterilizing Equipment Examination and Treatment Equipment Patient Care Equipment Dental Equipment Optical Equipment Operating Room Equipment Radiology Equipment Mortuary Equipment Solid Waste Handling Equipment Religious Equipment Agricultural Equipment Furnishings Furnishings Operation and Maintenance of Furnishings Operation and Maintenance of Other Furnishings Fabrics Art Murals Wall Decorations Sculptures Art Glass Religious Art Window Treatments Window Treatment Operating Hardwar Casework Manufactured Metal Casework Manufactured Wood Casework Specialty Casework Hospitality Casework Residential Casework Countertops Furnishings and Accessories Office Accessories Table Accessories Portable Lamps Bath Furnishings Bedroom Furnishings Furnishing Accessories Rugs and Mats Office Furniture Seating Hospitality Furniture Institutional Furniture Residential Furniture Systems Furniture Panel-Hung Component System Furniture Free-Standing Component System Furniture Beam System Furniture Desk System Furniture Multiple Seating Stadium and Arena Seating Booths and Tables Multiple-Use Fixed Seating Telescoping Stands Seat and Table Assemblies Interior Planters and Artificial Plants Interior Artificial Plants Interior Planters Interior Landscape Accessories Special Construction Special Construction Swimming Pools Fountains Amusement Park Structures and Equipment Ice Rinks Kennels and Animal Shelters Special Purpose Rooms Air-Supported Fabric Structures Fabricated Engineered Structures Sound, Vibration, and Seismic Control Radiation Protection Recording Instrumentation Stress Instrumentation Seismic Instrumentation Meteorological Instrumentation P a g e 8

9 Conveying Systems Conveying Systems Elevator Rehabilitation Dumbwaiters Manual Dumbwaiters Electric Dumbwaiters Hydraulic Dumbwaiters Elevators Electric Traction Elevators Hydraulic Elevators Custom Elevator Cabs Elevator Equipment and Controls Escalators and Moving Walks Lifts People Lifts Wheelchair Lifts Platform Lifts Sidewalk Lifts Vehicle Lifts Turntables Scaffolding Suspended Scaffolding Rope Climbers Telescoping Platforms Powered Scaffolding Facility Chutes Fire Suppression Fire Suppression Operation and Maintenance of Fire-Suppression Common Work Results for Fire Suppression Meters and Gages for Fire-Suppression Systems General Duty-Valves for Water-Based Fire-Suppression Piping Hangers and Supports for Fire-Suppression Piping and Equipment Vibration and Seismic Controls for Fire-Suppression Piping and Equipment Identification for Fire-Suppression Piping and Equipment Fire-Suppression Systems Equipment Insulation Facility Fire-Suppression Water-Servicing Pipes Fire-Suppression Standpipes Fire-Suppression Hoses and Nozzles Wet-Pipe Sprinkler Systems Dry-Pipe Sprinkler Systems Pre-action Sprinkler Systems Foam Water Systems Fire-Extinguishing Systems Carbon-Dioxide Fire-Extinguishing Systems Clean-Agent Fire Extinguishing Systems Dry-Chemical Fire-Extinguishing Systems Fire Pumps Storage Tanks for Fire-Suppression Water Elevated Storage Tanks for Fire-Suppression Plumbing Plumbing Operation and Maintenance of Plumbing Common Work Results for Plumbing Meters and Gages for Plumbing Piping General-Duty Valves for Plumbing Piping Hangers and Supports for Plumbing Piping and Equipment Vibration and Seismic Control for Plumbing Piping and Equipment Identification for Plumbing Piping and Equipment Plumbing Equipment Insulation Facility Water Distribution Domestic Water Piping Facility Portable-Water Storage Tanks Facility Elevated, Portable-Water Storage Tanks Sanitary Waste and Vent Piping Sanitary Sewerage Pumps Facility Storm Drainage Facility Storm Drainage Piping Sump Pumps Plumbing Equipment Domestic Water Softeners Domestic Water Filtrating Equipment Electric Domestic Water Heaters Fuel-Fired Domestic Water Heaters Plumbing Fixtures Swimming Pool and Fountain Plumbing Systems P a g e 9

10 Swimming Pool Pumps Pool and Fountain Plumbing Systems Fountain Pumps Gas and Vacuum Systems for Laboratory And Healthcare Facilities Gas Storage Tanks for Laboratory and Healthcare Facilities Processed Water Piping for Laboratory and Healthcare Facilities Heating, Ventilation and Air Conditioning (HVAC) Heating, Ventilation and Air Conditioning (HVAC) Operation and Maintenance of HVAC Systems Common Work Results for HVAC Meters and Gages for HVAC Piping General-Duty Valves for HVAC Piping Hangers and Supports for HVAC Piping and Equipment Vibration and Seismic Control for HVAC Identification for HVAC Plumbing and Piping Testing, Adjusting, and Balancing for HVAC HVAC Insulation Instrumentation and Control for HVAC Instrumentation and Control Devices for HVAC Direct-Digital Control Systems for HVAC Electric and Electronic Control Systems for HVAC Breechings, Chimneys, and Stacks Heating Boilers Heating Boiler Feedwater Equipment Heating Solar Flat-Plate Collectors Furnaces Fuel-Fired Heaters Solar Energy Heating Equipment Packaged Solar Heating Equipment Field-Erected Cooling Towers Liquid Coolers Central HVAC Equipment Air-to-Air Energy Recovery Equipment Decentralized HVAC Equipment Facility Fuel-Storage Tanks Pneumatic Controls System for HVAC Pneumatic and Electric Control System for HVAC Sequence of Operation for HVAC Controls Facility Fuel-Oil Piping HVAC Piping and Pumps Hydronic Pumps HVAC Ducts and Casing Air Duct Accessories HVAC Fans Air Terminal Units Air Outlets and Inlets Commercial-Kitchen Hoods HVAC Air Cleaning Devices Central Heating Equipment Heating Solar Concentrating Collectors Heat Exchangers for HVAC Central Cooling Equipment Refrigerant Compressors Refrigerant Condensers Packaged Water Chillers Cooling Towers Decentralized Unitary HVAC Equipment Convection Heating and Cooling Units Radiant Heating Units Humidity Control Equipment Integrated Automation Integrated Automation Operation and Maintenance of Integrated Automation Common Work Results for Integrated Automation Conductors and Cables for Integrated Automation Grounding and Bonding for Integrated Automation Hangers and Supports for Integrated Automation Vibration and Seismic Controls for Integrated Automation Integrated Automation Network Equipment Integrated Automation Control and Monitoring Network Integrated Automation Software Integrated Automation Instrumentation and Terminal Devices Integrated Automation Actuators and Operators Integrated Automation Sensors and Transmitters Integrated Automation Control Valves P a g e 10

11 Integrated Automation Control Dampers Integrated Automation Compressed Air Supply Integrated Automation Facility Controls Integrated Automation Control of Facility Equipment Integrated Automation Control of Conveying Equipment Integrated Automation Control of Fire-Suppression Systems Integrated Automation Control of Plumbing Integrated Automation Control of HVAC Integrated Automation Control of Electrical Systems Integrated Automation Control Sequences Electrical Electrical Operation and Maintenance of Electrical Systems Maintenance Testing of Electrical Systems Operation and Maintenance of Lighting Common Work Results for Electrical Control-Voltage Electrical Power Cables Grounding and Bonding for Electrical Systems Raceway and Boxes for Electrical Systems Hangers and Supports for Electrical Systems Identification for Electrical Systems Commissioning of Electrical Systems Electrical Power Monitoring Lighting Control Devices Central Dimming Controls Modular Dimming Controls Network Lighting Controls Medium-Voltage Electrical Distribution Medium-Voltage Transformers Unit Substations Medium-Voltage Switchgear Medium-Voltage Circuit Protection Devices Low-Voltage Electrical Distribution Low-Voltage Transformers Low-Voltage Switchgear Switchboards and Panelboards Enclosed Bus Assemblies Power Distribution Units Low-Voltage Distribution Equipment Wiring Devices Enclosed Switches and Circuit Breakers Enclosed Controllers Facility Electrical Power Generating and Storing Equipment Photovoltaic Collectors Packaged Generator Assemblies Wind Energy Equipment Battery Equipment Static Power Converters Power Filters and Conditioners Facility Lightning Protection Lightning Protection for Structures Lightning Protection for Buildings Cathodic Protection Lighting Interior Lighting Emergency Lighting Classified Location Lighting Exterior Lighting Special Purpose Lighting Communications Communications Structured Cabling Communications Optical Fiber Backbone Cabling Communications Optical Fiber Horizontal Cabling Data Communications Voice Communications Audio-Video Communications Audio-Video Systems Integrated Audio-Video Systems and Equipment Distributed Communications and Monitoring Systems Public Address Systems P a g e 11

12 Electronic Safety and Security Electronic Safety and Security Operation and Maintenance of Electronic Safety and Security Operation and Maintenance of Electronic Surveillance Operation and Maintenance of Electronic Detection and Alarm Operation and Maintenance of Electronic Monitoring and Control Common Work Results for Electronic Safety and Security Conductors and Cables for Electronic Safety and Security Pathways for Electronic Safety and Security Hangers and Supports for Electronic Safety and Security Vibration and Seismic Controls for Electronic Safety and Security Identification for Electronic Safety and Security Schedules for Electronic Safety and Security Access Control Intrusion Detection Electronic Surveillance Video Surveillance Electronic Detection and Alarm Fire Detection and Alarm Smoke Detection Sensors Gas Detection and Alarm Fuel-Oil Detection and Alarm Refrigerant Detection and Alarm Mass Notification Systems Water Detection and Alarm Earthwork Earthwork Maintenance of Earthwork Tunnel Leak Repairs Geosynthetics for Earthwork Cement and Concrete for Earthwork Geotechnical Instrumentation and Monitoring of Earthwork Foundation Performance Instrumentation Site Clearing Clearing and Grubbing Selective Clearing Grading Rough Grading Embankments Erosion and Sedimentation Controls Soil Treatment Soil Stabilization Shoring and Underpinning Shoring Excavation Support and Protection Driven Piles Bored Piles Caissons Foundation Anchors Tunneling and Mining Tunnel Excavation Tunnel Support Systems Tunnel Grouting Tunnel Construction Shaft Construction Submersible Tube Tunnels Exterior Improvements Exterior Improvements Operation and Maintenance of Exterior Improvements Operation and Maintenance of Planting Flexible Paving Surface Treatment Asphalt Paving Reuse Sealing Cracks in Asphalt Paving Rigid Paving Rehabilitation Common Work Results for Exterior Improvements Geosynthetics for Exterior Improvements Cement and Concrete for Exterior Improvements Bases, Ballasts, and Paving Base Courses Subgrade Modifications Flexible Paving Flexible Paving Surface Treatments Porous Flexible Paving Rigid Paving Concrete Paving Unit Paving Brick Unit Paving Asphalt Unit Paving P a g e 12

13 Porous Unit Paving Aggregate Surfacing Athletic and Recreational Surfacing Site Improvements Fences and Gates Fabricated Bridges Screening Devices Utilities Utilities Operation and Maintenance of Utilities Operation and Maintenance of Sewer Utilities Rehabilitation of Sewer Utilities Common Work Results for Utilities Utility Structures Utility Pipe Jacking Microtunneling Water Utility Pumping Stations Underground Water Utility Storage Tanjks Utility Septic Tanks Storm Drainage Utilities Culverts Ponds and Reservoirs Pipe Culverts Sub-drainage Fuel Distribution Utilities Underground Fuel-Storage tanks Hydronic and Steam Energy Utilities Irrigation System Plant Preparation Turf and Grasses Plants Planting Accessories Transplanting Electrical Utility Transmission and Distribution Transmission and Distribution Equipment Electrical Utility Services Utility Substations Utility Transformers High-Voltage Switchgear and Protection Devices High-Voltage Utility Fuses High-Voltage Surge Arresters Medium-Voltage Utility Cutouts Medium-Voltage Utility Fuses Medium-Voltage Utility Surge Arresters Medium-Voltage Utility Reclosers Site Grounding Communications Distribution Optical Fiber Communications Distribution Cabling Microwave Transmitters and Receivers UHF/VHF Transmitters and Antennas Transportation Transportation Rail Tracks Monorails Funiculars Aerial tramways Transportation Signaling and Control Equipment Roadway Signaling and Control Equipment Railway Signaling and Control Equipment Airfield Signaling and Control Equipment Traffic Signals Railway Signals Airfield Signals Operating Bridge Signals Roadway Construction Passenger Boarding Bridges Baggage Conveying Equipment Waterway and Marine Construction Waterway and Marine Construction Operation and Maintenance of Waterway and Marine Construction Operation and Maintenance of Coastal Construction Operation and Maintenance of Waterway Construction P a g e 13

14 Waterway Dredging Preservation of Water Courses Common Work Results for Waterway and Marine Construction Signaling Equipment for Waterways Marine Signaling Equipment Signaling Equipment for Dams Marine Navigation Equipment Hydraulic Fabrications Hydraulic Gates Hydraulic Valves Dredging Shoreline Protection Underwater Construction Underwater Pipeline Construction Underwater Foundation Construction Underwater Structures Construction Underwater Waterproofing Marine Specialties Dam Construction and Equipment Process Integration Process Integration Gas Vapor Process Piping Compressed Air Process Piping Vacuum Systems Process Piping Water Process Piping Primary Process Measurement Devices Primary Control Valves Analog Controllers Chart Recorders Process Control Panels and Hardware Liquids Process Piping Bulk Materials Piping and Chutes Commissioning and Process Systems Instrumentation and Control for Process Systems Process Control Wiring Process Control Junction Boxes Process Control Software Reports Process Control Auxiliary Devices Material Processing and Handling Equipment Material Processing and Handling Equipment Operation and Maintenance of Material Processing and Handling Equipment Bulk Material Processing Equipment Bulk Material Conveyors Bulk Material Feeders Piece Material Handling Equipment Piece Material Conveyors Postal Conveyors Cranes and Hoists Cranes Bridge Cranes Gantry Cranes Jib Cranes Mobile Cranes Tower Cranes Hoists Derricks Lifting Devices Specialty Material Handling Equipment Process Heating, Cooling, and Drying Equipment Process Heating, Cooling and Drying Equipment Operation and Maintenance of Process Heating, Cooling, and Drying Equipment Process Heating Equipment Process Boilers Process Heaters Solar Process Heaters Industrial Heat Exchangers and Recuperators Industrial Furnaces P a g e 14

15 Process Gas and Liquid Handing, Purification, and Storage Equipment Process Gas and Liquid Handling, Gas Process Equipment Purification, and Storage Equipment Process Air and Gas Filters Common Work Results for Gas Liquid Handling Equipment Handling Equipment Liquid Pumps Common Work Results for Liquid Liquid Process Equipment Handling Equipment Process Liquid Filters Common Work Results for Gas and Gas and Liquid Purification Equipment Liquid Storage Gas and Liquid Storage Gas Compressors Pollution and Waste Control Equipment Pollution and Waste Control Equipment Water Pollution Control Equipment Water Pollution Containment and Cleanup Equipment Aeration Water Treatment Equipment Water Treatment Clarifiers Water Treatment Pumps Water Filters Water Filter Presses Water Treatment Chemical Feed Equipment Water Flocculators Water Fluoridation Equipment Sludge Treatment and Handling Equipment for Water Treatment Systems Sludge Incinerators Solid Waste Control Equipment Electrical Power Generation Electrical Power Generation Operation and Maintenance of Electrical Power Generation Common Work Results for Electrical Power Generation Wind Energy Electrical Power Generation Equipment Wind Turbines Electrical Power Generation Equipment Nuclear Fuel Plant Electrical Power Generation Equipment Solar Energy Collectors Electric Power Control Equipment Electrical Power Generation Testing NAICS Codes Electrical Supplies Concrete Supplies Building Materials Supply Dealer Bonding Insurance Agency and Brokerage Real Estate Asset Management Attorney Services Accounting Services CPA Services Engineering Services Financial Management Consulting Architectural Services Landscape Architectural Services Computer Systems Design Services Business Management Consulting Services Safety Consulting Services Business Research and Development Services Employment Placement Agencies Professional and Management Development Training P a g e 15

16 If you know your NAICS Code and would like to have it listed, please provide the code number and code description below: P a g e 16

DUKE UNIVERSITY CONSTRUCTION STANDARDS

DUKE UNIVERSITY CONSTRUCTION STANDARDS 1 00 01 10 Table of Contents DIVISION 00: PROCUREMENT AND CONTRACTING REQUIREMENTS 00 01 10 Table of Contents 06.17.2014 00 21 13 Instructions to Bidders 11.08.2013 00 22 13 Supplementary Instructions

More information

SUB-CONTRACTOR PRE-QUALIFICATION FORM

SUB-CONTRACTOR PRE-QUALIFICATION FORM CONTACT INFORMATION Company Contact Person: Title: Street Address: Suite No.: EXPERIENCE City: Zip: 1. Please check the CSI Codes applicable to your business: 02 00 00 Existing Conditions 02 20 00 Assessment

More information

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT TABLE OF CONTENTS INTRODUCTORY INFORMATION 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Notice to Bidders

More information

UGA DESIGN & CONSTRUCTION SUPPLEMENTAL GENERAL REQUIREMENTS & STANDARDS TABLE OF CONTENTS

UGA DESIGN & CONSTRUCTION SUPPLEMENTAL GENERAL REQUIREMENTS & STANDARDS TABLE OF CONTENTS Table of Contents Introduction Changes from September 16, 2013 version to January 16, 2015 version Supplemental General Requirements (asterisk * indicates revised) 00 00 02 Terms * 00 00 03 Modifications

More information

UGA DESIGN & CONSTRUCTION SUPPLEMENTAL GENERAL REQUIREMENTS & STANDARDS TABLE OF CONTENTS

UGA DESIGN & CONSTRUCTION SUPPLEMENTAL GENERAL REQUIREMENTS & STANDARDS TABLE OF CONTENTS Table of Contents Introduction Changes from August 1, 2016 version to April 30, 2018 Supplemental General Requirements (asterisk * indicates revised) 00 00 02 Terms 00 00 03 Modifications to General Requirements

More information

FACILITY COMPONENTS - MIDDLE SCHOOL

FACILITY COMPONENTS - MIDDLE SCHOOL SITE AREAS Parking and Access - Buses 4.0 2.0 0.59 Parking and Access - Serv. / Delivery 3.0 1.0 0.22 Parking and Access - Staff 4.0 3.0 0.89 Parking and Access - Visitors 4.0 3.0 0.89 Parking and Access

More information

STANDARD PLAN RELEASE SUMMARY (SPR)

STANDARD PLAN RELEASE SUMMARY (SPR) STANDARD PLAN RELEASE SUMMARY (SPR) MFD/ Architecture, Engineering, and Construction Division Documents: Release Date: April 2012 C = M = RI = B = D = CM = MO = Church Master Specifications Below is a

More information

ING CITY COUNCIL AGENDA REPORT. Honorable Mayor and City Council Members. Director of Public Works - Utilities. Final Payment Applications

ING CITY COUNCIL AGENDA REPORT. Honorable Mayor and City Council Members. Director of Public Works - Utilities. Final Payment Applications City of RED W1' ING CITY COUNCIL AGENDA REPORT TO: Honorable Mayor and City Council Members FROM: Bob Stark Deputy Director of Public Works - Utilities Agenda Item No.: 8- M Meeting Date: September 25,

More information

Plumbing All plumbing 25 years B_Plumb25

Plumbing All plumbing 25 years B_Plumb25 Assigned Asset Buildings and Building Components Building Structures Reinforced Concrete Buildings 40 years B_Bldg40 Building Structures Outdoor stadiums 40 years B_Bldg40 Building Structures Multilevel

More information

University of Maryland UB USPS Maintenance Facility Remaining Bid Packages

University of Maryland UB USPS Maintenance Facility Remaining Bid Packages University of Maryland UB USPS Maintenance Facility Remaining Bid Packages Procurement Office: University of Maryland, Baltimore Owner: University of Baltimore Design-Build Contractor: The Whiting-Turner

More information

HAYSVILLE USD 261 Preliminary Project Timeline

HAYSVILLE USD 261 Preliminary Project Timeline HAYSVILLE USD 261 Preliminary Project Timeline 2015 2016 2017 2018 Package J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D J F M A M J J A S O N D June 9th Election 1 Campus High School ##

More information

Tier IV Standards as Specified in the TIA 942 Document

Tier IV Standards as Specified in the TIA 942 Document S No Architectural Proximity of visitor parking to data 18.3 m / 60 ft minimum separation with physical barriers to prevent vehicles from 1 center perimeter building walls driving closer 2 Building Construction

More information

University of Missouri System Accounting Policies and Procedures

University of Missouri System Accounting Policies and Procedures University of Missouri System Accounting Policies and Procedures Policy Number: APM-20.16 Policy Name: Schedule of Depreciable Lives The following is a schedule of depreciable lives for those Capital categories,

More information

Unified Facilities Guide Specifications (UFGS)

Unified Facilities Guide Specifications (UFGS) Unified Facilities Guide Specifications (UFGS) Quarterly Update - February 24, 2010 UFGS MASTER (02-24-2010) 15557 KB UFGS in PDF - All sections combined into one document. (02-2010) PDF 51088 KB, 21342

More information

OFFICE OF EDUCATIONAL FACILITIES SECTION 453 APPLICATION MATRIX

OFFICE OF EDUCATIONAL FACILITIES SECTION 453 APPLICATION MATRIX 453.1 Scope: Public educational facilities X X X 453.2 Public schools and Florida colleges general requirements X X X 453.2.1 Owner X X X 453.2.2 Exemption from local requirements X X X 453.3 Code enforcement

More information

NATIONAL DEMOLITION ASSOCIATION PROJECT PRE-START SURVEY

NATIONAL DEMOLITION ASSOCIATION PROJECT PRE-START SURVEY NATIONAL DEMOLITION ASSOCIATION PROJECT PRE-START SURVEY PROJECT INFORMATION Project Name Project Number Project Location City Legal Description: Plat # State Zip Code County Client Client Address Contact(s)

More information

A/E REVIEW CHECKLIST TELECOMMUNICATIONS SYSTEMS

A/E REVIEW CHECKLIST TELECOMMUNICATIONS SYSTEMS A/E REVIEW CHECKLIST TELECOMMUNICATIONS SYSTEMS May 1, 2016 Reviewers should - Be aware that these checklists are not allinclusive but only provide important review items. Reviewers should - Use Checklists

More information

DDDM 45 (40-60 TPH) DDDM 60 ( TPH) COLD AGGREGATE FEEDER. Auxiliary belt No. of bins. Gathering conveyor reduction gear

DDDM 45 (40-60 TPH) DDDM 60 ( TPH) COLD AGGREGATE FEEDER. Auxiliary belt No. of bins. Gathering conveyor reduction gear I TECHNICAL SPECIFICATIONS ROAD BUILDING DDDM 45 (40-60 TPH) DOUBLE DRUM ASPHALT PLANT - DDDM 50 (60-90 TPH) DDDM 60 (90-120 TPH) COLD AGGREGATE FEEDER Stationary four bin cold aggregate feeder unit is

More information

Pipeline engineer competency standards list: onshore sector

Pipeline engineer competency standards list: onshore sector Pipeline engineer competency standards list: onshore sector ID Competency area/competency Gen Des Cons Ops Level General engineering GE001 Engineering degree in a relevant discipline x Core GE002 Pipeline

More information

PREFABRICATED SUBSTATIONS AND E-HOUSES. tgood.com. Energy, Fast!

PREFABRICATED SUBSTATIONS AND E-HOUSES. tgood.com. Energy, Fast! PREFABRICATED SUBSTATIONS AND E-HOUSES tgood.com Energy, Fast! Global leader in prefabricated substations and E-House systems PRODUCT OVERVIEW Fully integrated prefabricated substations and E-House systems.

More information

CONSTRUCTION & DEVELOPMENT MANUAL SUMTER COUNTY, FLORIDA

CONSTRUCTION & DEVELOPMENT MANUAL SUMTER COUNTY, FLORIDA CONSTRUCTION & DEVELOPMENT MANUAL SUMTER COUNTY, FLORIDA Original: June 1, 2004 Revised: May 31, 2005 Revised: August 8, 2006 Revised: September 1, 2006 Revised: August 20, 2007 Revised: November 1, 2011

More information

ROLLING COUNTER SHUTTERS

ROLLING COUNTER SHUTTERS 500 ROLLING COUNTER SHUTTERS EXCEPTIONAL SECURITY AND AESTHETICS WAYNE DALTON COMMERCIAL DOOR SYSTEMS The Wayne Dalton Rolling Counter Shutter system provides the perfect solution for smaller openings

More information

Appendix C.6. Best Management Practices for Construction Activities

Appendix C.6. Best Management Practices for Construction Activities Appendix C.6 Best Management Practices for Construction Activities In accordance with Section F.2 of San Diego Regional Water Quality Control Board (RWQCB) Order 2001-01 (Permit), the City of La Mesa has

More information

Technology Incubation Center. High Tech Cleanroom Laboratory & Production Facility.

Technology Incubation Center. High Tech Cleanroom Laboratory & Production Facility. High Tech Cleanroom Laboratory & Production Facility www.technologyincubationcenter.com Jay Chmieleski 612 275 3775 mobile Dan Friedner FOR SALE OR LEASE Technology Incubation Center VADNAIS HEIGHTS, MINNESOTA

More information

29 June Termination of Tables 2, 3 and 4 P0151

29 June Termination of Tables 2, 3 and 4 P0151 29 June 2017 Termination of Tables 2, 3 and 4 P0151 The price indices for materials used in certain industries (Table 3) and selected materials (Table 4) were temporarily suspended from publication in

More information

Why WeWork. WeWork Ginza 6- Tokyo

Why WeWork. WeWork Ginza 6- Tokyo Why WeWork Make real estate flexible Access great buildings Increase capital efficiency Get up and running fast Attract and retain top talent Grow globally at your own pace WeWork Ginza 6- Tokyo WHAT IS

More information

CIP # Category Bldg. / Room CIP15 PROJECTS as approved by the College Governing Council, September 2014 GOVERNMENT DESCRIPTION Estimated Cost 15.01 Safety & Security Building B [RENOVATIN] To improve Student

More information

2012 Bond Issue Completed Projects Identified and/or Funded from 2012 Bond Issue Proceeds

2012 Bond Issue Completed Projects Identified and/or Funded from 2012 Bond Issue Proceeds d Projects and/or 2012 Bluffsview Elementary Interior Painting 100 2012 Bluffsview Elementary Replace High Security Key system 100 2012 Bluffsview Elementary Exterior Tuckpointing and Paint 100 2012 Bluffsview

More information

TEA, Inc. CORPORATE HEALTH AND SAFETY PROGRAM

TEA, Inc. CORPORATE HEALTH AND SAFETY PROGRAM CORPORATE HEALTH AND SAFETY PROGRAM Updated June 24, 2013 August 12, 2013 Prepared by 10636 Linkwood Court Baton Rouge, Louisiana 70810 Phone: (225) 767-3880 Fax: (225) 767-3883 TABLE OF CONTENTS Section

More information

It is acceptable to place all required information in the main element (such as G4010) and delete the sub-elements provided in this template.

It is acceptable to place all required information in the main element (such as G4010) and delete the sub-elements provided in this template. 6. ENGINEERING SYSTEMS REQUIREMENTS G40 SITE ELECTRICAL UTILITIES SYSTEMS REQUIREMENTS SITE ELECTRICAL UTILITIES TEMPLATE 02/18 Instructions for using this template: There are template files for each UNIFORMAT

More information

STATE OF CONNECTICUT DEPARTMENT OF CONSUMER PROTECTION 450 Columbus Blvd, Suite 901 Hartford, CT 06103

STATE OF CONNECTICUT DEPARTMENT OF CONSUMER PROTECTION 450 Columbus Blvd, Suite 901 Hartford, CT 06103 STATE OF CONNECTICUT DEPARTMENT OF CONSUMER PROTECTION 450 Columbus Blvd, Suite 901 Hartford, CT 06103 RESIDENTIAL PROPERTY CONDITION DISCLOSURE REPORT The Uniform Property Condition Disclosure Act (Connecticut

More information

List of forms CLAP/WGP by subject /68/UE

List of forms CLAP/WGP by subject /68/UE List of forms CLAP/WGP by subject - 2014/68/UE Subject Assembly - Assembly including an item of pressure equipment placed on the market before 29 May 2002 in compliance with national pre-ped regulations

More information

3a. IEM Indoor Metal Clad Medium Voltage Switchgear 25KV a. Section INDOOR METAL CLAD MEDIUM VOLTAGE SWTICHGEAR (Std.

3a. IEM Indoor Metal Clad Medium Voltage Switchgear 25KV a. Section INDOOR METAL CLAD MEDIUM VOLTAGE SWTICHGEAR (Std. 3a. IEM Indoor Metal Clad Medium Voltage Switchgear 25KV 16346-1 3a. Section 16346 INDOOR METAL CLAD MEDIUM VOLTAGE SWTICHGEAR (Std. Relays) Part 1 General 1.1 CONDITIONS AND REQUIREMENTS: A. Refer to

More information

SECTION ENCLOSED SWITCHES AND CIRCUIT BREAKERS

SECTION ENCLOSED SWITCHES AND CIRCUIT BREAKERS SECTION 262816 - ENCLOSED SWITCHES AND CIRCUIT BREAKERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

FFI. Advances in Medium and Low Voltage Power Distribution ESS Metron Expo and Technical Seminars. Presented By: Greg Pelster & Robert Schmid

FFI. Advances in Medium and Low Voltage Power Distribution ESS Metron Expo and Technical Seminars. Presented By: Greg Pelster & Robert Schmid Advances in Medium and Low Voltage Power Distribution ESS Metron Expo and Technical Seminars Presented By: Greg Pelster & Robert Schmid FFI Ferrie, Franzmann Industries LOW VOLTAGE SWITCHGEAR & LOW VOLTAGE

More information

Karvo Paving Company Hudson Drive Stow, OH Unit Price Labor & Material Total Unit Price Labor Unit Price Material

Karvo Paving Company Hudson Drive Stow, OH Unit Price Labor & Material Total Unit Price Labor Unit Price Material ITEM SPEC CMS DESCRIPTION QUANTITY Labor Labor Labor 1 201 ODOT CLEARING AND GRUBBBING 1 $13,000.00 $0.00 $13,000.00 $13,000.00 $6,800.00 $10,200.00 $17,000.00 $17,000.00 $75,000.00 $0.00 $75,000.00 $75,000.00

More information

DISTRIBUTION OF QUANTITIES

DISTRIBUTION OF QUANTITIES DISTRIBUTION OF QUANTITIES Index: 1 Table of Contents - Distribution of Quantities R.I. Contract - 2018-CB-059 Description Page 201.0415 REMOVE AND DISPOSE GUARDRAIL AND POST ALL TYPES 1 201.9901 REMOVE

More information

TABLE OF CONTENTS. Section 2.0 GENERAL PLAN REQUIREMENTS 05/2011. Section 100 ROADWAY DESIGN 01/2016

TABLE OF CONTENTS. Section 2.0 GENERAL PLAN REQUIREMENTS 05/2011. Section 100 ROADWAY DESIGN 01/2016 TABLE OF CONTENTS The City Standard Manual was revised in 2010. Please see dates in the revised column for details that have been modified after 2010. PART 1 - DESIGN STANDARDS Section 1.0 ENGINEERING

More information

Facilities Department Town of Duxbury, MA

Facilities Department Town of Duxbury, MA Facilities Department Town of Duxbury, MA FY18 Capital Project Request Presentation To The Board of Selectmen, Finance, & Fiscal Advisory Committee s Duxbury Senior Center November 14, 2016 Prepared and

More information

SECTION PANELBOARDS

SECTION PANELBOARDS SECTION 16450 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes requirements for panelboards providing fault interrupting capability and overcurrent protective devices. 1.02 REFERENCE STANDARDS A.

More information

Board Presentation 12 December Capital Project A Sewer, Roof, Security, Technology and Energy Project. Thursday, 12 December 2013

Board Presentation 12 December Capital Project A Sewer, Roof, Security, Technology and Energy Project. Thursday, 12 December 2013 Board Presentation 12 December 2013 A Sewer, Roof, Security, Technology and Energy Project 2013 Thursday, 12 December 2013 Project Consulting Team Stieglitz Snyder Architecture Architecture Bernard P.

More information

Specification. Radiamatic Detectors and Accessories

Specification. Radiamatic Detectors and Accessories 4/92 Page 1 of 8 Radiamatic Detectors and Accessories Specification Function The Radiamatic temperature detector generates an emf proportional to the temperature of the object sighted. It is used with

More information

EXPERIS DATA CENTER Valley Pike, Middletown, VA. Location Map & Aerials. Building Profile & Facts. Floor Plans

EXPERIS DATA CENTER Valley Pike, Middletown, VA. Location Map & Aerials. Building Profile & Facts. Floor Plans Building Profile & Facts 1 Location Map & Aerials 4 Floor Plans 5 BUILDING PROFILE & FACTS SHEET 1 Property Name Address Tax Map & Parcel Number Land Area Building Size Experis Data Centers, LLC 8209 Valley

More information

Current Control Houses

Current Control Houses Current Control Houses Building Shielding db Type Example 0 Transparent Wood 5 Poor Masonry 10 Moderate Concrete 20 Good Metal Siding 30 Metal All-Metal Current Control Houses Points of Entry Electrical

More information

nspire n ELECTROMECHANICAL WORKS LLC

nspire n ELECTROMECHANICAL WORKS LLC Our Key Services MECHANICAL, ELECTRICAL & PLUMBING SERVICES MANUFACTURING MAGNETS PRODUCTS & VACCUM PUMPS IT, INDUSTRIAL, COMMERCIAL & HOME AUTOMATION SOLUTIONS CCTV, HR MANAGEMENT, SOFTWARE DEVELOPMENT,

More information

CPCCCA2002B Matrix Map

CPCCCA2002B Matrix Map CPCCCA2002B Matrix Map (Generated Monday, 24 July 2017) ELEMENTS AND PERFORMANCE CRITERIA Element Peformance Criteria Task / Question Map Plan and prepare. Work instructions and operational details are

More information

PROJECT CONSTRUCTION SUMMARY

PROJECT CONSTRUCTION SUMMARY 1 Estimate #: 1586 Due Date: 11/13/15 Location: Coralville, Iowa Architect: JLG PROJECT CONSTRUCTION SUMMARY Description Quantity Total Cost Unit Cost Variance 10/20/2015 Estimate Sports Performance Building

More information

Your Solution For Energy and Cost Savings. McQuay Packaged Chiller Plant

Your Solution For Energy and Cost Savings. McQuay Packaged Chiller Plant Your Solution For Energy and Cost Savings McQuay Packaged Chiller Plant Innovative Solutions for Your Chiller Plant McQuay packaged chiller plants provide energy efficient chillers integrated with pumps,

More information

OWNER PROPERTY DISCLOSURE

OWNER PROPERTY DISCLOSURE OWNER PROPERTY DISCLOSURE GENERAL INFORMATION Rental Property Address Owner s Name (First, MI, Last) Nickname Home # Business # Extension Email address Mobile # Pager # Address City State Zip code Name

More information

DISTRIBUTION OF QUANTITIES

DISTRIBUTION OF QUANTITIES DISTRIBUTION OF QUANTITIES Index: 1 Table of Contents - Distribution of Quantities R.I. Contract - 2018-CB-109 Description Page 201.0403 REMOVE AND DISPOSE SIDEWALKS 1 201.0407 REMOVE AND DISPOSE PAVEMENT

More information

UCSD University Centers Long Term Facility Maintenance Plan* Price Center and Student Center FY > FY204-25

UCSD University Centers Long Term Facility Maintenance Plan* Price Center and Student Center FY > FY204-25 UCSD University Centers Long Term Facility Maintenance Plan* Price Center and Student Center FY2015-16 ---> FY204-25 *Lifecycles were estimated using industry standards. Some items may not need attention

More information

Appendix Five-Year Facility Assessment 2009

Appendix Five-Year Facility Assessment 2009 Appendix Five-Year Facility Assessment 2009 Five-Year Facility Assessment 2009 Table of Contents Campus Map Administration Building 1 KJS Library 45 Alumni House 3 Marquette Hall 47 Aquatic Research Laboratory

More information

IXcellerate Moscow One Datacentre - Phase 1 & 2 Overview

IXcellerate Moscow One Datacentre - Phase 1 & 2 Overview Contents 1. Document Purpose... 2 2. Facility Overview... 2 2.1 Technical Space... 2 2.2 Load Density... 2 2.3 Resilience... 2 2.4 Engineering Plant Maintenance & Service Restoration... 3 3. Engineering

More information

Install-It-Yourself Batch Oven Kits

Install-It-Yourself Batch Oven Kits Install-It-Yourself Batch Oven Kits Flexibility with standard assembled or installit-yourself ovens for preheating, drying and curing for applications up to 00 F (260 C). Durability provided from quality

More information

ASHNuN. Fundamentals of HVAC Control Systems. Robert McDowell and Ross Montgomery are the authors of the

ASHNuN. Fundamentals of HVAC Control Systems. Robert McDowell and Ross Montgomery are the authors of the Fundamentals of HVAC Control Systems Robert McDowell and Ross Montgomery are the authors of the 2009 edition of Fundamentals of HVAC Control Systems. This book is a revision of an earlier edition authored

More information

Install-It-Yourself Batch Oven Kits

Install-It-Yourself Batch Oven Kits Install-It-Yourself Batch Oven Kits Flexibility with standard assembled or installit-yourself ovens for preheating, drying and curing for applications up to 00 F (260 C). Durability provided from quality

More information

NZQA registered unit standard version 2 Page 1 of 7. Demonstrate basic knowledge of electronic security data protocols and cabling

NZQA registered unit standard version 2 Page 1 of 7. Demonstrate basic knowledge of electronic security data protocols and cabling Page 1 of 7 Title Demonstrate basic knowledge of electronic security data protocols and cabling Level 3 Credits 15 Purpose This unit standard is for electronic security installers engaged in the installation

More information

The Asia Pacific Center

The Asia Pacific Center The Asia Pacific Center A modern downtown building serving all of Calgary. Managed and Leased by Bow River Management Ltd. About our Building 100 Fourth Avenue SW Located at a prime corner at 4 th Avenue

More information

CONTROLLING ROOFTOP UNIT (RTU) NOISE

CONTROLLING ROOFTOP UNIT (RTU) NOISE HUSHCORE Acoustical Products & Systems Technical Discussion General Information Terminology & Definitions Product Types Treatment Strategies Applications/Uses Industrial Architectural HVAC OEM Environmental

More information

GE Enterprise Solutions. Digital Energy

GE Enterprise Solutions. Digital Energy GE Enterprise Solutions Digital Energy g Digital Energy we protect and connect the world s critical equipment to ensure safe, reliable power Our strength lies in the innovative people who deliver solutions

More information

Table 5.5. Industry Employment Opportunity Grades, 2012: Native Americans

Table 5.5. Industry Employment Opportunity Grades, 2012: Native Americans 5) American Table 5.5 ranks all industries in terms of their overall grade on American employment opportunity. For each industry we also display their grades for the four dimensions of employment opportunity.

More information

Communications Site Installation R56 Installer and Communications Site Inspector/Auditor version COMPETENCY REQUIREMENTS

Communications Site Installation R56 Installer and Communications Site Inspector/Auditor version COMPETENCY REQUIREMENTS Communications Site Installation R56 Installer and Communications Site Inspector/Auditor version COMPETENCY REQUIREMENTS The following is a listing of each topic considered necessary to be included in

More information

A B C D E G H I J K L M N O P Q R S T U V W X Y Gene Dillon Upper Elementray School BID TABULATION ALTERNATES. Alt-2 Alt-2.2 Alt-3.1 Low Bid w/alt 3.

A B C D E G H I J K L M N O P Q R S T U V W X Y Gene Dillon Upper Elementray School BID TABULATION ALTERNATES. Alt-2 Alt-2.2 Alt-3.1 Low Bid w/alt 3. Date: December, 0 Work Scope : -A-Final Cleaning KA Base Apparent Low Alt- Low w/alt Alt- Alt-. Alt- Low w/alt Alt-. Alt-. Alt-. Alt-. Alt- Alt- Alt- Alt- Alt-0 Gym Flooring Flooring Masonry Walls Tile

More information

Twin Core Data Center Munich

Twin Core Data Center Munich Twin Core Data Center Munich T-Systems Data Center Munich Sister Site, Back Up Location/Twin Core DC ALL (Allach) 1st Route: 13km DWDM System 2nd Route: 27km DC EIP (Euro Industrie Park) Point to Point

More information

What Can You Automate? We Sell Robots

What Can You Automate? We Sell Robots AUTOMATION SOLUTIONS What Can You Automate? We Sell Robots Let Numatic Engineering s Value Add Services help keep your resources focused on your company s core business. Assembly Manufacturing Outsourcing

More information

USD 290 High School Bid Date 10/5/2016 BoE Approval 11/03/2016

USD 290 High School Bid Date 10/5/2016 BoE Approval 11/03/2016 Demo Floor slab Site / civil Bid Package 1 Demolition structures removal demo B&R $ 584,655 x x x x $ (229,956) $ 354,699 Eiberger $ 280,000 x $ 78,000 $ 24,000 $ 382,000 Complete Construction Services

More information

June 1, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA

June 1, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA June 1, 2017 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA REVISED AMENDMENT NO.3/ CONTRACT NO. Y16-182 TERM CONTRACT FOR COUNTY WIDE ROOF MAINTENANCE AND REPAIR ADVANCED ROOFING, INC. 200 Northstar

More information

DNG-200 LOW FOG GENERATOR USER MANUAL DNG-200 低煙機使用說明書

DNG-200 LOW FOG GENERATOR USER MANUAL DNG-200 低煙機使用說明書 DNG-200 LOW FOG GENERATOR USER MANUAL DNG-200 低煙機使用說明書 Read and save these insturctions 2008 Antari Lighting & Effects Ltd. User Manual Antari DNG-200 Low fog Generator Congratulations on the purchase

More information

SECTION PROJECTOR LIFTS AND MOUNTS. A. Refer to Section [ Submittal Procedures] [Insert section number and title].

SECTION PROJECTOR LIFTS AND MOUNTS. A. Refer to Section [ Submittal Procedures] [Insert section number and title]. (Specifier Note: The purpose of this guide specification is to assist the Specifier in correctly specifying AeroLift motorized projector lifts and their installation. The Specifier needs to edit these

More information

Tremco FX 130 Heavy Duty Chemical Anchor

Tremco FX 130 Heavy Duty Chemical Anchor Description FX 130 is a heavy duty 2 component vinylester styrene free injection system specially formulated for anchoring threaded bars, reinforcing bars (rebars) and sockets into concrete and most other

More information

TOTAL NUMBER OF UNITS: # NUMBER OF BUILDINGS: # AVERAGE OCCUPANCY RATE: % IS MOTEL SEASONAL? YES NO IF YES, # OF MONTHS OPENED?

TOTAL NUMBER OF UNITS: # NUMBER OF BUILDINGS: # AVERAGE OCCUPANCY RATE: % IS MOTEL SEASONAL? YES NO IF YES, # OF MONTHS OPENED? 1411 SW Morrison Street, Suite 400 Portland, OR 97205-1945 800-527-7397 Fax 800-742-5176 BUSINESS NAME: APPLICANT S NAME: LOCATION OF PREMISES: YEARS OWNED? OWNER MANAGED? IF NO, DESCRIBE MANAGEMENT: YEARS

More information

SECTION SWITCHGEAR

SECTION SWITCHGEAR SECTION 26 23 13 SWITCHGEAR PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections,

More information

Electrical Components and Equipment for General Use Self Inspection Checklist

Electrical Components and Equipment for General Use Self Inspection Checklist Name of School: Optional Information Date of Inspection: Vocational Program/Course/Room: Signature of Inspector: Electrical Components and Equipment for General Use Self Inspection Checklist Guidelines:

More information

Furnace Camera System Operator s Manual. Version

Furnace Camera System Operator s Manual. Version Furnace Camera System Operator s Manual Version 12-2010 Contents 1. Introduction... 2 2. Description... 2 2.1 Model Nomenclature... 2 2.2 Specifications... 3 2.3 Confirmation of Camera Field of View...

More information

DEEM MECHANICAL AND ELECTRICAL COMPANY COMMERCIAL AND INDUSTRIAL 24 HOUR EMERGENCY SERVICE : DEEMFIRST.

DEEM MECHANICAL AND ELECTRICAL COMPANY COMMERCIAL AND INDUSTRIAL 24 HOUR EMERGENCY SERVICE : DEEMFIRST. DEEM MECHANICAL AND ELECTRICAL COMPANY COMMERCIAL AND INDUSTRIAL 24 HOUR EMERGENCY SERVICE : 866.288.2990 SERVICEREQUEST@DEEMFIRST.COM DEEMFIRST.COM Experience HIGHLY TRAINED TECHNICIANS, MULTI-TRADE ABILITY,

More information

PROPERTY PROFILE GRC COMPLEX. South Fir Street - Medford

PROPERTY PROFILE GRC COMPLEX. South Fir Street - Medford GRC COMPLEX South Fir Street - Medford Naumes, Inc. P.O. Box 996 2 Barnett Road Medford, OR 97501 Phone 541.772.6268 Fax 541.772.2135 NO AGENCY, REPRESENTATION OR COMMISSION This Property Profile is being

More information

ELECTRICAL/ELECTRICAL APPARATUS/COMMUNICATIONS EQUIPMENT/HOME ENTERTAINMENT SYSTEMS & SATELLITE DISH INSTALLATION QUESTIONNAIRE

ELECTRICAL/ELECTRICAL APPARATUS/COMMUNICATIONS EQUIPMENT/HOME ENTERTAINMENT SYSTEMS & SATELLITE DISH INSTALLATION QUESTIONNAIRE ELECTRICAL/ELECTRICAL APPARATUS/COMMUNICATIONS EQUIPMENT/HOME ENTERTAINMENT SYSTEMS & SATELLITE DISH INSTALLATION QUESTIONNAIRE 1. General Information Name of Applicant: Website Address: Annual Receipts:

More information

Washington Square FPO. 111 Washington Square > Office Space FOR LEASE > OFFICE SPACE 111 WASHINGTON AVENUE, MINNEAPOLIS, MN 55401

Washington Square FPO. 111 Washington Square > Office Space FOR LEASE > OFFICE SPACE 111 WASHINGTON AVENUE, MINNEAPOLIS, MN 55401 FOR LEASE > OFFICE SPACE Washington Square 111 WASHINGTON AVENUE, MINNEAPOLIS, MN 55401 FPO 111 Washington Square > Office Space HENNEPIN AVE PARKING RAMP > Built in 1987, 111 Washington is part of a three

More information

Multi-Purpose Building

Multi-Purpose Building Multi-Purpose Building Description and Goals Multi-Purpose Rooms should be large enough to accommodate 400-500 students. The main multi-purpose will be acoustically designed primarily for musical performances

More information

Data Centre Infrastructure

Data Centre Infrastructure Data Centre Infrastructure Aisle Containment Solution Aisle Containment is a popular way of cooling high density server installations. Aisle containment can work in two ways: Cold Aisle Containment where

More information

2 Telecommunications Data Center Facility Requirements

2 Telecommunications Data Center Facility Requirements Generic Requirements for Telecommunications Data Center Equipment and Spaces GR-3160-CORE Table of Contents Table of Contents Generic Requirements Notice of Disclaimer..................... iii Preface...........................................

More information

Seychelles Institute of Technology (SIT) Tel , Fax ,

Seychelles Institute of Technology (SIT) Tel , Fax , Seychelles Institute of Technology (SIT) Tel. 248 4601501, Fax 248 4601059, Email: director.sit@eduhq.edu.sc INFORMATION FOR S5 SCHOOL LEAVERS INTRODUCTION The Seychelles Institute of Technology (SIT)

More information

STATE OF NEW JERSEY BUREAUS OF ITS ENGINEERING AND SAFETY & DATA DEVELOPMENT DEPARTMENT OF TRANSPORTATION TRENTON, NEW JERSEY 08625

STATE OF NEW JERSEY BUREAUS OF ITS ENGINEERING AND SAFETY & DATA DEVELOPMENT DEPARTMENT OF TRANSPORTATION TRENTON, NEW JERSEY 08625 September 2011 STATE OF NEW JERSEY BUREAUS OF ITS ENGINEERING AND SAFETY & DATA DEVELOPMENT DEPARTMENT OF TRANSPORTATION TRENTON, NEW JERSEY 08625 MATERIAL SPECIFICATIONS FOR WEIGH-IN-MOTION SYSTEM The

More information

Webb Core Cleanroom Wall System

Webb Core Cleanroom Wall System Webb Core Cleanroom Wall System PART 1 GENERAL 1.1 WORK INCLUDED A. This Section specifies the requirements necessary to furnish, install and complete a cleanroom wall system (CRW) including, but not limited

More information

UniCom Ltd. is global end-to-end services provider to telecom infrastructure industry.

UniCom Ltd. is global end-to-end services provider to telecom infrastructure industry. UniCom Ltd. is global end-to-end services provider to telecom infrastructure industry. Vision; To emerge as a preferred partner of telecom equipment manufacturers and service providers, by offering end

More information

Mission Critical Facilities & Technology Conference November 3, 2011 Cooling 101. Nick Gangemi Regional Sales Manager Data Aire

Mission Critical Facilities & Technology Conference November 3, 2011 Cooling 101. Nick Gangemi Regional Sales Manager Data Aire Mission Critical Facilities & Technology Conference November 3, 2011 Cooling 101 Nick Gangemi Regional Sales Manager Data Aire Agenda Exactly what are we talking about ASHRAE TC 9.9 Design best practices

More information

ANSI/TIA/EIA-568-B Cabling Standard NOTE

ANSI/TIA/EIA-568-B Cabling Standard NOTE 95 ANSI/TIA/EIA-569-A Though the ANSI/TIA/EIA-568-B Standard describes the subsystems of a structured cabling system, the TIA has published a more thorough document called ANSI/TIA/EIA-569-A Commercial

More information

Presented by: Oscar Araujo Photovoltaic Solutions Manager. 4 th Canadian German Solar PV Conference March 2 nd 2011

Presented by: Oscar Araujo Photovoltaic Solutions Manager. 4 th Canadian German Solar PV Conference March 2 nd 2011 Photovoltaic Solutions Make the most of your solar PV project Presented by: Oscar Araujo Photovoltaic Solutions Manager 4 th Canadian German Solar PV Conference March 2 nd 2011 Agenda Solutions for Renewable

More information

A Review of the National Electrical Code Articles that Affect Data Center Design By Leo Marsh, PE, RCDD JACOBS (CH2M)

A Review of the National Electrical Code Articles that Affect Data Center Design By Leo Marsh, PE, RCDD JACOBS (CH2M) A Review of the National Electrical Code Articles that Affect Data Center Design By Leo Marsh, PE, RCDD JACOBS (CH2M) Safety Moment Here are five quick tips to remember before leaving your house and while

More information

Our Power & Control line of Business offers solutions that safely distribute power to your home or business. Our product range includes Low/Medium

Our Power & Control line of Business offers solutions that safely distribute power to your home or business. Our product range includes Low/Medium Our Power & Control line of Business offers solutions that safely distribute power to your home or business. Our product range includes Low/Medium Voltage Panels and Enclosures designed and built with

More information

Power Control Systems

Power Control Systems Power Control Systems Power Control Systems for Virtually Any Control Strategy Power Control Systems for: Emergency generator control Emergency generator control with load demand sensing Emergency generator

More information

SECTION IDENTIFICATION FOR ELECTRICAL SYSTEMS

SECTION IDENTIFICATION FOR ELECTRICAL SYSTEMS SECTION 26 05 53 IDENTIFICATION FOR ELECTRICAL SYSTEMS PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Nameplates. 2. Labels. 3. Wire markers. 4. Conduit markers. 5. Underground Warning Tape. 6. Lockout

More information

Engineering SCADA (Introduction) Dr. Sasidharan Sreedharan

Engineering SCADA (Introduction) Dr. Sasidharan Sreedharan Engineering SCADA (Introduction) Dr. Sasidharan Sreedharan www.sasidharan.webs.com Contents What is a SCADA System Simple SCADA System lay out and working Components of a SCADA System Levels of SCADA -

More information

DEPARTMENT OF ENERGY, LABOR, AND ECONOMIC GROWTH BUREAU OF FIRE SERVICES FIRE PREVENTION CODE

DEPARTMENT OF ENERGY, LABOR, AND ECONOMIC GROWTH BUREAU OF FIRE SERVICES FIRE PREVENTION CODE DEPARTMENT OF ENERGY, LABOR, AND ECONOMIC GROWTH BUREAU OF FIRE SERVICES FIRE PREVENTION CODE (By authority conferred on the bureau of fire services by section 3c and section 3e of 1941 PA 207 and ERO

More information

A B C D E G H I J K L M N O P Q R S T U V W X Y Z AA AB AC AD AE AF AG Gene Dillon Upper Elementray School BID TABULATION Bemidji, MN ALTERNATES

A B C D E G H I J K L M N O P Q R S T U V W X Y Z AA AB AC AD AE AF AG Gene Dillon Upper Elementray School BID TABULATION Bemidji, MN ALTERNATES Date: December, 01 Work Scope / Description Work Scope : 1-A-Final Cleaning DLR KA Base Apparent Low Alt-1 Low w/alt 1 Alt- Low w/alt Alt-. Low w/alt. Alt- Low w/alt Alt-. Alt-. Alt-.1 Alt-. Alt- Alt-

More information

Assembly and Maintenance

Assembly and Maintenance Assembly and Maintenance Assembly and Maintenance Test Pumps Pressure Test Pumps Tests all types of installations such as heating, compressed air and refrigeration systems, oil installations, fire lines

More information

SpecLink-E Catalog Listing As Of: November, 2015

SpecLink-E Catalog Listing As Of: November, 2015 Total Sections: 472 DIVISION 00 PROCUREMENT AND CONTRACTING REQUIREMENTS Catalog Updated 00 0101 - BSD Project Title Page For the project name, location, Owner, project specific information. ASCLME# Mar

More information

DIVISION 27 COMMUNICATIONS

DIVISION 27 COMMUNICATIONS DIVISION 27 COMMUNICATIONS 27 00 00 COMMUNICATIONS 27 01 00 Operation and Maintenance of Communications Systems 27 01 10 Operation and Maintenance of Structured Cabling and Enclosures 27 01 20 Operation

More information

9500 Belmont Avenue ٠ Franklin Park, Illinois (847) , FAX # (847)

9500 Belmont Avenue ٠ Franklin Park, Illinois (847) , FAX # (847) DEPARTMENT OF INSPECTIONAL SERVICES FEE STRUCTURE 11-1-1: SCHEDULE A; ACTIVITIES REGULATED BY DEPARTMENT OF INSPECTIONAL SERVICES: The following is a fee schedule relative to construction, improvements

More information

LEARN INSTA COST A Software for Estimating Project Cost & Tender SOQ Instantly

LEARN INSTA COST A Software for Estimating Project Cost & Tender SOQ Instantly LEARN INSTA COST A Software for Estimating Project Cost & Tender SOQ Instantly By : Y.A. Agboatwala & Fatima.Y. Agboatwala 1802, Jamuna Amrut, 219, Patel Estate, S.V.Road, Jogeshwari(W), Mumbai - 400102

More information