FLORIDA STATE UNIVERSITY MASTER PLAN 10 Utilities

Similar documents
GOAL 1: To develop an on-campus chilled water generation and distribution system that adequately serves the future campus population needs.

a) Provision of a chilled water supply b) Provision of electric power supply and other fuels

Energy Action Plan 2015

Comprehensive Energy Management & Utility Master Plan

CASE STUDIES. Brevard Community College: Florida Power & Light. Cape Canaveral Air Force Station: NORESCO

IDEA Campus Energy UNIVERSITY OF MARYLAND Securing Our Networked Utility Infrastructure

City Reso-A Requests FY 2018 (City Council and Borough Presidents)

College Statement and Statistics Campus Site Map Five-Year Capital Plan Request FY through FY

El Camino Community College El CAPITAL CONSTRUCTION PROJECTS 2013

Critical Maintenance for Community Colleges bonded Health and Safety bonded Facilities Preservation bonded

Concord Hospital Infrastructure Upgrades Increased Energy and Operating Efficiencies with a Tangible Reduction in Operating Costs

Construct Chiller Plant, Phase I

Must possess Universal EPA Section 608 certification; OR Type I AND Type II EPA Section 608 certification.

LIFE CYCLE COST ANALYSIS, CRITERIA AND DATA SHEETS DOCUMENT NUMBER: APPLICATION: ELEMENTARY, MIDDLE AND HIGH SCHOOL

Utility System Infrastructure

Georgia Institute of Technology Advanced Computing Technology Building. Draft Program. Vision Program Outline

Agenda. What would a 30% reduction in energy use do for your budget? The next generation of energy and infrastructure projects in MI

1200 West 7th Street, Los Angeles, CA Smart.

Beverly D. Grappone Hall Certified LEED Silver Home of NHTI s State-of-the Art Nursing Simulation Center

Five-Year Capital Plan Request FY through FY

Washington Square FPO. 111 Washington Square > Office Space FOR LEASE > OFFICE SPACE 111 WASHINGTON AVENUE, MINNEAPOLIS, MN 55401

PUBLIC WORKS ORGANIZATIONAL CHART

Maximizing the University s Physical Assets (Part I): Facility Condition Assessment

Digital Realty Data Center Solutions Digital Chicago Datacampus Franklin Park, Illinois Owner: Digital Realty Trust Engineer of Record: ESD Architect

Driving Proactive Facility Operations with Automated HVAC Diagnostics

White Paper: Data Center Capacity Management Provides New Business Opportunities & Efficiency at State-of-the-Art One Wilshire June 8, 2017

UESCs and VA s Performance Contracting Program Lara Spader Department of Veterans Affairs August 17, 2017

Western Illinois University Quad Cities FACILITIES. FY17 Planning and Accomplishments. Submitted by: William Brewer Director of Facilities Quad Cities

LEADERS IN MEP, COMMISSIONING & ICT FOR BOSTON AND THE NORTHEAST

Item IV Transfer of On-site Natural Gas Distribution System

50 Years of Facility Operations or Rebuilding from the inside out

CHAPTER/REGIONAL TECHNOLOGY AWARD - SHORT FORM

Gold: points Platinum: 80+ points. Certified: points Silver: points

Annual Report for the Utility Savings Initiative

New Wisconsin Energy Code: What it Means for Me?

College Statement and Statistics Campus Site Map Five-Year Capital Plan Request FY through FY

John Strybos, PE OCTOBER 11, 2016

LaGuardia Community College

Campus Electrical System Renewal, Reliability & Safety Presented by Andrew Hay, PE

Strategic Planning Electrical, Lighting and Communications October 24 th, 2017

BOARD OF TRUSTEES THE CITY UNIVERSITY OF NEW YORK

Emergency Support Function (ESF) #14a: UTILITIES: Central Electric & Steam. ESF Activation Contact: Cornell IPP Customer Service (607)

Silicon Valley Power Data Center Program Rebate Application

CHILLED WATER. HIGH PRECISION AIR CONDITIONERS, FROM 7 TO 211 kw

Ft Worth Data Center Power Metering for Real Time PUE Calculation. Scope of Work

FY Janette Pell Department Director. Information and Communications Technology. Administration and Finance

Achieving Operational Excellence

CNM Master Plan. Total Project Budget Section A - Proposed Facilities and IT Maintenance Projects for FY18

Track 11, Session 4 -- Campus Utility Distribution Systems

Engineered Energy Solutions An Overview. Controls, Automation and Energy Conservation

Federal Utilities, Postage and Communication Costs FY FY FY 2003 Request. FY 2002 Actual

Data Center Energy Savings By the numbers

RCMP Capital Improvements

T66 Central Utility Building (CUB) Control System Reliability, Optimization & Demand Management

Chiller Plant Optimization: A Case Study

Let s face it addressing the growing list of deferred

Data Center Facility Analysis Project. Final Presentation Wednesday, July 22, :30 3:30 PM

Deferred Maintenance Backlog is $907M State-supported $738M Exterior infrastructure $169M

Sustainable IT at Stanford

Fair City Plaza. Task: Diagnose problems, recommend improvements for small municipal district cooling system

Marshall University Information Technology Council. Procedure ITP-16 IT INFRASTRUCTURE AUTHORIZATION PROCEDURE

WAYNE COUNTY COMMUNITY COLLEGE DISTRICT FROM VISION TO REALITY

DATA MSP RD AVE S MINNEAPOLIS, MN MINNEAPOLIS, MINNESOTA

Agenda Item No. AGENDA ITEM BRIEFING

Metropolitan Council. Transportation Division Proposed Transit Capital Program

IXcellerate Moscow One Datacentre - Phase 1 & 2 Overview

FOR SALE OR LEASE CORPORATE RIDGE I FORMER INTEL FAB 23 BUILDING 1615 GARDEN OF THE GODS ROAD COLORADO SPRINGS, CO The Flexible Fab Building

Run a Smart Workplace Introducing the Digital Building. Digital Building Solutions

18.1 Provision of Premises 18.2 Maintenance and Improvement of Premises

Implementation Plan FY

A/E REVIEW CHECKLIST TELECOMMUNICATIONS SYSTEMS

Course Description. Audience. Prerequisites. : Course CTDC : Certified TIA-942 Design Consultant. Course Outline :: CTDC ::

Director of Public Works/City Engineer. Secretary. Word Processor. Streets and Facilities Supervisor. Traffic Signal Technician.

STATE DATA CENTER DRAFT PROPOSAL. STATE OF OREGON DATA CENTER 28 October 2016

Deferred Maintenance Backlog is $907M State-supported $738M Exterior infrastructure $169M

Business Opportunities with VISN 23 Capital Assets Management. Cynthia A. Doolittle, PE Capital Assets Manager Eagan, MN (VISN 23)

HIGH DENSITY DATACOM INTEGRATED COOLING SYSTEM.

Analysis of FY 2012 Physical Plant Rates (numbers in thousands) FY 2012

Green IT Project: The Business Case

Technology Incubation Center. High Tech Cleanroom Laboratory & Production Facility.

3300 kw, Tier 3, Chilled Water, 70,000 ft 2

Municipal Service Park 3 December Consolidation of City services to one centralized complex

Improving Situational Awareness for Utilities Operators and Energy Managers

Demand for sustainable power is growing worldwide. Energy producers are broadening their offerings for a quickly evolving marketplace.

Technology Master Plan Proposal

PISCATAWAY, NEW JERSEY NJ1 DATA CENTERS POWERED BY TRUST

Monthly Status Briefing. March 2012

Energy Performance Contracting

It is acceptable to place all required information in the main element (such as G4010) and delete the sub-elements provided in this template.

Senate Comprehensive Energy Bill

SCHENDT ENGINEERING PRIOR EXPERIENCE

Metering and Energy Retrofits for the GSA

KEEPING YOU OUT IN FRONT

Service Plan for Infrastructure Engineering

How The University of Texas at Austin Optimizes Operational Efficiency with HanAra CASE STUDY

KCTCS Facilities Support Services and Capital Projects

Chiller Replacement and System Strategy. Colin Berry Account Manager

HPE Energy Efficiency Certification Service

Dykin Engineering Part & Services Sdn. Bhd.

Passive RDHx as a Cost Effective Alternative to CRAH Air Cooling. Jeremiah Stikeleather Applications Engineer

Transcription:

UTILITIES ELEMENT NOTE: Unless otherwise noted, the goals, objectives and policies contained in this element shall guide development of the Main Campus and Southwest Campus in Tallahassee as well as the Panama City Campus in Panama City, Florida. STEAM AND CHILLED WATER SUB-ELEMENT Goal 1 To provide heating, ventilation, and air conditioning to meet the future needs of the University. Objective 1A Improve the efficiency and performance of the chilled water system within five years to improve energy efficiency and make energy savings. Policy 1A-1 Continue to monitor improved scheduling of building HVAC operations to reduce chilled water waste during periods when buildings are not in use. Policy 1A-2 Continue to monitor control system technology and modify standard control requirements for buildings and HVAC system types including sequences of operations and typical control points. Policy 1A-3 Continue to document the status of existing chillers, pumps, and piping systems. Include an evaluation of present condition, required repairs and maintenance, operating costs and anticipated remaining life, and evaluate scenarios for supporting proposed expansion. Objective 1B Ensure adequate chilled water production and distribution capacity to meet the future growth of the University. Policy 1B-1 Update the chilled water system load analysis and the distribution system load 10-1

map/analysis at least yearly. The analysis will include all existing facilities and all future development plans. Policy 1B-2 Establish a new utility corridor to serve the proposed classroom/office area north of Parking Garage #4 and the proposed expansion of academic facilities south of Call Street. Policy 1B-3 Establish new utility corridor from the new Satellite Chilled Water Plant II to serve the future classroom complex and student union expansion. Policy 1B-4 Maintain a level of service at the central plant and both satellite plants for chilled water supply of 3.75 tons per 1,000 net square feet. This capacity will be available with one chiller on standby in each chilled water production facility. Policy 1B-5 Update chilled water utility maps on a continuing basis to incorporate new construction. Copies of current maps are available from the Campus Utilities Section in the Facilities Department. Objective 1C Continue to improve the efficiency and performance of the steam system to improve energy efficiency and make energy savings. Policy 1C-1 Continue to inspect all heat exchangers at least twice a year to ensure that hard water is not entering the steam condensate system. Policy 1C-2 Continue to develop and implement improved scheduling of building HVAC operations to reduce steam waste during periods when buildings are not in use. Policy 1C-3 Continue to optimize the steam system pressure to reduce thermal losses during periods of low demand. 10-2

Objective 1D Ensure adequate steam production and distribution capacity to meet future needs of the University. Policy 1D-1 Expand steam distribution piping to provide for future growth into the areas of planned new construction. Coordinate timing with development planning of new areas. Policy 1D-2 Update the steam distribution maps and flow analysis at least yearly to verify adequacy of steam distribution capacity. Policy 1D-3 Maintain a level of service at the central plant of 55 pounds per hour of steam per 1,000 net square feet. This capacity will be available with one boiler on standby. Policy 1D-4 Update steam utility maps on a continuing basis to incorporate new construction. Copies of Current maps are available from the Campus Utilities Section in the Facilities Department. ELECTRICAL POWER AND OTHER FUELS SUB-ELEMENT Goal 2 To provide adequate and safe electric facilities and service to support the mission of the University. Objective 2A To improve the efficiency and performance, reduce system losses of electric distribution system, and to ensure adequate electric distribution capacity and space to meet the future needs of the University. Policy 2A-1 Continue to provide projected electric load data to the local electrical providers in 10-3

Tallahassee and Panama City at least every three years or when significant changes develop. Policy 2A-2 The University shall provide and maintain electrical distribution circuits from the Woodward Avenue Substation in the center of the campus to handle the additional loads for the projected expansions in those areas. Policy 2A-3 The University shall maintain an up-to-date electrical riser diagram of the campus. Policy 2A-4 The University shall provide underground electrical distribution required to accommodate the proposed expansion projects. Policy 2A-5 The University will continue to provide redundant electrical service to all new buildings by creating loop feeds. Policy 2A-6 As new facilities are developed, coordinate conduit and cable routing with routes for mechanical system piping in order to create orderly utility corridors. Policy 2A-7 The University shall continue to maintain a level of service in the main transformers and distribution system to provide 3 KW per 1,000 gross square feet. Policy 2A-8 Update the utility policies and project development manual for architects, engineers, and FSU personnel. Policy 2A-9 Update electrical utility maps on a continuing basis to incorporate new construction. Copies of current maps are available from the Central Utilities and Engineering Services Section in the Facilities Department. 10-4

Objective 2B Improve maintenance and safety procedures relating to the electric distribution systems. Policy 2B-1 Update and expand the preventative maintenance program to inspect the 15 KV equipment (i.e., substation, switches, and transformers) on an annual basis. Policy 2B-2 Continue to study the electrical distribution system every five years to determine if the circuits are evenly balanced. Policy 2B-3 Annually review and update all existing safety and training programs. Objective 2C Establish design standards and operations programs to improve conservation of energy. Policy 2C-1 Pursue state energy office grants to assist in the upgrading of equipment and studying of procedures to save energy. Policy 2C-2 Expand, enhance, and promote existing administrative and operational procedures to conserve energy and minimize future demand, under the leadership of the Central Utilities and Engineering Services Section in the Facilities Department. TELECOMMUNICATIONS SYSTEMS SUB-ELEMENT Goal 3 To support the mission of the University by providing Voice, Data, Video services via campus wide infrastructure that will be reliable, flexible, expandable and sustainable. Objective 3A Expand and enhance the campus infrastructure to match University growth, allowing seamless communications and networking to all areas of future University expansion, to maintain a continuous improvement of service and sustainability to the University 10-5

community as a whole. Policy 3A-1 Maintain relationships between the Facilities Department and Information Technology Services (ITS) so that internal building wiring (voice, video and data), networking infrastructure and external infrastructure (the number and type of conduits and manholes required by the building) is considered when new buildings are added to the Campus. Include input from ITS in the programming and planning of appropriate major and minor new construction, renovation, and remodeling projects. Policy 3A-2 Develop policies and procedures regarding continued expansion of underground conduit and distribution systems ( outside plant ). If the policy requires purchasing existing conduit systems or installation of new infrastructure, determine funding sources. The Plan will be amended to reflect the results of the Master Telecommunications Plan and other studies that may be done. Policy 3A-3 Continue to develop new or extension contracts that that will allow new products and services in the areas of voice, video and networking services to the campus. Policy 3A-4 Complete a review of the existing 20 Year Master Telecommunications Plan of the duct banks and manhole infrastructure and determine the impact of the new voice circuit requirements as well as the impact and expansion capabilities to remote properties. Policy 3A-5 Complete a review and 10 Year Master Networking Plan for networking technologies. This could include building infrastructure, national network connectivity, equipment replacement cycles, strategic locations where wireless equipment would be placed to provide excellent coverage to our growing customer base. Objective 3B Develop a 20 Year Master Plan for Telecommunications covering voice services, networking services, Outside Plant Infrastructure and system capability. 10-6

Policy 3B-1 Annually review voice, video and data technologies and infrastructure to identify those aspects that are in demand or may have changed. Following such review(s) identify funding priorities. Policy 3B-2 Annually review both the 20 Year Master Plan for Telecommunications and 10 year Master Plan for networking to determine if new services, properties or technologies have changed and should be revised. Policy 3B-3 Assure that the expanding Southwest Campus and FSU facilities located within Innovation Park are included in all master planning documents and long range planning activities for Telecommunications and Networking infrastructure. This would include establishing a centralized utilities corroder for placing underground infrastructure. Policy 3B-4 Continue to identify resources and establish a reserve within FSU to allow maximum flexibility and sustainability concerning the implementation of these two master plans for Telecommunications. Objective 3C Upgrade and/or replace the telecommunications infrastructure across the University. Policy 3C-1 Continue to have the Florida State University Telecommunications Infrastructure Standard or any subsequent revision as a mandatory minimum requirement for all new construction and renovation projects. Policy 3C-2 Initiate the first comprehensive Florida State University Telecommunications Networking Infrastructure Standard, and include this or any subsequent revision as a mandatory minimum requirement for all new construction and renovation projects. Policy 3C-3 10-7

Continue to review, on a yearly basis, the existing infrastructure and how it can be improved by means of developing a scope of work and the priority order in which the improvements should be scheduled. This would be accomplished by following the Master Plan for Telecommunications as outlined in Policies 3B-1, 3B-2, and 3B-3. Policy 3C-4 The University shall implement telecommunications system improvements as identified in the Master Plan for Telecommunications of the University. The timing and phasing requirements and priorities for these improvements are established in the Capital Improvements Element. 10-8