Nashville Area Regional ITS Architecture Update Project Kick-Off Workshop

Similar documents
Johnson City Regional ITS Architecture Update Review Workshop. March 12, 2015

Chattanooga Regional ITS Architecture Update Project Overview. January 7, 2014

Mountain Corridor Incident Management Program

KIPDA ITS Architecture Update Kick-off Meeting

Executive Summary. September 17, Prepared by: Copyright 2004 by Texas Department of Transportation. All rights reserved.

TDOT Intelligent Transportation Systems, State of the State

NORTHWEST PA REGIONAL OPERATIONS PLAN PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 1-0

Intelligent Transportation Systems (ITS)

Cedar Rapids ITS Deployment Project

Regional TSM&O Vision and ITS Architecture Update

LAWRENCE-DOUGLAS COUNTY INTELLIGENT JOURNEY

South Central Pennsylvania Regional Operations Plan Candidate Project Listing (DRAFT)

DIXIE REGIONAL ITS ARCHITECTURE EXECUTIVE SUMMARY

Arizona State Troopers Highway Patrol Division Sergeant John Paul Cartier

Executive Summary. City of Goodyear. Prepared for: Prepared by: November, 2008 Copyright 2008, Kimley-Horn and Associates, Inc.

South Central ROP Projects

Traveler Information In Virginia

NOVA ITS Architecture Maintenance and Training. Task 46 NOVA ITS Architecture v. 1.2 Final Report

PennDOT Planning Services and Implementation Regional Operations Plan for the Southern Alleghenies Region. Task Force #1.

ALASKA IWAYS ARCHITECTURE UPDATE: USE & MAINTENANCE GUIDE

DISTRICT 6-0 REGIONAL OPERATIONS PLAN PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 6-0

DISTRICT 2-0 REGIONAL OPERATIONS PLAN PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 2-0

Page 7. Page 8. (MDSS)) Pilot Phase. Page 9. Page 6. Vision. Mission. of Program. Optimizing the. complimentary. Page 1 of 9

ALABAMA DEPARTMENT OF TRANSPORTATION (ALDOT) STATEWIDE OPERATIONS

Metropolitan Topeka Planning Organization

2

TMC of the Future. Matt Lee Associate Vice President

Boston Regional ITS Architecture. Lev Pinelis Angela Ho Steve Alpert Tyler Smith

Arizona Emergency VII (E-VII) Program Overview and Focus Areas

STATEWIDE CENTERLINE INITIATIVE EDITED: MAY 17, 2013

DAVID WOLFE TMC Operations & Incident Management Specialist

TxDOT TMS PERFORMANCE MEASURES ITS TEXAS Texas Department of Transportation

3 ITS Standards Deployment and Testing Strategies

STATEWIDE INTEGRATED TRANSPORTATION RELIABILITY PROGRAM

Fusing Data Across the State of Florida to Support ATIS Services

Coordinated Highways Action Response Team

ontents Ten Year Strategic Plan Turbo Architecture Output Appendix

Revised Strategic Deployment Plan. Executive Summary

Next Generation COMPASS Lite. Presented to: ITS ACGM 2014 Present by: Kris Huber, CTO, Array Systems Computing

Away from Isolation: Caltrans Arterial Management

KENTUCKY TRANSPORTATION CABINET

Intelligent Work Zones on Traffic Critical Projects

Regional Operations Traffic Signals Task Force Meeting #1 February 13, 2007

San Antonio TransGuide: TOC Update ITS Texas 2009

CAPACITY BUILDING WORKSHOP FOR TRAFFIC MANAGEMENT INFORMATION CONTROL CENTRES (TMICC) AND NATIONAL URBAN TRANSPORT HELPLINE (NUTH)

Deployment of ITS Projects in Pasadena A Local Agency Perspective

I. City of Virginia Beach Intelligent Transportation Systems Workshop, November 2 and 3, 2011

REGIONAL ITS ARCHITECTURE

Oklahoma City Area Regional Transportation Study (OCARTS) Intelligent Transportation Systems (ITS) Architecture

The Missouri Department of Transportation, in cooperation with its regional partners Illinois Department of Transportation, Metro and East West

Iowa s Statewide Road Centerline Cooperative Program. Bill Schuman, GIS Coordinator Iowa Department of Transportation

NCTCOG MTP Policy Bundle Application for TXDOT

AZTech Capability Maturity Model

Washington Metropolitan Area Transit Authority Board Action/Information Summary MEAD Number:

Regional ITS Architecture Report

Traveler Information System

COMPUTER AIDED DISPATCH: WAYS TO INTEGRATE INTO TMC SYSTEMS

Data Integration for Integrated Corridor Management

Model Concept of Operations - Remotely Operated and Dynamic Systems for Road Closures and Advisory Messages in Remote Areas

Opportunities To Succeed

Downtown Boise Multimodal Center

Transportation System Cybersecurity Framework

Virginia Connected Corridor

Year 2004 Update Final Report June 2005

Project Summary. Feb. 2014

Mobile Communications for Transit

Escambia-Santa Rosa Regional ATMS. Escambia-Santa Rosa Regional Advanced Traffic Management System (ATMS) Florida Alabama TPO

Transportation Data for Chicago Traffic Management Center. Abraham Emmanuel Deputy Commissioner, CDOT

AZTech would like to acknowledge the partnership s public and private partners and contributors to this Plan: Valley Metro

DISTRICT 2-0 REGIONAL OPERATIONS PLAN PENNSYLVANIA DEPARTMENT OF TRANSPORTATION ENGINEERING DISTRICT 2-0

SMART REGION STARNET PERFORMANCE ASSESSMENT AND MODERNIZATION STRATEGY DRAFT. December 20, 2018

Pennsylvania Safety Transportation and Research Track (PennSTART)

I 95 CORRIDOR COALITION EXECUTIVE BOARD & STEERING COMMITTEE MEETING Chicago, Illinois September 25, 2015

The Benefits of Regional Collaboration in Managing Network Transportation Operations

Texas Clear Lanes. Congestion Relief Initiative

APTS05 Transit Security Private Bus Operators and AMTRAK

King County Ombudsman Whistle-Blowers Office Complaint

Metropolitan Topeka Planning Organization

the official views or policies of the funding agencies.

Help Manual Version 8.0

Approaches to Develop an ITS Architecture and Integrated ITS

I-20 EAST TEXAS CORRIDOR STUDY. TxDOT Planning Conference, Corpus Christi June 4 th, 2014

Getting Results from Regional Traffic Incident Management Teams

Managing DC Work Zones via a Citywide Transportation Management Plan. ITE Mid-Colonial District Annual Meeting May 20, 2014

INNOVATION AT THE VIRGINIA DEPARTMENT OF TRANSPORTATION. Robert H. Cary, PE, LS, Chief Deputy Commissioner 10/2/2018

Pinellas Police Standards Council Post Retreat Opinion Survey

2006 GIS-T T Symposium Columbus Ohio

Engaging Maryland toward CAV advancements Christine Nizer, Administrator

City of Houston Traffic Signal Management Software Upgrade Project

Kapsch TrafficCom Traffic Management Solutions

EMERGENCY SUPPORT FUNCTION (ESF) 13 PUBLIC SAFETY AND SECURITY

Dulles Area Transportation Association

CITY OF DUBUQUE ADMINISTRATIVE POLICY REVISED OCTOBER 24, 2011 RETROACTIVE TO JANUARY 1, 2011

TXDOT ITS STRATEGIC PLAN DEVELOPMENT

Planning for Resiliency. June 20, 2017 Richard Tetreault, PE WSP USA Office Lead VT, NH, and ME

The Proposed Road Centerline Standard for Minnesota Overview and Frequently Asked Questions

CAD-AVL, Onboard Systems Integration & Enterprise Database Architecture

IP PSAP System Features and Capabilities. Operational Information Document (OID)

Washington Metropolitan Area Transit Authority Board Action/Information Summary

National Operations Center of Excellence. Douglas W. Wiersig, P.E. Director of Transportation and Public Works, City of Fort Worth, Texas

Transcription:

N A S H V I L L A R A R G I O N A L I T S A R C H I T C T U R U P D A T W O R K S H O P M I N U T S MTING DAT: October 1, 2009 MTING TIM: 1:00 PM MTING LOCATION: Nashville Public Library, Nashville, TN ATTNDS: Max Baker, Nashville Area MPO Carl Baughman, City of Franklin Tom Brashear, Wilson County Glen Chrisman, City of Murfreesboro PD Jonathan Cleghon, Metro Nashville-Davidson County Sue Connor, Franklin Transit William Crook, City of Gallatin FD Ali Farhangi, TDOT Region 3 Don Gedge, FHWA Terry Gladden, TDOT Luanne Grandinetti, TDOT John Hall, TDOT Ray Hallavant, TDOT Region 3 Jeff Jones, TDOT Marlin Keel, City of Mt. Juliet David King, Town of Smyrna Duane Phillips, Metro Nashville-Davidson County Mike Presley, TDOT Kevin Rigsby, Town of Smyrna Michael Skipper, Nashville Area MPO Dowell Squier, Gresham Smith Mike Thompson, Williamson County Magi Tilton, City of Lebanon d Turbyfill, Gresham Smith Bill Vahldiek, Ctiy of Gallatin PD Robert Weithofer, Metro Nashville-Davidson County Andy Zimmerman, MTA Tom Fowler, Kimley-Horn and Associates Amy Lewis, Kimley-Horn and Associates Jonathan Moore, Kimley-Horn and Associates Chris Rhodes, Kimley-Horn and Associates SUBJCT: Nashville Area Regional ITS Architecture Update Project Kick-Off Workshop Introductions Michael Skipper of the Nashville Area Metropolitan Planning Organization (MPO) welcomed everyone and thanked the stakeholders for their participation in the update of the Nashville Area Regional Intelligent Transportation System (ITS) Architecture. Michael also introduced Tom Fowler, the consultant project manager, who then introduced the other Kimley-Horn team members present at the workshop. veryone in attendance introduced themselves and identified the agency or organization they were representing. Project Overview Presentation Tom Fowler gave a presentation on the Nashville Area Regional ITS Architecture Update project. The presentation included an overview of ITS, explanation of an ITS Architecture, and a description of the steps that will be used to update the Regional ITS Architecture. Tom noted that in addition to the Kick-off Workshop there will be three other workshops held over the next six months, each with a different purpose, to gather stakeholder input to update the Nashville Area Regional ITS Architecture. Once it is updated the Regional ITS Architecture should provide a vision and framework for the implementation and operation of ITS in the region over the next 20 years. The Regional ITS Architecture is also necessary in order to meet the Federal Highway Administration (FHWA) and Federal Transit Administration (FTA) ITS Architecture conformity requirements for any ITS projects in the region that use federal transportation funds. Although updating the Regional ITS Architecture does not guarantee funding for the Region, it does allow the Region to be eligible for federal funding of ITS projects.

W o r k s h o p M i n u t e s Page 2 of 6 The geographic boundaries of the architecture were defined as the boundaries of the Nashville Area MPO. Connections that need to occur with other agencies outside of the geographic boundaries were mentioned as well. An example given was the need for the sharing of information between the Tennessee Department of Transportation (TDOT) SmartWay Traffic Management Centers (TMCs) in Nashville and Memphis. A list of stakeholder agencies that were invited to participate in the process was also presented. Tom asked the stakeholders to let him or the Nashville Area MPO know if there were any missing stakeholders from the list. Tom also encouraged everyone to extend an invitation to anyone else within their own agency that they thought might be interested in participating. ITS Inventory and Needs Chris Rhodes and Amy Lewis led a discussion on the ITS inventory for the Nashville Area. Stakeholders were asked to identify existing and planned ITS inventory elements. A summary of all ITS inventory items and agency specific needs identified is included in the series of tables that follow. The inventory will assist the project team in preparing a rough draft of the Regional ITS Architecture for the next workshop. Projects were categorized as xisting, Planned/Funded, or Future Need. xisting projects included those currently deployed or projects that are funded and are expected to be fully deployed within the first half of 2010. Planned/Funded projects include any projects that are planned and have funding identified. Future Needs are any project with no funding identified but the stakeholder felt were needed in the Region.

Traffic Management and Traveler Information Services W o r k s h o p M i n u t e s Page 3 of 6 Transportation Management Center (TMC) or Traffic Operations Center (TOC) Coordinated/ Closed Loop Signal System Video Detection for Signal Operations Other Detection CCTV Cameras Dynamic Message Signs (DMS) Highway Advisory Radio (HAR) Data Sharing Between Traffic Mgmt Agencies Data Sharing with Media Real Time Information Website Telephone Traveler Information Data Archiving TDOT (See below) N (Other TDOT) Metro Nashville P P (TDOT) P P City of Brentwood (TDOT) City of Franklin (TDOT) City of Gallatin City of Lebanon City of Mt. Juliet City of Murfreesboro (TDOT) City of Smyrna Williamson County Isolated Wilson County Isolated = xisting, P=Planned/Funded, N=Future Need

mergency Management Services W o r k s h o p M i n u t e s Page 4 of 6 Centralized Dispatch Center Computer Aided Dispatch (CAD) Automated Vehicle Location (AVL) Mobile Data Terminals (MDTs) mergency Vehicle Signal Preemption Data Sharing with Traffic Management mergency Operations Center Data Sharing Between OC and Traffic Management Reverse 911 System Data Archiving TDOT HLP Service Patrol (TMC) THP P P Nashville mergency Communications Center City of Franklin (PD and FD) P P (TSIS) P Testing P P P (Backup @ County) (FD) (PD) City of Gallatin (PD and FD) (PD) P (FD) (FD) City of Lebanon (PD and FD) City of Mt. Juliet PD City of Smyrna (PD and PD) Sumner County MS WMA Fire and MS Williamson County Uncentralized Wilson County PSAP Dispatch = xisting, P=Planned/Funded, N=Future Need (Sheriff)

Maintenance and Construction Management Services W o r k s h o p M i n u t e s Page 5 of 6 Portable DMS Portable CCTV Road Weather Information Systems (RWIS) CAD AVL TDOT P Metro Nashville N (Ice detection) City of Gallatin City of Lebanon City of Smyrna Williamson County = xisting, P=Planned/Funded, N=Future Need (Dispatch monitors) Public Transportation Services Centralized Dispatch AVL MDTs Automated Passenger Counters lectronic Fare Collection Real Time Information On-Board Video Surveillance On-Board Mayday Alarm Transit Facility Surveillance Data Archiving MTA (kiosks) P (real time transmit) Franklin Transit Authority P P P (web and kiosks) Mid-Cumberland Human Resource = xisting, P=Planned/Funded, N=Future Need

W o r k s h o p M i n u t e s Page 6 of 6 Tom led a discussion on the Region s ITS needs. The following general regional needs were identified: Information on incidents and closures on arterial roadways to include on the TDOT SmartWay 511 traveler information system; Centralized regional information resource keep integration in mind when developing information systems so that they are compatible and coordinated whenever possible; Improved focus on local roads in statewide crash record database; Improved coordination with private service providers for navigation systems; Advance planning for alternate signal timing plans that can be implemented during incidents, detours, or special events; Improved coordination with the Tennessee Highway Patrol (THP) to get incident information; Improved emergency management coordination, especially along jurisdictional boundaries to speed incident response; Provide real time maintenance and construction management information to emergency management to support dispatch; Arterial DMS or alternate information dissemination more suitable for the urban environment; and Ability for emergency management to have access to CCTV camera feeds on MDTs. Concluding Comments and Next Steps Tom thanked everyone for their participation. He encouraged the ITS stakeholders to contact any of the project team members if they had any questions or if they would like to add additional items to the ITS inventory or needs. He also asked the stakeholders to contact any of the project team members if they would like for the project team to extend an invitation to participate to any other agencies or individuals not currently included in the list of stakeholders. The next workshop will be held in December and the focus will be to work with stakeholders to select the desired ITS services for the Nashville Area and identify what types of information need to be exchanged between agencies. The workshop will be broken out into three smaller workshops over a two day period with one focused on traffic and travel management, one on incident management, and one on transit. An invitation will be sent to all stakeholders and everyone is encouraged to attend as many of the workshops as possible.