1 Background Statement for SEMI Draft Document 5738 REVISION TO SEMI E PROVISIONAL SPECIFICATION FOR SECS-II PROTOCOL FOR CARRIER MANAGEMENT (CMS) NOTICE: This Background Statement is not part of the balloted item It is provided solely to assist the recipient in reaching an informed decision based on the rationale of the activity that preceded the creation of this ballot NOTICE: For each Reject Vote, the Voter shall provide text or other supportive material indicating the reason(s) for disapproval (ie, Negative[s]), referenced to the applicable section(s) and/or paragraph(s), to accompany the vote NOTICE: Recipients of this ballot are invited to submit, with their Comments, notification of any relevant patented technology or copyrighted items of which they are aware and to provide supporting documentation In this context, patented technology is defined as technology for which a patent has been issued or has been applied for In the latter case, only publicly available information on the contents of the patent application is to be provided Background The E871 specification was originally published in the year 2000 as a provisional specification Although this specification is widely in use throughout the world, the provisional status was never removed SEMI regulations no longer allow for the existence of provisional standards This major revision intends to release the E871 specification without the provisional status The only way to do this was by using a major revision ballot which allowed for both title change and text change in the specification The changes are not extensive Note that the text mmhh is expected to be replace by SEMI staff with the actual publication date month and year And the text <date> with the actual date of acceptance Note that text to be added are shown in underlined blue text Deleted items are shown in strikethrough red text Formatting changes, such as changing the number of spaces, are not indicated, although numerous such changes have been made SEMI Staff will use the formatting demonstrated in this ballot What is the problem being solved? Remove the provisional status, both in the title and within the specification As a major revision, the formatting within the specification has been made more consistent and a few minor changes have been made to make the intent more clear and allow E871 to adapt to more use cases Specifically, Capacity is no longer restricted to the maximum value 25 since the restriction really served no function Several editorial changes were made as well to clean up the text Additionally, the format codes are now specified consistently Previously, they were specified erratically What is the history of this issue and ballot? This is the first submission of this ballot Who will this affect? How? Why? This changes are not expected to affect any existing implementations in any way Is this a change to an existing solution, or, is it a new activity? These are changes to an existing Specification

2 Revision Control This revision control records activity within the task force as well as formal submit and resubmit dates and results per SEMI Entries have been made by the task force Date Version Name Edits Jan 6, Brian Rubow Initial edits to remove provisional status Feb 10, Inna Skvortsova Ballot formatting according to SEMI Standards Regulations The ballot results will be reviewed and adjudicated at the meetings indicated in the table below Check wwwsemiorg/standards under Standards Calendar for the latest update Review and Adjudication Information Task Force Review Committee Adjudication Group: NA GEM300 TF NA Information & Control Committee Date: April 4 th 2017 April 5 th 2017 Time & Timezone: 13:00 16:00 Pacific Time 8:00 17:00 Pacific Time Location: SEMI Headquarters SEMI Headquarters City, State/Country: Milpitas, CA/USA Milpitas, CA/USA Leader(s): Brian Rubow (Cimetrix) Jack Ghiselli (Ghiselli Consulting) Brian Rubow (Cimetrix) James Moyne (University of Michigan) Standards Staff: Inna Skvortsova (SEMI NA) iskvortsova@semiorg Inna Skvortsova (SEMI NA) iskvortsova@semiorg This meeting s details are subject to change, and additional review sessions may be scheduled if necessary Contact the task force leaders or Standards staff for confirmation Telephone and web information will be distributed to interested parties as the meeting date approaches If you will not be able to attend these meetings in person but would like to participate by telephone/web, please contact Standards staff

3 673 S Milpitas Blvd Phone: SEMI Draft Document 5738 REVISION TO SEMI E PROVISIONAL SPECIFICATION FOR SECS-II PROTOCOL FOR CARRIER MANAGEMENT (CMS) NOTICE: Additions are indicated by underline and deletions are indicated by strikethrough 1 Purpose This standard was technically approved by the global Information & Control Committee This edition was approved for publication by the global Audits and Reviews Subcommittee on <date> It was available at wwwsemiorg in June 2007 and on CD-ROM in July 2007 Originally published February 2000; previously published November This document maps the services and data of SEMI E87 to SECS-II streams and functions, and data definitions 2 Scope 21 This is a provisional specification covering equipment supporting automated access to load ports from the host point-of-view The provisional status is required because of the immaturity of implementations of integrated equipment with AMHS, and additional specifications may yet be defined Also, further exception handling and error recovery scenarios need to be defined 22 This document applies to all implementations of SEMI E87 that use the SECS-II message protocol [SEMI E5] Compliance to this standard requires compliance to both SEMI E87 and SEMI E5 NOTICE: This standard does not purport to address safety issues, if any, associated with its use It is the responsibility of the users of this standard to establish appropriate safety and health practices and determine the applicability of regulatory or other limitations prior to use 3 Limitations 31 This specification applies to semiconductor equipment with SEMI E151 compliant load ports It may also be applied to other manufacturing equipment that supports automated carrier transfer and/or contains an internal buffer 32 This is a provisional specification The following areas must be completed before the provisional status is removed: Any additional services, or changes to existing services, in Carrier Management must be mapped to SECS- II messages 4 Referenced Standards and Documents 41 SEMI Standards SEMI E5 SEMI Equipment Communications Standard 2 Message Content (SECS-II) SEMI 151 Provisional Specification for 300 mm Tool Load Port SEMI E391 SECS-II Protocol for Object Services Standard (OSS) SEMI E87 Specification for Carrier Management (CMS) NOTICE: Unless otherwise indicated, all documents cited shall be the latest published versions 5 Services Mapping 51 This section shows the specific SECS-II streams and functions that shall be used for SECS-II implementation of the services defined in SEMI E87, as well as the parameter mapping for data attached to services 52 Services Message Mapping 521 Table 1 defines the relationships between SEMI E87 services and SECS-II messages This is a Draft Document of the SEMI International Standards program No material on this page is to be construed as an official or adopted Standard or Safety Guideline activity All other reproduction and/or distribution without the prior written consent of SEMI is prohibited Page 1 Doc 5738 SEMI

4 673 S Milpitas Blvd Phone: Table 1 Services Message Mapping Table Service Name Stream, Function SECS-II Message Name Bind S3,F17/18 Carrier Action Request/Acknowledge CancelBind S3,F17/18 Carrier Action Request/Acknowledge CancelAllCarrierOut S3,F19/20 Cancel All Carrier Out Request/Acknowledge CancelCarrier S3,F17/18 Carrier Action Request/Acknowledge CancelCarrierAtPort S3,F17/18 Carrier Action Request/Acknowledge CancelCarrierNotification S3,F17/18 Carrier Action Request/Acknowledge CancelCarrierOut S3,F17/18 Carrier Action Request/Acknowledge CancelReservationAtPort S3,F25/26 Port Action Request/Acknowledge CarrierIn S3,F17/18 Carrier Action Request/Acknowledge CarrierNotification S3,F17/18 Carrier Action Request/Acknowledge CarrierOut S3,F17/18 Carrier Action Request/Acknowledge CarrierReCreate S3,F17/18 CarrierReCreate Rquest Request/Acknowledge CarrierRelease S3,F17/18 Carrier Action Request/Acknowledge CarrierTagReadData S3,F29/30 Carrier Tag Read Data Request/Acknowledge CarrierTagWriteData S3,F31/32 Carrier Tag Write Data Request/Acknowledge ChangeAccess S3,F27/28 ChangeAccess ChangeServiceStatus S3,F25/26 Port Action Request/Acknowledge ProceedWithCarrier S3,F17/18 Carrier Action Request/Acknowledge ReserveAtPort S3,F25/26 Port Action Request/Acknowledge 53 Services Parameter Mapping 531 Table 2 maps the SEMI E87 service parameters to SECS-II Data Items NOTE 1: Use of parameters not specified for a given message in SEMI E87 is prohibited SECS-II data items not used for a given message shall be sent as zero-length items Table 2 Service Parameters to SECS-II Data Items Mapping Parameter Name Range SECS-II Data Item AccessMode Enumerated: MANUAL, AUTO ACCESSMODE AttributeData Any CATTRDATA AttributeID Text format restrictions per SEMI E391, 6 CATTRID CarrierID 1 to 80 characters CARRIERID CMAcknowledge Enumerated CAACK CMStatus Structure L,2 1 <CAACK> 2 Status Data ASCII (Format Code 20) DATA DataLength Integer (Un or SnFormat Code or 50-54) DATALENGTH DataSeg ASCII (Format Code 20) DATASEG ErrorCode Enumerated ERRCODE ErrorText 1 to 80 characters ERRTEXT LocationID ASCII (Format Code 20) LOCID This is a Draft Document of the SEMI International Standards program No material on this page is to be construed as an official or adopted Standard or Safety Guideline activity All other reproduction and/or distribution without the prior written consent of SEMI is prohibited Page 2 Doc 5738 SEMI

5 673 S Milpitas Blvd Phone: Parameter Name Range SECS-II Data Item PropertiesList Non-identifier properties n = number of attributes PortID Format Code 51 U1 (1 255) PTN ServiceStatus Enumerated: IN SERVICE, OUT OF SERVICE L,n 1 L,2 1 <CATTRID1> 2 <CATTRDATA1> n L,2 1< CATTRID n> 2 <CATTRDATA n> U1 Format Code 51 0 = OUT OF SERVICE 1 = IN SERVICE Status n = number of errors L,n 1 L,2 1 <ERRCODE1> 2 < ERRTEXT 1> n 1< ERRCODE n> 2 <ERRTEXT n> 54 SECS-II Data Items Without Corresponding SEMI E87 Parameters 541 Table 3 contains the SECS-II data items that do not correspond to SEMI E87 s service parameter Table 3 Additional Data Item Requirements Table Function Used by S3,F17 to differentiate between Bind, CancelCarrierOut, CancelCarrierAtPort, CancelBind, CarrierIn, ProceedWithCarrier, CancelCarrierNotification CarrierNotification services, and CarrierReCreate Used to satisfy SECS-II conventions for linking a multi-block inquiry with a subsequent multi-block message Neither required nor specified by CMS Used to inform receiver of total message length size for SECS-II multi-block conventions May also be used to indicate the length of a section of data being transmitted to or from a carrier tag Used to satisfy SECS-II multi-block requirements Neither required nor specified by SEMI E87 Used by S3,F25 to differentiate between port related, CancelReservationAtPort, and ReserveAtPort services Used by S3F27 S3,F27 to specify desired Port Access Mode SECS-II Data Item CARRIERACTION DATAID DATALENGTH GRANT PORTACTION ACCESSMODE 6 Variable Data Item Mapping 61 This section shows the specific SECS-II data classes, and formats needed for SECS-II implementations of SEMI E87 variable data items This is a Draft Document of the SEMI International Standards program No material on this page is to be construed as an official or adopted Standard or Safety Guideline activity All other reproduction and/or distribution without the prior written consent of SEMI is prohibited Page 3 Doc 5738 SEMI

6 673 S Milpitas Blvd Phone: Table 4 Variable Data Item Mapping Table Variable Name Class Format AccessMode DVVAL Format Code 51 (U1) Enumerated: 0 = MANUAL 1 = AUTO AccessModei SV Format Code 51 (U1) Enumerated: 0 = MANUAL 1 = AUTO AvailPartitionCapacity DVVAL Format Code 51 AvailPartitionCapacityi SV Format Code 51 BufferCapacityList SV L,n where n = number of partitions 1 <BufferPartitionInfo1> n <BufferPartitionInfon> BufferPartitionInfo DVVAL L, 5 1 <PartitionID> 2 <PartitionType> 3 <AvailPartitionCapacity> 4 <PartitionCapacity> 5 <UnallocatedPartitionCapacity> BufferPartitionInfoi SV L, 5 1 <PartitionIDi> 2 <PartitionTypei> 3 <AvailPartitionCapacityi> 4 <PartitionCapacityi> 5 <UnallocatedPartitionCapacityi> CarrierAccessingStatus DVVAL Format Code 51 (U1) 0 = NOT ACCESSED 1 = IN ACCESS 2 = CARRIER COMPLETE 3 = CARRIER STOPPED CarrierID DVVAL Format Code 20, 1 to 80 characters A[1 80] (Conforms to restrictions of ObjID as specified in SEMI E391, 6) CarrierIDi SV Format Code 20, 1 to 80 characters A[1 80] (Conforms to restrictions of ObjID as specified in SEMI E391, 6) CarrierIDStatus DVVAL Format Code 51 (U1) 0 = ID NOT READ 1 = [ID] WAITING FOR HOST 2 = ID VERIFICATION OK 3 = ID VERIFICATION FAILED This is a Draft Document of the SEMI International Standards program No material on this page is to be construed as an official or adopted Standard or Safety Guideline activity All other reproduction and/or distribution without the prior written consent of SEMI is prohibited Page 4 Doc 5738 SEMI

7 673 S Milpitas Blvd Phone: Variable Name Class Format CarrierLocationMatrix SV L,n where n = number of carrier locations 1 L,2 1 <LocationID1> 2 <CarrierID1> n L,2 1 <LocationIDn> 2 <CarrierIDn> LoadPortReservationState DVVAL Format Code 51 (U1) 0 = NOT RESERVEED 1 = RESERVED LoadPortReservationStateI SV Format Code 51 (U1) 0 = NOT RESERVED 1 = RESERVED LoadPortReservationStateList SV L,n where n = number of load ports 1<LoadPortReservationState1> n<loadportreservationstaten> LocationID DVVAL Format Code 20, 1 to 80 characters A[1 80] (Conforms to restrictions of ObjID as specified in SEMI E391, 6) LocationIDi SV Format Code 20, 1 to 80 characters A[1 80] (Conforms to restrictions of ObjID as specified in SEMI E391, 6) PartitionCapacity DVVAL Format Code 51 PartitionCapacityi SV Format Code 51 PartitionID DVVAL Format Code 20, 1 to 80 characters A[1 80] (Conforms to restrictions of ObjID as specified in SEMI E391, 6) PartitionIDi SV Format Code 20, 1 to 80 characters A[1 80] (Conforms to restrictions of ObjID as specified in SEMI E391, 6) PartitionType DVVAL Format Code 20, 1 to 64 characters A[1 64] PartitionTypei SV Format Code 20, 1 to 64 characters A[1 64] PortAssociationState DVVAL Format Code 51 (U1) 0 = NOT ASSOCIATED 1 = ASSOCIATED PortAssociationStatei SV Format Code 51 (U1) 0 = NOT ASSOCIATED 1 = ASSOCIATED This is a Draft Document of the SEMI International Standards program No material on this page is to be construed as an official or adopted Standard or Safety Guideline activity All other reproduction and/or distribution without the prior written consent of SEMI is prohibited Page 5 Doc 5738 SEMI

8 673 S Milpitas Blvd Phone: Variable Name Class Format PortAssociationStateList SV L,n where n = number of load ports 1 <PortAssociationState1> n <PortAssociationStaten> PortID DVVAL Format Code 51 PortIDi SV Format Code 51 PortStateInfo DVVAL L,2 1 <PortAssociationState> 2 <PortTransferState> PortStateInfoi SV L,2 1 <PortAssociationStatei> 2 <PortTransferStatei> PortStateInfoList SV L,n where n = number of load ports 1 <PortStateInfo1> n <PortStateInfon> PortTransferState DVVAL Format Code 51 (U1) 0 = OUT OF SERVICE 1 = TRANSFER BLOCKED 2 = READY TO LOAD 3 = READY TO UNLOAD PortTransferStatei SV Format Code 51 (U1) 0 = OUT OF SERVICE 1 = TRANSFER BLOCKED 2 = READY TO LOAD 3 = READY TO UNLOAD PortTransferStateList SV L,n where n = number of load ports 1 <PortTransferState1> n <PortTransferStaten> Reason DVVAL Format Code 51 (U1) 0 = VERIFICATION NEEDED 1 = VERIFICATION BY EQUIPMENT UNSUCCESSFUL 2 = READ FAIL 3 = IMPROPER SUBSTRATE POSITION SlotMapStatus DVVAL Format Code 51 (U1) 0 = SLOT MAP NOT READ 1 = [SLOT] WAITING FOR HOST 2 = SLOT MAP VERIFICATION OK 3 = SLOT MAP VERIFICATION FAILED This is a Draft Document of the SEMI International Standards program No material on this page is to be construed as an official or adopted Standard or Safety Guideline activity All other reproduction and/or distribution without the prior written consent of SEMI is prohibited Page 6 Doc 5738 SEMI

9 673 S Milpitas Blvd Phone: SlotMap Variable Name Class Format DVVAL L, n where n= capacity Capacity (125) 1 Format Code 51 enumerated Enumerated 2 Format Code 51 enumerated Enumerated 3 Format Code 51 enumerated n Format Code 51 enumerated Each as 51 (U1) 0 = UNDEFINED 1 = EMPTY 2 = NOT EMPTY 3 = CORRECTLY OCCUPIED 4 = DOUBLE SLOTTED 5 = CROSS SLOTTED UnAllocatedPartitionCapacity DVVAL Format Code 51 UnAllocatedPartitionCapacityi SV Format Code 51 7 SECS-II Attribute Definitions 71 Carrier Object SECS-II Attributes Definitions 711 The following are the SECS-II structure definitions for the SEMI E87 Carrier Object Table 5 Carrier Object Attribute Definitions ObjType Attribute Name 1 Carrier Attribute Data Form: SECS-II Structure ObjID 1 <CARRIERID> (Conforms to the restrictions of ObjID as specified in SEMI E391, 6) Capacity CarrierAccessingStatus CarrierIDStatus ContentMap LocationID Format Code 51 (U1) Capacity Capacity Range: 1 25 to 255 Capacity Examples: 1, 13, 25 Format Code 51 (U1) CarrierAccessingStatus CarrierAccessingStatus enumerated per Variable CarrierAccessingStatus Format Code 51 (U1) CarrierIDStatus CarrierIDStatus enumerated per Variable CarrierIDStatus L, n where n=capacity 1 L,2 1 Format Code 20 (A) LotID 2 Format Code 20 (A) SubstID n L,2 1 Format Code 20 (A) LotID 2 Format Code 20 (A) SubstID 2 SubstID conform conforms to the restrictions of ObjID as specified in SEMI E391, 6 Format Code 20 (A) LocationID LocationID conforms to the restrictions of ObjID as specified in SEMI E391, 6 This is a Draft Document of the SEMI International Standards program No material on this page is to be construed as an official or adopted Standard or Safety Guideline activity All other reproduction and/or distribution without the prior written consent of SEMI is prohibited Page 7 Doc 5738 SEMI

10 673 S Milpitas Blvd Phone: Attribute Name SlotMap L, n n=capacity 1 Format Code 51 (U1) enumerated n Format Code 51 (U1) enumerated SlotMapStatus SubstrateCount Usage enumerated Enumerated per variable SlotMap Attribute Data Form: SECS-II Structure Format Code 51 (U1) SlotMapStatus SlotMapStatus enumerated per Variable SlotMapStatus Format Code 51 (U1) SubstrateCount SubstrateCount Range: 0 to 25 Capacity SubstrateCount Examples: 1, 3, 21, 25 Format Code 20 (A) Usage Usage is equipment defined, examples: TEST, DUMMY, PRODUCT NOTICE: SEMI makes no warranties or representations as to the suitability of the Standards and Safety Guidelines set forth herein for any particular application The determination of the suitability of the Standard or Safety Guideline is solely the responsibility of the user Users are cautioned to refer to manufacturer s instructions, product labels, product data sheets, and other relevant literature, respecting any materials or equipment mentioned herein Standards and Safety Guidelines are subject to change without notice By publication of this Standard or Safety Guideline, SEMI takes no position respecting the validity of any patent rights or copyrights asserted in connection with any items mentioned in this Standard or Safety Guideline Users of this Standard or Safety Guideline are expressly advised that determination of any such patent rights or copyrights and the risk of infringement of such rights are entirely their own responsibility <End of Ballot> This is a Draft Document of the SEMI International Standards program No material on this page is to be construed as an official or adopted Standard or Safety Guideline activity All other reproduction and/or distribution without the prior written consent of SEMI is prohibited Page 8 Doc 5738 SEMI

Background Statement for SEMI Draft Document 5872B LINE ITEM REVISION TO SEMI E Specification for SECS Equipment Data Dictionary (SEDD)

Background Statement for SEMI Draft Document 5872B LINE ITEM REVISION TO SEMI E Specification for SECS Equipment Data Dictionary (SEDD) Background Statement for SEMI Draft Document 5872B LINE ITEM REVISION TO SEMI E172-1015 Specification for SECS Equipment Data Dictionary (SEDD) NOTICE: This Background Statement is not part of the balloted

More information

Background The following is the complete list of the new proposed technical change(s) with their justifications:

Background The following is the complete list of the new proposed technical change(s) with their justifications: Background Statement for the Ratification Ballot of SEMI Draft Document 5274G REVISION TO ADD A NEW SUBORDINATE STANDARD: SPECIFICATION FOR SENSOR/ACTUATOR NETWORK SPECIFIC DEVICE MODEL OF A GENERIC EQUIPMENT

More information

There are some issues to be resolved in SEMI T7-0415, so the revision is being proposed in this ballot. The points are as following:

There are some issues to be resolved in SEMI T7-0415, so the revision is being proposed in this ballot. The points are as following: Background Statement for SEMI Draft Document 5890 Revision to SEMI T7-0415 SPECIFICATION FOR BACK SURFACE MARKING OF DOUBLE-SIDE POLISHED WAFERS WITH A TWO-DIMENSIONAL MATRIX CODE SYMBOL Notice: This background

More information

PLEASE NOTE: This ballot contains a proposal for a revision to an existing standard.

PLEASE NOTE: This ballot contains a proposal for a revision to an existing standard. Background Statement for SEMI Draft Document 5274AInfo REVISION TO ADD A NEW SUBORDINATE STANDARD: SPECIFICATION FOR SENSOR/ACTUATOR NETWORK SPECIFIC DEVICE MODEL OF A GENERIC EQUIPMENT ADD-ON SENSOR (ADDON)

More information

Record of Line-item Letter Ballot Review by TC Chapter for Procedural Review

Record of Line-item Letter Ballot Review by TC Chapter for Procedural Review List of Line Items Record of Line-item Letter Ballot Review by TC Chapter for Procedural Review Region/Locale: North America Global Technical Committee: Information and Control TC Chapter Cochairs: Brian

More information

Background Statement for SEMI Draft Document 4764D New Standard: TEST METHOD OF FPD-BASED STEREOSCOPIC DISPLAY WITH ACTIVE GLASSES

Background Statement for SEMI Draft Document 4764D New Standard: TEST METHOD OF FPD-BASED STEREOSCOPIC DISPLAY WITH ACTIVE GLASSES Background Statement for SEMI Draft Document 4764D New Standard: TEST METHOD OF FPD-BASED STEREOSCOPIC DISPAY WITH ACTIVE GASSES Notice: This background statement is not part of the balloted item. It is

More information

SEMI Draft Document 4537 Revision to SEMI M PRACTICE FOR DETERMINING WAFER-NEAR-EDGE GEOMETRY USING PARTIAL WAFER SITE FLATNESS

SEMI Draft Document 4537 Revision to SEMI M PRACTICE FOR DETERMINING WAFER-NEAR-EDGE GEOMETRY USING PARTIAL WAFER SITE FLATNESS SEMI Draft Document 4537 Revision to SEMI M70-0307 PRACTICE FOR DETERMINING WAFER-NEAR-EDGE GEOMETRY USING PARTIAL WAFER SITE FLATNESS Background Statement Note: This background statement is not part of

More information

Review and adjudication information

Review and adjudication information Background Statement for SEMI Draft Document 587 REVISION TO SEMI M77-, PRACTICE FOR DETERMINING WAFER NEAR-EDGE GEOMETRY USING ROLL-OFF AMOUNT, ROA With Title Change To: TEST METHOD FOR DETERMINING WAFER

More information

Background Statement for SEMI Draft Document 5716

Background Statement for SEMI Draft Document 5716 Background Statement for Draft Document 5716 Revision to E133, SPECIFICATION FOR AUTOMATED PROCESS CONTROL SYSTEMS INTERFACE and E133.1, PROVISIONAL SPECIFICATION FOR XML MESSAGING FOR PROCESS CONTROL

More information

SEMI 4845 NEW STANDARD:

SEMI 4845 NEW STANDARD: Background Statement for SEMI Draft Document 4845 NEW STANDARD: Specification for Identification by Digital Certificate Issued from CSB(Certificate Service Body ) for Anti-Counterfeiting Traceability in

More information

Line Item #1: Change designation of SEMI PV35 from PV to A.

Line Item #1: Change designation of SEMI PV35 from PV to A. Background Statement for SEMI Draft Document 6088 Line Item Revision to: SEMI PV35-0215 Specification for Horizontal Communication between Equipment for Photovoltaic Fabrication System with designation

More information

METHOD FOR DETERMINING WAFER FLATNESS USING THE MOVING AVERAGE QUALIFICATION METRIC BASED ON SCANNING LITHOGRAPHY

METHOD FOR DETERMINING WAFER FLATNESS USING THE MOVING AVERAGE QUALIFICATION METRIC BASED ON SCANNING LITHOGRAPHY Background Statement for SEMI Draft Document 4274 New Standard TEST METHOD FOR DETERMINING WAFER FLATNESS USING THE MOVING AVERAGE QUALIFICATION METRIC BASED ON SCANNING LITHOGRAPHY Notice: This background

More information

The NA PV Materials TC Chapter reviewed and recommended to issue for reapproval ballot.

The NA PV Materials TC Chapter reviewed and recommended to issue for reapproval ballot. Background Statement for SEMI Draft Document 5905 REAPPROVAL OF SEMI PV15-0211 GUIDE FOR DEFINING CONDITIONS FOR ANGLE RESOLVED LIGHT SCATTER MEASUREMENTS TO MONITOR THE SURFACE ROUGHNESS AND TEXTURE OF

More information

Background Statement for SEMI Draft Document 4764B New Standard: TEST METHOD OF FPD-BASED STEREOSCOPIC DISPLAY WITH ACTIVE GLASSES

Background Statement for SEMI Draft Document 4764B New Standard: TEST METHOD OF FPD-BASED STEREOSCOPIC DISPLAY WITH ACTIVE GLASSES Background Statement for SEMI Draft Document 4764B New Standard: TEST METHOD OF FPD-BASED STEREOSCOPIC DISPAY WITH ACTIVE GASSES Note: This background statement is not part of the balloted item. It is

More information

revised version: 7.1 Measuring Equipment Suitable for acquiring the height data array of the near-edge region, (skip the rest)

revised version: 7.1 Measuring Equipment Suitable for acquiring the height data array of the near-edge region, (skip the rest) Background Statement for SEMI Draft Document 4635B Revision to SEMI M69-37 PRACTICE FOR DETERMINING WAFER NEAR-EDGE GEOMETRY USING ROLL-OFF AMOUNT, ROA Notice: This background statement is not part of

More information

Japan Information & Control Standards Committee Meeting Summary and Minutes

Japan Information & Control Standards Committee Meeting Summary and Minutes Japan Information & Control Standards Committee Meeting Summary and Minutes Japan Standards Fall Meetings 2011 September 15, 2011, 13:30-17:00 Japan Time Oshima Conference Room 3, SEMI Japan Office, Committee

More information

Standard Development Timeline

Standard Development Timeline Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard is adopted by the NERC Board of Trustees (Board).

More information

SEMI E C SEMI 1997 SENSOR/ACTUATOR NETWORK STANDARD

SEMI E C SEMI 1997 SENSOR/ACTUATOR NETWORK STANDARD SEMI E54-0997 C SEMI 1997 SENSOR/ACTUATOR NETWORK STANDARD NOTE: The document that was previously designated as SEMI E54 (Standard for Sensor/Actuator Network Common Device Model) has been redesignated

More information

Administrative Guideline. SMPTE Metadata Registers Maintenance and Publication SMPTE AG 18:2017. Table of Contents

Administrative Guideline. SMPTE Metadata Registers Maintenance and Publication SMPTE AG 18:2017. Table of Contents SMPTE AG 18:2017 Administrative Guideline SMPTE Metadata Registers Maintenance and Publication Page 1 of 20 pages Table of Contents 1 Scope 3 2 Conformance Notation 3 3 Normative References 3 4 Definitions

More information

Certification Test Plan SSRF Conformance for OpenSSRF Software v Document WINNF-14-S-0023

Certification Test Plan SSRF Conformance for OpenSSRF Software v Document WINNF-14-S-0023 Certification Test Plan SSRF Conformance for OpenSSRF Software v3.1.0 Document WINNF-14-S-0023 Version V1.0.0 10 February 2015 TERMS, CONDITIONS & NOTICES This document has been prepared by the Open SSRF

More information

Cyber Security Standards Drafting Team Update

Cyber Security Standards Drafting Team Update Cyber Security Standards Drafting Team Update Michael Assante, VP & Chief Security Officer North American Electric Reliability Corp. February 3, 2008 Overview About NERC Project Background Proposed Modifications

More information

ISO/IEC JTC 1/SC 35 N 1664

ISO/IEC JTC 1/SC 35 N 1664 ISO/IEC JTC 1/SC 35 N 1664 DATE: 2011-03-29 ISO/IEC JTC 1/SC 35 User Interfaces Secretariat: AFNOR DOC TYPE: TITLE: SOURCE: PROJECT: STATUS: WD Information technology User interfaces Principal voice commands

More information

AN OVERVIEW OF FACTORY AUTOMATION REQUIREMENTS AND DESIGN AUX

AN OVERVIEW OF FACTORY AUTOMATION REQUIREMENTS AND DESIGN AUX AN OVERVIEW OF FACTORY AUTOMATION REQUIREMENTS AND DESIGN AUX 0002-0600 Foreword Publication of this document as Auxiliary Information independent of any standards was authorized by a 2/3- majority vote

More information

Contributed by Djingov, Gouginski, Kyutchukov & Velichkov

Contributed by Djingov, Gouginski, Kyutchukov & Velichkov Contributed by Djingov, Gouginski, Kyutchukov & Velichkov General I Data Protection Laws National Legislation General data protection laws The Personal Data Protection Act implemented the Data Protection

More information

THIS DOCUMENT IS STILL UNDER STUDY AND SUBJECT TO CHANGE. IT SHOULD NOT BE USED FOR REFERENCE PURPOSES.

THIS DOCUMENT IS STILL UNDER STUDY AND SUBJECT TO CHANGE. IT SHOULD NOT BE USED FOR REFERENCE PURPOSES. Final Committee Draft ISO/IEC FCD 14957 Date: 2007-12-23 Reference number: ISO/JTC 1/SC 32N1678 Supersedes document SC 32N1399 THIS DOCUMENT IS STILL UNDER STUDY AND SUBJECT TO CHANGE. IT SHOULD NOT BE

More information

CD-ROM COMPATIBLE TAPE FORMAT FOR INSTALLABLE FILE SYSTEM

CD-ROM COMPATIBLE TAPE FORMAT FOR INSTALLABLE FILE SYSTEM QIC-174 Revision A 21 Mar 96 CD-ROM COMPATIBLE TAPE FORMAT FOR INSTALLABLE FILE SYSTEM (See important notices on the following page) Important Notices This document is a development standard adopted by

More information

Standard Development Timeline

Standard Development Timeline Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard is adopted by the NERC Board of Trustees (Board).

More information

Enterprise - Control System Integration Part 2: Object Model Attributes

Enterprise - Control System Integration Part 2: Object Model Attributes ISA Draft 95.00.02 Draft Standard Enterprise - Control System Integration Part 2: Object Model Attributes Draft 9 May 2001 Deleted: 8 Deleted: April This document is a draft that represents work being

More information

IEEE P1564 Voltage Sag Indices Task Force Meeting

IEEE P1564 Voltage Sag Indices Task Force Meeting IEEE P1564 Voltage Sag Indices Task Force Meeting Dan Sabin Electrotek Concepts, Inc. d.sabin@ieee.org January14, 2013 Memphis, Tennessee, USA IEEE P1564 Task Force Meeting Agenda Introductions Patent

More information

primary Control Center, for the exchange of Real-time data with its Balancing

primary Control Center, for the exchange of Real-time data with its Balancing A. Introduction 1. Title: Reliability Coordination Monitoring and Analysis 2. Number: IRO-002-5 3. Purpose: To provide System Operators with the capabilities necessary to monitor and analyze data needed

More information

This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective.

This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Description of Current Draft

More information

TR-374 YANG modules for management of G.hn systems in FTTdp architectures

TR-374 YANG modules for management of G.hn systems in FTTdp architectures TECHNICAL REPORT TR-374 YANG modules for management of G.hn systems in FTTdp architectures Issue: 1 Issue Date: June 2018 The Broadband Forum. All rights reserved. Notice The Broadband Forum is a non-profit

More information

CGI Deliverables Approval and Maintenance Process

CGI Deliverables Approval and Maintenance Process CGI Management CGI Deliverables Approval and Maintenance Process Approved 02 September 2011 1. Introduction The following describes the official approval and maintenance process for the Common Global Implementation

More information

ISO INTERNATIONAL STANDARD. Adhesives T-peel test for flexible-toflexible

ISO INTERNATIONAL STANDARD. Adhesives T-peel test for flexible-toflexible INTERNATIONAL STANDARD ISO 11339 Third edition 2010-02-15 Adhesives T-peel test for flexible-toflexible bonded assemblies Adhésifs Essai de pelage en T d'assemblages collés flexible sur flexible Reference

More information

4.2 Electronic Mail Policy

4.2 Electronic Mail Policy Policy Statement E-mail is an accepted, efficient communications tool for supporting departmental business. As provided in the Government Records Act, e-mail messages are included in the definition of

More information

Market Participant Client Platform

Market Participant Client Platform PUBLIC IESO_ISTD_0017 Market Participant Client Platform Information Technology Standard Issue 2.0 This document is intended to clearly and concisely present the standards and guidelines for the upgrade

More information

Compliance Verification Program Governance Guide

Compliance Verification Program Governance Guide Compliance Verification Program Governance Guide Version 1.0.0 9/19/2018 Executive Summary LF Networking is offering compliance verification through its OPNFV Verification Program (OVP). The OVP verifies

More information

Wireless Innovation Forum Contribution

Wireless Innovation Forum Contribution [WINNF-IN-00] 0 0 Wireless Innovation Forum Contribution Committee: SSC WG CBSD Task Group Title: WInnForum CBSD/DP UUT Security Test Cases Tutorial Short Title: WInnForum CBSD/DP UUT Security Test Cases

More information

CIP Cyber Security Configuration Change Management and Vulnerability Assessments

CIP Cyber Security Configuration Change Management and Vulnerability Assessments Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed

More information

ISO INTERNATIONAL STANDARD. Adhesives Peel test for a flexible-bonded-to-rigid test specimen assembly Part 2: 180 peel

ISO INTERNATIONAL STANDARD. Adhesives Peel test for a flexible-bonded-to-rigid test specimen assembly Part 2: 180 peel INTERNATIONAL STANDARD ISO 8510-2 Second edition 2006-12-01 Adhesives Peel test for a flexible-bonded-to-rigid test specimen assembly Part 2: 180 peel Adhésifs Essai de pelage pour un assemblage collé

More information

Proposed Clean and Redline for Version 2 Implementation Plan

Proposed Clean and Redline for Version 2 Implementation Plan Exhibit A Implementation Plans for CIP-002-2 through CIP-009-2 and CIP-002-3 and CIP-009-3 For Generator Owners and Generator Operators of U.S. Nuclear Power Plants Proposed Clean and Redline for Version

More information

Overview of OGC Document Types

Overview of OGC Document Types Overview of Document Types Carl Reed February 2015 Overview The following set of slides documents the current set of key documents, their key policy and procedure actions, and key document work flows.

More information

IOGP. Supplementary Procedure for Development and Maintenance of ISO Standards as an ISO Liaison Member. Approved

IOGP. Supplementary Procedure for Development and Maintenance of ISO Standards as an ISO Liaison Member. Approved IOGP Supplementary Procedure for Development and Maintenance of ISO Standards as an ISO Liaison Member Approved 20170707 Disclaimer Whilst every effort has been made to ensure the accuracy of this procedure,

More information

ISO/IEC INTERNATIONAL STANDARD. Information technology Abstract Syntax Notation One (ASN.1): Parameterization of ASN.

ISO/IEC INTERNATIONAL STANDARD. Information technology Abstract Syntax Notation One (ASN.1): Parameterization of ASN. INTERNATIONAL STANDARD ISO/IEC 8824-4 Fifth edition 2015-11-15 Information technology Abstract Syntax Notation One (ASN.1): Parameterization of ASN.1 specifications Technologies de l'information Notation

More information

Development System (UL CSDS)

Development System (UL CSDS) UL Collaborative Standards Development System (UL CSDS) s UL CSDS Basics What is UL CSDS? The UL Collaborative Standards Development System (CSDS) was created to further enhance the maintenance of UL's

More information

Standards Designation and Organization Manual

Standards Designation and Organization Manual Standards Designation and Organization Manual InfoComm International Standards Program Ver. 2014-1 April 28, 2014 Issued by: Joseph Bocchiaro III, Ph.D., CStd., CTS-D, CTS-I, ISF-C Director of Standards

More information

OASIS - Artifact naming guidelines

OASIS - Artifact naming guidelines OASIS - Artifact naming guidelines Working Draft 06, 9 July 2004 Document identifier: Location: http://www.oasis-open.org/apps/org/workgroup/tab/documents.php Editor: Tim Moses Contributors: William Cox

More information

ECLIPSE FOUNDATION, INC. INDIVIDUAL COMMITTER AGREEMENT

ECLIPSE FOUNDATION, INC. INDIVIDUAL COMMITTER AGREEMENT ECLIPSE FOUNDATION, INC. INDIVIDUAL COMMITTER AGREEMENT THIS INDIVIDUAL COMMITTER AGREEMENT (THE AGREEMENT ) is entered into as of the day of, 20 (the Effective Date ) by and between Eclipse Foundation,

More information

Circulated to P- and O-members, and to technical committees and organizations in liaison for voting (P-members only) by:

Circulated to P- and O-members, and to technical committees and organizations in liaison for voting (P-members only) by: Committee Draft ISO/IEC CD 24706 Date: 2006-05-01 Reference number: ISO/JTC 1/SC 32N1469 Supersedes document SC 32N1257 THIS DOCUMENT IS STILL UNDER STUDY AND SUBJECT TO CHANGE. IT SHOULD NOT BE USED FOR

More information

Research in Ireland Conference (THRIC)

Research in Ireland Conference (THRIC) 12 th Annual Tourism and Hospitality Research in Ireland Conference (THRIC) SUBMISSION GUIDELINES ABSTRACTS AND PAPERS IMPORTANT DATES Conference Notification/Abstract Call 9 th November 2015 Extended

More information

Web Point and Print White Paper

Web Point and Print White Paper 07/26/2010 Technical Information: White Paper Document Version 1.0 Copyright 2010 RICOH Americas Corporation. All rights reserved. Page 1 of 9 Visit our Knowledgebase at: http://tsrc.ricoh-usa.com/ref/faq.asp

More information

OpenChain Specification Version 1.2 pc6 (DRAFT) [With Edit Markups Turned Off]

OpenChain Specification Version 1.2 pc6 (DRAFT) [With Edit Markups Turned Off] OpenChain Specification Version 1.2 pc6 (DRAFT) [With Edit Markups Turned Off] DRAFT: This is the near final draft of the 1.2 version of the OpenChain Specification. We have recently completed the final

More information

OpenChain Specification Version 1.3 (DRAFT)

OpenChain Specification Version 1.3 (DRAFT) OpenChain Specification Version 1.3 (DRAFT) 2018.10.14 DRAFT: This is the draft of the next version 1.3 of the OpenChain specification. Recommended changes to be made over the current released version

More information

SSC-WG4 Certification Process

SSC-WG4 Certification Process SSC-WG4 Certification Process Document WINNF-15-P-0060-V1.0.0 19 October 2015 1 Terms and Conditions This document has been prepared by the SSC WG4 to assist The Software Defined Radio Forum Inc. (or its

More information

International SEMATECH Technology Transfer # D-XFR

International SEMATECH Technology Transfer # D-XFR 300 mm Equipment Base Software Functionality Requirements Fixed Buffer and Internal Buffer Type Equipment: Selete/ CIM Base Functionality Requirements Collaboration, Phase 1 Rev. 2.0 and the logo are registered

More information

ANSI/CEA Standard. Fiber-Optic Channel Specification

ANSI/CEA Standard. Fiber-Optic Channel Specification ANSI/CEA Standard Fiber-Optic Channel Specification ANSI/CEA-709.4 February 2013 [Note: This standard is the same as EIA-709.4, later renamed CEA-709.4, which was approved as an EIA standard in November

More information

SCA v4.1 SAD and DCD Uniformity

SCA v4.1 SAD and DCD Uniformity SCA v4.1 SAD and DCD Uniformity Document WINNF-15-R-0026 Version V1.0.0 May 29, 2015 Slide 1 Terms and Conditions This document has been prepared by the SCA 4.1 Draft Adjudication Work Group to assist

More information

Introduction to the American Academy of Forensic Sciences Standards Board

Introduction to the American Academy of Forensic Sciences Standards Board Introduction to the American Academy of Forensic Sciences Standards Board Introduction Teresa Ambrosius, Secretariat Mary McKiel, Communication Liaison Technical Coordinator Position to be filled Background

More information

Video Services Forum Rules of Procedure

Video Services Forum Rules of Procedure Rules and procedures for compliance with the VSF IPR Policy January 17, 2017 Introduction This document is intended to assist Video Services Forum ( VSF ) chairpersons, members and staff in taking the

More information

COMMISSION IMPLEMENTING DECISION (EU)

COMMISSION IMPLEMENTING DECISION (EU) L 127/32 18.5.2016 COMMISSION IMPLEMTING DECISION (EU) 2016/770 of 14 April 2016 establishing a common format for the submission of information concerning the operation of the procedures pursuant to Regulation

More information

Standard COM-002-2a Communications and Coordination

Standard COM-002-2a Communications and Coordination A. Introduction 1. Title: Communication and Coordination 2. Number: COM-002-2a 3. Purpose: To ensure Balancing Authorities, Transmission Operators, and Generator Operators have adequate communications

More information

ACH Audit Guide for Third-Party Senders Step-by-Step Guidance and Interactive Form For Internal ACH Audits Audit Year 2017

ACH Audit Guide for Third-Party Senders Step-by-Step Guidance and Interactive Form For Internal ACH Audits Audit Year 2017 Publications ACH Audit Guide for Third-Party Senders Step-by-Step Guidance and Interactive Form For Internal ACH Audits Audit Year 2017 Price: $250 Member Price: $125 (Publication #505-17) A new approach

More information

ISO/IEC TS Conformity assessment Guidelines for determining the duration of management system certification audits

ISO/IEC TS Conformity assessment Guidelines for determining the duration of management system certification audits TECHNICAL SPECIFICATION ISO/IEC TS 17023 First edition 2013-08-01 Conformity assessment Guidelines for determining the duration of management system certification audits Évaluation de la conformité Lignes

More information

AMENDMENT ISO/IEC :2005 FDAM 1 FINAL DRAFT

AMENDMENT ISO/IEC :2005 FDAM 1 FINAL DRAFT FINAL DRAFT AMENDMENT ISO/IEC 7816-4:2005 FDAM 1 ISO/IEC JTC 1 Secretariat: ANSI Voting begins on: 2008-07-08 Voting terminates on: 2008-09-08 Identification cards Integrated circuit cards Part 4: Organization,

More information

IEEE Standards Association. Sponsor Balloting Process Using myproject

IEEE Standards Association. Sponsor Balloting Process Using myproject IEEE Standards Association Sponsor Balloting Process Using myproject What is the standards process? There are 6 steps to the IEEE Standards Process 1. Initiating the project An idea for a standard is proposed

More information

Mississippi Medicaid. Mississippi Medicaid Program Provider Enrollment P.O. Box Jackson, Mississippi Complete form and mail original to:

Mississippi Medicaid. Mississippi Medicaid Program Provider Enrollment P.O. Box Jackson, Mississippi Complete form and mail original to: Mississippi Medicaid Complete form and mail original to: Blank forms may by copied. Call LTC at 888-941-8967 if you have questions. Please complete the following Mississippi Medicaid Provider EDI Enrollment

More information

Inter American Accreditation Cooperation. IAAC, IAF and ILAC Resolutions Applicable to IAAC MLA Peer Evaluations

Inter American Accreditation Cooperation. IAAC, IAF and ILAC Resolutions Applicable to IAAC MLA Peer Evaluations IAAC, IAF and ILAC Resolutions Applicable to IAAC MLA Peer Evaluations CLASSIFICATION This document is classified as an IAAC Mandatory Document. AUTHORIZATION Issue Nº: 07 Prepared by: MLA Committee and

More information

Instructions for PC Chairs - How to take Comments Offline and Send Responses to Commenters (and other options available to the Chair)

Instructions for PC Chairs - How to take Comments Offline and Send Responses to Commenters (and other options available to the Chair) October 2012 1. Go to the online comment database at https://osr.ashrae.org/default.aspx. NOTE: Please see the Instructions for Project Committee Members for additional information on how to login to the

More information

TITLE 595. DEPARTMENT OF PUBLIC SAFETY CHAPTER 10. CLASS D DRIVER LICENSES AND IDENTIFICATION CARDS AND MOTOR LICENSE AGENT PROCEDURES

TITLE 595. DEPARTMENT OF PUBLIC SAFETY CHAPTER 10. CLASS D DRIVER LICENSES AND IDENTIFICATION CARDS AND MOTOR LICENSE AGENT PROCEDURES TITLE 595. DEPARTMENT OF PUBLIC SAFETY CHAPTER 10. CLASS D DRIVER LICENSES AND IDENTIFICATION CARDS AND MOTOR LICENSE AGENT PROCEDURES RULEMAKING ACTION: EMERGENCY adoption PROPOSED RULES: Subchapter 11.

More information

Certification Test Requirements for Conformance with the Standard Spectrum Resource Format (SSRF) Document WINNF-14-S-0022

Certification Test Requirements for Conformance with the Standard Spectrum Resource Format (SSRF) Document WINNF-14-S-0022 Certification Test Requirements for Conformance with the Standard Spectrum Resource Format (SSRF) Document WINNF-14-S-0022 Version V2.0.0 10 Feburary 2015 TERMS, CONDITIONS & NOTICES This document has

More information

IEEE-SA Standards Board Project Authorization Request (PAR) Form (2002)

IEEE-SA Standards Board Project Authorization Request (PAR) Form (2002) 2002-09-26 IEEE 802.16-02/47 IEEE-SA Standards Board Project Authorization Request (PAR) Form (2002) For a review of the Standards Development Process (designed to assist the Working Group, Working Group

More information

Regulatory Notice 14-39

Regulatory Notice 14-39 Regulatory Notice 14-39 Electronic Filing New Template Available on FINRA Firm Gateway for Compliance With SEA Rule 17a-5(f)(2) (Statement Regarding Independent Public Accountant) Executive Summary In

More information

Government of Ontario IT Standard (GO-ITS) Number 30.2 OPS Middleware Software for Java Platform

Government of Ontario IT Standard (GO-ITS) Number 30.2 OPS Middleware Software for Java Platform Government of Ontario IT Standard (GO-ITS) Number 30.2 OPS Middleware Software for Java Platform Version #: 1.0 Status: Approved Prepared for the Information Technology Standards Council (ITSC) under the

More information

Government of Ontario IT Standard (GO ITS)

Government of Ontario IT Standard (GO ITS) Government of Ontario IT Standard (GO ITS) GO-ITS Number 56.3 Information Modeling Standard Version # : 1.5 Status: Approved Prepared under the delegated authority of the Management Board of Cabinet Queen's

More information

Systems and software engineering Requirements for testers and reviewers of information for users

Systems and software engineering Requirements for testers and reviewers of information for users INTERNATIONAL STANDARD ISO/IEC/ IEEE 26513 Second edition 2017-10 Systems and software engineering Requirements for testers and reviewers of information for users Ingénierie des systèmes et du logiciel

More information

LONG-RANGE IDENTIFICATION AND TRACKING SYSTEM TECHNICAL DOCUMENTATION (PART II)

LONG-RANGE IDENTIFICATION AND TRACKING SYSTEM TECHNICAL DOCUMENTATION (PART II) E 4 ALBERT EMBANKMENT LONDON SE1 7SR Telephone: +44 (0)20 7735 7611 ax: +44 (0)20 7587 3210 LONG-RANGE IDENTIICATION AND TRACKING SYSTEM TECHNICAL DOCUMENTATION (PART II) MSC.1/Circ.1294/Rev.5 17 January

More information

ISO/IEC/ IEEE INTERNATIONAL STANDARD. Systems and software engineering Architecture description

ISO/IEC/ IEEE INTERNATIONAL STANDARD. Systems and software engineering Architecture description INTERNATIONAL STANDARD ISO/IEC/ IEEE 42010 First edition 2011-12-01 Systems and software engineering Architecture description Ingénierie des systèmes et des logiciels Description de l'architecture Reference

More information

FIPA ACL Message Structure Specification

FIPA ACL Message Structure Specification 1 2 3 4 5 FOUNDATION FOR INTELLIGENT PHYSICAL AGENTS FIPA ACL Message Structure Specification 6 7 Document title FIPA ACL Message Structure Specification Document number XC00061E Document source FIPA TC

More information

PUR1205/07. Request for Information (RFI) Provision of Lotus Domino environment and Lotus Notes application support service.

PUR1205/07. Request for Information (RFI) Provision of Lotus Domino environment and Lotus Notes application support service. PUR1205/07 Request for Information (RFI) Provision of Lotus Domino environment and Lotus Notes application support service to the European Bank for Reconstruction and Development TABLE OF CONTENTS 1. Introduction...2

More information

IEEE P1564 Voltage Sag Indices Task Force Meeting

IEEE P1564 Voltage Sag Indices Task Force Meeting 100 Va Vb Vc Voltage (%) 50 0-50 -100-2 0 2 4 6 8 10 12 Time (c) IEEE P1564 Voltage Sag Indices Task Force Meeting Daniel Sabin Electrotek Concepts, Inc. d.sabin@ieee.org 23 July 2013 Vancouver, British

More information

Test Assertions for the SCA Web Service Binding Version 1.1 Specification

Test Assertions for the SCA Web Service Binding Version 1.1 Specification Test Assertions for the SCA Web Service Binding Version 1.1 Specification Working Draft 02 7 October 2009 Specification URIs: This Version: http://docs.oasis-open.org/sca-bindings/sca-wsbinding-1.1-test-assertions-cd01.html

More information

CONTINUOUS PROFESSIONAL DEVELOPMENT (CPD) POLICY

CONTINUOUS PROFESSIONAL DEVELOPMENT (CPD) POLICY CONTINUOUS PROFESSIONAL DEVELOPMENT (CPD) POLICY SUMMARY: This defined as a framework that encourages continuous updating of professional knowledge, personal skills and competencies. DATE OF APPROVAL FOR

More information

Examination Guidelines for Design (Provisional translation)

Examination Guidelines for Design (Provisional translation) Examination Guidelines for Design (Provisional translation) Japan Patent Office Examination Guidelines for Design The Examination Guidelines for Design aims to ensure consistent interpretation and implementation

More information

Standard Development Timeline

Standard Development Timeline Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Description of Current Draft

More information

GNSO Council Report to the ICANN Board Locking of a Domain Name subject to UDRP Proceedings PDP

GNSO Council Report to the ICANN Board Locking of a Domain Name subject to UDRP Proceedings PDP GNSO Council Report to the ICANN Board Locking of a Domain Name subject to UDRP Proceedings PDP Executive Summary The Generic Names Supporting Organization (GNSO) unanimously approved at its meeting on

More information

Standard INT Dynamic Transfers

Standard INT Dynamic Transfers Standard INT-004-3.1 Dynamic Transfers A. Introduction 1. Title: Dynamic Transfers 2. Number: INT-004-3.1 3. Purpose: To ensure Dynamic Schedules and Pseudo-Ties are communicated and accounted for appropriately

More information

ISO/IEC INTERNATIONAL STANDARD. Information technology JPEG XR image coding system Part 5: Reference software

ISO/IEC INTERNATIONAL STANDARD. Information technology JPEG XR image coding system Part 5: Reference software INTERNATIONAL STANDARD ISO/IEC 29199-5 Second edition 2012-03-15 Information technology JPEG XR image coding system Part 5: Reference software Technologies de l'information Système de codage d'image JPEG

More information

WORLD AIRLINE ENTERTAINMENT ASSOCIATION TECHNOLOGY COMMITTEE WAEA SPECIFICATION

WORLD AIRLINE ENTERTAINMENT ASSOCIATION TECHNOLOGY COMMITTEE WAEA SPECIFICATION WORLD AIRLINE ENTERTAINMENT ASSOCIATION TECHNOLOGY COMMITTEE WAEA SPECIFICATION 1289-2 Specification for Mastertape Recording, Tape Duplication, Compact Disc Replication, and Digital Encoding for Airborne

More information

AE On-Site Audit. Welcome to the AE On Site Audit training. Course #

AE On-Site Audit. Welcome to the AE On Site Audit training. Course # Welcome to the AE On Site Audit training. Course # 002 01 04 1 This webcast includes spoken narration. To adjust the volume, use the controls at the bottom of the screen. While viewing this webcast, there

More information

INTERNATIONAL STANDARD

INTERNATIONAL STANDARD INTERNATIONAL STANDARD ISO/IEC 90003 First edition 2004-02-15 Software engineering Guidelines for the application of ISO 9001:2000 to computer software Ingénierie du logiciel Lignes directrices pour l'application

More information

This is a preview - click here to buy the full publication PUBLICLY AVAILABLE SPECIFICATION. Pre-Standard

This is a preview - click here to buy the full publication PUBLICLY AVAILABLE SPECIFICATION. Pre-Standard PUBLICLY AVAILABLE SPECIFICATION Pre-Standard IEC PAS 61512-3 First edition 2004-11 Batch control Part 3: General and site recipe models and representation Reference number IEC/PAS 61512-3:2004(E) AMERICAN

More information

OpenChain Conformance 2016-H1 Specification

OpenChain Conformance 2016-H1 Specification Contents Introduction... 3 Definitions... 4 Requirements... 5 G1: Know Your FOSS Responsibilities... 5 G2: Assign Responsibility for Achieving Compliance... 6 G3: Review and Approve FOSS Content... 7 G4:

More information

Style and Formatting Guide ( )

Style and Formatting Guide ( ) Style and Formatting Guide (3-19-2002) Document Type: [American National Standard, Trial-Use Standard, Joint Standard, Technical Report, Technical Requirement, T1 Specification, etc.] [NOTE - Fill in all

More information

EXAM PREPARATION GUIDE

EXAM PREPARATION GUIDE When Recognition Matters EXAM PREPARATION GUIDE PECB Certified ISO 22000 Lead Auditor www.pecb.com The objective of the Certified ISO 22000 Lead Auditor examination is to ensure that the candidate has

More information

This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective.

This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed

More information

Physical Security Reliability Standard Implementation

Physical Security Reliability Standard Implementation Physical Security Reliability Standard Implementation Attachment 4b Action Information Background On March 7, 2014, the Commission issued an order directing NERC to submit for approval, within 90 days,

More information

File No. SR-NASD-00-70

File No. SR-NASD-00-70 November 29, 2000 Ms. Katherine A. England Assistant Director Division of Market Regulation Securities and Exchange Commission 450 Fifth Street, N.W. Washington, D.C. 20549-1001 Re: File No. SR-NASD-00-70

More information

CIP Cyber Security Configuration Management and Vulnerability Assessments

CIP Cyber Security Configuration Management and Vulnerability Assessments Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed

More information

Regulatory Notice 08-26

Regulatory Notice 08-26 Regulatory Notice 08-26 Investor Education Proposed Consolidated FINRA Rule Addressing Investor Education and Protection Comment Period Expires: June 13, 2008 Executive Summary As part of the process of

More information

Specification for TRAN Layer Services

Specification for TRAN Layer Services Specification for TRAN Layer Services Version 1.0 November 3, 1995 Sponsored by: Architecture Working Group of the 1394 Trade Association Approved for Release by: 1394 Trade Association Steering Committee

More information