WHEEL LUG NUT MACHINES

Size: px
Start display at page:

Download "WHEEL LUG NUT MACHINES"

Transcription

1 1) OVERVIEW This document summarizes the current ITM requirements for new Wheel Lug Nut Torque Machines to be installed in Chrysler Assembly Plants. This document is managed by the ITM Assembly System Launch Management Group (ASLM) of Chrysler. For the latest version of this document, please contact a member of this group. Please refer to the BOIG (Book of Implementation Guidelines) for specific hardware part numbers. Deviations to equipment from this document must be approved through the launch deviation process. 2) SCOPE This document applies to new equipment built from 3/1/2003 forward. It does not imply that any existing equipment shall be modified to meet these requirements. It can be used as a reference for existing equipment that is being refurbished. 3) OPERATION OF EQUIPMENT 1. A standard Wheel Lug Nut Machine is PC Based 2. Chrysler ITM shall specify the make and model of PC to be used in the machine. This shall ensure that the plant will be able to provide hardware support. 3. Chrysler ITM shall need to approve the operating system to be used on the PC. (Typically called the software slam ) 4. The equipment must be capable of detecting the wheel (front vs. rear and left side vs. right side) on which the current torque operation is being performed. 5. Send a unique PFCS machine ID for each wheel 6. The equipment must be capable of operating in plants with or without QAS. 7. In QAS mode: The Quality Alert System (QAS) will be used to sequence the operator terminals. The lug nut machine will send a VIN of to PFCS at the completion of each cycle. The machine must be capable of accepting style download information. 8. In non QAS mode: Owner: F. Moore Page 1 of 8 Revision: 1.8

2 The Lug Nut Machine shall utilize a fixed barcode scanner to identify the vehicle s VIN from the windshield label. This machine shall send the VIN number to PFS. A scanned VIN must be held in a buffer if a torque operation is in process A screen must be provided to allow an operator to enter the correct VIN in the case of a scanner no read. If no valid VIN is scanned or entered, the torque operation will be allowed to continue, and a default VIN of will be sent with the torque data. The vehicle will be flagged in PFS as a fail 9. Monitor, process (set pass and fail), and transmit both torque and angle values. 10. Have a user settable minimum torque threshold value that at least one of the spindles must achieve before data is sent to PFS. (Don't send a package of 0 torque or angle value's) 11. Send a fail for both the Overall data packet, and each individual spindle that is set in bypass mode. 12. PFS shall not set up problem description codes to identify specific spindle numbers, as it is impossible to positively relate a particular lug nut with a spindle number after the vehicle has left the torque station. 13. AME s process requires a repair person to torque all nuts on a failed wheel. 4) GENERAL PROCESS FLOW This is the process flow from the ITM perspective: 1. Vehicle enters station 2. Non-QAS: Limit switch signals the PC to turn barcode scanner on. 3. Non-QAS: Scanner reads VIN into PC 4. Non-QAS: PC turns scanner off 5. Operator torque's the front wheel. 6. Results are sent to PFS with machine ID LUG1 (front left wheel) or LUG2 (front right wheel). The torque controller will send one message for each wheel with all torque values for that wheel included. 7. Pass/Fail Information is sent to the PFS screen 8. AME s process does not allow the operator to repair fails in station 9. Operator torque's the rear wheel. 10. Results are sent to PFS with machine ID LUG3 (rear left wheel) or LUG4 (rear right wheel) and scanned VIN. 11. Vehicle exits station Owner: F. Moore Page 2 of 8 Revision: 1.8

3 5) AVI (AUTOMATIC VEHICLE IDENTIFICATION) If QAS sequencing is used, barcode scanning is not required. If QAS is not used, then AVI standards apply, specifically to hardware model numbers and the requirement of the PC to duplicate PLC functionality, such as beam control and stack lights. Refer to BOIG documents , (PLC-5 implementations) or (CLx implementations), and (PLC-5 implementations) or (CLx implementations), for detailed AVI Reader Implementation information. 6) FIS (FACTORY INFORMATION SYSTEM) Lugnut machines are not required to connect to FIS. 7) PFCS (PLANT FLOOR COMMUNIATIONS SYSTEM) The device shall conform to PFCS Vendor Specifications, BOIG Document : 1. The connection to PFCS shall be made via Ethernet (TCP/IP). (Must be made through a dedicated NIC, not through a switch or router internal to the machine) 2. Have a unique IP address assigned by the plant. 3. Use PFCS group-certified communication software (a combination of the hardware, firmware and software). No device shall be connected to the Chrysler network until this certification process has been completed. 4. Use a machine ID format of LUG1 (front left), LUG2 (front right), LUG3 (rear left), LUG4 (rear right). The next machine would use machine ID s LUG5 - LUG8. 5. Send torque data as one PFCS message for each wheel. 6. All messages sent back and forth to PFCS shall be logged into a file on the Lugnut PC and kept for 96 hours. Documentation must be provided directing maintenance personnel in how to read and access this file. This is useful for debugging communications problems. 7. Utilize the PFCS recommended DLL software module as the basis of your communications driver. The latest version will be specified by your ASLM contact. Owner: F. Moore Page 3 of 8 Revision: 1.8

4 8) PFS (PERFORMANCE FEEDBACK SYSTEM) Every Lug Nut Machine shall be tested at the OEM's facility for its ability to communicate to PFS before delivery to the assembly plant. Contact your ITM ASLM representative for more information. DATA FORMAT Start End Len Description Machine ID, LUG1 - LUG4 or LUG5 - LUG Spaces Message Sequence Number (refer to PFCS Vendor Specs) Data byte count (position 22 to the end, exclude <CR> Spaces Last 6 of the VIN (Zero's) Date and Time (YYMMDDHHMMSS) Overall Pass/Fail (P/F) Pass/Fail of First Measurement Spindle number (01-x) Torque Status (Pass or Fail) Torque High Limit Torque Low Limit Torque Reading Angle Status (Pass or Fail) Angle High Limit Angle Low Limit Angle Reading Results for Spindle Results for spindle 3 Etc. Results for spindle 4-x. Owner: F. Moore Page 4 of 8 Revision: 1.8

5 9) SYSTEM ARCHITECTURE NON QAS B a r c o d e S c a n n e r R Y G B P F C S V e h ic le RS-232 Ethernet V e h ic le S e n s o r ( L S o r P /E ) V e h ic le S e n s o r ( L S o r P /E ) C o n v e y o r M o v e m e n t Owner: F. Moore Page 5 of 8 Revision: 1.8

6 10) ACCEPTANCE CRITERIA This is a summary of the ITM acceptance criteria required of the vendor; please refer to the Chrysler Do s and Don ts for more detail. 1. PFCS certification must be completed before: The device can be attached to the plant network PFS data certification can be conducted 2. PFS certification must be complete before the device ships to the plant. 3. AVI standard point certification must be followed if an AVI barcode reader is used; this includes testing at the OEM prior to equipment shipping. 4. No FIS certification is required. 5. The following line items must be tracked in the OEM timeline: 1. ITM Hardware Design 2. ITM Software Design 3. ITM Communications Testing At Chrysler (PFCS) 4. ITM System Testing At OEM (PFS Functionality) 5. ITM System Testing at Chrysler Assembly Plant Owner: F. Moore Page 6 of 8 Revision: 1.8

7 Document Revisions Doc. Rev. Date Doc. Rev. Number Doc. Rev. Description Section No. Revised 10/29/ Second draft All 12/10/ Add QAS TNG as a requirement (does not support QAS TFG. Add wording requiring a viewable history file for communications. 2/20/ Multiple changes after AME review 1,2,3 3/3/ First official Release, paragraph numbers added. All 5/1/ Remove ambiguity Remove The assumption is made 3.1 Make QAS the preferred sequencing method 3.5 Clarify that there is one PFCS for each wheel 4.6 Add QAS wording that no AVI is required if QAS 5 Remove RS-232 option 7.1 Remove barcode option eliminating section Add BOIG wording to AVI documents 5 Clarify terminal sequencing methods 3.7,3.8 Refer to Do s and Don ts for Acceptance section 10 Add exact wording for OEM timelines 10 10/26/ Clarify QAS vs. non QAS Mode 3 Clarify scanner operation Change 48 hours to 96 hours 7.6 Revise timeline wording /11/ Expand BOIG 1 Acceptance criteria clarified /02/ Add QAS Style download Owner: F. Moore Page 7 of 8 Revision: 1.8

8 Owner: F. Moore Page 8 of 8 Revision: 1.8

BRAKE Fill Machines ICT Requirements

BRAKE Fill Machines ICT Requirements Manufacturing Engineering General Assembly (MEGA.ICT-8519-02_A.01) BRAKE Fill Machines ICT Requirements 1) OVERVIEW This document summarizes the current ICT requirements for new machines to be purchased

More information

Leak Test Machines ICT Requirements

Leak Test Machines ICT Requirements Manufacturing Engineering General Assembly (MEGA.ICT-8519-10_A.01) ICT Requirements 1) OVERVIEW This document summarizes the current ICT requirements for new to be purchased and installed in Fiat Chrysler

More information

Automatic Vehicle Identification System (AVI) Training Manual

Automatic Vehicle Identification System (AVI) Training Manual Automatic Vehicle Identification System (AVI) Training Manual Chapter A1: Acronyms Owner: APICS Page 1 of 7 Revision: 1.1 TABLE OF CONTENTS A ACRYONYMS...4 Owner: APICS Page 2 of 7 Revision: 1.1 Document

More information

Book of Implementation Guidelines PFCS Driver Integration for ControlLogix

Book of Implementation Guidelines PFCS Driver Integration for ControlLogix Advance Manufacturing Engineering Book of Implementation Guidelines AMS 0220 Section 11.3.1 Revision Date: 08/01/07 Page 1 of 25 Revision: 1.3 Proprietary Notice This document comprises legally protected

More information

Automatic Product Identification and Control Systems

Automatic Product Identification and Control Systems Automatic Product Identification and Control Systems Presented by: Larry Vavro, Manager APIC Systems Larry Walker, Senior Manager Assembly Systems Processes 3/12/2002 APIC Systems 1 APIC Systems Topics

More information

Mistake Proofing Certification Document

Mistake Proofing Certification Document Mistake Proofing Certification Document Owner: Gerald Stocker Page 1 of 7 Revision: 1.1 TABLE OF CONTENTS 1 INTRODUCTION...4 1.1 DOCUMENT PURPOSE...4 1.2 INTENDED USERS...4 1.3 SUPPORTING DOCUMENTATION...4

More information

Book of Implementation Guidelines PFCS Vendor Specification

Book of Implementation Guidelines PFCS Vendor Specification Manufacturing Engineering PFCS Vendor Specification Revision Date: 07/25/11 Page 1 of 138 Revision: 2.4 Proprietary Notice This document comprises legally protected subject matter proprietary to Chrysler,

More information

Chapter 5 QAS Setup and Configuration

Chapter 5 QAS Setup and Configuration Chapter 5 QAS Setup and Configuration In This Chapter Overview QAS PLC-5 Tracking Image Application Installation and Configuration Incremental Encoder Configuration SoftLogix5 Setup and Configuration Configuration

More information

Book of Implementation Guidelines PFCS Vendor Specification

Book of Implementation Guidelines PFCS Vendor Specification Advance Manufacturing Engineering Book of Implementation Guidelines AMS 0220 Section 11.1.1 Revision Date: 08/01/07 Page 1 of 102 Revision: 2.3 Proprietary Notice This document comprises legally protected

More information

Book of Implementation Guidelines AVI/VMS DeviceNet Reader Installation & Configuration for PLC-5

Book of Implementation Guidelines AVI/VMS DeviceNet Reader Installation & Configuration for PLC-5 Advance Manufacturing Engineering Book of Implementation Guidelines AVI/VMS DeviceNet Reader Installation & Configuration for PLC-5 AMS 0220 Section 14.2.4 Revision Date: 08/01/07 Page 1 of 44 Revision:

More information

Automatic Vehicle Identification System (AVI) Training Manual

Automatic Vehicle Identification System (AVI) Training Manual Automatic Vehicle Identification System (AVI) Training Manual Chapter 7: Supervisory User Interface Owner: APICS Page 1 of 50 Revision: 1.34 TABLE OF CONTENTS 7 SUPERVISORY USER INTERFACE...4 7.1 APIC

More information

Mistake Proofing Software Requirements Document I/O Test

Mistake Proofing Software Requirements Document I/O Test Mistake Proofing Software Requirements Document I/O Test Owner: Nima Bayan Page 1 of 16 Revision: 3.1 TABLE OF CONTENTS 1 INTRODUCTION...4 1.1 DOCUMENT PURPOSE...4 1.2 INTENDED USERS...4 1.3 SUPPORTING

More information

Automatic Vehicle Identification System (AVI) Training Manual

Automatic Vehicle Identification System (AVI) Training Manual Automatic Vehicle Identification System (AVI) Training Manual Chapter 3: Plant Floor Vehicle Identification Owner: APICS Page 1 of 48 Revision: 1.1 TABLE OF CONTENTS 3 PLANT FLOOR VEHICLE IDENTIFICATION...4

More information

PFCS/Qualifier Interface

PFCS/Qualifier Interface PFCS/Qualifier Interface INSTRUCTION MANUAL CE Electronics Inc. 2107 Industrial Drive Bryan, OH 43506 (419) 636-6705 E-mail: sales@ceelectronics.com www.ceelectronics.com PFCS/Qualifier Interface PFCS/Qualifier

More information

Quality Assurance Program Addendum for IEC Specific Product Testing

Quality Assurance Program Addendum for IEC Specific Product Testing Quality Assurance Program Addendum for IEC 61850 Specific Product Testing July 15, 2008 Version 1.3 Prepared for the UCA International Users Group - 1-07/15/2008 PREPARED BY: UCA International Users Group

More information

Request for Proposal for Technical Consulting Services

Request for Proposal for Technical Consulting Services Request for Proposal for Technical Consulting Services The Node.js Foundation is requesting proposals from highly qualified consultants with demonstrated expertise in providing Node.js technical consultation

More information

Documents: 1 QAS Summary Guide. 2 QAS Plant Journal. 3 QAS Plant User Guide. 4 QAS Reference Guide

Documents: 1 QAS Summary Guide. 2 QAS Plant Journal. 3 QAS Plant User Guide. 4 QAS Reference Guide Documents: 1 QAS Summary Guide 2 QAS Plant Journal 3 QAS Plant User Guide 4 QAS Reference Guide 5 QAS Support Team Plant Installation/Update Checklist 6 QAS Support Team Test Checklist 7 QAS Simulation

More information

CIP Cyber Security Configuration Change Management and Vulnerability Assessments

CIP Cyber Security Configuration Change Management and Vulnerability Assessments Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed

More information

EtherNet /IP User Guide

EtherNet /IP User Guide EtherNet /IP User Guide Trademark Notices Comtrol, DeviceMaster, and PortVision are registered trademarks of Comtrol Corporation. ControlLogix, PLC-5 and Rockwell Automation are registered trademarks of

More information

Industrial IT Basic and Extended Set of Aspects

Industrial IT Basic and Extended Set of Aspects ATCE/PA/MS 2003-12-09 En D 1 (6) Category: Approved Industrial IT Basic and Extended Set of Aspects Summary: This document aims at giving the audience guidelines of what to consider when developing and

More information

Forwarding and Queuing for Time-Sensitive Streams

Forwarding and Queuing for Time-Sensitive Streams Forwarding and Queuing for Time-Sensitive Streams Draft 5 Criteria 7/6/2006 Broad Market Potential Broad set(s) of applicability Multiple vendors and numerous users Balanced cost (LAN vs. attached stations)

More information

StruxureWare TM Data Center Operation Periodic Maintenance. Statement Of Work. 2.0 Features & Benefits

StruxureWare TM Data Center Operation Periodic Maintenance. Statement Of Work. 2.0 Features & Benefits - 1 - StruxureWare TM DC Operation Periodic Maintenance Service Integration Service Statement Of Work 1. Executive summary StruxureWare TM Data Center Operation Periodic Maintenance Table of Contents 1.0

More information

QUALITY SYSTEM PROCEDURE CONTROL OF RECORDS

QUALITY SYSTEM PROCEDURE CONTROL OF RECORDS Page : 1 of 11 0 01.04.17 Issued for Implementation S. Chauhan A. Bhargava (COO) Rev. Date Description Prepared Checked & No. By Approved By D.N.Pal (MR) Authorized By This document is exclusive property

More information

MANUFACTURING TECHNICAL INSTRUCTIONS - SAFETY. Subject: Control Reliability for Machinery & Equipment

MANUFACTURING TECHNICAL INSTRUCTIONS - SAFETY. Subject: Control Reliability for Machinery & Equipment DAIMLERCHRYSLER MANUFACTURING TECHNICAL INSTRUCTIONS - SAFETY Subject: Control Reliability for Machinery & Equipment ISSUE DATE: January 3, 2005 EFFECTIVE DATE: January 31, 2005 REVIEW DATE. June 26, 2007

More information

Standard CIP Cyber Security Physical Security

Standard CIP Cyber Security Physical Security A. Introduction 1. Title: Cyber Security Physical Security of Critical Cyber Assets 2. Number: CIP-006-3 3. Purpose: Standard CIP-006-3 is intended to ensure the implementation of a physical security program

More information

THE MOST EFFECTIVE TOOL TO MANAGE AND VISUALIZE YOUR INDUSTRIAL ETHERNET NETWORK AND CONNECTED DEVICES. Network Vision Inc.

THE MOST EFFECTIVE TOOL TO MANAGE AND VISUALIZE YOUR INDUSTRIAL ETHERNET NETWORK AND CONNECTED DEVICES. Network Vision Inc. THE MOST EFFECTIVE TOOL TO MANAGE AND VISUALIZE YOUR INDUSTRIAL ETHERNET NETWORK AND CONNECTED DEVICES. Industrial Automation Networks Ethernet deployment on the factory floor is expanding at an accelerating

More information

Power Focus 4000 A new level of tightening intelligence

Power Focus 4000 A new level of tightening intelligence Power Focus 4000 A new level of tightening intelligence Presenting the Power Focus 4000 With your productivity in mind, we present the next generation of control systems for Tensor tools. The Power Focus

More information

Standard CIP 007 3a Cyber Security Systems Security Management

Standard CIP 007 3a Cyber Security Systems Security Management A. Introduction 1. Title: Cyber Security Systems Security Management 2. Number: CIP-007-3a 3. Purpose: Standard CIP-007-3 requires Responsible Entities to define methods, processes, and procedures for

More information

ASG-NW2500-ACOP ACOP Network Communication Module. User s Guide

ASG-NW2500-ACOP ACOP Network Communication Module. User s Guide ASG-NW2500-ACOP ACOP Network Communication Module ŀ User s Guide Version 2.0.1 January, 2014 X-PAQ/ACOP Network Addendum 1 of 17 ASG Precision Fastening ASG-NW2500-ACOP User s Guide Version 2.0.1 Major

More information

Certification Report. EAL 4+ (ALC_DVS.2) Evaluation of TÜBİTAK BİLGEM UEKAE. AKİS v1.4i PASAPORT

Certification Report. EAL 4+ (ALC_DVS.2) Evaluation of TÜBİTAK BİLGEM UEKAE. AKİS v1.4i PASAPORT Certification Report EAL 4+ (ALC_DVS.2) Evaluation of TÜBİTAK BİLGEM UEKAE AKİS v1.4i PASAPORT issued by Turkish Standards Institution Common Criteria Certification Scheme SOFTWARE TEST and CERTIFICATION

More information

Knowledge Base Article. Integrating ISONAS Access Control System with TagMaster LR-series RFID Readers

Knowledge Base Article. Integrating ISONAS Access Control System with TagMaster LR-series RFID Readers Knowledge Base Article Integrating ISONAS Access Control System with TagMaster LR-series RFID Readers Copyright 2009-2013 ISONAS Security Systems All rights reserved Table of Contents 1: INTRODUCTION...

More information

IATF - International Automotive Task Force Rules for achieving and maintaining IATF Recognition IATF Rules 5 th Edition Sanctioned Interpretations

IATF - International Automotive Task Force Rules for achieving and maintaining IATF Recognition IATF Rules 5 th Edition Sanctioned Interpretations Rules for achieving and maintaining IATF Recognition IATF Rules 5 th Edition Sanctioned Interpretations The Rules for achieving and maintaining IATF Recognition 5 th Edition for IATF 16949 ( Rules 5 th

More information

PRELIMINARY INTERFACE REQUIREMENTS AGREEMENT

PRELIMINARY INTERFACE REQUIREMENTS AGREEMENT PRELIMINARY INTERFACE REQUIREMENTS AGREEMENT November 2007 DRAFT v2.3 Consortium for Ocean Leadership 1201 New York Avenue NW, Fourth Floor, Washington, D.C. 20005 www.joiscience.org Table of Contents

More information

Standard Development Timeline

Standard Development Timeline Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard is adopted by the NERC Board of Trustees (Board).

More information

<PROJECT NAME> IMPLEMENTATION PLAN

<PROJECT NAME> IMPLEMENTATION PLAN IMPLEMENTATION PLAN Version VERSION HISTORY [Provide information on how the development and distribution of the Project Implementation Plan was controlled and tracked.

More information

Credit based Flow Control PAR, 5 Criteria & Objectives

Credit based Flow Control PAR, 5 Criteria & Objectives Credit based Flow Control PAR, 5 Criteria & Objectives Results of 2/20/14 DCB TG CC discussion new dcb lynch cb flow control par 5c obj 0214 v02 1 PROJECT AUTHORIZATION REQUEST Based on IEEE 802 LMSC Operations

More information

FACTORY AUTOMATION. MANUAL OHV-F230-B17 PROFINET Gateway for OHV Handheld

FACTORY AUTOMATION. MANUAL OHV-F230-B17 PROFINET Gateway for OHV Handheld FACTORY AUTOMATION MANUAL OHV-F230-B17 PROFINET Gateway for OHV Handheld R With regard to the supply of products, the current issue of the following document is applicable: The General Terms of Delivery

More information

CYBERSECURITY IMPLEMENTATION FOR THE MARINE AND OFFSHORE INDUSTRIES

CYBERSECURITY IMPLEMENTATION FOR THE MARINE AND OFFSHORE INDUSTRIES GUIDE FOR CYBERSECURITY IMPLEMENTATION FOR THE MARINE AND OFFSHORE INDUSTRIES ABS CyberSafety TM VOLUME 2 SEPTEMBER 2016 NOTICE NO. 2 June 2018 The following Changes were approved by the ABS Rules Committee

More information

Voluntary Product Accessibility Template (VPAT ) WCAG Edition. About This Document. Version 2.2 July 2018

Voluntary Product Accessibility Template (VPAT ) WCAG Edition. About This Document. Version 2.2 July 2018 This document is broken into two main sections: Voluntary Product Accessibility Template (VPAT ) WCAG Edition Version 2.2 July 2018 About This Document...1 Essential Requirements and Best Practices for

More information

COMMON CRITERIA CERTIFICATION REPORT

COMMON CRITERIA CERTIFICATION REPORT COMMON CRITERIA CERTIFICATION REPORT CA Technologies CA API Gateway v9.2 10 October 2017 383-4-417 V 1.0 Government of Canada. This document is the property of the Government of Canada. It shall not be

More information

Ethernet DHX Driver Help Ethernet DHX Driver for Allen-Bradley TCP/IP Networks

Ethernet DHX Driver Help Ethernet DHX Driver for Allen-Bradley TCP/IP Networks Ethernet DHX Driver Help Ethernet DHX Driver for Allen-Bradley TCP/IP Networks Version 9 ETHERNET DHX DRIVER HELP Ethernet DHX Driver for Allen-Bradley TCP/IP Networks Version 9 Copyright 1994-2017, Cyberlogic

More information

Certification Report

Certification Report Certification Report EAL 3+ Evaluation of Juniper Networks M-Series Multiservice Edge Routers, MX-Series 3D Universal Edge Routers, T-Series Core Routers and EX-Series Ethernet Switches running JUNOS 11.4R2

More information

B. System Design and Performance Requirements

B. System Design and Performance Requirements Change History Date Description of Change Pages / Sections Modified Change Approver Initials 6/15/16 Updated division section from 16950 to 26 27 13, removed references to other section numbers 11/21/14

More information

Standard Development Timeline

Standard Development Timeline Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard is adopted by the NERC Board of Trustees (Board).

More information

DRAFT. Cyber Security Communications between Control Centers. March May Technical Rationale and Justification for Reliability Standard CIP-012-1

DRAFT. Cyber Security Communications between Control Centers. March May Technical Rationale and Justification for Reliability Standard CIP-012-1 DRAFT Cyber Security Communications between Control Centers Technical Rationale and Justification for Reliability Standard CIP-012-1 March May 2018 NERC Report Title Report Date I Table of Contents Preface...

More information

Conformity assessment Requirements for bodies providing audit and certification of management systems. Part 6:

Conformity assessment Requirements for bodies providing audit and certification of management systems. Part 6: TECHNICAL SPECIFICATION ISO/IEC TS 17021-6 First edition 2014-12-01 Conformity assessment Requirements for bodies providing audit and certification of management systems Part 6: Competence requirements

More information

Standard CIP 007 4a Cyber Security Systems Security Management

Standard CIP 007 4a Cyber Security Systems Security Management A. Introduction 1. Title: Cyber Security Systems Security Management 2. Number: CIP-007-4a 3. Purpose: Standard CIP-007-4 requires Responsible Entities to define methods, processes, and procedures for

More information

Firmware Release Notes PREMIUM ETYPORT EXEC V5.4 TSX P M TSX P M TSX P M

Firmware Release Notes PREMIUM ETYPORT EXEC V5.4 TSX P M TSX P M TSX P M Status: Official Doc. No.: S1A5907607 Revision: 04 Firmware Release Notes PREMIUM ETYPORT EXEC V5.4 TSX P57 1634M TSX P57 2634M TSX P57 3634M Affected Product (s) Prior Version (s) New Version (s) Date

More information

Docking Station Operational Description

Docking Station Operational Description Docking Station Operational Description August 2018 Copyright 2017, 2018 All Rights Reserved Aures Technologies Changes: Ver 1.0, December 1, 2017, 1 st release Ver 1.1, January 11, 2018, add static IP

More information

Implementing an EtherNet/IP Device DTM

Implementing an EtherNet/IP Device DTM Implementing an EtherNet/IP Device DTM Rick Blair, Schneider Electric www.odva.org Technical Track Overview Introduction to FDT/DTM Implementation Methods From device description files From existing application

More information

EtherNet/IP with Applied Motion Drives

EtherNet/IP with Applied Motion Drives EtherNet/IP with Applied Motion Drives EtherNet/IP with Applied Motion Drives Jeff Kordik CTO Applied Motion Products, Inc. 1 92-5 Rev. B Applied Motion Products Contents Overview of EtherNet/IP...3 EtherNet/IP

More information

Critical Cyber Asset Identification Security Management Controls

Critical Cyber Asset Identification Security Management Controls Implementation Plan Purpose On January 18, 2008, FERC (or Commission ) issued Order. 706 that approved Version 1 of the Critical Infrastructure Protection Reliability Standards, CIP-002-1 through CIP-009-1.

More information

Streamlining Access Control Systems

Streamlining Access Control Systems Streamlining Access Control Systems Strategies for networking serial-based peripheral devices for access control applications Quatech 5675 Hudson Industrial Parkway Hudson, OH 44236-5012 Tel: (800) 553-1170

More information

Certification Report

Certification Report Certification Report EAL 2+ Evaluation of Tactical Network-layer Gateway (2E2 IA): a GD Canada MESHnet G2 Gateway product Issued by: Communications Security Establishment Canada Certification Body Canadian

More information

Introduction. In This Chapter... Manual Overview Ethernet Base Controller Overview Ethernet Standards

Introduction. In This Chapter... Manual Overview Ethernet Base Controller Overview Ethernet Standards 1 1 In This Chapter.... Manual Overview Ethernet Base Controller Overview Ethernet Standards 1-2 Manual Overview Overview of this Manual This manual describes the installation and operation of the Ethernet

More information

Certification Report

Certification Report Certification Report McAfee Enterprise Security Manager with Event Receiver, Enterprise Log Manager, Advanced Correlation Engine, Application Data Monitor and Database Event Monitor 9.1 Issued by: Communications

More information

IT Security Evaluation and Certification Scheme Document

IT Security Evaluation and Certification Scheme Document IT Security Evaluation and Certification Scheme Document June 2015 CCS-01 Information-technology Promotion Agency, Japan (IPA) IT Security Evaluation and Certification Scheme (CCS-01) i / ii Table of Contents

More information

Enterprise - Control System Integration Part 2: Object Model Attributes

Enterprise - Control System Integration Part 2: Object Model Attributes ISA Draft 95.00.02 Draft Standard Enterprise - Control System Integration Part 2: Object Model Attributes Draft 9 May 2001 Deleted: 8 Deleted: April This document is a draft that represents work being

More information

Certification Report

Certification Report Certification Report McAfee File and Removable Media Protection 4.3.1 and epolicy Orchestrator 5.1.2 Issued by: Communications Security Establishment Certification Body Canadian Common Criteria Evaluation

More information

Certification Report

Certification Report Certification Report EAL 2+ Evaluation of Service Router Operating System (SR OS) v7.0 Issued by: Communications Security Establishment Canada Certification Body Canadian Common Criteria Evaluation and

More information

FieldServer Driver - Ethernet FS EtherNet/IP

FieldServer Driver - Ethernet FS EtherNet/IP Driver Version: 1.02 Document Revision: 2 Description FieldServer Driver - Ethernet FS-8704-14 EtherNet/IP The Ethernet IP driver allows the FieldServer to transfer data to and from devices over Ethernet

More information

Standard CIP Cyber Security Systems Security Management

Standard CIP Cyber Security Systems Security Management A. Introduction 1. Title: Cyber Security Systems Security Management 2. Number: CIP-007-4 3. Purpose: Standard CIP-007-4 requires Responsible Entities to define methods, processes, and procedures for securing

More information

Recommended Functionality for EtherNet/IP Devices

Recommended Functionality for EtherNet/IP Devices Version 10 PR001 November 28, 2018 PUB00070R10 Published by Roundtable for EtherNet/IP Implementors 1 Introduction 1.1 Scope of Document The purpose of this document is to recommend functionality related

More information

CIP Cyber Security Configuration Management and Vulnerability Assessments

CIP Cyber Security Configuration Management and Vulnerability Assessments Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed

More information

SECTION N -- ELECTROSTATIC DISCHARGE (ESD)

SECTION N -- ELECTROSTATIC DISCHARGE (ESD) INSTALLATION REQUIREMENTS AT&T January, 2012 Section N, ATT-TP-76300 Revised NA SECTION N -- ELECTROSTATIC DISCHARGE (ESD) CONTENTS PAGE 1. GENERAL... N-1 1.1. Introduction... N-1 1.2. General Requirements...

More information

Certification Report

Certification Report Certification Report Issued by: Communications Security Establishment Canada Certification Body Canadian Common Criteria Evaluation and Certification Scheme Government of Canada, Communications Security

More information

Document Pricing Guidelines

Document Pricing Guidelines Document Pricing Guidelines Table of Contents New Installation Document Pricing...3 Standard Document Pricing*...4 Unlocked Documents (PDF, IFD, EXCEL or DOC)... 4 Proprietary Documents... 4 Document Conversion

More information

FUNCTIONAL ARCHITECTURE...

FUNCTIONAL ARCHITECTURE... Table of contents 1 INTRODUCTION... 3 1.1 Definitions... 3 2 FUNCTIONAL ARCHITECTURE... 3 3 CQF HOMEPAGE... 5 3.1 User Profiles Login enabling... 5 3.2 "Contact us" function... 6 3.3 "Login" function...

More information

Internetworking Switching and Routing MODULE LEVEL 7 MODULE CREDIT POINTS 30 SI MODULE CODE (if known) Computer Systems & Networks

Internetworking Switching and Routing MODULE LEVEL 7 MODULE CREDIT POINTS 30 SI MODULE CODE (if known) Computer Systems & Networks MODULE DESCRIPTOR MODULE TITLE Internetworking Switching and Routing MODULE LEVEL 7 MODULE CREDIT POINTS 30 SI MODULE CODE (if known) 12-7952 MODULE JACS CODE G410 SUBJECT GROUP Computer Systems & Networks

More information

ICE STORAGE BINS CERTIFICATION PROGRAM

ICE STORAGE BINS CERTIFICATION PROGRAM ICE STORAGE BINS CERTIFICATION PROGRAM AHRI IBIN OM JANUARY 2018 2111 Wilson Blvd, Suite 500 Arlington, Virginia 22201 (703) 524-8800 PREFACE The following manual outlines the procedures and policies of

More information

CIP Cyber Security Configuration Change Management and Vulnerability Assessments

CIP Cyber Security Configuration Change Management and Vulnerability Assessments CIP-010-2 Cyber Security Configuration Change Management and Vulnerability Assessments A. Introduction 1. Title: Cyber Security Configuration Change Management and Vulnerability Assessments 2. Number:

More information

Requirements Engineering

Requirements Engineering Requirements Engineering An introduction to requirements engineering Gerald Kotonya and Ian Sommerville G. Kotonya and I. Sommerville 1998 Slide 1 Objectives To introduce the notion of system requirements

More information

Certification Report

Certification Report Certification Report Issued by: Communications Security Establishment Certification Body Canadian Common Criteria Evaluation and Certification Scheme Government of Canada, Communications Security Establishment,

More information

SpeechMike Classic / Pro / Pure / Barcode

SpeechMike Classic / Pro / Pure / Barcode SpeechMike Classic / Pro / Pure / Barcode LFH 5250 LFH 5260 LFH 5262 LFH 5270 LFH 5272 LFH 5274 LFH 5276 LFH 5282 LFH 5284 For product information and support, visit www.philips.com/dictation EN User manual

More information

KEMKRAFT ENGINEERING, INC. MODEL KEI-200/BS SPC DIGITAL INCLINOMETER

KEMKRAFT ENGINEERING, INC. MODEL KEI-200/BS SPC DIGITAL INCLINOMETER KEMKRAFT KEMKRAFT ENGINEERING, INC. INSTRUCTIONAL MANUAL SPC DIGITAL INCLINOMETER MODEL KEI-200/BS W/ OPTIONAL BARCODE SCANNER REVISION DATE: SEPT. 19 1997 96-013.doc Page 1 OPERATION PROCEDURE: This unit

More information

IECEx Guide Guidance for Applications from Service Facilities seeking IECEx Certification

IECEx Guide Guidance for Applications from Service Facilities seeking IECEx Certification IECEx Guide Guidance for Applications from Service Facilities seeking IECEx Certification INTERNATIONAL ELECTROTECHNICAL COMMISSION SCHEME FOR CERTIFICATION TO STANDARDS RELATING TO EQUIPMENT FOR USE IN

More information

Subsea Performance Bolt Workshop

Subsea Performance Bolt Workshop Subsea Performance Bolt Workshop API Spec Q1, Specification for Quality Management System Requirements for Manufacturing Organizations for the Petroleum and Natural Gas Industry, 9 th Edition API Spec

More information

ivu Plus Industrial Ethernet Instruction Manual

ivu Plus Industrial Ethernet Instruction Manual ivu Plus Industrial Ethernet Instruction Manual Original Instructions B_3095133 Rev. D 26 January 2015 Contents 1 Device Setup...3 1.1 Set IP Address...3 1.2 Set Industrial Ethernet Protocol (EIP/Modbus/TCP/PCCC)...

More information

Unicorn WorkFlows Academic Reserves Training Guide

Unicorn WorkFlows Academic Reserves Training Guide Unicorn Library Management System Unicorn WorkFlows Academic Reserves Training Guide Sirsi 101 Washington Street SE Huntsville, Alabama 35801 (256) 704-7000 Doc No. 400 1100 000 04 1 2002 Sirsi Corporation

More information

EA-7/05 - EA Guidance on the Application of ISO/IEC 17021:2006 for Combined Audits

EA-7/05 - EA Guidance on the Application of ISO/IEC 17021:2006 for Combined Audits Publication Reference EA-7/05 EA Guidance on the Application of ISO/IEC 17021:2006 for Combined Audits PURPOSE This document has been prepared by a task force under the direction of the European Cooperation

More information

CIP Cyber Security Configuration Change Management and Vulnerability Assessments

CIP Cyber Security Configuration Change Management and Vulnerability Assessments CIP-010-2 3 Cyber Security Configuration Change Management and Vulnerability Assessments A. Introduction 1. Title: Cyber Security Configuration Change Management and Vulnerability Assessments 2. Number:

More information

Contents. Rev. 2, 5/12/2016 1

Contents. Rev. 2, 5/12/2016 1 Answers to Frequently Asked Questions for CTI STD-201 Thermal Certification of Cooling Towers, Closed Circuit Coolers and Evaporative Refrigerant Condensers Contents What is CTI STD-201?... 3 To what equipment

More information

HOME AUTOMATION, INC. Model 93A00-1. Serial Server. User s Manual

HOME AUTOMATION, INC. Model 93A00-1. Serial Server. User s Manual HOME AUTOMATION, INC. Model 93A00-1 Serial Server User s Manual Document Number 93I00-1 Rev. A December, 2009 Introduction The 93A00-1 is a RS232/RS485 to TCP/IP converter integrated with a robust system

More information

Recommended Functionality for EtherNet/IP Devices

Recommended Functionality for EtherNet/IP Devices Version 8 March 30, 2017 PUB00070R8 Published by Roundtable for EtherNet/IP Implementors 1 Introduction 1.1 Scope of Document The purpose of this document is to recommend functionality related to the EtherNet/IP

More information

People. Processes. Integrating Globally.

People. Processes. Integrating Globally. People. Processes. Integrating Globally. Course: isupplier for Suppliers Table of Contents Table of Contents Course Introduction...4 L1: Vendor Registration... 6 Register for isupplier using SteelTrack

More information

Smart TV Security Solution V2.0 for Samsung Knox. Certification Report

Smart TV Security Solution V2.0 for Samsung Knox. Certification Report KECS-CR-17-82 Smart TV Security Solution V2.0 for Samsung Knox Certification Report Certification No.: KECS-CISS-0846-2017 2017. 12. 27 IT Security Certification Center History of Creation and Revision

More information

Certifying LXI Products Testing Criteria and Process

Certifying LXI Products Testing Criteria and Process LXI Consortium Certifying LXI Products Testing Criteria and Process Jochen Wolle Jochen.Wolle@rohde-schwarz.com Agenda List of LXI Conformant Devices LXI Conformance Process Conformance Documents Tools

More information

Certification Report

Certification Report Certification Report EAL 2+ Evaluation of EMC Celerra Network Server Version 5.5 running on EMC Celerra NSX and EMC Celerra NS series Issued by: Communications Security Establishment Certification Body

More information

CIP Cyber Security Configuration Change Management and Vulnerability Assessments

CIP Cyber Security Configuration Change Management and Vulnerability Assessments CIP 010 1 Cyber Security Configuration Change Management and Vulnerability Assessments A. Introduction 1. Title: Cyber Security Configuration Change Management and Vulnerability Assessments 2. Number:

More information

ELITE Test Systems. /Quick Start Wiring. Botron Company Inc.

ELITE Test Systems. /Quick Start Wiring. Botron Company Inc. ELITE Test Systems 01 /Quick Start Wiring Botron Company Inc. GETTING TO KNOW YOUR ELITE P1 This guide shows you how to assemble and wire your ELITE Test System, and gets you ready for everyday use. Once

More information

Partner Premier Service Program

Partner Premier Service Program SERVICE DESCRIPTION Partner Premier Service Program Polycom s Partner Premier Service Program provides Service Partners with technical telephone support, advance parts replacement, software upgrades &

More information

Cell and PDAs Policy

Cell and PDAs Policy Cell and PDAs Policy CHAPTER: 13 Information Services Department SECTION: 13 SUBJECT: Cell Phones and PDAs POLICY #: 13.13.00 Revised OFFICE/DEPARTMENT: Information Services EFFECTIVE DATE: October 1,

More information

Certification Report

Certification Report Certification Report Koji Nishigaki, Chairman Information-technology Promotion Agency, Japan Target of Evaluation Application date/id 2008-02-12 (ITC-8195) Certification No. C0189 Sponsor Panasonic Communications

More information

COMMON CRITERIA CERTIFICATION REPORT

COMMON CRITERIA CERTIFICATION REPORT COMMON CRITERIA CERTIFICATION REPORT VMware Horizon 6 version 6.2.2 and Horizon Client 3.5.2 12 August 2016 v1.0 File Number 383-4-356 Government of Canada. This document is the property of the Government

More information

Standard CIP-006-3c Cyber Security Physical Security

Standard CIP-006-3c Cyber Security Physical Security A. Introduction 1. Title: Cyber Security Physical Security of Critical Cyber Assets 2. Number: CIP-006-3c 3. Purpose: Standard CIP-006-3 is intended to ensure the implementation of a physical security

More information

Barcode (ASCII Read) Driver for DeltaV Programmable Serial Interface Card

Barcode (ASCII Read) Driver for DeltaV Programmable Serial Interface Card Barcode (ASCII Read) Driver for DeltaV Programmable Serial Interface Card USER MANUAL Rev. P1.55 December 27, 2016 DeltaV is a trademark of Emerson Process Management Emerson Process Management 1998, 1999.

More information

FieldServer Driver - Ethernet FS EtherNet/IP

FieldServer Driver - Ethernet FS EtherNet/IP FieldServer Driver - Ethernet FS-8704-14 EtherNet/IP Description The EtherNet/IP driver allows the FieldServer to transfer data to and from an EtherNet/IP enabled device. This driver encapsulates the Control

More information

The home of Junior Librarian.net Classic features the book interface. The book interface hosts a number of interactive links that you can click on.

The home of Junior Librarian.net Classic features the book interface. The book interface hosts a number of interactive links that you can click on. Click on Other Libraries to visit MLSLibraries.net and library catalogues outside of your school. Quick Start Guide Click on Circulate to issue and return books to one student at a time. The home of Junior

More information

CAISO RIG Acceptance Test Procedure

CAISO RIG Acceptance Test Procedure CAISO RIG Acceptance Test Procedure TABLE OF CONTENTS 1.0 PURPOSE... 3 2.0 INTRODUCTION... 3 3.0 TEST PROCEDURE... 8 Market Services/ EDAS CAISO Public Revision History 1.0 PURPOSE The procedure is intended

More information

3GPP TS V8.3.0 ( )

3GPP TS V8.3.0 ( ) TS 29.282 V8.3.0 (2012-09) Technical Specification 3rd Generation Partnership Project; Technical Specification Group Core Network and Terminals; Mobile IPv6 vendor specific option format and usage within

More information