PULSA PV. joule pulsa pv solar high performance ac solar module installation guide

Size: px
Start display at page:

Download "PULSA PV. joule pulsa pv solar high performance ac solar module installation guide"

Transcription

1 PULSA PV joule pulsa pv solar high performance ac solar module installation guide

2

3 Please complete this warranty card and return it to Joule to activate the warranty. Installer Name... Company Name... Address Contact Tel. no.... Contact ... Client Name... Site Address Contact Tel. no.... Contact ... Unit purchased from... Date purchased... Installation date... Inverter Serial No s.... Inverter Serial No s.... Inverter Serial No s.... Inverter Serial No s.... Inverter Serial No s.... Inverter Serial No s.... Inverter Serial No s.... Inverter Serial No s.... Inverter Serial No s.... Inverter Serial No s.... Inverter Serial No s.... Inverter Serial No s.... Scan the page or alternatively take a photo with smart phone of complete sheet with all information filled in. This must be completed by the installer and a copy sent to Joule - warranty@joule.ie

4

5 Table of Contents 6 Why Install Photovoltaic Solar Panels? 7 Contribution to Running Costs 8 Advantages 9 Features 10 Maximising Performance 11 Transportation and Installation Notes 12 Safety Instructions General Safety Handling Safety Installation Safety 13 Fire Safety 14 Technical Specification 16 Mechanical Installation Select suitable locations for installation Components supplied 17 Installation 19 Locating the Inverter Installing Branch Connectors 20 Electrical Installation Lightning Surge Protection Selecting Engage Cable Type 21 Installation Procedure Step 1 - Measure AC at the Electricity Network connection 22 Step 2 - Install the AC Branch Circuit Junction Box 23 Step 3 - Position the Enphase Engage Cable Step 4 - Attach the Microinverters to the Mounting Rail 24 Step 5 - Dress the Engage Cable 26 Step 6 - Terminate the Unused End of the Engage Cable 29 Step 7 - Connect the Engage Cable to AC Junction Box(es) 31 Electrical Installation - Microinverter 32 Technical Specification 34 Electrical Installation 35 Engage and Wire Sizing Overview What Contributes to Voltage Rise 36 Sample Calculation 38 Voltage Rise for M215s with the 230V Engage Cable 39 Step 8 - Verification and Commissioning 40 Maintenance 41 Replacing a Microinverter

6 Locating the Unit Why Install Photovoltaic Solar Panels? Since the revisions to Part L of the Building Regulations in March 2014 there has been a need for a greater contribution from renewable sources of energy for domestic and commercial constructions. One way to comply with the updated regulations is by installing Photovoltaic (PV) Solar Panels. There are numerous benefits to installing PV Solar Panels PV panels provide clean, green energy. During electricity generation with PV panels there is no harmful greenhouse gas emissions thus solar PV is environmentally friendly. Solar energy is energy supplied by nature it is thus free and abundant! Solar energy can be made available almost anywhere there is sunlight Photovoltaic panels, through photoelectric phenomenon, produce electricity in a direct electricity generation way. Operating and maintenance costs for PV panels are considered to be low, almost negligible, compared to costs of other renewable energy systems. PV panels have no mechanically moving parts, except in cases of sun-tracking mechanical bases; consequently they have far less breakages or require less maintenance than other renewable energy systems (e.g. wind turbines). PV panels are totally silent, producing no noise at all; consequently, they are a perfect solution for urban areas and for residential applications. 6

7 PULSA PV installation manual Contribution to Running Costs The table below gives typical consumptions of standard electrical devices. Even when electrical devices are turned off they may still be consuming power. Photovoltaic Solar Panels can contribute towards the operation of these products with the contribution given being determined by the amount of panels installed. Customers may start with as little as one PS260AC Module and then increase their system wattage as budget, time, and space permit. As each Photovoltaic AC module produces grid compliant AC current, the modules serve as building blocks with no matching or string sizing required. The integrated Enphase Microinverter instantly converts DC electricity into ready to use AC power. If an Enphase Envoy is installed, the intelligent Microinverter also sends vital health and performance information to the Enphase communications gateway. 7

8 Locating the Unit Advantages This next generation design eliminates the need for expensive DC wiring components and centralized power inverters. Also, the Photovoltaic AC Module dramatically reduces the complex design and installation process associated with a traditional DC solar power system. AC Advantages High efficiency solar module integrated with an Enphase Microinverter, the world s most efficient AC system solution Higher Efficiencies than String Inverter systems Optimized for higher outputs in low light conditions Modules are individually optimized Eliminates module mismatch losses Any shading will affect only the shaded panel, not the entire system Easier to Design and Install Installation labour reduced, no DC switches, GFCI, etc. required Fast, inexpensive mounting - delivered ready for connection Pre manufactured cables Greater Productivity with more reliability AC wiring systems are more efficient at transporting electricity as they do not suffer typical electrical losses that are common in all DC wiring circuits. More uptime means more kw-h generated Installers need not match PV output characteristics before installation Better Performance Individual PV breakages (e.g. hail) do not stop system power output No system mismatch losses Any shading will affect only the shaded panel, not the entire system Optional communication hub monitors every module independently Peak efficiency 96.3%, CEC efficiency 96% No single point of failure will disable the system AC Modules are sealed. No cooling vents mean that the units always stay clean and dry inside Convection cooled with no moving parts Safer no DC-side wiring (eliminates dangerous high voltage DC and all DC wiring loss) Reduced inspection code issues 8

9 PULSA PV installation manual Features Advantages Durability assured Up to 17% module efficiency Outstanding performance in weaklight conditions Excellent temperature coefficient giving higher yields in the long term Salt mist corrosion certification Ammonia corrosion certification Fire test certification Positive current sorting A+ class in PI Berlin test IP68 connectors enhance the reliability of the PV system Certified to withstand increased loads of up to 5400Pa 10-year product warranty 25-year performance warranty 9

10 Locating the Unit Maximising Performance 10

11 PULSA PV installation manual Transportation and Installation Notes 11

12 Locating the Unit Safety Instructions General Safety The installation of a photovoltaic system requires specialized skills and knowledge and must only be carried out by licensed/qualified persons. Installers should assume all risks of injury and do everything to avoid potential damages and risks that might occur during installation, including but not limited to, the risks of electric shock. Joule Pulsa modules do not need special cables for connection. All of the modules have permanent junction boxes, cables and connectors. Do not use mirrors or magnifiers to concentrate sunlight onto the modules. The modules generate DC electrical energy from sunlight. They are designed for outdoor use and can be mounted onto frames on rooftops or in the ground etc. Do not paint the module or attach anything on to the back of the module. Do not attempt to disassemble the modules, and do not remove any attached nameplates or components from the modules. Handling safety When handling the module insulated gloves must be worn. Inappropriate transportation and installation may break the module. Do not lift or move the module by holding the junction box or cable. Do not place anything on the module or press on the module surface. Do not drop the module or allow objects to fall on the module. Do not expose the back of the module to direct sunlight. Do not wear metal ornaments while handling the module. Do not install or handle modules in wet or strong windy conditions. Installation safety Local, regional and state laws and regulations must be adhered to while installing a photovoltaic system. For example, any necessary licenses must be obtained prior to the installation commencing. Regulations around vehicles and ships must also be observed during the installation. Observe all safety rules for the other system components, including the cables, connectors, charging controllers, inverter and storage battery etc. Do not place the modules near a location where flammable gases are either generated or collected. Insulated gloves must be worn during the installation. Do not wear metal ornaments during the installation. Do not drill holes in the frame. 12

13 PULSA PV installation manual Under normal conditions, a module is likely to produce more current and/or voltage than reported under Standard Test Conditions (STC). Accordingly, the values of ISC and VOC marked on the module nameplate should be multiplied by a factor when determining the component voltage ratings, conductor current ratings, fuse sizes, and the size of controllers connected to the photovoltaic system. The exact factor value should be suggested by a licensed/qualified person. The connecting ends with electricity may cause fire, spark or lethal shocks even when the modules are not connected. Electricity can be generated when the modules are exposed to sunlight, even if they are not connected. It is dangerous to touch 30V DC or higher, so never open the electrical connectors or unplug the electrical connectors while the circuit is under load, and do not touch the end with electricity during installations, when the modules are exposed to sunlight. Children should be kept away from the photovoltaic system. In order to prevent current and voltage generation during installation an opaque board can be used to cover the modules. Only use licensed/qualified insulated tools. The frame of the modules must be grounded according to local, regional and state safety and electrical standards. A recommended connector or equivalent must be used for the grounding cable. The grounding cable must be appropriately fastened to the module frame. Only Balance of System (BOS) in conformity to local, regional, state safety electricity standards and photovoltaic system such as connectors, cables and frames can be used, avoiding affect on the module performance and/or damage it. Fire Safety Consult your local authority for guidelines and requirements for building or structural fire safety. Roof constructions and installations may affect the fire safety of a building; an improper installation may create a hazard in the event of a fire. Use components such as ground fault circuit breakers and fuses as required by the local authorities. Do not use the modules near a location where flammable gases are either generated or collected. The modules have been rated Fire Class C, and are suitable for mounting onto a Class A roof. 13

14 Locating the Unit Technical Specification Solar cells Collector height Mechanical characteristics Polycrystalline 156mm x 156mm square, 6 x 10 pieces in series 75mm / 2.95 inch Dimensions (mm) L W H Collector width Collector lenght 992mm / inch 1640mm / inch Weight (kg) Front glass 21.6kg / 47.6lbs 3.2mm toughened glass 8-9x14 2-Ø Frame Anodized aluminium alloy Cable 0.90m wire (Ø4mm 2 ) Diodes 6 pieces Schottky by-pass diodes Junction Box IP65 rated Back sheet (black) H 942 AC Electrical typical values Output Data VAC Frame (black) Maximum Output Power 215W 215W Nominal output current 1.0A (arms at nominal duration) 0.9A (arms at nominal duration) Nominal voltage/range 208V / V 240V/ V Extended voltage/range 208V/ V 240V/ V Nominal frequency/range 60.0/ Hz 60.0/ Hz 992 Extended frequency/range 60.0/ Hz 60.0/ Hz Power Factor >0.95 >0.95 Maximum units per 20A branch circuit 25 (3 phase) 17 (single phase) Maximum output fault current 1.05 Arms, over 3 cycles; 25.2 Apeak, 1.74ms duration 1640 Ambient temperature range -40 C to +65 C Weak light performance (DC module) Intensity (W/m 2 ) Impp Vmpp Absolute maximum rating Intensity (W/m 2 ) Operating Temperature Hail 80km/h Surface Maximum Load Capacity Maximum Series Fuse Rating IEC Application Class (IEC 61215) Fire Rating (UL 1703) Impp From -40 to +85 C Up to 25mm Up to 5400Pa 15A A C Note This publication summarizes product warranty and specifications, which are subjected to change without notice. Additional information can be found on www. phonosolar.com 1. Defined as standard deviation of thousands measurements. Absolute power values depend on the measuring system. They can differ by +/-5% from one measuring system to another. 2. Measurement conditions under irradiance level of Standard Test Conditions (STC): 1000W/m2, Air mass 1.5 Spectrum, cell temperature of 25 C. Temperature characteristics (DC module) NOCT (Nominal Operation Cell Temperature) 45 C ± 2 C Voltage Temperature Coefficient -0.31%/K Current Temperature Coefficient +0.07%/K Power Temperature Coefficient -0.40%/K 14

15 PULSA PV installation manual 15

16 Locating the Unit Mechanical Installation (Note: All instructions hereafter are for reference only. A licensed/qualified person or installer must be responsible for the design, installation, mechanical load calculation and security of the photovoltaic system.) Select suitable locations for installation Select a suitable location for installing the modules. Joule recommends that to achieve the best performance the modules should face south. The exact tilt angle and orientation of mounted modules should be recommended by a licensed/qualified installer. Clamp fitting: Use the provided module clamps on the long side of the module frame to mount the modules in portrait orientation or on the short side of the module frame for landscape orientation. Components Supplied Module Frame Mounting Rail M8 Screw Split Washer M8 Bolt M8 Nut Flat Washer Mounting Rail Roof Fixing Bolts End Clamps Middle Clamps Drop Connectors Microinverters AC Lockable Isolator AC Junction Box 16

17 PULSA PV installation manual Installation Select the appropriate installation method as per the installation diagram. The module clamps should not come into contact with the front glass and must not deform the module frame. Avoid any shadowing effects from the module clamps. The module frame cannot be modified under any circumstances. Regardless of the orientation chosen, at least 4 clamps must be used on each module. For portrait orientation, 2 clamps should be attached to the long sides of the module and for landscape orientation 2 clamps should be attached to the short sides of the module. Depending on the local wind and snow loads, additional clamps may be required. The applied torque should be about 8Nm. The modules should be completely free of shade at all times. Do not place the modules near a location where flammable gases are either generated or collected. Mounting System The system for the fixation of modules onto the cross beam rails allows for optimum security and short mounting times giving the following benefits: Quick and convenient mounting Secure fixation with qualitity steel thread Application of standard components 17

18 Locating the Unit Mechanical Installation Roof fixing bolts are drilled down through the slate or tile covering the roof. The rubber gasket on the bolt keeps the penetration point in the roof weather proofed. A UVresistant EPDM gasket with sealing cone and support collar is counter screwed with a third mounting nut and safely seals the roof. The roof fixing bolt bolt is connected to the profile by use of a stainless steel clamp of which one side which slides into the square side of the horizontal profile. The bolt head slides through the profile to the desired location where the second side of the clamp locks the profile into position. 18

19 PULSA PV installation manual Locating the Inverter With the rail in position the Microinverters are then fitted. Each Joule Pulsa panel requires its own Microinverter and the Microinverters should be fitted to the right hand side of the connection cables that are fixed to the Pulsa panel. The supplied M8 square nut is positioned in the profile using the plastic positioner supplied. The Microinverter is fixed to the rail using the M8 bolt. Use one inverter per module, one bolt per iverter Installing Branch Connectors In addition to the Enphase Microinverters, PV modules, mounting rail, and associated hardware, you will need the following items. Enphase equipment: Enphase Engage Cable. See Selecting Engage Cable Type on page 5 for options. Sealing caps, as needed (for any unused drops on the Engage Cable) Terminators, as needed (one needed at the end of each AC branch circuit) Enphase disconnect tool Other items: Outdoor-rated, weather-proof AC junction box(es) Gland or strain relief fitting (one per AC junction box) Earthing (bonding) conductor Torque wrench, sockets, spanners for mounting hardware Adjustable spanner or open ended spanner (for terminators) 19

20 Locating the Unit Electrical Installation Lightning Surge Protection Lightning protection and resulting voltage surge are protected in accordance with BS 7671 and EN It is assumed that the PV modules are installed in accordance with related standards and that the Microinverter is a part of a broader lightning protection system in accordance with BS 7617 and EN , -3. In some areas, the statistical frequency of lightning strikes near a PV installation is high enough that lightning protection must be installed as part of an Enphase system. In some areas, a surge protection device might be mandatory following a risk analysis, according to local regulation, BS 7671, or NF C (art. 443) & NF C L. The first step to install the Engage Cable is to simply roll out the desired length and cut it to size. One end is wired directly into the junction box at the head of the branch circuit, eliminating the need for a separate AC interconnect cable. The other end is sealed from the environment using an Enphase Branch Terminator. The Microinverter AC cable connectors are then plugged into the regularly-spaced connectors as shown. 20

21 PULSA PV installation manual Installation Procedure Installing the Enphase Engage Cable and Accessories involves several key steps: 1. Measure AC at the Electricity Network Connection 2. Install the AC Branch Circuit Junction Box 3. Position the Enphase Engage Cable 4. Attach the Microinverters to the Mounting Rail 5. Dress the Enphase Engage Cable 6. Terminate the Unused End 7. Connect the Engage Cable to AC Junction Box(es) 8. Verification and Commissioning Risk of Electrical Shock Due to presence of exposed conductors, DO NOT connect the Enphase Microinverters to the electricity network or energize the main AC circuit(s) until you complete all of the installation procedures as described in the following sections. Step 1 Measure AC at the Electricity Network Connection Measure AC line voltage at the electricity network connection to confirm that it is within range. Acceptable ranges are shown in the following table. Single-Phase Service L1 to neutral Three-Phase Service L1 to L2 to L3 207 to 253 Vac 360 to 440 Vac Be sure the Engage Cable you are using matches the electricity network connection at the site. Use 5G2.5 Engage Cable at sites with three-phase (and neutral) service, or use 3G2.5 Engage Cable at sites with single-phase service. Check the labelling on the drop connectors to verify the voltage type. Enphase Microinverters are designed to operate phase-to-neutral. When multiple phases are present at sites with single-phase service, connect only one phase to each Microinverter branch. Connecting multiple phases to a Microinverter branch circuit will damage or destroy the Microinverters. 21

22 Locating the Unit Electrical Installation Step 2 Install the AC Branch Circuit Junction Box Risk of Electrical Shock. Be aware that installation of this equipment includes risk of electric shock. Do not install the AC junction box without first removing AC power from the Enphase System. Use electrical system components approved for wet locations only. When stripping off the Engage Cable sheath, make sure that the conductors are not damaged. Loose cables might become a tripping hazard. Dress the Engage Cable to minimize this potential. Do NOT exceed the 17 Microinverters in an single phase AC branch circuit, and protect each Microinverter AC branch circuit with a 20 A maximum breaker (or in accordance with local installation code). Size the AC cable/wire size to account for voltage drop. Select conductor diameter based on the distance from the beginning of the Microinverter AC branch circuit to the breaker in the AC mains. All components of system wiring must be considered, including internal voltage drop within the length of Engage Cable. Typically, three wire sections and several wire terminations must be quantified. There is also some resistance associated with each circuit breaker. As all of these resistances are in series, they add together. Since the same current is flowing through each resistance, the total voltage drop is total current times the total resistance. For a single-phase system, the total resistance is equal to two times the one-way resistance. For a three-phase system, each of the three line currents and resistances must be calculated. Standard guidelines for voltage drop on feeder and AC branch circuit conductors might not be sufficient for Microinverter AC branch circuits that contain the maximum allowable Microinverters. This is due to high inherent voltage rise on the AC branch circuit. Install an outdoor rated, weather-proof AC junction box at a suitable location on the mounting rail (typically at the end of a row of PV modules). Provide an AC connection from the AC junction box back to the electrical utility connection, using equipment and practice as required by local standards. Enphase Microinverters are designed to operate phase-to-neutral. When multiple phases are present at sites with single phase 230V service, connect only one phase to each Microinverter branch. Connecting multiple phases to a Microinverter branch circuit will damage or destroy the Microinverters. Step 3 Position the Enphase Engage Cable 22

23 PULSA PV installation manual Position the Engage Cable to the right hand side of the centre of the panel so that connectors that are attached to the panels are not obstructed when fitting the Joule Pulsa panel to the mounting rail. Lay the Engage Cable along the route it will travel, positioning the connectors so that they align with the PV modules. Step 4 Attach the Microinverters to the Mounting Rail Mount the Microinverters as per the diagram below. Ensure both that the Microinverter does not interfere with the PV module frames and that the AC connector from the Microinverter can easily reach the AC connector on the Engage Cable. 23

24 Locating the Unit Electrical Installation Step 5 Dress the Engage Cable Adhere to the following requirements: Do not expose the connection to directed, pressurized liquid (water jets, etc.). Do not expose the connection to continuous immersion. Do not expose the AC connector to continuous tension (e.g., avoid pulling or bending the Engage Cable near the connectors) Do not allow contamination or debris in the connectors. Use the Engage Cable and Accessories only when all parts are present and intact. Fit the connection using only the prescribed tools. There are two release holes in the connector. These holes are to be used only for disconnecting. Keep these release holes clear and accessible. Dress any excess in loops so that Engage Cable does not contact the roof. Tripping Hazard. Loose cables might become a tripping hazard. Dress the Engage Cable to minimize this potential. 24

25 PULSA PV installation manual Place tie wraps on either side of the drop connector. Use one or two tie wraps, or other support scheme to secure the Engage Cable between connectors. Remove and discard the temporary shipping caps from the Engage Cable. Connect the Microinverter and listen for two clicks as the two prongs engage. Ensure that both latching mechanisms engage. The connector is not designed for repeated plugging and unplugging. Cover any unused connector with a sealing cap. Listen for two clicks as the connectors engage. Ensure that both latching mechanisms engage. Ensure the gasket seal is intact and fitted correctly to the drop connector before connecting to the Microinverter. If the gasket is not correctly in situ the system will not have an IP67 rated connection. AC Drop Connector Gasket gives IP67 seal 25

26 Locating the Unit Electrical Installation Install sealing caps on all unused AC connectors. Unused AC connectors are live when the system is energized. Do not use the shipping cap to cover unused connectors. The shipping cap does not provide an adequate environmental seal. Enphase sealing caps are required for protection against moisture ingress. Enphase sealing caps are IP67 rated. Within the term IP67, IP indicates an Ingress Protection (IP) rating against dust and liquids. This specific rating of IP67 indicates that this connector protects against all dust particles and immersion in liquid. If you need to remove a sealing cap, you must use a disconnect tool. Step 6 Terminate the Unused End of the Engage Cable Attaching the Terminator The terminator is intended for one-time use only. If you open the terminator following installation, the latching mechanism is destroyed and the terminator cannot be used again. If the latching mechanism is defective, the terminator must not be used. The latching mechanism must not be circumvented or manipulated. Adhere to the following requirements: Use the terminator assembly to seal the conductor end of the Engage Cable. No other method is allowed. Do not expose the terminator to directed, pressurized liquid (water jets, etc.). Do not expose the terminator to continuous immersion. Do not expose the terminator to continuous tension (e.g., avoid pulling or bending the Engage Cable near the terminator) Use the terminator only when all parts are present and intact. Fit the terminator using only the prescribed tools. To attach the terminator: Check the terminator for completeness. It is made up of the individual parts shown. 26

27 PULSA PV installation manual To guarantee the safety of the wire organizer and to ensure that it remains sealed, please make sure that all parts are present and that all seals are seated correctly in the wire organizer. The wire organizer must be complete, as shown. Risk of Electrical Shock. The terminator must not be installed while power is connected. At the end of the Engage Cable, strip at least 60 mm (2.5 inches) of the cable sheath from the conductors. If the exposed wires are damaged, system function can no longer be guaranteed. Slide the hex nut onto the Engage Cable. Insert the Engage Cable end all the way into the wire organizer (up to the stop). Bend the individual wires into the slots (spaces) on the wire organizer. Using a diagonal cutter, trim wires to the correct length so that they fit cleanly into the slots (spaces) in the wire organizer. Press the cap onto the wire organizer, bending the wires into the slots of the wire organizer. If the wires resist being pressed into the cap, you may need to trim the wires a little further. Screw the hex nut onto the cap. Never unscrew the hex nut as this can twist and damage the cable. Insert a #2 Philips screwdriver into the slot on the cap to hold it in place. (Alternatively you can hold the cap firmly in place using the disconnect tool). Use a 22mm (7/8 inch) spanner and tighten the nut until the latching mechanism has been screwed all the way to the base. Use a tie wrap to attach the cable to the mounting rail, so that the Engage Cable and terminator do not touch the roof. 27

28 Locating the Unit Electrical Installation Replacing or Removing the Terminator If the terminator must be replaced or removed, observe the following. Risk of Electrical Shock. Be aware that installation of this equipment includes risk of electric shock. Do not install the AC junction box without first removing AC power from the Enphase System. Never open, remove or replace the terminator while it is connected to the power supply. Damage to the latching mechanism cannot be seen with the naked eye. Label the opened terminator and dispose of it immediately to ensure that it cannot be reused accidentally. The terminator is intended for one-time use only. If you open the terminator again following the installation, this will destroy the latching mechanism, meaning that the unit then cannot be used again. Remove the terminator by cutting it off using a diagonal cutter set flush against the end of the Engage Cable. Replace the terminator as described in the previous steps. Step 7 Connect the Engage Cable to AC Junction Box(es) Perform the following steps in accordance with local standards. Connect the Engage Cable into the AC branch circuit junction box using an appropriate gland or strain relief fitting. It requires a strain relief fitting with an opening of 1.3 cm (0.5 inches) in diameter. Connect the Engage Cable into additional AC junction boxes as needed to transition to conduit between smaller sub-arrays. Remember to adhere to AC branch circuit limits for the Microinverters being used. 28 Fitting Branch Termination Endcap

29 PULSA PV installation manual 29

30 Locating the Unit Electrical Installation Fixing the Pulsa Solar Module to the rails 1. Push click components into the upper groove of the cross beam profile, insert square nuts into the click components and distribute at approximate distances along the length of the profile. 2. Loosely attach the first two end clamps with serrated M8 screws (or screws with locking nuts) at the end of the cross beam rail. 3. Then position the first module and loosely secure with end clamps (the end clamps should be placed at least 5mm from the outer edge of the cross beam). Now adjust the first module in line with the cross beam. 4. When mounting with clamps, click these into the required position, arrange flush with the modules and tighten screws. After aligning the first module in each row, a middle clamp is loosely fastened to the corresponding cross beam. 5. The next module is then connected, shifted beneath the module clamp and secured. 6. The first middle clamp is then tightened. 7. Repeat steps 5 and 6 until all panels are in position. 8. Repeat steps 2 and 3 for the edge last panel 30

31 PULSA PV installation manual Electrical Installation - Microinverter The Microinverter with integrated ground delivers increased energy harvest and reduces design and installation complexity with its all-ac approach. With the advanced M215, the DC circuit is isolated and insulated from ground, so no Ground Electrode Conductor (GEC) is required for the Microinverter. This further simplifies installation, enhances safety, and saves on labor and materials costs. Productive, Simple, Reliable Maximizes energy production Minimizes impact of shading, dust, and debris No single point of system failure No GEC needed for Microinverter No DC design or string calculation required Easy installation with Engage Cable More than 1 million hours of testing and millions of units shipped Industry-leading warranty, up to 25 Years 31

32 Locating the Unit Electrical Installation - Microinverter Technical Specification 32

33 PULSA PV installation manual 33

34 Locating the Unit Electrical Installation - Microinverter Electrical Installation Legend 1. Joule Pulsa Photovoltaic Panel 2. Microinverter 3. Drop Connector 4. Branch Terminator 5. Junction Box 6. 20A Lockable 2-pole AC Isolator 7. PV Generation Meter (not supplied) 8 Consumer Board 9. Utility Meter 10. Cut Out Fuse Notes 1. IMPORTANT: Check the L to N voltage at the point of connection. This must be in the range 207 to 253V. 2. All wiring and equipment designed must be installed in accordance with the most recent edition of BS 7671 and must by a qualified Competant Person 3. All calculations assume Ze = 0.35Ω at the point of connection (ie consumer unit). 4. AC Cable between junction box and the consumer board to be sized based on a total voltage drop not exceeding 1%. 5. Typically a single phase engage cable branch is terminated into a 1-pole 20A Type B MCB 6. The Microinverter uses a HF transformer which provides simple separation. A Type B RCD is NOT required. A Type AC RCD may be required as a result of the AC circuit design. 34

35 PULSA PV installation manual Engage and Wire Sizing Overview The Engage Cable is a continuous length of 2.5mm 2 stranded copper, outdoor rated cable, with integrated connectors for the Microinverters. The Engage Cable is available either with meters between connectors for PV modules in portrait orientation or with 1.7 meters between connectors for PV modules in landscape orientation. Voltage type / conductor count Connector Spacing PV module orientation 230/240 Vac, 4 conductor m Portrait 230/240 Vac, 4 conductor 1.7 m Landscape In this document, calculations are provided for both Engage Cable options. Regardless of the application, Joule recommends that the total percentage of voltage rise in the AC wiring be less than 2%, with (an inclusive) less than 1% voltage rise. All components within the system wiring can add resistance and must be considered when calculating the total VRise. Typically, the resistance of three distinct wire sections and several wire terminations must be quantified. There is also some resistance associated with each OCPD (Over Current Protective Device), typically a circuit breaker. As all of these resistances are in series, they are cumulative. Since the same current is flowing through each resistance, the total VRise is simply the total current times the total resistance. For a single-phase system, the total resistance is equal to two times the one-way resistance. Wire sizing is very important because improper wire size can result in nuisance tripping of the Microinverter s utility protective functions. This results in loss of energy harvest. What Contributes to Voltage Rise Enphase Microinverter systems are installed as dedicated branch circuits. Each dedicated branch circuit of the Microinverters is protected by a 20A OCPD. Wire size, circuit current, circuit, length, voltage margin, and utility voltage must all be considered. Wire size: Of course, there is a tradeoff to be made between increased wire size and increased cost. The wire size can often be increased by one trade size with minimal cost impact. At some point, however, increasing the wire size necessitates increases in wiring and conduit costs can be offset by the increase in energy production over the lifetime of the system. Circuit current: The circuit current will vary depending on which wire section is being considered in the installation. See VRise Calculations by Wire Section. A typical installation will contain three wiresections. In the Engage Cable (wire section 1), the current increases with each inverter added to the circuit. 35

36 Locating the Unit Electrical Installation - Microinverter Circuit length: There is often little choice in circuit length, but center-feeding the dedicated branch circuit will significantly reduce voltage rise within the branch, See Advantages of Center-Feeding the AC branch Circuits in the following section. Voltage margin: If the service voltage is chronically high, the utility will sometimes perform a tap change on the distribution transformer. This can provide a percent or two of additional voltage margin Utility voltage: The utility strives to maintain voltage at the main service meter within a certain percentage of nominal. The protective functions of the Microinverters are set to +10%/-12% by default, but your local utility may have alternate requirements. The high voltage end of the tolerance is of most concern because inverters are a source and not a load. If the utility is consistently 5% high, this leaves less than 5% for all wiring and interconnection losses and inverter measurement accuracy. If you are concerned about the utility s voltage, you may request that your utility place a data logger at the main service meter and make a record of the voltages available to you at the site. Sample Calculation The following example is for a fully populated branch circuit of 17 Microinverters. Microinverter full load AC current = 0.93 amps Wire gauge for individual branch circuit = 4mm 2 CU 4mm 2 CU resistance =.00461Ω/m (4.61ohms/km) Length of individual branch circuit = 15m Two way wire length= 30m Vrise = (0.93 * 17) * ( Ω/m) * (15m * 2) = * * 30m =2.19 volts =2.19 volts / 230 volts = 0.95% Vrise *The voltage rise from the junction box to the Microinverter subpanel is 0.95% Voltage Rise from the Microinverter Subpanel to the Main service meter Vrise = (Amps/inverter * #inverters) * (resistance Ω/m) * (2 way wire length) 36

37 PULSA PV installation manual Example: 3 branches of 17 = 51 M215s current of 3 branches = 47.43A wire gauge for sub-panel feed = 25mm 2 CU 35 mm 2 CU resistance = Ω/m Length of Microinverter sub-panel feed = 30m Two way wire length = 60m VRise = (51 * 0.93A) * ( Ω/m) * (30m * 2) = 47.43A * Ω/m * 60m = 1.49 volts = 1.49 volts / 230 volts =.6% Vrise * The voltage rise from the Microinverter sub panel to the main service meter is 0.6% 37

38 Locating the Unit Electrical Installation - Microinverter Voltage Rise for M215s with the 230V Engage Cable 230V Engage Internal VRise 38

39 PULSA PV installation manual Step 8 Verification and Commissioning Prior to final connection to the electricity network, ensure that all AC and DC wiring is correct. Ensure that none of the AC and DC wires are pinched or damaged. Ensure that all AC junction boxes are properly closed. Ensure that all unused connectors are capped. Ensure that all connectors are properly seated. Install the Microinverters and commission the system as instructed by the Enphase Microinverter installation and operation manual and in accordance with all local and national requirements. Start Up Sequence 1. Ensure the PV system MCB and the AC isolator are set to ON 2. Wait 3 minutes for the Microinverter system to start up. 3. A flashing green LED light on each Microinverter indicates that the system is operating correctly Shut Down Sequence 1. Turn OFF the AC isolater between the consumer unit and the PV panels 39

40 Locating the Unit Maintenance The Microinverter system requires virtually no maintenance and provides you with trouble-free energy production. Visually inspect the modules (panels), especially after storms, hail and high winds An inspection from the ground, with binoculars if needed, is usually sufficient. Check the array for dust, debris, leaves, and other soiling. Clean solar modules generate maximum energy harvest. Some geographic regions do not have much dust, debris, and pollution, so solar modules remain relatively clean and maintain optimum energy performance. In other areas, rain and snow naturally clean modules and help maintain performance. Perform an annual check In order to ensure optimum module performance, Joule recommends the following: If necessary, the glass front of the module can be cleaned with water and a soft sponge or cloth. A mild, non-abrasive detergent can be used to remove more stubborn stains. Check the electrical and mechanical connections periodically and make sure they are clean, safe, complete and secure. In the event of a problem, consult with a licensed/qualified person Talk to your solar professional about performing a yearly check. Your solar professional can inspect your array and verify that the electrical and mechanical connections are intact and working efficiently. Monitor system performance An add on Photovoltaic Envoy can be purchased to check energy production from your Enphase Microinverters on MyEnlighten to compare the month-to-month, or the year-to-year performance of your system. For example, use the MyEnlighten energy grid or generate a report and compare the energy production for one month to the same month in the previous year. Is it the same or lower? If lower, did cloud cover reduce energy production? If not, you may want to perform a visual inspection of your array and check for debris. 40

41 PULSA PV installation manual Replacing a Microinverter To ensure the Microinverter is not disconnected from the PV modules under load, adhere to the following disconnection steps in the order shown: 1. Using a clamp-on meter, verify there is no current flowing in the DC wires between the PV module and the Microinverter. Take care when measuring DC currents due to the fact that most clamp-on meters must be zeroed first and tend to drift with time. 2. Disconnect the PV module DC wire connectors from the Microinverter. 3. Disconnect the Microinverter AC connector from the Engage Cable. 4. The Microinverter connectors are tool-removable only. To disconnect a Microinverter from the Engage Cable, insert these two prongs into the two holes in the AC connector. Squeeze the sides of the disconnect tool to engage with the AC connector. Rock the connector back and forth while pulling gently to disengage. 5. Remove the Microinverter from the mounting rail. Risk of Electrical Shock. Do not leave the drop connector uncovered for an extended period. If you do not plan to replace the Microinverter immediately, you must cover any unused connector with a sealing cap. Listen for two clicks as the cap engages. Sealing caps may not be reused 41

42

43

44 JOULE IE JOULE UK JOULE PL mail tel fax eml web Kylemore Park West, Ballyfermot, Dublin (1) (1) mail tel fax eml web Unit 17C&D Power Road, Plantation Bus. Pk. Bromborough, Wirral, CH62 3RN +44 (0) (0) mail tel fax eml web Kraśnik, ul. Towarowa (0) (0)

Enphase S-Series Microinverter and Engage Cable Safety

Enphase S-Series Microinverter and Engage Cable Safety SAFETY Enphase S-Series Microinverter and Engage Cable Safety Important Safety Information (S280-60-LL and S230-60-LL) This document contains important instructions to use during installation of the Enphase

More information

M215 (M215-60) Safety

M215 (M215-60) Safety M215 QUICK INSTALL GUIDE M215 (M215-60) Safety Important Safety Information This document contains important instructions to use during installation and maintenance of the Enphase M215 Microinverter. To

More information

M250 (M LL) Safety

M250 (M LL) Safety M250 SAFETY M250 (M250-60-2LL) Safety Important Safety Information This document contains important instructions to use during installation of the Enphase M250 Microinverter. To reduce the risk of electrical

More information

M215 Safety (M LL-S22-IG / S23-IG / S24-IG)

M215 Safety (M LL-S22-IG / S23-IG / S24-IG) M215 SAFETY M215 Safety (M215-60-2LL-S22-IG / S23-IG / S24-IG) Important Safety Information This document contains important instructions to use during installation of the Enphase M215 Microinverter. To

More information

M215-Z Safety Information (M LL-IG-ZC)

M215-Z Safety Information (M LL-IG-ZC) M215-Z SAFETY M215-Z Safety Information (M215-60-2LL-IG-ZC) This document contains important instructions to use during installation of the M215-Z Zep Compatible Microinverters. To reduce the risk of electrical

More information

PV Module Installation Instructions

PV Module Installation Instructions Name 1601A Page 1 / 8 Name 1601A Page 2 / 8 1 Introduction Thanks for purchasing PV modules of HT SOLAR ENERGY JOINT STOCK COMPANY This manual refers to PV modules manufactured and sold by HT Turkey. This

More information

Installation Guide for America Solar Wholesale Photovoltaic Modules

Installation Guide for America Solar Wholesale Photovoltaic Modules Installation Guide for America Solar Wholesale Photovoltaic Modules Mono Module Poly Module 1 ASW Photovoltaic Module Installation Guide Installation guide for American Solar Wholesale Photovoltaic modules

More information

Enphase Engage Cable and Accessories

Enphase Engage Cable and Accessories INSTALLATION MANUAL Enphase Engage Cable and Accessories 141-00013, Rev 04 Contact Information Enphase Energy Inc. 1420 N. McDowell Blvd. Petaluma, CA 94954 http://www.enphase.com info@enphaseenergy.com

More information

Enphase Microinverter

Enphase Microinverter INSTALLATION AND OPERATION MANUAL Enphase Microinverter (M250-60-230-S22 and M215-60-230-S22-E, and M215-60-230-S22) 141-00024, Rev 00 Corporate Headquarters Contact Information Enphase Energy Inc. 1420

More information

DOWNLOAD PDF ENPHASE M250 INSTALLATION GUIDE

DOWNLOAD PDF ENPHASE M250 INSTALLATION GUIDE Chapter 1 : Enphase Energy MLL-S22 Grid-Tied Microinverter An Enphase team member may follow up with you about your feedback. The M maximizes the energy production of cell solar panels, working best with

More information

M-Series Enphase Microinverter

M-Series Enphase Microinverter INSTALLATION AND OPERATION MANUAL M-Series Enphase Microinverter (M250 and M215) 141-00024, Rev 02b Enphase Microinverter Installation and Operation Corporate Headquarters Contact Information Enphase Energy

More information

Installing Enphase IQ 6 and IQ 6+ Microinverters

Installing Enphase IQ 6 and IQ 6+ Microinverters QUICK INSTALL GUIDE IQ6PLUS-72-2-INT and IQ6-60-2-INT Installing IQ 6 and IQ 6 Microinverters To install the IQ 6 and IQ 6 Microinverters TM, read and follow all warnings and instructions in this guide.

More information

Worldwide Energy and Manufacturing USA, Co., LIMITED Add: RM 1708 C1, NAN FUNG TOWER, 173 DES VOEUX RD CENTRAL, HK. Installation Manual

Worldwide Energy and Manufacturing USA, Co., LIMITED Add: RM 1708 C1, NAN FUNG TOWER, 173 DES VOEUX RD CENTRAL, HK. Installation Manual Installation Manual Content 1. General information... 1 2. Safety precautions... 1 3. Storage and unpacking... 1 4. Product identification... 2 5. Mechanical installation... 2 5.1 Climate condition...

More information

Installing Enphase M250 and M215 Microinverters

Installing Enphase M250 and M215 Microinverters QUICK INSTALL GUIDE Installing Enphase M250 and M215 Microinverters To install the Enphase M250 and M215 Microinverters read and follow all warnings and instructions in this guide and in the Enphase M250

More information

IEC Installation Guide for Suntech Power Photovoltaic Module

IEC Installation Guide for Suntech Power Photovoltaic Module www.suntech-power.com IEC Installation Guide for Suntech Power Photovoltaic Module Version IEC 110101 Wuxi Suntech Power Co., Ltd. ddress: Changjiang South Road, New District Wuxi, China 214028 Customer

More information

Installing Enphase IQ 7, IQ 7+ and IQ 7X Microinverters

Installing Enphase IQ 7, IQ 7+ and IQ 7X Microinverters QUICK INSTALL GUIDE Installing IQ 7, IQ 7+ and IQ 7X Microinverters To install IQ Series Microinverters, read and follow all warnings and instructions in this guide and in the IQ 7 and IQ 7+ Microinverter

More information

Conergy PH Series Modules. Solar module user manual

Conergy PH Series Modules. Solar module user manual Conergy PH Series Modules Solar module user manual 1 Introduction 1.1 Short description Conergy PH modules are solar modules for installation in photovoltaic systems. 1.2 About this manual 1.2.1 Subject

More information

Installing Enphase IQ 7, IQ 7+ and IQ 7X Microinverters

Installing Enphase IQ 7, IQ 7+ and IQ 7X Microinverters QUICK INSTALL GUIDE Installing IQ 7, IQ 7 and IQ 7X Microinverters To install IQ Series Microinverters, read and follow all warnings and instructions in this guide and in the IQ 7 and IQ 7 Microinverter

More information

Enphase S-Series Microinverter

Enphase S-Series Microinverter INSTALLATION AND OPERATION MANUAL Enphase S-Series Microinverter 141-00029, Rev 01 Corporate Headquarters Contact Information Enphase Energy Inc. 1420 N. McDowell Blvd. Petaluma, CA 94954 USA enphase.com

More information

Enphase Microinverter Model M215

Enphase Microinverter Model M215 INSTALLATION AND OPERATION MANUAL Enphase Microinverter Model M215 (M215-60-230) 141-00017, Rev 02 Corporate Headquarters Contact Information Enphase Energy Inc. 1420 N. McDowell Blvd. Petaluma, CA 94954

More information

Installation and Operations Manual. Enphase Microinverter Model M215

Installation and Operations Manual. Enphase Microinverter Model M215 Installation and Operations Manual Enphase Microinverter Model M215 Contact Information Enphase Energy Inc. 201 1 St Street Petaluma, CA 94952 Phone: 707-763-4784 Toll Free: 877-797-4743 Fax: 707-763-0784

More information

Enphase S-Series Microinverter

Enphase S-Series Microinverter INSTALLATION AND OPERATION MANUAL Enphase S-Series Microinverter 141-00029, Rev 01b Corporate Headquarters Contact Information Enphase Energy Inc. 1420 N. McDowell Blvd. Petaluma, CA 94954 USA enphase.com

More information

Enphase Microinverter Model M215

Enphase Microinverter Model M215 INSTALLATION AND OPERATION MANUAL Enphase Microinverter Model M215 141-00012, Rev 04 Contact Information Enphase Energy Inc. 201 1 St Street Petaluma, CA 94952 http://www.enphase.com info@enphaseenergy.com

More information

Installing Enphase IQ 6 and IQ 6+ Microinverters

Installing Enphase IQ 6 and IQ 6+ Microinverters QUICK INSTALL GUIDE Installing IQ 6 and IQ 6 Microinverters To install the IQ 6 and IQ 6 Microinverters, read and follow all warnings and instructions in this guide and in the IQ 6 and IQ 6 Microinverter

More information

Enphase M215 Microinverter , Rev 06

Enphase M215 Microinverter , Rev 06 INSTALLATION AND OPERATION MANUAL Enphase M215 Microinverter 141-00012, Rev 06 Contact Information Enphase Energy Inc. 1420 N. McDowell Blvd. Petaluma, CA 94954 http://www.enphase.com info@enphaseenergy.com

More information

Enphase M250 Microinverter

Enphase M250 Microinverter INSTALLATION AND OPERATION MANUAL Enphase M250 Microinverter with integrated ground no GEC required 141-00022, Rev 01 Contact Information Enphase Energy Inc. 1420 N. McDowell Blvd. Petaluma, CA 94954 http://www.enphase.com

More information

Enphase M250 Microinverter

Enphase M250 Microinverter INSTALLATION AND OPERATION MANUAL Enphase M250 Microinverter with integrated ground no GEC required 141-00022, Rev 01 Contact Information Enphase Energy Inc. 1420 N. McDowell Blvd. Petaluma, CA 94954 http://www.enphase.com

More information

SoliTek Standard Photovoltaic module (PV) Documentation and Installation Manual

SoliTek Standard Photovoltaic module (PV) Documentation and Installation Manual SoliTek Standard Photovoltaic module (PV) Documentation and Installation Manual SoliTek Standard Photovoltaic Modules Please read carefully the following product documentation and safety instructions.

More information

IEC Installation Manual and User Manual for. BYD Photovoltaic Module

IEC Installation Manual and User Manual for. BYD Photovoltaic Module IEC Installation Manual and User Manual for BYD Photovoltaic Module BYD(Shanghai) Industrial Co.Ltd ADD:No.999 Xiangjing Road,Songjiang Shanghai, 201611, P.R.China TEL:+86-21-5777 8888 FAX:+86-21-5777

More information

Enphase M215 Microinverter , Rev 06

Enphase M215 Microinverter , Rev 06 INSTALLATION AND OPERATION MANUAL Enphase M215 Microinverter 141-00012, Rev 06 Contact Information Enphase Energy Inc. 1420 N. McDowell Blvd. Petaluma, CA 94954 http://www.enphase.com info@enphaseenergy.com

More information

M215 Microinverter Installation Planning

M215 Microinverter Installation Planning TECHNICAL BRIEF M215 Microinverter Installation Planning The M215 Microinverter The M215 Microinverter is a powerful and efficient grid-tied microinverter. It is compatible with most 60- cell PV modules

More information

INSTALLATION MANUAL FOR BISOL SOLAR MODULES

INSTALLATION MANUAL FOR BISOL SOLAR MODULES INSTALLATION MANUAL FOR BISOL SOLAR MODULES Before start of installation of BISOL solar modules, carefully read this installation manual in whole. This manual contains important information on safety,

More information

FS Series 3 PV Module

FS Series 3 PV Module User Guide User Guide: FS Series 3 PV Module Global REV 2.1 PD-5-200-03 02811_UG_24OCT12 FS Series 3 PV Module User Guide Global Page i of 11 Table of Contents 1 Introduction...1 1.1 Before You Begin...1

More information

Rev1 QP-10-IM21UL/Rev Rev2 QP-10-IM21UL/Rev Rev3 QP-10-IM21UL/Rev Rev4 QP-10-IM21UL/Rev4

Rev1 QP-10-IM21UL/Rev Rev2 QP-10-IM21UL/Rev Rev3 QP-10-IM21UL/Rev Rev4 QP-10-IM21UL/Rev4 Installation and Operation Manual UL1703 VERSION 2018 5.11.13 Rev1 QP10IM21UL/Rev1 21.12.14 Rev2 QP10IM21UL/Rev2 11.2.16 Rev3 QP10IM21UL/Rev3 2.4.16 Rev4 QP10IM21UL/Rev4 1.5.16 Rev5 QP10IM21UL/Rev5 3.05.16

More information

System Design Guide. APsystems YC Photovoltaic 3-Phase Grid-connected Microinverter. APsystems. Version 1.1 3/15

System Design Guide. APsystems YC Photovoltaic 3-Phase Grid-connected Microinverter. APsystems. Version 1.1 3/15 System Design Guide APsystems YC1000-3 Photovoltaic 3-Phase Grid-connected Microinverter Version 1.1 3/15 APsystems 600 Ericksen Ave NE. Ste 200; Seattle, WA 98110 TEL: 844-666-7035 EMAIL: info@apsystems.com

More information

Enphase C250 Microinverter System

Enphase C250 Microinverter System INSTALLATION AND OPERATION MANUAL Enphase C250 Microinverter System 141-00025, Rev 03 Corporate Headquarters Contact Information Enphase Energy Inc. 1420 N. McDowell Blvd. Petaluma, CA 94954 USA Company

More information

Enphase M215 (original)

Enphase M215 (original) Enphase Microinverters Enphase M215 (original) The Enphase Energy Microinverter System improves energy harvest, increases reliability, and dramatically simplifies design, installation, and management of

More information

Model Number Electrical Compatibility Module Connector Type M LL-S22 M LL-S22-NA M LL-S23 M LL-S23-NA

Model Number Electrical Compatibility Module Connector Type M LL-S22 M LL-S22-NA M LL-S23 M LL-S23-NA M215 Microinverter Installation Planning The Enphase M215 Microinverter The M215 Microinverter is Enphase s most powerful and efficient model yet. This grid-tied microinverter is compatible with most 60-cell

More information

User manual. Microinverter EVT248

User manual. Microinverter EVT248 User manual Microinverter EVT248 Microinverter EVT248 HIGHLIGHTS High-quality energy harvest with high MPPT accuracy Concentrated reliability and stability No single-point failure Improved safety with

More information

Installation/User Manual

Installation/User Manual Installation/User Manual APsystems YC500-A Photovoltaic Grid-connected Inverter Version 4.1 8/15 APsystems 600 Ericksen Ave. NE Ste 200 Seattle, WA 98110 TEL: 844-666-7035 EMAIL: info@apsystems.com WEB:

More information

Please carefully read the following installation and safety instructions. Non-compliance with these instructions may void the module warranty.

Please carefully read the following installation and safety instructions. Non-compliance with these instructions may void the module warranty. Installation Safety instructions Maintenance Photovoltaic modules user manual ET Solar series module Please carefully read the following installation and safety instructions. Non-compliance with these

More information

INSTALLATION MANUAL FOR ILB HELIOS PHOTOVOLTAIC MODULES

INSTALLATION MANUAL FOR ILB HELIOS PHOTOVOLTAIC MODULES INSTALLATION MANUAL FOR ILB HELIOS PHOTOVOLTAIC MODULES 1/13 www.ilb-helios-group.ch Content 1. GENERAL INFORMATION... 3 2. GENERAL HANDLING AND INSTALLATION... 3 3. MODULE WIRING AND ELECTRICAL CONNECTIONS...

More information

Installation manual plugs and connectors with screw connection (16/32 A)

Installation manual plugs and connectors with screw connection (16/32 A) EN Installation manual plugs and connectors with screw connection (16/32 60003213 Issue 04.2016 2016-04-01 Table of contents 1 About this manual 3 1.1 Structure of the warnings 3 1.2 Symbols used 4 1.3

More information

PV Rapid Shutdown device

PV Rapid Shutdown device PV Rapid Shutdown device Installation and Operation Manual Solis-RSD-1G(1:1) Solis-RSD-1G(2:2) Manufacturer: Ginlong (Ningbo) Technologies Co.,Ltd., Ningbo, Zhejiang, P.R.China US Office: 565 Metro Pl.

More information

Installation/User Manual

Installation/User Manual Installation/User Manual APsystems YC500i Photovoltaic Grid-connected Inverter Version 1.0 7/16 APsystems 600 Ericksen Ave. NE Ste 200 Seattle, WA 98110 TEL: 844-666-7035 EMAIL: info@apsystems.com WEB:

More information

Enphase IQ 6 and IQ 6+ Micros

Enphase IQ 6 and IQ 6+ Micros INSTALLATION AND OPERATION MANUAL Enphase IQ 6 and IQ 6+ Micros 141-00034-01 Corporate Headquarters Contact Information Enphase Energy Inc. 1420 N. McDowell Blvd. Petaluma, CA 94954 USA enphase.com/en-us/support/contact

More information

Bulletin Installation of Solar Photovoltaic Systems Section 50; Rules: , , ; Tables 11 and 19 Issued July 2010

Bulletin Installation of Solar Photovoltaic Systems Section 50; Rules: , , ; Tables 11 and 19 Issued July 2010 Ontario Electrical Safety Code - Bulletins 50-1-0 Bulletin 50-1-0 Installation of Solar Photovoltaic Systems Section 50; Rules: 84-020, 84-024, 84-030; Tables 11 and 19 Issued July 2010 Scope (1) Introduction

More information

C-POWER AC AUTOMATIC CONTROL

C-POWER AC AUTOMATIC CONTROL Issue 1 Print 1 C-POWER AC AUTOMATIC CONTROL INSTALLATION INSTRUCTIONS & OWNER S MANUAL Model: 93 ACMC100I A Charles Industries, Ltd. All rights reserved. Printed in the United States of America. Issue

More information

MOBILE CONNECTOR - GEN 2 OWNER'S MANUAL

MOBILE CONNECTOR - GEN 2 OWNER'S MANUAL MOBILE CONNECTOR - GEN 2 OWNER'S MANUAL UNITED STATES Contents Safety Information... 2 Save These Important Safety Instructions... 2 Warnings...2 Cautions...3 General Information... 4 Mobile Connector

More information

PanelView Plus/VersaView CE Terminals and Display Modules

PanelView Plus/VersaView CE Terminals and Display Modules Installation Instructions PanelView Plus/VersaView CE Terminals and Display Modules (Catalog Numbers 2711P-xxxxxx, 6182H-xxxxxx) English Inside: Overview...2 For More Information...2 Modular Components...3

More information

Installation Guide V290 (Color) This guide provides basic information for Unitronics LCD color touchscreen models V C30B and V T40B.

Installation Guide V290 (Color) This guide provides basic information for Unitronics LCD color touchscreen models V C30B and V T40B. Vision OPLC Installation Guide V290 (Color) This guide provides basic information for Unitronics LCD color touchscreen models V290-19-C30B and V290-19-T40B. General Description Vision OPLCs are programmable

More information

G12/G12x USER S MANUAL

G12/G12x USER S MANUAL G12/G12x USER S MANUAL TABLE OF CONTENTS SECTION 1 SLIDE CONFIGURATION SECTION 2 SLIDE CONFIGURATION ACCESSORIES SECTION 3 TABLETOP CONFIGURATION SECTION 4 TABLETOP CONFIGURATION ACCESSORIES SECTION 5

More information

1 Channel Strobe Controller ORDERCODE 40226

1 Channel Strobe Controller ORDERCODE 40226 1 Channel Strobe Controller ORDERCODE 40226 Congratulations! You have bought a great, innovative product from Showtec. The Showtec Strobe Controller brings excitement to any venue. Whether you want simple

More information

SRI LANKA STANDARD CODE OF PRACTICE FOR GRID CONNECTED PHOTOVOLTAIC POWER SYSTEMS SLS 1522:2016

SRI LANKA STANDARD CODE OF PRACTICE FOR GRID CONNECTED PHOTOVOLTAIC POWER SYSTEMS SLS 1522:2016 SRI LANKA STANDARD CODE OF PRACTICE FOR GRID CONNECTED PHOTOVOLTAIC POWER SYSTEMS SLS 1522:2016 BY H S W Karunaratne Assistant Director - Engineering Sri Lanka Standards Institution. 1 DEFINITIONS Ac module:

More information

Enphase IQ 7, IQ 7+, and IQ 7X Micros

Enphase IQ 7, IQ 7+, and IQ 7X Micros INSTALLATION AND OPERATION MANUAL Enphase IQ 7, IQ 7+, and IQ 7X Micros May 15, 2018 141-00043-02 Corporate Headquarters Contact Information Enphase Energy Inc. 1420 N. McDowell Blvd. Petaluma, CA 94954

More information

Optional add-on cassette Attachment Instruction manual

Optional add-on cassette Attachment Instruction manual E6580774 Optional add-on cassette Attachment Instruction manual 1. INTRODUCTION 3 2. CONNECTION TO THE INVERTER 4 2.1 Fixing the option alone 4 2.2 Connection to the inverter 6 3. SPECIFICATION 8 4. WARRANTY

More information

User Manual. 3KW/5KW PV Inverter

User Manual. 3KW/5KW PV Inverter User Manual 3KW/5KW PV Inverter (IP 20) Version: 1.0 Table Of Contents 1. Introduction... 1 1-1. Overview... 1 1-1. Affecting Factors for Performance of the Inverter... 1 2. Important Safety Warning...

More information

Conveyor Belt Alignment Switches from IDEM

Conveyor Belt Alignment Switches from IDEM Conveyor Belt Alignment Switches from IDEM Data Sheet Die-Cast Models Python Line Series Stainless Steel Models Using Conveyor Belt Alignment Switches Application: Conveyor Belt Alignment switches are

More information

Enphase IQ 7, IQ 7+, and IQ 7X Micros

Enphase IQ 7, IQ 7+, and IQ 7X Micros INSTALLATION AND OPERATION MANUAL Enphase IQ 7, IQ 7+, and IQ 7X Micros May 15, 2018 141-00043-02 Corporate Headquarters Contact Information Enphase Energy Inc. 1420 N. McDowell Blvd. Petaluma, CA 94954

More information

Obtaining Documentation and Submitting a Service Request, page xvii Safety Warnings, page xvii Safety Guidelines, page xx

Obtaining Documentation and Submitting a Service Request, page xvii Safety Warnings, page xvii Safety Guidelines, page xx Preface Obtaining Documentation and Submitting a Service Request, page xvii Safety s, page xvii Safety Guidelines, page xx Obtaining Documentation and Submitting a Service Request For information on obtaining

More information

2 Mesa Ethernet Dock User s Manual

2 Mesa Ethernet Dock User s Manual owner s manual Mesa Ethernet Dock The Mesa Ethernet Dock is an optional accessory that provides an ethernet port for networking, power input jack, USB client port, and a mounting station for the Mesa Rugged

More information

Installation and Operations Manual Micro-Inverter M S

Installation and Operations Manual Micro-Inverter M S Installation and Operations Manual Micro-Inverter M175-24-240-S Release 1.3 Page 1 Copyright Enphase Energy Inc. 2008 Release 1.3 Contact Information Enphase Energy Inc. 201 1 St Street, Suite 111 Petaluma,

More information

Instruction Manual. Electrical Management System (EMS) EMS-HW30C & EMS-HW50C

Instruction Manual. Electrical Management System (EMS) EMS-HW30C & EMS-HW50C Instruction Manual Electrical Management System (EMS) EMS-HW30C & EMS-HW50C EMS-HW50C EMS-HW30C! CAUTION These instructions are intended to provide assistance with the installation of this product, and

More information

Model 2460-KIT. Screw Terminal Connector Kit. Description / September 2014 *P * 1

Model 2460-KIT. Screw Terminal Connector Kit. Description / September 2014 *P * 1 Keithley Instruments 28775 Aurora Road Cleveland, Ohio 44139 1-800-935-5595 http://www.keithley.com Model 2460-KIT Screw Terminal Connector Kit Description The Model 2460-KIT Screw Terminal Connector Kit

More information

Installation Guide V290 (Color) This guide provides basic information for Unitronics LCD color touchscreen models V C30B and V T40B.

Installation Guide V290 (Color) This guide provides basic information for Unitronics LCD color touchscreen models V C30B and V T40B. Vision OPLC Installation Guide V290 (Color) This guide provides basic information for Unitronics LCD color touchscreen models V290-19-C30B and V290-19-T40B. General Description Vision OPLCs are programmable

More information

When any of the following symbols appear, read the associated information carefully. Symbol Meaning Description

When any of the following symbols appear, read the associated information carefully. Symbol Meaning Description Uni-I/O Modules Installation Guide UID-0808R, UID-0808T, UID-1600,UID-0016R, UID-0016T Uni-I/O is a family of Input/Output modules that are compatible with the UniStream control platform. This guide provides

More information

Smart Grid Tie Microinverter User Manual

Smart Grid Tie Microinverter User Manual Smart Grid Tie Microinverter User Manual Thanks for choosing Smart Microinverters. Read the following instruction carefully before installation and operating, install and operate as specified by this user

More information

TECHKNOW, INC. Kiosk Order Confirmation System INSTALLATION MANUAL. Revision Date: July 11, 2012 Part # Version 3.2

TECHKNOW, INC. Kiosk Order Confirmation System INSTALLATION MANUAL. Revision Date: July 11, 2012 Part # Version 3.2 document Page 1 of 18 TECHKNOW, INC Kiosk Order Confirmation System INSTALLATION MANUAL Revision Date: July 11, 2012 Part # Version 3.2 Techknow, Inc. 393 Mayfield Road Duncan, SC 29334 www.gotechknow.com

More information

SAVE THESE INSTRUCTIONS

SAVE THESE INSTRUCTIONS OUTDOOR HARDWIRE INSTALLATION INSTRUCTIONS Please read and save these instructions. Read carefully before using product. Protect yourself and others by observing all safety information, warnings and cautions.

More information

INSTALLATION MANUAL THE / MODULE. IEC & UL version

INSTALLATION MANUAL THE / MODULE. IEC & UL version INSTALLATION MANUAL IEC & UL version THE / MODULE Duomax Duomax M Plus TSM-PEG40.47 TSM-PEG5.40 TSM-PEG5.47 TSM-PEG14.40 TSM-DEG40.47(II) TSM-DEG5.40(II) TSM-DEG5.47(II) TSM-DEG14.40(II) Table of Content

More information

PRO-1250D CT MID DIN rail three phase four wire energy meter.

PRO-1250D CT MID DIN rail three phase four wire energy meter. PRO-1250D CT MID DIN rail three phase four wire energy meter. 1.1 Safety instructions 1.2 Foreword 1.3 MID certificate 1.4 Performance criteria 1.5 Specifications 1.6 Basic errors 1.7 Description 1.8 Dimensions

More information

User Manual. 1.5KW~5KW PV Inverter. Version: 1.1

User Manual. 1.5KW~5KW PV Inverter. Version: 1.1 User Manual 1.5KW~5KW PV Inverter Version: 1.1 Table Of Contents 1. Introduction... 1 1-1. Overview... 1 1-1. Affecting Factors for Performance of the Inverter... 1 2. Important Safety Warning... 2 3.

More information

FLEX Ex Spring Clamp Terminal Base

FLEX Ex Spring Clamp Terminal Base Installation Instructions FLEX Ex Spring Clamp Terminal Base (Cat. No. 1797-TB3S) 1 10 11 4 Only remove this cover plug if connecting another terminal base unit. 3 5 6 12 2 7 8 9 41253 Component Identification

More information

When any of the following symbols appear, read the associated information carefully. Symbol Meaning Description

When any of the following symbols appear, read the associated information carefully. Symbol Meaning Description Uni-I/O Wide Modules Installation Guide UID-W1616R, UID-W1616T Uni-I/O Wide is a family of Input/Output modules that are compatible with the UniStream control platform. Wide Modules are 1.5 times as wide

More information

SDM120 SERIES. SDM120 series User Manual. Single phase two wire DIN rail energy meter (One module)

SDM120 SERIES. SDM120 series User Manual. Single phase two wire DIN rail energy meter (One module) SDM120 SERIES Single phase two wire DIN rail energy meter (One module) User manual ------------ 1.1 Safety instruction 1.2 Foreword 1.3 Performance criteria 1.4 Specifications 1.5 Basic errors 1.6 Dimension

More information

60W Power over Ethernet Waterproof Adapter PoE IEEE BT Single Port Injector for Outdoor Application

60W Power over Ethernet Waterproof Adapter PoE IEEE BT Single Port Injector for Outdoor Application WWW.PHIHONG.COM 60W Power over Ethernet Waterproof Adapter PoE IEEE BT Single Port Injector for Outdoor Application Features Compliant with the IEEE802.3bt Standard Non-Vented Case with Mounting Bracket

More information

ILUMEN PID SOLUTION INDOOR OUTDOOR ILUMEN PIDBOX MINI INSTALLATION MANUAL. Ilumen PIDbox mini Version 1.5

ILUMEN PID SOLUTION INDOOR OUTDOOR ILUMEN PIDBOX MINI INSTALLATION MANUAL. Ilumen PIDbox mini Version 1.5 ILUMEN PID SOLUTION ILUMEN PIDBOX MINI INSTALLATION MANUAL INDOOR OUTDOOR Ilumen PIDbox mini Version 1.5 1 TABLE OF CONTENT 1 Information on this manual... 3 1.1 Validity... 3 1.2 Target group... 3 1.3

More information

Full HD Speed Dome IP Camera

Full HD Speed Dome IP Camera Full HD Speed Dome IP Camera Installation Guide Indoor / Outdoor Ver. 1.6 Preface The information given in this manual was current when published. The company reserves the right to revise and improve its

More information

Enphase IQ 6 and IQ 6+ Micros

Enphase IQ 6 and IQ 6+ Micros INSTALLATION AND OPERATION MANUAL Enphase IQ 6 and IQ 6+ Micros December 27, 2017 141-00034-01 Corporate Headquarters Contact Information Enphase Energy Inc. 1420 N. McDowell Blvd. Petaluma, CA 94954 USA

More information

Cisco CRS 3-Phase AC Power Distribution Unit Installation Guide 2. Cisco CRS 3-Phase AC Power Distribution Unit 2

Cisco CRS 3-Phase AC Power Distribution Unit Installation Guide 2. Cisco CRS 3-Phase AC Power Distribution Unit 2 Cisco CRS 3-Phase AC Power Distribution Unit Installation Guide Cisco CRS 3-Phase AC Power Distribution Unit Installation Guide 2 Cisco CRS 3-Phase AC Power Distribution Unit 2 Revised: November 18, 2016,

More information

sunmax Residential Solar Solution sunmax Hardware sunmax Software

sunmax Residential Solar Solution sunmax Hardware sunmax Software DATASHEET sunmax Residential Solar Solution The sunmax Residential Solar Solution provides a complete product solution including hardware and software. The sunmax hardware offers advantages such as simplified

More information

Installation and Operations Manual. Enphase Micro-Inverter Models M and M

Installation and Operations Manual. Enphase Micro-Inverter Models M and M Installation and Operations Manual Enphase Micro-Inverter Models M190-72-208 and M190-72-240 Contact Information Enphase Energy Inc. 201 1 St Street, Suite 300 Petaluma, CA 94952 Phone: 707-763-4784 Toll

More information

SPECIAL SPECIFICATION 1864 Pole Mounted Cabinet

SPECIAL SPECIFICATION 1864 Pole Mounted Cabinet 1993 Specifications CSJ s 0924-06-221,etc. & 0924-06-223 SPECIAL SPECIFICATION 1864 Pole Mounted Cabinet 1. Description. This specification describes the minimum acceptable requirements for a weatherproof

More information

Electrical Management System (EMS) EMS-HW30C & EMS-HW50C

Electrical Management System (EMS) EMS-HW30C & EMS-HW50C Electrical Management System (EMS) EMS-HW30C & EMS-HW50C Installation & Operating Guide for: Model EMS-HW30C Rated at 120V/30A and Model EMS-HW50C Rated at 240V/50A Surgio Says Lifetime Warranty on all

More information

Installation Job Aid for VSP 4850GTS

Installation Job Aid for VSP 4850GTS Installation Job Aid for VSP 4850GTS Notices Release 6.1.0.0 NN46251-308 Issue 02.01 November 2017 Notice paragraphs alert you about issues that require your attention. The following paragraphs describe

More information

Installation / User Manual

Installation / User Manual Installation / User Manual APsystems YC500A (240V) Photovoltaic Grid-connected Microinverter Rev 1.4 Please scan the QR code to get mobile app and more support to help the installation. ALTENERGY POWER

More information

Conductive Level Controller

Conductive Level Controller Conductive Level Controller 61F-D21T-V1 Ideal for level control for industrial facilities and equipment. Outputs can be set to self-hold at ON or OFF using self-holding circuits. Sensitivity adjustment

More information

First Solar Series 3 Black Plus Module

First Solar Series 3 Black Plus Module User Guide User Guide: First Solar Series 3 Black Plus Module North America REV 1.2 PD-5-200-03 Plus NA 02811_UG_NA_Plus_9AUG16 Series 3 Black Plus Module User Guide North America Page i of 13 Table of

More information

Installation/User Manual

Installation/User Manual Installation/User Manual APsystems YC500-A Photovoltaic Grid-connected Inverter Version 4.2 11/15 APsystems 600 Ericksen Ave. NE Ste 200 Seattle, WA 98110 TEL: 844-666-7035 EMAIL: info@apsystems.com WEB:

More information

Thread length (overall length) material

Thread length (overall length) material Cylindrical Proximity Sensor for Mobile Usage Designed and tested to keep your machines moving IP69k tested and certified for highest water resistance e1 type approval (according to automotive directive

More information

Model 2380 Rack-Mount Kit

Model 2380 Rack-Mount Kit Keithley Instruments 28775 Aurora Road Cleveland, Ohio 44139 1-800-935-5595 http://www.tek.com/keithley Model 2380 Rack-Mount Kit Installation Instructions Introduction The Model 2380 Fixed Rack-Mount

More information

Sun-Port Power Solar PV Modules Installation and User Manual

Sun-Port Power Solar PV Modules Installation and User Manual Sun-Port Power Solar PV Modules Installation and User Manual This manual contains important safety instructions for the Solar Photovoltaic Modules (hereafter referred to as Modules ) of Nanjing Sunport

More information

SolConeX Wall-Mounted Socket, 16 A

SolConeX Wall-Mounted Socket, 16 A SolConeX Wall-Mounted Socket, 16 A Operating instructions Additional languages www.stahl-ex.com General Information Contents 1 General Information...2 1.1 Manufacturer...2 1.2 Information Regarding the

More information

Installation / User Manual

Installation / User Manual Installation / User Manual APsystems YC1000-3 3-Phase Microinverter Rev 3.7 Please scan the QR code to get mobile app and more support to help the installation ALTENERGY POWER SYSTEM Inc. WEB: usa.apsystems.com

More information

Weathersafe Vision. Installation & Operating Instructions

Weathersafe Vision. Installation & Operating Instructions Weathersafe Vision Installation & Operating Instructions IP66 Products covered by these instructions 1 TGVL01 TGVL02 TGVL03 TGVL05 TGV101N TGV201N TGV104N Single Gang 2-Way Switch [SP] 10AX (Fluorescent

More information

EVT248 MICROINVERTER. User Manual. Zhejiang Envertech Corporation Ltd.

EVT248 MICROINVERTER. User Manual. Zhejiang Envertech Corporation Ltd. MICROINVERTER EVT248 Zhejiang Envertech Corporation Ltd. Tel+86 579 8926 6326 Webwww.envertec.com Emailinfo@envertec.com Add24th Floor, Jintong Mansion, Center of Headquarters, Yongkang City, Zhejiang

More information

hp uninterruptible power system r12000 xr models installation instructions

hp uninterruptible power system r12000 xr models installation instructions hp uninterruptible power system r000 xr models installation instructions Overview These instructions show how to install an uninterruptible power system (UPS). For detailed information about the UPS, refer

More information

E2A. Ordering Information. Cylindrical Proximity Sensor. Safe Mounting with Greater Sensing Distance. E2A Cylindrical Proximity Sensor 1

E2A. Ordering Information. Cylindrical Proximity Sensor. Safe Mounting with Greater Sensing Distance. E2A Cylindrical Proximity Sensor 1 Cylindrical Proximity Sensor E2A Safe Mounting with Greater Sensing Distance Ensures a sensing distance approximately 1. to 2 times larger than that of any conventional OMRON Sensor. Problems such as the

More information

MBE Mounts and Adapters

MBE Mounts and Adapters MBE Mounts and Adapters MBE Series en Installation Guide MBE Mounts and Adapters Table of Contents en 3 Table of Contents 1 Important safety instructions 4 2 MBE Series Mounts and Adapters 6 2.1 Unpacking

More information

KANEKA CORPORATION 3-2-4, NAKANOSHIMA, KITA-KU OSAKA , JAPAN

KANEKA CORPORATION 3-2-4, NAKANOSHIMA, KITA-KU OSAKA , JAPAN KANEKA Thin Film PV Installation Manual MODULE TYPE: GSA KANEKA CORPORATION 3-2-4, NAKANOSHIMA, KITA-KU OSAKA 530-8288, JAPAN reference No. GSA211.001 Warning Meaning of signs Not Allowed No Disassembly

More information