THE RESEARCH & TECHNICAL ACTIVITIES REPORT Release 2. RESEARCH SUBCOMMITTEE CHAIRS Research and Technical Services January 25, 2019

Size: px
Start display at page:

Download "THE RESEARCH & TECHNICAL ACTIVITIES REPORT Release 2. RESEARCH SUBCOMMITTEE CHAIRS Research and Technical Services January 25, 2019"

Transcription

1 THE RESEARCH & TECHNICAL ACTIVITIES REPORT Release 2 Michael R. Vaughn, P.E. FOR TC/TG/MTG/SSPC CHAIRS, VICE CHAIRS & Manager RESEARCH SUBCOMMITTEE CHAIRS Research and Technical Services January 25, WINTER MEETINGS The winter meetings of the Research Administration Committee (RAC), Technical Activities Committee (TAC), Technology Council, and the Board were recently completed with the results below. This report also includes information for RAC s and TAC s upcoming annual meeting. NEW PROJECTS AWARDED The following three projects were approved for award as follows: 1784-RP, Repeatability and Reproducibility Assessment of ASHRAE Standard 52.2 as currently Amended; Responsible Committee: TC 2.4 (Particulate Air Contaminants and Particulate Removal Equipment); Co-Sponsors: SSPC 52.2 (Method of Testing General Ventilation Air-Cleaning Devices for Removal Efficiency by Particle Size; Co-funding: None; Recommended Contractor: Owen Air Filtration Consulting. LLC; Estimated Duration: 18 months; Cost to ASHRAE: $150, RP, Updating climatic design information for the 2021 ASHRAE Handbook, Standard 169, and the Handbook of Smoke Control Engineering; Responsible Committee: TC 4.2 (Climatic Information); Co-Sponsor: TC 4.1 (Load Calculation and Procedures) and TC 5.6 (Control of Fire and Smoke); Co-funding: None; Recommended Contractor: Klimaat Consulting & Innovation, Inc.; Estimated Duration: 24 months; Cost to ASHRAE: $144, RP, Assessing the Impacts and Value of ASHRAE s Standards and Technology; Responsible Committee: MTG.IAST (Impact of ASHRAE Standards and Technology); Co-Sponsor: n/a; Cofunding: None; Recommended Contractor: Lawrence Technical University; Estimated Duration: 12 months; Cost to ASHRAE: $84,775 NEW PROJECTS LED BY OTHER NON-PROFITS THAT ARE CO-FUNDED BY ASHRAE None at this time PROJECTS THAT FAILED TO BE AWARDED 1853-URP, Building on an existing residential ventilation project: brushless permanent magnet (BPM) motor change-outs, pollutant emissions characterizations, and testing multi-zone ventilation system effectiveness; Responsible Committee: TC 4.3; Cost: $199,064; Duration: 18 months. PROJECTS STILL PENDING AWARD 1780-TRP, Test method to evaluate cross-contamination of gaseous contaminant within total energy recovery wheels; Responsible Committee: TC 9.10 (Laboratory Ventilation); Co-Sponsors: TC 2.3 (Gaseous Air Contaminants and Gas Contaminant Removal Equipment); TC 9.6 (Healthcare Facilities); SSPC 2.1 (Ventilation for Acceptable Indoor Air Quality); Co-funding: None; Estimated Duration: 15 months; Estimated Cost to ASHRAE: $200,000; Status: Need Contractor recommendation and TC vote on Summary Sheet for Reporting Proposal Evaluations form from TC 9.10 or recommendation to rebid with revised WS and expanded recommended bidders list TRP, Optical and Thermal Performance of Hollow Glass Block Units; Responsible Committee: TC 4.5 (Fenestration); Co-Sponsors: None; Co-funding: None; Estimated Duration: 26 months; Estimated Cost to ASHRAE: $197,000; Status: Need Contractor recommendation and TC vote on Summary Sheet for Reporting Proposal Evaluations form from TC 4.5 or recommendation to rebid with revised WS and expanded recommended bidders list.

2 1810-TRP, Development of Reference Building Information Model (BIM) Test Cases for Improving Usage of Software Interoperability Schemas; Responsible Committee: TC 1.5 (Computer Applications); Co-Sponsors: None; Co-funding: None; Estimated Duration: 20 months; Estimated Cost to ASHRAE: $135,000; Status: RAC will consider TC 1.5 s contractor recommendation at their next meeting in the coming weeks TRP, The Effects of Ventilation in Sleeping Environments; Responsible Committee: TC 2.1 (Physiology and Human Environment); Co-Sponsors: None; Co-funding: None; Estimated Duration: 18 months; Estimated Cost to ASHRAE: $250,000; Status: Need Contractor recommendation and TC vote on Summary Sheet for Reporting Proposal Evaluations form from TC 2.1 or recommendation to rebid with revised WS and expanded recommended bidders list TRP, Experimental Characterization of Aircraft Bleed Air Particulate Contamination; Responsible Committee: TC 9.3 (Transportation Air-Conditioning); Co-Sponsors: SSPC 161 (Air Quality within Commercial Aircraft); Co-funding: None; Estimated Duration: 18 months; Estimated Cost to ASHRAE: $150,000; Status: Need Contractor recommendation and TC vote on Summary Sheet for Reporting Proposal Evaluations form from TC 9.3 or recommendation to rebid with revised WS and expanded bidders list. POTENTIAL PROJECTS FOR BID IN SPRING 2018 The a portion of following six tentative research projects (TRPs) are expected to be released for bid or rebid this spring if ready by March 8th: Approved Work Statements Available for Possible Bid in spring 2019: 1644-TRP, Smoke Control in Long Atria; Responsible Committee: TC 5.6 (Control of Fire and Smoke); Co-Sponsors: None; Co-funding: None; Estimated Duration: 15 months; Estimated Cost to ASHRAE: $75,000; Status: Ready to Bid TRP-R (Re-bid), Experimental Evaluation of Two-Phase Pressure Drop and Flow Pattern in U-bends with Ammonia - Rebid; Responsible Committee: TC 1.3 (Heat Transfer and Fluid Flow); Co-Sponsors: TC 8.4 (Air-to-Refrigerant Heat Transfer Equipment); Co-funding: None; Estimated Duration: 30 months; Estimated Cost to ASHRAE: $150,000; Status: Rebid with revised WS and expanded recommended bidders list 1716-TRP-C (Conditional Approval), Oil Concentration of Field-Installed Liquid Chillers with Flooded Type Evaporators; Responsible Committee: TC 8.2 (Centrifugal Machines); Co- Sponsors: None; Co-funding: None; Estimated Duration: 12 months; Estimated Cost to ASHRAE: $135,000; Status: Clear conditions with RL to bid 1718-TRP-C (Conditional Approval), Development of a Method to Determine the Moisture Transport Through a Roof Shingle System Under Real Conditions; Responsible Committee: TC 4.4 (Building Materials and Building Envelope Performance); Co-Sponsors: None; Co-funding: None; Estimated Duration: 24 months; Estimated Cost to ASHRAE: $160,000; Status: Clear conditions with RL to bid 1740-TRP-R (Re-bid), Hydrogen Fluoride Capacity of Desiccants; Responsible Committee: TC 3.3 (Refrigerant Contaminant Control); Co-Sponsors: TC 3.2 (Refrigerant System Chemistry); Cofunding: None; Estimated Duration: 9 months; Estimated Cost to ASHRAE: $120,000; Status: Rebid with revised WS and expanded recommended bidders list TRP-R (Re-bid), Distribution of Water between Vapor and Liquid Phases of Low GWP Refrigerants; Responsible Committee: TC 3.3 (Refrigerant Contaminant Control); Co-Sponsors: None; Co-Funding: None; Estimated Duration: 12 months; Estimated Cost to ASHRAE: $100,000; Status: Rebid with revised WS and expanded recommended bidders list. 2

3 1816-TRP, Reporting the Energy use and Heat Gain from Imaging Equipment; Responsible Committee: TC 9.6 (Healthcare Facilities); Co-Sponsors: TC 4.1 (Load Calculation Data and Procedures); TC 4.7 (Energy Calculations); Co-Funding: None; Estimated Duration: 18 months; Estimated Cost to ASHRAE: $150,000; Status: Ready to Bid 1833-TRP, Literature Review for Evidence of the Basis for Specified Air Change Rates (ACR) for Cleanrooms, Laboratories, Laboratory Animal Facilities, and Health Care Facilities with Medium to High ACR; Responsible Committee: MTG.ACR (Air Change Rates); Co-Sponsors: TC 2.2, TC 4.3, TC 5.8, TC 9.2, TC 9.6, TC 9.10, TC 9.11, SSPC 62.1, SSPC 170, AIHA, NIOSH, I2SL; Co- Funding: None; Estimated Duration: 9 months; Estimated Cost to ASHRAE: $75,000; Status: Ready to Bid 1836-TRP, Developing a Standardized Categorization System for Energy Efficiency Measures; Responsible Committee: TC 7.6 (Building Energy Performance); Co-Sponsors: beq, SSPC 100; Co-funding: None; Estimated Duration: 16 months; Estimated Cost to ASHRAE: $80,000; Status: Ready to Bid WORK STATEMENTS REVIEWED AND APPROVED OR RETURNED WITH COMMENTS A total of two work statements were submitted by the TCs for review at the RAC winter meeting. None were accepted-is, none were conditionally accepted, both were returned with comments. See below for the status of each project after this review. Approved Work Statements: 1797-WS, Assessment of the A/B toxicity classification used in Standard 34; Responsible Committee: TC 3.1 (Refrigerants and Secondary Coolants); Co-Sponsors: None; Co-funding: None; Estimated Duration: 36 months; Estimated Cost to ASHRAE: $75,000; Status: Conditionally Accepted. Work with RL to clear RAC s approval conditions on work statement WS, Emerging gas-phase electronic filtration technologies and ASHRAE test standard; Responsible Committee: TC 2.3 (Gaseous Air Contaminants and Gas Contaminant Removal Equipment); Co-Sponsors: SSPC 62.1 and SSPC 145; Co-funding: None; Estimated Duration: 6 months; Estimated Cost to ASHRAE: $40,000; Status: Conditionally Accepted. Work with RL to clear RAC s approval conditions on work statement. Work Statements Returned with Comments or Rejected: 1703-WS, Performance of Vapor Retarder Systems Used on Mechanical Insulation; Responsible Committee: TC 1.8 (Mechanical Systems Insulation); Co-Sponsors: TC 10.3; Co-funding: None; Estimated Duration: 8-12 months; Estimated Cost to ASHRAE: $50,000 to $70,000; Status: Returned with comments. Work with RL to make possible revisions to work statement before resubmitting it to RAC for review WS, Long-term Temperature Change of Ground Heat Exchangers; Responsible Committee: TC 6.8 (Geothermal Heat Pump and Energy Recovery Applications) Co-Sponsors: None; Potential Co-funding: IGSHPA & EPRI; Estimated Duration: 20 months; Estimated Cost to ASHRAE: $180k to $215k; Status: Returned with comments. Work with RL to make possible revisions to work statement before resubmitting it to RAC for review WS, Develop cost and performance indices to evaluate effectiveness of virtual airflow sensors in HVAC applications; Responsible Committee: TC 7.5 (Smart Building Systems) Co- Sponsors: None; Co-funding: None; Estimated Duration: 24 months; Estimated Cost to ASHRAE: $250k; Status: Returned with comments. Work with RL to make possible revisions to work statement before resubmitting it to RAC for review. A revised work statement for any of the returned projects listed above can be submitted to the MORTS on or before March 15, 2019 in order to be considered at RAC s spring meeting or on or 3

4 before May 15, 2019 in order to be considered at RAC s Annual meeting in Kansas City MO this June. If a work statement can t be revised that quickly, the next scheduled deadline for RAC consideration is August 15, WORK STATEMENTS PREVIOUSLY RETURNED TO TCs TC/TGs should work with their Research Liaison to respond to written comments on the work statement provided by RAC via letter and revise the work statement appropriately. You can find a copy of the last draft submitted to RAC along with RAC s comments by clicking on the links in the Society s Research Implementation Plan posted on the Research page of the ASHRAE website. Please note that topics will be dropped from this plan if the work statement is not approved for bid after four years on the plan. The work statement forms that are now in use by RAC for Society year can also be found on the Research page at REVIEW OF RESEARCH TOPIC ACCEPTANCE REQUESTS (RTARs) RAC reviewed a total of seven RTARs at its winter meeting and none were accepted as-is, but all were accepted with comments for inclusion in the Society s Research Implementation Plan and for further development into work statements. The following is a listing of all RTARs reviewed: Approved RTARs: 1822-RTAR, Supplemental Normalization Parameters for Alternate/Enhanced Expression of Energy Performance - Responsible Committee: TC 7.6 (Building Energy Performance) Co- Sponsors: SSPC 100; Status: Accepted with comments. Proceed with the development of the project s work statement with guidance and feedback from your RL. Prior to submitting the work statement to RAC, work with your RL to develop a response letter to RAC explaining how RAC s comments on the RTAR were addressed in the work statement, and if not, why? 1870-RTAR, Investigating Occupant Energy Behavior and Building-Human Interaction in Office Buildings Responsible Committee: MTG.OBB (Occupant Behavior in Buildings) Co-Sponsors: None; Status: Accepted with comments. Proceed with the development of the project s work statement with guidance and feedback from your RL. Prior to submitting the work statement to RAC, work with your RL to develop a response letter to RAC explaining how RAC s comments on the RTAR were addressed in the work statement, and if not, why? 1871-RTAR, Hygrothermal Modeling of Below Ambient Pipe Insulation Systems in Both Buildings and Refrigeration Responsible Committee: TC 1.8 (Mechanical Systems Insulation); Co-Sponsors: TC 10.3; Status: Accepted with comments. Proceed with the development of the project s work statement with guidance and feedback from your RL. Prior to submitting the work statement to RAC, work with your RL to develop a response letter to RAC explaining how RAC s comments on the RTAR were addressed in the work statement, and if not, why? 1872-RTAR, Updating Site Energy Targets for ASHRAE Standard Energy Efficiency in Existing Buildings Responsible Committee: TC 7.6 (Building Energy Performance); Co- Sponsors: SSPC 100; Status: Accepted with comments. Proceed with the development of the project s work statement with guidance and feedback from your RL. Prior to submitting the work statement to RAC, work with your RL to develop a response letter to RAC explaining how RAC s comments on the RTAR were addressed in the work statement, and if not, why? 1873-RTAR, Upper-Air Ultraviolet Germicidal Irradiation (UVGI) for Tall Spaces Responsible Committee: TC 2.9 (Ultraviolet Air and Surface Treatment); Co-Sponsors: TC 9.6; Status: Accepted with comments. Proceed with the development of the project s work statement with guidance and feedback from your RL. Prior to submitting the work statement to RAC, work with your RL to develop a response letter to RAC explaining how RAC s comments on the RTAR were addressed in the work statement, and if not, why? 4

5 1874-RTAR, Climatic Design Conditions for Roof Top HVAC Equipment Responsible Committee: TC 4.2 (Climatic Information); Co-Sponsors: TC 4.7, TC 4.10; Status: Accepted with comments. Proceed with the development of the project s work statement with guidance and feedback from your RL. Prior to submitting the work statement to RAC, work with your RL to develop a response letter to RAC explaining how RAC s comments on the RTAR were addressed in the work statement, and if not, why? 1876-RTAR, Optimizing Air Curtains and the Effect on the Infiltration Load of Refrigerated Display Cases with Glass Doors Responsible Committee: TC 10.7 (Commercial Food and Beverage Refrigeration Equipment); Co-Sponsors: None; Status: Accepted with comments. Proceed with the development of the project s work statement with guidance and feedback from your RL. Prior to submitting the work statement to RAC, work with your RL to develop a response letter to RAC explaining how RAC s comments on the RTAR were addressed in the work statement, and if not, why? RTARs Returned with Comments or Rejected: None If a TC wants to pursue a rejected topic further, we recommend the TC first review the RAC comments and then discuss scope and topic further with your RL before submitting a new RTAR. The RTAR form that is now in use by RAC for Society year can be found on the Research page of the ASHRAE website at The next submission date for RTARs and WSs is March 15, The standing RAC submission dates for new and revised RTARs and WSs are as follows each year: March 15 RAC Spring meeting consideration in April May 15 RAC Annual meeting consideration in June August 15 RAC Fall meeting consideration in Sept. or Oct. December 15 RAC Winter meeting consideration in January Therefore, if you get MMAD each year, you won t be as frustrated with RAC. SOCIETY RESEARCH IMPLEMENTATION PLAN The Society Research Implementation Plan is now being updated following the winter meeting of RAC. New RTARs will be added and tentative research project RFPs will be added or dropped depending upon their bid status. This change to the way the implementation plan is updated necessitated that time limits be placed on how long a topic can remain on the plan without being approved for bid. The winter updates to the plan should be in place by March 1, 2019 or sooner. Please review the latest draft of the Implementation Plan posted on the ASHRAE Research page to see if any topics your TC is sponsoring are in danger of being dropped from the plan. 5

6 DEADLINES The following deadlines apply for the next several months. Please recognize that they are not arbitrarily set, but are set to meet subsequent events. So if you miss them, your input may be delayed for six months or in some cases, for a year. All research submissions should be sent to the Manager of Research and Technical Services (MORTS), Mike Vaughn, (morts@ashrae.net). February 8, 2019 Submission deadline for program proposals (seminars and forums) for the 2019 Annual meeting in Kansas City, MO. Conference Website: February 8, 2019 Revised Kansas City Conference and Technical Papers Due February 19, 2019 Conference & Technical Paper Final Accept/Reject Notifications for 2019 Annual meeting in Kansas City, MO sent by CEC. February 20, 2019 March 1, 2019 March 1, 2019 March 15, 2019 March 19, 2019 March 16, 2019 April 5, 2019 May 15, 2019 Deadline for Program Track Suggestions to CEC for 2020 Annual Meeting in Austin, TX. Send Suggestions to PRGstaff@ashrae.net Kansas City Registration Opens Applications for ASHRAE Graduate Student Grant in Aid program are due to MORTS@ashrae.net New or revised Work Statements and RTARs with TC vote are due to MORTS for RAC consideration at the 2019 RAC Spring meeting. Also on this date, TRPs that will bid in the spring are posted for bid on this date. Seminar, Forum, Workshop Accept/Reject Notifications for 2019 Annual meeting in Kansas City, MO sent by Conferences & Expositions Committee (CEC) TC/TG/TRG meeting minutes from the Atlanta meeting are posted on TC website and distributed to membership by this date or sooner. Please make a special effort to meet this deadline. We have received complaints that many TC minutes are typically released just prior to the next Society meeting. Members outside of your committee are interested in your committee s work. Completed TC/TG/TRG Meeting room request web forms for 2019 Annual meeting are due to Lizzy Seymour (lseymour@ashrae.org) at ASHRAE HQ. A link to the form is posted now on the TC web page of the ASHRAE website. Subcommittee meeting rooms must be requested each meeting or they will be dropped automatically. Also, consider hosting some subcommittee meetings in the weeks prior to the Annual meeting via conference call and/or web meeting to free-up time and space at the Annual meeting or if quorum is a concern to assure continued progress on critical items. The new on-line Meeting Room request form should also be used to request Remote Participation Meeting (RPM) capability for Kansas City Meeting room. RPM capability will be assigned to the committees in greatest need if demand for RPM exceeds capacity. Lastly, ASHRAE does NOT provide projectors, but ASHRAE will provide a screen, table, and power for a Members projector, if requested on the Meeting room request web form New or revised Work Statements and RTARs with TC vote are due to MORTS for RAC consideration at the 2019 RAC Annual meeting. May 15, 2019 Bids are due for all TRPs released for bid in spring

7 May 22, 2019 June 1, 2019 June 1, 2019 June 22, 2019 June 26th, 2019 Midnight July 8, 2019 July 26, 2019 October 4, 2019 August 9, 2019 August 15, 2019 TC/TG/TRG meeting agenda for the Kansas City meeting are posted on TC website and distributed to membership. Please make a special effort to meet this deadline. We have received complaints that many TC agendas are released just prior to the TC s meeting. Website opens for Seminar, Forum, Debate, Workshop, and Panel Discussion Proposals for winter meeting in Kansas City, MO. All PowerPoint presentations for the Kansas City, MO meeting must be uploaded to ASHRAE website by this date for review. ASHRAE 2019 Annual conference begins in Kansas City, MO Contractor recommendations are due to MORTS for all TRPs bid in spring Place the Proposal Evaluation Summary sheet in MORTS lockbox outside ASHRAE Headquarters Room in Kansas City or to MORTS@ashrae.net Final Orlando meeting Conference papers submitted for review. Conference Paper Accept/Revise/Reject Notifications for 2020 Winter meeting in Orlando, FL sent by CEC. Seminar, Forum, Debate, Panel Discussion, and Workshop Proposals due for Orlando meeting. Revised Orlando meeting Conference papers / Final Technical Papers due. New or revised Work Statements and RTARs with TC vote are due to MORTS for RAC consideration at the 2019 RAC Fall meeting. August 26, 2019 Conference & Technical Paper Final Accept/Reject Notifications for 2020 Winter meeting in Orlando, FL sent by CEC. October 4, 2019 February 1, 2020 Orlando meeting Seminar, Forum, Debate, Panel Discussion, and Workshop Accept/Reject notifications sent by CEC. ASHRAE 2020 winter conference begins in Orlando, FL 7

8 OTHER NEWS: A. ANNOUNCEMENTS George B. Hightower Technical Achievement Award Recipient David Moss, TC 9.9 Mr. David Moss contributions to ASHRAE & TC 9.9 in the past four years is impressive and includes the following: Lead author and technical editor of the 2016 ASHRAE Datacom Book IT Equipment Design Impact on data Center Solutions, Book #13. Major contributor to three other Datacom Book Series Books (Book #1 4th edition, Book #13 and Book #14) Seminar #5 presenter at 2014 annual meeting. Seminar # 42 presenter in 2017 at winter meeting. Led the ASHRAE IT subcommittee team effort in 2016 to reverse the change to IEC standard. David s willingness to take on hard tasks for the TC and ASHRAE makes him a well-qualified recipient for this award. Mr. Moss s contributions to ASHRAE technical committees, and especially to TC 9.9 in the last four years, have been exemplary and make him a well deserving recipient of the George B. Hightower Technical Achievement Award Service to ASHRAE Research Award - Jensen (Jianshun) Zhang, TCs 2.3, 4.3, 4.10 and EHC Prof. Jensen Zhang is a valued member of the ASHRAE research community. He has helped to write many RTARs and several WS, as well as having been the PI for projects. He brings many ideas and much enthusiasm to the table. In the last few years, just in TC 2.3, he has worked on RTAR-1846 Real Time Small sensors and proposed RTARs on a reactive air cleaner performance test method for VOC levels, the role of gas filtration improving IAQ in residences, and corrosion in data centers. Often the originally proposed RTAR doesn t end up being submitted, but the discussions of ideas feeds into other work that the committee submits. He also contributes to the ASHRAE Research Program by sending references to other groups to help with their RTAR/WS. Prof. Zhang s contributions to ASHRAE Research and especially to TCs 2.3, 4.3, 4.10 and EHC in the last four years, have been exemplary and make him a well deserving recipient of the Service to ASHRAE Research Award Homer Addams Award Recipient Omer Sarfraz for his work on RP-1742 The Homer Addams Award is intended for a graduate student that worked on an ASHRAE research project in the past 2 years and lead authored a technical paper on the project results. This year s award recipient is Omer Sarfraz from Oklahoma State University for his work on RP-1742 (Update to Measurements of Office Equipment Heat Gain Data). The award includes a $5,000 honorarium payment and the submission deadline for nominations each year is December 15 th. For more information on this award, please go to the research page of the ASHRAE Website at 7. TAC Section Heads & TC Chairs Participated in Student Welcome Event in Atlanta Some members of TAC and some TC Chairs participated in the Student Welcome activity titled Speed Poker in order to introduce students to technical committees in a fun way. The event was well received and TAC intends to make this an annual event at the Student Welcome B. REMINDERS & REQUESTS Rosters Access & Distribution Remember, the current roster for your TC, TG or MTG is in effect until after the June meeting this year. By now, each TC, TG and MTG chair should have received a PDF & MS-Excel file of their roster from their Section Head for distribution to the committee. In addition, each member can view all of the rosters of their committees on the ASHRAE Website by logging into the member s only section at Click on the 8

9 "blue" roster text at the left hand side of a committee to reveal the roster with linked contact information. The new committee rosters for Society year will be created based upon the update information that each TC, TG or MTG chair provides to their Section Head and staff using the NEW! Online roster update form. 2. TC Position Aliases list now Available The Alias list with the position aliases positions of the Technical Committee management team (Chair, Vice Chair, Secretary, Standard Sub. Chair, Program Sub. Chair, Handbook Sub. Chair, and Webmaster) is posted on the ASHRAE website under the heading Procedures, Forms & Information for TCs/TGs/MTGs and TRGs. 3. Option for TC Subcommittee Meetings via Conference Calls and Web Meetings More and more TCs are taking advantage of a new Society service that allows TCs to hold subcommittee meetings by phone and/or web prior to a Society meeting. Many TCs are finding this to be a more efficient way for them to conduct subcommittee business and it also allows TC members that can t travel to meetings on a regular basis a way to still contribute to the TC. Such a change can also eliminate potential conflicts with the TC s program sessions at Society meetings. Please pass your conference call/web meeting/webinar requests on to the Manager of Research and Technical Services, Mike Vaughn, at mvaughn@ashrae.org or MORTS@ashrae.net 4. The Professional Development Committee (PDC) is seeking ideas for new ASHRAE Learning Institute (ALI) courses. The on-going need is for practical courses of broad interest to be presented as face-to-face seminars or short courses, instructor-led online courses and self-paced courses. Examples would include courses with a focus on new technologies that need to be shared, fundamentals that may have been forgotten, standard applications that need explanation, and courses based on new design guides. The objective of the ASHRAE Learning Institute (ALI) is to provide quality, authoritative and practical technical information of broad interest. Contact Karen Murray (ASHRAE staff) at kmurray@ashrae.org or Charles Henck (PDC chair) at PDCchair@ashrae.net with new course ideas. 5. TAC Presentation template Available for TC members to use with local Chapter The presentation template allows TC members, without a lot of effort, to give a presentation to their local chapter on TAC and the TCs in general and to also customize a few slides with information specific to their own TC or TCs. The template is posted now on the Technical Committee page of the ASHRAE website for download - C. UPCOMING WORKSHOPS, CONFERENCES AND EVENTS Airvent - Indoor Air Quality, Ventilation and Energy Conservation in Buildings Feb. 13, 2019 Moscow, RUSSIA st AiCARR International Conference - The Human Dimension Of Building Energy Performance Feb. 20 to 22, 2019, Venice, ITALY th REHVA World Congress CLIMA 2019 May 26 to 29 - Bucharest, ROMANIA ICR 2019 Aug. 24 to 30 Montréal, CANADA 9

10 5. 5th International HVAC/R Congress Aug. 28 to 29 Puerta de Oro, COLUMBIA ASHRAE Building Performance Analysis Conference Sep. 25 to 27, Denver, Colorado, USA 7. ASHRAE 2019 Webcast The Future of Refrigerants: Unitary and VRF Systems Apr. 17 & 18 Register at th International Conference On Energy Research and Development Nov. 19 to 21 Kuwait Buildings XIV International Conference Dec. 9 to 12 Clearwater Beach, FL - D. UPCOMING TC AWARD NOMINATION SUBMISSION DEADLINES Hightower Award Nomination Process and Deadline Nominations for the George B. Hightower Technical Achievement Award are due to your Section Head by September 1, The award recognizes outstanding technical leadership and contributions on a TC/TG/TRG during the past four years, excluding research and standards activities. Please go to the Technical Committee page of the ASHRAE website at the following link under the Procedures and Forms heading: Service to ASHRAE Research Award Nomination Process and Deadline Nominations for the Service to ASHRAE Research Award for TC volunteer efforts in research are due to RAC research liaison by September 1, Please go to the Research page of the ASHRAE website at the following link under the Research Grants and Awards heading: Please let me know if I can be of any other assistance. Sincerely, Mike Vaughn 10

THE RESEARCH & TECHNICAL ACTIVITIES REPORT Release 1. RESEARCH SUBCOMMITTEE CHAIRS Research and Technical Services July 7, 2017

THE RESEARCH & TECHNICAL ACTIVITIES REPORT Release 1. RESEARCH SUBCOMMITTEE CHAIRS Research and Technical Services July 7, 2017 THE RESEARCH & TECHNICAL ACTIVITIES REPORT Release 1 Michael R. Vaughn, P.E. FOR TC/TG/MTG/SSPC CHAIRS, VICE CHAIRS & Manager RESEARCH SUBCOMMITTEE CHAIRS Research and Technical Services July 7, 2017 2017

More information

2018 ASHRAE WINTER Conference

2018 ASHRAE WINTER Conference AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING ENGINEERS, INC. 1791 Tullie Circle, N.E./Atlanta, GA 30329 404-636-8400 TC/TG/MTG/TRG MINUTES COVER SHEET (Minutes of all Meetings are to

More information

ASHRAE. Shaping Tomorrows Built Environment Today. Erich Binder - Director At Large

ASHRAE. Shaping Tomorrows Built Environment Today.  Erich Binder - Director At Large ASHRAE Shaping Tomorrows Built Environment Today Erich Binder - Director At Large http://ashare.org/ ASHRAE is the Answer People spend about 90 % of their lives indoors. Buildings are the places where

More information

Quorum>1/2 all VM, excluding NQM; super majority >=2/3 VM present; simple majority>1/2 VM present

Quorum>1/2 all VM, excluding NQM; super majority >=2/3 VM present; simple majority>1/2 VM present ASHRAE Technical Committee 4.3: Ventilation Requirements & Infiltration 2017 Winter Meeting Meeting Minutes Monday January 30, 2017, 4:15 pm-6:30 pm Room Emperor I at Caesars COMMITTEE AND MEETING INFORMATION

More information

Energy Engineering: Tools and Trends

Energy Engineering: Tools and Trends Energy Engineering: Tools and Trends AEE Northeast Ohio Chapter Meeting March 27, 2008 1 Introduction Background and Experience Energy Engineer for Trane 20 years in HVAC Industry Equipment design and

More information

ASHRAE s Energy Efficiency Technical Guidance

ASHRAE s Energy Efficiency Technical Guidance ASHRAE s Energy Efficiency Technical Guidance Tom Watson, P.E. Fellow ASHRAE, Life Member ASHRAE President ASHRAE Energy Efficiency Standards Agenda Standards & Guidelines Research Projects Design Guidance

More information

Last updated January 29, Approved by ECC March 3, 2015

Last updated January 29, Approved by ECC March 3, 2015 Last updated January 29, 2015 Approved by ECC March 3, 2015 ASHRAE Electronic Communications Strategic Plan Electronic Communications Committee (ECC) January 2015 Electronic Communications Committee Strategic

More information

AMERICAN SOCIETY OF HEATING, REFRIGERATING, AND AIR CONDITIONING ENGINEERS, INC. 1791Tullie Circle, NE / Atlanta, GA30329 (404)

AMERICAN SOCIETY OF HEATING, REFRIGERATING, AND AIR CONDITIONING ENGINEERS, INC. 1791Tullie Circle, NE / Atlanta, GA30329 (404) AMERICAN SOCIETY OF HEATING, REFRIGERATING, AND AIR CONDITIONING ENGINEERS, INC. 1791Tullie Circle, NE / Atlanta, GA30329 (404) 636-8400 TC/TG/TRG MINUTES COVER SHEET (Minutes of all TC/TG/TRG Meetings

More information

These draft minutes have not been approved and are not the official, approved record until approved

These draft minutes have not been approved and are not the official, approved record until approved ASHRAE TC5.6 Control of Fire and Smoke Draft Meeting Minutes Chicago Meeting January 2015 These draft minutes have not been approved and are not the official, approved record until approved by this committee.

More information

INVITATION TO SUBMIT A RESEARCH PROPOSAL ON AN ASHRAE RESEARCH PROJECT

INVITATION TO SUBMIT A RESEARCH PROPOSAL ON AN ASHRAE RESEARCH PROJECT INVITATION TO SUBMIT A RESEARCH PROPOSAL ON AN ASHRAE RESEARCH PROJECT 1810-TRP, Development of Reference Building Information Model (BIM) Test Cases for Improving Usage of Software Interoperability Schemas

More information

Overview of ABET Kent Hamlin Director Institute of Nuclear Power Operations Commissioner TAC of ABET

Overview of ABET Kent Hamlin Director Institute of Nuclear Power Operations Commissioner TAC of ABET Overview of ABET Kent Hamlin Director Institute of Nuclear Power Operations Commissioner TAC of ABET 1 st National Meeting on Improving Education and Training For Chinese Nuclear Power Industry Personnel

More information

STRUCTURAL MATERIALS DIVISION BYLAWS

STRUCTURAL MATERIALS DIVISION BYLAWS STRUCTURAL MATERIALS DIVISION BYLAWS ARTICLE I Name and Objective The name of this technical division shall be the Structural Materials Division, hereinafter referred to as SMD. The SMD shall function

More information

ASHRAE UPDATE. DRC Report to Chapters 2017 Winter Conference. By Doug Cochrane, P.Eng., LEED AP Region II

ASHRAE UPDATE. DRC Report to Chapters 2017 Winter Conference. By Doug Cochrane, P.Eng., LEED AP Region II ASHRAE UPDATE DRC Report to Chapters 2017 Winter Conference By Doug Cochrane, P.Eng., LEED AP Region II AHR EXPO/ASHRAE CONFERENCE AHR Expo Over 500,000 sq ft exhibit space More than 2,000 exhibitors and

More information

AMERICAN WATER WORKS ASSOCIATION 2013 DIVISION ANNUAL REPORT TO TEC

AMERICAN WATER WORKS ASSOCIATION 2013 DIVISION ANNUAL REPORT TO TEC AMERICAN WATER WORKS ASSOCIATION 2013 DIVISION ANNUAL REPORT TO TEC Division Name: Distribution & Plant Operations (DPOD) Chair: Charly C. Angadicheril Vice Chair: Ahmad Habibian When and where has the

More information

Giga-Joule. April Meeting Announcement. A Message from the President

Giga-Joule. April Meeting Announcement. A Message from the President http://www.ashrae4greenville.com/newsletter.php Giga-Joule April 2013 Meeting Announcement The April meeting will be held on, April 11, at the Roper Mountain Science Center. For more information, please

More information

Draft Meeting Minutes, TC 2.01 Physiology & Human Environment Winter 2012, Chicago, Ill. 6/24/2012

Draft Meeting Minutes, TC 2.01 Physiology & Human Environment Winter 2012, Chicago, Ill. 6/24/2012 Draft Meeting Minutes, TC 2.01 Physiology & Human Environment Winter 2012, Chicago, Ill. 6/24/2012 Meeting schedule Day Time TC 2.01 Physiology & Human Environment Tuesday 1:00-3:30P TC 2.01 Research Sunday

More information

AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING ENGINEERS, INC Tullie Circle, N.E./Atlanta, GA

AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING ENGINEERS, INC Tullie Circle, N.E./Atlanta, GA AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING ENGINEERS, INC. 1791 Tullie Circle, N.E./Atlanta, GA 30329 404-636-8400 TC/TG/MTG/TRG MINUTES COVER SHEET (Minutes of all Meetings are to

More information

AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING ENGINEERS, INC Tullie Circle, N.E./Atlanta, GA

AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING ENGINEERS, INC Tullie Circle, N.E./Atlanta, GA AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING ENGINEERS, INC. 1791 Tullie Circle, N.E./Atlanta, GA 30329 404-636-8400 TC/TG/MTG/TRG MINUTES COVER SHEET (Minutes of all Meetings are to

More information

2019 SOT Annual Meeting

2019 SOT Annual Meeting 2019 SOT Annual Meeting Invited Speaker Abstract Submission Instructions Thank you for your participation in the 58 th SOT Annual Meeting. This guide was developed to assist you in entering your invited

More information

CHAPTER/REGIONAL TECHNOLOGY AWARD - SHORT FORM

CHAPTER/REGIONAL TECHNOLOGY AWARD - SHORT FORM CHAPTER/REGIONAL TECHNOLOGY AWARD - SHORT FORM 1. Category (Check one and indicate New or Existing, if applicable) Commercial Buildings New or Existing Institutional Buildings: Educational Facilities New

More information

The ASHRAE Bookstore Offers. Multi-User Solutions. See whether a multi-user PDF or Enterprise solution is right for you:

The ASHRAE Bookstore Offers. Multi-User Solutions. See whether a multi-user PDF or Enterprise solution is right for you: The ASHRAE Bookstore Offers Formats to Fit Your Needs In addition to the classic print and digital PDF options, the ASHRAE Bookstore offers multiple formats for custom single- and multi-user solutions.

More information

Certified Ventilation Inspector (CVI) Certification Exam Candidate s Guide 2016

Certified Ventilation Inspector (CVI) Certification Exam Candidate s Guide 2016 Certified Ventilation Inspector (CVI) Certification Exam Candidate s Guide 2016 NADCA 1120 Rt. 73, Suite 200 Mt. Laurel, NJ 08054 1-855-GO-NADCA membership@nadca.com www.nadca.com Table of Contents Overview

More information

Client Services Procedure Manual

Client Services Procedure Manual Procedure: 85.00 Subject: Administration and Promotion of the Health and Safety Learning Series The Health and Safety Learning Series is a program designed and delivered by staff at WorkplaceNL to increase

More information

Meeting Notes Project Modifications to CIP Standards Drafting Team June 28-30, 2016

Meeting Notes Project Modifications to CIP Standards Drafting Team June 28-30, 2016 Meeting Notes Project 2016-02 Modifications to CIP Standards Drafting Team June 28-30, 2016 Exelon Chicago, IL Administrative 1. Introductions / Chair s Remarks The meeting was brought to order by S. Crutchfield

More information

Unique Tracking Number Assigned by MORTS Work Statement TC/TG: 7.5 Smart Building Systems

Unique Tracking Number Assigned by MORTS Work Statement TC/TG: 7.5 Smart Building Systems Unique Tracking Number Assigned by MORTS Work Statement TC/TG: 7.5 Smart Building Systems Title: Fault Detection and Diagnostics for Centrifugal Chillers - Phase III: Online-Time Implementation Executive

More information

Published: December 15, 2016 Revised: December 15, 2016

Published: December 15, 2016 Revised: December 15, 2016 Market Participant Guide: SPP 2017 Congestion Hedging Published: December 15, 2016 Revised: December 15, 2016 Revision History Chart Version Revised By Description of Modifications Revision Date 1.0 Congestion

More information

Published: December 15, 2017 Revised: December 15, 2017

Published: December 15, 2017 Revised: December 15, 2017 Market Participant Guide: SPP 2018 Congestion Hedging Published: December 15, 2017 Revised: December 15, 2017 Revision History Chart Version Revised By Description of Modifications Revision Date 1.0 Congestion

More information

ASHRAE elearning Course Catalog

ASHRAE elearning Course Catalog ASHRAE elearning Course Catalog Web-based, On-Demand Training Corporate Discounts Available (see page 2) 5 Great Reasons to Use ASHRAE elearning: Easy Administration: No special software required. Transcripts

More information

Chair: Markus Etter Vice-Chair: Diane Watkins Secretary: Joe Gravelle http://ewh.ieee.org/cmte/substations/ 1. Significant Accomplishments (include details and examples): a. Standards -- currently manages

More information

CARRIER edesign SUITE NEWS

CARRIER edesign SUITE NEWS Welcome Welcome to the premier issue of EXchange, offering timely, informative and interesting news on the Carrier edesign Suite of Software. Delivered quarterly, each issue will provide a wealth of information

More information

TIME LINE Physicians Legal Issues Conference June 7-8, 2017 The InterContinental, Chicago, IL

TIME LINE Physicians Legal Issues Conference June 7-8, 2017 The InterContinental, Chicago, IL Updated as of June 30, 2016 July-August 7/15-16/16 Milwaukee Leadership Mtg. will meet to discuss timeline, responsibilities & overview of committee. Discuss sponsorship / Week of 7/27 Request any updates

More information

We encourage you to reference and sample these as you prepare items to send to prospective donors.

We encourage you to reference and sample these as you prepare items to send to prospective donors. Following are examples of donor solicitation letters sent by Headquarters and various Chapters. Any inserts that were sent with the letter are also included. We encourage you to reference and sample these

More information

Instructions for Participating in ASHRAE s. Commissioning Process Management Professional (CPMP) Certification Program

Instructions for Participating in ASHRAE s. Commissioning Process Management Professional (CPMP) Certification Program Instructions for Participating in ASHRAE s Commissioning Process Management Professional (CPMP) Certification Program Effective date: 10/06/2009 Related Resources Resources available to help prepare for

More information

SLAS Special Interest Group Charter Application

SLAS Special Interest Group Charter Application SLAS Special Interest Group Charter Application SLAS is an international community of more than 15,000 individual scientists, engineers, researchers, technologists and others from academic, government

More information

IEEE Data Storage Technical Committee Update. Haitao (Tony) Xia Chair, IEEE Data Storage Technical Committee

IEEE Data Storage Technical Committee Update. Haitao (Tony) Xia Chair, IEEE Data Storage Technical Committee 1 IEEE Data Storage Technical Committee Update Haitao (Tony) Xia Chair, IEEE Data Storage Technical Committee Agenda! Introduction / Tony Xia! Mailing List Migration / Brian Kurkoski! Conference Reports

More information

Ventilation of Health Care Facilities

Ventilation of Health Care Facilities CMS Adoption of ANSI/ASHRAE/ASHE Standard 170-2008 Ventilation of Health Care Facilities Michael P. Sheerin, PE LEED AP Chief Executive Officer TLC Engineering for Architecture Vice Chair - ASHRAE 170

More information

IEEE 802 EC ITU standing committee

IEEE 802 EC ITU standing committee 1 IEEE 802 EC ITU standing committee Glenn Parsons - Ericsson glenn.parsons@ericsson.com +1 613 963 8141 November 2015 2 Agenda for November meeting Role of this standing committee IEEE membership in ITU

More information

IEEE P1564 Voltage Sag Indices Task Force Meeting

IEEE P1564 Voltage Sag Indices Task Force Meeting IEEE P1564 Voltage Sag Indices Task Force Meeting Dan Sabin Electrotek Concepts, Inc. d.sabin@ieee.org January14, 2013 Memphis, Tennessee, USA IEEE P1564 Task Force Meeting Agenda Introductions Patent

More information

Thank you for participating in the 2016 ASEE Annual Conference and Exposition in New Orleans, Louisiana.

Thank you for participating in the 2016 ASEE Annual Conference and Exposition in New Orleans, Louisiana. ASEE 2016 Annual Conference Author s Kit Author's Kit Thank you for participating in the 2016 ASEE Annual Conference and Exposition in New Orleans, Louisiana. This kit is a guide to help you submit and

More information

Summary. Program Overview. Notice Type: Request for Proposal. Short Title: CEI Industrial Refrigeration Technical Support

Summary. Program Overview. Notice Type: Request for Proposal. Short Title: CEI Industrial Refrigeration Technical Support Notice Type: Request for Proposal Short Title: CEI Industrial Refrigeration Technical Support Posted date: December 1, 2015 E-mail response date: December 31, 2015 Point of contact at VEIC: Greg Baker

More information

11 CERTIFICATION HANDBOOK

11 CERTIFICATION HANDBOOK MAINTAINING CAP CREDENTIAL THROUGH RECERTIFICATION Recertification dates are either May 31 or November 30. The May date is for the Spring designees who in their history took the exam before June 1 and

More information

A-6 Aerospace Actuation, Control and Fluid Power Systems

A-6 Aerospace Actuation, Control and Fluid Power Systems A-6 Aerospace Actuation, Control and Fluid Power Systems History Function Profile/Charter The SAE A-6 Committee is one of three The A-6 Committee addresses all facets of committees in the Aerospace Mechanical

More information

Annual Training plan 2018

Annual Training plan 2018 Annual Training plan 2018 Leadership,, HR, Creativity, Secretary Courses Sr. No. Course Name Date Venue Fees U.S $ January 1. Time & Stress 7-11/1/2018 Abu Dhabi 2600 2. Legal Writing Skills 7-11/1/2018

More information

Australian/New Zealand Standard

Australian/New Zealand Standard AS/NZS 14644.3:2009 AS/NZS 14644.3:2009 Australian/New Zealand Standard Cleanrooms and associated controlled environments Part 3: Test methods (ISO 14644-3:2005, MOD) AS/NZS 14644.3:2009 This Joint Australian/New

More information

ASHRAE 1791 Tullie Circle, NE / Atlanta, GA

ASHRAE 1791 Tullie Circle, NE / Atlanta, GA ASHRAE 1791 Tullie Circle, NE / Atlanta, GA 30329 404-636-8400 TC/TG/TRG MINUTES COVER SHEET TC/TG/TRG No. TC 2.8 DATE: January 25, 2015 TC/TG/TRG TITLE: Building s Environmental Impact and Sustainability

More information

SAVE International Certification Program Transition Summary

SAVE International Certification Program Transition Summary The following is a summary of the certification program changes for SAVE International (SAVE). This information was presented in detail at the 2017 Value Summit in Philadelphia in August 2017. The new

More information

Audit Report. Chartered Management Institute (CMI)

Audit Report. Chartered Management Institute (CMI) Audit Report Chartered Management Institute (CMI) 10 October 2012 Note Restricted or commercially sensitive information gathered during SQA Accreditation monitoring activities is treated in the strictest

More information

2019 Educational Courses Catalog

2019 Educational Courses Catalog 2019 Educational Courses Catalog (STULZ USA),, U.S.A. Phone: +888.529.1266 Email: STULZTraining@stulz-ats.com www.stulz.com TRG-C2019 Rev. A 10/27/17 Important Information These training sessions alone

More information

AWS-SCWI. American Welding Society Senior Certified Welding Inspector. Certification Programs for the Year 2018

AWS-SCWI. American Welding Society Senior Certified Welding Inspector. Certification Programs for the Year 2018 BETZ ENGINEERING & TECHNOLOGY ZONE Educational & Research Division AWS-SCWI American Welding Society Senior Certified Welding Inspector Certification Programs for the Year 2018 Authorized International

More information

EPA Research Programme EPA s Online Grant Application & Project Management Portal

EPA Research Programme EPA s Online Grant Application & Project Management Portal EPA Research Programme 2014-2020 EPA s Online Grant Application & Project Management Portal QUICK GUIDE TO MAKING AN APPLICATION April 2018 Version 3 Powered by SmartSimple The EPA Research Programme is

More information

TC MINUTES COVER SHEET MEMBERS

TC MINUTES COVER SHEET MEMBERS AMERICAN SOCIETY OF HEATING, REFRIGERATING AND AIR-CONDITIONING ENGINEERS, INC. 1791 Tullie Circle, N.E. Atlanta, GA 30329 404-636-8400 TC MINUTES COVER SHEET TC/TG/TRG NO TC 5.2 DATE January 31, 2017

More information

ASHRAE. Shaping Tomorrow s Built Environment Today

ASHRAE. Shaping Tomorrow s Built Environment Today ASHRAE Shaping Tomorrow s Built Environment Today Who We Are 53,000 volunteer members in over 130 countries More than 5,000 student members More than 170 chapters More than 250 student branches More than

More information

PrairieCat Governing Bodies, Committees and Meetings for FY2019

PrairieCat Governing Bodies, Committees and Meetings for FY2019 DELEGATES ASSEMBLY This body approves the budget, contracts, new members and other major decisions for PrairieCat. Consists of a representative from each Fully Participating and Basic Online member as

More information

Project Plan: TNI Standard Implementation

Project Plan: TNI Standard Implementation Project Plan: TNI Standard Document: ProjectPlan-NewTNIStandard-11-28-10-v11 # (Include of Review and Action Items) 1 02/12/10 2 01/27/10 QAM Template Subcommittee QS Expert Committee QAM Template Update

More information

Candidate s Guide Air Systems Cleaning Specialist (ASCS)

Candidate s Guide Air Systems Cleaning Specialist (ASCS) Air Systems Cleaning Specialist (ASCS) Candidate s Guide 2016 NADCA 1120 Rt. 73, Suite 200 Mt. Laurel, NJ 08054 1-855-GO-NADCA info@nadca.com www.nadca.com ASCS Candidate s Guide Table of Contents Overview

More information

SCHENDT ENGINEERING PRIOR EXPERIENCE

SCHENDT ENGINEERING PRIOR EXPERIENCE Mitchell Hall Renovation US Air Force Academy, Colorado Corp. was the prime consultant for this project. The project generally consisted of replacing all of the air handling units, exhaust fans, air curtains,

More information

Testing Organization and Proctor Guidelines

Testing Organization and Proctor Guidelines Testing Organization and Proctor Guidelines Kdrive ANSI 17024 Approved Document Nov 2011 Table of Contents Welcome to NATE Certification Testing... 2 Structure of Certification Tests... 2 Certifications

More information

Meredith Lichtenstein Cone, MPH Manager, Surveillance and Informatics Program May 8, 2018

Meredith Lichtenstein Cone, MPH Manager, Surveillance and Informatics Program May 8, 2018 Meredith Lichtenstein Cone, MPH Manager, Surveillance and Informatics Program May 8, 2018 Overview POSITION STATEMENTS Position Statements Purpose To document and analyze policy and/or standardized surveillance

More information

IIRSM UAE 68 th Branch Meeting. Name of Facilitator: Matt Cox Date: 7 th February, 2018

IIRSM UAE 68 th Branch Meeting. Name of Facilitator: Matt Cox Date: 7 th February, 2018 IIRSM UAE 68 th Branch Meeting Name of Facilitator: Matt Cox Date: 7 th February, 2018 Before we start Fire alarms, Tests & Evacuations Welfare Facilities Mobile Phones Agenda Welcome and Introductions

More information

IEEE Power and Energy Society Entity Annual Report

IEEE Power and Energy Society Entity Annual Report IEEE Power and Energy Society Entity Annual Report 2017 Entity: Power System Operation, Planning and Economics Committee (PSOPE) Chair: Hong Chen Vice-Chairs: Luiz Barroso and Fran Li Secretary: Jianhui

More information

WHAT IS THE DIGI-RTU South 59 th Street Omaha, NE bes-tech.net

WHAT IS THE DIGI-RTU South 59 th Street Omaha, NE bes-tech.net WHAT IS THE DIGI-RTU The Digi-RTU is a Heating, Ventilation, and Air Conditioning (HVAC) rooftop unit control kit that is both a demand management and energy usage device. It is designed to improve the

More information

Proposed Implementation Plan to Adopt Updates of the Regulatory Air Dispersion Models referenced in O.Reg. 419/05 Presentation to AWMA Air

Proposed Implementation Plan to Adopt Updates of the Regulatory Air Dispersion Models referenced in O.Reg. 419/05 Presentation to AWMA Air Proposed Implementation Plan to Adopt Updates of the Regulatory Air Dispersion Models referenced in O.Reg. 419/05 Presentation to AWMA Air Practitioner s Group February 11 th, 2015 Overview Background

More information

Reporting Intranet. Complete Online Guide. Table of Contents

Reporting Intranet. Complete Online Guide. Table of Contents Reporting Intranet Complete Online Guide Reporting Intranet - Main Topic Links Go to main link and make sure to scroll through all slides for that topic. Roles of Advisors & Officers Login Screen Terms

More information

IEEE-SA Standards Board Project Authorization Request (PAR) Form (2002)

IEEE-SA Standards Board Project Authorization Request (PAR) Form (2002) 2002-09-26 IEEE 802.16-02/47 IEEE-SA Standards Board Project Authorization Request (PAR) Form (2002) For a review of the Standards Development Process (designed to assist the Working Group, Working Group

More information

Become a Certified Association Executive through the CAE Program

Become a Certified Association Executive through the CAE Program How do the fees work Each course in the CAE Program has a CSAE member and non-member rate. There is also a one-time materials fee applicable when registering for your first course. Full details and the

More information

ISPOR Student Network Committee Work Plan Template

ISPOR Student Network Committee Work Plan Template 2013- SURVEY COMMITTEE ISPOR Student Network Committee Work Plan Template Goal 1: Calling the meeting of the survey committee 2 nd week of Sept Discussing the ISPOR Student Internship Survey (SIS-1) -

More information

The Certified Indoor Air Quality Professional (CIAQP ) Program

The Certified Indoor Air Quality Professional (CIAQP ) Program The Certified Indoor Air Quality Professional (CIAQP ) Program Date: Venue: 15 17 November 2007 (Tentative) IVE(Morrison Hill), Oi Kwan Road, Wanchai (Tentative) Course Code: CIAQP 01/07/HK THE MARK of

More information

Testing Organization and Proctor Guidelines

Testing Organization and Proctor Guidelines Testing Organization and Proctor Guidelines Table of Contents WELCOME TO NATE TESTING... 2 STRUCTURE OF CERTIFICATION EXAMS... 2 CERTIFICATIONS FOR TECHNICIANS... 3 THE ROLE OF TESTING ORGANIZATIONS...

More information

Is Data Center Free Cooling Feasible in the Middle East? By Noriel Ong, ASEAN Eng., PMP, ATD, PQP

Is Data Center Free Cooling Feasible in the Middle East? By Noriel Ong, ASEAN Eng., PMP, ATD, PQP Is Data Center Free Cooling Feasible in the Middle East? By Noriel Ong, ASEAN Eng., PMP, ATD, PQP This case study will evaluate the feasibility of data center free cooling in the Middle East using indirect

More information

The NIH Big Data to Knowledge Initiative: Raising the Prominence of Data

The NIH Big Data to Knowledge Initiative: Raising the Prominence of Data The NIH Big Data to Knowledge Initiative: Raising the Prominence of Data Michael F. Huerta, Ph.D. Associate Director, National Library of Medicine Director, Office of Health Information Programs Development

More information

THE UNIT MEMBERSHIP APPLICATION PROCESS

THE UNIT MEMBERSHIP APPLICATION PROCESS Mountain Rescue Association THE UNIT MEMBERSHIP APPLICATION PROCESS Please review the Policy 101 (below) for "Membership Qualifications". You need not be accredited to join. Typically, new teams join as

More information

The New Mexico Public Procurement Association (NMPPA) Presents the N M P C NEW MEXICO PROCUREMENT CERTIFICATION PROGRAM

The New Mexico Public Procurement Association (NMPPA) Presents the N M P C NEW MEXICO PROCUREMENT CERTIFICATION PROGRAM The New Mexico Public Procurement Association (NMPPA) Presents the N M P C NEW MEXICO PROCUREMENT CERTIFICATION PROGRAM PLAN 1 For: Qualified NMPPA Members Who have attended NMPPA Workshops from 2002 through

More information

POLICY COMMITTEE WORKPLAN Professional Development Committee (last update: 08/10/2011)

POLICY COMMITTEE WORKPLAN Professional Development Committee (last update: 08/10/2011) POLICY COMMITTEE WORKPLAN Professional Development Committee 2011 2012 (last update: 08/10/2011) 1.0 Overview The primary charge of the Professional Development Committee (PDC) is to provide vision, leadership,

More information

Lehigh Valley Insights JOURNAL OF THE LEHIGH VALLEY CHAPTER OF THE ASHRAE, INC.

Lehigh Valley Insights JOURNAL OF THE LEHIGH VALLEY CHAPTER OF THE ASHRAE, INC. Lehigh Valley Insights JOURNAL OF THE LEHIGH VALLEY CHAPTER OF THE ASHRAE, INC. VOLUME 46 ISSUE 8 September 2011 2011-2012 LEADERS MEETING NOTICE OFFICERS President: Donovan Denlinger (610) 567-5042 President

More information

NEBB Personnel Individual Certification Recertification of CPs, CxPPs and CTs Policy #117

NEBB Personnel Individual Certification Recertification of CPs, CxPPs and CTs Policy #117 NEBB Personnel Individual Certification Recertification of CPs, CxPPs and CTs Policy #117 Introduction ISO/IEC 17024:2014 Created: 1.1.2015 Revised 12.23.16 VERSION 2.0.0 The Certification Board recognizes

More information

IB Event Calendar Please check regularly for updates Last Update: April 30, 2013

IB Event Calendar Please check regularly for updates Last Update: April 30, 2013 IB Event Calendar 2012-2013 Please check regularly for updates Last Update: April 30, 2013 April 2013 24: (Sophomores): Required orientation meeting for all sophomores entering into IB their junior year.

More information

DISCOVR-e USER MANUAL. Vanderbilt University Human Research Protection Program

DISCOVR-e USER MANUAL. Vanderbilt University Human Research Protection Program DISCOVR-e USER MANUAL Vanderbilt University Human Research Protection Program Table of Contents Introduction and Overview... 3 Log into the System... 4 Investigator Dashboard... 5 Submitting a New Study...

More information

New Wisconsin Energy Code: What it Means for Me?

New Wisconsin Energy Code: What it Means for Me? 2018 Wisconsin Energy Efficiency Expo Hosted by the Wisconsin Association of Energy Engineers New Wisconsin Energy Code: What it Means for Me? May 17, 2018 Shana Scheiber, PE, LEED AP ID+C, WELL AP Building

More information

AMERICAN SOCIETY OF HEATING, REFRIGERATION AND AIR CONDITIONING ENGINEERS INC.

AMERICAN SOCIETY OF HEATING, REFRIGERATION AND AIR CONDITIONING ENGINEERS INC. AMERICAN SOCIETY OF HEATING, REFRIGERATION AND AIR CONDITIONING ENGINEERS INC. LONDON CANADA CHAPTER #116 LondonCanada.AshraeChapters.org JAN 30/2006 Board of Governors President Joseph Claessens ph: 672-8511

More information

Application Process Page 1 of 12. Application Process

Application Process Page 1 of 12. Application Process Page 1 of 12 Application Process Login Initiate an Online Application Process Payment of Application Fees Uploading Required Documentation Cloning Unlocking Program Related Applications Initial Grant of

More information

TTMD is 25 Years Old. Tuba Bingöl Altıok Vice President of TTMD

TTMD is 25 Years Old. Tuba Bingöl Altıok Vice President of TTMD TTMD is 25 Years Old Tuba Bingöl Altıok Vice President of TTMD 1 July, 1976 2 ABOUT TTMD has been founded in 1992 to develop the services given by Mechanical Engineering in heating, refrigerating, air

More information

DATACOM COOLING CERTIFICATION PROGRAM

DATACOM COOLING CERTIFICATION PROGRAM DATACOM COOLING CERTIFICATION PROGRAM AHRI DCOM OM JANUARY 2017 2111 Wilson Blvd, Suite 500 Arlington, Virginia 22201 (703) 524-8800 Sponsored and administered by: PREFACE The following manual outlines

More information

OC ACM Executive Committee October 2017 Meeting Agenda and Notes

OC ACM Executive Committee October 2017 Meeting Agenda and Notes OC ACM Executive Committee October 2017 Meeting Agenda and Notes Introductions Review and approve prior meeting minutes Treasurer's Report November Program Meeting Planning 2018 Program Meeting Speakers

More information

Gold: points Platinum: 80+ points. Certified: points Silver: points

Gold: points Platinum: 80+ points. Certified: points Silver: points What is LEED? LEED, or Leadership in Energy & Environmental Design, is redefining the way we think about the places where we live, work and learn. As an internationally recognized mark of excellence, LEED

More information

Energy Step Code Implementation Strategy. March 26, 2018

Energy Step Code Implementation Strategy. March 26, 2018 Energy Step Code Implementation Strategy March 26, 2018 About the BC Energy Step Code Climate Leadership Plan call for: Net zero energy ready buildings by 2032; Development of the Energy Step Code to get

More information

Sponsorship & Donation Program

Sponsorship & Donation Program Sponsorship & Donation Program 2017-2018 Sponsorship & Donation Program ASHRAE Toronto has initiated a Sponsorship Program for businesses that are passionate about supporting ASHRAE Research Canada. This

More information

Hitachi-GE Nuclear Energy, Ltd. UK ABWR GENERIC DESIGN ASSESSMENT Resolution Plan for RO-ABWR-0028 Safety System Logic & Control (SSLC) Class 1 HMI

Hitachi-GE Nuclear Energy, Ltd. UK ABWR GENERIC DESIGN ASSESSMENT Resolution Plan for RO-ABWR-0028 Safety System Logic & Control (SSLC) Class 1 HMI Hitachi-GE Nuclear Energy, Ltd. UK ABWR GENERIC DESIGN ASSESSMENT Resolution Plan for RO-ABWR-0028 Safety System Logic & Control (SSLC) Class 1 HMI RO TITLE: Safety System Logic & Control (SSLC) Class

More information

Authorized Training Provider Application Process

Authorized Training Provider Application Process Authorized Training Provider Application QuEST Forum Training Sub-Team 10 August 2015 This document describes the process and provides guidance to organizations that wish to become Authorized Training

More information

Contents. Rev. 2, 5/12/2016 1

Contents. Rev. 2, 5/12/2016 1 Answers to Frequently Asked Questions for CTI STD-201 Thermal Certification of Cooling Towers, Closed Circuit Coolers and Evaporative Refrigerant Condensers Contents What is CTI STD-201?... 3 To what equipment

More information

GENERATOR ADDENDUM TO MAGNOLIA GARDENS ASSISTED LIVING COMPREHENSIVE EMERGENCY MANAGEMENT PLAN

GENERATOR ADDENDUM TO MAGNOLIA GARDENS ASSISTED LIVING COMPREHENSIVE EMERGENCY MANAGEMENT PLAN Contact Person: Philip McCollum - Administrator Magnolia Gardens Assisted Living AL Lic# 10314 3800 62 nd Avenue North Pinellas Park, FL 33781 Phone: 727.489.6440 GENERATOR ADDENDUM TO MAGNOLIA GARDENS

More information

COMMERCIAL FURNACES CERTIFICATION PROGRAM

COMMERCIAL FURNACES CERTIFICATION PROGRAM COMMERCIAL FURNACES CERTIFICATION PROGRAM AHRI OM CFRN JANUARY 2018 2111 Wilson Blvd, Suite 500 Arlington, Virginia 22201 (703) 524-8800 Sponsored and administered by: PREFACE The following manual outlines

More information

RCMA COMMUNICATIONS, MEMBERSHIP, AND EDUCATION COMMITTEE

RCMA COMMUNICATIONS, MEMBERSHIP, AND EDUCATION COMMITTEE RCMA COMMUNICATIONS, MEMBERSHIP, AND EDUCATION COMMITTEE RCMA Communications, Membership, and Education Committee Co-chair: Matt Lendzinski, The Dow Chemical Company Co-Chair: Lee Martucci, GAF RCMA Communications

More information

AMTA WEB SITE SUPPORT Requirements

AMTA WEB SITE SUPPORT Requirements AMTA WEB SITE SUPPORT Requirements 1. Introduction The Antenna Measurement Techniques Association (AMTA) is a 501c (3) organization dedicated to the global development, application, and dissemination of

More information

Professional Development Standing Committee (PDSC)

Professional Development Standing Committee (PDSC) Professional Development Standing Committee (PDSC) MINUTES NOVEMBER 7, 2014 10:00AM-1:00PM MELBOURNE 1-122 MEETING CALLED BY TYPE OF MEETING FACILITATOR NOTE TAKER GUEST ATTENDEES MINUTES APPROVAL Committee

More information

Ref No: RACS/PCS/10 Page 1 of 7. Revision No: 00 Revision Date: October 1, 2018 PRODUCT CERTIFICATION SCHEME FOR ELECTRICAL EQUIPMENT

Ref No: RACS/PCS/10 Page 1 of 7. Revision No: 00 Revision Date: October 1, 2018 PRODUCT CERTIFICATION SCHEME FOR ELECTRICAL EQUIPMENT Ref No: RACS/PCS/10 Page 1 of 7 1. Objective: This procedure describes the criteria implemented by RACS as Notified Body of Emirates Authority of Standardization and Metrology (ESMA) to assure that Electrical

More information

IMPORTANT MEETING ACCESS INFORMATION!

IMPORTANT MEETING ACCESS INFORMATION! FLORIDA BUILDING COMMISSION EDUCATION POC MEETING MINUTES NOVEMBER 28, 2016 TALLAHASSEE, FLORIDA IMPORTANT MEETING ACCESS INFORMATION! Meeting information Date: Monday, November 28th, 2016 Time: 10:00

More information

IEEE 802 EC ITU standing committee

IEEE 802 EC ITU standing committee 1 IEEE 802 EC ITU standing committee Glenn Parsons - Ericsson glenn.parsons@ericsson.com +1 613 963 8141 March 2017 2 Agenda for March meeting Role of this standing committee IEEE membership in ITU IEEE-SA

More information

Initial Review of ASHRAE/ANSI/ACCA Standard 180 (2010)

Initial Review of ASHRAE/ANSI/ACCA Standard 180 (2010) Summary This 2010 document is the first in a series of documents by Western HVAC Performance Alliance (WHPA) industry volunteers of ASHRAE/ANSI/ACCA Standard 180. More recent WHPA documents provide detailed

More information

Certified Texas Emergency Manager

Certified Texas Emergency Manager Recertification Packet for Certified Texas Emergency Manager CEM Reciprocity Version Sponsored by: The Emergency Management Association of Texas 2502 Pace Bend Road South Spicewood, TX 78669 (877) 306-EMAT

More information

January 2016 Breeze. President s Message. Airflow Management for Healthcare Facilities Presented by Kishor Khankari, Ph.D.

January 2016 Breeze. President s Message. Airflow Management for Healthcare Facilities Presented by Kishor Khankari, Ph.D. January 2016 Breeze President s Message Airflow Management for Healthcare Facilities Presented by Kishor Khankari, Ph.D. Monday, Jan 9th, 2016 11:30 pm Check In 11:45 pm 1:00 pm Lunch Meeting Crowne Plaza

More information