1 ESA Unclassified For Official Use ESA/IPC(2017)47,add.1 Att.: Annexes Paris, 1 June 2017 (English Only) EUROPEAN SPACE AGENCY INDUSTRIAL POLICY COMMITTEE SPACE SITUATIONAL AWARENESS (SSA) PROGRAMME PERIOD 3 SSA Procurement Plan for 2017 (Second Half of Year) IPC is invited to approve this Procurement Plan by simple majority of the Participating States to the Period 3 of the Space Situational Awareness Programme: AT+BE+CH+CZ+DE+DK+ES+FI+FR+GB+ GR+IT+LU+NL+NO+PL+PT+RO+SE Summary In accordance with the procedure outlined in the SSA Programme Implementing Rules 1, Programme Participants will find, for approval, the Procurement Plan for the procurements to be initiated in the second half of 2017 under the SSA Programme (Period 3). Activities planned for the second half of 2017 were addressed at PB-SSA the 10 May Required Action The Industrial Policy Committee is invited to approve the attached Procurement Plan for 2017 covering the procurements planned for of the second half of Legal Basis Article 4 of the SSA Programme Implementing Rules. 1 SSA Programme Implementing Rules, ESA/C(2016)157 ecpb

2 Page 2 This page is intentionally left blank.

3 Page 3 1. Introduction 1.1 Outline of the SSA Procurement Plan 2017 for the Second Half of 2017 This SSA Procurement Plan includes all the procurements planned to be initiated in the second half of 2017, in accordance with the SSA Programme (Period 3) approved at the MC The activities included in this Procurement Plan support the strategic objectives of the SSA Programme for Period 3. During the SSA P3, the continuation of the developments initiated during the SSA Preparatory Programme and SSA P2 for the SWE, LGR, NEO and SST segments is ensured in line with available budgets and declared priorities with the goal to progressively prototype, develop, test and validate the main components of the future European SSA System. Activities are taking place in the following main areas: data and coordination centres, sensors, applications, user interfaces, hosted payloads, utilization of data from s/c in orbit (e.g. Proba- 2, SOHO, GAIA), phase A/B development of a Space Weather mission to L1/L5, development of a prototype wide field of view NEO telescope as well as networking of ESA and national SSA assets. All SSA activities undertaken during the SSA Period 3 will continue to be executed when applicable according to the security framework as described in the already approved SSA Programme Security Instructions (SSA-PSI). 1.2 SSA Programme Procurement Guidelines It is recalled that careful consideration will continue to be given to secure competition between the interested industries and institutions of the SSA Participating States, while respecting the rules of geo-return as indicated in the Article 6 of the Implementing Rules. Apart when indicated for some specific activities, the industrial procurements documented in this plan are planned to be awarded on the basis of open competition among the industries and research institutions of the SSA P3 Participating States, taking into account the interests indicated for the four segment activities (see Annex C). These will be done in accordance with the requirements set forth in the Implementing Rules for the SSA Programme. Whenever deemed appropriate by ESA, parallel contracts may be placed for some of the activities defined in this document, subject to the availability of the required budget. On a general basis and unless justified otherwise by the SSA Programme management in specific cases such as utilisation of non ESA software, software produced within the SSA Programme shall be considered as Operational Software.

4 Page 4 2. Proposed Procurements 2.1 List of the Procurements for 2017 (Second Half) Submitted for IPC Approval The procurements defined below are subject to the approval of the IPC. The outline of the activities included in the procurements subject to the IPC approval can be found in the Section 2.2 of this chapter. The complete list of intended procurements for the second half of 2017 is provided for information in the Annex A of this document. The more detailed description of the activities included in these procurements can be found in the Annex B of this document. Approval SSA Programme Period 3 Reference Title Budget (K ) Procurement Policy C: Competitive DN: Direct Negotiation Remarks IPC P3-SST-V Cheia Phase 2 3,300 C Q3/Q IPC P3-COM-IV SSA Test and Validation 2,900 C Q Table 1 List of the Proposed Procurements for 2017 (Second Half) Submitted for IPC Approval 2.2 Outline of the Proposed Procurements for 2017 (second half) SSA Reference: P3-SST-V Budget: 3,300 K SSA Segment: SST Title: Cheia Phase 2 Description Based on the outcome of Phase 1 (P3-SST-250), the implementation of the Cheia retrofit is performed in Phase 2. This activity will include the final detailed design, the procurement, the deployment and the system validation. At the end of Phase 2, the system shall be in a pre-operational state. Deliverables: Current TRL: N/A Target TRL: N/A Contract Duration: 30 months Target application / Time Frame Mid 2020 Procurement Policy: Ref. to ESTER N/A Harmonisation Roadmap: Follow-up of a previous activity: N/A P3-SST-IV (P3-SST-250)

5 Page 5 SSA Reference: P3-COM-IV Budget: 2,900 K SSA Segment: COM Title: SSA Test and Validation Description This is a service activity to ESA for the technical expert support that is needed to carry out the daily monitoring of the industrial development activities and verification and acceptance testing of the deliverables from the industrial contracts for the SWE, NEO and SST Segments. Deliverables: Current TRL: N/A Target TRL: N/A Target application / Time Frame End 2019 Procurement Policy: Ref. to ESTER N/A Harmonisation Roadmap: Follow-up of a previous activity: N/A Contract Duration: P3-COM-III (P3-SWE-605, P3-NEO-605, P3-SST-605) 24 months

6

7 Annex A, Page 1 ANNEX A DESCRIPTION OF SSA PERIOD 3 PROCUREMENTS INCLUDED IN THE SSA PROCUREMENT PLAN FOR QUARTERS THE SECOND HALF OF 2017 (FOR INFORMATION)

8 Annex A, Page 2 A.1 SSA P3 PROCUREMENTS (SSA Procurement Plan for the Second Half of 2017) The detailed definition of the activities included in the procurements shown in the tables below can be found in the Annex B of this document. A.1.1 List of SSA/SWE Procurements for the Second Half of 2017 The procurements described in the Table 2 below are related to the SSA Space Weather segment. Procurement Title Included Activities Budget (K ) Issue Date P3-SWE-VII SWE network analysis P3-SWE Q P3-SWE-VIII SWE service system P3-SWE Q3 design 2017 Heliospheric Weather P3-SWE-128 P3-SWE-IX 400 Q4 Focussed Application 2017 Developments P3-SWE-X P3-SWE-XV Space Environment Nowcasting and Forecasting Enhanced Solar Weather Event Analysis P3-SWE Q P3-SWE Q P3-SWE-XVI LOFAR Utilisation P3-SWE Q4 Study 2017 P3-SWE-XVII SSA Space Weather P3-SWE Q3 Coordination Centre 2017 (SSCC) Evolution P3-SWE-XVIII Enhancement of P3-SWE Q3 magnetometer network 2017 P3-SWE-XIX SmallSat mission study P3-SWE Q P3-SWE-XX D3S hosted payload P3-SWE Q4 instruments Part P3-SWE-XXI NGRM Data P3-SWE Q3 Processing 2017 Total 4375 Duration (months) Procurement Policy C: Competitive DN: Direct Negotiation 36 DN/CCN AIRBUS (UK) 18 C 18 C 24 C 18 C 12 DN ASTRON (NL) 15 C 12 DN IRF (SE) 12 C 24 C 30 C Table 2 SWE Procurements Starting in the Second Half of 2017

9 Annex A, Page 3 A.1.2 List of SSA/NEO Procurement for the Second Half of 2017 The procurement described in the Table 3 below is related to the SSA NEO segment. Procurement Title Included Activities Budget (K ) Issue Date Duration (months) Procurement Policy C: Competitive DN: Direct Negotiation P3-NEO-XII Telescope data P3-NEO C processing chain Total 600 Table 3 NEO Procurements Starting in the Second Half of 2017

10 Annex A, Page 4 A.1.3 List of SSA/SST Procurements for the Second Half of 2017 The procurements described in the Table 4 below are related to the SSA SST segment. Procurement P3-SST-I P3-SST-III Title SST Expert Centre Deployment and Demonstration Robotic Telescopes Demonstration Included Activities Budget (K ) Issue Date Duration (months) Procurement Policy C: Competitive DN: Direct Negotiation P3-SST C P3-SST C P3-SST-V Cheia Phase 2 P3-SST-251 3, C P3-SST-VII Laser Technology Enhancement P3-SST DN DiGOS Potsdam (DE), prime ASA Astrosystem (AT), subc. ÖAW-IWF Graz (AT), subc. Eventech Ltd. (LV), subc. P3-SST C P3-SST-VIII EISCAT 3D Performance Analysis P3-SST-IX SST Core Software P3-SST C Requirements and P3-SST-302 Framework Finalisation Total 5850 Table 4 SST Procurements Starting in the Second Half of 2017

11 Annex A, Page 5 A.1.4 List of SSA Common Procurements for the Second Half of 2017 For the following combined industrial procurements, the expressed interests by the SSA Participating Member States will be ensured at work package level. They are summarised in Table 5 below. Procurement P3-COM-II P3-COM-IV P3-COM-VI Title SSA ICT Support SSA-Test and Validation (previously Technical Support) SSA Data Centres and Applications maintenance Included Activities P3-SWE-615 P3-NEO-615 P3-SST-615 P3-SWE-610 P3-NEO-610 P3-SST-610 P3-SWE-630 P3-NEO-630 P3-SST-630 Budget (K ) Total 4,900 Issue Date Duration (months) Procurement Policy C: Competitive DN: Direct Negotiation 900 Q C 2,900 Q C 1,100 Q C Table 5 Common Procurements Starting in the Second Half of 2017

12 Annex A, Page 6 This page is intentionally left blank.

13 Annex B, Page 1 ANNEX B DETAILED DESCRIPTIONS OF THE ACTIVITIES EXECUTED DURING THE SSA PERIOD 3 (PROCUREMENT PLAN Second Half)

14 Annex B, Page 2 B.1 ACTIVITIES OF THE SSA/SWE SEGMENT B.1.1 New SWE Activities in Q3 and Q The Space Weather activities in 2017 will continue to support the development of the SSA SWE Segment capabilities. These include the utilisation of the results of the prototyping activities in ESA Technology Programmes and in the framework of the European Commission s 7th Framework Programme and Horizon 2020 programme where applicable. New SWE Segment activities in 2017 include the development and validation of the SSA/SWE system for the provision of services for all user domains identified in the SWE Customer Requirements Document (CRD). SWE space segment activities in SSA Period 3 will focus on ensuring that the space-based measurement data required by the SWE services will be available. The planned activities for 2017 include utilisation of the on-going hosted payload missions NGRM/EDRS-C, SOSMAG/GK2A. Development of instrument flight models for the Distributed SWE Sensor System (D3S) will be continued, together with studies focussing on SmallSat missions. All SWE activities in the Work Plan Second half contribute to achieving the strategic goals for SSA Period 3 as defined in the Strategic Plan for Period 3 of the SSA Programme (ESA/PB-SSA(2017)1, rev.1). A matrix indicating each procurement and the goal to which it relates is provided in the Annex. The activities planned to be undertaken in 2017 in the Space Weather Segment, together with their estimated budgetary value and duration, are summarised in Table 6. They are specified in the following categories: - P3-SWE-1xx SWE Service Network and System Developments - P3-SWE-2xx SWE Ground and Space Segment Operations and Maintenance Activities - P3-SWE-3xx D3S Development Activities - P3-SWE-4xx Technology Development Activities - P3-SWE-6xx SWE Technical Support

15 Annex B, Page 3 WP-ID Title Budget (k ) Duration (months) P3-SWE-120 SWE Network Annual External Review and Performance Analysis P3-SWE-122 SWE Service System Requirements Specification and System Design P3-SWE-128 Heliospheric Weather Focussed Application Developments P3-SWE-132 Space Environment Nowcast and Forecast Development - Part 1 P3-SWE-134 Enhanced Solar Weather Event Analysis P3-SWE-136 Utilisation of LOFAR in SSA SWE Services P3-SWE-138 SSA Space Weather Coordination Centre (SSCC) Evolution P3-SWE-140 Enhancement of the Scandinavian Magnetometer System P3-SWE-311 NGRM-EDRS-C, Ground Processor, Inflight Campaign and Early Operation P3-SWE-340 SmallSat Mission Study P3-SWE-352 Wide Field Auroral Camera P3-SWE-610 SWE Test and Validation in Period 3 1, P3-SWE-615 SWE ICT Support in Period P3-SWE-630 SWE Data Centre & Applications Maintenance Table 6 SWE Segment Activities to be Initiated in the Second Half of 2017

16 Annex B, Page 4 B.1.2 Description of SWE Segment Activities SWE Network Annual External Review and Performance Analysis Activity code: P3-SWE-120 Activity value: 150 K Duration: 36 months An overall review of the SWE Network performance will be carried out on an annual basis during Period 3. Reviews will consist of a comprehensive assessment of the level of service being provided by the ESCs, the products available and their accuracy measured against the SWE Customer Requirements Document baseline. The ESCs will solicit user feedback for each of these reviews, in coordination with the SSCC. The review is intended to address extensions to the product and service catalogue, together with improved procedures, work towards adopting a common Quality Assurance/Quality Control approach and overall ESC performance with respect to agreed KPIs. This activity will be coordinated by an entity external to the main SWE Network partners (SSCC and ESCs) in order to provide an external assessment of progress against agreed baselines and recommendations for improvement. Justification for Direct Negotiation External, industrial support for the SWE ESC network reviews during the SWE-I contacts in SSA Period 2 has been provided by Airbus Defense & Space Limited (UK). Because it is extremely important to continue this support until the end of the current SWE ESC network development phase with the same standards, references and reporting and to utilise the expertise of the Airbus team that is already familiar with the SWE ESC Network, this activity is foreseen to be a Contract Change Note (CCN) with Airbus Defense & Space Limited. SWE Service System Requirements Specification and System Design Activity code: P3-SWE-122 Activity value: 500 K Duration: 18 months This activity will establish the overall system requirements for the SSA SWE Service System including the SWE Data System. It will build on both the existing SSA System Requirements baseline and the experience gained during the Preparatory Phase and Period 2 in developing a distributed service provision network of entities capable of providing reliable products and services to SWE end users. The consolidated requirements will then form the basis of a complete system design allowing for the transition from a SWE Service Provision Network of entities to a SWE Service System, which will include complete specification of necessary interfaces and standardisation whilst maintaining the distributed nature of the expertise, product and service provision. A trade-off will be performed in terms of centralising certain key elements of the data processing chain, e.g. in the SWE Data Centre, and hosting all processing at multiple distributed sites. Heliospheric Weather Focussed Application Developments Activity code: P3-SWE-128

17 Annex B, Page 5 Activity value: 400 K Duration: 18 months This activity will build on the work done during SSA Period 2 to identify high-priority application developments in the heliospheric weather domain, primarily relating to solar wind propagation, nowcasting and short-term forecasting. The activity will focus on the further development and implementation of advanced space weather applications and prototypes and fully ensure their integration into the federated SSA SWE service environment. Space Environment Nowcast and Forecast Development - Part 1 Activity code: P3-SWE-132 Activity value: 800 K Duration: 24months This activity will build on the work done during SSA Period 2 to identify high-priority application developments in the space radiation domain. The activity will build on those priorities identified through extensive consultation with end users during SSA Period 2 and developments identified as high priority within the SWE Service Development Roadmap updates which took place in parallel. The activity will begin the development and implementation of advanced space weather applications based on data assimilation techniques empirical, semi-empirical and physics-based models. It should ensure state-of-the-art models and building blocks are available within this domain to underpin the end-user tailored SWE services. This activity is foreseen to include a particular focus on real-time specification nowcasting and forecasting of the Earth s trapped particle environment. Enhanced Solar Weather Event Analysis Activity Code: P3-SWE-134 Value: 250 K Duration: 18 months This activity will develop an enhanced set of solar resources enabling solar weather event analysis. The resources will include processed data products providing the user with multiwavelength remote sensing data analysis capability for current and past events. The resources will support solar near-side and far-side event analysis where data availability permits. Targeted development will enable the provision of timely information on photospheric electric currents giving information on the development of conditions associated with a high probability of eruption. The activity will be issued as an open ITT. The results from the activity will be integrated into the framework of the Solar Weather ESC. Utilisation of LOFAR in SSA SWE Services Activity Code: P3-SWE-136 Value: 200 K Duration: 12 months

18 Annex B, Page 6 This activity will assess and demonstrate the benefits and new capabilities that can be achieved in the SSA SWE system by utilising the measurement data from the LOFAR system. The activity will address the benefits from LOFAR data particularly in the Ionospheric and Heliospheric Weather services. The operational requirements for the SWE products and the possible constraints of the LOFAR system will be analysed and a roadmap for utilising the data will be proposed. Justification for Direct Negotiation The Netherlands has joined ESA SSA Programme as a new Participating State in Period 3 and has declared Space Weather as their primary area of interest. The Netherlands has asked SSA Programme to assess the utilisation of selected Dutch assets, like the LOFAR sensor array, in enhancing SSA SWE service capability. For this reason this activity is foreseen to be a Direct Negotiation contract with ASTRON (NL). SSA SWE Coordination Centre (SSCC) Evolution Activity code: P3-SWE-138 Activity value: 625 K Duration: 15 months During Period 3, the SSCC will further strengthen its interaction with the end user communities, targeting both established high-priority domains and rapidly emerging user domains such as downstream GNSS service users. User feedback will continue to be collected and fed into the SWE roadmaps, in conjunction with the Expert Centre coordinators as applicable. The SSCC role with respect to tailoring and developing end user focussed service interfaces will be further developed within this activity in close collaboration with the ESCs. Furthermore, as the central node of the SWE Network, the SSCC will liaise closely with wider SWE Network system requirements and design activities running in parallel in order to ensure a smooth transition towards the new system implementation later in the Period and consistent evolution of operational procedures. Enhancement of the Scandinavian Magnetometer System Activity Code: P3-SWE-140 Value: 300 K Duration: 12 months This activity will deploy new ground-based magnetometers in Scandinavia to improve the monitoring of the geomagnetic field and its disturbances. The coverage of the magnetometers in the MIRACLE network is good in parts of Scandinavia, but there are very limited measurements from some areas, e.g. southern parts of Sweden. The aim of this activity is to deploy new magnetometers to fill the gaps in the current networks to enhance the SSA SWE geomagnetic conditions services at high latitude region. This activity contributes to the SWE Segment strategic objective to enhance space weather services for key user domains, in this case for power grid operators. Justification for Direct Negotiation Deployment of the new ground based magnetometers into Sweden and Denmark requires scientific knowledge to determine the best locations for the measurements, experience in

19 Annex B, Page 7 deploying instruments of this type and expertise to carry out the commissioning, calibration and validation of the measurement data. This is why this activity is foreseen to be a Direct Negotiation contract with a consortium formed by Swedish Institute of Space Physics (IRF) and Danish Technical University (DTU), who are already operating networks of similar instruments in Sweden and Denmark. SSA SWE Test and Validation in Period 3 Activity Code: P3-SWE-610 Activity value: 1600 K Duration: 24 months This is a service activity to ESA for the technical expert support that is needed to carry out the daily monitoring of the industrial development activities and verification and acceptance testing of the deliverables from the industrial contracts for the SWE, NEO and SST Segments. The expertise within this contract includes scientific expertise on space weather, technical expertise on spaceborne and ground-based SSA instruments, IT expertise for all three SSA segments and expertise on configuration control. All services in this activity are managed and delivered through the prime contractor s Service Delivery Manager. The prime contractor also has the responsibility over all services delivered to ESA within the framework of this activity. This activity will provide the test and validation services for the SSA SWE Segment in SSA SWE ICT Support in Period 3 Activity Code: P3-SWE-615 Activity value: 450 K Duration: 24 months This activity aims at procuring the necessary support to the administration and operations of the ICT infrastructure deployed in the SWE centres in Administration activity covers the following aspects: Inventory and configuration control of the ICT infrastructure System administration Administration of security issues ICT infrastructure backup Support to the Segment activity. Maintenance and Support activity: Monitoring performance of the ICT infrastructure Maintenance and evolution of the ICT baselines Support to segment for all the infrastructure issues Critical review of the proposed changes to the IT infrastructure (hardware, COTS, Network, Segment specific application). SWE Data Centre & Applications Maintenance Activity Code: P3-SWE-630 Activity value: 200 K Duration: 24 months

20 Annex B, Page 8 This activity will include the corrective and evolutionary maintenance of the applications in the SWE Data Centre. The activity will cover implementing identified necessary software changes in order to ensure the continued operation of the applications installed within the SWE Data Centre, and continued availability of the archive and (near) real-time datasets contained therein.

21 Annex B, Page 9 B.2 ACTIVITIES OF THE SSA/NEO SEGMENT In Period 2, the NEO segment concentrated on the establishment of initial precursor services that are operated from the NEO Coordination Centre at ESRIN. These precursor services are largely based on existing assets (NEODyS, EARN, Spaceguard Central Node Priority List) which were combined, partly enhanced, and made available via a new NEO web portal ( The NEO precursor system was extended, e.g. with an improved orbit visualisation tool, additional information on close approaches, implementation of an image database, the addition of a comet database, and with additional statistical information. NEO observations were performed using the 1-m OGS telescope on Tenerife (ES) to test procedures for NEO follow-up observations and surveys. Agreements with cooperating sensors have been established, in particular ESA is now using ESO s 8-m VLT telescope for follow-up observations of critical objects. Further work occurred within the Action Team 14 of UN COPUOS related to the international coordination on NEO mitigation. ESA played a leading role in the establishment of the Space Missions Planning Advisory Group (SMPAG) and plays an active role in the International Asteroid Warning Network (IAWN). The work of the Action Team itself has been concluded. The following services for a full NEO system had been defined: (S1) Issue NEO impact warnings and news releases. (S2) Provide direct access to data in the NEO database. This applies to most NEO data, including the orbit and impact risk predictions. (S3) Provide access to data in the NEO database via registration. This applies to certain type of measurement data which have large volumes or which address specialist only, like raw images or spectrometric data. (S4) Perform additional observations. Within this service the SSA-NEO segment will perform observations on special request. (S5) Provide high-priority information. This includes potentially sensitive information like the corridor of impact locations on ground or the expected energy release. The distribution of such information could be restricted. (S6) Provide educational and Public Relations material. (S7) Provide user tools. Such tools include e.g. programmes to calculate the object size from a measured brightness or to calculate the position of a NEO in the sky and its visibility from a given location. For Period 3 ( ), the activities are split into the following four 'pillars': - Observation activities - Information provision (including orbit determination, impact monitoring, databases, web sites) - Mitigation activities (tools, technology developments, mission studies) - General support like ICT, hard- and software development support. This pillar is also called 'development'.

22 Annex B, Page 10 Additional activities covered by the SSA Programme Declaration will be initiated after They include: Starting the procurement of a second fly-eye telescope Further enhancements of the NEO Coordination Centre (capabilities and backup functionalities) NEO mitigation technology and strategy developments. B.2.1 New NEO Activities in the Second Half of 2017 Based on the four pillars previously described, the NEO activities are grouped according to the following table. WP-ID P3-NEO-1xx P3-NEO-2xx P3-NEO-3xx P3-NEO-4xx P3-NEO-6xx Title Observations Information Provision Mitigation Activities Development Support The individual NEO activities are listed in Table 7 below.

23 Annex B, Page 11 WP-ID Title Budget (K ) Duration (months) P3-NEO-420 Telescope Data Processing Chain P3-NEO-610 NEO Test and Validation P3-NEO-615 NEO ICT Support in Period P3-NEO-630 NEO Data Centre & Applications Maintenance Table 7 NEO Segment Activities to be Initiated in the Second Half of 2017 B.2.2 NEO Segment Activity Descriptions The following NEO activities are included in the SSA Work Plan for the second half of Telescope Data Processing Chain Activity Code: P3-NEO-420 Activity value: 600 K Duration: 24 months, Q Q For the operation of telescopes of the SSA-NEO segment, in particular for the fly-eye telescope(s), software needs to be developed that performs the data processing of the returned images. For the fly-eye telescope, 16 individual images have to be put together, moving objects have to be found, measured, and submitted to the relevant partners. Manual inspection/intervention of the processing results must be possible. This task should take the developments from the Test-Bed Telescope activities and the experience with the OGS and other collaborative telescopes into account. It should be in line with any standards developed by the SSA-NEO team. SSA-NEO Test and Validation Activity Code: P3-NEO-610 Activity value: 300 K Duration: 24 months This is a service activity to ESA for the technical support that is needed to test and validate the NEO Segment industrial deliverables in The main task will be to follow closely ongoing contracts related to the NEO work and execute test and validation and acceptance tests of the deliverables. Currently ongoing contracts cover e.g. the development of tools to prepare and plan NEO observations, convert and visualise NEO-related data, perform astrometric measurements of asteroids in optical sky images, and developing an image archive. SSA-NEO ICT Support in Period 3 Activity Code: P3-NEO-615 Activity value: 225 K Duration: 24 months

24 Annex B, Page 12 This activity aims at procuring the necessary support to the administration and operations of the ICT infrastructure deployed in the NEO centres in NEO Data Centre & Applications Maintenance Activity Code: P3-NEO-630 Activity value: 500 K Duration: 24 months This activity will include the corrective and evolutionary maintenance of the applications in the NEO Coordination and Data Centres. The activity will cover implementing identified necessary software changes in order to ensure the continued operation of the applications installed within the NEO Coordination and Data Centres, and continued availability of the archive and (near) real-time datasets contained therein.

25 Annex B, Page 13 B.3 ACTIVITIES OF THE SSA/SST SEGMENT In the Preparatory Phase, the SST segment concentrated on the establishment of initial precursor application, the characterisation of available European SST assets and the definition of a future architecture for a European SSA system. The SST activities in Period 2 developed the SST data centre system, initiated research and development within the area of satellite laser ranging (SLR) and optical surveillance. Finally, it integrated and tested the data centre software and provided the associated technical support. During the third period, the SST activities will focus on research and development, supporting national initiatives, which demand larger, cross-national SST components and technology developments and expected to ensure interoperability of national systems. The activities will entail the deployment of expert centres to pursue the qualification of national assets and networking technologies. Further, it will address the development of a community approach for the core SST software, that is maintained jointly and used nationally to harmonise system interfaces and safe maintenance costs. Also, sensor technology will be moved forward in the areas of automated telescopes, space-based sensors and laser and radar sensor technology. Finally, this period will address the development and maintenance of SST-related standards and architecture aspects in view of a European topology consisting of national centres. As in previous phases, these activities will be carried out in a step approach that will allow to adjust each subsequent step to the condition reached before and to the fast-developing needs of Member States. This will reduce the potential risk on time, scope and financing as the Programme progresses. B.3.1 New SST Activities in the Second Half of 2017 The SST activities to be placed in 2017 and beyond rely on the achievements in SSA Period 2. The definition of these activities reflects priorities stated by Member States participating to Period 3 of the SSA Programme. Priority in Q1 and Q2 of 2017 is given to technology aspects that have been newly introduced for this period, primarily addressing sensor technology developments. The focus of all 2017 activities, including also the subsequent second half of the year is to carry out: - The development and demonstration of the SST expert for laser tracking and optical observations; - Preparation of a test programme for remote, automated telescope operation - System requirements definition of a space-based optical component - Preparation of the Community Approach to the SST Core Software - Sensor technology developments. These priorities will provide the grounds for the evolution of the Period 3 elements and are to be taken forward in the next work plan. The acceptance and maintenance of the developed components, the implementation of the Steering and Change Control Board and the consolidation of user requirements for the community approach to the SST Core Software and standardisation activities require technical support that is also accounted for in this work plan.

26 Annex B, Page 14 Beyond this, the initiation of Period 3 activities will also look into establishing complementary technology activities within GSTP to improve specific aspects. Activities outlined in Table 8 are specified in the following categories: - P3-SST-1xx SST Networking Technologies (and Qualification of National Assets) - P3-SST-2xx SST Sensors Development - P3-SST-3xx SST Data Processing and Applications Development - P3-SST-4xx SST Architecture and Standards - P3-SST-5xx SST EU and International Cooperation - P3-SST-6xx SST Technical Support WP-ID P3-SST-101 P3-SST-201 Title SST Expert Centre Deployment and Demonstration Demonstration of Remotely Operated Robotic Telescopes Budget (K ) Table 8 SST Segment Activities to be Initiated in the Second Half of 2017 Duration (months) P3-SST-251 Tracking Radar Retrofit for Cheia Phase 2 3, P3-SST-270 Laser Technology Enhancement P3-SST-290 EISCAT 3D Performance Analysis P3-SST-301 P3-SST-302 Community Approach SST Core Software Consolidation of Member State Requirements Community Approach SST Core Software Framework Finalisation P3-SST-610 SST Technical Support in Period 3 1, P3-SST-615 SST ICT Support in Period P3-SST-630 SST Data Centre & Applications Maintenance B.3.2 SST Segment Activity Descriptions The following sections provide additional details on the content of each of the specific activities identified. These details follow the identification scheme outlined in the previous section, a description of what is intended to be done within each activity, the proposed budgetary envelope and the expected duration when combined within a contract. SST Expert Centre Deployment and Demonstration Activity Code: P3-SST-101 Activity value: 500 K Duration: 18 months

27 Annex B, Page 15 This activity shall deploy, test and demonstrate operational readiness of the expert centres for optical and laser measurements. Following the definition and the development of the two expert centres in Period 2, this activity shall consolidate the development. This will entail a full qualification programme for the expert centre software, and a consolidation of the service definition. This will further entail the freeze of the interfaces and integration tests with the data centre software. Finally, the centres will be rolled out in their final (to-be-determined) deployment site and undergo site acceptance testing. This will be followed by a first demonstration programme in which the centres coordinate a calibration and test campaign with further use of the data for the data centre consolidation. The centres will then also support the qualification of national sensors in the frame of this activity. The activity will be followed by a further exploitation and extensive testing activity. A dedicated activity for sensor data acquisition for SST will also follow in a subsequent work plan. Demonstration of Remotely-Operated Robotic Telescopes Activity Code: P3-SST-201 Activity value: 250 K Duration: 12 months This activity will deploy existing robotic telescopes and demonstrate the robustness of remote automated operation. Two half-metre class telescopes on robotic mounts have been integrated in the frame of a technology development programme. Following an in-factory qualification programme, under human supervision and involving commercial, off-the-shelf processing software, for full-end autonomy and robustness testing, the deployment to suitable sites is the task of this activity. The deployment will ensure adequate service level agreements with the site operator and dual use by the SST and NEO segments. The deployment and test programme will be conducted in two steps, starting with semi-staffed operations (casual first- and second-line maintenance by a person on site) followed by full autonomous operations. This activity will characterise the availability, optimise the monitoring and control efforts and associated interface definitions and characterise the performance envelope. Tracking Radar Retrofit for Cheia Phase 2 Activity Code: P3-SST-251 Activity value: 3300 K Duration: 30 months Based on the outcome of Phase 1 (P3-SST-250), the implementation of the Cheia retrofit is performed in Phase 2. This activity will include the final detailed design, the procurement, the deployment and the system validation. At the end of Phase 2, the system shall be in a preoperational state. Laser Technology Enhancement Activity Code: P3-SST-270 Activity value: 800 K Duration: 24 months

28 Annex B, Page 16 This activity shall start addressing the further development observation techniques, and components for satellite laser ranging to non-cooperative targets based on preparatory activities and from demonstration experiments. The activity shall focus on identifying and closing gaps of the existing technologies in meeting the SST system requirements, and on establishing efficient means and formats to exchange data in coordination with the SST Expert Centre activities. It will utilise the synergies from joining a larger, two-year Laser Ranging Station for Cooperative Targets activity of 1.6 M total, including co-funding through the SSA work plan, GSTP, PECS Latvia, and Mission Operations Infrastructure (MOI). The activity shall develop an ESA capability for developing and testing laser ranging technologies. A first prototype will be developed to range to cooperative targets, and will provide an excellent basis for testing ranging of non-cooperative targets during both day and night. It will also execute fully automated operations, and demonstrate networking and handover to/from passive optical sensors. EISCAT 3D Performance Analysis Activity Code: P3-SST-290 Activity value: 250 K Duration: 12 months This activity shall extend the previous work on studying the EISCAT 3D capabilities for SST data acquisition. Dedicated observation modes optimised for catalogue generation and maintenance shall be analysed and an associated experiment plan for the EISCAT 3D demonstrator suggested. Tracking experiments with the existing EISCAT facilities shall be optimised. Community Approach SST Core Software Consolidation of Member State Requirements Activity Code: P3-SST-301 Activity value: 250 K Duration: 9 months This activity shall set up and support the Steering Board to develop a single set of joint requirements for SST data centre software to be developed and maintained jointly. Since data centre software for orbit determination, correlation, catalogue maintenance and sensor scheduling is not sensor/system specific, a joint development and maintenance of such software for the various national systems in Europe has been identified as a cost-saver and enabler for interoperability and data and product compatibility. This activity will use the integrated and consolidated SST data centre software as a starting point for this development. The current system requirements will be used to poll each member state for their completeness from their national view. ESA will then provide an overview of the individual user requirements, and propose the largest common subset. This largest common subset will be the development baseline for the first common version. The activity will conclude with a System Requirements Review presenting a development and verification programme for the first version and a first development contract.

29 Community Approach SST Core Software Framework Finalisation Activity Code: P3-SST-302 Activity value: 500 K Duration: 15 months ESA/IPC(2017)47,add.1 Annex B, Page 17 This activity shall refine the setup for the development phase, related roles and agreements, as well as fully establish the framework for the maintenance phase of SST Core Software through a community approach. SSA SST Test and Validation Activity Code: P3-SST-610 Activity value: 1000 K Duration: 24 months This is a service activity to ESA for the technical support that is needed to test and validate the SST Segment industrial deliverables in This includes in particular the SST Core Software as well as the support to the end-to-end test and validation campaigns of the full SST system (radars, telescopes, data processing chain). SSA SST ICT Support in Period 3 Activity Code: P3-SST-615 Activity value: 225 K Duration: 24 months This activity aims at procuring the necessary support to the administration and operations of the ICT infrastructure deployed in the SST centres in SST Data Centre & Applications Maintenance Activity Code: P3-SST-630 Activity value: 400 K Duration: 24 months This activity will include the corrective and evolutionary maintenance of the applications in the SST Centres. The activity shall aim at implementing identified necessary software changes in order to ensure the continued operation of the applications installed within the SST Centres, and continued availability of the archive and (near) real-time datasets contained therein.

30 Annex B, Page 18 B.4 SSA P3 COMMON PROCUREMENTS The following activities, described in the segment-specific tables above, are combined into common industrial contracts in order to increase the synergies and reduce overhead costs. The interests expressed by the SSA Participating States and industrial return will be ensured at work-package level. Procurement Included Activities Budget(K ) P3-COM-II SSA ICT Support P3-COM-IV SSA-Test and Validation (previously Technical Support) P3-SWE-615 P3-NEO-615 P3-SST-615 P3-SWE-610 P3-NEO-610 P3-SST-610 Issue Date Duration (months) 900 Q ,900 Q P3-COM-VI SSA Data Centres and Applications maintenance P3-SWE-630 P3-NEO-630 P3-SST-630 1,100 Q Total 4,900 Table 9 SSA Common Contracts Starting in the Second Half of 2017

31 This page is intentionally left blank. ESA/IPC(2017)47,add.1 Annex B, Page 19

32

33 Annex C, Page 1 ANNEX C INDICATED PARTICIPATION TO THE SSA PROGRAMME PERIOD 3 PER SEGMENT (Status 10 March 2017)

34 Annex C, Page 2 C.1 PARTICIPATION IN SSA P3 PER SEGMENT In the Table 10 below, the SSA P3 Participating States express their interest in the four SSA main areas of activities (SWE, NEO, SST, L1/L5). SWE NEO SST L1/L5 AUSTRIA x x x x BELGIUM x CZECH REPUBLIC x x x x DENMARK x FINLAND x x x - FRANCE x GERMANY x x x x GREECE ITALY x x x - LUXEMBOURG x x NETHERLANDS x NORWAY x - x - POLAND x x x PORTUGAL ROMANIA x x x x SPAIN x x SWEDEN x - x x SWITZERLAND x x x x UNITED KINGDOM x - x x Table 10 Expression of Interest of SSA P3 Participating States (Status 10 March 2017)

Alexi Glover & Juha-Pekka Luntama SSA Programme Space Weather Segment, OPS-L ESA/ESAC, Madrid, Spain

Alexi Glover & Juha-Pekka Luntama SSA Programme Space Weather Segment, OPS-L ESA/ESAC, Madrid, Spain Alexi Glover & Juha-Pekka Luntama SSA Programme Space Weather Segment, OPS-L ESA/ESAC, Madrid, Spain Presentation Outline 1. SSA Programme short introduction 2. SWE Service Domains 3. Precursor Services

More information

SPACE SITUATIONAL AWARENESS

SPACE SITUATIONAL AWARENESS SPACE SITUATIONAL AWARENESS BACKGROUND AND SPACE SURVEILLANCE STATUS Page: 1 BACKGROUND BACKGROUND PURPOSE OF THE SSA PROGRAMME The objective of the Space Situational Awareness (SSA) programme is to support

More information

Meeting at ASI. SSA Preparatory Programme ESA,

Meeting at ASI. SSA Preparatory Programme ESA, Meeting at ASI 9 th July 2012 SSA Preparatory Programme ESA, 2009-2012 Nicolas Bobrinsky, HSO-L PURPOSE OF THE SSA PROGRAMME The objective of the Space Situational Awareness (SSA) programme is to support

More information

SSA NEO Segment Overview and approach for Phase 2

SSA NEO Segment Overview and approach for Phase 2 SSA NEO Segment Overview and approach for Phase 2 Detlef Koschny, Gerhard Drolshagen Detlef.Koschny@esa.int mage credit: ESA ESA Unclassified For public distribution 1 Tasks of the NEO segment NEO = near-earth

More information

The SSA Programme and SWE Segment status + view towards Period 3. SWWT Steering Board meeting 15 th November, 2016

The SSA Programme and SWE Segment status + view towards Period 3. SWWT Steering Board meeting 15 th November, 2016 The SSA Programme and SWE Segment status + view towards Period 3 SWWT Steering Board meeting 15 th November, 2016 ESA SSA Programme Objective: Protection of space and ground assets against adverse effects

More information

SPACE SURVEILLANCE AND TRACKING

SPACE SURVEILLANCE AND TRACKING SPACE SURVEILLANCE AND TRACKING Background, progress and future developments EMMET FLETCHER Space Surveillance and Tracking Manager Space Situational Awareness Programme Office Page: 1 BACKGROUND Page:

More information

Current status of ESA s Space Situational Awareness Near-Earth Object programme

Current status of ESA s Space Situational Awareness Near-Earth Object programme Current status of ESA s Space Situational Awareness Near-Earth Object programme Detlef Koschny, European Space Agency, Solar System Missions Division Keplerlaan 1 NL-2201 AZ Noordwijk ZH Detlef.Koschny@esa.int

More information

ESA s Space Situational Awareness Near-Earth Object programme

ESA s Space Situational Awareness Near-Earth Object programme ESA s Space Situational Awareness Near-Earth Object programme Detlef Koschny, European Space Agency, Solar System Missions Division Keplerlaan 1 NL-2201 AZ Noordwijk ZH Detlef.Koschny@esa.int What is Space

More information

First results from the deployment of Expert Centres supporting optical and laser observations in a European Space Surveillance and Tracking System

First results from the deployment of Expert Centres supporting optical and laser observations in a European Space Surveillance and Tracking System First results from the deployment of Expert Centres supporting optical and laser observations in a European Space Surveillance and Tracking System Tim Flohrer ESA Space Debris Office and Space Situational

More information

Space Policy and ESDP. The use of satellites in space for security purposes

Space Policy and ESDP. The use of satellites in space for security purposes Space Policy and ESDP The use of satellites in space for security purposes 14 February 2008 Geraldine Naja-Corbin Head, Institutional Matters and Strategic Studies European Space Agency Overview I ESA

More information

REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL

REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL EUROPEAN COMMISSION Brussels, 3.5.2018 COM(2018) 256 final REPORT FROM THE COMMISSION TO THE EUROPEAN PARLIAMENT AND THE COUNCIL on the implementation of the Space Surveillance and Tracking (SST) support

More information

PROJECT FINAL REPORT. Tel: Fax:

PROJECT FINAL REPORT. Tel: Fax: PROJECT FINAL REPORT Grant Agreement number: 262023 Project acronym: EURO-BIOIMAGING Project title: Euro- BioImaging - Research infrastructure for imaging technologies in biological and biomedical sciences

More information

Copernicus Space Component. Technical Collaborative Arrangement. between ESA. and. Enterprise Estonia

Copernicus Space Component. Technical Collaborative Arrangement. between ESA. and. Enterprise Estonia Copernicus Space Component Technical Collaborative Arrangement between ESA and Enterprise Estonia 2 Table of Contents 1 INTRODUCTION... 4 1.1 Purpose and objectives... 4 1.2 Scope... 5 1.3 References...

More information

Future Core Ground Segment Scenarios

Future Core Ground Segment Scenarios Future Core Ground Segment Scenarios Pascal Gilles EOP-G Ground Segment Coordination Body Workshop 2015 ESRIN, 24 September2015 Ground Segment Coordination Body Workshop 2015 ESRIN 24 September2015 Pag.

More information

The EuroHPC strategic initiative

The EuroHPC strategic initiative Amsterdam, 12 December 2017 The EuroHPC strategic initiative Thomas Skordas Director, DG CONNECT-C, European Commission The European HPC strategy in Horizon 2020 Infrastructure Capacity of acquiring leadership-class

More information

European Cybersecurity cppp and ECSO. org.eu

European Cybersecurity cppp and ECSO.   org.eu European Cybersecurity cppp and ECSO www.ecs org.eu ABOUT THE EUROPEAN CYBERSECURITY PPP A EUROPEAN PPP ON CYBERSECURITY The European Commission has signed on July 2016 a PPP with the private sector for

More information

Michael Hübner. Co-Chair SET-Plan MS Working Group on SET-Plan Action 4- Energy Systems and Networks (SET-Plan Steering Group)

Michael Hübner. Co-Chair SET-Plan MS Working Group on SET-Plan Action 4- Energy Systems and Networks (SET-Plan Steering Group) Michael Hübner Austrian Federal Ministry of Transport, Innovation and Technology Department of Energy and Environmental Technologies (Smart Energy Systems, Smart Grids) Co-Chair SET-Plan MS Working Group

More information

Research Infrastructures and Horizon 2020

Research Infrastructures and Horizon 2020 Research Infrastructures and Horizon 2020 Christos VASILAKOS DG Research & 1 st CoPoRI Workshop on EoE 11-12 June 2012 Hamburg, DE The EU Framework Programme for Research and 2014-2020 Research and Europe

More information

EuroHPC: the European HPC Strategy

EuroHPC: the European HPC Strategy HPC User Forum Campus Teratec, Bruyères-le-Châtel (F) 6-7 March 2018 EuroHPC: the European HPC Strategy Leonardo Flores Añover Senior Expert, HPC and Quantum Computing Unit DG CONNECT, European Commission

More information

This document is a preview generated by EVS

This document is a preview generated by EVS TECHNICAL REPORT CEN/CLC/ETSI/TR 50572 RAPPORT TECHNIQUE TECHNISCHER BERICHT December 2011 ICS 33.200; 91.140.01 English version Functional reference architecture for communications in smart metering systems

More information

COUNCIL OF THE EUROPEAN UNION. Brussels, 26 November /10

COUNCIL OF THE EUROPEAN UNION. Brussels, 26 November /10 COUNCIL OF THE EUROPEAN UNION Brussels, 26 November 2010 16864/10 ESPACE 19 COMPET 390 RECH 392 IND 161 TRANS 349 ENER 343 REGIO 95 ECOFIN 759 CODUN 47 ENV 804 EDUC 213 OUTCOME OF PROCEEDINGS From : Competitiveness

More information

Pascal Gilles H-EOP-GT. Meeting ESA-FFG-Austrian Actors ESRIN, 24 th May 2016

Pascal Gilles H-EOP-GT. Meeting ESA-FFG-Austrian Actors ESRIN, 24 th May 2016 Pascal Gilles H-EOP-GT Meeting ESA-FFG-Austrian Actors ESRIN, 24 th May 2016 ESA EO GS Operations Concept Evolution: Objectives Mission improvement Improve the availability and facilitate the exploitation

More information

Memorandum of Understanding

Memorandum of Understanding Memorandum of Understanding between the European Commission, the European Union Agency for Railways and the European rail sector associations (CER, EIM, EPTTOLA, ERFA, the ERTMS Users Group, GSM-R Industry

More information

EUREKA European Network in international R&D Cooperation

EUREKA European Network in international R&D Cooperation DLR-PT.de Chart 1 > EUREKA Andrea Hesse 2nd June 2016 EUREKA European Network in international R&D Cooperation DLR-PT - National EUREKA Bureau Andrea Hesse TRAINING DLR-PT.de Chart 2 > EUREKA Andrea Hesse

More information

ITS Action Plan Task 1.3 Digital Maps

ITS Action Plan Task 1.3 Digital Maps ITS Action Plan Task 1.3 Digital Maps Stakeholder consultation results 29 th March, Brussels Aims of the stakeholder consultation Develop an understanding of: The organisations involved in the delivery

More information

Report to Plenary on item 3.1

Report to Plenary on item 3.1 World Meteorological Organization Cg-XVI/PINK 3.1(1) SIXTEENTH CONGRESS GENEVA, 2011 Submitted by: Chair, Committee C Date: 27.V.2011 Original Language: English Agenda item: 3.1 WORLD WEATHER WATCH PROGRAMME

More information

GRIDS INTRODUCTION TO GRID INFRASTRUCTURES. Fabrizio Gagliardi

GRIDS INTRODUCTION TO GRID INFRASTRUCTURES. Fabrizio Gagliardi GRIDS INTRODUCTION TO GRID INFRASTRUCTURES Fabrizio Gagliardi Dr. Fabrizio Gagliardi is the leader of the EU DataGrid project and designated director of the proposed EGEE (Enabling Grids for E-science

More information

Friedrich Smaxwil CEN President. CEN European Committee for Standardization

Friedrich Smaxwil CEN President. CEN European Committee for Standardization Friedrich Smaxwil CEN President CEN European Committee for Standardization www.cen.eu www.cencenelec.eu Friedrich Smaxwil, CEN President 1. Standards & standardization 2. CEN s role in European Standardization

More information

GSCB-Workshop on Ground Segment Evolution Strategy

GSCB-Workshop on Ground Segment Evolution Strategy GSCB-Workshop on Ground Segment Evolution Strategy N. Hanowski, EOP-G, Ground Segment and Operations Department, nicolaus.hanowski@esa.int 24 September 2015 ESA UNCLASSIFIED For Official Use - Slide 1

More information

Recommendations of the Action Team on NEOs for an International Response to the Near-Earth Object Impact Threat. L. Johnson (NASA), D.

Recommendations of the Action Team on NEOs for an International Response to the Near-Earth Object Impact Threat. L. Johnson (NASA), D. Recommendations of the Action Team on NEOs for an International Response to the Near-Earth Object Impact Threat L. Johnson (NASA), D. Koschny (ESA) Introduction Many experts and assets already exist For

More information

REPORT 2015/149 INTERNAL AUDIT DIVISION

REPORT 2015/149 INTERNAL AUDIT DIVISION INTERNAL AUDIT DIVISION REPORT 2015/149 Audit of the information and communications technology operations in the Investment Management Division of the United Nations Joint Staff Pension Fund Overall results

More information

ehaction Joint Action to Support the ehealth Network

ehaction Joint Action to Support the ehealth Network Stakeholder Engagement - Consultation (22 August 2017) ehaction Joint Action to Support the ehealth Network 3 rd Joint Action to Support the ehealth Network Open Consultation 1 Participants of the 3 rd

More information

European outlook for safety and security in space

European outlook for safety and security in space IFRI BXL 27 November 2018FRIIF European outlook for safety and security in space Marco Ferrazzani European Space Agency CM16 Mandate for Space Safety and Security Space safety and security in DG s Proposal,

More information

13967/16 MK/mj 1 DG D 2B

13967/16 MK/mj 1 DG D 2B Council of the European Union Brussels, 4 November 2016 (OR. en) 13967/16 'I/A' ITEM NOTE From: To: General Secretariat of the Council No. prev. doc.: 11911/3/16 REV 3 No. Cion doc.: 11013/16 Subject:

More information

Service Overview. Dell Services. Service Description: PowerEdge & PowerVault Maintenance

Service Overview. Dell Services. Service Description: PowerEdge & PowerVault Maintenance Dell Services Service Description: PowerEdge & PowerVault Maintenance Service Overview Dell will provide the services in accordance with this Service Description and the Terms and Conditions of the Dell

More information

General Overview & Annex 1: Global Smart Grid Inventory

General Overview & Annex 1: Global Smart Grid Inventory General Overview & Annex 1: Global Smart Grid Inventory 2 nd EU-US Workshop on Smart Grid Assessment Methodologies Washington DC, 7 th November 2011 Michele de Nigris, RSE, ISGAN Chair Russ Conklin, U.S.

More information

EUMETSAT EXPERIENCE WITH MULTICAST ACROSS GÉANT

EUMETSAT EXPERIENCE WITH MULTICAST ACROSS GÉANT 1 EUMETSAT EXPERIENCE WITH MULTICAST ACROSS GÉANT Lothar.Wolf@eumetsat.int Competence Area Manager for Data Services OVERVIEW EUMETSAT Background WAN links Multicast accross GÉANT infrastructure Summary

More information

EU Customs Policy for Supply Chain Security & Detection Technology (for CBRNE)

EU Customs Policy for Supply Chain Security & Detection Technology (for CBRNE) EU Customs Policy for Supply Chain Security & Detection Technology (for CBRNE) Manuela Cabral Directorate General for Taxation and Customs Union Head of Risk management and Security, Unit B 2 Brussels,

More information

This document is a preview generated by EVS

This document is a preview generated by EVS TECHNICAL REPORT RAPPORT TECHNIQUE TECHNISCHER BERICHT CEN/TR 15449-5 April 2015 ICS 07.040; 35.240.70 English Version Geographic information - Spatial data infrastructures - Part 5: Validation and testing

More information

HPC IN EUROPE. Organisation of public HPC resources

HPC IN EUROPE. Organisation of public HPC resources HPC IN EUROPE Organisation of public HPC resources Context Focus on publicly-funded HPC resources provided primarily to enable scientific research and development at European universities and other publicly-funded

More information

First Review of COP 21 and Potential impacts on Space Agencies

First Review of COP 21 and Potential impacts on Space Agencies First Review of COP 21 and Potential impacts on Space Agencies Pascal Lecomte WGClimate Chair March 4 th, 2016 COP 21 the event Space Agencies were present and visible in the negotiation areas (Blue Zone)

More information

Galileo Reference Centre. Peter BUIST (GSA), Alvaro Mozo (GSA), Hillar Tork (EC) EUREF SYMPOSIUM 2018, May 30 th, Amsterdam

Galileo Reference Centre. Peter BUIST (GSA), Alvaro Mozo (GSA), Hillar Tork (EC) EUREF SYMPOSIUM 2018, May 30 th, Amsterdam Galileo Reference Centre Peter BUIST (GSA), Alvaro Mozo (GSA), Hillar Tork (EC) EUREF SYMPOSIUM 2018, May 30 th, Amsterdam EU GNSS programmes Political Oversight European Council and Parliament Programme

More information

Italy - Information Day: 2012 FP7 Space WP and 5th Call. Peter Breger Space Research and Development Unit

Italy - Information Day: 2012 FP7 Space WP and 5th Call. Peter Breger Space Research and Development Unit Italy - Information Day: 2012 FP7 Space WP and 5th Call Peter Breger Space Research and Development Unit Content Overview General features Activity 9.1 Space based applications and GMES Activity 9.2 Strengthening

More information

INSPIRE status report

INSPIRE status report INSPIRE Team INSPIRE Status report 29/10/2010 Page 1 of 7 INSPIRE status report Table of contents 1 INTRODUCTION... 1 2 INSPIRE STATUS... 2 2.1 BACKGROUND AND RATIONAL... 2 2.2 STAKEHOLDER PARTICIPATION...

More information

e-sens Electronic Simple European Networked Services

e-sens Electronic Simple European Networked Services e-sens Electronic Simple European Networked Services Herbert Leitold, A-SIT 2 nd SSEDIC International Identity Initiatives Conference (SIIIC) Rome, July 8 th 2013 Presentation Overview esens - LSP Relation

More information

Deployment is underway!

Deployment is underway! Deployment is underway! 15 September 2015 Scandic Hotel Roskilde, Denmark CODECS has received funding from the European Union s Horizon 2020 research and innovation programme under Grant Agreement No 653339.

More information

European Cybersecurity PPP European Cyber Security Organisation - ECSO November 2016

European Cybersecurity PPP European Cyber Security Organisation - ECSO November 2016 European Cybersecurity PPP European Cyber Security Organisation - ECSO November 2016 Présentation Géraud Canet geraud.canet@cea.fr ABOUT THE CYBERSECURITY cppp 3 AIM 1. Foster cooperation between public

More information

The US National Near-Earth Object Preparedness Strategy and Action Plan

The US National Near-Earth Object Preparedness Strategy and Action Plan The US National Near-Earth Object Preparedness Strategy and Action Plan Briefing to SMPAG Lindley Johnson Program Executive / Planetary Defense Officer Science Mission Directorate NASA HQ October 18, 2018

More information

Safety of Nuclear Installations

Safety of Nuclear Installations Objective To continuously improve the safety of nuclear installations during site evaluation, design, construction and operation through the availability of safety standards and their application. To support

More information

Designing a System Engineering Environment in a structured way

Designing a System Engineering Environment in a structured way Designing a System Engineering Environment in a structured way Anna Todino Ivo Viglietti Bruno Tranchero Leonardo-Finmeccanica Aircraft Division Torino, Italy Copyright held by the authors. Rubén de Juan

More information

THE REGULATORY ENVIRONMENT IN EUROPE

THE REGULATORY ENVIRONMENT IN EUROPE THE REGULATORY ENVIRONMENT IN EUROPE How does ETSI help? ETSI Seminar European regulations on radio equipment and spectrum Policy positions Legal certainty Political support Harmonized Standards and other

More information

EU Research for Secure Societies

EU Research for Secure Societies EU Research for Secure Societies Paolo Salieri European Commission DG Migration Home Affairs Innovation and Industry for Security Rotterdam October 9 th 20182013 Content EU Security Research "Secure Societies

More information

Principles for a National Space Industry Policy

Principles for a National Space Industry Policy Principles for a National Space Industry Policy Commonwealth of Australia 2011 DIISR 11/144 This work is copyright. Apart from any use as permitted under the Copyright Act 1968, no part may be reproduced

More information

Mapping of the CVD models in Europe

Mapping of the CVD models in Europe Mapping of the CVD models in Europe TASK FORCE ON SW VULNERABILITY DISCLOSURE IN EUROPE Brussels, 29/11/2017 Gianluca Varisco Disclaimer This preliminary mapping has been put together by: reaching out

More information

European agreement on the Implementation of the European Hairdressing Certificates

European agreement on the Implementation of the European Hairdressing Certificates European agreement on the Implementation of the European Hairdressing Certificates 1. Introduction The Social Partners, UNI europa Hair and Beauty and Coiffure EU, share a longstanding commitment to better

More information

EXPERT CENTRES: A KEY COMPONENT IN ESA S TOPOLOGY FOR SPACE SURVEILLANCE

EXPERT CENTRES: A KEY COMPONENT IN ESA S TOPOLOGY FOR SPACE SURVEILLANCE EXPERT CENTRES: A KEY COMPONENT IN ESA S TOPOLOGY FOR SPACE SURVEILLANCE Beatriz Jilete (1), Tim Flohrer (2), Thomas Schildknecht (3), Christophe Paccolat (4), Michael Steindorfer (5) (1) GMV/ESA, Camino

More information

EXPOFACTS. Exposure Factors Sourcebook for Europe GENERAL

EXPOFACTS. Exposure Factors Sourcebook for Europe GENERAL EXPOFACTS Exposure Factors Sourcebook for Europe GENERAL 10.7.2006 This document describes the general structure of ExpoFacts Sourcebook, as well as the principles according to which data have been collected

More information

ULISSE. Carlo Albanese Telespazio. ASI Workshop on Space Foundations Rome, 29 May 2012

ULISSE. Carlo Albanese Telespazio. ASI Workshop on Space Foundations Rome, 29 May 2012 ULISSE Carlo Albanese Telespazio ASI Workshop on Space Foundations Rome, 29 May 2012 Motivation for ULISSE Space data peculiarity: Large range of scientific domains; Long preparation time of space experiments;

More information

esignature Infrastructure Marketing Model

esignature Infrastructure Marketing Model www.peppol.eu esignature Infrastructure Marketing Model esignature Long Demo Objectives of PEPPOL esignature The overall objective of PEPPOL esignature is to provide cross European interoperability of

More information

This document is a preview generated by EVS

This document is a preview generated by EVS CEN WORKSHOP CWA 16458 May 2012 AGREEMENT ICS 35.020 English version European ICT Professional Profiles This CEN Workshop Agreement has been drafted and approved by a Workshop of representatives of interested

More information

SGEO: Overview and Product Offering. Marco R. Fuchs. Marco R. R. Fuchs. DLR-ESA Workshop on ARTES 11. Marco R. Fuchs OHB Technology AG

SGEO: Overview and Product Offering. Marco R. Fuchs. Marco R. R. Fuchs. DLR-ESA Workshop on ARTES 11. Marco R. Fuchs OHB Technology AG DLR-ESA Workshop on ARTES 11 SGEO: Overview and Product Offering Marco R. R. Fuchs June June29, 29, 2006 2006 Tegernsee, Tegernsee, Germany Germany Marco R. Fuchs Marco R. Fuchs OHB Technology AG OHB Technology

More information

H2020 Space Robotic SRC- OG4

H2020 Space Robotic SRC- OG4 H2020 Space Robotic SRC- OG4 2 nd PERASPERA workshop Presentation by Sabrina Andiappane Thales Alenia Space France This project has received funding from the European Union s Horizon 2020 research and

More information

UNOOSA Supporting Member States in the Implementation of TCBMs in Outer Space Activities Niklas Hedman

UNOOSA Supporting Member States in the Implementation of TCBMs in Outer Space Activities Niklas Hedman 10th United Nations Workshop on Space Law 5-8 September, Vienna UNOOSA Supporting Member States in the Implementation of TCBMs in Outer Space Activities Niklas Hedman United Nations Office for Outer Space

More information

This document is a preview generated by EVS

This document is a preview generated by EVS CEN WORKSHOP AGREEMENT CWA 16458-4 August 2018 ICS 35.020 English version European ICT professional role profiles - Part 4: case studies This CEN Workshop Agreement has been drafted and approved by a Workshop

More information

ANNEX A.1 TECHNICAL SPECIFICATIONS OPEN CALL FOR TENDERS

ANNEX A.1 TECHNICAL SPECIFICATIONS OPEN CALL FOR TENDERS ANNEX A.1 TECHNICAL SPECIFICATIONS OPEN CALL FOR TENDERS Provision of Internet, Voice & Mobile Services FRA1-200 2008-2410 2410-T 01 Page 1 Table of Contents ANNEX A.1 TECHNICAL SPECIFICATIONS OPEN CALL

More information

Research Infrastructures and Horizon 2020

Research Infrastructures and Horizon 2020 Ana Arana Antelo DG Research & Head of Research Infrastructures ERF Workshop - Hamburg, 31 May 2012 Research Infrastructures and Horizon 2020 The EU Framework Programme for Research and 2014-2020 Research

More information

Call for Expressions of Interest

Call for Expressions of Interest Call for Expressions of Interest ENISA M/CEI/17/T01 Experts for assisting in the implementation of the annual ENISA Work Programme TECHNICAL DESCRIPTION CONTENTS TECHNICAL DESCRIPTION... 3 1. INTRODUCTION...

More information

ICB Industry Consultation Body

ICB Industry Consultation Body ICB Industry Consultation Body Evolution of network management 17/11/2016 Issue Position Paper Long-term evolution of Network Management This position paper is intended to form the basis of advice to the

More information

Session 3: IOD/IOV Context and Orientations - ESA. September 2016

Session 3: IOD/IOV Context and Orientations - ESA. September 2016 Session 3: IOD/IOV Context and Orientations - ESA September 2016 In-Orbit Demonstration (IOD) at ESA IOD has been addressed at ESA for ~ 30 years to support Member States and industry interests in Technology

More information

Geospatial Intelligence Centres Empowered by Airbus

Geospatial Intelligence Centres Empowered by Airbus DEFENCE AND SPACE Intelligence Geospatial Intelligence Centres Empowered by Airbus Planning Collection Processing Analysis Dissemination 2 Geospatial Intelligence Centres Geospatial Intelligence Centres

More information

European Cybersecurity PPP European Cyber Security Organisation - ECSO

European Cybersecurity PPP European Cyber Security Organisation - ECSO European Cybersecurity PPP European Cyber Security Organisation - ECSO Luigi Rebuffi CEO, EOS Secretary General, ECSO European Cyber Security Organisation Objectives of the cppp Gather industrial and public

More information

Cost Saving Measures for Broadband Roll-out

Cost Saving Measures for Broadband Roll-out Cost Saving Measures for Broadband Roll-out out Izmir, 22 February 2013 Petri Koistinen, DG CONNECT The views expressed in this presentation may not in any circumstances be regarded as stating an official

More information

Digital Dividend harmonisation in Europe

Digital Dividend harmonisation in Europe Presentation to ATU Digital Migration and Spectrum Policy Summit Digital Dividend harmonisation in Europe Nairobi, 30 November 2011 Robert Schumann 2 Analysys Mason has conducted two major European studies

More information

Summary of Data Management Principles

Summary of Data Management Principles Large Synoptic Survey Telescope (LSST) Summary of Data Management Principles Steven M. Kahn LPM-151 Latest Revision: June 30, 2015 Change Record Version Date Description Owner name 1 6/30/2015 Initial

More information

KENYA SCHOOL OF GOVERNMENT EMPLOYMENT OPORTUNITY (EXTERNAL ADVERTISEMENT)

KENYA SCHOOL OF GOVERNMENT EMPLOYMENT OPORTUNITY (EXTERNAL ADVERTISEMENT) KENYA SCHOOL OF GOVERNMENT EMPLOYMENT OPORTUNITY (EXTERNAL ADVERTISEMENT) 1. DIRECTOR, LEARNING & DEVELOPMENT - LOWER KABETE Reporting to the Director General, Campus Directors will be responsible for

More information

Space Data Coordination Group Meeting (SDCG-13) 15 th -16 th September 2018, Bogotá, Colombia Meeting Objectives

Space Data Coordination Group Meeting (SDCG-13) 15 th -16 th September 2018, Bogotá, Colombia Meeting Objectives Space Data Coordination Group Meeting (SDCG-13) 15 th -16 th September 2018, Bogotá, Colombia Meeting Objectives The SDCG-13 meeting will be structured around the outcomes and tasks defined in the group

More information

Server Virtualisation Assessment. Service Overview

Server Virtualisation Assessment. Service Overview Server Virtualisation Assessment Service Overview Our Server Virtualisation Assessment helps organisations reduce server total cost of ownership and make informed decisions around capacity planning by

More information

User Manual for the delivery of a new national Natura 2000 database to the Commission. Version 1.1

User Manual for the delivery of a new national Natura 2000 database to the Commission. Version 1.1 User Manual for the delivery of a new national Natura 2000 database to the Commission Version 1.1 The Natura 2000 network of protected sites consists of the sites classified under the Birds Directive first

More information

New Zealand Government IBM Infrastructure as a Service

New Zealand Government IBM Infrastructure as a Service New Zealand Government IBM Infrastructure as a Service A world class agile cloud infrastructure designed to provide quick access to a security-rich, enterprise-class virtual server environment. 2 New Zealand

More information

The NIS Directive and Cybersecurity in

The NIS Directive and Cybersecurity in The NIS Directive and Cybersecurity in ehealth Dr. Athanasios Drougkas Officer in NIS Belgian Hospitals Meeting on Security Brussels 13 th October European Union Agency For Network And Information Security

More information

WORLD METEOROLOGICAL ORGANIZATION AFRICAN CONFERENCE ON METEOROLOGY FOR AVIATION (ACMA -2018)

WORLD METEOROLOGICAL ORGANIZATION AFRICAN CONFERENCE ON METEOROLOGY FOR AVIATION (ACMA -2018) Hello Bonjour WORLD METEOROLOGICAL ORGANIZATION AFRICAN CONFERENCE ON METEOROLOGY FOR AVIATION (ACMA -2018) 28 to 30 November 2018 Dakar, Senegal ENHANCING QUALITY AND COST EFFICIENCY OF SERVICES THROUGH

More information

INCEPTION IMPACT ASSESSMENT. A. Context, Problem definition and Subsidiarity Check

INCEPTION IMPACT ASSESSMENT. A. Context, Problem definition and Subsidiarity Check TITLE OF THE INITIATIVE LEAD DG RESPONSIBLE UNIT AP NUMBER LIKELY TYPE OF INITIATIVE INDICATIVE PLANNING December 2017 ADDITIONAL INFORMATION - INCEPTION IMPACT ASSESSMENT Governmental Satellite Communications

More information

Data-link Services (DLS) implementation 2017 CEF Transport Calls for proposals

Data-link Services (DLS) implementation 2017 CEF Transport Calls for proposals Data-link Services (DLS) implementation 2017 CEF Transport Calls for proposals Brussels, 17 th November 2017 EC Workshop on DLS Agenda Overview SDM activities for Path I and Path II Path I - implementation

More information

WHO-ITU National ehealth Strategy Toolkit

WHO-ITU National ehealth Strategy Toolkit WHO-ITU National ehealth Strategy Toolkit Context and need for a National Strategy A landscape of isolated islands of small scale applications unable to effectively communicate and to share information

More information

INFORMATION NOTE. United Nations/Germany International Conference

INFORMATION NOTE. United Nations/Germany International Conference INFORMATION NOTE United Nations/Germany International Conference Earth Observation: Global solutions for the challenges of sustainable development in societies at risk Organized by The United Nations Office

More information

Sony Customer Journey

Sony Customer Journey Sony Customer Journey A declining market share due to new market entrants, Apple and Samsung, meant that cost reduction was a critical issue. The CIO was tasked with reducing the European IT budget by

More information

English version. European e-competence Framework - Part 1: The Framework - Version 1.0

English version. European e-competence Framework - Part 1: The Framework - Version 1.0 CEN WORKSHOP CWA 15893-1 November 2008 AGREEMENT ICS 35.240.99 English version European e-competence Framework - Part 1: The Framework - Version 1.0 This CEN Workshop Agreement has been drafted and approved

More information

Support-EAM. Publishable Executive Summary SIXTH FRAMEWORK PROGRAMME. Project/Contract no. : IST SSA. the 6th Framework Programme

Support-EAM. Publishable Executive Summary SIXTH FRAMEWORK PROGRAMME. Project/Contract no. : IST SSA. the 6th Framework Programme Support-EAM Supporting the creation of an eaccessibility Mark SIXTH FRAMEWORK PROGRAMME Project/Contract no. : IST-2-004754-SSA Project acronym: Project full title: Instrument: Thematic Priority: SUPPORT-

More information

Invitation to Tender AO/1-9079/17/D/CS Network Operations Centre (NOC) Services at ESOC Industry Day AO 9079

Invitation to Tender AO/1-9079/17/D/CS Network Operations Centre (NOC) Services at ESOC Industry Day AO 9079 Invitation to Tender AO/1-9079/17/D/CS Network Operations Centre (NOC) Services at ESOC Industry Day AO 9079 12/10/2017 ESA UNCLASSIFIED - For Official Use AGENDA Introduction/Start (13:00 hrs) Presentation

More information

The Copernicus Sentinel-3 Mission: Getting Ready for Operations

The Copernicus Sentinel-3 Mission: Getting Ready for Operations The Copernicus Sentinel-3 Mission: Getting Ready for Operations Susanne Mecklenburg ESA Sentinel-3 Mission Manager Sentinel-3 ESA development & operations teams Sentinel-3A Status S-3A Satellite on stand

More information

Section One of the Order: The Cybersecurity of Federal Networks.

Section One of the Order: The Cybersecurity of Federal Networks. Summary and Analysis of the May 11, 2017 Presidential Executive Order on Strengthening the Cybersecurity of Federal Networks and Critical Infrastructure. Introduction On May 11, 2017, President Donald

More information

Final Subtask A Report

Final Subtask A Report IEA Hydrogen Implementing Agreement Annex 18 Integrated Systems Evaluation Subtask A - Information Base Development Final Subtask A Report Have participated in the preparation of this Final Report the

More information

OPEN Networks - Future Worlds Consultation

OPEN Networks - Future Worlds Consultation ENA Open Networks Future Worlds Consultation OPEN Networks - Future Worlds Consultation Developing change options to facilitate energy decarbonisation, digitisation and decentralisation Executive Summary

More information

European Data Relay Satellite System EDA Workshop

European Data Relay Satellite System EDA Workshop European Data Relay Satellite System EDA Workshop Brussels 7/06/2011 Agenda 1. Rationale for Data Relay Services 2. Potential benefits for Earth Observation systems 3. EDRS Programme principles, targeted

More information

The Role of SANAS in Support of South African Regulatory Objectives. Mr. Mpho Phaloane South African National Accreditation System

The Role of SANAS in Support of South African Regulatory Objectives. Mr. Mpho Phaloane South African National Accreditation System The Role of SANAS in Support of South African Regulatory Objectives Mr. Mpho Phaloane South African National Accreditation System Outline of Presentation INTRODUCTION STATUS OF SANAS TECHNICAL INFRASTRUCTURE

More information

REPORT ON THE ESTABLISHMENT OF THE INTERNATIONAL FORUM OF USERS OF SATELLITE DATA TELECOMMUNICATION SYSTEMS (SATCOM FORUM)

REPORT ON THE ESTABLISHMENT OF THE INTERNATIONAL FORUM OF USERS OF SATELLITE DATA TELECOMMUNICATION SYSTEMS (SATCOM FORUM) WORLD METEOROLOGICAL ORGANIZATION ARGOS JOINT TARIFF AGREEMENT THIRTY FIFTH SESSION GENEVA, SWITZERLAND 26-28 OCTOBER 2015 INTERGOVERNMENTAL OCEANOGRAPHIC COMMISSION (OF UNESCO) JTA-35/ Doc. 11 (29.07.2015)

More information

COMMUNICATIONS COMMITTEE

COMMUNICATIONS COMMITTEE EUROPEAN COMMISSION Directorate-General for Communications Networks, Content and Technology Electronic Communications Networks and Services Implementation of the Regulatory Framework Brussels, 10 February

More information

Effective 1 January 2016

Effective 1 January 2016 BATS Chi-X Europe Market Data Policy Effective 1 January 2016 Published October 2015 Copyright BATS Trading Limited. No part of this material may be copied, photocopied, duplicated or published in any

More information

H2020 & THE FRENCH SECURITY RESEARCH

H2020 & THE FRENCH SECURITY RESEARCH H2020 & THE FRENCH SECURITY RESEARCH JANUARY 22, 2013 WISG 2013 / TROYES LUIGI REBUFFI CEO EUROPEAN ORGANISATION FOR SECURITY WWW.EOS EU.COM PRESIDENT CSOSG STEERING COMMITTEE European Organisation for

More information

FP7 Information & Communication Technologies. Rules of the Programme

FP7 Information & Communication Technologies. Rules of the Programme FP7 Information & Communication Technologies Rules of the Programme FP7/ICT Calls in Information Society 2009-2010 ICT Call 4, Closed Opened 19 November 2008: Close 1 April 2009 Joint Call with ENERGY,

More information