PROPER SIZING OF IT POWER AND COOLING LOADS WHITE PAPER

Size: px
Start display at page:

Download "PROPER SIZING OF IT POWER AND COOLING LOADS WHITE PAPER"

Transcription

1 WHITE PAPER #23 PROPER SIZING OF IT POWER AND COOLING LOADS WHITE PAPER CONTRIBUTORS: JOHN BEAN, APC RON BEDNAR, EMERSON NETWORK POWER RICHARD JONES, CHATSWORTH PRODUCTS ROBB JONES, CHATSWORTH PRODUCTS PHIL MORRIS, SUN MICROSYSTEMS DAVID MOSS, DELL DR. MICHAEL PATTERSON, INTEL JOE PRISCO, IBM WADE VINSON, HP JOHN WALLERICH, DELL

2 PAGE 2 TABLE OF CONTENTS: I. Introduction...3 II. Today s Data Centers...3 III. Nameplate Power Rating Misconceptions...3 IV. Nameplate Versus Actual...5 V. Cooling Load Calculations...6 VI. Energy Ef ciency Focus New Tools...6 VII. Tool Links...8 VIII. Proper Use of Calculating Tools...9 IX. Summary/Conclusion...9 X. References...10

3 PAGE 3 I. INTRODUCTION Between 2000 and 2006, energy requirements for data centers doubled, and they are on track to double again by In the same time period, typical per-rack heat densities went from 1 kw to 7 kw, and they are estimated to exceed 20 kw per rack by This places tremendous importance on a data center facility planner s ability to properly budget for future power and cooling infrastructure requirements. In the past, facilities planners used IT equipment nameplate ratings values as a method to plan power and cooling capacity requirements, which resulted in over-built, under-utilized, inef cient infrastructure. Today s energy costs and ef ciency demands necessitate a more accurate method of determining those requirements. This white paper has been developed to introduce the reader to the many new and highly accurate software tools available for estimating power and cooling capacity requirements. II. TODAY S DATA CENTERS The inaccuracy of data centers standard process for estimating the power consumption of IT equipment has led to the under- and over-provisioning of circuits, power distribution units (PDUs), and uninterruptible power supplies (UPSs) as well as the cooling systems needed to remove the energy dissipated. This can have a signi cant impact on power distribution ef ciencies, total power consumption, service availability, and operational costs. In an attempt to simplify this process and to help improve power consumption accuracy, the majority of IT vendors have made power and cooling estimation tools available for their various equipment models and con gurations. Prior to the proliferation of those tools, the American Society of Heating, Refrigerating, and Air-Conditioning Engineers (ASHRAE) suggested the use of the thermal report, which provided the end user with power-draw and cooling-load estimates heat removal and air ow rates for minimal, typical, and maximum load con gurations 1. But even that signi cant step forward was still subject to errors based on different server con gurations and the exact complement of hardware options (CPU, hard drives, memory, I/O con gurations, etc.) The minimum baseline has since been expanded upon by system manufacturers. III. NAMEPLATE POWER RATING MISCONCEPTIONS Prior to the ASHRAE thermal report, the buyer or data center architect had little-to-no information on the expected power consumption of a server, so the default value was initially the nameplate value. Yet the term nameplate is often misused. When discussing server power draw and cooling loads, nameplate is frequently used (albeit incorrectly) to describe the value from the server data sheet for the power supply (generally the output of the power supply listed in watts). The technically correct description of nameplate value is the value from the system rating label (see Figure 1). The nameplate on a piece of IT equipment is a marking from a third-party agency that indicates that the equipment complies with a set of requirements set forth by a product safety standard such as IEC (Information technology equipment - Safety - Part 1: General requirements). Figure 1 shows an example of a nameplate found on a piece of IT equipment.

4 PAGE 4 FIGURE 1. EXAMPLE NAMEPLATE The nameplate includes, at a minimum, rated input voltage, rated input amperage, kilovolt-ampere (kva), frequency, and phase information. It is important to note that the wattage does not appear on the nameplate. The purpose of the nameplate is twofold: To give information necessary for the preparation of the electrical installation (e.g., circuit breakers, receptacles, wiring methods) to ensure adherence with electrical codes. To provide assurance to the installer or user who plugs the equipment into the mains that the equipment is suitable for installation at a particular location within the data center. Manufacturers derive the nameplate value in many different ways to ensure compliance with a product safety standard. The value could be based on the line cord assembly that is used to provide power to the IT equipment or the DC output power rating on the power supply unit (PSU). The nameplate value chosen may be a result of the cost of manufacturing: many OEMs standardize their power supplies on a smaller number of PSUs, which can result in substantial gaps between nameplate values and actual power consumed for a given piece of IT equipment. Also, power consumption can vary based on device con gurations additional components such as memory can increase the actual power draw of equipment. The same power supply may be used in a server with low-voltage CPUs and minimal memory as in the same server model that is con gured with the highest memory and CPU con gurations. Regardless of how they are chosen, nameplate values are generally accepted as representing power consumption levels that exceed actual power consumption of equipment under normal usage. Therefore, these over-in ated values do not support realistic power prediction. Unfortunately, nameplate value (regardless of whether it is the incorrect use of the data sheet PSU description or the proper de nition above) is still frequently used by data center planners in the design, planning, and deployment of power and cooling systems. This practice often results in excessive capital expense and operational costs due to lower ef ciencies that result from overestimating resource requirements. Many of these planners mistakenly use the nameplate value because it is either on the data sheet when they are ordering or always available and clearly visible on any piece of IT equipment when installed. There is also a misconception that devices upstream from the IT equipment (such as PDUs and/or UPSs) must be sized to accommodate the sum of all the nameplate ratings. As discussed above, the nameplate rating generally does not re ect actual power consumption and using it as an indicator leads to grossly over-provisioned power distribution systems. Typically, any electrical loads hardwired into a system are, by code, limited to 80% of the upstream components capacity. However, because the server has a plug, it is

5 PAGE 5 considered portable and the management of the load then falls to the owner. In this case, a better design practice would be to use the peak-measured or maximum-measured manufacturer s reported draw for the speci c IT equipment con guration and ensure that the sum of those loads does not exceed 80% of the rating of the upstream panel. Also, it is important to check with the local code authority having jurisdiction for any speci c ruling that would preclude this practice. There are some speci c geographies, instances, and tools that can allow higher loadings when the diversity of the load (frequency of equipment peak power occurring at the same time) is known, but these are outside the scope of this paper. In general, the electrical loading should be sized based on IT equipment peak measured or maximum measured power consumption levels and not nameplate values. IV. NAMEPLATE VERSUS ACTUAL Servers, PSU Rating vs peak draw Actual "50%" PSU Nameplate (Watts) Peak draw (Watts) FIGURE 2. PSU NAMEPLATE RATING VERSUS PEAK POWER DRAW The above gure shows 51 servers and their power supplies tested by the U.S. Environmental Protection Agency 3. The nameplate rating (Y axis) is plotted against peak draw (X axis). Consider, for example, the large group of 1000 W PSUs in the gure. There were 23 of these, which indicates the manufacturer s propensity to use standard-size components at the next-greater size rather than exactly matching the expected load. Also noteworthy is the range of actual power draw found for these servers. The low end was roughly 160 watts compared to a high end of about 580 watts all using the same 1000 W power supply. With only the knowledge of the nameplate value in hand, many data center managers use a method of de-rating in order to estimate actual power consumption. In doing so, they establish actual power consumption as a percentage of the nameplate value. Some use a simple nameplate divided by 2 (nameplate/2) convention for estimating power loads. If that method were accurate, then the peak draw values would be 50% of the PSU nameplate

6 PAGE 6 values and fall on the 50% line in Figure 2, yet review of Figure 2 clearly shows this is not the case. This example shows how the nameplate/2 practice could result in incorrect power and cooling load estimates, as well as the over-sizing (or under-sizing) of both electrical systems and cooling systems. Some of the data points fall on or near the 50% line, but the number that do is far less than the number that do not. The issue is further complicated by the redundancy (or lack thereof) in PSUs. A typical server operation with redundant PSUs has both PSUs operational and carrying 50% of the load. In the case of one failing, the functioning PSU can rapidly ramp to 100% of the server load. Two important aspects should be noted. First, the total connected load from the dual PSU nameplates is now double the non-redundant load and can add to far greater over-sizing if not clearly understood. Second, dual power supplies will typically increase server consumption, due to the PSU being lower down the utilization curve, which can mean lower ef ciency. This added power needs to be factored in. Clearly, rule-of thumb methods such as nameplate/2, PSU divided by 2, and others cannot account for this level of detail. V. COOLING LOAD CALCULATIONS Data center planners and managers also use IT equipment s power predictions to calculate cooling load. All of the inaccuracies involved in using nameplate data for power load calculations are repeated in the cooling load analysis. In sizing the cooling infrastructure, both the cooling load (kw or BTU/hr) and air ow rates (m3/ hour of CFM) need to be determined. To further complicate the problems created by using nameplate data, planners and managers use an estimated, historical, or rule-of-thumb differential temperature (deltat) across the servers. From that deltat and the estimated power load, they calculate an air ow rate. Unfortunately, that air ow rate is based on two inaccurate estimates (nameplate and an assumed deltat). VI. ENERGY EFFICIENCY FOCUS NEW TOOLS As a result of the focus on energy ef ciency, most IT vendors now provide power measurement and power estimation tools that can help to identify a more accurate power consumption value for their IT equipment. That value is based either on actual measurements (a power meter) or an estimation tool (hardware options and utilization). Ideally, measuring the power consumed by IT equipment provides the most accurate method for determining the power and cooling load that IT equipment places on a data center. IT equipment manufacturers provide power meters that are internal and external to IT equipment. These can be used to show trends in power consumption over long periods of time under many workloads. Measuring power consumption allows for realtime measurement of application intensity and other factors that have an impact on power consumption, such as inlet ambient temperature and/or operating voltage. Vendors power and cooling estimation tools are best for planning power and cooling loads for new equipment being placed in the data center. The values found in vendor planning tools are typically the result of using this approach, with an added margin for error that will yield much more useful power consumption estimates. Application loading or utilization within the planning tool is offset from a peak power consumption level based on some type of proxy application, such as an industry benchmark or stress program. It is the deviation from actual usage to this proxy that adds one level of inaccuracy. Another factor that increases inaccuracy is the variation of power consumption in electronic components that vary from lot-to-lot. Although vendors tools typically yield results that are far better than common de-rating methods, their results tend to be somewhat conservative as compared with actual power measurements from the IT equipment.

7 PAGE 7 An additional bene t of power and cooling estimation tools is that some tools provide more accurate estimations of the speci c air ow rates for the server con guration, utilization, and inlet air temperature. The air ow rates combined with the heat released by the equipment will provide the information that planners need to size the cooling infrastructure. Table 1 below is a typical example of the results obtainable by using a vendor estimation tool compared to the value that would likely have been derived from using a nameplate de-rating estimate. Equipment Design Input Tool Output 1U server Power 370 watts 208V AC power (power factor.98) Flow rate 32 CFM Dual socket quad core processor Weight 46 lbs 8 GB memory Current 1.78 A 2 disk drives deltat 37.3 F Dual power supplies Operating condition: 25 C server inlet temperature, typical workload TABLE 1. TOOL EXAMPLE Using the con guration above, the sample vendor s power estimate is 370 watts. Per the vendor s guidance, this estimate would still be conservative, even for a virtualized load that typically operates at a higher level of processor utilization. General-purpose servers running at lower utilization levels would measure up to 20% less in terms of total power consumed. The tool estimates a worst-case con guration for the same server to be 490 watts under full load, but that power estimate would increase to 555 watts if the server were running a more processor-intensive load, such as HPC (high performance computing) cluster computing. Furthermore, if the system were running a processor-intensive load at a maximum inlet temperature of 35 C (95 F), the power estimate would increase to 620 watts due to the electrical inef ciencies that result from running at high temperatures. This server has a power supply nameplate value of 670 watts. If, for example, the server power supply was actually delivering 650 watts of DC power, and it was running at 85% ef ciency, then it would be consuming 765 watts and releasing approximately 2610 BTUs (1 W of load requires BTUs to cool) of heat into the room. This example demonstrates that there are many parameters that affect power consumption, including, but not limited to, server con guration, processor selection, memory amount and con guration, number of drives, peripherals, I/O, processor utilization, and inlet temperature. The sophistication of vendor estimation tools continues to grow and provide the end user with an increasingly accurate method of predicting power and cooling loads.

8 PAGE 8 VII. TOOL LINKS As mentioned above, actual power measurements are ideal, but many IT vendors produce power estimation tools and calculators that can be used for planning purposes. Cautionary note Updates to calculators may occur without notice. While The Green Grid will attempt to keep the reference links below as up-to-date as possible, readers should contact the supplier to verify they have the latest version. Company Link Comments HP TOOL: gurator/powercalcs.asp HP also has a white paper on the tool (see second link) WHITE PAPER: r+calculator&url=http%3a//h20000.www2.hp.com/bc/ docs/support/supportmanual/c /c pdf%3fjumpid%3dreg_r1002_usen&pos=1 Dell PLANNING FOR ENERGY REQUIREMENTS: This link includes instructions and Data Center planning tools IBM Calculator for the blades and modular product lines (x86 architecture server systems and rack storage), the tool can be downloaded at: powercon g/ For the Power Processor-based server systems, an online tool is available at the following link: Sun Power Tool: Calculators powercalculators.jsp Cisco Power Tool: Calculator fcc?type= &realmoid= a a3-a dc90000&GUID=&SMAUTHREASON=0& METHOD=GET&SMAGENTNAME=$SM$GDuJAbSsi7kExzQD RfPKUItt%2bPcjKOjTGlbtk%2fRp7BdNYLiP9lyOBjXBU5PAxIX D&TARGET=http%3A%2F%2Ftools.cisco.com%2Fcpc%2F TABLE 2. POWER/COOLING ESTIMATION TOOLS Registration required

9 PAGE 9 VIII. PROPER USE OF CALCULATING TOOLS Remember that many of these vendor estimation tools are estimators. Because there are so many factors that affect power draw, it is nearly impossible to exactly match a tool to the actual results that will be seen in every data center. If more exact power or cooling planning information is needed, there is no substitute for real-time measurement using the particular system installed in a controlled fashion and running its normal workload and utilization levels. The tools may be used for electrical and cooling load planning instead of nameplate or maximum measured values, and they will yield far more accurate predictions than those derived from other estimating methods. However, detailed attention should be paid to individual server con gurations and their power systems and potential system upgrades. For example, changes to the memory con guration or additional PCI cards over the life of the server could affect the amps from an electrical circuit, the heat released, and the server air ow or deltat. Finally, when using tool estimators for data center planning and design purposes, keep in mind that while cooling systems can handle short increases in heat load in the room, an increase in amperage draw from a server that is over the limit of a circuit breaker will create a problem far more quickly. Servers can temporarily run on an increased intake air temperature, and typically a cooling system has the ability to react to that short temperature spike and provide extra cooling. If a spike in amperage draw over the circuit breaker limit occurs, that server and others around it may go down due to tripped breakers in the rack-level power distribution or in a oor PDU. Know what safety factors have been designed into your data center. Use the online tools to get good estimates for power draw and heat load, but also measure your units once installed to verify that the tools were correct. IX. SUMMARY/CONCLUSION Measuring power consumed by IT equipment provides the most accurate method for determining the power and cooling load that IT equipment places on a data center. However, vendors provide power and cooling calculators that can be used to determine a more accurate estimation of load based on hardware con guration and utilization. The Green Grid highly recommends the use of power meters and power calculators for ensuring that equipment resource infrastructures are sized properly to accommodate the actual electrical and heat loads. Due to planning calculator tools inability to re ect your speci c application, the accuracy of your planning/ deployment process can be increased by factoring in your understanding of the differences between the tools estimates and your own application-based measurements. If future capacity requirements are unknown, refer to ASHRAE 90427, Datacom Equipment Power Trends and Cooling Applications (2005) 2. In summary, using nameplate values to estimate power resource requirements or space-cooling loads can produce highly unreliable results, including substantial under-sizing (miscalculating) or over-sizing (using the label as is without understanding hardware options and equipment utilization) of electrical systems and cooling systems. Miscalculations also can result in loss of service or excessive cost of operations. The more accurate the power consumption data that can be established, the more ef cient and reliable the electrical distribution systems can be. In addition, accurate data helps improve service availability and optimize operational costs for power and cooling systems

10 PAGE 10 X. REFERENCES 1. ASHRAE 90431, Thermal Guidelines for Data Processing Environments (2004) %25datacom%25 ) 2. ASHRAE 90427, Datacom Equipment Power Trends and Cooling Applications (2005) %25datacom%25 ) 3. United States Environmental Protection Agency, Energy Star for Workstations 4. Find an ENERGY STAR Compliant Computer: nd_a_ product.showproductgroup&pgw_code=co 5. ENERGY STAR Framework Document Framework_Document pdf XI. ABOUT THE GREEN GRID The Green Grid is a non-pro t trade organization of IT professionals formed to address the issues of power and cooling in datacenters. The Green Grid seeks to de ne best practices for optimizing the ef cient consumption of power at the IT equipment and facility levels, as well as the manner in which cooling is delivered at these levels. The association is funded by four levels of membership, and activities are driven by end-user needs. The Green Grid does not endorse any vendor-speci c products or solutions but seeks to provide industry-wide recommendations on best practices, metrics, and technologies that will improve overall data center energy ef ciencies.

Increasing Data Center Efficiency by Using Improved High Density Power Distribution

Increasing Data Center Efficiency by Using Improved High Density Power Distribution Increasing Data Center Efficiency by Using Improved High Density Power Distribution By Neil Rasmussen White Paper #128 Revision 1 Executive Summary A new approach to power distribution for high density

More information

HP Power Calculator Utility: a tool for estimating power requirements for HP ProLiant rack-mounted systems

HP Power Calculator Utility: a tool for estimating power requirements for HP ProLiant rack-mounted systems HP Power Calculator Utility: a tool for estimating power requirements for HP ProLiant rack-mounted systems technology brief Abstract... 2 Introduction... 2 Key parameters... 2 Input line voltage... 2 Device

More information

Calculating Total Power Requirements for Data Centers

Calculating Total Power Requirements for Data Centers Calculating Total Power Requirements for Data Centers White Paper 3 Revision 1 by Victor Avelar > Executive summary Part of data center planning and design is to align the power and cooling requirements

More information

Dominick Lovicott Enterprise Thermal Engineering. One Dell Way One Dell Way Round Rock, Texas

Dominick Lovicott Enterprise Thermal Engineering. One Dell Way One Dell Way Round Rock, Texas One Dell Way One Dell Way Round Rock, Texas 78682 www.dell.com DELL ENTERPRISE WHITEPAPER THERMAL DESIGN OF THE DELL POWEREDGE T610, R610, AND R710 SERVERS Dominick Lovicott Enterprise Thermal Engineering

More information

Remote Management of Data Center White Space: What to Manage and How? Ashish Moondra Sr. Product Manager Chatsworth Products

Remote Management of Data Center White Space: What to Manage and How? Ashish Moondra Sr. Product Manager Chatsworth Products Remote Management of Data Center White Space: What to Manage and How? Ashish Moondra Sr. Product Manager Chatsworth Products Learning Outcomes Need for Remote Management of Whitespace Understand Elements

More information

Power and Cooling Innovations in Dell PowerEdge Servers

Power and Cooling Innovations in Dell PowerEdge Servers Power and Cooling Innovations in Dell PowerEdge Servers This technical white paper describes the Dell PowerEdge Energy Smart Architecture and the new and enhanced features designed into Dell PowerEdge

More information

Power and Cooling for Ultra-High Density Racks and Blade Servers

Power and Cooling for Ultra-High Density Racks and Blade Servers Power and Cooling for Ultra-High Density Racks and Blade Servers APC White Paper #46 Richard L. Sawyer Director of Data Center Technology American Power Conversion Company 2005 APC corporation What has

More information

Server Technology Inc.

Server Technology Inc. Server Technology Inc. Power Efficiency Gains by Deploying 415 VAC Power Distribution in North American Data Centers White Paper STI-100-008 2011-Sept-22 Headquarters Server Technology, Inc. 1040 Sandhill

More information

for Power Energy and

for Power Energy and Engineered for Power Management: Dell PowerEdge Servers Are Designed to Help Save Energy and Reduce Costs ABSTRACT Keeping up with the rising cost of energy is one of the greatest challenges facing IT

More information

DCIM Data Center Infrastructure Management

DCIM Data Center Infrastructure Management DCIM Data Center Infrastructure Management Part 3 Operational Management Moves Adds and Changes & Electrical Infrastructure November 5, 2013 Presented by Julius Neudorfer Sponsored by Today s Topics Operational

More information

Systems and Technology Group. IBM Technology and Solutions Jan Janick IBM Vice President Modular Systems and Storage Development

Systems and Technology Group. IBM Technology and Solutions Jan Janick IBM Vice President Modular Systems and Storage Development Systems and Technology Group IBM Technology and Solutions Jan Janick IBM Vice President Modular Systems and Storage Development Power and cooling are complex issues There is no single fix. IBM is working

More information

PowerExecutive. Tom Brey IBM Agenda. Why PowerExecutive. Fundamentals of PowerExecutive. - The Data Center Power/Cooling Crisis.

PowerExecutive. Tom Brey IBM Agenda. Why PowerExecutive. Fundamentals of PowerExecutive. - The Data Center Power/Cooling Crisis. PowerExecutive IBM Agenda Why PowerExecutive - The Data Center Power/Cooling Crisis Fundamentals of PowerExecutive 1 The Data Center Power/Cooling Crisis Customers want more IT processing cycles to run

More information

Data Centre Energy & Cost Efficiency Simulation Software. Zahl Limbuwala

Data Centre Energy & Cost Efficiency Simulation Software. Zahl Limbuwala Data Centre Energy & Cost Efficiency Simulation Software Zahl Limbuwala BCS Data Centre Simulator Overview of Tools Structure of the BCS Simulator Input Data Sample Output Development Path Overview of

More information

Smart Data Centres. Robert M Pe, Data Centre Consultant HP Services SEA

Smart Data Centres. Robert M Pe, Data Centre Consultant HP Services SEA Smart Data Centres Robert M Pe, Data Centre Consultant Services SEA 2006 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice Content Data center

More information

Increasing Energy Efficiency through Modular Infrastructure

Increasing Energy Efficiency through Modular Infrastructure Increasing Energy Efficiency through Modular Infrastructure This technical white paper addresses energy efficiencies created by the combination of Dell s Chassis Management Controller and modular infrastructure

More information

Avoiding Costs From Oversizing Datacenter Infrastructure

Avoiding Costs From Oversizing Datacenter Infrastructure Avoiding Costs From Oversizing Datacenter Infrastructure White Paper # 37 Executive Summary The physical and power infrastructure of data centers is typically oversized by more than 100%. Statistics related

More information

Next Generation Cooling

Next Generation Cooling Next Generation Cooling Server Manufacturer Perspective Practical and Cost Effective David Moss Data Center Strategist Dell 1 Why Chip, Row, or Rack? Density? Energy Don t be scared; I don t see 50kW/rack

More information

HP Power Capping and HP Dynamic Power Capping for ProLiant servers

HP Power Capping and HP Dynamic Power Capping for ProLiant servers HP Power Capping and HP Dynamic Power Capping for ProLiant servers Technology brief, 2 nd Edition Introduction... 3 Basics of server power control... 3 Processor P-states... 4 Clock throttling... 4 How

More information

Deploying High Power to IT Equipment Racks

Deploying High Power to IT Equipment Racks 1 Deploying High Power to IT Equipment Racks A White Paper from Raritan 2 Table of Contents Overview...3 Trends in Data Center Power Deployment...3 Drivers for High Power Racks...4 Data Center Power Distribution

More information

Dell OpenManage Power Center s Power Policies for 12 th -Generation Servers

Dell OpenManage Power Center s Power Policies for 12 th -Generation Servers Dell OpenManage Power Center s Power Policies for 12 th -Generation Servers This Dell white paper describes the advantages of using the Dell OpenManage Power Center to set power policies in a data center.

More information

Navigating the Pros and Cons of Structured Cabling vs. Top of Rack in the Data Center

Navigating the Pros and Cons of Structured Cabling vs. Top of Rack in the Data Center Navigating the Pros and Cons of Structured Cabling vs. Top of Rack in the Data Center Executive Summary There is no single end-all cabling configuration for every data center, and CIOs, data center professionals

More information

THE OFFICIAL TRADE JOURNAL OF BICSI

THE OFFICIAL TRADE JOURNAL OF BICSI ICT TODAY THE OFFICIAL TRADE JOURNAL OF BICSI January/February 2017 Volume 38, Number 1 + PLUS + Information Security and ESS in the Age of the Internet of Things + Grounding System Design and Testing

More information

Calculating Power for Cisco StackPower and the Cisco Catalyst 3750-X Series Switches

Calculating Power for Cisco StackPower and the Cisco Catalyst 3750-X Series Switches White Paper Calculating Power for Cisco StackPower and the Cisco Catalyst 3750-X Series Switches Power Allocation, Consumption, Dissipation, Reservation, and Power Supply Requirements By: José Martell

More information

Deploying High Power to IT Equipment Racks

Deploying High Power to IT Equipment Racks 2012 Raritan Inc. Table of Contents Overview Page 3 Trends in Data Center Power Deployment Page 3 Drivers for High Power Racks Page 3 Data Center Power Distribution Around the World Page 4 What Is High

More information

Bus Way vs. Cable: a CapEx comparison

Bus Way vs. Cable: a CapEx comparison Siemens.com/datacenters Bus Way vs. Cable: a CapEx comparison Positive economics characterize bus way based designs for Data Center critical power distribution White Paper November 2013 Traditionally,

More information

> Executive summary. Implementing Energy Efficient Data Centers. White Paper 114 Revision 1. Contents. by Neil Rasmussen

> Executive summary. Implementing Energy Efficient Data Centers. White Paper 114 Revision 1. Contents. by Neil Rasmussen Implementing Energy Efficient Data Centers White Paper 114 Revision 1 by Neil Rasmussen Click on a section to jump to it > Executive summary Electricity usage costs have become an increasing fraction of

More information

ENERGY STAR for Data Center Products: UPS plus Servers, Storage, and more April 24, 2012

ENERGY STAR for Data Center Products: UPS plus Servers, Storage, and more April 24, 2012 ENERGY STAR for Data Center Products: UPS plus Servers, Storage, and more April 24, 2012 Robert (RJ) Meyers Data Center Products Lead ENERGY STAR Program US Environmental Protection Agency 1 Overview Main

More information

APC APPLICATION NOTE #74

APC APPLICATION NOTE #74 #74 Configuration of InfraStruXure for Data Centers to Support Dell PowerEdge 1855 Abstract Many companies are making plans to incorporate Dell PowerEdge Blade Servers into their data center applications.

More information

Z8 G4 Site Prep Guide Table of contents

Z8 G4 Site Prep Guide Table of contents Z8 G4 Site Prep Guide Table of contents Introduction... 2 Power consumption and cooling considerations... 2 Power consumption limitations... 2 Uninterruptible power supply (UPS)... 3 Power consumption

More information

APPLYING DATA CENTER INFRASTRUCTURE MANAGEMENT IN COLOCATION DATA CENTERS

APPLYING DATA CENTER INFRASTRUCTURE MANAGEMENT IN COLOCATION DATA CENTERS APPLYING DATA CENTER INFRASTRUCTURE MANAGEMENT IN COLOCATION DATA CENTERS Table of Contents Executive Summary 3 The Colocation Market 4 An Introduction to DCIM 5 The Value of DCIM for Colocation Providers

More information

The Virtualized Server Environment

The Virtualized Server Environment CHAPTER 3 The Virtualized Server Environment Based on the analysis performed on the existing server environment in the previous chapter, this chapter covers the virtualized solution. The Capacity Planner

More information

Dell Energy Smart Solution Advisor (ESSA)

Dell Energy Smart Solution Advisor (ESSA) Dell Energy Smart Solution Advisor (ESSA) User guide and FAQ Dell ESSA helps IT professionals plan and fine-tune their computer and infrastructure equipment for maximum efficiency. Offering a wide range

More information

Meeting the Energy Efficiency and Financial Challenges in IT. Liam Newcombe BCS Data Centre Specialist Group Secretary

Meeting the Energy Efficiency and Financial Challenges in IT. Liam Newcombe BCS Data Centre Specialist Group Secretary Meeting the Energy Efficiency and Financial Challenges in IT Liam Newcombe BCS Data Centre Specialist Group Secretary Meeting the Energy and Financial Challenges in IT Recognising the Problem Recognising

More information

Energy Logic: Emerson Network Power. A Roadmap for Reducing Energy Consumption in the Data Center. Ross Hammond Managing Director

Energy Logic: Emerson Network Power. A Roadmap for Reducing Energy Consumption in the Data Center. Ross Hammond Managing Director Energy Logic: A Roadmap for Reducing Energy Consumption in the Data Center Emerson Network Power Ross Hammond Managing Director Agenda Energy efficiency Where We Are Today What Data Center Managers Are

More information

Dynamic Power Capping TCO and Best Practices White Paper

Dynamic Power Capping TCO and Best Practices White Paper Dynamic Power Capping TCO and Best Practices White Paper Executive Summary... 2 Introduction... 2 Poor Power Planning Results in Trapped Power Capacity... 2 Thermal Logic and Dynamic Power Capping Reclaim

More information

HP Uninterruptible Power Supplies Overview

HP Uninterruptible Power Supplies Overview NOTE: Additional information on these and additional HP UPS products at: http://h18004.www1.hp.com/products/servers/proliantstorage/power-protection/index.html Description HP rack mountable UPSs, designed

More information

Cisco EnergyWise Optimize and Cost Saving. Traditional IT Power Management

Cisco EnergyWise Optimize and Cost Saving. Traditional IT Power Management Cisco EnergyWise Introduction In response to energy costs, environmental concerns, and government directives, there is an increased need for sustainable and green business IT operations. Methods to measure

More information

How much power?! Data Centre Efficiency. How much Money?! Carbon Reduction Commitment (CRC)

How much power?! Data Centre Efficiency. How much Money?! Carbon Reduction Commitment (CRC) How much power?! Data Centre Efficiency The US EPA found in 2006 data centres used 1.5% of total US consumption (5) For Bangor University data centres use approximately 5-10% of the total university electricity

More information

Power distribution solutions for the ProLiant DL580 G2 server

Power distribution solutions for the ProLiant DL580 G2 server Power distribution solutions for the ProLiant DL580 G2 server Introduction... 2 Symbols in text... 2 Executive summary... 2 Glossary... 2 ProLiant DL580 G2 server power requirements... 3 Power distribution

More information

The Efficient Enterprise. All content in this presentation is protected 2008 American Power Conversion Corporation

The Efficient Enterprise. All content in this presentation is protected 2008 American Power Conversion Corporation Ee The Efficient Enterprise All content in this presentation is protected 2008 American Power Conversion Corporation Keystrokes Kilowatts Heat OUT Electricity IN Need for bandwidth exploding Going hyperbolic!

More information

ELASTIC CLOUD STORAGE (ECS) APPLIANCE

ELASTIC CLOUD STORAGE (ECS) APPLIANCE Specification Sheet ELASTIC CLOUD STORAGE (ECS) APPLIANCE Dell EMC Elastic Cloud Storage (ECS ) Appliance is a multi-purpose, software-defined cloud-storage platform. This 3rd Generation object-based solution

More information

ASHRAE Data Center Standards: An Overview

ASHRAE Data Center Standards: An Overview Mission Critical Facilities ASHRAE Data Center Standards: An Overview 10012 North Dale Mabry Highway Suite 109 Tampa, FL 33618 813-792-6009 www.pergravis.com Presenter: Steve Ritzi, CDCE Pergravis is a

More information

Tech Byte 20: The Benefits of Power Switching in Dual Bus UPS Designs

Tech Byte 20: The Benefits of Power Switching in Dual Bus UPS Designs Introduction Dual bus uninterruptible power supply architectures have long been recognized as the preferred redundancy design for supporting mission critical applications. However, a dual bus design represents

More information

The Basics of Selecting Rack-Mount Power Distribution Units (PDUs) and Power Strips

The Basics of Selecting Rack-Mount Power Distribution Units (PDUs) and Power Strips WHITE PAPER The Basics of Selecting Rack-Mount Power Distribution Units (PDUs) and Power Strips By David Knapp Product Marketing Manager Chatsworth Products (CPI) Published: January 2019 US & Canada +1-800-834-4969

More information

A Dell Technical White Paper Dell

A Dell Technical White Paper Dell Which UPS is Right for the Job? A Dell Technical White Paper Dell THIS WHITE PAPER IS FOR INFORMATIONAL PURPOSES ONLY, AND MAY CONTAIN TYPOGRAPHICAL ERRORS AND TECHNICAL INACCURACIES. THE CONTENT IS PROVIDED

More information

Where s the Heat Coming From. Leland Sparks Global Account Technical Consultant Belden

Where s the Heat Coming From. Leland Sparks Global Account Technical Consultant Belden Where s the Heat Coming From Leland Sparks Global Account Technical Consultant Belden What is the greatest DC challenge you face? Air Flow to Heat Load Relation Server Inlet Fans Chips Outlet LOAD Dell

More information

Reducing Data Center Cooling Costs through Airflow Containment

Reducing Data Center Cooling Costs through Airflow Containment FEATURE Reducing Data Center Cooling Costs through Airflow Containment Implementing a containment solution in the data center costs much less than the alternatives of adding air handlers or other supplemental

More information

Highly Efficient Power Protection for High Density Computing Applications

Highly Efficient Power Protection for High Density Computing Applications Highly Efficient Power Protection for High Density Computing Applications IB Power and Cooling Symposium Lennart Jonsson Eaton Corporation 2007 Eaton Corporation. All rights reserved. Impact of High Density

More information

EMC Symmetrix DMX-3 and DMX-4 Electrical Power Estimation and Configuration Planning

EMC Symmetrix DMX-3 and DMX-4 Electrical Power Estimation and Configuration Planning EMC Symmetrix DMX-3 and DMX-4 Electrical Power Estimation and Configuration Planning A Detailed Review Abstract This white paper provides a detailed description of the EMC Symmetrix DMX-3 and DMX-4 power

More information

SmartMod Intelligent, Integrated Infrastructure for the Data Center

SmartMod Intelligent, Integrated Infrastructure for the Data Center SmartMod Intelligent, Integrated Infrastructure for the Data Center Deploy a High-Capacity, Efficient and Secure Infrastructure in Just Months Building a new data center in a short timeframe is nearly

More information

How High Temperature Data Centers & Intel Technologies save Energy, Money, Water and Greenhouse Gas Emissions

How High Temperature Data Centers & Intel Technologies save Energy, Money, Water and Greenhouse Gas Emissions Intel Intelligent Power Management Intel How High Temperature Data Centers & Intel Technologies save Energy, Money, Water and Greenhouse Gas Emissions Power savings through the use of Intel s intelligent

More information

Green IT. Finding Practical Efficiencies. Infrastructure Planning and Facilities. Green IT: Finding Practical Efficiencies

Green IT. Finding Practical Efficiencies. Infrastructure Planning and Facilities. Green IT: Finding Practical Efficiencies Green IT Finding Practical Infrastructure Planning and Facilities Dan Francis dfrancis@ipf.msu.edu David Graff dsgraff@ipf.msu.edu William Lakos wjlakos@ipf.msu.edu 1 2 MSU Historical Energy Efficiency

More information

E-Series Site Preparation Guide

E-Series Site Preparation Guide E-Series Site Preparation Guide September 2017 215-11797_A0 doccomments@netapp.com Table of Contents 3 Contents Deciding whether to use this guide... 10 Specifications of the model 3040 40U cabinet...

More information

Polar PDUs POWER MANAGEMENT

Polar PDUs POWER MANAGEMENT Polar Power Distribution Units (PDUs) provide the ultimate solution for combining cabinet level power management, environmental monitoring, and cabinet access control in multi-tenant and enterprise data

More information

Liebert. APM from 30 to 300 kw. The Compact Row Based UPS With FlexPower Technology

Liebert. APM from 30 to 300 kw. The Compact Row Based UPS With FlexPower Technology Liebert APM from 30 to 300 kw The Compact Row Based UPS With FlexPower Technology LIEBERT APM from 30 to 300 kw Vertiv Vertiv designs, builds and services mission critical technologies that enable the

More information

Reliable Power and Thermal Management in The Data Center

Reliable Power and Thermal Management in The Data Center Reliable Power and Thermal Management in The Data Center Deva Bodas Corporation April 19, 2004 Deva.Bodas@.com 1 Agenda 2 Data center manageability challenges & trends Current state of power & thermal

More information

PLAYBOOK. How Do You Plan to Grow? Evaluating Your Critical Infrastructure Can Help Uncover the Right Strategy

PLAYBOOK. How Do You Plan to Grow? Evaluating Your Critical Infrastructure Can Help Uncover the Right Strategy PLAYBOOK F O R C H A N G E How Do You Plan to Grow? Evaluating Your Critical Infrastructure Can Help Uncover the Right Strategy The world is becoming more digital every day. The demand for feature-rich,

More information

Liebert GXT3 5kVA-10kVA UPS Compact UPS Systems For High Power Network Rack Applications. AC Power For Business-Critical Continuity

Liebert GXT3 5kVA-10kVA UPS Compact UPS Systems For High Power Network Rack Applications. AC Power For Business-Critical Continuity Liebert GXT3 5kVA-10kVA UPS Compact UPS Systems For High Power Network Rack Applications AC Power For Business-Critical Continuity Liebert GXT3, 5kVA-10kVA UPS Systems: Big Protection, Small Package Today

More information

Planning a Green Datacenter

Planning a Green Datacenter Planning a Green Datacenter Dr. Dominique Singy Contribution to: Green IT Crash Course Organisator: Green IT Special Interest Group of the Swiss Informatics Society ETH-Zurich / February 13, Green Data

More information

The HP BladeSystem p-class 1U power enclosure: hot-plug, redundant power for a server blade enclosure

The HP BladeSystem p-class 1U power enclosure: hot-plug, redundant power for a server blade enclosure The HP BladeSystem p-class 1U power enclosure: hot-plug, redundant power for a server blade enclosure technology brief Abstract... 3 Introduction... 3 Components of the enclosure... 3 Hot-plug, redundant

More information

Implementation considerations for cabling supporting remote powering

Implementation considerations for cabling supporting remote powering Implementation considerations for cabling supporting remote powering Table of contents Background...3 Advantages of remote powering using communications cabling...4 CommScope implementation considerations

More information

84 kw, Tier 3, Direct Expansion, 937 ft 2

84 kw, Tier 3, Direct Expansion, 937 ft 2 [Reference Design 42] 84 kw, Tier 3, Direct Expansion, 937 ft 2 DESIGN OVERVIEW Data Center IT Capacity 84 kw Target Availability Tier 3 Annualized PUE at 100% Load 1.712 Total Racks and Average Density

More information

Cooling. Highly efficient cooling products for any IT application. For More Information: (866) DATA CENTER SOLUTIONS

Cooling. Highly efficient cooling products for any IT application. For More Information: (866) DATA CENTER SOLUTIONS Cooling > Highly efficient cooling products for any IT application. DATA CENTER SOLUTIONS For More Information: (866) 787-3271 Sales@PTSdcs.com End-to-End Cooling Solutions from the Closet to the Data

More information

Server Technology, Inc.

Server Technology, Inc. Server Technology, Inc. Planning, Implementing and Application of Cabinet Power Distribution Units White Paper STI-100-007 Headquarters Server Technology, Inc. 1040 Sandhill Drive Reno, NV 89521 United

More information

Rack Power Distribution. Rack power distribution offerings for entry-level networking equipment and high-density server and blade environments

Rack Power Distribution. Rack power distribution offerings for entry-level networking equipment and high-density server and blade environments Rack Power Distribution Rack power distribution offerings for entry-level networking equipment and high-density server and blade environments Wiring Closet/Server Rooms IP Telephony High Density Small/Medium

More information

APC APPLICATION NOTE #114

APC APPLICATION NOTE #114 APPLICATION NOT #4 Using the Rack Air Containment System with the InfraStruXure InRow SC By David Roden Abstract The InfraStruXure InRow SC (ACSC00 and ACSC0) is a self-contained air conditioner for server

More information

Server room guide helps energy managers reduce server consumption

Server room guide helps energy managers reduce server consumption Server room guide helps energy managers reduce server consumption Jan Viegand Viegand Maagøe Nr. Farimagsgade 37 1364 Copenhagen K Denmark jv@viegandmaagoe.dk Keywords servers, guidelines, server rooms,

More information

Combining Cold Aisle Containment with Intelligent Control to Optimize Data Center Cooling Efficiency

Combining Cold Aisle Containment with Intelligent Control to Optimize Data Center Cooling Efficiency A White Paper from the Experts in Business-Critical Continuity TM Combining Cold Aisle Containment with Intelligent Control to Optimize Data Center Cooling Efficiency Executive Summary Energy efficiency

More information

Data Sheet FUJITSU Server PRIMERGY CX400 M1 Scale out Server

Data Sheet FUJITSU Server PRIMERGY CX400 M1 Scale out Server Data Sheet FUJITSU Server Scale out Server Data Sheet FUJITSU Server Scale out Server Scale-Out Smart for HPC, Cloud and Hyper-Converged Computing FUJITSU Server PRIMERGY will give you the servers you

More information

Data Center Infrastructure Management (D.C.I.M.)

Data Center Infrastructure Management (D.C.I.M.) Data Center Infrastructure Management (D.C.I.M.) Garies Chong, RCDD, DCDC. BICSI Southeast Asia District Chair Managing Director of EMS Wiring Systems Pte Ltd Data Center Infrastructure Management (D.C.I.M.)

More information

ENERGY STAR for Computer Servers Version 1.0

ENERGY STAR for Computer Servers Version 1.0 ENERGY STAR for Computer Servers Version 1.0 Nick Gruendler Senior Technical Staff Member Power and Energy Initiatives ENERGY STAR Program Is a joint program of the US Environmental Protection Agency (EPA)

More information

Power Distribution. For technical support call Online catalog available at leviton.com 461

Power Distribution. For technical support call Online catalog available at leviton.com 461 INDEX FLX Series... 463 Switched Series... 464 Metered Series... 465 P1000 Series... 466 5500 & 5505 Series... 467 4500 Series... 468 For technical support call 800-824-3005 Online catalog available at

More information

Data Sheet Fujitsu Server PRIMERGY CX400 M1 Compact and Easy

Data Sheet Fujitsu Server PRIMERGY CX400 M1 Compact and Easy Data Sheet Fujitsu Server Compact and Easy Data Sheet Fujitsu Server Compact and Easy Scale-Out Smart for HPC, Cloud and Hyper-Converged Computing The Fujitsu Server helps to meet the immense challenges

More information

ARE YOUR RACK PDUS KEEPING YOU FROM OPTIMIZING POWER MANAGEMENT?

ARE YOUR RACK PDUS KEEPING YOU FROM OPTIMIZING POWER MANAGEMENT? ARE YOUR RACK PDUS KEEPING YOU FROM OPTIMIZING POWER MANAGEMENT? 1 ARE YOU ENSURING A HIGHLY AVAILABLE, GRID-TO-CHIP POWER CHAIN? As your data processing needs increase, you re experiencing rising power

More information

Applying branch circuit breakers and supplementary protectors in North America

Applying branch circuit breakers and supplementary protectors in North America Product Application AP01102005E WMZT WMZS Applying branch circuit breakers and supplementary protectors in North America Introduction Eaton offers two types of miniature circuit breakers for use in North

More information

Liquid Cooling Package LCP Cooling Systems

Liquid Cooling Package LCP Cooling Systems Liquid Cooling Package LCP Cooling Systems 2 Rittal LCP The whole is more than the sum of its parts. The same is true of Rittal The System. With this in mind, we have bundled our innovative enclosure,

More information

G5 PDU Installation Guide

G5 PDU Installation Guide G5 PDU Installation Guide 1 Contents Before You Begin... 3 Overview... 3 Important Safety Information... 3 Required Tools... 5 Section 1 Introduction... 6 Classification Overview... 6 Features... 7 Form

More information

A Data Center Heat Removal System That Saves... 80% Discover Inertech s Award-winning Data Center Heat Removal System

A Data Center Heat Removal System That Saves... 80% Discover Inertech s Award-winning Data Center Heat Removal System A Data Center Heat Removal System That Saves... Infrastructure Power Water up to 40% up to 80% up to 85% Discover Inertech s Award-winning Data Center Heat Removal System A Cool Solution; A Breakthrough

More information

ISILON HD-SERIES. Isilon HD400 ARCHITECTURE SPECIFICATION SHEET Dell Inc. or its subsidiaries.

ISILON HD-SERIES. Isilon HD400 ARCHITECTURE SPECIFICATION SHEET Dell Inc. or its subsidiaries. SPECIFICATION SHEET ISILON HD-SERIES Isilon HD400 The rapid growth of unstructured data combined with increasingly stringent compliance requirements is resulting in a growing need for efficient data archiving

More information

Shared Infrastructure: Scale-Out Advantages and Effects on TCO

Shared Infrastructure: Scale-Out Advantages and Effects on TCO Shared Infrastructure: Scale-Out Advantages and Effects on TCO A Dell TM Technical White Paper Dell Data Center Solutions THIS WHITE PAPER IS FOR INFORMATIONAL PURPOSES ONLY, AND MAY CONTAIN TYPOGRAPHICAL

More information

Data Centre Solutions Expertly Engineered APC Management Software

Data Centre Solutions Expertly Engineered APC Management Software Data Centre Solutions Expertly Engineered APC Management Software Data Centre Solutions Expertly Engineered A vendor neutral software suite, which provides a unified view and analysis of complex IT physical

More information

APC by Schneider Electric Solutions for Cisco Unified Computing System (UCS) Blade Applications

APC by Schneider Electric Solutions for Cisco Unified Computing System (UCS) Blade Applications APC by Schneider Electric Solutions for Cisco Unified Computing System (UCS) Blade Applications The Cisco Unified Computing System is a next-generation data center platform that unites compute, network,

More information

Energy Efficiency and WCT Innovations

Energy Efficiency and WCT Innovations Energy Efficiency and WCT Innovations Zeeshan Kamal Siddiqi HPC Leader Middle East, Turkey and Africa (META) Lenovo 2017 Lenovo. All rights reserved. Why do we have a problem? Higher TDP Processors Data

More information

SMART SOLUTIONS TM INTELLIGENT, INTEGRATED INFRASTRUCTURE FOR THE DATA CENTER

SMART SOLUTIONS TM INTELLIGENT, INTEGRATED INFRASTRUCTURE FOR THE DATA CENTER SMART SOLUTIONS TM INTELLIGENT, INTEGRATED INFRASTRUCTURE FOR THE DATA CENTER Enabling Tomorrow s CRITICAL EDGE INFRASTRUCTURE We helped some of the largest names in the industry bring new capacity online

More information

Higher Availability: Self-diagnostics. Automatically tests unit electronics and batteries. Designed to simplify maintenance and troubleshooting.

Higher Availability: Self-diagnostics. Automatically tests unit electronics and batteries. Designed to simplify maintenance and troubleshooting. UPS operation and display panel can rotate 90 degrees, which provides upright viewing for users. Liebert GXT3 UPS Includes These Outstanding Features: Flexibility: Rack/tower configuration. The versatile

More information

The End of Redundancy. Alan Wood Sun Microsystems May 8, 2009

The End of Redundancy. Alan Wood Sun Microsystems May 8, 2009 The End of Redundancy Alan Wood Sun Microsystems May 8, 2009 Growing Demand, Shrinking Resources By 2008, 50% of current data centers will have insufficient power and cooling capacity to meet the demands

More information

IBM eserver Total Storage, On Demand

IBM eserver Total Storage, On Demand IBM eserver Total Storage, On Demand Bill Ott, Vice President, eserver xseries & IntelliStation Development Systems and Technology Group 10/7/2005 IBM 2Q 2005 Business Status Key Accomplishments Operational

More information

QLogic TrueScale InfiniBand and Teraflop Simulations

QLogic TrueScale InfiniBand and Teraflop Simulations WHITE Paper QLogic TrueScale InfiniBand and Teraflop Simulations For ANSYS Mechanical v12 High Performance Interconnect for ANSYS Computer Aided Engineering Solutions Executive Summary Today s challenging

More information

Site Preparation for ClearCube Installation. Rev. F

Site Preparation for ClearCube Installation. Rev. F Site Preparation for ClearCube Installation Rev. F EXECUTIVE SUMMARY Because of the centralized nature of the ClearCube architecture, installation of the system requires a certain degree of site preparation.

More information

Case Study: The design of a modern data centre Jeffrey Brindle Technical Director, HP Critical Facilities Services

Case Study: The design of a modern data centre Jeffrey Brindle Technical Director, HP Critical Facilities Services Case Study: The design of a modern data centre Jeffrey Brindle Technical Director, HP Critical Facilities Services EMEA Roll-out 2 Main Mirror UK Swindon/Newbury area (15,000m 2 ) Germany Russelsheim(main)/

More information

Two-Stage Power Distribution: An Essential Strategy to Future Proof the Data Center

Two-Stage Power Distribution: An Essential Strategy to Future Proof the Data Center Two-Stage Power Distribution: An Essential Strategy to Future Proof the Data Center Adapting to Change Concern over the pace of technology change is increasing among data center managers. This was reflected

More information

Understanding the performance of an X user environment

Understanding the performance of an X user environment Understanding the performance of an X550 11-user environment Overview NComputing s desktop virtualization technology enables significantly lower computing costs by letting multiple users share a single

More information

8205-E6C ENERGY STAR Power and Performance Data Sheet

8205-E6C ENERGY STAR Power and Performance Data Sheet 8205-E6C ENERGY STAR Power and Performance Data Sheet ii 8205-E6C ENERGY STAR Power and Performance Data Sheet Contents 8205-E6C ENERGY STAR Power and Performance Data Sheet........ 1 iii iv 8205-E6C ENERGY

More information

LCP Hybrid Efficient performance with heat pipe technology

LCP Hybrid Efficient performance with heat pipe technology LCP Hybrid Efficient performance with heat pipe technology 2 LCP Hybrid The whole is more than the sum of its parts The same is true of "Rittal The System." With this in mind, we have bundled our innovative

More information

APC APPLICATION NOTE #146

APC APPLICATION NOTE #146 #146 Hot Aisle Containment Application Guidelines and Approved Configurations By Kevin Lemke Abstract The Hot Aisle Containment System (HACS) is a modular ceiling panel and door system for use in isolating

More information

SUN CUSTOMER READY HPC CLUSTER: REFERENCE CONFIGURATIONS WITH SUN FIRE X4100, X4200, AND X4600 SERVERS Jeff Lu, Systems Group Sun BluePrints OnLine

SUN CUSTOMER READY HPC CLUSTER: REFERENCE CONFIGURATIONS WITH SUN FIRE X4100, X4200, AND X4600 SERVERS Jeff Lu, Systems Group Sun BluePrints OnLine SUN CUSTOMER READY HPC CLUSTER: REFERENCE CONFIGURATIONS WITH SUN FIRE X4100, X4200, AND X4600 SERVERS Jeff Lu, Systems Group Sun BluePrints OnLine April 2007 Part No 820-1270-11 Revision 1.1, 4/18/07

More information

Current Data Center Design. James Monahan Sept 19 th 2006 IEEE San Francisco ComSoc

Current Data Center Design. James Monahan Sept 19 th 2006 IEEE San Francisco ComSoc Current Data Center Design James Monahan Sept 19 th 2006 IEEE San Francisco ComSoc What is the biggest facility problem in your data center? 35% 30% 25% 20% 15% Series1 10% 5% 0% Excessive heat Insufficient

More information

European Union Code of Conduct for Data Centres. Liam Newcombe BCS DCSG

European Union Code of Conduct for Data Centres. Liam Newcombe BCS DCSG European Union Code of Conduct for Data Centres Liam Newcombe BCS DCSG Development Best Practice Intent Expected Practices Application Examples Questions Development Formally commenced at the March 2008

More information

The Thin Client Operational Cost Advantage

The Thin Client Operational Cost Advantage CANDIS GROUP LTD www.candisgroup.com White Paper Series: # 15062009, June 2009 The Thin Client Operational Cost Advantage Richard Ford rford@candisgroup.com Keywords: operational-costs server-based-computing

More information

Rack Powering Options for High Density

Rack Powering Options for High Density Rack Powering Options for High Density White Paper 29 Revision 7 by Neil Rasmussen > Executive summary Alternatives for providing electrical power to high density racks in data centers and network rooms

More information