1 Request for Proposals Backup and Recovery Issued September 4, 2018 Table of Contents Page Background I. MARC Organizational Structure and Activities... 1 II. Objectives... 1 III. Current Backup and Recovery System... 2 IV. Desired System... 3 V. Required/Desired Features... 3 VI. Vendor Requirements... 4 Scope of Work... 4 Proposal Requirements... 4 Questions... 6 Response Requirements... 6 Anticipated Schedule for Vendor Selection... 7 Evaluation Criteria... 7 Open Records Act and Proprietary Information... 7 Protest Procedure... 8 Appendix A Proposed Plan by MARC Consultant... 9 Closing Date and Time for Proposals October 4, 2018, by 4 pm CDT Contact Information Sasan Baharaeen, Information Technology Program Director, sasan@marc.org
2 Background I. MARC Organizational Structure and Activities The Mid-America Regional Council (MARC) is the metropolitan planning organization and association of city and county governments serving the bi-state Kansas City region. It is a public, nonprofit agency. MARC serves nine counties with 119 cities, including Cass, Clay, Jackson, Platte and Ray counties in Missouri; and Johnson, Leavenworth, Miami and Wyandotte counties in Kansas. MARC was formed in 1972 and is governed by a 33-member board of directors composed of city and county elected officials. In addition to the board, MARC has dozens of policy, technical and advisory committees and decision-making entities overseeing its work and providing important and diverse stakeholder involvement. This series of committees and working groups enables MARC to engage a diverse array of community interests and representatives from often under-represented constituencies. The Board and committee activities are supported by a professional staff headed by an executive director who is appointed by the Board. MARC currently has 130+ employees working in six departments: aging and adult services, community development, early learning, research services, financial affairs, and transportation and environment. MARC services are funded by a variety of sources including contributions by member governments; formula and discretionary grants from Missouri, Kansas, and the federal government; and contributions for specific programs from private foundations and civic organizations. II. Objectives MARC is planning to replace its current tape-based backup system and IT Disaster Recovery plan by implementing a fully functional cloud storage, backup, and recovery solution based on the Microsoft Azure platform. MARC engaged an IT consultant to perform a study of its backup and recovery process in 2017 and was provided with a recommended solution and action plan that would meet MARC s Recovery Time Objectives (RTO) and Recovery Point Objectives (RPO). 1
3 III. Current Backup and Recovery System MARC currently operates with a mixture of physical and virtual servers. There is a heavy investment in the Microsoft Stack. The majority of workloads depend on a Microsoft product as well as Microsoft virtualization through Hyper-V. MARC uses an HP tape library (HP MSL2024) and the Veritas BackupExec software to perform complete weekly and incremental daily backups of all its data on tapes. We keep 20 sets of weekly backups and two sets of annual backups. One set is always kept off-site. There are off-site recovery capabilities available to MARC through a service provided by Agility Recovery. The service provides trailers, generators, servers, an LTO tape library, and satellite Internet connectivity, but there is a lengthy and complicated process involved with activating the services. The following is a description of MARC s network and data storage. Virtualization: Virtual Hosts: Microsoft Hyper-V Host 1 Windows 2016 Datacenter, 256GB RAM (198 GB allocated to VMs), 22TB storage (13TB free). Hosts 18 Virtual Machines. Host 2 Windows 2012R2 Datacenter, 128GB RAM (97 GB allocated to VMs), 10TB storage (3.6TB free). Hosts 11 Virtual Machines. Virtual Replicator: Domain Controllers: Physical Servers: Replicator 1 Windows 2016 Datacenter, 56GB RAM, 9TB storage (5TB free). One physical and one virtual. Backup/Print server, VPN server (will be changed to virtual), GIS server (will be retired), Accounting Report server, Computer Lab server, Phone server. Firewall: SonicWall NSA 4600 Switches: Ruckus ICX 7150 managed POE Internet Connectivity: 1G Google fiber (primary), 50M AT&T Business fiber (secondary) Backup: Weekly full backup size 6TB Weekly physical server image backup size 2TB Weekly virtual server backup size 4.5TB Daily implemental backup size 150GB to 500 GB 2
4 Phone System: Avaya IP Office w/ Application Server. This is the only server running Linux and VMware. Workstations: HP desktop and notebooks (most running Windows 10). Software: Website: Office 365 Enterprise (backup provided by Barracuda Essentials), Microsoft Dynamic GP Accounting, Ungerboeck EBMS contact management and event registration software. Hosted on a private cloud using Amazon Web Services by a third party. IV. Desired Systems The desired solution should combine on-site and cloud storage through Microsoft Azure to provide storage, backup, and recovery functionality. V. Required/Desired Features The following is a list of required functionality for the new system. Easy/intuitive interface and management. Ability to quickly restore a deleted file/folder or restore an older version of a file. Ability to quickly restore a virtual server. Ability to restore a physical server to a replacement physical server. Ability to recover from Ransomware. Ability to backup machines with different operating systems (Windows and Linux). Provide continued functionality in the event of a power loss from outside the network. Provide continued functionality in the event of a disaster that limits access to the building for a short or extended time period. Flexible, Hardware-Agnostic replication. Service Level Agreement specifying Recovery Time Objectives and Recovery Point Objective. Geodiversity of replication hardware. Strong security. Ability to perform semiannual or annual failover testing. Detailed documentation of required steps for proper backup and recovery. Ability to meet HIPPA, FERPA (Family Educational Rights and Privacy Act) requirements. Ability to meet CIS (Center for Internet Security) standards. Ability to perform searches on archived files in the event of a legal requirement. 3
5 VI. Vendor Requirements The vendor should: Assign Microsoft and Azure-certified engineers to the project. Be able to provide service after hours if necessary. Scope of Work Work with MARC staff to review current network infrastructure and stored data to provide detailed requirements for a successful Azure implementation. This includes any changes that should be made to the internal network. Review the proposed backup and recovery plan developed by our consultant and recommend any possible changes. Recommend, install, and configure all required hardware for the plan. MARC intends to purchase any required equipment and software. The selected vendor may provide its own pricing for the equipment/software, but MARC may consider other vendors for purchasing the equipment. Set up all required infrastructure on Microsoft Azure for successful backup and full recovery processes. Provide administrator training for MARC IT staff during regular business hours. The IT staff should be able to manage daily processes and file restore functionality on their own. Configure, schedule, and provide encrypted backup management of all the data including, but not limited to: files, folders, images, system state, databases, and enterprise applications. Optimize the backup process in terms of time, space, and minimal disruption to the production environment. Help MARC staff develop a Backup and Disaster Recovery documentation/guideline, including fully annotated diagrams to use for daily operations and during an emergency. The guidelines should include processes for different types of emergencies. Perform failover testing. Proposal Requirements Company Information o List your company s legal name, address, and telephone number. o How long has your company been in business? o How long has your company or division been providing on-premises and cloud backup and recovery solutions? o Indicate if you have a partnership with Microsoft, HP, and SonicWall and describe the level of your partnership. o Do you install the equipment or use subcontractors? o How many employees do you have? o How many Microsoft, SonicWall, and VMware certified engineers do you have on staff? How many have certifications in Azure Backup and Recovery? o If you have to modify the existing plan proposed by our previous consultant, explain why your proposed solution is a better fit for our agency. 4
6 Vendor References o Provide a minimum of three (3) references for customers with operations similar to ours that use the equipment and technology being proposed. Include contact names, telephone numbers, and addresses. The solution must be in full production use. Product Requirements o Provide product descriptions and manufacturer part numbers for the proposed equipment. o Provide a spreadsheet of the Required features included in this RFP and describe how your proposal meets those requirements. o Provide IT network requirements. o Include a diagram and describe the proposed system design and required rack space. Installation Service and Maintenance o Explain details of the installation plan. o Provide a complete service and warranty agreement detailing your response time for routine maintenance work, occasional technical issues, and emergencies. Disaster Recovery o Provide a separate section to discuss how your proposal handles the recovery process for disasters caused by: Malfunctioning equipment Ransomware Loss of power Loss of access to the building Destruction of building Project Plan o Provide a detailed Project Plan/Schedule which documents all activities and timelines associated with the project including, but not limited to: Services ordered, including any required on-site equipment Solution design and configuration Timelines for system administration training On-site installation of any required equipment Testing and acceptance On-site and remote post implementation support o It is anticipated that the consultant should be able to complete the project within a 30- to 45-day timeframe. Pricing o Include separate pricing for: Any required equipment Hourly rates for out of contract work Any other fees 5
7 o Include part and model numbers for all proposed equipment. o Any travel expenses during or after the implementation if physical presence is required by MARC. o All costs associated with responding to this RFP are the sole responsibility of the responding vendor. o MARC has a 501C3 designation and also qualifies for GSA pricing. The 501C3 designation qualifies MARC for a $5,000 credit per year from Microsoft. Questions All questions regarding this Request for Proposals (RFP) should be directed to Sasan Baharaeen by at sasan@marc.org by September 20, Responses to questions will be provided to all interested parties by September 27, Response Requirements Responses to this Request for Proposals should be directed to Sasan Baharaeen NO LATER THAN 4 p.m. CDT on October 4, Responses can be submitted in print or electronic formats. Printed responses should be delivered to: Sasan Baharaeen Mid-America Regional Council 600 Broadway, Suite 200 Kansas City, MO Electronic submittals should be ed in PDF format to Sasan Baharaeen at sasan@marc.org. Note: It is the responsibility of the vendor to verify the receipt of proposals or any related electronic communication by MARC staff as there is always the possibility of s getting blocked by MARC s firewall/spam filter. Engagement This Request for Proposals does not commit MARC to award a contract or to pay costs incurred in the preparation of a proposal in response to this request. MARC reserves the right to accept or reject any or all responses received as a result of this request if it is considered in the best interest of MARC. MARC may require the proposer selected to participate in negotiations, and to submit such price, technical or other information as may be needed to finalize a particular engagement for services. 6
8 Anticipated Schedule for Vendor Selection REQUEST FOR PROPOSALS The following schedule will be used for the selection of a vendor. Issue Request for Proposals September 4, 2018 Deadline for Questions and Requests for Further Information September 20, 2018 Responses to Questions September 27, 2018 Deadline for Proposals October 4, 2018, by 4 pm CDT Select Preferred Vendor October 22, 2018 Finalize Agreement and Issue Notice to Proceed Week of October 25 We encourage vendors to make site survey appointments with the MARC IT staff. Evaluation Criteria The proposals submitted by each vendor will be evaluated by an internal committee of MARC staff according to the following factors: A. Technical a. Experience and expertise b. Effective demonstration of similar projects B. Quality, reliability, completeness, and efficiency of the technical approach and the degree it uses existing MARC equipment and infrastructure. C. Physical presence in the Kansas City metropolitan area D. Ability to complete the project in a timely manner E. Price During the evaluation process, MARC staff reserves the right, where it may serve MARC's best interest, to request additional information or clarification from proposers or to allow corrections of errors or omissions. Open Records Act and Proprietary Information The Mid-America Regional Council (MARC) is a public organization and is subject to the Missouri Open Records Act (Chapter 610, RSMo). All records obtained or retained by MARC are considered public records and are open to the public or media upon request unless those records are specifically protected from disclosure by law or exempted under the Missouri Sunshine Law. All contents of a response to a Request for Bids, Qualifications, Proposals or information issued by MARC are considered public records and subject to public release following decisions by MARC regarding the bid request. If a proposer has information that it considers proprietary, a bidder shall identify documents or portions of documents it considers to contain descriptions of scientific and technological innovations in which it has a proprietary interest, or other information that is protected from public disclosure by law, which is contained in a Proposal. 7
9 After either a contract is executed pursuant to the Request for Bids, RFQ or RFP, or all submittals are rejected, if a request is made to inspect information submitted and if documents are identified as Proprietary Information as provided above under Missouri Sunshine Law, MARC will notify the proposer of the request for access, and it shall be the burden of the proposer to establish that those documents are exempt from disclosure under the law. Protest Procedures In the course of this solicitation for proposals and the selection process, a proposer (bidder of offer or whose direct economic interest would be affected by the award of the contract) may file a protest when in the proposer s opinion, actions were taken by MARC staff and /or the selection committee which could unfairly affect the outcome of the selection procedure. All protests should be in writing and directed to Mr. David Warm, Executive Director, Mid-America Regional Council, 600 Broadway, Suite 200, Kansas City, MO Protest should be made immediately upon occurrence of the incident in question but no later than three (3) days after the proposer receives notification of the outcome of the selection procedure. The protest should clearly state the grounds for such a protest. Upon receipt of the protest, MARC s Executive Director will review the actual procedures followed during the selection process and the documentation available. If it is determined the action(s) unfairly changed the outcome of the process, notifications with the selected proposer will cease until the matter is resolved. 8
10 Appendix A Proposed plan by MARC consultant 9
11 BACKUP AND DISASTER RECOVERY RECOMMENDATION 1. Microsoft Backup and Azure Site Recovery A. Overview: 1) Includes the ability to both backup and restore locally as well as within the MS Azure cloud services. 2) Creates a great way for MARC to test the grounds with cloud services. 3) Creates a simple approach to full migration to the cloud, if MARC chooses to go that direction in the future. 4) Substantially improved RTO and RPO capabilities over existing solution while at the same time maintaining the current DR/BCP budget. 5) Service Provider (Microsoft) managed DR site. Includes facilities, cooling, security, networking, storage, compute, etc. 6) Capable of easily expanding the solution to other locations and services. B. Estimated Expense Breakdown: $20k - Local Hyper-V host for both backups as well as restoration of files and full servers to either original production location or backup hypervisor. $13k/year estimated Azure cloud storage costs $3k + $200/m Network failover capabilities provides by Cisco virtual appliance and onsite router $10k estimated implementation costs for solution Total first year = $46k Each remaining year = $15.6k Estimated average annual costs = $21.6k NOTE: estimates were generated with an estimated RTO of 30 min, RPO of 1day and a retention of 45 days. 10
12 C. General Design Docs Solution includes both local backups to a MS Hyper-V Host as well as replication jobs for offsite backups to a MS Azure cloud service. Also included in this solution is an IP WAN mobility solution to assist with access to services in an automated fashion when services are provided from the Azure virtual DR site. 11
13 D. Network Failover to Azure In order to address the manual requirements of updating IP addressing, DNS, and the like. We recommend the implementation of an IP WAN mobility solution such as Cisco s OTV. This can be accomplished within Azure by Implementing the following: i) Small Cisco Azure supported virtual appliance - ~$200/m ii) Small Cisco OTV supported router on site - ~$3k 12
City of North Kansas City Request for Proposals Microsoft Office 365
City of North Kansas City Request for Proposals Microsoft Office 365 Project Overview The City of North Kansas City, Missouri is soliciting proposals to contract with a vendor to assist the City in the
More informationRequest for Proposal. I. Introduction. II. Scope of Work. IT Managed Services Support. IT Environment. Main Facility
Request for Proposal IT Managed Services Support I. Introduction The Hoh Indian Tribe ( Tribe or Hoh Tribe ) is located in western Washington State in Jefferson County, 28 miles South of Forks, Washington.
More informationICBA Migration to IaaS Cloud Platform REQUEST FOR PROPOSAL
INTERNATIONAL CENTER FOR BIOSALINE AGRICULTURE ICBA Migration to IaaS Cloud Platform REQUEST FOR PROPOSAL Imane Boujidane Procurement Officer +971 4 336 1100 ext. 201 i.boujidane@biosaline.org.ae International
More informationKansas City s Metropolitan Emergency Information System (MEIS)
Information- Sharing Interagency Cooperation Resources Management Law Enforcement Fire Emergency Medical Services Public Health Private Sector Kansas City s Metropolitan Emergency Information System (MEIS)
More informationRequest for Proposal for Technical Consulting Services
Request for Proposal for Technical Consulting Services The Node.js Foundation is requesting proposals from highly qualified consultants with demonstrated expertise in providing Node.js technical consultation
More informationGreat Northern Corporation Request for Proposal for Network Server Installation and Service
Great Northern Corporation Request for Proposal for Network Server Installation and Service Background Purpose The purpose of this Request for Proposal (RFP) is to invite prospective vendors to submit
More informationCITY OF MONTEBELLO SYSTEMS MANAGER
CITY OF MONTEBELLO 109A DEFINITION Under general administrative direction of the City Administrator, provides advanced professional support to departments with very complex computer systems, programs and
More informationVirtual Server Service
ITS Service Level Agreement February 2016 Virtual Server Service What is a Virtual Server? A virtual server (also known as a virtual machine ) is a server that runs on shared physical equipment. Usually,
More informationREQUEST FOR PROPOSALS
REQUEST FOR PROPOSALS The City of Somerset is requesting proposals for migration to, and implementation of, the Office 365 hosted environment for its Exchange email system and the full suite of existing
More informationADDENDUM 1 April 13, 2018 Request for Proposals: Professional Services for Server Backup Solution
Following are the questions submitted on or before April 6, 2018, in accordance with RFP specifications. All questions are published verbatim as received, without regard to errors in spelling, punctuation,
More informationSECTION 10 CONTRACTING FOR PROFESSIONAL SERVICES CONSULTANT COMPETITIVE NEGOTIATION ACT (CCNA)
SECTION 10 CONTRACTING FOR PROFESSIONAL SERVICES CONSULTANT COMPETITIVE NEGOTIATION ACT (CCNA) 10.0 INTRODUCTION The purpose of this procedure is to provide guidance for hiring professional firms for architectural,
More informationRequest for Qualifications for Audit Services March 25, 2015
Request for Qualifications for Audit Services March 25, 2015 I. GENERAL INFORMATION A. Purpose This Request for Qualifications (RFQ) is to solicit a CPA firm with which to contract for a financial and
More informationSERVICE DESCRIPTION MANAGED BACKUP & RECOVERY
Contents Service Overview.... 3 Key Features... 3 Implementation... 4 Validation... 4 Implementation Process.... 4 Internal Kick-Off... 4 Customer Kick-Off... 5 Provisioning & Testing.... 5 Billing....
More informationVMware vcloud Air Accelerator Service
DATASHEET AT A GLANCE The VMware vcloud Air Accelerator Service assists customers with extending their private VMware vsphere environment to a VMware vcloud Air public cloud. This Accelerator Service engagement
More informationREQUEST FOR PROPOSALS Mobile Application for Public Health Surveillance
TABLE OF CONTENTS: REQUEST FOR PROPOSALS Mobile Application for Public Health Surveillance Part I. Overview Information Part II. Full Text of Announcement Section I. Funding Opportunity Description 1.
More informationVersion v November 2015
Service Description HPE Quality Center Enterprise on Software-as-a-Service Version v2.0 26 November 2015 This Service Description describes the components and services included in HPE Quality Center Enterprise
More informationRequest for Proposals (RFP) IT Infrastructure Upgrade & Storage Solution January 26, 2017 Proposal Deadline: February 8, 2017
Request for Proposals (RFP) IT Infrastructure Upgrade & Storage Solution January 26, 2017 Proposal Deadline: February 8, 2017 I. Overview Tipton County Government is seeking an IT Infrastructure Upgrade
More informationarcserve r16.5 Hybrid data protection
arcserve r16.5 Hybrid data protection Whether you re protecting the data center, remote offices or desktop resources, you need a solution that helps you meet today s demanding service-level agreements
More informationSolution Pack. Managed Services Virtual Private Cloud Managed Database Service Selections and Prerequisites
Solution Pack Managed Services Virtual Private Cloud Managed Database Service Selections and Prerequisites Subject Governing Agreement Term DXC Services Requirements Agreement between DXC and Customer
More informationNew Jersey LFN Packet Check List
New Jersey LFN 2012-10 Packet Check List Contract Documents Screenshot Page from solicitation that indicates Lead Agency and issuance of solicitation on behalf of themselves, U.S. Communities and agencies
More informationREQUEST FOR PROPOSALS Rolling Plains Management Corporation Request for Proposal Cellular Phone Services
REQUEST FOR PROPOSALS Rolling Plains Management Corporation Request for Proposal Cellular Phone Services INQUIRIES AND PROPOSALS SHOULD BE DIRECTED TO: Lezlie Carroll Transportation Director Or Keren Whitney
More informationServeRestore Service Description
ServeRestore Service Description... 2 ServeRestore Service Options... 2 ServeRestore Service Limitations... 2 ServeRestore Implementation Plan and Timeline... 4 ServeRestore Disaster Recovery Process...
More informationTENDER 10/2017 Installation and Supply of Data Center Hyper-Converged Infrastructure. Requirement Specification Document
TENDER 10/2017 Installation and Supply of Data Center Hyper-Converged Infrastructure Requirement Specification Document Closing Date: 17 November 2017 TENDER No. 10/2017 Installation and Supply of Data
More informationUniversity Information Technology Data Backup and Recovery Policy
University Information Technology Data Backup and Recovery Policy I. Purpose and Scope A. The purpose of this policy is to document the University of Utah Information Technology (UIT) data backup and recovery
More information02/14/2017 ADDENDUM # 1. RFP : Managed Service Provider for IT Infrastructure. Provide answers to Managed Service Provider questions.
02/14/2017 ADDENDUM # 1 RFP 17-031: Managed Service Provider for IT Infrastructure Addendum #1 is being issued to: Provide answers to Managed Service Provider questions. Proposers shall sign this Addendum
More informationPHILADELPHIA GAS WORKS
Q1 Q2 Q3 Q4 QUESTIONS Regarding section 2.2.1 Hosting Services. The last bullet on page 6 states Primary Data center facility to be located in Philadelphia. Does this just confirm that PGW already has
More informationAnna Independent School District
Anna Independent School District 501 S. Sherley Avenue Anna Texas 75409 www.annaisd.org Phone: 972-924-1000 Fax: 972-924-1001 Request for Proposals (RFP) Spring 2015 Computer Hardware Refresh The Technology
More informationLincoln County, Georgia. Office 365 & Antivirus
Lincoln County, Georgia November 16, 2018 Office 365 & Antivirus Invitation for Bid RFP 18-006 The Lincoln County Board of Commissioners is requesting bids for migration to, and implementation of, the
More informationOUTDATED. Policy and Procedures 1-12 : University Institutional Data Management Policy
Policy 1-16 Rev. Date: May 14, 2001 Back to Index Subject: WORLD WIDE WEB RESOURCES POLICY PURPOSE To outline the University's policy for students, faculty and staff concerning the use of the University's
More informationTECHNOLOGY SUPPORT SERVICE LEVEL AGREEMENT
TECHNOLOGY SUPPORT SERVICE LEVEL AGREEMENT Statement of Intent The Information Technology Center (MVECA) and school district mutually agree that this Service Level Agreement (SLA) documents school technology
More informationREQUEST FOR PROPOSAL (RFP) TELECOMMUNICATIONS SERVICES
REQUEST FOR PROPOSAL (RFP) TELECOMMUNICATIONS SERVICES SUMMIT LEADERSHIP ACADEMY 12850 MUSCATEL HESPERIA, CA 92345 FEBRUARY 6, 2015 TABLE OF CONTENTS 1. SUMMARY AND BACKGROUND... 2 2. PROPOSAL GUIDELINES...
More informationCity of Centralia, Missouri Website Design & Development
No. CEN19-AD01 City of Centralia, Missouri Website Design & Development City of Centralia 114 South Rollins Street Centralia, MO 65240 Phone: (573) 682-2139 Submittal Requirements The deadline for RFP
More informationAUTHORIZATION TO ENTER INTO A CONTRACT WITH SOFTWAREONE, INC. FOR LICENSING OF MICROSOFT SOFTWARE
Agenda Report TO: FROM: SUBJECT: Honorable Mayor and City Council Department of Information Technology AUTHORIZATION TO ENTER INTO A CONTRACT WITH SOFTWAREONE, INC. FOR LICENSING OF MICROSOFT SOFTWARE
More informationREQUEST FOR PROPOSALS ZONING ORDINANCE
REQUEST FOR PROPOSALS ZONING ORDINANCE City of Allegan Allegan County, Michigan A. Background. The City of Allegan is hereby requesting proposals from qualified, multidisciplinary professionals in the
More informationAtoS IT Solutions and Services. Microsoft Solutions Summit 2012
Microsoft Solutions Summit 2012 1 Building Private Cloud with Microsoft Solution 2 Building Private Cloud with Microsoft Solution Atos integration Establish a new strategic IT partnership From July 2011
More informationRecords Information Management
Information Systems Sciences Records Information Management Region V Spring Conference March 26, 2015 Was I supposed to keep that 1 Where did we store that 2 Space Issues. Need storage space for a classroom
More informationNew York Department of Financial Services Cybersecurity Regulation Compliance and Certification Deadlines
New York Department of Financial Services Cybersecurity Regulation Compliance and Certification Deadlines New York Department of Financial Services ( DFS ) Regulation 23 NYCRR 500 requires that entities
More informationWelcome! Considering a Warm Disaster Recovery Site?
Welcome! Considering a Warm Disaster Recovery Site? Today s Moderator: Chris Riley Director 410-771-5544 x4331 criley@syssrc.com Today s Presenter: Rich Glenn Director 410-771-5544 x4420 rglenn@syssrc.com
More informationOVERARCHING SECURITY CONSULTING SERVICES SAWS Solicitation No. R JAM. ADDENDUM NO. 1 February 28, 2018
To Respondent of Record: OVERARCHING SECURITY CONSULTING SERVICES SAWS Solicitation No. R-18-001-JAM ADDENDUM NO. 1 February 28, 2018 This addendum, applicable to project referenced above, is an amendment
More informationREQUEST FOR PROPOSALS FOR COMPUTER HARDWARE, SOFTWARE, PERIPHERALS, AND INSTALLATION SERVICES PROPOSAL NO.s PIT & PIT ADDENDUM #4
PURCHASING DEPARTMENT Willowbend Road Peachtree City, GA 3069 Phone: 770-487-767 Fax: 770-63-0 www.peachtree-city.org REQUEST FOR PROPOSALS FOR COMPUTER HARDWARE, SOFTWARE, PERIPHERALS, AND INSTALLATION
More informationApplication Lifecycle Management on Softwareas-a-Service
Service Description HPE Application Lifecycle Management on Software-as-a- Service Version v2.0 26 November 2015 This Service Description describes the components and services included in HPE Application
More informationArcserve Solutions for Amazon Web Services (AWS)
Arcserve Solutions for Amazon Web Services (AWS) Introduction The public cloud has become a major factor in all IT decision making due to its endless supply of technical resources at an affordable cost.
More informationCapital Area Council of Governments Request for Proposals - WEBSITE REDESIGN. Questions and Answers Posted on 07/13/18
6800 Burleson Road, Building 310, Suite 165 Austin, Texas 78744-2306 Ph: 512-916-6000 Fax: 512-916-6001 www.capcog.org BASTROP BLANCO BURNET CALDWELL FAYETTE HAYS LEE LLANO TRAVIS WILLIAMSON Capital Area
More informationPUT DATA PROTECTION WHERE YOU NEED IT
from Carbonite PUT DATA PROTECTION WHERE YOU NEED IT Flexibility is your best friend when it comes to choosing a backup plan. For a backup solution to be considered flexible, it needs to satisfy several
More informationBUSINESS CONTINUITY PLAN Document Number: 100-P-01 v1.4
BUSINESS CONTINUITY PLAN Document Number: 100-P-01 v1.4 2016 DR Committee 1 Table of Contents REVISION HISTORY... 3 PURPOSE... 3 POLICY... 3 DR COMMITTEE... 3 POLICY MANAGEMENT... 3 EMPLOYEE TRAINING AND
More informationRequest for Proposal
IROQUOIS COUNTY INFORMATION SERVICES Request for Proposal Iroquois County Information Services Data Center Computer Server Consolidation R.G.Egolf, Consultant 12/3/2013 PROPOSALS DUE BY 4:00 PM MONDAY,
More informationVersion v November 2015
Service Description HPE Project and Portfolio Management on Software-as-a- Service Version v2.0 26 November 2015 This Service Description describes the components and services included in HPE Project and
More informationQUESTIONS AND CONTACTS
Contact: Jake Losinski, Management Analyst P.O. Box 2315 480 East Avenue North Ketchum, ID 83340 July 27, 2018 Telephone: (208) 727-5081 jlosinski@ketchumidaho.org SUBMITTAL DEADLINE The City of Ketchum,
More informationMicrosoft Operations Management Suite (OMS) Fernando Andreazi RED CLOUD
Microsoft Operations Management Suite (OMS) Fernando Andreazi RED CLOUD Management as a Service Data analytics Shifting landscape at play Modern management Micro-services and containers Cloud Migrations
More informationSubject: University Information Technology Resource Security Policy: OUTDATED
Policy 1-18 Rev. 2 Date: September 7, 2006 Back to Index Subject: University Information Technology Resource Security Policy: I. PURPOSE II. University Information Technology Resources are at risk from
More informationSUBJECT: PRESTO operating agreement renewal update. Committee of the Whole. Transit Department. Recommendation: Purpose: Page 1 of Report TR-01-17
Page 1 of Report TR-01-17 SUBJECT: PRESTO operating agreement renewal update TO: FROM: Committee of the Whole Transit Department Report Number: TR-01-17 Wards Affected: All File Numbers: 465-12, 770-11
More informationKroll Ontrack VMware Forum. Survey and Report
Kroll Ontrack VMware Forum Survey and Report Contents I. Defining Cloud and Adoption 4 II. Risks 6 III. Challenging Recoveries with Loss 7 IV. Questions to Ask Prior to Engaging in Cloud storage Solutions
More information6/4/2018 Request for Proposal. Upgrade and Consolidation Storage Backup Network Shares Virtual Infrastructure Disaster Recovery
6/4/2018 Request for Proposal Upgrade and Consolidation Storage Backup Network Shares Virtual Infrastructure Disaster Recovery Network Infrastructure Services - Server Team DC WATER & SEWER AUTHORITY (DC
More informationADDENDUM #1 Boulder Office of Emergency Management Ambulance Services for Boulder County RFS #
ADDENDUM #1 Boulder Office of Emergency Management Ambulance Services for Boulder County RFS # 6825-18 April 23, 2018 The attached addendum supersedes the original Information and Specifications regarding
More informationUNITRENDS & NUTANIX ARCHITECTURE & IMPLEMENTATION GUIDE
UNITRENDS & NUTANIX ARCHITECTURE & IMPLEMENTATION GUIDE ALL-IN-ONE BACKUP AND DISASTER RECOVERY FOR LEADING HYPERCONVERGED INFRASTRUCTURE 1 INTRODUCTION Nutanix and Unitrends have jointly integrated their
More informationINSTRUCTIONS FOR RESPONSE TO REQUEST FOR BEST VALUE PROPOSALS (RFP) #852W001
INSTRUCTIONS FOR RESPONSE TO REQUEST FOR BEST VALUE PROPOSALS (RFP) #852W001 Issue Date: April 17, 2019 Title: VFHY Website Development Issuing Agency: Virginia Foundation for Healthy Youth (VFHY) Period
More informationNC Project Learning Tree Guidelines
NC Project Learning Tree Guidelines PREFACE Project Learning Tree (PLT) is an environmental education program for educators and youth leaders working with students from pre-kindergarten through grade 12.
More informationUniversity of Pittsburgh Security Assessment Questionnaire (v1.7)
Technology Help Desk 412 624-HELP [4357] technology.pitt.edu University of Pittsburgh Security Assessment Questionnaire (v1.7) Directions and Instructions for completing this assessment The answers provided
More informationVirtualizing disaster recovery helps ensure business resiliency while cutting operating costs.
IBM Global Technology Services July 2009 Virtualizing disaster recovery helps ensure business resiliency while cutting operating costs. Virtualization doesn t stop with servers and storage devices it s
More informationOUR CUSTOMER TERMS CLOUD SERVICES - INFRASTRUCTURE
CONTENTS 1 ABOUT THIS PART... 2 2 GENERAL... 2 3 CLOUD INFRASTRUCTURE (FORMERLY UTILITY HOSTING)... 2 4 TAILORED INFRASTRUCTURE (FORMERLY DEDICATED HOSTING)... 3 5 COMPUTE... 3 6 BACKUP & RECOVERY... 8
More informationAccreditation Services Council Governing Charter
Accreditation Services Council Governing Charter 2 Accreditation Services Council Governing Charter I. Introduction The Accreditation Services Council (Council) is established as a standing committee of
More informationData Protection Service Guide
Data Protection Service Guide Backup & Disaster Recovery Local Backup & Recovery Ancero Backup & Disaster Recovery Ancero Backup & Disaster Recovery provides device backups and onsite recovery as virtual
More informationLAKE MICHIGAN AIR DIRECTORS CONSORTIUM
REQUEST FOR PROPOSAL Website Development for the Lake Michigan Air Directors Consortium The Lake Michigan Air Directors Consortium (LADCO) is seeking contractor assistance to update the LADCO website.
More informationNU Cloud Terms of Service
Overview This document represents the Terms of Service among Northwestern Information Technology (IT) and participating tenants in the NUCloud private cloud environment at Northwestern. The goal of these
More informationThe Interlocal Purchasing System (TIPS Cooperative) Supplier Response Bid Information Contact Information Ship to Information Bid Creator Kim Thompson Coordinator Address Region VIII Education Address
More informationAbstract: Data Protection Cloud Strategies
Enterprise Strategy Group Getting to the bigger truth. Research Report Abstract: Data Protection Cloud Strategies Considerations for Organizations Seeking to Utilize Cloud Services as Part of Their Data
More information50 TB. Traditional Storage + Data Protection Architecture. StorSimple Cloud-integrated Storage. Traditional CapEx: $375K Support: $75K per Year
Compelling Economics: Traditional Storage vs. StorSimple Traditional Storage + Data Protection Architecture StorSimple Cloud-integrated Storage Servers Servers Primary Volume Disk Array ($100K; Double
More informationC H A P T E R Overview Figure 1-1 What is Disaster Recovery as a Service?
CHAPTER 1 Cisco Disaster Recovery as a Service Solution (DRaaS) architecture described in this document is designed to provide a new set of related capabilities allowing Virtualized Multi-Tenant Data Center
More informationATTACHMENT A Statement of Work
ATTACHMENT A Statement of Work Albuquerque Public Schools is soliciting proposals for a fiber optic wide area network solution for all locations identified in the Scope of Services below. SCOPE OF SERVICES
More information2) No, the City will not entertain separating this work at this point in time. 3) These questions are not relevant given the response to question #2
From: To: Cc: Subject: Date: Attachments: William Whitson Rick Glavosek Jennifer Elkins; Lee Sudduth Fwd: BerryDunn Questions Regarding RFQ Tuesday, September 29, 2015 4:48:13 PM BerryDunnQuestions_HapevilleGA.pdf
More informationArcserve Cloud Frequently Asked Questions
ARCSERVE CLOUD FAQS Arcserve Cloud Frequently Asked Questions The Arcserve Cloud empowers SMBs and mid-sized organizations to complete their data protection strategy with a seamless means to achieve disaster
More information7.16 INFORMATION TECHNOLOGY SECURITY
7.16 INFORMATION TECHNOLOGY SECURITY The superintendent shall be responsible for ensuring the district has the necessary components in place to meet the district s needs and the state s requirements for
More informationConnecticut Department of Department of Administrative Services and the Broadband Technology Opportunity Program (BTOP) 8/20/2012 1
Connecticut Department of Department of Administrative Services and the Broadband Technology Opportunity Program (BTOP) 8/20/2012 1 Presentation Overview What is BTOP? Making BTOP work for our state What
More informationTender Schedule No. Figure: Active-Active Cluster with RAC
Tender Schedule No SIBL-IT-2014-01- ORACLE_RAC_ADG Social Islami Bank Ltd is running Core Islami Banking Solution since 2009. Total no of Branches/Users is increasing per year. Now, Database Server Load
More informationWIRELESS NETWORK: BID Montville Public Schools High School
WIRELESS NETWORK: BID2015-01 Montville Public Schools High School 800 Old Colchester Road Oakdale, CT 06370 Phone: (860) 848-1228 Fax: (601) 587-2221 Website: http://www.montvilleschools.org Issued: February
More informationIBM Emptoris Managed Cloud Delivery
Service Description IBM Emptoris Managed Cloud Delivery This Service Description describes the Cloud Service IBM provides to Client. Client means the company and its authorized users and recipients of
More informationCASA External Peer Review Program Guidelines. Table of Contents
CASA External Peer Review Program Guidelines Table of Contents Introduction... I-1 Eligibility/Point System... I-1 How to Request a Peer Review... I-1 Peer Reviewer Qualifications... I-2 CASA Peer Review
More informationREQUEST FOR PROPOSAL DATABASE DEVELOPMENT FOR THE DISTRICT OF COLUMBIA COLLEGE ACCESS PROGRAM
1400 L Street, NW, Suite 400, Washington, D. C. 20005 Phone: (202) 783-7933 Fax: (202) 783-7939 www.dccap.org REQUEST FOR PROPOSAL DATABASE DEVELOPMENT FOR THE DISTRICT OF COLUMBIA COLLEGE ACCESS PROGRAM
More informationData Storage, Recovery and Backup Checklists for Public Health Laboratories
Data Storage, Recovery and Backup Checklists for Public Health Laboratories DECEMBER 2018 Introduction Data play a critical role in the operation of a laboratory information management system (LIMS) and
More informationIT Managed Services. Schedule 1 Specification 11/07/18
` IT Managed Services Schedule 1 Specification 11/07/18 IT Managed Service ITT Schedule 1 Specification Table of Contents 1.0 Introduction... 2 1.1 Overview... 2 2.0 Scope... 2 3.0 Vendor Response Requirements...
More informationThe following table provides additional detail by identifying the items included in the service.
roduct ervice Description Iaa Intel This service component is delivered as a set of assets, hardware and software to provide Intel based computing services for Microsoft Windows and Linux. The service
More informationAcronis Backup. Acronis, All rights reserved. Dual headquarters in Switzerland and Singapore. Dual headquarters in Switzerland and Singapore
Acronis Backup 1 Acronis Backup Guards Against Modern Threats Cybercrimes will cost $6 trillion per year worldwide by 2021 50% of hard drives die within 5 years Keeps Business Running Data is growing 33
More informationAdministrative & Operations Network Security Assessment
TAMPA-HILLSBOROUGH COUNTY EXPRESSWAY AUTHORITY Letter of Clarification No. 1 FOR REQUEST FOR QUALIFICATIONS (RFQ) Administrative & Operations Network Security Assessment RFQ No. O-00418 Page 1 of 15 Letter
More informationZYNSTRA TECHNICAL BRIEFING NOTE
ZYNSTRA TECHNICAL BRIEFING NOTE Backup What is Backup? Backup is a service that forms an integral part of each Cloud Managed Server. Its purpose is to regularly store an additional copy of your data and
More informationWhy the Cloud is Changing the Face of DR
Why the Cloud is Changing the Face of DR Janson Hoambrecker Director of World Wide Cloud Incubation Services EVault, Inc., a Seagate Company 2012 EVault, Inc. All Rights 1 Upgrading DR Capability Seen
More informationThe Project Charter. Date of Issue Author Description. Revision Number. Version 0.9 October 27 th, 2014 Moe Yousof Initial Draft
The Project Charter Project Title: VDI Data Center Design and Build Project Sponsor: South Alberta Data Centers Inc. (SADC Inc.) Project Customer: The City of Calgary Project Manager: Moe Yousof Document
More informationWHITE PAPER- Managed Services Security Practices
WHITE PAPER- Managed Services Security Practices The information security practices outlined below provide standards expected of each staff member, consultant, or customer staff member granted access to
More informationHosted VoIP Unified Communications Service
Request for Proposals: Hosted VoIP Unified Communications Service June 2018 Hosted VoIP Unified Communications Service Published: July 3, 2018 Responses Due: July 27, 2018 Submit bid to: Goleta Union School
More informationWEBSITE DESIGN, DEVELOPMENT AND HOSTING SERVICES
REQUEST FOR PROPOSAL WEBSITE DESIGN, DEVELOPMENT AND HOSTING SERVICES FOR FIRST NATIONS HEALTH MANAGERS ASSOCIATION (FNHMA) TABLE OF CONTENTS PART A INTRODUCTION Pages 3 5 1.0 Introduction 2.0 Scope of
More informationWhat information is collected from you and how it is used
Richmond Road Runners Club PRIVACY POLICY Board Approved: 10/11/2017 Our Commitment to Privacy Richmond Road Runners Club (RRRC) is the sole owner of the information collected on its sites and through
More informationASSEMBLY, No STATE OF NEW JERSEY. 217th LEGISLATURE INTRODUCED FEBRUARY 4, 2016
ASSEMBLY, No. STATE OF NEW JERSEY th LEGISLATURE INTRODUCED FEBRUARY, 0 Sponsored by: Assemblywoman VALERIE VAINIERI HUTTLE District (Bergen) Assemblyman DANIEL R. BENSON District (Mercer and Middlesex)
More informationIBM Emptoris Managed Cloud Delivery
Service Description IBM Emptoris Managed Cloud Delivery This Service Description describes the Cloud Service IBM provides to Client. Client means the company and its authorized users and recipients of
More informationBroward County RFP TEC P1
Broward County RFP TEC2115735P1 John Burns - SVP Sales & Marketing Paul Leppert - VP & Managing Director (TLC Denver) Don West - CARL Strategic Account Consultant CARL X Questions Hosted from Solution
More informationUniversity Information Systems. Administrative Computing Services. Contingency Plan. Overview
University Information Systems Administrative Computing Services Contingency Plan Overview Last updated 01/11/2005 University Information Systems Administrative Computing Services Contingency Plan Overview
More informationBUSINESS CONTINUITY. Topics covered in this checklist include: General Planning
BUSINESS CONTINUITY Natural and manmade disasters are happening with alarming regularity. If your organization doesn t have a great business continuity plan the repercussions will range from guaranteed
More informationMarine Institute Job Description
Marine Institute Job Description Position Contract Service Group Location Temporary Systems Administrator Team Leader Temporary Specified Purpose contract for a duration of up to 3 years Ocean Science
More informationSECURITY & PRIVACY DOCUMENTATION
Okta s Commitment to Security & Privacy SECURITY & PRIVACY DOCUMENTATION (last updated September 15, 2017) Okta is committed to achieving and preserving the trust of our customers, by providing a comprehensive
More informationHIPAA Compliance and OBS Online Backup
WHITE PAPER HIPAA Compliance and OBS Online Backup Table of Contents Table of Contents 2 HIPAA Compliance and the Office Backup Solutions 3 Introduction 3 More about the HIPAA Security Rule 3 HIPAA Security
More informationTENDER # WAF 14/02/28/FIN/ICT. FOR THE SUPPLY, INSTALLATION AND COMMISSIONING OF SERVER, STORAGE and DR VIRTUALIZATION SOLUTION FOR
TENDER # WAF 14/02/28/FIN/ICT FOR THE SUPPLY, INSTALLATION AND COMMISSIONING OF SERVER, STORAGE and DR VIRTUALIZATION SOLUTION FOR THE WATER AUTHORITY OF FIJI 1 Content Section 1 1. General Terms and Conditions
More informationUNITED NATIONS DEVELOPMENT PROGRAMME TERMS OF REFERENCE
UNITED NATIONS DEVELOPMENT PROGRAMME TERMS OF REFERENCE 1. Consultancy Information Title: Location: Application Deadline: Type of Contract: Languages Required: Duration of Contract: ICT Infrastructure