1 Including safety and testing in long-term procurement Focus on the ETCS Level 2 and interlocking contract for Belgium Yves WERNER Manager Signalling System Prescriptions
2 1. ETCS2 and New Interlocking Program 2. Technical Development approach 3. ETCS2 Testing & Safety Strategy 4. Infrabel ETCS Test Center 2
3 1 ETCS2 and New Interlocking Program 3
4 1. ETCS2 and New Interlocking Program Long Term Contract for ETCS2 Program execution ETCS Level 2 is one of the 3 pillars of the ETCS Master Plan in Belgium Contract awarded to Siemens & Fabricom Contract Scope 2500 km track ETCS km track New IL Turn-Key Contract Maximum Responsability on Contractor 4
5 1. ETCS2 and New Interlocking Program 3 pilot lines PL1 : ETCS2 only PL2 : ETCS2 + simple IL PL3 : ETCS2 + complex IL ETCS2 36 roll-out projects New Interlocking 31 roll-out projects ETCS2 projects 5
6 2 Technical Development approach 6
7 2. Technical development approach Technical development in the contract based on : Technical Development A generic development Application & Validation via pilot lines Updates/upgrades from roll-out Roll-out is based on this generic development (principles + process) Generic Development ETCS2 + IL Application Pilot line 1 Pilot line 2 Pilot line 3 Validation Start Updates & Upgrades feedback Roll-out Projects Roll-out Projects Roll-out Projects 7
8 2. Technical development approach Project Phases of the generic development 8
9 3 ETCS2 Testing & Safety Strategy 9
10 3. ETCS2 Testing & Safety Strategy Testing - Generic Development 1 Lab tests Contractor Generic development applied on pilot lines Pilot lines configuration Lab Tests scenarios RBC Contractor Lab Tests Pilot lines OBU Contractor Contractually, lab tests to be done with 2 different OBUs (diversity) Trackside simulator OBU Other supplier 10
11 3. ETCS2 Testing & Safety Strategy Testing - Generic Development 2 On-site tests Contractor Pilot lines technically in service ETCS Test Train Infrabel On-site Tests Scenarios On site Tests Pilot Lines RBC / Balises / GSM-R Contractually, on-site tests to be done with 1 OBU, but on-site tests needed with existing OBUs for homologation.. 11
12 3. ETCS2 Testing & Safety Strategy Testing & Safety Output Generic Development Output of the generic development Generic Case ETCS2 validated, certified (GASC + ISA/No-Bo certificates) ready to start roll-out projects Generic Application Case ETCS2 Certified Homologated Pilot lines homologated (SASC + ISA / No-Bo certificates) OBUs (re)-homologated for ETCS2 conventional Network Homologated 12
13 3. ETCS2 Testing & Safety Strategy Testing Roll-out projects Project Specific Configuration based on Generic Case Test of the trackside configuration / installation. Lab tests : maximum of tests in lab + automatisation On-site tests : ETCS test train, limited to a minimum No tests needed with other OBUs (except if new function) RBC Contrator Trackside simulator On site Tests RBC / Balises / GSM-R Lab Tests EVC Contractor 13
14 3. ETCS2 Testing & Safety Strategy Testing & Safety Output Roll-out project Output of the roll-out tests for one project The same approach was followed on our ETCS1 Full Supervision deployment Specific project homologated (SASC + ISA / No-Bo certificates) Generic phase + Pilot line : 3 years Feedback to adapt the Generic Case if necessary Roll-out 20 projects (1000 km track) : 4-5 years 14
15 3. ETCS2 Testing & Safety Strategy Safety Strategy Generic development and Roll-out Safety strategy also based on 2 steps : 1 Generic development 2 Roll-out Includes all safety analysis and evidences needed to get a safe and Interoperable ETCS2 production procedure (= ETCS2 Generic Case). Includes mainly the evidences that the ETCS2 production procedure is followed on the specific project (via verification / validation / tests reports). To increase the confidence level and certification / homologation in the defined planning it is important to regularly involve all Safety stakeholders : ISA / Notify Body / NSA during development and roll-out (monthly meetings). 15
16 4 Infrabel ETCS Test Center 16
17 4. Infrabel Test Center 12th UIC ERTMS World Conference 2016 The ETCS2 contractor will supply a lab test bench to Infrabel Mid and long term objectives: Homologation of new OBU or modified OBU (eg migration baseline 3) in lab to minimalize the on-site tests Non regression testing when a system/subsystem evolves (Interlocking / RBC / Control center.) Testing / validation of reworks on ETCS2 lines in service Training of the Infrabel staff 17
18 Conclusions The Testing and Safety approach applied in the ETCS2 contract is based on the Infrabel ETCS1 experience. This approach requires a lot of efforts during the roll-out on pilot lines to get a good and complete generic case but allows an industrial deployment by following standard processes afterwards. This approach is quite challenging for the Contractor Siemens/Fabricom and Infrabel. 18
19 Thank you 19
Consolidation of the Specifications
ERTMS Users Group - UNISIG joint co-operation operation for Consolidation of the Specifications F. Camurri UNISIG P. Guido ERTMS Users Group A Collaborative Framework European Commission DB PRORAIL NETWORK
More informationAlTrac ETCS solutions Customer focused innovation for business performance
www.thalesgroup.com AlTrac ETCS solutions Customer focused innovation for business performance Growing your business with ETCS Smart signalling is at the heart of rail transformation Every rail business
More informationThales rue Grange Dame Rose Vélizy-Villacoublay - +33(0)
Thales 20-22 rue Grange Dame Rose - 78141 Vélizy-Villacoublay - +33(0)1 73 32 00 00 Email: transportation@thalesgroup.com 04/2012 - Thales 2012 THCS008-brochure_ETCS_A4_8p.indd 8 13/04/12 15:20 www.thalesgroup.com
More informationEGNOS and ESSP Certification. ESESA Aviation Workshop 26 th - 27 th October 2010
EGNOS and ESSP Certification ESESA Aviation Workshop 26 th - 27 th October 2010 Content 1. Certification needs and framework 2. SES Certification regulations 3. Certification activities 4. Current Status
More informationMemorandum of Understanding
Memorandum of Understanding between the European Commission, the European Union Agency for Railways and the European rail sector associations (CER, EIM, EPTTOLA, ERFA, the ERTMS Users Group, GSM-R Industry
More informationCyber Security of ETCS
1 Addressing the challenges Cyber Security of ETCS Simon Tonks 2 Background The UK rail network is currently being upgraded to use new signalling technology (ERTMS) The ROSCOs are delivering the First
More informationUSE OF REFERENCE LABORATORIES TO PUT ETCS PROJECTS INTO SERVICE (TRACKS & TRAINS)
ERA ETCS test and certification Conference 2011 USE OF REFERENCE LABORATORIES TO PUT ETCS PROJECTS INTO SERVICE (TRACKS & TRAINS) Lille 29 th March 2011 Slide 1 ERA ETCS test and certification Conference
More information25th of October EuroMedRail project National Safety Authority Belgium
25th of October 2017 - EuroMedRail project National Safety Authority Belgium 2 Content 1. Legal basis and history 2. The Belgian rail system 3. Railway safety in Belgium 2016 4. The Belgian NSA : DRSI
More informationEULYNX. on track towards digital railways. Ljubljana 17 May EULYNX PMO
Hinweis: Für externe Präsentationen bitte immer eine Titelfolie mit der Ressort-Farbe verwenden. EULYNX on track towards digital railways Ljubljana 17 May 2017 www.eulynx.eu Agenda EULYNX fosters a new
More informationSMART METERING EQUIPMENT READINESS UPDATE JUNE Dr Howard Porter Chief Executive Officer, BEAMA
SMART METERING EQUIPMENT READINESS UPDATE JUNE 2014 Dr Howard Porter Chief Executive Officer, BEAMA Mandated smart metering group 2 BEAMA has been asked to give the view from manufacturers on the state
More informationCOMMISSION DECISION. of
EUROPEAN COMMISSION Brussels, 6.11.2012 C(2012) 7325 final COMMISSION DECISION of 6.11.2012 amending Commission Decision 2012/88/EU on the technical specifications for interoperability relating to the
More informationEULYNX: The Next Generation Signalling Strategy SUMMARY 1 MOTIVATION AND APPROACH
EULYNX: The Next Generation Signalling Strategy Maarten van der Werff, B.Sc, FIRSE, ProRail, EULYNX Frans Heijnen, HonFIRSE, MVDEI, M.Sc, MBA, Heijnen Rail Consulting,EULYNX Mirko Blazic, B.Sc, BCE Consulting
More informationETCS interoperability testing based on the UNISIG Specifications SUBSET-110, 111, 112
ETCS interoperability testing based on the UNISIG Specifications SUBSET-110, 111, 112 Symposium Test4Rail, 17.10.2017 Burkhard Börner, Thales Deutschland GmbH www.thalesgroup.com History of UNISIG WP IOP
More informationAxle counter and balise cables for reliability, upgradeability, interoperability
Axle counter and balise cables for reliability, upgradeability, interoperability exans, worldwide leader in cables and cabling systems As a global expert in cables and cabling systems, Nexans brings an
More informationImplementation status : GSM-R
Implementation status : GSM-R Robert SARFATI UIC ERTMS/GSM-R Operators Group Chairman ETSI Technical Committee Rail Chairman SYSTRA FIRSE Background: GSM-R an European choice In Europe, existing standard
More informationE R T M S COMMUNICATION PLAN
U I C E R T M S COMMUNICATION PLAN Paolo de Cicco Senior Advisor ERTMS Platform Paris, 14/03/2007-1 Item 16: UIC Workshop Euro-Interlocking Hazard List Methodology for Railway Signalling WORKSHOP HELD
More informationElectronic Subcontracting Reporting System (esrs) Department of Defense Government Training
0 Electronic Subcontracting Reporting System (esrs) http://www.esrs.gov Department of Defense Government Training 1 Submitting an Individual Subcontracting Report (ISR) 2 Subcontracting Program: The Basics
More informationA guide to. exemptions
A guide to This guide outlines how to apply for from modules of the CIPS qualifications. We recognise that many learners undertake prior learning that can be equivalent to the CIPS qualification and our
More informationADIF INTERNATIONAL CUSTOMIZED RAIL SOLUTIONS
CONTACT: Adif International Department Sor Ángela de la Cruz, 3 28020, Madrid, Spain +34 917 744 247 adifinternational@adif.es international.adif.es ADIF INTERNATIONAL CUSTOMIZED RAIL SOLUTIONS PROVIDING
More informationTÜV Rheinland Global Rail: Assessment and Certification.
TÜV Rheinland Global Rail: Assessment and Certification. Denis Belinsky, Shutterstock www.tuv.com Our Principle: Solution-oriented Assessment and Certification for Rail and Transport Technology. In the
More informationCampus IT Modernization OPERATIONAL CONTINUITY FLEXIBLE TECHNOLOGY MODERNIZED SYSTEMS
Campus IT Modernization OPERATIONAL CONTINUITY FLEXIBLE TECHNOLOGY MODERNIZED SYSTEMS Managing the Complexity of IT Modernization Constructing and modernizing a new campus is a complex undertaking, requiring
More informationUNITED NATIONS DEVELOPMENT PROGRAMME TERMS OF REFERENCE
UNITED NATIONS DEVELOPMENT PROGRAMME TERMS OF REFERENCE 1. Consultancy Information Title: Location: Application Deadline: Type of Contract: Languages Required: Duration of Contract: ICT Infrastructure
More informationAuthorization of infrastructure in Denmark and Norway - similarities and differences
Authorization of infrastructure in Denmark and Norway - similarities and differences Liz Anette Stordahl, Principal Engineer, Norwegian Railway Authority (Liz.Anette.Stordahl@sjt.no) and Mari Ruuhi, Danish
More informationSALISBURY NHS FOUNDATION TRUST. TITLE - Information Strategy Annual Review
SALISBURY NHS FOUNDATION TRUST PAPER - SFT 1931 TITLE - Information Strategy 2007 2010 Annual Review PURPOSE OF PAPER To inform the Board as to progress made within the Information Systems Strategy during
More informationAuthorisation of placing in service in the context of new technologies
Roma, 22 January 2016 GNSS technology advantages in a multiconstellation framework Authorisation of placing in service in the context of new technologies Assumption For its size and complexity, the rail
More information10 Considerations for a Cloud Procurement. March 2017
10 Considerations for a Cloud Procurement March 2017 2017, Amazon Web Services, Inc. or its affiliates. All rights reserved. Notices This document is provided for informational purposes only. It represents
More information5.10 CUSTOMER SPECIFIC DESIGN AND ENGINEERING SERVICES (L )
5.10 CUSTOMER SPECIFIC DESIGN AND ENGINEERING SERVICES (L.34.1.5) Qwest s Networx Customer Specific Design and Engineering Services provide systems and applications test facilities domestically and nondomestically
More informationdevelopment, return of experience, state of the art
CCRCC 2012 Thomas Wesenberg Speaker of the GSM-R Industry Group Lille November 6th, 2012 development, return of experience, state of the art www.gsm-rail.com # Agenda 1. GSM-R IG general update 2. Developing
More informationMINIMUM SYSTEM SPECIFICATION (MSS)
MINIMUM SYSTEM SPECIFICATION (MSS) PROCESSES AND PROCEDURES FOR NHS WALES COMPLIANT SYSTEMS [Summary Document] MSS Scheme Development Processes and Procedures 1.0 PURPOSE This document describes the NHS
More informationCISM - Certified Information Security Manager. Course Outline. CISM - Certified Information Security Manager.
Course Outline CISM - Certified Information Security Manager 20 Nov 2017 Contents 1. Course Objective 2. Pre-Assessment 3. Exercises, Quizzes, Flashcards & Glossary Number of Questions 4. Expert Instructor-Led
More informationRequest for Proposal for Technical Consulting Services
Request for Proposal for Technical Consulting Services The Node.js Foundation is requesting proposals from highly qualified consultants with demonstrated expertise in providing Node.js technical consultation
More informationRECOMMENDATION FOR USE
Page 1 of 6 TITLE CONTENT OF THE TECHNICAL FILE ORIGINATOR NB-RAIL STRATEGY SG SUBJECT RELATED TO Directives 2008/57/EC, 2009/131/EC, 2011/18/EU, Recommendation 2011/217/EU, Decision 2010/713/EU and all
More informationCISM - Certified Information Security Manager. Course Outline. CISM - Certified Information Security Manager. 22 Mar
Course Outline CISM - Certified Information Security Manager 22 Mar 2019 Contents 1. Course Objective 2. Pre-Assessment 3. Exercises, Quizzes, Flashcards & Glossary Number of Questions 4. Expert Instructor-Led
More informationPreparing Infra-structure transition toward FRMCS (Next Generation)
Preparing Infra-structure transition toward FRMCS (Next Generation) Michael Klöcker Head of Strategy Railway Solutions Nokia Networks ETSI headquarters, Sophia-Antipolis 2 nd November 2016 GSM-R Industry
More informationService Description of Advanced Services: Focused Technical Support and Network Optimization Support
Back to Table of Contents Service Description of Advanced Services: Focused Technical Support and Network Optimization Support This document describes Focused Technical Support (FTS) and Network Optimization
More informationGetting to Go Live 1/20/2015. Full System Launch. APD Overview. Planning APD. Implementation APD. RFPs and Procurement.
Getting to Go Live Full System Launch 1 You are here APD Overview Planning APD Implementation APD RFPs and Procurement APD Updates System Testing Regulation Getting to Go Live Project Management Acronyms
More informationRole of the DSO in providing flexibility. Febeliec Workshop Demand Response 15/6/2015
Role of the DSO in providing flexibility Febeliec Workshop Demand Response 15/6/2015 Introduction: Synergrid, the flexibility ballpark Synergrid C8WG5 Technical specifications NFS/CCC master data Reflex
More informationInterface. Installation. ScriptSure erx
ScriptSure erx Interface 1 About ScriptSure ScriptSure is a SureScripts GOLD certified product and rated #1 eprescribing software for its breadth of technology and ease of use. Print, fax or electronically
More informationNetwork Certification Body
Network Certification Body Scheme rules for assessment of Entities in Charge of Maintenance in accordance with requirements of ECM Regulation EU 445/2011 ECM certification scheme 1 NCB_MS_106_ECM Introduction
More information/CENELEC Phase 4/EIR/HL/Interface/Non-Functional Interface Requirements
Project Interface /CENELEC Phase 4/EIR/HL/Interface/ Version: 7.0 Printed by: Holter Printed on: 22 May 2003 Generated from DOORS V5.2 Copyright (c) 2003 UIC / Euro-Interlocking Contents 1 Introduction
More informationDeutsche Bahn AG Digital Rail (IDX)
Deutsche Bahn s Digital Rail Vision and its Implications on the Future Radio for Rail Transport Dr. Patrick Marsch ETSI Workshop on Developing the Future Radio for Rail Transport, July 5th, 2018 The Envisioned
More information1. All stakeholders shall ensure conformance to 9104 series of standards and the published timeline for 91XX:2009 transition as they apply.
Purpose: Provide supplemental rules for all stakeholders to facilitate the transition to the 91xx:2009 Aerospace Quality Management Systems (AQMS) standards, including the implementation of 9104/1 and
More informationBRE Global Limited Scheme Document SD 186: Issue No December 2017
BRE Global Limited Scheme Document SD 186: Issue No. 11.1 Commercial-in-Confidence Page 1 of 9 Introduction This certification scheme has been designed to promote the use of sustainable materials and
More informationScheme Document. For more information or help with your application contact BRE Global on +44 (0) or
Page: Page 1 of 15 1. Introduction This certification scheme has been designed to promote sustainable production of construction products and materials. Responsible sourcing includes organisational management,
More informationStandards: Implementation, Certification and Testing Work group Friday, May 8, :00 Pm-1:30 Pm ET.
Standards: Implementation, Certification and Testing Work group Friday, May 8, 2015. 12:00 Pm-1:30 Pm ET. Agenda Complete Work group Comments- Group 1 Review Group 2 Comments. 2015 Edition Certification
More informationTMTCS Conference in Istanbul 16 and 17 October
TMTCS Conference in Istanbul 16 and 17 October Tracktrain info exchange & data transmission: example based on the ETCS overimposing on existing signalling systems in China Antonio Casazza AGENDA Ansaldo
More informationCIM Certification Program. Deborah May The Open Group
CIM Certification Program Deborah May The Open Group d.may@opengroup.org Agenda Certification Program Overview of program Test Suite Overview of Test Suite Beta Release DMTF 2002 Developers' Conference
More informationVaccine data collection tool Oct Functions, Indicators & Sub-Indicators
data collection tool Oct. 2011 A. National Regulatory System RS01: Legal framework for establishment of a regulatory system, mandate and enforcement power for each function RS01.01: Legislation or and
More informationNeutral Host Reimbursable Capital Project
Finance & Administration Committee Action Item III-E November 4, 2010 Neutral Host Reimbursable Capital Project Page 37 of 161 Washington Metropolitan Area Transit Authority Board Action/Information Summary
More informationBentley in Construction Bentley Systems, Incorporated
Bentley in Construction 3 WWW.BENTLEY.COM 2012 Bentley Systems, Incorporated The Need For Innovation Success in construction is elusive Independent Project Analysis (IPA) study of 318 projects > $2B: 65%
More informationPART IV GLOSSARY OF TERMS
PART IV GLOSSARY OF TERMS Terms and Definitions For the purposes of this document, the following terms and definitions shall apply: PROCESS MANUAL FOR THE GFSI BENCHMARKING PROCESS V7.2 Introduction Purpose
More informationTHE AUTOMATED TEST FRAMEWORK
2017 THE AUTOMATED TEST FRAMEWORK Test More. Test Consistently. Test Faster. Secure Results. Delivered. xceleratesolutions.com TABLE OF CONTENTS CONCEPT...3 BENEFITS...4 TRANSFORMING FROM TRADITIONAL TO
More informationRFP UNFPA/CPH/12/035. Questions and Answers
RFP UNFPA/CPH/12/035 Questions and Answers 1) Having thoroughly analyzed the TOR, the following terms are difficult to include in the financial proposal for a fixed cost, as required: 2.4, the provider
More informationTOWARD A COMMON PLATFORM FOR SIMULATION-BASED EVALUATION OF BOTH FUNCTIONAL AND TELECOMMUNICATION SUB-SYSTEMS OF THE ERTMS
Proceedings of the 2012 Joint Rail Conference JRC2012 April 17-19, 2012, Philadelphia, Pennsylvania, USA JRC2012-74049 TOWARD A COMMON PLATFORM FOR SIMULATION-BASED EVALUATION OF BOTH FUNCTIONAL AND TELECOMMUNICATION
More informationA Whirlwind Tour of Project Management To certify or not to certify? NNCA Construction Workshop v
A Whirlwind Tour of Project Management To certify or not to certify? NNCA Construction Workshop v 2015.1 Presented by Darya Duma, PEng, PMP, PRINCE2 www.procept.com 4DPM 2015 Outline Modern PM PM credentials
More informationEndesa s mass-scale metering roll-out
endesa dirección acceso de clientes y medida 10 10 12 Endesa s mass-scale metering roll-out Dr. Robert Denda Smart Metering Project Coordinator Endesa s Smart Metering System 2011 2010 2009-2008 2018 2012
More informationQUALITY ASSURANCE POLICY. Quality Assurance Policy. September 2016 Version 2.0 Policy authorised by Responsible Officer
Quality Assurance Policy September 2016 Version 2.0 Policy authorised by Responsible Officer 1 Table of Contents 1.0 Introduction...3 2.0 Scope of policy...3 3.0 Policy statement...3 4.0 Quality assurance
More informationProject Management Certification
Project Management Certification PM Certification Project Management Practice June 2015 Four Certification Levels in Project Management If you love your craft, then challenge yourself every day to improve
More informationEnd-to-end Safety, Security and Reliability Keys for a successful I4.0 Migration
End-to-end Safety, Security and Reliability Keys for a successful I4.0 Migration Dr. Andreas Hauser Director Digital Service, TÜV SÜD Tokyo, 21 February 2017 Corporate Profile Slide 2 Our heritage: 150
More informationExperience with first interconnections of GSM-R Networks. Connecting Networks
Experience with first interconnections of GSM-R Networks Connecting Networks DB Netz AG I.NVIZ Budapest, April, 2006 1 Content ERTMS/GSM- R Solution Connection Solution Cross border - Operation of a harmonized
More informationDATA ITEM DESCRIPTION
helping projects succeed... DATA ITEM DESCRIPTION 1. TITLE VERIFICATION REQUIREMENTS SPECIFICATION (VRS) 2. Identification Number PPA-003914-7 17 August 2017 3. DESCRIPTION/PURPOSE OF THE VRS 3.1 The Verification
More informationGet your business Skype d up. Lessons learned from Skype for Business adoption
Get your business Skype d up Lessons learned from Skype for Business adoption On the rise with Skype for Business Recent figures from Microsoft found that 90% of Fortune 500 companies and over 100 million
More informationBUILDING AUTOMATION AND CONTROL SYSTEM (BACS) IN THE THESSALONIKI METRO EXTENSION TO KALAMARIA RFP-327/17 Α.Σ CLARIFICATIONS DOCUMENT
TITLE OF THE TENDER: PROCUREMENT AND INSTALLATION OF THE BUILDING THESSALONIKI METRO EXTENSION This Clarifications Document is issued in accordance with the stipulations in paragraph 9.2 of the Invitation
More informationEuropean Rail Traffic Management System Level 1 plus Radio Infill Unit capacity performance
Faculty of Civil and Industrial Engineering Thesis of Master Degree in TRANSPORT SYSTEMS ENGINEERING European Rail Traffic Management System Level 1 plus Radio Infill Unit capacity performance Supervisor
More informationVOCATIONAL QUALIFICATIONS ENTRY CODES 2017/18. ocr.org.uk
VOCATIONAL QUALIFICATIONS ENTRY CODES 2017/18 ocr.org.uk Contents Introduction 1 Key to forms of assessment 1 Version control 2 1 Skills for Business 3 1.1 Administration (Business Professional) 3 1.2
More informationJOB DESCRIPTION FOR SUPPORT STAFF
JOB DESCRIPTION FOR SUPPORT STAFF JOB TITLE: REPORTS TO: Systems Administrator Technical Services Manager PURPOSE OF THE JOB The System Administrator is responsible for the effective provisioning, installation
More informationIEEE Conformity Assessment Program (ICAP) May 2018 Jason Allnutt Program Manager, ICAP
IEEE Conformity Assessment Program (ICAP) May 2018 Jason Allnutt Program Manager, ICAP Understanding Conformity Assessment What is Conformity Assessment? Conformity Assessment is defined as the process
More informationProject Management Professional (PMP) Certification Course
Project Management Professional (PMP) Certification Course Project based management appears to be the most efficient and effective way of managing the strategic goals of an organisation. Therefore, Project
More informationCERTIFICATION CONDITIONS
1 of 5 + CERTIFICATION CONDITIONS PERMIT NO 000/0. SATAS SOUTH AFRICAN TECHNICAL AUDITING SERVICES Pty Ltd Co Reg No 2002/015355/07 AGREEMENT ENTERED INTO WITH Co Reg No.. 2 of 5 CERTIFICATION CONDITIONS
More informationIMPROVING CYBERSECURITY AND RESILIENCE THROUGH ACQUISITION
IMPROVING CYBERSECURITY AND RESILIENCE THROUGH ACQUISITION Briefing for OFPP Working Group 19 Feb 2015 Emile Monette GSA Office of Governmentwide Policy emile.monette@gsa.gov Cybersecurity Threats are
More informationCentral Maine Power AMI Program: Building a Stronger, Smarter Grid for Maine Contact: Laney Brown;
Central Maine Power AMI Program: Building a Stronger, Smarter Grid for Maine Contact: Laney Brown; laney.brown@cmpco.com October 10, 2012 1 Overview of Central Maine Power Wholly-owned subsidiary of Iberdrola
More informationInternet copy. EasyGo security policy. Annex 1.3 to Joint Venture Agreement Toll Service Provider Agreement
EasyGo security policy Annex 1.3 to Joint Venture Agreement Toll Service Provider Agreement This copy of the document was published on and is for information purposes only. It may change without further
More informationSTATEMENT OF WORK FOR. County of Los Angeles Chief Executive Office
STATEMENT OF WORK FOR County of Los Angeles Chief Executive Office 1. Introduction This Statement of Work ( SOW ) is made between a McAfee Certified Partner ( McAfee Partner ) and County of Los Angeles,
More informationThe Verification and Validation activity for a railway control system
The Verification and Validation activity for a railway control system Davide Alagna, Alessandro Romei [alagna.davide@asf.ansaldo.it, romei.alessandro@asf.ansaldo.it] RAMS Department Geneva, 19 th September
More informationContents. 1 General Terms. Page 1 of 8
Page 1 of 8 Service Description: Advanced Services --- Fixed Price Secure Agile Exchange Advise and Implement (Quick Start) (ASF-CORE-SAI-QS) This document describes Cisco s Secure Agile Exchange Advise
More informationSubcontracted Delivery Policy
Subcontracted Delivery Policy Main points of policy 1. Background to the policy 2. Scope of the Policy 3. Policy Statement 4. Reasons for subcontracting 5. BCA contribution to improving own and subcontractor
More informationU.S. General Services Administration Planned Refresh of TDR Pilot Schedules / SINS
U.S. General Services Administration Planned Refresh of TDR Pilot Schedules / SINS 1 September 12, 2017 Disclaimer "The purpose of this webinar is to allow GSA FAS to verbally present the DRAFT planned
More informationCBTC test simulation bench
Computers in Railways XII 485 CBTC test simulation bench J. M. Mera, I. Gómez-Rey & E. Rodrigo CITEF (Railway Technology Research Centre), Escuela Técnica Superior de Ingenieros Industriales, Universidad
More informationBorderless ehealth in support of healthy citizens in Europe
Borderless ehealth in support of healthy citizens in Europe Pēteris Zilgalvis, J.D. Head of Unit, ICT for Health DG Information Society and Media EHTEL 2011 Symposium Seamless Integration for Personal
More informationSolutions Technology, Inc. (STI) Corporate Capability Brief
Solutions Technology, Inc. (STI) Corporate Capability Brief STI CORPORATE OVERVIEW Located in the metropolitan area of Washington, District of Columbia (D.C.), Solutions Technology Inc. (STI), women owned
More informationITIL Foundation. Processexam.com. Exam Summary Syllabus Questions
ITIL Foundation Processexam.com Exam Syllabus Questions Table of s Key to success in ITIL Foundation Exam... 2 ITIL Foundation Certification Details:... 2 ITIL Foundation Exam Syllabus:... 2 ITIL Foundation
More informationOPTIMIZATION MAXIMIZING TELECOM AND NETWORK. The current state of enterprise optimization, best practices and considerations for improvement
MAXIMIZING TELECOM AND NETWORK OPTIMIZATION The current state of enterprise optimization, best practices and considerations for improvement AOTMP.com The Next Evolution of Telecom Management OVERVIEW As
More informationMETERS AND MORE: Beyond the Meter
METERS AND MORE: Beyond the Meter Carlo MASSERONI Secretary of the Working Group for Communication at Meters and More AISBL STMicroelectronics, Italy Agenda Meters and More association Technology overview
More informationPilz Network Rail Innovation & Collaboration
Pilz Network Rail Innovation & Collaboration COTS PLC technology in rail signalling LX PLC project David Collier, Pilz UK Business Development Tahir Ayub, Senior Design Authority Engineer, Network Rail
More informationCertification Commission for Healthcare Information Technology. CCHIT A Catalyst for EHR Adoption
Certification Commission for Healthcare Information Technology CCHIT A Catalyst for EHR Adoption Alisa Ray, Executive Director, CCHIT Sarah Corley, MD, Chief Medical Officer, NextGen Healthcare Systems;
More informationPOSITION DESCRIPTION
Infrastructure Engineer POSITION DESCRIPTION Unit/Branch, Directorate: Location: Reporting to: Direct reports: Infrastructure, Intelligence Directorate Wellington, Auckland Infrastructure Lead Nil Salary
More informationKMC-ETCS Entity Off-line KM FIS
ERTMS/ETCS KMC-ETCS Entity Off-line KM FIS REF : ISSUE: 110 DATE : 17-12-2015 Company Technical Approval Management approval ALSTOM ANSALDO AZD BOMBARDIER CAF SIEMENS THALES 110 KMC-ETCS Entity Off-line
More informationFrontline Interoperability Test Team Case Studies
Frontline Interoperability Test Team Case Studies Frontline IOT Means Maximum Device Compatibility Case Summary A large Bluetooth developer (Customer X) created a new Bluetooth-enabled phone for commercial
More informationTURNKEY BOILER BURNER SOLUTIONS
TURNKEY BOILER BURNER SOLUTIONS BURNERS FLARES INCINERATORS PARTS & SERVICE TURNKEY BOILER BURNER SOLUTIONS Upgrading just got easier. Whether you re converting a plant to natural gas to comply with new
More informationSession 609 Tuesday, October 22, 2:45 PM - 3:45 PM Track: IT Governance and Security
Session 609 Tuesday, October 22, 2:45 PM - 3:45 PM Track: IT Governance and Security An Overview of Recent Changes to ISO 20000 Ron Lester Enterprise Service Management Consultant, Information Technology
More informationEuropean Train Control System: The Management of Packet 44
European Train Control System: The Management of Packet 44 Synopsis This document mandates the manner in which the packet 44 of the European Train Control System data protocol shall be managed to ensure
More informationStaff User Manual. Chapter 3 Contracts
Staff User Manual Chapter 3 Contracts Copyright 2013 by B2Gnow/AskReply, Inc. All rights reserved. Published in the United States by B2Gnow/AskReply, Inc. www.b2gnow.com B2Gnow is a registered trademark
More informationCustomer Success Story. ERTMS Level 2. European Rail Traffic Management System. Robust Industrial Data Communications Made Easy
Customer Success Story ERTMS Level 2 European Rail Traffic Management System Robust Industrial Data Communications Made Easy Cost effective improved rail safety Manufacturer: The European Rail Traffic
More informationModelling Functionality of Train Control Systems using Petri Nets
Modelling Functionality of Train Control Systems using Petri Nets Michael Meyer zu Hörste and Hardi Hungar German Aerospace Centre (DLR) Institute of Transportation Systems Lilienthaplatz 7, 38108 Braunschweig,
More informationPATHWAYS TO INNOVATION IN DISASTER RISK MANAGEMENT. Paolo Venturoni CEO European Organisation For Security 4 th June 2018
PATHWAYS TO INNOVATION IN DISASTER RISK MANAGEMENT Paolo Venturoni CEO European Organisation For Security 4 th June 2018 1 What is EOS The European Organisation for Security (EOS) is the voice of the European
More informationComplete Transportation Solutions - Passengers
Complete Transportation Solutions - Passengers 1 List of contents Conventional Metro Driverless Metro CBTC Why Ansaldo STS? Operation and Maintenance Connecting pieces of your world Copenhagen Metro Genoa
More informationFPGA Hardware in the Loop System for ERTMS-ETCS Train Equipment Verification
Journée Thématique du GDR CNRS SoC SiP Systèmes Embarqués pour les Transports de Demain 15 Mars 2016, UVHC FPGA Hardware in the Loop System for ERTMS-ETCS Train Equipment Verification Presented by Naïm
More informationGuidelines for Certification - Elevating Work Platforms Inspectors
Guidelines for Certification - Elevating Work Platforms Inspectors DOCUMENT NO: Fourth Edition March 2015 Issued under the Authority of the Certification Board for Inspection Personnel, New Zealand (CBIP)
More informationShared Services Canada Environment and Climate Change Canada HPC Renewal Project
Shared Services Canada Environment and Climate Change Canada HPC Renewal Project CUG 2017 Redmond, WA, USA Deric Sullivan Alain St-Denis & Luc Corbeil May 2017 Background: SSC's HPC Renewal for ECCC Environment
More informationIEC Conformance Testing
IEC 61850 Conformance Testing Bas Mulder UCAIUG meeting Austin, November 2011 Experience you can trust. Introduction KEMA 21 November, 2011 IEC 61850 Testing 2 Quality Assurance 21 November, 2011 IEC 61850
More information