1 Overview of DSASP; Telemetry/Communication Alternatives The New York Independent System Operator Price Responsive Load Working Group May 12, 2010

2 Agenda Overview of DSASP Market Rules Current Communications/Telemetry Requirements for DSASP Direct Communications Option for DSASP Proposed Timeline Market Participant Feedback 2

3 Purpose of DSASP Allow Demand Side Resources to participate in NYISO s Ancillary Services markets Regulation service Demand side resources will be committed to raise or lower demand via dispatch from Automatic Generation Control (AGC) Operating Reserve services Demand Side Resources will provide demand reductions when economics of the offer result in least cost solution for Operating Reserves 3

4 Reserve Provider Criteria DSASP Reserve resources: Must be located in NYCA Minimum 1 MW reduction Sustained reduction for 1 hour Modeled and offered as a supplier Specify a Day-Ahead availability offer for each category of reserve for which the resource is qualified Reduce demand when dispatched by the NYISO 4

5 Reserve Provider Criteria Eligibility Criteria Spinning Reserve (10-minute synchronous) Demand Side Resources that are not supporting their Demand Reduction through the use of Local Generators 10-Minute Non-Synchronized Reserve Demand Side Resources that are supporting their demand reduction through the use of Local Generators 30-Minute Reserve (Spinning and Non-Synchronized) ) Spinning: Demand Side Resources that are not supporting their Demand Reduction through the use Local Generators Non-Synchronized: Demand Side Resources that are supporting their demand reduction through the use of Local Generators that are capable of starting, synchronizing, and increasing their output level within thirty minutes 5

6 DSASP Regulation Requirements Minimum 1 MW reduction Capable of Regulation response Capable of supplying Regulation Service continuously in both the up and down directions for intervals in the scheduled hour and for all hours with accepted bids Capable of responding to automatic generation control signals on a 6-second basis 6

7 Current DSASP Communication Requirements through a Transmission Owner Be capable of receiving automatic control signals through the Transmission Owner and optionally with NYISO On a six-second periodicity for regulation On a five-minute periodicity for operating reserves Be capable of providing telemetered output data through TO and optionally with NYISO that can be scanned every 6 seconds. Telemetry measures load curtailment Compliant with NERC Disturbance Control Standards (DCS) Must be positive during energy schedule and zero at all other times Provide for all required interfaces to the Transmission Owner (TO) control centers as defined by the TO-MP Interconnection Agreement, if applicable 7

8 Sample Communication Path Through Transmission Owner 8

9 NYISO is considering Direct Communications for DSASP Direct Communications are currently available to suppliers as an additional path to connection through the Transmission Owner Direct Communications under consideration for DSASP would remove the requirement for connection through the Transmission Owner This type of Direct Communications would be limited to DSASP resources only 9

10 Why Direct Communications for DSASP? Connection through the Transmission Owner has presented challenges for some market participants Lead time to complete the integration into the Transmission Owner s EMS Potential upgrades to Transmission Owner systems to incorporate DSASP resources have also been identified Procurement, installation and testing of equipment based on Transmission Owners requirements and schedule 10

11 Why Direct Communications for DSASP? The NYISO believes that the option to connect through the Transmission Owner should still be available to demand resources providing ancillary services However, as a result of market participant feedback for a more streamlined approach to overcome the technical challenges of participation, the NYISO will identify and evaluate options based on the requirements for demand resources to receive direct communications from the NYISO without the requirement for connection through the Transmission Owner 11

12 Benefits of Direct Communication for DSASP on Aggregations Provides a foundation for work associated with implementation of DSASP aggregations Simplifies implementation Single set of hardware and communication requirements Composite signal to/from aggregator Aggregator coordinates resources Direct communications is the only practical approach for Aggregators in multiple Zones Current approach would require integration with multiple Transmission Owners Any tariff changes, market rules or procedural changes specific to aggregations will be considered during the Direct Communications for DSASP effort 12

13 Potential Communication Flow through Transmission Owners for DSASP Aggregations Aggregation A Via ICCP Transmission Owner #1 Resource (TO #1) (Subzone 1) Via TO EMS To Aggregation A Via Aggregator Comm To Aggregation A Resource (TO #1) (Subzone 1) Aggregation B NYISO Via ICCP Transmission Owner #2 Via TO EMS To Aggregation B Via TO EMS Aggregator Via Aggregator Comm To Aggregation B Aggregation C Resource (TO #1) (Subzone 2) Resource (TO #1) (Subzone 2) Via TO EMS Via Aggregator Comm Resource (TO #2) (Subzone 3) Resource (TO #2) (Subzone 3) Via ICCP Transmission Owner #3 Aggregation D Via Aggregator Comm Resource (TO #3) (Subzone 4) Resource (TO #3) (Subzone 4) 13

14 Simplified Direct Communication Flow for DSASP Aggregations 14

15 Direct Communications for DSASP NYISO sends dispatch instructions via ICCP to the DSASP resource The DSASP resource sends response directly to the NYISO NYISO updates the Transmission Owner on each update/scan cycle (6 seconds) Transmission Owner incorporates DSASP information according to its own operating procedures 15

16 Sample Direct Communications Path for DSASP NYISO SCAN 6-second (update and read) 1 NYISO EMS NYISO UPDATE TO SCAN Up to 10 Seconds (update and read) 1. NYISO (1,2) to DSASP RTU (6) via ICCP 2. METERS (8) TO TOTALIZER (7) TO DSASP RTU (6) 3. NYISO to TO ICCP (3) to TO EMS (4) 2 NYISO ICCP 3 TO ICCP 4 TO EMS DSASP SCAN? Seconds (update and read) Communications Requirements for Direct Communication for DSASP 6 DSASP RTU??? SECOND SCAN (Digital) 7 TOTALIZER??? SECOND SCAN Requirement Specifications New to NYISO 8 METER 8 METER 8 METER 16

17 Sample Direct Communication Path for DSASP Aggregation NYISO SCAN 6-second (update and read) 1 NYISO EMS NYISO UPDATE TO SCAN Up to 10 Seconds (update and read) 1. NYISO (1,2) to DSASP AGGREGATOR RTU (6) via ICCP 2. DSASP AGGREGATOR (6) to RESOURCE METERS (8) via DSASP AGGREGATOR DISPATCH/TOTALIZER SYSTEM (7) 3. NYISO to TO ICCP (3) to TO EMS (4) 2 NYISO ICCP 3 TO ICCP 4 TO EMS Communication Requirements for Direct Communication for DSASP 6 DSASP AGGREGATOR RTU DSASP SCAN? Seconds (update and read)??? SECOND SCAN (Digital) 7 DSASP AGGREGATOR DISPATCH/TOTALIZER SYSTEM??? SECOND SCAN Market Rules New to DSASP 8 METER 8 METER 8 METER 17

18 Operational Impact of Direct Communications for DSASP NYISO will need to develop specifications, requirements and procedures for operations that have historically been handled by the Transmission Owners Hardware requirements Communication requirements and procedures Security requirements Installation and testing requirements Identify any software or operational procedure changes 18

19 Hardware and Communication Requirements Hardware Research RTUs and meters for use by DSASP providers Develop specification documents Identify acceptable meter configurations Communication Identify communication requirements Develop protocol documentation Establish requirements, as necessary, for Encryption Redundancy (e.g., PCC/ACC, multiple Frame Relay Network provider as option) Backup and emergency procedures 19

20 Security Requirements Hardware Communication Authentication Procedures Potential implications of NERC CIP requirements 20

21 Installation and Testing requirements Installation of RTU, Communications and Metering Specifications Configurations Inspection Testing Hardware tests Communication tests 21

22 Other Impacts of Direct Communications for DSASP Cross-functional team will involve several NYISO departments Identify changes to NYISO documents and procedures Prioritization with other demand response initiatives 22

23 Identify Changes to NYISO Documents and Procedures Review procedures, tariff and manuals to determine necessary changes Develop procedures For Direct Communications enrollment for DSASP NYISO internal procedures for operation and support of Direct Communications for DSASP Identify any market rule changes Resulting from Direct Communications or DSASP Aggregations Identify any software impacts Review reliability rules Update manuals/procedures Such as the Ancillary Services Manual and Direct Communications Procedure 23

24 Direct Communications Procedure Formerly known as the Direct Generator Communications Manual Changed to Direct Communications Procedure in February 2010 Secure document Requires Critical Energy Infrastructure Information (CEII) Request and Non-Disclosure Agreement CEII Request and Non-Disclosure Agreement available from NYISO Customer Relations Request forms by calling

25 Schedule Prioritization with other Demand Response Initiatives Q Q Q May Jun Jul Aug Sep Oct Nov Dec DEMAND RESPONSE INFORMATION SYSTEM DRIS Training and Market Trials DRIS Deployment DRIS Training and Market Trials DRIS Deployment DRIS Training and Market Trials SCR BASELINE ANALYSIS Baseline Analysis Processing Results of SCR Baseline Analysis Procedures, Tariff and/or Manual Changes resulting from SCR Baseline Analysis and Aggregations DSASP DSASP Workshop NYISO Internal Procedures, Tariff and Manual Changes for Direct Communication for DSASP Tariff Filings, including DSASP Aggregations REAL-TIME DEMAND RESPONSE (ENERGY) Preliminary Market Design: Real-Time Energy for Demand Response 2011 Project Prioritization Schedule prioritization subject to change as necessary to comply with regulatory orders 25

26 Market Participant Feedback on Direct Communications for DSASP Does the proposed plan address the requests for a streamlined approach to communications for DSASP? Are there other issues related to DSASP that should be addressed as part of the plan? 26

27 Market Participant Feedback on Potential Enrollment for DSASP NYISO is looking for feedback from market participants interested in enrolling resources in DSASP using Direct Communications Estimated MW by location Estimated enrollment window relative to NYISO s implementation of Direct Communications (i.e., 3 months, 6 months, etc.) Type of enrollments (individual vs. aggregations) and estimated MW of each Please send estimates to Leigh Bullock (lbullock@nyiso.com) by June 4 27

28 The New York Independent System Operator (NYISO) is a not-for for-profit corporation that began operations in The NYISO operates New w York s s bulk electricity grid, administers the state s s wholesale electricity markets, and provides comprehensive reliability planning for the state s s bulk electricity system. 28

Energy Storage Integration

Energy Storage Integration Energy Storage Integration Feedback Update James Pigeon Senior Market Design Specialist, Distributed Resources Integration MIWG April 18, 2016 Krey Corporate Center, Rensselaer, NY 2000-2016 New York Independent

More information

Contingency Reserve Sharing; Ancillary Services Market. Presented to the JCM Joint Stakeholder Meeting

Contingency Reserve Sharing; Ancillary Services Market. Presented to the JCM Joint Stakeholder Meeting Contingency Reserve Sharing; Ancillary Services Market Presented to the JCM Joint Stakeholder Meeting 1 Agenda Products and Nature of Current Services Contingency Reserve Sharing Group (CRSG) Agreement

More information

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

California Independent System Operator Corporation Fifth Replacement Electronic Tariff Table of Contents Appendix M... 2 Dynamic Scheduling Protocol (DSP)... 2 1. DYNAMIC SCHEDULES OF IMPORTS TO THE CAISO BALANCING AUTHORITY AREA... 2 1.2 Contractual Relationships... 2 1.3 Communications,

More information

Direct Communications Manual. August 2017

Direct Communications Manual. August 2017 MANUAL 22 Direct Communications Manual August 2017 Version: 3.0.1 Effective Date: 08/17/2017 Committee Acceptance: 03/11/2010 This document was prepared by: New York Independent System Operator 10 Krey

More information

Introduction to the NYISO

Introduction to the NYISO Introduction to the NYISO Power Control Center Guilderland, NY July 21, 2011 1 Today s Topics NYISO History NYISO Roles & Governance NYISO Markets Building Reliability Emerging Trends 2 Evolution of the

More information

New York Market Opportunities

New York Market Opportunities New York Market Opportunities Robert Pike Director, Market Design New York Independent System Operator Workshop on Microgrid Technology and Applications October 11, 2013 Rensselaer Polytechnic Institute,

More information

Part 5 DSASP Resource Registration for MIS Demand Response Information System (DRIS) Training for March 2013 Deployment

Part 5 DSASP Resource Registration for MIS Demand Response Information System (DRIS) Training for March 2013 Deployment Part 5 DSASP Resource Registration for MIS Demand Response Information System (DRIS) Training for March 2013 Deployment Michael Lavillotti Product Business Analyst New York Independent System Operator

More information

Introduction: Model Relationships Network Model Overview Example Commercial Model Overview Component Hierarchy & Definitions Example of Structure

Introduction: Model Relationships Network Model Overview Example Commercial Model Overview Component Hierarchy & Definitions Example of Structure 1 2 3 Introduction: Model Relationships Network Model Overview Example Commercial Model Overview Component Hierarchy & Definitions Example of Structure MISO Functions Served by the Network Model by the

More information

Metering System and Communication Requirements

Metering System and Communication Requirements Metering System and Communication Requirements Andrew Levitt Sr. Market Strategist MIC Special Session on DER June 20, 2017 Definitions Metering system: includes all components from the meter location

More information

Energy Storage Integration

Energy Storage Integration Energy Storage Integration Feedback Update James Pigeon Senior Market Design Specialist, Distributed Resources Integration MIWG August 4, 2016 Krey Corporate Center, Rensselaer, NY 2000-2016 New York Independent

More information

Interconnection and Transmission

Interconnection and Transmission Interconnection and Transmission Gary L. Brown, P.E. Director of Energy Development Gary@ZGlobal.biz 916-985-9461 Kevin Coffee Energy Management Committee Meeting Irvine, California August 26, 2015 Interconnection

More information

Expanding Metering and Telemetry Options Technical Stakeholder Initiative

Expanding Metering and Telemetry Options Technical Stakeholder Initiative Expanding Metering and Telemetry Options Technical Stakeholder Initiative August 28th, 2013 9:00 a.m. 12:00 p.m. (Pacific Time) Web Conference Information Web Conference Information Web Address (URL):

More information

CAISO Metering & Telemetry Requirements. Jeremy Laundergan - Director, EnerNex November 8, 2012

CAISO Metering & Telemetry Requirements. Jeremy Laundergan - Director, EnerNex November 8, 2012 CAISO Metering & Telemetry Requirements Jeremy Laundergan - Director, EnerNex November 8, 2012 Background and Overview Both federal and state regulatory authorities are advocating the participation of

More information

Entergy Arkansas, Inc. Transition Plan Technical Conference #1

Entergy Arkansas, Inc. Transition Plan Technical Conference #1 Entergy Arkansas, Inc. Transition Plan Technical Conference #1 May 5, 2010 1 Why Technical Conferences? Complex subject matter Venue for stakeholders to develop an awareness and understanding of the issues

More information

Expanding Metering and Telemetry Options Technical Stakeholder Initiative

Expanding Metering and Telemetry Options Technical Stakeholder Initiative Expanding Metering and Telemetry Options Technical Stakeholder Initiative April 24, 2013 Todays Agenda Time Topic Presenter 10:00 10:10 Opening Comments/Introductions Khaled Abdul-Rahman 10:10 10:20 Stakeholder

More information

Interchange Distribution Calculator Billing

Interchange Distribution Calculator Billing Interchange Distribution Calculator Billing Chris Russell Manager, Customer Settlements New York Independent System Operator Billing & Accounting Working Group November 26, 2012 KCC 2012 New York Independent

More information

2011 North American SCADA & Process Control Summit March 1, 2011 Orlando, Fl

2011 North American SCADA & Process Control Summit March 1, 2011 Orlando, Fl Beyond Compliance Greg Goodrich Supervisor, Enterprise Security New York Independent System Operator 2011 North American SCADA & Process Control Summit March 1, 2011 Orlando, Fl Roles of the NYISO Reliable

More information

GUIDE 11. Demand Response Information System User s Guide

GUIDE 11. Demand Response Information System User s Guide GUIDE 11 Demand Response Information System User s Guide June 2016 11. PERFORMING RELIABILITY PROGRAM DEMAND RESPONSE EVENT-SPECIFIC OR TEST-SPECIFIC TASKS For NYISO s Reliability Programs, Demand Response

More information

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Keith Casey, Vice President, Market & Infrastructure Development Date: May 21, 2014 Re: Decision on interconnection

More information

NYISO Selected Topics

NYISO Selected Topics Engineering Conferences International ECI Digital Archives Modeling, Simulation, And Optimization for the 21st Century Electric Power Grid Proceedings Fall 10-22-2014 NYISO Selected Topics Dejan Sobajic

More information

Budget Review Process (BRP) Preliminary List of Business Initiatives. Stakeholder Meeting April 10, 2017

Budget Review Process (BRP) Preliminary List of Business Initiatives. Stakeholder Meeting April 10, 2017 2017-18 Budget Review Process (BRP) Preliminary List of Business Initiatives Stakeholder Meeting April 10, 2017 Purpose / Agenda The purpose of this presentation is to: Provide stakeholders with a BRP

More information

Midwest ISO Overview - ATC Customer Meeting. February 26, 2009

Midwest ISO Overview - ATC Customer Meeting. February 26, 2009 Midwest ISO Overview - ATC Customer Meeting February 26, 2009 Agenda Overview January 2009 Dashboard Module E RAR Timeline Questions 2 Overview January was characterized by seasonal cold temperatures,

More information

2017 Peak Dates & Times, 2017 NYSRC Fall Forecast Update, & 2018 ICAP Forecast Schedule

2017 Peak Dates & Times, 2017 NYSRC Fall Forecast Update, & 2018 ICAP Forecast Schedule 2017 Peak Dates & Times, 2017 NYSRC Fall Forecast Update, & 2018 ICAP Forecast Schedule Arthur Maniaci Supervisor, Load Forecasting & Energy Efficiency Load Forecasting Task Force September 1, 2017 COPYRIGHT

More information

Wide-Area Reliability Monitoring and Visualization Tools

Wide-Area Reliability Monitoring and Visualization Tools OE Visualization and Controls Peer Review Wide-Area Reliability Monitoring and Visualization Tools Carlos Martinez CERTS - Electric Power Group 21 October 2008 Washington, D.C. Presentation Outline Research

More information

NERC Monitoring and Situational Awareness Conference: Loss of Control Center Procedures and Testing Practices

NERC Monitoring and Situational Awareness Conference: Loss of Control Center Procedures and Testing Practices NERC Monitoring and Situational Awareness Conference: Loss of Control Center Procedures and Testing Practices Ed Batalla Director of Technology Florida Power & Light Company September 19, 2013 Florida

More information

Implementing Cyber-Security Standards

Implementing Cyber-Security Standards Implementing Cyber-Security Standards Greg Goodrich TFIST Chair, CISSP New York Independent System Operator Northeast Power Coordinating Council General Meeting Montreal, QC November 28, 2012 Topics Critical

More information

GO15 Reliable & Sustainable Power Grids

GO15 Reliable & Sustainable Power Grids Travis Rouillard Markets & Distributed Resources GE Grid Solutions GO15 Reliable & Sustainable Power Grids April 13, 2016 Corporate Enterprise February 2014 1 2040 GLOBAL POPULATION: 9 billion INCREASED

More information

ISO-NE Demand response season preparation webinar

ISO-NE Demand response season preparation webinar ISO-NE Demand response 2017 season preparation webinar agenda What you need to know Program information recap Market history and expectations Up-to-date information Curtailment plans Communications drill

More information

Matthew Musto, Senior Project Manager, New York ISO Charles Alonge, Senior Software Developer, New York ISO

Matthew Musto, Senior Project Manager, New York ISO Charles Alonge, Senior Software Developer, New York ISO Industry: Transmission/Distribution/Smarts Presented by Matthew Musto, Senior Project Manager, New York ISO Charles Alonge, Senior Software Developer, New York ISO Agenda About the NYISO A New State-of-the-Art

More information

N ORTH A MERICAN ELECTRIC RELIABILITY COUNCIL

N ORTH A MERICAN ELECTRIC RELIABILITY COUNCIL Michehl R. Gent President and CEO N ORTH A MERICAN ELECTRIC RELIABILITY COUNCIL Princeton Forrestal Village, 116-390 Village Boulevard, Princeton, New Jersey 08540-5731 The Honorable Patrick H. Wood III,

More information

New York ISO - Dynamic Data Response. Copyr i ght 2014 O SIs oft, LLC.

New York ISO - Dynamic Data Response. Copyr i ght 2014 O SIs oft, LLC. 1 New York ISO - Dynamic Data Response Presented by Matthew Musto NYISO Dynamic Data Response As the amount of information system operators, engineers and business units face continues to grow, we are

More information

Utility Interconnection. Highlights of the New Fast Track Process Proposed by FERC and Changes to IEEE 1547

Utility Interconnection. Highlights of the New Fast Track Process Proposed by FERC and Changes to IEEE 1547 Utility Interconnection Highlights of the New Fast Track Process Proposed by FERC and Changes to IEEE 1547 1 4/16/2013 Agenda Review of Status of Distributed Energy Resources Standards Changes Review of

More information

Written Testimony of Rick Gonzales Senior Vice President and Chief Operating Officer New York Independent System Operator

Written Testimony of Rick Gonzales Senior Vice President and Chief Operating Officer New York Independent System Operator Assembly Standing Committee on Energy Kevin A. Cahill, Chairman Assembly Standing Committee on Corporations, Authorities and Commissions James F. Brennan, Chairman Assembly Standing Committee on Cities

More information

BC Hydro Open Access Transmission Tariff Effective: January 26, 2018 OATT Attachment Q-1 First Revision of Page 1

BC Hydro Open Access Transmission Tariff Effective: January 26, 2018 OATT Attachment Q-1 First Revision of Page 1 OATT Attachment Q-1 First Revision of Page 1 ATTACHMENT Q-1 Dynamic Scheduling This attachment contains the eligibility requirements and the terms and conditions for the provision of dynamic scheduling

More information

Empowering Operations with the PI System

Empowering Operations with the PI System Empowering Operations with the PI System Presented by Thomas Marshall, IT Manager, PI Support NRG Energy Agenda o About NRG Energy o History of the NRG PI System Fleet Program o Timeline \ Milestones o

More information

The NYISO shall assign a Queue Position based upon the date and time of receipt of the

The NYISO shall assign a Queue Position based upon the date and time of receipt of the 30.4 Queue Position 30.4.1 General The NYISO shall assign a Queue Position based upon the date and time of receipt of the valid Interconnection Request; provided that, if the sole reason an Interconnection

More information

Agreements and Queue Management

Agreements and Queue Management Agreements and Queue Management Infrastructure Contracts and Management Joanne Bradley, Queue Management Shoukat Ansari, Contract Negotiation PJ Topping, Regulatory Contracts February 27, 2019 Interconnection

More information

Concept White Paper. Concepts for Proposed Content of Eventual Standard(s) for Project : Real-Time Monitoring and Analysis Capabilities

Concept White Paper. Concepts for Proposed Content of Eventual Standard(s) for Project : Real-Time Monitoring and Analysis Capabilities Concept White Paper Concepts for Proposed Content of Eventual Standard(s) for Project 2009-02: Real-Time Monitoring and Analysis Capabilities Real-time Monitoring and Analysis Capabilities Standard Drafting

More information

Compliance Enforcement Initiative

Compliance Enforcement Initiative Compliance Enforcement Initiative Filing and Status Update November 2, 2011 Rebecca Michael Status of the Filings NERC filed several components of the Compliance Enforcement Initiative on September 30,

More information

Standards Authorization Request Form

Standards Authorization Request Form Standards Authorization Request Form When completed, email this form to: sarcomm@nerc.com NERC welcomes suggestions to improve the reliability of the bulk power system through improved reliability standards.

More information

Table of Contents. Preface. SECTION 1 Introduction 1. SECTION 3 Operating Reserve 65. SECTION 2 Energy Market 17

Table of Contents. Preface. SECTION 1 Introduction 1. SECTION 3 Operating Reserve 65. SECTION 2 Energy Market 17 Table of Contents Table of Contents Preface SECTION 1 Introduction 1 Q3 2012 In Review 1 PJM Market Background 2 Conclusions 3 Role of MMU 6 Reporting 7 Monitoring 7 Market Design 8 Recommendations 8 Highlights

More information

CIP-014. JEA Compliance Approach. FRCC Fall Compliance Workshop Presenter Daniel Mishra

CIP-014. JEA Compliance Approach. FRCC Fall Compliance Workshop Presenter Daniel Mishra CIP-014 JEA Compliance Approach FRCC Fall Compliance Workshop Presenter Daniel Mishra Acronyms & Terminologies DHS Department of Homeland Security JEA It s not an acronym JSO Jacksonville Sheriff's Office

More information

ATTACHMENT F Form of Service Agreement for Wholesale Network Integration Transmission Service

ATTACHMENT F Form of Service Agreement for Wholesale Network Integration Transmission Service Improvement and Power District Original Sheet No. F-1 ATTACHMENT F Form of Service Agreement for Wholesale Network Integration Transmission Service 1.0 This Form of Service Agreement for Wholesale Network

More information

Energy Storage and Distributed Energy Resources Phase 2 Implementation

Energy Storage and Distributed Energy Resources Phase 2 Implementation Energy Storage and Distributed Energy Resources Phase 2 Implementation Customer Partnership Group January 29, 2018 1:00 p.m. 2:00 p.m. (Pacific Standard Time) Public Agenda Item Project Schedule Update

More information

Energy Storage and Distributed Energy Resources (ESDER) Stakeholder Initiative. Revised Scope and Schedule

Energy Storage and Distributed Energy Resources (ESDER) Stakeholder Initiative. Revised Scope and Schedule Energy Storage and Distributed Energy Resources (ESDER) Stakeholder Initiative Revised Scope and Schedule June 25, 2015 Table of Contents 1 Introduction... 3 2 Background... 3 3 Stakeholder process...

More information

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. Southern California Edison Revised Cal. PUC Sheet No. 63159-E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No. 62810-E Schedule D-SDP Sheet 1 APPLICABILITY The Domestic Summer Discount

More information

Analysis of EMS Outages

Analysis of EMS Outages Analysis of EMS Outages Venkat Tirupati, LCRA, Supervisor EMS SW & Advanced Applications NERC 3 rd Annual Monitoring and Situational Awareness Conference September 29-30, 2015 Agenda Introduction Common

More information

Utility Representative Frank Doherty, Con Ed Vendor Representative David Cohen, CEO Infotility, Inc.

Utility Representative Frank Doherty, Con Ed Vendor Representative David Cohen, CEO Infotility, Inc. Efficient Building Systems Utility Communications Internet Renewables PV Consumer Portal & Building EMS Advanced Distribution Dynamic Metering Control Operations Interface Systems Control Plug-In Hybrids

More information

MISO PJM Joint and Common Market Cross Border Transmission Planning

MISO PJM Joint and Common Market Cross Border Transmission Planning MISO PJM Joint and Common Market Cross Border Transmission Planning May 30, 2018 1 Coordinated System Plan Study 2 Using information from the March 30 Annual Issues Review, the JRPC has decided to perform

More information

Joint Energy Scheduling System User s Guide. March 2018

Joint Energy Scheduling System User s Guide. March 2018 GUIDE 14 Joint Energy Scheduling System User s Guide March 2018 Version: 2.4 Effective Date: 03/15/2018 This document was prepared by: NYISO Stakeholder Services New York Independent System Operator 10

More information

Standard CIP Cyber Security Critical Cyber Asset Identification

Standard CIP Cyber Security Critical Cyber Asset Identification Standard CIP 002 1 Cyber Security Critical Cyber Asset Identification Standard Development Roadmap This section is maintained by the drafting team during the development of the standard and will be removed

More information

Standard CIP Cyber Security Critical Cyber Asset Identification

Standard CIP Cyber Security Critical Cyber Asset Identification Standard CIP 002 1 Cyber Security Critical Cyber Asset Identification Standard Development Roadmap This section is maintained by the drafting team during the development of the standard and will be removed

More information

Agreements and Queue Management

Agreements and Queue Management Agreements and Queue Management Infrastructure Contracts and Management Emilee Plouff, Contract Negotiation and Regulatory Contracts Joanne Bradley, Queue Management March 6, 2018 Interconnection Process

More information

Standard Development Timeline

Standard Development Timeline Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard is adopted by the NERC Board of Trustees (Board).

More information

CIP V5 Implementation Study SMUD s Experience

CIP V5 Implementation Study SMUD s Experience CIP V5 Implementation Study SMUD s Experience Tim Kelley October 16, 2014 Powering forward. Together. SMUD Fast Facts General Information SMUD employs approximately 2,000 individuals Service area of 900

More information

Low Impact Generation CIP Compliance. Ryan Walter

Low Impact Generation CIP Compliance. Ryan Walter Low Impact Generation CIP Compliance Ryan Walter Agenda Entity Overview NERC CIP Introduction CIP-002-5.1, Asset Classification What Should Already be Done CIP-003-7, Low Impact Requirements Tri-State

More information

Cyber security for digital substations. IEC Europe Conference 2017

Cyber security for digital substations. IEC Europe Conference 2017 Cyber security for digital substations IEC 61850 Europe Conference 2017 Unrestricted Siemens 2017 siemens.com/gridsecurity Substation Digitalization process From security via simplicity 1st generation:

More information

EXHIBIT A: PROJECT SCOPE AND SCHEDULE The Project consists of the activities and delivery dates identified in this Exhibit A, implemented in accordance with the Agreement. The Parties have included a schedule

More information

TRANSMISSION ENGINEERING STANDARDS SUBSTATIONS

TRANSMISSION ENGINEERING STANDARDS SUBSTATIONS This standard was reviewed and approved by key managers on. Officer approval of this revision is not required. 1.0 SCOPE 1.1 This guide applies to the interconnection of a generating plant with the Oncor

More information

Advanced RTU Campaign Technical Resources: Evaluating Performance December 10, 2013

Advanced RTU Campaign Technical Resources: Evaluating Performance December 10, 2013 Advanced RTU Campaign Technical Resources: Evaluating Performance December 10, 2013 Agenda Overview of the Advanced RTU Campaign Resources for RTU Evaluation RTU Evaluation Application RTU Upgrade Case

More information

PHASE I ENERGY STORAGE: LESSONS LEARNED

PHASE I ENERGY STORAGE: LESSONS LEARNED PHASE I ENERGY STORAGE: LESSONS LEARNED ESAG Meeting, June 28, 2018 Innovation Research and Development Table of Contents 1. History and Background 2. Pre-Commissioning: Challenges experienced 3. Project

More information

CIP Cyber Security Configuration Change Management and Vulnerability Assessments

CIP Cyber Security Configuration Change Management and Vulnerability Assessments Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed

More information

RELIABILITY AS A SERVICE FOR BUSINESS. by MidEnterprises, LLC

RELIABILITY AS A SERVICE FOR BUSINESS. by MidEnterprises, LLC RELIABILITY AS A SERVICE FOR BUSINESS by MidEnterprises, LLC THE OPPORTUNITY Less than 30% of commercial facilities have a reliable back-up power supply Only10-15% of those having existing installations

More information

This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective.

This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Description of Current Draft

More information

This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective.

This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed

More information

WELCOME. Draft Energy Storage Roadmap. Draft Matrix Stakeholder Call. November 3, 2014 San Francisco SAFER, SMARTER, GREENER

WELCOME. Draft Energy Storage Roadmap. Draft Matrix Stakeholder Call. November 3, 2014 San Francisco SAFER, SMARTER, GREENER WELCOME Draft Energy Storage Roadmap Draft Matrix Stakeholder Call November 3, 2014 San Francisco SAFER, SMARTER, GREENER Alignment of Proposed Actions to Storage Configuration and Use Cases Robert Anderson,

More information

SDG&E s Accomplishments and Future Plans

SDG&E s Accomplishments and Future Plans SDG&E s Accomplishments and Future Plans Tariq Raman and Subbu Sankaran San Diego Gas & Electric Work Group Meeting October 23-24, 2018 San Diego Gas & Electric San Francisco SDG&E Los Angeles San Diego

More information

Energy Solutions for Buildings

Energy Solutions for Buildings Energy Solutions for Buildings Making energy safe, reliable, efficient, productive and green Make the most of your energy SM 1 Solutions to enable and sustain energy savings Technology is crucial to make

More information

SME License Order Working Group Update - Webinar #3 Call in number:

SME License Order Working Group Update - Webinar #3 Call in number: SME License Order Working Group Update - Webinar #3 Call in number: Canada Local: +1-416-915-8942 Canada Toll Free: +1-855-244-8680 Event Number: 662 298 966 Attendee ID: check your WebEx session under

More information

Generator Interconnection Process. Wholesale Transmission Overview

Generator Interconnection Process. Wholesale Transmission Overview 1 Generator Interconnection Process Wholesale Transmission Overview 2 This presentation summarizes the FERC-approved Generator Interconnection Procedures (GIP) in Appendix Y of the California Independent

More information

Order No Compliance Filing Related to Interconnection Issues Proposed Transmission Interconnection Process

Order No Compliance Filing Related to Interconnection Issues Proposed Transmission Interconnection Process Order No. 1000 Compliance Filing Related to Interconnection Issues Proposed Transmission Interconnection Process Thinh Nguyen Manager, Interconnection Projects New York Independent System Operator Joint

More information

ICAP Automated Market User s Guide

ICAP Automated Market User s Guide GUIDE 2 ICAP Automated Market User s Guide April 2010 Version: 1.8 Revision Date: 04/07/2010 This document was prepared by: NYISO Customer Support New York Independent System Operator 3890 Carman Road

More information

Physical Security Reliability Standard Implementation

Physical Security Reliability Standard Implementation Physical Security Reliability Standard Implementation Attachment 4b Action Information Background On March 7, 2014, the Commission issued an order directing NERC to submit for approval, within 90 days,

More information

Status and Next Steps NARUC Electricity Committee Hank Courtright, Senior VP July 15, 2014

Status and Next Steps NARUC Electricity Committee Hank Courtright, Senior VP July 15, 2014 Status and Next Steps NARUC Electricity Committee Hank Courtright, Senior VP July 15, 2014 2014 Electric Power Research Institute, Inc. All rights reserved. Meet the Challenge An Integrated Grid 2 Interconnected

More information

Demonstration Test Bed for Advanced Control Systems

Demonstration Test Bed for Advanced Control Systems Demonstration Test Bed for Advanced Control Systems Christopher R Clarke Senior Engineer SCE Advanced Technology June 22, 2016 1 Advanced Distribution Control Systems Introduction of customer adoption

More information

Stakeholder consultation process and online consultation platform

Stakeholder consultation process and online consultation platform Stakeholder consultation process and online consultation platform Grant agreement no.: 633107 Deliverable No. D6.2 Stakeholder consultation process and online consultation platform Status: Final Dissemination

More information

IntelliGrid. Don Von Dollen IntelliGrid Program Manager (650)

IntelliGrid. Don Von Dollen IntelliGrid Program Manager  (650) IntelliGrid Don Von Dollen IntelliGrid Program Manager dvondoll@epri.com www.epri-intelligrid.com (650) 855-2679 Background EPRI s IntelliGrid Program Mission: To accelerate the transformation of the power

More information

REPORT ON TELECOMMUNICATIONS SERVICE QUALITY WINDSTREAM FLORIDA, INC.

REPORT ON TELECOMMUNICATIONS SERVICE QUALITY WINDSTREAM FLORIDA, INC. REPORT ON TELECOMMUNICATIONS SERVICE QUALITY For WINDSTREAM FLORIDA, INC. Alachua, Brooker, High Springs, Melrose, and Waldo s February 4 March 14, 2008 Division of Service, Safety & Consumer Assistance

More information

Data Miner 2 Release Notes Release 18.09

Data Miner 2 Release Notes Release 18.09 Data Miner 2 Release Notes Release 18.09 Release Date: September 24, 2018 New Features: 1. New feeds These feeds will be available from September 25, 2018 onwards Enhancements: Real Time Temperature Sets

More information

IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO

IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO PREPARED BY: System Management (WA) DOCUMENT REF: SO_OP_WA_3805 VERSION: 1.0 EFFECTIVE DATE: 13/10/2017 STATUS: DRAFT FOR CONSULTATION Approved

More information

Microgrids and Distribution Utilities

Microgrids and Distribution Utilities Microgrids and Distribution Utilities Dan Ton, Power Systems Engineering Research & Development October 19, 2017 Office of Electricity The Office of Electricity Delivery and Energy Reliability (OE) drives

More information

REAL-TIME MONITORING DATA SPECIFICATION

REAL-TIME MONITORING DATA SPECIFICATION REAL-TIME MONITORING DATA SPECIFICATION Version 1 December 9, 2016 Revision History Version Date Reviewer Revisions 1 11/1/16 Mansion Hudson Initial document 1 Contents 1. DOCUMENT REVIEW... 3 2. DEFINITIONS...

More information

Southern California Edison. Leading the Way in Electricity TM

Southern California Edison. Leading the Way in Electricity TM Southern California Edison Leading the Way in Electricity TM Smart Metering Essentials at SCE End-Use Energy Reductions through Monitoring, Feedback, and Behavior Modification Precourt Institute for Energy

More information

IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO

IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO PREPARED BY: System Management (WA) DOCUMENT REF: SO_OP_WA_3805 VERSION: 1.0 EFFECTIVE DATE: 13/10/2017 STATUS: FINAL Approved for distribution

More information

John P Buechler NYISO Executive Regulatory Policy Advisor. NPCC Governmental and Regulatory Affairs Advisory Group Meeting Albany, NY

John P Buechler NYISO Executive Regulatory Policy Advisor. NPCC Governmental and Regulatory Affairs Advisory Group Meeting Albany, NY Eastern Interconnection Planning Collaborative Update John P Buechler NYISO Executive Regulatory Policy Advisor NPCC Governmental and Regulatory Affairs Advisory Group Meeting Albany, NY November 30, 2010

More information

January 22, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

January 22, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. California Independent System Operator Corporation January 22, 2013 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Re: California

More information

Utility Applications for Energy Storage. NY-BEST Capture the Energy 2018 March 15, 2018 Albany, NY

Utility Applications for Energy Storage. NY-BEST Capture the Energy 2018 March 15, 2018 Albany, NY Utility Applications for Energy Storage NY-BEST Capture the Energy 2018 March 15, 2018 Albany, NY Presenter Pete Falcier VP Analytics & Regulatory Affairs pfalcier@gienergyus.com (646) 786-1256 2 REV Demo

More information

Grid Modernization in New York: The Role of New Technologies and Early Lessons Learned

Grid Modernization in New York: The Role of New Technologies and Early Lessons Learned Grid Modernization in New York: The Role of New Technologies and Early Lessons Learned James T. Gallagher, Executive Director New York State Smart Grid Consortium April 11, 2018 New York State Smart Grid

More information

CIP Cyber Security Configuration Change Management and Vulnerability Assessments

CIP Cyber Security Configuration Change Management and Vulnerability Assessments CIP-010-2 3 Cyber Security Configuration Change Management and Vulnerability Assessments A. Introduction 1. Title: Cyber Security Configuration Change Management and Vulnerability Assessments 2. Number:

More information

GridEx IV Initial Lessons Learned and Resilience Initiatives

GridEx IV Initial Lessons Learned and Resilience Initiatives GridEx IV Initial Lessons Learned and Resilience Initiatives LeRoy T. Bunyon, MBA, CBCP Sr. Lead Analyst, Business Continuity 2017 GridEx IV GridEx is a NERC-sponsored, North American grid resilience exercise

More information

May Hands-on Guidance. Measurable Results. SUPPLIER EFFICIENCY PROGRAM

May Hands-on Guidance. Measurable Results. SUPPLIER EFFICIENCY PROGRAM May 2015 Hands-on Guidance. Measurable Results. SUPPLIER EFFICIENCY PROGRAM REACHING OUTSIDE OUR WALLS WHAT A scalable education and training platform that helps suppliers reduce their energy use and costs

More information

AMI Applications at SDG&E Metering America March 24, 2009 Ted M. Reguly Smart Meter Program Director SDG&E

AMI Applications at SDG&E Metering America March 24, 2009 Ted M. Reguly Smart Meter Program Director SDG&E AMI Applications at SDG&E Metering America March 24, 2009 Ted M. Reguly Smart Meter Program Director SDG&E 2008 San Diego Gas & Electric Company. All copyright and trademark rights reserved About Sempra

More information

The City of Seattle s Mandatory Benchmarking and Disclosure Program

The City of Seattle s Mandatory Benchmarking and Disclosure Program The City of Seattle s Mandatory Benchmarking and Disclosure Program IFMA Seattle Annual Education Symposium March 10, 2011 City of Seattle Department of Planning and Development Agenda Background Overview

More information

ISO-NE Demand Resource New Dispatch & Real-Time Data. Robert B. Burke, Principal Analyst Market Development ISO New England Inc.

ISO-NE Demand Resource New Dispatch & Real-Time Data. Robert B. Burke, Principal Analyst Market Development ISO New England Inc. ISO-NE Demand Resource New Dispatch & Real-Time Data Robert B. Burke, Principal Analyst Market Development ISO New England Inc. May 12, 2010 Definitions Baseline Telemetry System (BLTS): new system developed

More information

Glencoe Light and Power

Glencoe Light and Power Glencoe Light and Power REQUIREMENTS FOR GENERATION, TRANSMISSION, AND END-USER FACILITY INTERCONNECTIONS 1 Table of Contents Page I. INTRODUCTION...5 A. Authority... 5 B. Objectives...5 C. Interconnection

More information

Security in grid control centers: Spectrum Power TM Cyber Security

Security in grid control centers: Spectrum Power TM Cyber Security Security in grid control centers: Spectrum Power TM Cyber Security Thomas Schmidt, Information Security Manager siemens.at/future-of-energy Spectrum Power TM 7 Historical Information System Table of content

More information

SOUTHERN CALIFORNIA EDISON COMPANY

SOUTHERN CALIFORNIA EDISON COMPANY SOUTHERN CALIFORNIA EDISON COMPANY COMPLIANCE PROCEDURES IMPLEMENTING FERC ORDER 717C STANDARDS OF CONDUCT Version 1.2 Updated June 14, 2017 Purpose: To provide Southern California Edison s (SCE) overall

More information

Standard INT Dynamic Transfers

Standard INT Dynamic Transfers A. Introduction 1. Title: Dynamic Transfers 2. Number: INT-004-3 3. Purpose: To ensure Dynamic Schedules and Pseudo-Ties are communicated and accounted for appropriately in congestion management procedures.

More information

GRID MODERNIZATION INITIATIVE PEER REVIEW

GRID MODERNIZATION INITIATIVE PEER REVIEW GRID MODERNIZATION INITIATIVE PEER REVIEW GMLC 1.3.5 DER Siting and Optimization tool for JOHN GROSH & GONÇALO CARDOSO April 18-20, 2017 Sheraton Pentagon City Arlington, VA Planning and Design Tools 4/4/17

More information

Comment Form for 1 st Draft of Standard for Backup Facilities (Project )

Comment Form for 1 st Draft of Standard for Backup Facilities (Project ) Comment Form for 1 st Draft of Standard for Backup Facilities (Project 2006-04) Please use this form to submit comments on the 1 st draft of the standards for Backup Facilities (Project 2006-04). Comments

More information