DOCUMENT ADDENDUM

Size: px
Start display at page:

Download "DOCUMENT ADDENDUM"

Transcription

1 DOCUMENT ADDENDUM KILLIAN CREEK WWTP UPGRADE LINCOLN COUNTY, NORTH CAROLINA WKD Project Number CL ADDENDUM NUMBER 1 June 11, 2015 BID DATE: June 25, 2015, 2:00 PM TO ALL BIDDERS: Below are changes and/or clarifications to the bid documents for this project. CONTRACTING REQUIREMENTS 1. REVISE Section Bid Form A. The Bid Form is to be reissued in whole in a later Addendum to reflect the following revisions: I. Schedule A. Tabulation of Major Equipment and Products - ADD Specification Description Base Bid Equipment or Products Mfg Polymer Blending & Feed Equip. Rotary Drum Filter Press Supervisory Control and Data Acquisition (SCADA) for Base Bid and Owner Elective Items Alternative Owner Preferred Equip. or Product Mfg Excell Feeders, Inc. Dorsett Technologies Addition/ Deduct to Base Bid Price for Alternative Owner Preferred Equip. or Product $ $ Lincoln County Addendum No. 1 Killian Creek WWTP Upgrade WKD Project Number: CL

2 DOCUMENT ADDENDUM II. Schedule B. Tabulation of Owner Additive Alternative Bid Item Costs REVISE: SCHEDULE B. TABULATION OF OWNER ADDITIVE ALTERNATE BID ITEM COSTS: Specification Description Equipment Mfg/Supplier Total Installed Cost A. Rotary Drum Thickener Equipment and Field Erected Precast Concrete Building. Polymer Blending & Feed Equipment (PD-3) $ 2. REVISE - Specification Summary A. ADD - Item 1.2.A.8 Polymer Blending & Feed Equipment (PD-2) for the Rotary Filter Press. B. ADD Item 1.2.A.9 Supervisory Control and Data Acquisition (SCADA) for both Base Bid and Owner Additive Elective Equipment Items and Products. C. ADD - Paragraph 1.2.B.1 Bid Item A: The total installed cost is to include the Rotary Drum Thickener, Field Erected Precast Building and Polymer Blending & Feed Equipment (PD-3) associated with the Rotary Drum Thickener. After bid award and prior to final selection of the Owner Additive Alternative Bid for the Rotary Drum Thickener (Specification Section ), the proposed manufacture will be requested to submit information regarding typical polymer usage for waste activated sludge applications and installation references. The proposed manufacture may then be requested to perform confirmation polymer and dewatering performance bench testing at no cost to the Owner, with waste activated sludge samples from the Killian Creek WWTP. The testing is to be performed utilizing the manufacturer s recommended polymer and the polymer currently utilized by the Owner for dewatering to establish a maximum polymer dosage and minimum thickened sludge concentration. Lincoln County Addendum No. 1 Killian Creek WWTP Upgrade WKD Project Number: CL

3 DOCUMENT ADDENDUM At the Owner s election, a selected alternative manufacturer may be provided the opportunity to perform the same testing to provide data for alternative system. The resulting polymer and performance data will be utilized by the Owner evaluate life cycle costs for the respective manufacturers taking into consideration any added cost to the Contractors bid for the competitive equipment. Final equipment procurement may also include a negotiated performance based guarantee and penalty should the installed equipment fail to meet a performance guarantee. D. Paragraph 1.5.A.2 - I. Work associated with the piping revision in the sludge holding tank is to be scheduled prior to the work to install piping in the digesters to permit operational flexibility during work requiring lowering digester levels. II. The new effluent filter #3 is to be installed prior to work associated with the post equalization pumps and mixers to provide additional filter capacity for drainage of the post equalization tank. III. Work requiring access to the bottom of the post equalization must be scheduled in off hours between midnight and 8 am to facilitate drainage of the tank and retainage of flow within the post equalization tank. TECHNICAL SPECIFICATIONS 1. CLARIFICATION Specification Section Process Piping, Fittings, Valves and Accessories A. Paragraph 2.7.B Gaskets for flanged pipe are to be Toruseal or equal, 1/8 Styrene Butadiene (SBR) rubber conforming to ANSI/AWWA C111/A21.11 for Ductile Iron Pipe and ASTM F-477 for plastic pipe. 2. CHANGE - Specification Section Ultraviolet Disinfection Equipment A. Paragraph 2.12.I.1 Delete paragraph and add the following: I. SCADA System Output - The existing plant UV system has been modified to eliminate hardwired monitoring of the UV system via SCADA. Those modifications include the addition of a Modbus TCP communications link between the UV system and SCADA RTU3. This Modbus TCP communications link will accommodate monitoring of the new UV channel equipment to be installed as part of this project. The UV vendor shall provide I/O mapping information for coordination with the SCADA integrator to accommodate SCADA monitoring of the UV system status. Lincoln County Addendum No. 1 Killian Creek WWTP Upgrade WKD Project Number: CL

4 DOCUMENT ADDENDUM 1) The intent is for monitoring of the new UV system to match that of the existing UV system. Details shall be coordinated and verified with the Owner s plant staff. 2) In addition to matching existing UV system monitoring, Open/Closed Position of Channel Gates for each UV system shall be monitored. 3) It is anticipated that up to 60 discrete tags in the new UV system will be monitored by SCADA. 4) It is anticipated that up to 20 real tags in the new UV system will be monitored by SCADA. 3. ADD - Specification Section Supervisory Control and Data Acquisition (SCADA). 4. CLARIFICATION Specification Section Rotary Drum Thickener Pump Station. A. Paragraph 3.2B The requirement for factory testing of the complete pump station system shall include the pump station control panel, pumps, drives, discharge piping, valves and air release completely assembled in the enclosure. DRAWINGS 1. REPLACE DRAWING E1.2 WITH ATTACHED DRAWING E1.2 REVISED 5/21/15 Drawing E1.2 was revised to extend 120 V for SCADA RTU Expansion Cabinet(s). 2. REPLACE DRAWING E1.4 WITH ATTACHED DRAWING E1.4 REVISED 5/21/15 Drawing E1.4 was revised to extend 120 V to SCADA RTU Expansion Cabinet(s) and for modifications to existing UV system SCADA monitoring. 3. REPLACE DRAWING E1.6 WITH ATTACHED DRAWING E1.6 REVISED 5/21/15 Drawing E1.2 was revised to extend 120 V for SCADA RTU Expansion Cabinet(s). Lincoln County Addendum No. 1 Killian Creek WWTP Upgrade WKD Project Number: CL

5 DOCUMENT ADDENDUM GENERAL The mandatory pre-bid meeting was held on June 11, A copy of the attendees and meeting agenda is attached. Bids will be accepted only from companies represented at the prebid meeting and are registered plan holders. Related comments and clarifications from the meeting are as follows: 1. Time of completion The Contractor s construction activity at the plant site is to be limited to the last 180 days of the construction period. Access to the site during the initial 125 days will be permitted for preliminary mobilization, layout, measurements and field investigation activities not requiring the physical installation of equipment or disruption of any plant operations. 2. The rainfall record from the Mounty Holly 4 NE NOAA weather reporting station is to be utilized for the determination of the mean days of precipitation each month in accordance with the Supplementary Conditions. 3. Normal plant operational hours are 7 am to 5 pm, Monday to Friday. Contractor access to the site at other times must be coordinated in advance with the Owner. 4. The Contractor will be permitted to utilize office and rest room facilities in the Maintenance Building but will be responsible for installing a temporary security fence for protection of the Owner equipment stored in the building and maintaining cleanliness of the facility utilized by the Contractor. 5. Work related to the piping modifications in the Sludge Holding Tank is to be performed prior to the work within Digester #1 and #2 to provide process flexibility during the work at the digesters. 6. Work within the Post Equalization Basin is to be performed after installation of the new effluent filter and is to be scheduled between midnight and 8 am unless other temporary provisions are made for the temporary transfer of decant flow during the work. Lincoln County Addendum No. 1 Killian Creek WWTP Upgrade WKD Project Number: CL

6

7 SECTION SUPERVISORY CONTROL AND DATA ACQUISITION (SCADA) PART 1 GENERAL 1.1 RELATED DOCUMENTS A. The Drawings and provisions of the General Conditions, Special Conditions, and the Sections included under General Requirements are included as part of this Section as though bound herein. 1.2 WORK INCLUDED A. This section gives the requirements for SCADA system work on the Lincoln County SCADA system. B. Completeness: These specifications cover the intended function of the equipment, but do not necessarily cover all details necessary for a complete, operating and functional system. Contractor shall supply all devices and appurtenances necessary to provide a complete, operable and satisfactory system as indicated or specified. 1.3 ABBREVIATIONS AI AO DI DO I/O RTU SBR SCADA UI Analog Input Analog Output Digital Input Digital Output Input/Output Remote Terminal Unit Sequenced Batch Reactor Supervisory Control and Data Acquisition Universal Input 1.4 SUBMITTALS A. Pre-Construction: Shop drawings and product data for component installation to upgrade the existing RTUs to accommodate the additional I/O required for this project. B. Post-Construction: Submit to the Owner, CD copies of software for the SCADA system. One copy of the software shall be of the base software control system. Two copies shall be provided with all programmed variables, parameters, and functions of the SCADA system. 1.5 CERTIFICATIONS A. Equipment and components shall be 3 rd part listed; UL, ETL, CSA, etc. 1.6 WARRANTY / GUARANTEE A. The Integrator shall provide a 1-year warranty for all installed equipment stating that it is free from defects in workmanship and material. B. It is the intent of these specifications that the integrator shall furnish a complete, integrated, functionally operating system. Integrator shall warrant that the system performs the intended functions. PART 2 PRODUCTS Killian Creek WWTP Upgrades SCADA WKD Project Number CL

8 2.1 SCADA SYSTEM COMPONENTS A. The components of Lincoln County's existing SCADA System at Killian Creek Wastewater Treatment Plant include four RTUs designated SCADA Base RTU, RTU1, RTU2, and RTU3. B. The existing remote terminal units (RTU) utilize the following components for inputs and outputs. 1. Dorsett MicroScan4 Universal Controllers Part No. MS4-UNV. 2. Dorsett MicroScan4 Digital Controllers Part No. MS4-DIG. C. The Owner s integrator for SCADA system work is: Dorsett Technologies, Inc. 100 Woodlyn Drive Yadkinville, NC Phone: Fax: Contact: David W. Hutchens D. Replacement or upgrades to RTUs required to accommodate additional I/O for this project shall be determined by the Owner s SCADA integrator. Components not requiring replacement shall be re-used with the existing RTUs. E. Modifications shall be compatible with and interface seamlessly with the existing Lincoln County SCADA System. 2.2 RTU MODIFICATIONS A. Modifications for RTUs are quantified below based on information available for existing and proposed I/O quantities. Existing I/O availability shall be verified in the field. Proposed I/O shall be verified with what is indicated in the project drawings. B. SCADA BASE RTU (Lab Building): 1. No additional hardwired I/O connections are anticipated to this RTU. 2. This RTU is connected via a digital communications link to the plant SBR Control Panel to monitor status of the SBR system equipment and components. SCADA programming will be required for modifications to the SBR system as part of this upgrade project. 3. Control system programming shall be performed to provide system monitoring and control functions and modifications. Specific revisions to be incorporated associated with the SBR system are indicated on Instrumentation and Control Schedules in the project drawings. C. RTU1 (Blower Building): 1. Record documents show the following I/O availability: a. DI: 0. b. DO: 8. c. UI: 8. d. AO: This plant expansion project requires the following I/O points: a. DI: 17. b. AI: 1. Killian Creek WWTP Upgrades SCADA WKD Project Number CL

9 3. To accommodate the additional inputs, it is anticipated that installation of an expansion cabinet associated with the RTU is necessary. D. RTU2 (Dewatering Building): 1. Record documents show the following I/O availability: a. DI: 16. b. DO: 66. c. UI: 15. d. AO: This plant expansion project requires the following I/O points: a. DI: 36. b. DO: To accommodate the additional inputs, it is anticipated that installation of an expansion cabinet or multiple expansion cabinets associated with the RTU is necessary. E. RTU3 (Filter / UV Building): 2.3 WIRING 1. Record documents show the following I/O availability: a. DI: 10. b. DO: 72. c. UI: 6. d. AO: This plant expansion project requires the following I/O points: a. DI: 44. b. AI: To accommodate the additional inputs, it is anticipated that installation of an expansion cabinet or multiple expansion cabinets associated with the RTU is necessary. 4. Modifications to the existing UV system have been made to eliminate hardwired monitoring of the UV system via SCADA RTU3. Modifications include the addition of a Modbus TCP communications link between the UV system and SCADA RTU3. This Modbus TCP communications link will accommodate monitoring of the new UV channel equipment to be installed as part of this project. The UV vendor will provide I/O mapping information for coordination with the SCADA integrator to accommodate SCADA monitoring of the UV system status. a. It is anticipated that up to 60 discrete tags in the UV system will be monitored by SCADA. b. It is anticipated that up to 20 real tags in the UV system will be monitored by SCADA. A. All internal instrument and component device wiring shall be as normally furnished by the manufacturer. With exception of electronic circuits, all interconnecting wiring and wiring to terminals for external connection shall be no less than 18 AWG copper, insulated for not less than 600 volts, with a moisture and heat resistant material and flame retardant nonmetallic covering. B. All wires are to be identified with permanent wire number markers at each termination point of the wire. Acceptable NEC and ISA wire colors for various voltage conductors are to be used. C. Terminal blocks for field connections shall be suitable for No. 12 AWG wire and be complete with marking strip and screw connectors. Terminals shall be labeled to agree with identifications shown on supplier's submittal drawings. A terminal shall be provided for each conductor of external circuits plus one ground for each shielded cable. All wiring shall be grouped or cabled and firmly supported to the panel. Not less than 8 inches of clearance shall Killian Creek WWTP Upgrades SCADA WKD Project Number CL

10 be provided between the terminal strips and the base of vertical panels for conduit and wiring space. No less than 25% spare terminals shall be provided. Each control loop or system shall be individually fused and all fuses or circuit breakers shall be clearly labeled and located for easy maintenance. 2.4 DEVICE IDENTIFICATION A. All devices shall be permanently identified. The device and terminal identifications shall agree with those shown on the equipment drawings. B. Nameplates shall be provided on the face of individual devices. PART 3 EXECUTION 3.1 SUBMITTALS A. Submit to the Owner, CD copies of software for the SCADA system. One copy of the software shall be of the base software control system. Two copies shall be provided with all programmed variables, parameters, and functions of the SCADA system. 3.2 INSTALLATION A. General: The Contractor shall receive, handle and store all equipment and materials to be installed, being careful to prevent any damage during transport and storage. All equipment stored shall be protected from weather in a manner recommended by the manufacturer. 1. All equipment shall be handled and installed in accordance with written instructions and approved shop drawing details of the manufacturer and as required by the drawings. 2. If the Contractor determines that existing conditions do not permit proper installation, he shall immediately notify the Owner s Representative. B. Maintain existing programming for wastewater treatment plant monitoring and control functions that are not to be modified as part of this project. C. Control system programming shall be performed to provide system monitoring and control functions and modifications. Specific revisions to be incorporated are indicated on Instrumentation and Control Schedules in the project drawings. 3.3 START-UP TESTING A. Test system for proper function. 3.4 WITNESS TESTING A. The OWNER, ENGINEER, regular operators, and the maintenance staff shall be notified 1 week in advance of the times and dates of site tests. Tests shall be performed that fully exhibit the control and monitoring functions as specified herein. 3.5 SUPERVISION, START-UP, SERVICE, AND TRAINING A. Integrator's trained service engineer/technician shall provide installation supervision to the Contractor. B. Integrator's trained service engineer/technician shall provide initial startup, calibration and adjustment of equipment. Killian Creek WWTP Upgrades SCADA WKD Project Number CL

11 C. Integrator shall, during the warranty period, furnish all service necessary to repair defective equipment or work, and no charges will be made for any service due to these reasons. A complete written report shall be furnished to the Owner and Engineer after each service visit, giving the reason for failure and recommendations to prevent recurrence. D. Conditional service shall also be provided, upon request of the Owner, for a period of one year after final acceptance, up to two 8-hour days, on-site. E. Maintenance Training: At start-up, the integrator shall provide eight (8) hours of maintenance training for the owner s personnel. END OF SECTION Killian Creek WWTP Upgrades SCADA WKD Project Number CL

12 INTENTIONALLY LEFT BLANK

13 COPYRIGHT, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. CONSULTING ENGINEERS 3412 ENTERPRISE DRIVE (910) NC LICENSE #: C-1073 community infrastructure consultants 616 COLONNADE DRIVE CHARLOTTE, NC (t) (f) NC LICENSE NO.F-0374 PROFESSIONAL SEAL AIR INTAKE NEW BLOWER NO. 8 DIGESTER NEW BLOWER NO. 4 SBR AIR INTAKE REVISION RECORD 1 05/21/15 MAC DESCRIPTION BY DATE NO. FILE PATH:F:\1468 Killian Creek WWTP Expansion\DWG\1468 E1.2 BLOWER.dwgF:\1468 Killian Creek WWTP Expansion\DWG\1468 E1.2 BLOWER.dwg, MARK, 5/21/2015 4:25:55 PM BID DOCUMENT - DO NOT USE FOR CONSTRUCTION PROJECT NAME: KILLIAN CREEK WWTP UPGRADES WKD PROJ. NO.: DRAWING TITLE: PROJ. MGR.: BF DESIGN BY: MAC DRAWN BY: FM PROJ. DATE: DEC DRAWING NUMBER: E1.2 ELECTRICAL BLOWER BUILDING CL

14 COPYRIGHT, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. CONSULTING ENGINEERS 3412 ENTERPRISE DRIVE (910) NC LICENSE #: C-1073 community infrastructure consultants 616 COLONNADE DRIVE CHARLOTTE, NC (t) (f) NC LICENSE NO.F-0374 PROFESSIONAL SEAL REVISION RECORD DATE DESCRIPTION BY FILE PATH:F:\1468 Killian Creek WWTP Expansion\DWG\1468 E1.4 EFFLUENT-UV.dwgF:\1468 Killian Creek WWTP Expansion\DWG\1468 E1.4 EFFLUENT-UV.dwg, MARK, 5/21/2015 4:25:17 PM 1 05/21/15 MAC NO. BID DOCUMENT - DO NOT USE FOR CONSTRUCTION PROJECT NAME: KILLIAN CREEK WWTP UPGRADES WKD PROJ. NO.: DRAWING TITLE: PROJ. MGR.: BF DESIGN BY: MAC DRAWN BY: FM PROJ. DATE: DEC DRAWING NUMBER: E1.4 ELECTRICAL EFFLUENT / UV BUILDING CL

15 COPYRIGHT, W.K. DICKSON & CO., INC. ALL RIGHTS RESERVED. REPRODUCTION OR USE OF THE CONTENTS OF THIS DOCUMENT; ADDITIONS OR DELETIONS TO THIS DOCUMENT, IN WHOLE OR IN PART, WITHOUT WRITTEN CONSENT OF W.K. DICKSON & CO., INC., IS PROHIBITED. ONLY COPIES FROM THE ORIGINAL OF THIS DOCUMENT, MARKED WITH AN ORIGINAL SIGNATURE AND SEAL SHALL BE CONSIDERED TO BE VALID, TRUE COPIES. CONSULTING ENGINEERS 3412 ENTERPRISE DRIVE (910) NC LICENSE #: C-1073 community infrastructure consultants 616 COLONNADE DRIVE CHARLOTTE, NC (t) (f) NC LICENSE NO.F-0374 PROFESSIONAL SEAL REVISION RECORD 1 05/21/15 MAC NO. FILE PATH:F:\1468 Killian Creek WWTP Expansion\DWG\1468 E1.6 SLUDGE DEWATER.dwgF:\1468 Killian Creek WWTP Expansion\DWG\1468 E1.6 SLUDGE DEWATER.dwg, MARK, 5/21/2015 4:26:27 PM BID DOCUMENT - DO NOT USE FOR CONSTRUCTION DATE DESCRIPTION BY PROJECT NAME: KILLIAN CREEK WWTP UPGRADES PROJ. MGR.: BF DESIGN BY: MAC DRAWN BY: FM PROJ. DATE: DEC DRAWING NUMBER: WKD PROJ. NO.: DRAWING TITLE: E1.6 ELECTRICAL SLUDGE DEWATERING CL

16 MEETING AGENDA KILLIAN CREEK WWTP UPGRADE PRE-BID MEETING JUNE 11, Attendance Sign-in [Official Record for Approved Bidders] 2. Overview of project scope 3. Review of Bid Form a. Bib Date June 25, 2:00 PM, 3 rd Floor, Citizens Center in Lincolnton, NC. b. Lump Sum Bid c. Owner Additive Bid Items d. Bid Attachments i. Schedule of Subcontractors ii. Bid Security iii. NC Affidavit A Listing of Good Faith Efforts iv. NC Affidavit B Intent to Perform Contract with Own Workforce (If Applicable) 4. Time of Completion a. 305 calendar days (125 equipment purchase/shop drawing review and approval with site work limited to 180 days) b. Liquidated damages - $1,250/day from project completion date. c. Abnormal weather determination (General Conditions Paragraph 4.05 C-2 amended by Supplemental Conditions) 5. Contractor s Use of Site and Premises a. The Contractor will be allowed access to the site during operational hours (7:00 am to 5:00 pm) corresponding to the wastewater treatment plant operation or prior scheduled with the Owner. b. All work associated with the renovations shall be performed in a manner such that there will be no impact to the existing wastewater treatment operations or performance. c. All work requiring utility outages of shutdown will be limited and must be scheduled with the Owner in advance. d. The initial contract period is to be utilized for shop drawing submittals and approvals and other non-site related work and the field construction work at the Killian Creek WWTP site to be limited to the contract period noted in the Agreement. e. Erosion control requirements (Reference Drawing C.3). f. Designated Contractor Office/Restroom Area (Reference Spec # ). The Contractor shall be responsible for maintaining cleanliness and security of 1

17 Owner materials and equipment stored within the building and shall be responsible for any thief or vandalism directly associated from lack of security. g. Designated Contractor Parking and Storage Area. 6. Special Work Sequence Requirements a. Aerobic digester piping revision area i. Schedule early in project to permit process flexibility for installation of RDT pump suctions in digesters. ii. Coordinate schedule with operations to get SHT and Digester(s) levels lowered. iii. Work to be performed with sludge at lower level in tank. b. Post equalization basin area i. Work to be scheduled after installation /startup of third effluent filter. ii. Plant operations to coordinate preliminary drainage of tank to removed bottom solids accumulation prior to work. iii. Work to be scheduled between 12 midnight and 8 am. 7. Proposed Site Tour Areas a. Designated contractor office/restroom area b. Blower building c. New rotary drum thickener area d. SBR retrievable aeration assemblies e. Aerobic digester piping revision area f. Post equalization basin area g. Effluent filter building (effluent filter, UV equipment and effluent reuse system) h. Sludge pump area i. Rotary sludge press area. 8. Final wrap-up* * It is requested that specific questions be submitted in writing to bfroneberger@wkdickson.com no later than June 19, 2015 to permit response to all plan holders in the form of an Addendum. 2

18 PROJECT OVERVIEW The Project consists of supplying, installation, startup and related work of the following equipment systems at the existing wastewater treatment plant as a lump sum bid: 1. Ten (10) retrievable aeration diffuser racks in existing Sequencing Batch Reactor Basins (SBR); 2. Two (2) positive displacement blowers for SBR and Aerobic Digesters; 3. Two (2) submersible pumps in Post Equalization Basin; 4. One (1) effluent disc filter; 5. One (1) ultraviolet disinfection system with two (2) banks; 6. One (1) rotary lobe sludge transfer pump; 7. One (1) rotary filter press system with associated modifications to the existing dewatered solids conveyor system permitting distribution to two dumpsters. 8. Two (2) polymer systems rotary drum sludge press and rotary drum thickener) 9. SCADA The following equipment and related work are to be bid as Owner Additive Alternative Bid Items : A. One (1) new rotary drum thickener system including sludge transfer pumps, polymer system, precast concrete building and associated interconnecting piping. B. Modifications to dewatered sludge distribution conveyor to permit feeding of dewatered solids to two dumpsters. C. Addition of four (4) submersible mixers and associated controls at the post equalization basin. D. New plant effluent reuse water system including supply pumps, reuse water storage tank, package booster pump system, hypochlorite feed system, chemical drum storage pallet, basket strainer and associated distribution piping. E. Electrical modifications to add start/stop control of sludge transfer pumps in Digester #2 and Sludge Holding tank at the sludge truck loading station. F. Modifications to the truck loading station to improve flexibility of hose and ease of handling. G. RAS piping revisions and valve additions to permit transfer of from Digester No. 2 back to Digester 1. H. Grating modifications at effluent weir to provide better sampling access. 3

19 4

20

21

INVITATION FOR BIDS For RO PLANT #2 PLC SYSTEMS UPGRADE (CIP# WTR1702)

INVITATION FOR BIDS For RO PLANT #2 PLC SYSTEMS UPGRADE (CIP# WTR1702) INVITATION FOR BIDS For RO PLANT #2 PLC SYSTEMS UPGRADE (CIP# WTR1702) BID SUBMITTAL DATE, TIME, & LOCATION: EMAIL QUESTIONS TO: December 8, 2017 @ 2:00 PM Mount Pleasant Waterworks Operations Center 1619

More information

ING CITY COUNCIL AGENDA REPORT. Honorable Mayor and City Council Members. Director of Public Works - Utilities. Final Payment Applications

ING CITY COUNCIL AGENDA REPORT. Honorable Mayor and City Council Members. Director of Public Works - Utilities. Final Payment Applications City of RED W1' ING CITY COUNCIL AGENDA REPORT TO: Honorable Mayor and City Council Members FROM: Bob Stark Deputy Director of Public Works - Utilities Agenda Item No.: 8- M Meeting Date: September 25,

More information

SUPERVISORY CONTROL AND DATA ACQUISITION SYSTEM (SCADA)

SUPERVISORY CONTROL AND DATA ACQUISITION SYSTEM (SCADA) TECHNICAL SPECIAL PROVISION FOR SUPERVISORY CONTROL AND DATA ACQUISITION SYSTEM (SCADA) FINANCIAL PROJECT NO.: 428213-2-52-02 MARION COUNTY The official record of this Technical Special Provision is the

More information

PIMA COUNTY REGIONAL WASTEWATER RECLAMATION DEPARTMENT SCADA STANDARDIZATION PROJECT TABLE OF CONTENTS

PIMA COUNTY REGIONAL WASTEWATER RECLAMATION DEPARTMENT SCADA STANDARDIZATION PROJECT TABLE OF CONTENTS PIMA COUNTY REGIONAL WASTEWATER RECLAMATION DEPARTMENT SCADA STANDARDIZATION PROJECT TABLE OF CONTENTS Section Page DIVISION 13 - SPECIAL CONSTRUCTION 13401 SCADA System, General Requirements... 13401-1

More information

AGENDA ITEM EXECUTIVE SUMMARY

AGENDA ITEM EXECUTIVE SUMMARY 202 AGENDA ITEM EXECUTIVE SUMMARY Agenda Item: Presenter & Title: Wastewater Treatment Plant SCADA System and Fiber Optic Communication System Upgrades Richard Babica, Director of Public Works Date: May

More information

.2 Section General Commissioning (Cx) Requirements. .3 Section Common Work Requirements - Electrical

.2 Section General Commissioning (Cx) Requirements. .3 Section Common Work Requirements - Electrical Issued for Review Section 26 28 16.01 Air Circuit Breakers Page 1 of 7 PART 1 GENERAL 1.1 GENERAL.1 This specification serves to define requirements for a replacement of low voltage circuit breaker of

More information

*REQUIRED* 169 Main Street 700 Plaza Middlesex Middletown, CT T: F:

*REQUIRED* 169 Main Street 700 Plaza Middlesex Middletown, CT T: F: ADDENDUM COVER & RECEIPT CONFIRMATION SHEET 169 Main Street 700 Plaza Middlesex Middletown, CT 06457 T: 860-343-8297 F: 860-343-9504 www.wright-pierce.com DATE: 9/6/16 ADDENDUM CONSISTS OF (Including this

More information

SECTION VARIABLE FREQUENCY MOTOR CONTROLLERS (VFD)

SECTION VARIABLE FREQUENCY MOTOR CONTROLLERS (VFD) SECTION 26 29 23 VARIABLE FREQUENCY MOTOR CONTROLLERS (VFD) PART 1 -GENERAL 1.1 SYSTEM DESCRIPTION A. Definitions: The Variable Speed AC Motor Drive (hereafter referred to as "VFD") shall be designed to

More information

1510 MOTOR CONTROLLERS

1510 MOTOR CONTROLLERS SECTION 262913- MOTOR CONTROLLERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of contract, including general and supplementary conditions and Division 1 specification section,

More information

1. Section Lightning Protection for lightning protection system. D. The installation shall be in conformance with NEC Article 285.

1. Section Lightning Protection for lightning protection system. D. The installation shall be in conformance with NEC Article 285. SECTION 26 04 75 - SURGE PROTECTION DEVICES PART 1 - GENERAL 1.1 SUMMARY A. Applicable provisions of the General Conditions, Supplementary General Conditions and Special Conditions shall govern work performed

More information

Governing Standards. All wiring and components shall meet the applicable requirements of the NEC.

Governing Standards. All wiring and components shall meet the applicable requirements of the NEC. 1.1 SCOPE. This section covers the furnishing and installation of Video Surveillance Systems (VSS), including Video Management System (VMS) software, Cameras, and all associated equipment, devices, and

More information

SECTION ELECTRIC METERING

SECTION ELECTRIC METERING SECTION 26 27 13 ELECTRIC METERING SPEC WRITER NOTES: Use this section only for NCA projects Delete between //----// if not applicable to project. Also delete any other item or paragraph not applicable

More information

Posted Date: April 30, Solicitation No.: B180193LAC. Solicitation Name: Fiesta Village WWTP Filter Controls Upgrade. Subject: Addendum Number 2

Posted Date: April 30, Solicitation No.: B180193LAC. Solicitation Name: Fiesta Village WWTP Filter Controls Upgrade. Subject: Addendum Number 2 Posted Date: April 30, 2018 Procurement Management Department 1500 Monroe Street 4 th Floor Fort Myers, FL 33901 Main Line: (239) 533-8881 Fax Line: (239) 485-8383 www.leegov.com/procurement Solicitation

More information

CONTRACT DOCUMENTS. for the CIGAR LAKE: RECLAIMED WATER DISTRIBUTION PUMP STATION (ITB - U ) PREPARED BY

CONTRACT DOCUMENTS. for the CIGAR LAKE: RECLAIMED WATER DISTRIBUTION PUMP STATION (ITB - U ) PREPARED BY Addendum No. 2 December 19, 2006 CONTRACT DOCUMENTS for the CIGAR LAKE: RECLAIMED WATER STRIBUTION PUMP STATION (ITB - U - 07-04) PREPARED BY CPH ENGINEERS, INC. P.O. BOX 2808 SANFORD, FL 32772-2808 PHONE:

More information

ADDENDUM NO. 2. GOODWYN, MILLS AND CAWOOD, INC st Avenue South Suite 100 Birmingham, Alabama Ph: Fax:

ADDENDUM NO. 2. GOODWYN, MILLS AND CAWOOD, INC st Avenue South Suite 100 Birmingham, Alabama Ph: Fax: ADDENDUM NO. 2 GOODWYN, MILLS AND CAWOOD, INC. 2701 1 st Avenue South Suite 100 Birmingham, Alabama Ph: 205-879-4462 Fax: 205-879-4493 To: ALL PLAN HOLDERS Date: March 24, 2017 Fax #: Pages: 33, including

More information

3a. IEM Indoor Metal Clad Medium Voltage Switchgear 25KV a. Section INDOOR METAL CLAD MEDIUM VOLTAGE SWTICHGEAR (Std.

3a. IEM Indoor Metal Clad Medium Voltage Switchgear 25KV a. Section INDOOR METAL CLAD MEDIUM VOLTAGE SWTICHGEAR (Std. 3a. IEM Indoor Metal Clad Medium Voltage Switchgear 25KV 16346-1 3a. Section 16346 INDOOR METAL CLAD MEDIUM VOLTAGE SWTICHGEAR (Std. Relays) Part 1 General 1.1 CONDITIONS AND REQUIREMENTS: A. Refer to

More information

SECTION PANELBOARDS

SECTION PANELBOARDS SECTION 16450 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes requirements for panelboards providing fault interrupting capability and overcurrent protective devices. 1.02 REFERENCE STANDARDS A.

More information

PROJECT TELEMETRY SYSTEM UPGRADES, PHASE 3 IOWA GREAT LAKES SANITARY DISTRICT MILFORD, IOWA. ADDENDUM NO. 2 August 15, 2017

PROJECT TELEMETRY SYSTEM UPGRADES, PHASE 3 IOWA GREAT LAKES SANITARY DISTRICT MILFORD, IOWA. ADDENDUM NO. 2 August 15, 2017 PROJECT 2017-2 TELEMETRY SYSTEM UPGRADES, PHASE 3 IOWA GREAT LAKES SANITARY DISTRICT MILFORD, IOWA CONTRACTOR S BID DATE: PLACE TO FILE FOR CONTRACTOR S BIDS: Tuesday, August 22, 2017, 11:00 A.M. IGLSD

More information

PROJECT TELEMETRY SYSTEM UPGRADES, PHASE 3 IOWA GREAT LAKES SANITARY DISTRICT MILFORD, IOWA. ADDENDUM NO. 2 August 15, 2017

PROJECT TELEMETRY SYSTEM UPGRADES, PHASE 3 IOWA GREAT LAKES SANITARY DISTRICT MILFORD, IOWA. ADDENDUM NO. 2 August 15, 2017 PROJECT 2017-2 TELEMETRY SYSTEM UPGRADES, PHASE 3 IOWA GREAT LAKES SANITARY DISTRICT MILFORD, IOWA CONTRACTOR S BID DATE: PLACE TO FILE FOR CONTRACTOR S BIDS: Tuesday, August 22, 2017, 11:00 A.M. IGLSD

More information

Minimum Support Needed for a Reliable SCADA System

Minimum Support Needed for a Reliable SCADA System Minimum Support Needed for a Reliable SCADA System Speaker Bio Jeff Miller, PE, ISI ENV SP Dewberry Automation Manager MEP Service Line Raleigh, NC 22 years experience in Electrical / Instrumentation &

More information

ANSI/TIA-568-C Cat 6A Field Test Specifications

ANSI/TIA-568-C Cat 6A Field Test Specifications This document has been prepared to aid consultants or engineers in developing contractual specifications covering the certification of Category 6A Permanent Links. It is offered as a general guide. Suitability

More information

(1986; Rev. 1989) Molded Case Circuit Breakers and Molded Case Switches. (1985; Rev. 1988) Enclosures for Electrical Equipment (1000 Volts Maximum)

(1986; Rev. 1989) Molded Case Circuit Breakers and Molded Case Switches. (1985; Rev. 1988) Enclosures for Electrical Equipment (1000 Volts Maximum) Section 16306 50/60-HERTZ (HZ) SOLID STATE FREQUENCY CONVERTER Index PART 1 GENERAL PART 2 PRODUCTS 1.1 References 2.1 Frequency Converters 1.2 Factory Tests 2.2 Conduit and Fittings 1.3 Submittals 2.3

More information

SECTION SWITCHGEAR

SECTION SWITCHGEAR SECTION 26 23 13 SWITCHGEAR PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections,

More information

2. Volume II, paragraph 1.2.2: Replace the following first paragraph and Table 1-4: Table 1-4: Number of GWA/SCADA Upgraded Facilities

2. Volume II, paragraph 1.2.2: Replace the following first paragraph and Table 1-4: Table 1-4: Number of GWA/SCADA Upgraded Facilities 2. Volume II, paragraph 1.2.2: Replace the following first paragraph and Table 1-4: GWA has a few facilities upgraded with supervisory control and data acquisition systems and are presently operating as

More information

Indefinite Delivery, Indefinite Quantity (IDIQ)

Indefinite Delivery, Indefinite Quantity (IDIQ) CONTRACT ADMINISTRATION MANUAL Minnesota Department of Transportation Chapter 7 Section 7.1 Indefinite Delivery, Indefinite Quantity (IDIQ) General Disclaimer: This manual section not currently approved

More information

SECTION ( ) LIGHTING CONTROL PANELBOARD

SECTION ( ) LIGHTING CONTROL PANELBOARD (26 24 16.02) LIGHTING CONTROL PANELBOARD PART 1 GENERAL 1.01 SCOPE A. The Contractor shall furnish and install Lighting Control Panelboards as specified and as shown on the contract drawings. B. The Lighting

More information

ANSI/TIA-568-C Cat 6 Field Test Specifications

ANSI/TIA-568-C Cat 6 Field Test Specifications This document has been prepared to aid consultants or engineers in developing contractual specifications covering the certification of Category 6 Permanent Links. It is offered as a general guide. Suitability

More information

SECTION SCADA SYSTEM APPLICATIONS PROGRAMMING PART 1 - GENERAL 1.01 SCOPE OF WORK

SECTION SCADA SYSTEM APPLICATIONS PROGRAMMING PART 1 - GENERAL 1.01 SCOPE OF WORK SECTON 16925 SCADA SYSTEM APPLCATONS PROGRAMMNG PART 1 - GENERAL 1.01 SCOPE OF WORK A. Programming and configuration of the SCADA system (Server and Workstations) is by Owner Representative, herein defined

More information

SECTION 16450: NON-AUTOMATIC TRANSFER SWITCH / QUICK CONNECT GENERATOR SWITCHBOARD <S> <OM>

SECTION 16450: NON-AUTOMATIC TRANSFER SWITCH / QUICK CONNECT GENERATOR SWITCHBOARD <S> <OM> SECTION 16450: NON-AUTOMATIC TRANSFER SWITCH / QUICK CONNECT GENERATOR SWITCHBOARD PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General

More information

SECTION APPENDIX B SFC DOCUMENT SUBMITTAL SCHEDULE

SECTION APPENDIX B SFC DOCUMENT SUBMITTAL SCHEDULE SECTION 16262 - APPENDIX B SFC DOCUMENT SUBMITTAL SCHEDULE PART 1 - GENERAL 1.01 RELATED SECTIONS A. Section 01300 Submittals B. Section 16262 Static Frequency Converter C. Section 16262A Appendix A SFC

More information

APPROVE PROCUREMENT PROCESS FOR EQUIPMENT AND INSTALLATION

APPROVE PROCUREMENT PROCESS FOR EQUIPMENT AND INSTALLATION etro Metropolitan Transportation Authority One Gateway Plaza Los Angeles, CA 90012-2952 213. 922. 20( met,". OPERATIONS COMMITTEE JANUARY 20, 2005 SUBJECT: ACTION~ METRO RED LINE SEGMENT-! REMOTE TERMINAL

More information

Hosted VoIP Unified Communications Service

Hosted VoIP Unified Communications Service Request for Proposals: Hosted VoIP Unified Communications Service June 2018 Hosted VoIP Unified Communications Service Published: July 3, 2018 Responses Due: July 27, 2018 Submit bid to: Goleta Union School

More information

University of Nebraska-Lincoln

University of Nebraska-Lincoln University of Nebraska-Lincoln Bid Information Contact Information Ship to Information Bid Owner Claudette Biskup Sourcing Address 1700 Y Street Address 1110 S 67th Street Specialist Email claudette.biskup@unl.edu

More information

Copper Riser And Intrabuilding Cabling

Copper Riser And Intrabuilding Cabling Copper Riser And Intrabuilding Cabling PART 1: GENERAL The Contractor is held responsible to be familiar with the provisions contained herein and with other Sections of this Specification as applicable

More information

SECTION ENCLOSED SWITCHES AND CIRCUIT BREAKERS

SECTION ENCLOSED SWITCHES AND CIRCUIT BREAKERS SECTION 262816 - ENCLOSED SWITCHES AND CIRCUIT BREAKERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

CONTRACT NO: T Division 13 SCADA AND INSTRUMENTATION DATE: August 2012 Page 1 of 1 DIVISION 13 SCADA AND INSTRUMENTATION

CONTRACT NO: T Division 13 SCADA AND INSTRUMENTATION DATE: August 2012 Page 1 of 1 DIVISION 13 SCADA AND INSTRUMENTATION CONTRACT NO: T-12-16 Division 13 SCADA AND INSTRUMENTATION 2011-03-15 DATE: August 2012 Page 1 of 1. DIVISION 13 SCADA AND INSTRUMENTATION CONTRACT NO. T-12-16 Division 13 TABLE OF CONTENTS 2011-03-15

More information

MESP TECHNICAL SPECIFICATION FOR A RECTIFIER UNIT CONTROL & PROTECTION SYSTEM FOR USE IN THE 1500V DC TRACTION SYSTEM

MESP TECHNICAL SPECIFICATION FOR A RECTIFIER UNIT CONTROL & PROTECTION SYSTEM FOR USE IN THE 1500V DC TRACTION SYSTEM Engineering Specification Electrical Networks TECHNICAL SPECIFICATION FOR A RECTIFIER UNIT CONTROL & PROTECTION SYSTEM FOR USE IN THE 1500V Version: 1 Issued: March 2014 Owner: Electrical Networks Asset

More information

Gaston County Schools

Gaston County Schools Gaston County Schools 2008 Gaston County Schools Date: 5/4/2008 RFP #: S2008 Request for Proposal Project Name: Cisco Switch Purchase Facilities: Bessemer City High School Chapel Grove Elementary School

More information

SECTION SURGE PROTECTIVE DEVICES

SECTION SURGE PROTECTIVE DEVICES SECTION 16289 PART 1 GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this

More information

SECTION TRANSIENT VOLTAGE SUPPRESSION FOR LOW-VOLTAGE ELECTRICAL POWER CIRCUITS

SECTION TRANSIENT VOLTAGE SUPPRESSION FOR LOW-VOLTAGE ELECTRICAL POWER CIRCUITS SECTION 264313 - TRANSIENT VOLTAGE SUPPRESSION FOR LOW-VOLTAGE ELECTRICAL POWER CIRCUITS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and

More information

. SECTION SUPERVISORY CONTROL AND DATA ACQUISITION SYSTEM

. SECTION SUPERVISORY CONTROL AND DATA ACQUISITION SYSTEM . SECTION 13380 - SUPERVISORY CONTROL AND DATA ACQUISITION SYSTEM PART 1 - GENERAL 1.01 WORK OF THIS SECTION A. The CONTRACTOR shall furnish, install, configure, program, test and put into operation the

More information

University of Northern Iowa Centric Project Web Site User Guide

University of Northern Iowa Centric Project Web Site User Guide University of Northern Iowa Centric Project Web Site User Guide Overview On all projects in excess of $1,000,000 and other select projects, the University of Northern Iowa utilizes an internet based project

More information

Specification Voltage Limiting Device

Specification Voltage Limiting Device Engineering Specification Electrical Networks L1-CHE-SPE-152 Specification Voltage Limiting Device Version: 1 Issued: 20 th April 2018 Owner: Chief Engineer Approved By: Andrew Russack Head of Engineering,

More information

BuildingName The Description of the Project P DOCUMENTS

BuildingName The Description of the Project P DOCUMENTS ARCHITECTURE, ENGINEERING AND CONSTRUCTION P00000000 0000 DOCUMENTS ARCHITECTURE & ENGINEERING 326 East Hoover, Mail Stop B Ann Arbor, MI 48109-1002 Phone: 734-764-3414 Fax: 734-936-3334 SPECIFICATION

More information

Document C0. Use for:

Document C0. Use for: Date: July 27, 2015 Document C0 Use for: Connection of Electric Generation that will operate with an Open Transition (Category 1) between the Ameren System and the Generator or operate with a Synchronized

More information

Request for Quotation Amendment #: 1

Request for Quotation Amendment #: 1 Request for Quotation Amendment #: 1 Solicitation Number Printed Issued Procurement Officer Phone E-Mail Address 080515-962-36505-08/14/15 08/11/15 08/11/15 Robert E. Tyner, C.P.M. 843-574-6279 Robert.tyner@tridenttech.edu

More information

Appendix B. TechKnowsion PLC and SCADA Programming Proposal

Appendix B. TechKnowsion PLC and SCADA Programming Proposal Appendix B TechKnowsion PLC and SCADA Programming Proposal THIS PAGE LEFT INTENTIONALLY BLANK TechKnowsion, Inc. 3305 Vincent Road Pleasant Hill, CA 94523 925.939.8324 Voice 925.280.8324 Fax www.techknowsion.com

More information

MAXIMA + Series ROTARY LEVEL CONTROL

MAXIMA + Series ROTARY LEVEL CONTROL Price $5.00 MAXIMA + Series ROTARY LEVEL CONTROL OPERATING INSTRUCTIONS PLEASE READ CAREFULLY Division of Garner Industries 7201 North 98th Street Lincoln, NE 68507-9741 (402) 434-9102 925-0268 Rev. A

More information

December 16, 2016 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA ADDENDUM NO. 2 / IFB NO. Y PH

December 16, 2016 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA ADDENDUM NO. 2 / IFB NO. Y PH December 16, 2016 BOARD OF COUNTY COMMISSIONERS ORANGE COUNTY, FLORIDA ADDENDUM NO. 2 / IFB NO. Y17-722-PH SOUTH WATER RECLAMATION FACILITY SODIUM HYPOCHLORITE STORAGE AND FEED SYSTEMS IMPROVEMENTS BID

More information

AMP Rack User Manual. Publication Rev G

AMP Rack User Manual. Publication Rev G Publication Introduction This manual contains information for the AMP Rack from Forney Corporation, 16479 Dallas Parkway, Suite 600, Addison, Texas. www.forneycorp.com All personnel should become thoroughly

More information

ADDENDUM NO. 02 INVITATION NUMBER:

ADDENDUM NO. 02 INVITATION NUMBER: ADDENDUM NO. 02 INVITATION NUMBER: 160190 DATE: TO: PROSPECTIVE BIDDERS REFERENCE: B STREET/NEW JERSEY AVENUE TRUNK SEWER REHABILITATION AND CLEANING PHASE 1 THIS PAGE IS INTENTIONALLY LEFT BLANK DISTRICT

More information

ADDENDUM #1. Date: 12/21/2018

ADDENDUM #1. Date: 12/21/2018 Minnesota State Colleges and Universities Request for Proposals for Architectural and Engineering Services Physical Security Enhancements at St. Cloud State University Date: 12/21/2018 ADDENDUM #1 1. The

More information

Data Center Consultants for the upcoming IIT Bombay HPC+BYOH Data Center

Data Center Consultants for the upcoming IIT Bombay HPC+BYOH Data Center Data Center Consultants for the upcoming IIT Bombay HPC+BYOH Data Center IIT Bombay Computer Center invites Data Center Consultants to submit their bids for the contract for the design and project management

More information

Models beginning with 2M, 2L or 2X. Product Description. Technical Specifications. Installation Instructions. Series 2000 Multiple Meter Units (MMUs)

Models beginning with 2M, 2L or 2X. Product Description. Technical Specifications. Installation Instructions. Series 2000 Multiple Meter Units (MMUs) Models beginning with 2M, 2L or 2X Series 2000 Multiple Meter Units (MMUs) Product Description Technical Specifications Installation Instructions February 28 th, 2013 List of Figures...2 List of Tables...2

More information

INSTRUCTION MANUAL RA 19-7B RACK ADAPTER HOT SWAP RACK ADAPTER FOR HSF SERIES POWER SUPPLIES

INSTRUCTION MANUAL RA 19-7B RACK ADAPTER HOT SWAP RACK ADAPTER FOR HSF SERIES POWER SUPPLIES INSTRUCTION MANUAL RA 19-7B RACK ADAPTER HOT SWAP RACK ADAPTER FOR HSF SERIES POWER SUPPLIES KEPCO INC. An ISO 9001 Company. MODEL RA 19-7B RACK ADAPTER ORDER NO. REV. NO. IMPORTANT NOTES: 1) This manual

More information

B. System Design and Performance Requirements

B. System Design and Performance Requirements Change History Date Description of Change Pages / Sections Modified Change Approver Initials 6/15/16 Updated division section from 16950 to 26 27 13, removed references to other section numbers 11/21/14

More information

Town of Gilmanton, New Hampshire SELECTMENS OFFICE

Town of Gilmanton, New Hampshire SELECTMENS OFFICE TOWN OF GILMANTON SELECTMEN S OFFICE PO Box 550, Gilmanton, NH 03237 Ph. 603-267-6700 Fax 603-267-6701 townadministrator@gilmantonnh.org Town of Gilmanton, New Hampshire SELECTMENS OFFICE REQUEST FOR PROPOSAL

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR TRAVEL TIME SYSTEM. UNIV:SRP 1 of 6 ITS:APPR:CLC:DBP:

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR TRAVEL TIME SYSTEM. UNIV:SRP 1 of 6 ITS:APPR:CLC:DBP: MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR TRAVEL TIME SYSTEM UNIV:SRP 1 of 6 ITS:APPR:CLC:DBP:02-02-12 a. Description. This work consists of furnishing, installing, integrating, and testing

More information

PCM-7140 Pulsed Current Source Operation Manual

PCM-7140 Pulsed Current Source Operation Manual PCM-7140 Pulsed Current Source Operation Manual Directed Energy, Inc. 1609 Oakridge Dr., Suite 100, Fort Collins, CO 80525 (970) 493-1901 sales@ixyscolorado.com www.ixyscolorado.com Manual Document 7650-0031

More information

REQUEST FOR PROPOSALS For Uniform Services

REQUEST FOR PROPOSALS For Uniform Services REQUEST FOR PROPOSALS For Uniform Services PROPOSAL SUBMITTAL DATE, TIME, & LOCATION: August 17, 2018 @ 10:00 AM Mount Pleasant Waterworks Operations Center 1619 Rifle Range Road Mount Pleasant, SC 29464

More information

PDI Modular Compact Remote Power Panel

PDI Modular Compact Remote Power Panel Guide Specifications (Revision 000, 6/17/2016) 1 GENERAL 1.1 Summary These specifications describe requirements for a remote power panel (RPP) distributing power to sensitive loads. These specifications

More information

ADDENDUM # 8 BID # FY CITY OF HALLANDALE BEACH INFLOW AND INFILTRATION REMOVAL PHASE 2

ADDENDUM # 8 BID # FY CITY OF HALLANDALE BEACH INFLOW AND INFILTRATION REMOVAL PHASE 2 ADDENDUM # 8 BID # FY 2017-2018-019 INFLOW AND INFILTRATION REMOVAL PHASE 2 Please ensure you check the City s website for the latest addendum released for this project. Below find the link to the City

More information

CHARTER TOWNSHIP OF SHELBY REQUEST FOR PROPOSAL. Fiber Optic Project Charter Township of Shelby Fire Stations #2 #3 & #4 to Fire Station #1

CHARTER TOWNSHIP OF SHELBY REQUEST FOR PROPOSAL. Fiber Optic Project Charter Township of Shelby Fire Stations #2 #3 & #4 to Fire Station #1 CHARTER TOWNSHIP OF SHELBY REQUEST FOR PROPOSAL Fiber Optic Project Charter Township of Shelby Fire Stations #2 #3 & #4 to Fire Station #1 The Charter Township of Shelby is soliciting proposals to install

More information

SECTION FARE COLLECTION SYSTEM

SECTION FARE COLLECTION SYSTEM SECTION 17830 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes requirements for the Ticket Vending Machines (TVMs) and for the Clipper Network Card Interface Devices (CIDs) as a subsystem of the station

More information

TABLE OF CONTENTS INTRODUCTION. 3. Analog Input Analog Output Digital Input Digital Output OPERATIONAL DESCRIPITON.. 7 PROGRAMMING AND INITIAL SETUP.

TABLE OF CONTENTS INTRODUCTION. 3. Analog Input Analog Output Digital Input Digital Output OPERATIONAL DESCRIPITON.. 7 PROGRAMMING AND INITIAL SETUP. DIVERSIFIED HEAT TRANSFER SERIES 700 STEAM GENERATOR CONTROLLER INSTRUCTION MANUAL VISIT OUR WEBSITE AT SIGMACONTROLS.COM SERIES 700 DHT STEAM GENERATOR MANUAL 042514 2 TABLE OF CONTENTS INTRODUCTION.

More information

Minutes - Standing Policy Committee on Finance - April 9, 2015 REPORTS

Minutes - Standing Policy Committee on Finance - April 9, 2015 REPORTS Minutes - Standing Policy Committee on Finance - April 9, 2015 REPORTS Item No. 4 Water Supervisory Control and Data Acquisition (SCADA) Upgrade Financial Status Report No. 1 for the Period from November

More information

Anna Independent School District

Anna Independent School District Anna Independent School District 501 S. Sherley Avenue Anna Texas 75409 www.annaisd.org Phone: 972-924-1000 Fax: 972-924-1001 Request for Proposals (RFP) Spring 2015 Computer Hardware Refresh The Technology

More information

DUKE UNIVERSITY CONSTRUCTION STANDARDS

DUKE UNIVERSITY CONSTRUCTION STANDARDS 1 00 01 10 Table of Contents DIVISION 00: PROCUREMENT AND CONTRACTING REQUIREMENTS 00 01 10 Table of Contents 06.17.2014 00 21 13 Instructions to Bidders 11.08.2013 00 22 13 Supplementary Instructions

More information

CLEANROOM CERTIFICATION AND ACCEPTANCE PROCEDURES

CLEANROOM CERTIFICATION AND ACCEPTANCE PROCEDURES CLEANROOM CERTIFICATION AND ACCEPTANCE PROCEDURES PART I--GENERAL 1.1 Work Included [Edit this specification to eliminate tests not required. Place tests in the desired sequence of performance] A. This

More information

MAXIMA + Series ROTARY LEVEL CONTROL

MAXIMA + Series ROTARY LEVEL CONTROL Price $5.00 MAXIMA + Series ROTARY LEVEL CONTROL OPERATING INSTRUCTIONS PLEASE READ CAREFULLY Division of Garner Industries 7201 North 98th Street Lincoln, NE 68507-9741 (402) 434-9102 925-0268 TABLE OF

More information

Lincoln County, Georgia. Office 365 & Antivirus

Lincoln County, Georgia. Office 365 & Antivirus Lincoln County, Georgia November 16, 2018 Office 365 & Antivirus Invitation for Bid RFP 18-006 The Lincoln County Board of Commissioners is requesting bids for migration to, and implementation of, the

More information

INSTRUCTION MANUAL RA 19-5B RACK ADAPTER HOT SWAP RACK ADAPTER FOR HSF SERIES POWER SUPPLIES

INSTRUCTION MANUAL RA 19-5B RACK ADAPTER HOT SWAP RACK ADAPTER FOR HSF SERIES POWER SUPPLIES INSTRUCTION MANUAL RA 19-5B RACK ADAPTER HOT SWAP RACK ADAPTER FOR HSF SERIES POWER SUPPLIES KEPCO INC. An ISO 9001 Company. MODEL RA 19-5B RACK ADAPTER ORDER NO. REV. NO. IMPORTANT NOTES: 1) This manual

More information

INSTRUCTION MANUAL RA 19-4B RACK ADAPTER HOT SWAP RACK ADAPTER FOR HSF SERIES POWER SUPPLIES

INSTRUCTION MANUAL RA 19-4B RACK ADAPTER HOT SWAP RACK ADAPTER FOR HSF SERIES POWER SUPPLIES INSTRUCTION MANUAL RA 19-4B RACK ADAPTER HOT SWAP RACK ADAPTER FOR HSF SERIES POWER SUPPLIES KEPCO INC. An ISO 9001 Company. MODEL RA 19-4B RACK ADAPTER ORDER NO. REV. NO. IMPORTANT NOTES: 1) This manual

More information

American Society of Sanitary Engineering Seal (Certification) Program

American Society of Sanitary Engineering Seal (Certification) Program American Society of Sanitary Engineering Seal (Certification) Program Laboratory Evaluation Report for: Water Hammer Arresters Tested under ASSE Standard 1010 Revised: February, 2004 Laboratory File Number

More information

UW Purchase Specification Section Central Cooling Water Meter Page 1 of 6

UW Purchase Specification Section Central Cooling Water Meter Page 1 of 6 Page 1 of 6 PART 1 GENERAL 1.01 DESCRIPTION A. Purpose 1. This section covers central cooling water meters for use in the Owner's central cooling water systems. 1.02 QUALIFICATIONS A. Approved manufacturers

More information

Scanner 2000 Steam Mass Flow Transmitter

Scanner 2000 Steam Mass Flow Transmitter 3352051/2 IM-P335-24 MI Issue 2 Scanner 2000 Steam Mass Flow Transmitter Installation and Maintenance Instructions 1. Safety information 2. Mechanical installation 3. Configuring software 4. Wiring procedures

More information

RFP Annex A Terms of Reference UNHCR HQ Data Centre Colocation Service

RFP Annex A Terms of Reference UNHCR HQ Data Centre Colocation Service RFP 2017 845 Annex A Terms of Reference UNHCR HQ Data Centre Colocation Service Version 1 Contents Project objectives... 1 Background... 1 Scope... 1 Timeframe and Cost... 4 Stakeholders, roles and responsibilities...

More information

City of Toledo WTP SCADA System Upgrade 2015

City of Toledo WTP SCADA System Upgrade 2015 City of Toledo WTP SCADA System Upgrade 2015 Dmytryka Jacobs Engineers, Inc. Selected to provide the required services for the WTP SCADA Upgrade Project Local Consulting Engineering Firm (Toledo Cleveland)

More information

Request for Quotation RFQ SUBJECT: FT-IR SYSTEM

Request for Quotation RFQ SUBJECT: FT-IR SYSTEM Request for Quotation SUBJECT: FT-IR SYSTEM DATE OF ISSUE: January 31, 2018 TO RESPOND BY: RESPOND TO: February 26, 2018 @ 1400 Hours (2:00 PM Pacific Time) Sandra Shelke Contract & Supply Chain Management

More information

SPECIFICATION STANDARD COPPER RISER AND INTRABUILDING CABLING

SPECIFICATION STANDARD COPPER RISER AND INTRABUILDING CABLING PART 1: GENERAL 1.01 SCOPE OF WORK A. The Designer and Contractor are responsible to be familiar with the provisions contained herein and with other Sections of this Specification as applicable to the

More information

Great Northern Corporation Request for Proposal for Network Server Installation and Service

Great Northern Corporation Request for Proposal for Network Server Installation and Service Great Northern Corporation Request for Proposal for Network Server Installation and Service Background Purpose The purpose of this Request for Proposal (RFP) is to invite prospective vendors to submit

More information

Lake County Housing Authority North U.S. Highway 45 Grayslake, IL 60030

Lake County Housing Authority North U.S. Highway 45 Grayslake, IL 60030 Proposal for Services Security Camera Replacement Must be received by 10:00 a.m. on March 30, 2018 Services to be provided at Shiloh Towers 1525 27 th St. Zion, IL A Mandatory Pre-bid Meeting will be held

More information

Request for Proposal George West Independent School District ERate

Request for Proposal George West Independent School District ERate Request for Proposal ERate 2015-2016 Infrastructure for New Wings at George West High School and George West Elementary School Due: March 9, 2015 2:00 PM Superintendent: Ty Sparks ERate 2015 RFP:, George

More information

ROAM 120V-277V Node Control Specification Guideline Division 16520

ROAM 120V-277V Node Control Specification Guideline Division 16520 ROAM 120V-277V Node Control Specification Guideline Division 16520 PART 1. GENERAL 1.1 INTRODUCTION A. The intent of this specification is to provide for furnishing, installing, testing and placing into

More information

INSTRUCTION MANUAL RA 19-6B RACK ADAPTER HOT SWAP RACK ADAPTER FOR HSF SERIES POWER SUPPLIES

INSTRUCTION MANUAL RA 19-6B RACK ADAPTER HOT SWAP RACK ADAPTER FOR HSF SERIES POWER SUPPLIES INSTRUCTION MANUAL RA 19-6B RACK ADAPTER HOT SWAP RACK ADAPTER FOR HSF SERIES POWER SUPPLIES KEPCO INC. An ISO 9001 Company. MODEL RA 19-6B RACK ADAPTER ORDER NO. REV. NO. IMPORTANT NOTES: 1) This manual

More information

CENTRAL TELEPHONE COMPANY NEVADA DIVISION ( SPRINT ) NEVADA LOCAL TERMS OF SERVICE

CENTRAL TELEPHONE COMPANY NEVADA DIVISION ( SPRINT ) NEVADA LOCAL TERMS OF SERVICE CENTRAL TELEPHONE COMPANY NEVADA DIVISION ( SPRINT ) NEVADA LOCAL TERMS OF SERVICE SECTION THIRTY-TWO: SPRINT ETHERNET SM SERVICES 32.1. GENERAL A. Sprint Ethernet Services is a high-speed data service,

More information

LINCOLN AUTHORIZED SERVICE FACILITY (LASF) SERVICE CODE TERMS & CONDITIONS

LINCOLN AUTHORIZED SERVICE FACILITY (LASF) SERVICE CODE TERMS & CONDITIONS The Lincoln Electric Company 22801 St. Clair Avenue Cleveland, Ohio 44117-1199 LASF Contract Attachment Last revision: February, 2016 LINCOLN AUTHORIZED SERVICE FACILITY (LASF) SERVICE POLICY: CODE TERMS

More information

ROAD MAINTENANCE DIVISION VIDEO SECURITY SYSTEM GORMAN YARD (RD 556A) GORMAN POST RD GORMAN, CA RFB-IS

ROAD MAINTENANCE DIVISION VIDEO SECURITY SYSTEM GORMAN YARD (RD 556A) GORMAN POST RD GORMAN, CA RFB-IS ROAD MAINTENANCE DIVISION VIDEO SECURITY SYSTEM GORMAN YARD (RD 556A) 49530 GORMAN POST RD GORMAN, CA 93243 1 PURPOSE 4 2 GENERAL 4 3 ACCEPTANCE POLICY 4 4 STANDARDS 4 5 SCOPE OF SERVICES 4 6 MAIN LOCATION

More information

PagePac PAGEPAC PLUS ZONE EXPANSION UNIT V

PagePac PAGEPAC PLUS ZONE EXPANSION UNIT V PagePac Issue 3 by PAGEPAC PLUS ZONE EXPANSION UNIT V-5335100 INTRODUCTION The Zone Expansion Unit (ZEU) provides up to 16 zones of audio output (including talkback), contact closure outputs or inputs.

More information

PLC 4 PRIMARY SEDIMENTATION SYSTEM SCADA SYSTEM OPERATION MANUAL. Revision 1.0 May 15, 2006

PLC 4 PRIMARY SEDIMENTATION SYSTEM SCADA SYSTEM OPERATION MANUAL. Revision 1.0 May 15, 2006 PLC 4 PRIMARY SEDIMENTATION SYSTEM SCADA SYSTEM OPERATION MANUAL Revision 1.0 May 15, 2006 PLC 4 PRIMARY SEDIMENTATION SYSTEM SCADA SYSTEM OPERATION MANUAL Revision 1.0 May 15, 2006 Table of Contents 1

More information

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT

DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT TABLE OF CONTENTS INTRODUCTORY INFORMATION 00 00 10 Title Page 00 00 20 Table of Contents DIVISION 0 - BIDDING REQUIREMENTS, CONTRACTOR FORMS AND CONDITIONS OF THE CONTRACT Section 00 02 00 Notice to Bidders

More information

FUCHS ATAD. from sewage sludge to Class A Biosolids. Air. Water. Biosolids

FUCHS ATAD. from sewage sludge to Class A Biosolids. Air. Water. Biosolids FUCHS ATAD from sewage sludge to Class A Biosolids Air Water Biosolids FUCHS ATAD Process How to make Class A Biosolids FUCHS ATAD Process: The economical and reliable way from sewage sludge and manure

More information

MAXIMA+ Series Rotary Level Indicator

MAXIMA+ Series Rotary Level Indicator MAXIMA+ Series Rotary Level Indicator BinMaster: Division of Garner Industries 7201 N. 98th St., Lincoln, NE 68507 402-434-9102 email: info@binmaster.com www.binmaster.com OPERATING INSTRUCTIONS PLEASE

More information

BID ISSUE DATE: JUNE 2016

BID ISSUE DATE: JUNE 2016 July 11, 2016 To All Plan Holders: ADDENDUM NO. 1 TO THE CONTRACT DOCUMENTS FOR CHATHAM COUNTY SOLID WASTE AND RECYCLING RECYCLING STATION BID ISSUE DATE: JUNE 2016 The following revisions, additions and

More information

Computer Network Design Guide Existing Systems 1 / 6

Computer Network Design Guide Existing Systems 1 / 6 COMPUTER NETWORK DESIGN GUIDELINE FOR EXISTING SYSTEMS DOCUMENT NUMBER: 16765 APPLICATION: ELEMENTARY, MIDDLE AND HIGH SCHOOL DATE OF ISSUE: 11-27-06 - First Issued NOTES: The attached guideline should

More information

SPECIAL SPECIFICATION 1838 Computer Room VoIP Gateway/Gatekeeper

SPECIAL SPECIFICATION 1838 Computer Room VoIP Gateway/Gatekeeper 1993 Specifications CSJ 0521-04-223 SPECIAL SPECIFICATION 1838 Computer Room VoIP Gateway/Gatekeeper 1. Description. Furnish, install, and make fully operational a Computer Room Voice-over- Internet Protocol

More information

SPECIAL SPECIFICATION 1826 Field Ethernet Switch

SPECIAL SPECIFICATION 1826 Field Ethernet Switch 1993 Specifications CSJ 0521-04-223 SPECIAL SPECIFICATION 1826 Field Ethernet Switch 1. Description. Furnish, install, and make fully operational a Field Ethernet Switch at designated locations as shown

More information

SECTION SURGE PROTECTION DEVICES. A. Section includes Surge Protection Devices for low-voltage power, control, and communication equipment.

SECTION SURGE PROTECTION DEVICES. A. Section includes Surge Protection Devices for low-voltage power, control, and communication equipment. SECTION 26 43 00 SURGE PROTECTION DEVICES PART 1 - GENERAL 1.1 SUMMARY A. Section includes Surge Protection Devices for low-voltage power, control, and communication equipment. 1.2 DEFINITIONS A. ATS:

More information

Virginia State Fire Marshal s Office

Virginia State Fire Marshal s Office Virginia State Fire Marshal s Office Application for the USE of PYROTECHNICS INSIDE State-owned Buildings and OUTDOORS on State-owned Property Before a Proximate Audience 1. Applicant Name/Company: 2.

More information

Enterprise - Control System Integration Part 2: Object Model Attributes

Enterprise - Control System Integration Part 2: Object Model Attributes ISA Draft 95.00.02 Draft Standard Enterprise - Control System Integration Part 2: Object Model Attributes Draft 9 May 2001 Deleted: 8 Deleted: April This document is a draft that represents work being

More information