Low Voltage Grid Digitalization Rainer Brade Product Manager

Size: px
Start display at page:

Download "Low Voltage Grid Digitalization Rainer Brade Product Manager"

Transcription

1 Low Voltage Grid Digitalization Rainer Brade Product Manager Unrestricted Siemens AG Österreich 2017 siemens.at/future-of-energy

2 Digital Transformation is Happening Now Market Trends From central power plants to agile self-generating prosumers From manual unit-by-unit tuning to self-learning site optimization From manual meter readings to smart data end-to-end processes Page 2

3 Digital Transformation is Happening Now Today Tomorrow Unidirectional power flow Bidirectional power flow Meshed system throughout voltage levels Radial system Simple protection No data acquisition No intelligence Prosumers Intelligent Transformer Substations Low Voltage Digitalization Generation at MV level Generation at MV level Comprehensive automation Multifunctional communication ecar Infrastructure Energy Storage Page 3

4 Digitalization in three Level LV Grid Digitalization Drivers 1. Monitoring 2. Metering 3. Remote Control / Automation Reduction of: CAPEX: Capital Expenditure Power Reliability Fast Fault location in the Grid Enabling Grid Self Healing Power Quality Measuring Unbalances, Technical Losses and energy theft Enabling Voltage Regulation and Self Optimization Power management and increased availability Energy monitoring, communication and remote control reducing operation costs Short off time after tripping OPEX: SAIDI: SAIFI: Operational Expenditure System Average Interruption Duration Index System Average Interruption Frequency Index SAIFI CAPEX SAIIDI OPEX Page 4

5 1. Monitoring Fault Location in The Cloud 1. Monitoring SAIIDI OPEX Use Cases Customer Benefits Power Reliability Fast fault localization in the grid Enabling self healing Siemens Portfolio Low voltage fuse protection with blown fuse detection Low Voltage Circuit Breaker with trip alarm switch SICAM FCG (Fault Collector Gateway) FliC Account Page 5

6 1. Monitoring Page 6

7 2. Metering Low Voltage Meetering 2. Metering CAPEX SAIIDI OPEX Use Cases Customer Benefits Power Quality Measuring unbalances, technical losses and energy theft Enabling voltage regulation and self optimization Siemens Portfolio Circuit breaker with integrated metering Single Metering Devices Multi Metering Devices for multiple tap-offs (UL) Page 7

8 3. Remote control / automation Remote Circuit Breaker 3. Remote Control / Automation SAIFI CAPEX SAIIDI OPEX Use Cases Customer Benefits Power management and increased availability Energy monitoring, communication and remote control reducing operation costs Short off time after tripping Siemens Portfolio Circuit Breaker with integrated Monitoring, Meetering and Communication + Motor Operator Communication Interface (A8000) Page 8

9 Customer View Visibility Unbalances and Losses Pilot Project Including: 300 Secondary Substations Improve customer attention and reduce penalties in case of black out F A Low Voltage Network Digitalization B Monitoring and Control OBJECTIVE: Value creation for business and customers by the development of an automated Low Voltage network management Providing more value added information to the customers E Efficiency and Safety D C Analysis and Simulation Save and Cost Optimized Maintenance Value to the Utiltiy Value to the End Customer Page 9

10 Customer Requirements Remote management, supervision and automation of single pole low voltage feeders Scope / Solution Measurement Low voltage single phase protection 1pole remote control / automation Advanced low voltage supervision Boundaries Current solution fuse protected No local competitors known Customer is testing automatic double fuse link solution; see next page Customer Benefits Increase safety (remote switching) Maintenance cost reduction Reduction of financial impacts due black outs on grid side Avoidance of power theft Automatic customer allocation Customer Statement For Every Smart Meter, metering in the substation / street cabinet is needed for data matching: Identifying technical and non technical losses Automatic customer allocation to phases Management Software needed to bring meter data together (potential cloud application) Page 10

11 Portfolio for Secondary Substations Protection of Auxiliary Supply SDF MCB RCCB SPD 3NP1 5SL 5SV 5SD7 Low Voltage Feeders Monitoring Power Meter and Power Quality Recorder SICAM Fuse Monitoring 5TT3170 Low Voltage Main Breaker MCCB SDF LV HRC Fuse 3VA 3NJ4 3NA/3ND Options: Fused and fuse less protection Integrated measuring function Communication Motor drive ACB MCCB SD SDF 3WL 3VA 3KD 3NJ4 Options: Fused and fuse less protection Integrated measuring function Communication Motor drive Page 11

12 8MF Substations Page 12

13 Contact Rainer Brade RC-AT EM LP Wolfgang Pauli Strasse Linz Mobile: rainer.brade@siemens.com siemens.at/future-of-energy Page 13

AMEU FuseSaver Highest availability and cost savings for your medium voltage distribution network

AMEU FuseSaver Highest availability and cost savings for your medium voltage distribution network AMEU 2012 FuseSaver Highest availability and cost savings for your medium voltage distribution network October Page 2012 1 Siemens IC AG LMV 2012 MV C PPM Challenges for rural networks Characteristics

More information

BIDELEK SAREAK PROJECT: SMARTER GRIDS FOR BILBAO. Amsterdam, 5th November, 2014

BIDELEK SAREAK PROJECT: SMARTER GRIDS FOR BILBAO. Amsterdam, 5th November, 2014 BIDELEK SAREAK PROJECT: SMARTER GRIDS FOR BILBAO Amsterdam, 5th November, 2014 0 TABLE OF CONTENTS Bidelek Sareak Project: an actual Smart grids project Contribution of the value chain: Smart Grids Basque

More information

Fault and outage management

Fault and outage management WEBINAR, SEPTEMBER 2017 Distribution Automation for electrical grids Fault and outage management Alain Aurus, Theodoros Oikonomou, Yasmine Vögele Introduction Facility Management Use the detach button

More information

UniSec, MV AIS for Secondary Distribution Smart Grid applications

UniSec, MV AIS for Secondary Distribution Smart Grid applications Ing. Natalia Moizzes- Switchgear Product Specialist Chile Abril 14 th 2015 UniSec, MV AIS for Secondary Distribution Smart Grid applications Slide 1 Concept - Needs and Solutions Requests are: Manage faults

More information

Miniature circuit breakers for all applications

Miniature circuit breakers for all applications Miniature circuit breakers for all applications BETA Low-Voltage Circuit Protection Answers for infrastructure. BETA Low-Voltage Circuit Protection: Circuits under Control, Wherever, Whenever. Whether

More information

FCIs reduce fault-locating times and improve reliability metrics, especially the Customer Average Interruption Duration Index (CAIDI).

FCIs reduce fault-locating times and improve reliability metrics, especially the Customer Average Interruption Duration Index (CAIDI). 1 Intelligent electronic devices (IEDs) are the preferred choice for modernizing the grid. Communication among networks of robust IEDs designed for protection, control, and monitoring (PCM) of the power

More information

Jussi Ahola, ABB Oy A self healing power system for the accurate fault location and zone concept T&D Smart Grids Europe 2012

Jussi Ahola, ABB Oy A self healing power system for the accurate fault location and zone concept T&D Smart Grids Europe 2012 Jussi Ahola, ABB Oy A self healing power system for the accurate fault location and zone concept T&D Smart Grids Europe 2012 October 16, 2012 Slide 1 Introduction Why self-healing? Needs to improvements

More information

KEDS DSO Development Plan. George Karagutoff, KEDS CEO Prishtina, Kosovo 20 March, 2018

KEDS DSO Development Plan. George Karagutoff, KEDS CEO Prishtina, Kosovo 20 March, 2018 KEDS DSO Development Plan George Karagutoff, KEDS CEO Prishtina, Kosovo 20 March, 2018 1 INVESTMENTS AT A GLANCE KEDS begun its operations after the successful unbundling of Distribution and Supply business

More information

Toronto Hydro-Electric System Limited EB Exhibit G1 Tab 1 Schedule 1 ORIGINAL Page 1 of 15 SMART GRID PLAN

Toronto Hydro-Electric System Limited EB Exhibit G1 Tab 1 Schedule 1 ORIGINAL Page 1 of 15 SMART GRID PLAN EB-00-0 Exhibit G Tab Schedule Page of 0 SMART GRID PLAN INTRODUCTION This Exhibit presents THESL s plans for development of the smart grid in keeping with the Green Energy and Green Economy Act, 00 (

More information

AIR INTELLIGENT GRID AUTOMATION

AIR INTELLIGENT GRID AUTOMATION AIR INTELLIGENT GRID AUTOMATION Felipe ROVER Tiago MORAIS Jorge AITH Elektro Brazil Elektro Brazil Elektro Brazil felipe.rover@elektro.com.br tiago.morais@elektro.com.br jorge.aith@elektro.com.br ABSTRACT

More information

POWER GRID AUTOMATION. Pág.. n. RMU Automation

POWER GRID AUTOMATION. Pág.. n. RMU Automation POWER GRID AUTOMATION RMU Automation Distribution Network Non-Controlled Secondary Distribution Systems Distribution Network RMU Automation - Levels RMU Automation - RTU / FRTU SMART CONTROLLER Monitoring

More information

3VA molded case circuit breaker up to 1600A. Frei verwendbar Siemens AG 2018

3VA molded case circuit breaker up to 1600A. Frei verwendbar Siemens AG 2018 3VA molded case circuit breaker up to 1600A Unrestricted Siemens AG 2018 siemens.com/3va 3VA molded case circuit breaker New 3VA13/14 with TMTU (Thermal Magnetic Trip Unit) New 3VA27 with ETU (ElectronicTrip

More information

Siemens FuseSaver New half-cycle circuit breaker for rural smart grids to minimize operating costs of feeder and spur lines

Siemens FuseSaver New half-cycle circuit breaker for rural smart grids to minimize operating costs of feeder and spur lines Siemens FuseSaver New half-cycle circuit breaker for rural smart grids to minimize operating costs of feeder and spur lines Authors: Dr. Brett Watson, Siemens Ltd., PO Box 4833, Loganholme, QLD 4129, Australia

More information

Switching gears. Moving to smart switchgear for primary and secondary substations

Switching gears. Moving to smart switchgear for primary and secondary substations Moving to smart switchgear for primary and secondary substations VINCENZO BALZANO, MARTIN CELKO Medium-voltage (MV) distribution systems are undergoing a revolution: Gone are the days when they merely

More information

Fernando Tani, ABB Brazil, Jornadas Técnicas ABB en Chile Electrical integration with IEC61850 Benefits for the mining industry

Fernando Tani, ABB Brazil, Jornadas Técnicas ABB en Chile Electrical integration with IEC61850 Benefits for the mining industry Fernando Tani, ABB Brazil, Jornadas Técnicas ABB en Chile 2015 Electrical integration with IEC61850 Benefits for the mining industry Global trends & challenges Mining Industry CAPEX OPEX Energy supply

More information

Fortum SGEM Program Presentation of ongoing research activities

Fortum SGEM Program Presentation of ongoing research activities Fortum SGEM Program Presentation of ongoing research activities MV and LV Network Automation Solutions in EU Benchmarking Research 1 Existing Distribution Grid Little change in the past few decades Mostly

More information

Agile and 360 Digital: Path to the Future of Energy. Michael Carlson

Agile and 360 Digital: Path to the Future of Energy. Michael Carlson Agile and 360 Digital: Path to the Future of Energy unrestricted Siemens AG 2016 usa.siemens.com/digitalgrid Michael Carlson 21 st Century Challenges Facing Utilities: Maintain Reliability, Resiliency,

More information

Demonstration of the UPGRID project urban network of the future

Demonstration of the UPGRID project urban network of the future Demonstration of the UPGRID project urban network of the future SŁAWOMIR NOSKE, DOMINIK FALKOWSKI ENERGA-OPERATOR SA e-mail: {slawomir.noske/dominik.falkowski}@energa.pl 1. Introduction Sustainable development,

More information

Background Smart Grid is changing the way we do business Fit and forget or Smart Grids? Different levels in automation

Background Smart Grid is changing the way we do business Fit and forget or Smart Grids? Different levels in automation Content Background Smart Grid is changing the way we do business Fit and forget or Smart Grids? Different levels in automation SGEM Highlights from different automation levels Process: Low-cost fault indicator

More information

Auto-Changeover & Feeder Automation. Reclosers & Sectionalizers

Auto-Changeover & Feeder Automation. Reclosers & Sectionalizers Auto-Changeover & Feeder Automation Reclosers & Sectionalizers WHY AUTOMATE? COMPETITION SERVICE VALUE QUALITY RELIABILITY REGULATION RATES BASED ON RELIABITY & PERFORMANCE PENALTIES REGULATION SAIDI (System

More information

Enel experience in Smart Grids

Enel experience in Smart Grids Enel experience in Smart Grids Enel Global Infrastructure and Networks Positioning and key figures Argentina (16%) 1 18 TWh distributed energy 2.5 mn end-users Brazil (12%) 1 35 TWh distributed energy

More information

What You Should Know About Communication Systems: Business Strategies and Options

What You Should Know About Communication Systems: Business Strategies and Options Doug Voda, PPMV Global Segment Leader for Smart Grid February 2015 NRECA TechAdvantage What You Should Know About Communication Systems: Business Strategies and Options The visionary Smart Grid Five Pillars

More information

Guide to using the IEC standard to simplify the setup of an energy measurement plan

Guide to using the IEC standard to simplify the setup of an energy measurement plan Guide to using the IEC 61557-12 standard to simplify the setup of an energy measurement plan White Paper Number 998-19721655_GMA-US Revision 1 by Franck GRUFFAZ Executive summary Many facility owners and

More information

INTELLIGENCE FOR SMART GRIDS LAST MILE

INTELLIGENCE FOR SMART GRIDS LAST MILE INTELLIGENCE FOR SMART GRIDS LAST MILE Bruno OPITSCH Manfred HASLINGER Markus SPANGLER Siemens AG Germany Siemens AG Austria Siemens AG - Germany Bruno.opitsch@siemens.com Manfred.haslinger@siemens.com

More information

Cost and performance implications of infrastructure investment options in the Eskom Distribution network

Cost and performance implications of infrastructure investment options in the Eskom Distribution network Cost and performance implications of infrastructure investment options in the Eskom Distribution network Dr Clinton Carter-Brown Industry Association Resource Centre Eskom Holdings Limited Martin Cameron

More information

SIPROTEC 5 V7.8 Protection, automation and monitoring for digital substations

SIPROTEC 5 V7.8 Protection, automation and monitoring for digital substations SIPROTEC 5 V7.8 Protection, automation and monitoring for digital substations siemens.com/siprotec5 SIPROTEC 5 Table of content Introduction New functions of V7.8 SIPROTEC 5 - the core of Digital Substation

More information

Dan Murray, Siemens Energy Management Division

Dan Murray, Siemens Energy Management Division Design and Implementation of a Communication Network to Support Real-time Distribution Feeder Automation, SCADA Integration and Backhaul of Substation and Metering Data Dan Murray, Siemens Energy Management

More information

Smart region project overview. Zdenka Pokorna ČEZ Distribuce, a.s.

Smart region project overview. Zdenka Pokorna ČEZ Distribuce, a.s. Smart region project overview Zdenka Pokorna ČEZ Distribuce, a.s. 2 Presentation outline Smart Region important part of CEZ Group FUTUR/E/MOTION About Smart Region Location and partners Goals and expectations,

More information

Smart Systems. Smart Systems

Smart Systems. Smart Systems Smart Systems Smart Systems Mohamed Shishani Schneider Electric This session is eligible for 1 Contact Hour. For these hours to appear on your certificate, you must: Have your badge scanned at the door

More information

MNS Platform, low voltage systems Rear Access Power Motor Control Center. Alberto Carini, Global Product Manager

MNS Platform, low voltage systems Rear Access Power Motor Control Center. Alberto Carini, Global Product Manager MNS Platform, low voltage systems Rear Access Power Motor Control Center Alberto Carini, Global Product Manager MNS Platform, low voltage systems Add Value to our customers Sales After sales Maximum safety;

More information

IDS SAS. Station Automation System for Complex Applications

IDS SAS. Station Automation System for Complex Applications IDS SAS Station Automation System for Complex Applications IDS SAS The IDS SAS automation system for switchgear significantly reduces costs and efforts for the installation of secondary equipment and enables

More information

SurvalentONE Distribution Management System

SurvalentONE Distribution Management System SurvalentONE Distribution Management System Analyze & Optimize Critical Grid Functions for Advanced System Monitoring & Control SurvalentONE ADMS The SurvalentONE ADMS platform is a fully integrated SCADA,

More information

SIPROTEC 5 Application Note

SIPROTEC 5 Application Note www.siemens.com/protection SIPROTEC 5 Application Note SIP5-APN-001: Properties and Functional Structure Answers for infrastructure and cities SIPROTEC 5 Properties SIPROTEC 5 - Application: SIP5-APN-001

More information

NETWORK CONTROL SOLUTIONS BASED ON AN EDGE COMPUTING ARCHITECTURE Open Field Message Bus (FMB) Brussels (Belgium) December 2015

NETWORK CONTROL SOLUTIONS BASED ON AN EDGE COMPUTING ARCHITECTURE Open Field Message Bus (FMB) Brussels (Belgium) December 2015 NETWORK CONTROL SOLUTIONS BASED ON AN EDGE COMPUTING ARCHITECTURE Open Field Message Bus (FMB) Brussels (Belgium) December 2015 INDEX 01 Utilities Trends: Towards a Smart Grid 02 Edge Computing Architectures

More information

Protective Relays & SCADA Systems

Protective Relays & SCADA Systems 14 SWITCHGEAR Protective Relays & SCADA Systems SCADA Substation Automation SICAM PAS & PQ Analyzer SICAM PAS (Power Automation System) is a complete substation automation control and protection system

More information

Relays - SCADA - Metering

Relays - SCADA - Metering Industrial Ethernet Competence Test Instruments Energy Management Service Complete Solutions Services Quality Protective Relaying Substation Automation, SCADA Relays - SCADA - Metering u Utility SCADA

More information

SCADA Training - T&D Automation

SCADA Training - T&D Automation SCADA Training - T&D Automation Contact us Today for a FREE quotation to deliver this course at your company?s location. https://www.electricityforum.com/onsite-training-rfq This course covers all the

More information

Smart Distribution Technology

Smart Distribution Technology Smart Distribution Technology Presentation Agenda Alabama Power Company, A Southern Company Distribution Automation Supervisory Control And Data Acquisition (SCADA) Multiple Address System (MAS) communications

More information

Substation intelligence, future proof by design! Software defined substation monitoring, protection, control and communication

Substation intelligence, future proof by design! Software defined substation monitoring, protection, control and communication The intelligent digital substation Substation intelligence, future proof by design! Software defined substation monitoring, protection, control and communication Increase safety & reliability Improve efficiency

More information

MiCOM P122C Time-Overcurrent Protection

MiCOM P122C Time-Overcurrent Protection Protection Relays 01 MiCOM P122C Time-Overcurrent Protection Customer Benefits 1A/5A software setting 4 function keys Compact unit for flush and wall-surface mounting Comprehensive measurements Disturbance

More information

ELECTRICAL, INSTRUMENTATION & CONTROL SYSTEMS

ELECTRICAL, INSTRUMENTATION & CONTROL SYSTEMS ELECTRICAL, INSTRUMENTATION & CONTROL SYSTEMS Presentation by: RANA NASIR ALI General Manager, Power Plants Projects, at PITCO November 02, 2017 ELECTRICAL PLANT CONCEPT The electrical equipment, depending

More information

Sacramen Sacr t amen o t Municipal Utility Dis t Dis rict t SMUD May Ma 10,

Sacramen Sacr t amen o t Municipal Utility Dis t Dis rict t SMUD May Ma 10, Sacramento Municipal Utility District SMUD May 10, 2010 1 SMUD Facts and Figures 900 Sq. Miles Service Area 585,500 Customers 1.4 million Area Population 10 Bulk Substations 473 Miles of Transmission Lines

More information

SIPROTEC 5 Application Note

SIPROTEC 5 Application Note www.siemens.com/protection SIPROTEC 5 Application Note SIP5-APN-010: Answers for infrastructure and cities. SIPROTEC 5 - Application: SIP5-APN-010 SIPROTEC 5 Application Content 1 Application 3 1.1 Summary

More information

HIGH LEVEL REQUIREMENTS OF FAST SIMULATION AND MODELLING SUITE OF TOOLS FOR FUTURE SELF-HEALING DISTRIBUTION POWER SYSTEM

HIGH LEVEL REQUIREMENTS OF FAST SIMULATION AND MODELLING SUITE OF TOOLS FOR FUTURE SELF-HEALING DISTRIBUTION POWER SYSTEM HIGH LEVEL REQUIREMENTS OF FAST SIMULATION AND MODELLING SUITE OF TOOLS FOR FUTURE SELF-HEALING DISTRIBUTION POWER SYSTEM A. Valenti* I Bel ** S. Lee *EDF **EPRI E2I ConEdison France USA USA arnaud.valenti@edf.fr

More information

Transitioning to Smart MV/LV Substations as the Cornerstone of Your Smart Grid

Transitioning to Smart MV/LV Substations as the Cornerstone of Your Smart Grid Transitioning to Smart MV/LV Substations as the Cornerstone of Your Smart Grid by Yves Chollot, Renzo Coccioni, and Laurent Guise Executive summary 998-2095-11-30-15AR0 Utilities face increasingly higher

More information

A rede elétrica inteligente como pré-requisito para IOT

A rede elétrica inteligente como pré-requisito para IOT A rede elétrica inteligente como pré-requisito para IOT Claudio Oliveira, Smart Grid Architect claudio.oliveira@schneider-electric.com Confidential Property of Schneider Electric Page 3 when life is ENERGIZED

More information

Power Management System. Measuring Devices for Power Distribution

Power Management System. Measuring Devices for Power Distribution Power Management System Measuring Devices for Power Distribution Power Management System System overview /2 - Overview /2 - More information SENTRON Power Monitoring Devices General data /3 - Overview

More information

USE CASE 14 CONTROLLED ISLANDING

USE CASE 14 CONTROLLED ISLANDING I USE CASE 14 CONTROLLED ISLANDING Use Case Title Centralized application separates grid into islands to prevent blackout Use Case Summary Controlled islanding is a method that can significantly improve

More information

Sivacon S4. Low-Voltage Switchboards. siemens.co.uk/tip

Sivacon S4. Low-Voltage Switchboards. siemens.co.uk/tip Product Managers and dedicated Business Development Managers are available to assist with all your enquiries. Technical presentations (Forms of Separation, Discrimination etc) available Site response capability

More information

SIEBREAK-VCB 5-15 kv metal-enclosed interrupter switchgear usa.siemens.com/siebreak

SIEBREAK-VCB 5-15 kv metal-enclosed interrupter switchgear usa.siemens.com/siebreak Reducing arc-flash energy SBRK-VCB 5-15 kv metal-enclosed interrupter switchgear usa.siemens.com/siebreak SBRK-VCB with ORS Brochure Reducing the arc-flash incident energy in low-voltage substation applications

More information

Answers for energy. SIPROTEC 5 the new benchmark for protection, automation, and monitoring of transmission grids

Answers for energy. SIPROTEC 5 the new benchmark for protection, automation, and monitoring of transmission grids Answers for energy. SIPROTEC 5 the new benchmark for protection, automation, and monitoring of transmission grids 2 SIPROTEC 5 the new benchmark for protection, automation, and monitoring of your transmission

More information

Bob Warden. IP Metering and the Smart Grid WAN Revolution October 27, 2008

Bob Warden. IP Metering and the Smart Grid WAN Revolution October 27, 2008 Bob Warden IP Metering and the Smart Grid WAN Revolution October 27, 2008 Creating a Digital Grid A Smart Grid is the foundation for a next-generation utility: The central nervous system." A single NETWORK

More information

Smart Communication the Enabler for Smart Grids

Smart Communication the Enabler for Smart Grids Smart Communication the Enabler for Smart Grids True customer value in Smart Grids The Smart Grid Suite Page 2 The Smart Grid Communication Network Comprehensive, Simple and Easy to understand TSO Control

More information

IEEE Distribution Automation Working Group

IEEE Distribution Automation Working Group IEEE Distribution Automation Working Group Tuesday 26 June Tampa, Florida EDF Distribution system of the future and DA roadmap 1 EDF Group at a glance United Kingdom EDF Energy 8 M customers 16 GW capacity

More information

Circuit Breaker Asset Management using Intelligent Electronic Device (IED) Based Health Monitoring

Circuit Breaker Asset Management using Intelligent Electronic Device (IED) Based Health Monitoring Circuit Breaker Asset Management using Intelligent Electronic Device (IED) Based Health Monitoring Carey Schneider Mike Skidmore Zak Campbell Jason Byerly Kyle Phillips American Electric Power October

More information

Let Energy Monitoring Solutions Do the Heavy Lifting

Let Energy Monitoring Solutions Do the Heavy Lifting Let Energy Monitoring Solutions Do the Heavy Lifting Let Energy Monitoring Solutions Do the Heavy Lifting Duke Dunsford & John Forsyth Schneider Electric This session is eligible for 1 Contact Hour. For

More information

Jose Molina Sales Manager, Global Asset - RTU500 Series (Germany)

Jose Molina Sales Manager, Global Asset - RTU500 Series (Germany) X JORNADAS TECNICAS - ABB EN CHILE, 12 DE ABRIL 2017 Distribution Automation Solution with RTU500 series Jose Molina Sales Manager, Global Asset - RTU500 Series (Germany) Agenda Why RTUs in Distribution

More information

Overload Relays. 3RB2 Solid-State Overload Relays. 3RB20, 3RB21 for standard applications. 5/48 Siemens LV Overview

Overload Relays. 3RB2 Solid-State Overload Relays. 3RB20, 3RB21 for standard applications. 5/48 Siemens LV Overview Overload Relays Siemens AG 2009 Overview 1 2 2 (1)Connection for mounting onto contactors: Optimally adapted in electrical, mechanical and design terms to the contactors and soft starters, these connecting

More information

Blueprint Data Center

Blueprint Data Center Systems and Applications for Data Center Siemens Industy 1. Overview / Purpose In EM EA the datacenter market is seen as one of the fastest growing of the energy businesses. This blueprint is designed

More information

Digitalisierung der Verteilernetze. Wien,

Digitalisierung der Verteilernetze. Wien, Digitalisierung der Verteilernetze Wien, 2. 10. 2017 Transformer ststion Transformer station Das grundsätzliche Verhalten der Energiekonsumenten blieb überviele Jahrzehnte unverändert Anforderungen an

More information

AUTOMATION OF POWER DISTRIBUTION USING SCADA

AUTOMATION OF POWER DISTRIBUTION USING SCADA 1 2 ABSTRACT In every substation certain measurements, supervision, control, operation and protection functions are necessary. Traditionally these functions were performed manually by system operator from

More information

SICAM DC - A new Generation of Smart Meter Data Concentrator Answers for infrastructure and cities.

SICAM DC - A new Generation of Smart Meter Data Concentrator Answers for infrastructure and cities. Siemens Smart Grid Products - A new Generation of Smart Meter Data Concentrator Answers for infrastructure and cities. Smart Metering an integral Part of Smart Grids The Challenges. The Contribution of

More information

Pepco s Plans for Smart Grid. Rob Stewart Blueprint Technology Strategist

Pepco s Plans for Smart Grid. Rob Stewart Blueprint Technology Strategist Pepco s Plans for Grid Rob Stewart Blueprint Technology Strategist 0 Pepco s Grid Vision Through the Grid, customers will become empowered to make choices regarding their use and cost of energy. It will

More information

Surge Protective Device

Surge Protective Device SURGE PROTECTIVE DEVICE Surge Protective Device 20 R 320 Type Max. discharge current Imax/Iimp (ka) Number of poles (P) R: with alarm auxiliary contact Blank: without alarm auxiliary contact Max. continuous

More information

MiCOM P521. Fast Feeder Differential Protection

MiCOM P521. Fast Feeder Differential Protection 01 Fast Feeder Differential Protection The relay provides high-speed two-ended current differential unit protection of overhead lines and underground cables in applications such as ring mains and parallel

More information

Digital Substation Unrestricted Siemens AG 2017 siemens.com/digital-substation

Digital Substation Unrestricted Siemens AG 2017 siemens.com/digital-substation Digital Substation A Substation Why Should We Make It Digital? Adopt new business models Time to operation Quality assurance Business agility Avoid outages Investment security Ensuring grid availability

More information

BEFORE THE ARKANSAS PUBLIC SERVICE COMMISSION

BEFORE THE ARKANSAS PUBLIC SERVICE COMMISSION BEFORE THE ARKANSAS PUBLIC SERVICE COMMISSION IN THE MATTER OF THE FORMULA ) RATE PLAN FILINGS OF OKLAHOMA GAS ) GAS AND ELECTRIC COMPANY ) DOCKET NO. -0-FR PURSUANT TO APSC DOCKET ) NO. -0-U ) Direct

More information

/ sicam SICAM CMIC The smart cube for your distribution network Answers for infrastructure and cities.

/ sicam SICAM CMIC The smart cube for your distribution network Answers for infrastructure and cities. www.siemens.com / sicam SICAM CMIC The smart cube for your distribution network Answers for infrastructure and cities. Simply smart: The compact telecontrol unit SICAM CMIC compact micro Three-stage intelligence

More information

APRIL 2018 ABB Division Fact Sheets

APRIL 2018 ABB Division Fact Sheets APRIL 208 ABB Division Fact Sheets ABB financial summary Revenues by division 207 % of total revenues 24% 29% 9% PG EP 28% IA RM Revenues by region 207 % of total revenues 35% Europe Americas AMEA 46%

More information

SMART METERING IN THE CZECH REPUBLIC, VIEWED BY EZ DISTRIBUCE

SMART METERING IN THE CZECH REPUBLIC, VIEWED BY EZ DISTRIBUCE SMART METERING IN THE CZECH REPUBLIC, VIEWED BY EZ DISTRIBUCE April 2017 Pavel Šolc Board Member, EZ Distribuce, a.s. SMART METERING STRATEGY IN THE CZECH REPUBLIC 2009 2nd unbundling packet smart metering

More information

SICAM Products and Solutions for Energy Automation

SICAM Products and Solutions for Energy Automation SICAM Products and Solutions for Energy Automation Manfred Haslinger, Product Lifecycle Manager SICAM RTUs Josef Müllner, Product Lifecycle Manager SICAM TOOLBOX II siemens.at/future-of-energy SICAM Products

More information

Easily configurable HMI system for power automation siemens.com/sicam

Easily configurable HMI system for power automation siemens.com/sicam SICAM SCC Easily configurable HMI system for power automation siemens.com/sicam Small components big prospects: Your SICAM SCC station control Power grid operation is becoming more and more dynamic. To

More information

Substation SCADA Monitoring

Substation SCADA Monitoring Substation SCADA Monitoring Contact us Today for a FREE quotation to deliver this course at your company?s location. https://www.electricityforum.com/onsite-training-rfq Substations are a critical component

More information

Modular Smart Grid Power Systems Simulators (Utilities)

Modular Smart Grid Power Systems Simulators (Utilities) Modular Smart Grid Power Systems Simulators (Utilities) AEL-MPSS SCADA Key features: Several Utilities and Final User options. Modular and scalable applications (from simple to advance complexity). Scalable

More information

Uniform parameterisation, operation, and monitoring of intelligent switchboards

Uniform parameterisation, operation, and monitoring of intelligent switchboards Uniform parameterisation, operation, and monitoring of intelligent switchboards SIVACON S8 diagnostics station Consistently well informed: Recording of device status and energy values To increase operational

More information

Third Generation System of the Future

Third Generation System of the Future Third Generation System of the Future Reza Ghafurian Consolidated Edison Company of New York 1 Company Overview Electric, gas, and steam regulated utility Supplying New York City and Westchester County

More information

Power Management System. Multifunction Measuring Instruments

Power Management System. Multifunction Measuring Instruments Power Management System Multifunction Measuring Instruments Power Management System /2 - System overview /2 - More information PAC3200 Multifunction Measuring Instruments /3 - Overview /4 - Benefits /5

More information

SURGE PROTECTIVE DEVICES

SURGE PROTECTIVE DEVICES SURGE PROTECTIVE DEVICES SUITABLE SOLUTIONS FOR ALL TYPES OF INSTALLATIONS AND ALL RISK LEVELS 1 CONTENT: Introduction Theory and principles Installation rules Legrand offer 2 2 INTRODUCTION Lightning

More information

SIPROTEC 5 New features of V7.5

SIPROTEC 5 New features of V7.5 SIPROTEC 5 New features of V7.5 siemens.com/siprotec5 New Features for SIPROTEC 5 Release 7.50 Feeder Protection Ground Fault Detection (Pulse Detection, Harmonic Detection) Automatic Load Shedding Vector

More information

Small Generator Interconnection System Impact Study Report. Completed For Q0047

Small Generator Interconnection System Impact Study Report. Completed For Q0047 Small Generator Interconnection Completed For Q0047 Proposed Interconnection PacifiCorp s Existing Goshen Rigby 69 kv Line March 7, 2005 1.0 Description of the Generation Facility Q0047 ( Interconnection

More information

ABB Digital medium-voltage switchgear

ABB Digital medium-voltage switchgear NAMIBIA AMEU/AEDU MARCH 2018 ABB Digital medium-voltage switchgear Barry Addinall UniGear Digital Contents 1. Digital switchgear 2. Complexity of Distribution networks 3. New technologies using digital

More information

MiCOM P521. Fast feeder differential protection

MiCOM P521. Fast feeder differential protection 01 Fast feeder differential protection The relay provides high-speed two-ended current differential unit protection of overhead lines and underground cables in applications such as ring mains and parallel

More information

THE ENEL SMART GRID TEST SYSTEM: A REAL-TIME DIGITAL SIMULATOR-BASED INFRASTRUCTURE

THE ENEL SMART GRID TEST SYSTEM: A REAL-TIME DIGITAL SIMULATOR-BASED INFRASTRUCTURE THE ENEL SMART GRID TEST SYSTEM: A REAL-TIME DIGITAL SIMULATOR-BASED INFRASTRUCTURE Gianluca Sapienza Gianpatrizio Bianco Giorgio Di Lembo Enel Distribuzione Italy Enel Distribuzione Italy Enel Distribuzione

More information

DTRV-EP. COMPLEX DIGITAL PROTECTION FOR 120 kv / MEDIUM VOLTAGE TRANSFORMERS. Application field

DTRV-EP. COMPLEX DIGITAL PROTECTION FOR 120 kv / MEDIUM VOLTAGE TRANSFORMERS. Application field DTRV-EP COMPLEX DIGITAL PROTECTION FOR 120 kv / MEDIUM VOLTAGE TRANSFORMERS Application field The DTRV type of complex transformer protection is designed to protect 120 kv / medium voltage transformers,

More information

Common Departures Interconnecting Facilities Requirements

Common Departures Interconnecting Facilities Requirements Welcome to our e-rew Express. In our last issue, we discussed the common departures on metering installation requirements. This time, we would like to discuss the common departures on the customer low

More information

Product brochure. Grid automation system solutions

Product brochure. Grid automation system solutions Product brochure Grid automation system solutions Improve reliability, productivity and energy efficiency Eaton s Smart Grid solutions provide utilities with the technology they need to build, transform,

More information

Approval...6. Current Revision...7. Introduction... 8 About PJM Manuals... 8 About This Manual... 8 Using This Manual...9

Approval...6. Current Revision...7. Introduction... 8 About PJM Manuals... 8 About This Manual... 8 Using This Manual...9 PJM Manual 07: PJM Protection Standards Revision: 3 Effective Date: May 24, 2018 Prepared by System Planning Division Transmission Planning Department PJM 2018 Table of Contents Table of Contents Approval...6

More information

Bus Way vs. Cable: a CapEx comparison

Bus Way vs. Cable: a CapEx comparison Siemens.com/datacenters Bus Way vs. Cable: a CapEx comparison Positive economics characterize bus way based designs for Data Center critical power distribution White Paper November 2013 Traditionally,

More information

A RELIABILITY AND COST ASSESSMENT METHODOLOGY OF MEDIUM VOLTAGE FEEDERS

A RELIABILITY AND COST ASSESSMENT METHODOLOGY OF MEDIUM VOLTAGE FEEDERS A RELIABILITY AND COST ASSESSMENT METHODOLOGY OF MEDIUM VOLTAGE FEEDERS Cattia RODUNER BKW Energie AG Switzerland cattia.roduner@bkw.ch Efstratios TAXEIDIS BKW Energie AG - Switzerland efstratios.taxeidis@bkw.ch

More information

IEC unites low-and medium-voltage

IEC unites low-and medium-voltage 25 PROTECTION AND SAFETY IEC 61850 unites low-and medium-voltage IEC 61850 can be used with ABB s low-voltage (LV) intelligent electronic devices (IEDs) such as medium-voltage (MV) protection relays and

More information

System Engineering, IT/OT Integration and the Smart Grid. Steve Apps Pr.Eng SAIEE Associate Director EON Consulting, South Africa

System Engineering, IT/OT Integration and the Smart Grid. Steve Apps Pr.Eng SAIEE Associate Director EON Consulting, South Africa System Engineering, IT/OT Integration and the Smart Grid Steve Apps Pr.Eng SAIEE Associate Director EON Consulting, South Africa South African grid: large and complex Line (kv) Length (km) 765 1,859 533

More information

CIGRE U.S. National Committee

CIGRE U.S. National Committee CIGRE U.S. National Committee 2014 Grid of the Future Symposium October 20, 2014 Houston, TX New Tools for Managing Smart Switching Devices Chris McCarthy, Jason Lombardo S&C Electric Company CWG/9416P

More information

Peter Overgaauw Pascal Stijns 27 Oct 2016 EXPERION PKS CONTROLS ELECTRICAL SYSTEMS TOO!

Peter Overgaauw Pascal Stijns 27 Oct 2016 EXPERION PKS CONTROLS ELECTRICAL SYSTEMS TOO! Peter Overgaauw Pascal Stijns 27 Oct 2016 EXPERION PKS CONTROLS ELECTRICAL SYSTEMS TOO! Abstract Gain a basic understanding of an electrical control management system Exposure to a number of technology

More information

Power Distribution. Siemens AG Alle Rechte vorbehalten.

Power Distribution. Siemens AG Alle Rechte vorbehalten. Power Distribution Safety and protection for wind turbines Perfectly coordinated components for low-voltage power distribution Our world is changing Global warming Global greenhouse gas emissions Global

More information

Sentron 3VT circuit breakers Simply Smart: First choice for power distribution

Sentron 3VT circuit breakers Simply Smart: First choice for power distribution s Sentron 3VT circuit breakers Simply Smart: First choice for power distribution www.siemens.com/industry Sentron 3VT Molded Case Circuit-Breakers - 10-1600Amperes With the standard line of 3VT molded-case

More information

Driven by Digital: from EcoStruxure Power to Data Centers Philippe Delorme Executive Vice President Low Voltage & Secure Power

Driven by Digital: from EcoStruxure Power to Data Centers Philippe Delorme Executive Vice President Low Voltage & Secure Power Driven by Digital: from EcoStruxure Power to Data Centers Philippe Delorme Executive Vice President Low Voltage & Secure Power End to End Cybersecurity Cloud and/or On Premise markets with its six domains

More information

Smart Grid Development in Ho Chi Minh City

Smart Grid Development in Ho Chi Minh City Power Grid Modernization by Smart Grid Development in Ho Chi Minh City Ho Chi Minh City, 06/2016 CONTENTS Introduction of EVNHCMC Power Grid Modernization by Smart Grid Development in EVNHCMC Perspectives

More information

COLLABORATE TO WIN. 03/31/2017 Digital Substation Turning IEC61850 features into benefits. Peter Rietmann, Program Manager Digital Substation NA

COLLABORATE TO WIN. 03/31/2017 Digital Substation Turning IEC61850 features into benefits. Peter Rietmann, Program Manager Digital Substation NA COLLABORATE TO WIN 03/31/2017 Digital Substation Turning IEC61850 features into benefits Peter Rietmann, Program Manager Digital Substation NA Increasing Reliability Higher functional integration and process

More information

Products Portfolio. Pole mounted Vacuum Recloser

Products Portfolio. Pole mounted Vacuum Recloser Products Portfolio Pole mounted Vacuum Recloser Efacec Switchgear Efacec Switchgear is a leading company in Portugal and a worldwide reference in the development of solutions for power generation, transmission,

More information

Feeder Hosting Capacity and Impacts of Distribution Connected Generation. NGN Tutorial. Prepared for GOTF October 22, 2017

Feeder Hosting Capacity and Impacts of Distribution Connected Generation. NGN Tutorial. Prepared for GOTF October 22, 2017 Feeder Hosting Capacity and Impacts of Distribution Connected Generation NGN Tutorial Matthew Rylander, PhD Technical Leader Power System Studies Electric Power Research Institute mrylander@epri.com Prepared

More information