MEASURE MONITOR UNDERSTAND
|
|
- Brittany Green
- 6 years ago
- Views:
Transcription
1 MEASURE MONITOR UNDERSTAND Presented by Alistair Hunt Energy Monitoring, Measurement metrics Where and What 1
2 History & Background Company Timeline 18 Years Comrac & Sinetica founded 15 Years Raritan Integration Partner 11 Years First generic SNMP Adaptor 7 Years Hawk-i Platform 7 Years Rack Level Power Monitoring 6 Years First rack Deployment at BP 4 Years Second Generation Products 4 Years Partner Programme 3 Years Unite Technologies Formed 3 Years Carbon Trust Listing 2 Year Third Generation Products 1 Year SEI ACA Accreditation 2
3 History & Background Client Base Finance Blue Chip Universities Local Govt. Blue Light 3
4 Original Energy Usage Case study Annual energy usage of 1.4 MWHrs, 1,260,000 Annual CO2 consumption 7,500 Tonnes/Yr Original PUE calculated at 2.5 No of racks 273, Ave KVA /rack = 2.34KVA Energy Savings opportunity qualified against a PUE target of 1.8
5 Energy savings no Change in IT Load 5
6 Observations Observations and recommendations Supporting services Cooling in areas with little IT pay load in Data hall Condenser cooling water temperature at 12degrees, [8 degrees ambient air temperature] Condenser suction and Head end pressure setting sub optimal Recommendations Optimise Under floor air movement to data racks, seal off un-used areas Raise Condenser cooling water temperature to 14 degrees Celsius [10 degrees Celsius ambient air temperature], more free cooling hours Optimise BMS settings Small refrigeration systems were used with lower efficiency centralised refrigeration systems are more efficient at high load, better condenser performance, efficient compressors, better expansion valves and large evaporators better part load performance due to shared condensing and evaporating surface floating head pressures/suction pressures variable speed compressor control better level of free cooling by sharing available heat exchanger surface
7 Observations Observations and recommendations Data Hall Recommendations Cooling in areas with little IT pay load Data Hall Optimise CRAC use Optimise air flow to data racks and under floor, seal off un-used areas Increase to ASHRAE recommendations, note 23 Cold Aisle temperatures measured at 19 degrees degrees Celsius is the top limit due to server fans Celsius being continuously on Increase Free Air Cooling Cold Aisle ventilated tiles less than 50 % Rack Hotspots Cold Aisle and Hot Air mixing Deploy 80% efficient Ventilation Tiles Rack level Temperature Monitoring. Optimise air flow within the racks and under floor, high Pay load operations Deploy Cold Aisle Containment install Blanking plates and Floor grommets to improve CRAC operational efficiency,, switch off 3 out of 9 CRAC Units Oversized, utilised below optimum efficiency UPS Identify and remove, Virtulisation Non operational IT Equipment powered up
8 Energy Management Solutions [no change in IT load] 8
9 Energy Management Solutions [with a 5% reduction in IT Load] 9
10 WHERE THE SAVINGS COME FROM Source PUE 2.5 Recorded Energy spend PUE 1.8 Energy spend Saving PUE 1.8 Energy spend With 5% IT saving IT Pay load 504, , ,000 Refrigeration 529, , , ,000 UPS Losses 57,200 42,000 15,200 42,000 Lighting 32,000 18,000 14,000 18,000 AHU s 84,800 56,000 48,800 51,000 Other 52,000 40,000 12,000 40,000 1,260, , , ,000 70% savings in Chillers 1 degree Celsius = 3-4% Energy costs Maximise Free cooling Saving of 28% Total Energy spend 46% Total Facilities spend 10
11 5% in IT Energy savings Switching off unused servers consolidation of applications where possible implementation of VM technology 5%,[ 28,000] savings can be achieved by turning off Servers. eg HP Proliant 585 G5 Server Max power is 1300W, running power consumption is 650W this equates to an 5694KWh Annually. At 0.09 a KW, Annual cost of To make these savings, would mean switching off 55 servers. 11
12 Capital Expenditure costs Activity Related costs Comments Deployment of power and environmental monitoring hardware including sensors Airflow management and miscellaneous items 163,800 Non invasive technology Temperature & Humidity Data Power and Facility Monitoring 18,000 Blanking of open U space Vertical infill's (800mm wide Cabs) Optional Under floor solutions (not inc.) Installation and commissioning 9.,000 Site services Commissioning and test Deployment of cold aisle containment including sensor in 273 Racks 90,000 Includes supply and installation Enterprise Management Software including standard reporting package 35,000 Dynamic PUE Environmental kwhrs, kva, CO2 Tonnes Costs per rack, group, total Total 315,800 12
13 Return on investment Return on investment Total Energy spend PUE: ,260, Total Energy spend target PUE:1.8, Energy cost saving target (year 1) 353, Total cost to deploy legacy EMS solution 315, Average cost per cabinet 1, Return on investment 11 months 13
14 WHERE FURTHER SAVINGS CAN BE MADE Source Saving Capital cost ROI CRC Carbon credit allowance reduction 25,200 New Centralised Chiller 100, , Yrs National Grid Power Rental 3MW Back up 50,000/MW Capacity 150,000 5,000 NA [New Revenue Stream] TOTAL 275, ,000 14
15 National Grid has spike demands Backup/Stand by Power Rental to the National Grid To cater for this the National Grid has to supply a sharp increase in power for a Short period of time. This is done by firing up Power Stations 12 hours in advance. This is inefficient. by having the ability to use customer Back up / Standby Generators, high peak demand can be efficiently managed. Rental is based on Capacity, 50,000 / MW. Use of capacity can be 1 hour per year to a few hours per month. Non Intrusive to the customers business activity. CRC Carbon credits are also given for the full capacity to the customer 15
16 Monitoring Metrics 16
17 Data Centre Metrics PUE [Power Usage Effectiveness] Total Facility Energy Usage/ IT Energy usage DCiE Reciprocal of PUE IT Energy Usage/ Total Facility Energy Usage However PUE and DCiE does not distinguish between fixed and variable Energy costs Fixed Energy Overhead Facility Power drawn if no IT equipment is on load, ie UPS s. CRAC Units Variable Energy Overhead Facility Power drawn in response to IT load, ie Chiller compressor pumps I²T Heating affect with current draw, ie Caballing and Transformers 17
18 Dynamic PUE 18
19 Data Centre Metrics PUE / DCiE Not the be all and end all Data Centre metrics such as PUE and DCiE are commonly Used as a measure of Data Centre Efficiency. There are however some issues with these metrics If an energy efficiency programme is being carried out, which includes reducing the IT load, deployment of more efficient IT equipment, these metrics could get worse Operators with older designed Data Centres Operators with high resilience levels Both will have higher fixed energy overheads. The Fixed Energy overhead has a significant effect on PUE and DCiE, Deploying Fixed and Variable energy overhead metrics can be used to develop Data Centre Efficiency performance Fixed Energy overhead; Base line performance Variable overhead Operational performance 19
20 Data Centre Metrics DCEe and PUE Metrics will identify efficiency issues They need to be monitored dynamically. Manual measurements at 1] Max IT Load, low Utility load = Optimum DCiE/ PUE 2] Min it Load, High Utility Load = Worst DCiE / PUE Neither are correct Snap shot in time Information not accurate to deliver effective cost savings analysis Dynamic PUE /DCiE, Fixed and Variable Energy overhead metrics measured at the right level of granularity, will high level information to help make practical decisions to improve Energy efficiency 20
21 Equipment Loss Parameters Device Caballing & Switchgear Rated power (MW) Fixed Losses Variable Losses I²T Losses 1 0% 0% 1.5% PDU s % 0% 0.5% UPS s 1.1 2% 2.5% 5% CRAC s % 1.5% 0% Chiller Plant 1.5 5% 30% 0% Transformer % 0% 2.5% 21
22 Data Centre Metrics Calculating / Measuring Fixed and Variable Energy Overhead for New build can be carried out at the Design Test stage of the deployment For an existing Legacy Data centres this is not so easy. Estimations need to be made. This can be done by monitoring the Utility load and IT Load in hourly intervals over several days. Rack level and External temperature should also be measured to consider the effect of cooling/ Free air cooling with external temperature A scatter graph with regression analysis can be plotted to calculate the Fixed Energy Overhead. 22
23 Fixed and Proportional Energy Overhead 23
24 Fixed and Proportional Energy Overhead 24
25 Fixed and Proportional Energy Overhead Variable Energy Overhead 25
26 Monitoring points for DC Metrics 26
27 Monitoring points for DC Metrics 27
28 Conclusion Modular flexible Data Centre design to optimise Fixed Energy overhead, particularly for New Build Data Centres, not fully populated Monitoring of Facilities and IT Load equipment to provide accurate operation performance measurements, DCiE / PUE, Fixed and Variable Energy overheads Monitoring Parameters should include External air Temperature Cold Aisle air Temperature Rack temp monitoring Rack IT load, Utility load dynamic Ideally to specific utilities to monitor optimal performance Monitoring the above parameters at the right level of granularity will allow optimisation of Free air cooling CRAC, Chiller, UPS optimisation Dynamic PUE / DCiE metrics Identify and reduce Hot spots which determine cooling requirements Rack/server KVA duty Phase Balancing 28
29 Reporting 29
30 Dash board view of estate to a rack 30
31 31
32 32
33 33
34 34
35 35
36 36
37 37
Cooling on Demand - scalable and smart cooling solutions. Marcus Edwards B.Sc.
Cooling on Demand - scalable and smart cooling solutions Marcus Edwards B.Sc. Schroff UK Limited Data Centre cooling what a waste of money! A 1MW data center needs 177,000,000 kwh in its lifetime of 10
More informationEvaporative free air cooling technology Providing evaporative free air cooling solutions.
Evaporative free air cooling technology Providing evaporative free air cooling solutions. Creating an effective workspace environment data centre free air cooling technology FreeCool - Evaporative Free
More informationThermal management. Thermal management
Thermal management Thermal management Managing thermal loads is a major challenge for all Data Centre operators. Effecting proper control of the thermal environment drives energy consumption and ultimately
More informationMSYS 4480 AC Systems Winter 2015
MSYS 4480 AC Systems Winter 2015 Module 12: DATA CENTERS By Satwinder Singh 14/05/2015 1 Data Centers Data Centers are specialized environments that safeguard your company's most valuable equipment and
More informationVirtualization and consolidation
Virtualization and consolidation Choosing a density strategy Implementing a high-density environment Maximizing the efficiency benefit Anticipating the dynamic data center Schneider Electric 1 Topical
More information18 th National Award for Excellence in Energy Management. July 27, 2017
18 th National Award for Excellence in Energy Management July 27, 2017 ICICI Bank, Data Centre, August Hyderabad 30 & 31, 2017 ICICI Bank - Revolution in Digital Banking Over 100,000 Digital POS in 4 months
More informationRecapture Capacity for Existing. and Airflow Optimization
Recapture Capacity for Existing Data Centers Through Cooling and Airflow Optimization Introduction Challenges and Trends Agenda Cooling & Airflow Optimization Takeaways Learning Objectives Recognize opportunities
More informationEnergy Efficiency Best Practice Guide Data Centre and IT Facilities
2 Energy Efficiency Best Practice Guide Data Centre and IT Facilities Best Practice Guide Pumping Systems Contents Medium-sized data centres energy efficiency 3 1 Introduction 4 2 The business benefits
More informationPROCESS & DATA CENTER COOLING. How and Why To Prepare For What s To Come JOHN MORRIS REGIONAL DIRECTOR OF SALES
PROCESS & DATA CENTER COOLING How and Why To Prepare For What s To Come JOHN MORRIS REGIONAL DIRECTOR OF SALES CONGRATULATIONS 2 BOLD PREDICTION 3 Where We Are TODAY Computer Technology NOW advances more
More informationSmart Data Centres. Robert M Pe, Data Centre Consultant HP Services SEA
Smart Data Centres Robert M Pe, Data Centre Consultant Services SEA 2006 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice Content Data center
More informationEfficiency of Data Center cooling
Efficiency of Data Center cooling Comparison of data room layouts and cooling systems Bohumil Cimbal Product manager for Cooling Systems in CONTEG Company Objective Basic questions between investor and
More informationSwitch to Perfection
Switch to Perfection Traditional Data Centre - Temperatures Ideal Air Temperature: 22 C Chilled Water: 7-9 C Heat Load per Rack: Up to 4,5 Chilling & Pump Set The challenge a thermal image Front View of
More informationGreen Data Centers A Guideline
Green Data Centers A Guideline Sekhar Kondepudi Ph.D Associate Professor Smart Buildings & Smart Cities Vice Chair Focus Group on Smart Sustainable Cities ITU-TRCSL Workshop on Greening the Future: Bridging
More informationFuture of Cooling High Density Equipment. Steve Madara Vice President and General Manager Liebert Precision Cooling Business Emerson Network Power
Future of Cooling High Density Equipment Steve Madara Vice President and General Manager Liebert Precision Cooling Business Emerson Network Power Agenda Issues facing the Data Center Managing the explosive
More informationIndustry leading low energy evaporative fresh air cooling.
Industry leading low energy evaporative fresh air cooling. Freecool Evaporative Free Air Cooling by Workspace Technology delivers innovative low energy cooling for a range of applications including data
More informationGreen Sustainable Data Centres. Checklist - EU Code of Conduct on Data Centres. Annex
Green Sustainable Data Centres Checklist - EU Code of Conduct on Data Centres Annex This course is produced under the authority of e-infranet: http://e-infranet.eu/ Course team prof. dr. Colin Pattinson,
More informationServer Room & Data Centre Energy Efficiency. Technology Paper 003
Technology Paper 003 Server Room & Data Centre Energy Efficiency Workspace Technology Limited Technology House, PO BOX 11578, Sutton Coldfield West Midlands B72 1ZB Telephone: 0121 354 4894 Facsimile:
More informationData Centre Energy Efficiency. Duncan Clubb EMEA Data Centre Practice Director CS Technology
Data Centre Energy Efficiency Duncan Clubb EMEA Data Centre Practice Director CS Technology Key Messages No more silos energy efficiency only comes from a holistic approach to DC design and operation If
More informationGoogle s Green Data Centers: Network POP Case Study
Google s Green Data Centers: Network POP Case Study Table of Contents Introduction... 2 Best practices: Measuring. performance, optimizing air flow,. and turning up the thermostat... 2...Best Practice
More informationData Centre Energy & Cost Efficiency Simulation Software. Zahl Limbuwala
Data Centre Energy & Cost Efficiency Simulation Software Zahl Limbuwala BCS Data Centre Simulator Overview of Tools Structure of the BCS Simulator Input Data Sample Output Development Path Overview of
More informationSurvey and Audit Service Schedule. Airflow and Thermal Imaging Survey Service Schedule. Data Centre Solutions Expertly Engineered
Survey and Audit Service Schedule Airflow and Thermal Imaging Survey Service Schedule Data Centre Solutions Expertly Engineered Consult optimisation, audit and survey services Data Centre Services Workspace
More informationIT Air Conditioning Units
IT Air Conditioning Units Modern Flexible Effective Energy Saving CoolTeg Plus and CoolTop overview CoolTeg Plus CW CoolTeg Plus DX CoolTeg Plus XC CoolTop Installation Between IT racks On top of IT rack
More informationCase Study: The design of a modern data centre Jeffrey Brindle Technical Director, HP Critical Facilities Services
Case Study: The design of a modern data centre Jeffrey Brindle Technical Director, HP Critical Facilities Services EMEA Roll-out 2 Main Mirror UK Swindon/Newbury area (15,000m 2 ) Germany Russelsheim(main)/
More informationMission Critical Facilities & Technology Conference November 3, 2011 Cooling 101. Nick Gangemi Regional Sales Manager Data Aire
Mission Critical Facilities & Technology Conference November 3, 2011 Cooling 101 Nick Gangemi Regional Sales Manager Data Aire Agenda Exactly what are we talking about ASHRAE TC 9.9 Design best practices
More information7 Best Practices for Increasing Efficiency, Availability and Capacity. XXXX XXXXXXXX Liebert North America
7 Best Practices for Increasing Efficiency, Availability and Capacity XXXX XXXXXXXX Liebert North America Emerson Network Power: The global leader in enabling Business-Critical Continuity Automatic Transfer
More informationExcool Indirect Adiabatic and Evaporative Data Centre Cooling World s Leading Indirect Adiabatic and Evaporative Data Centre Cooling
Excool Indirect Adiabatic and Evaporative Data Centre Cooling World s Leading Indirect Adiabatic and Evaporative Data Centre Cooling Data Centre Solutions Expertly Engineered Indirect Adiabatic and Evaporative
More informationData Center Energy Savings By the numbers
Data Center Energy Savings By the numbers Chris Kurkjian, PE HP Critical Facility Services provided by EYP Mission Critical Facilities 2008 Hewlett-Packard Development Company, L.P. The information contained
More informationWhere s the Heat Coming From. Leland Sparks Global Account Technical Consultant Belden
Where s the Heat Coming From Leland Sparks Global Account Technical Consultant Belden What is the greatest DC challenge you face? Air Flow to Heat Load Relation Server Inlet Fans Chips Outlet LOAD Dell
More informationPassive RDHx as a Cost Effective Alternative to CRAH Air Cooling. Jeremiah Stikeleather Applications Engineer
Passive RDHx as a Cost Effective Alternative to CRAH Air Cooling Jeremiah Stikeleather Applications Engineer Passive RDHx as a Cost Effective Alternative to CRAH Air Cooling While CRAH cooling has been
More informationHIGH DENSITY DATACOM INTEGRATED COOLING SYSTEM.
HIGH DENSITY DATACOM INTEGRATED COOLING SYSTEM. SYSTEM LOGICA is the most advanced alternative to the problem of cooling of server rooms MONTAIR is the trademark which represents excellence on the market
More informationHow much power?! Data Centre Efficiency. How much Money?! Carbon Reduction Commitment (CRC)
How much power?! Data Centre Efficiency The US EPA found in 2006 data centres used 1.5% of total US consumption (5) For Bangor University data centres use approximately 5-10% of the total university electricity
More information1.0 Executive Summary. 2.0 Available Features & Benefits
Statement Of Work Energy Management Services Table of Contents 1.0 Executive Summary 2.0 Available Features & Benefits 3.0 Assessment Deliverables Selection 4.0 On Site Assessment Activities 5.0 Exclusions
More informationApplication of Green Technology For Data Centre
Application of Green Technology For Data Centre Steven So Vice President Data Centre Business Cloud Business Division NTT Com Asia Limited 25 Sep 2013 Today s Agenda Why? How? What? Business Drivers
More informationTotal Modular Data Centre Solutions
Sector Data Centre Total Modular Data Centre Solutions www.airedale.com BRITISH MANUFACTURER ENERGY EFFICIENCY CONTROLS SERVICE TRAINING 01 Standardised Modular Designs to fit your needs Our modular system
More informationCase study on Green Data Center. Reliance Jio Infocomm Limited
Case study on Green Data Center 2 What is data center? Use and functions of Data Center. Basic Infrastructure requirement for data center. Energy consumption heads in data center. 3 What is Data Center
More informationMoving Containment Inside the Enclosure. Jeff Markle Great Lakes Case & Cabinet
Moving Containment Inside the Enclosure Presented by Jeff Markle Great Lakes Case & Cabinet Containment Containment : To put constraint upon; to restrain; to confine; to keep within bounds Containment
More informationOvercoming the Challenges of Server Virtualisation
Overcoming the Challenges of Server Virtualisation Maximise the benefits by optimising power & cooling in the server room Server rooms are unknowingly missing a great portion of their benefit entitlement
More informationTWO FINANCIAL IMPACT STUDIES. Seal IT Equipment Cabinets for Significant Annual Cost Savings and Simple Payback in a Few Short Months
TWO FINANCIAL IMPACT STUDIES Seal IT Equipment Cabinets for Significant Annual Cost Savings and Simple Payback in a Few Short Months TWO FINANCIAL IMPACT STUDIES Seal IT Equipment Cabinets for Significant
More informationDATA CENTER EFFICIENCY: Data Center Temperature Set-point Impact on Cooling Efficiency
DATA CENTER EFFICIENCY: Data Center Temperature Set-point Impact on Cooling Efficiency September 27 th, 2013 Tejas Desai, PE CEM CEA LEED AP Sameer Behere, PE CEM LEED AP Agenda Problem: Quick fixes can
More informationHow to Increase Data Center Efficiency
How to Increase Data Center Efficiency Shivani Shukla Potkar Product Marketing Manager Pentair Electronics Protection High cooling efficiency & and reduced power consumption enhances the balance between
More informationPower & Cooling Considerations for Virtualized Environments
Power & Cooling Considerations for Virtualized Environments Cisco Data Center Day 2008 31-01-2008 APC-MGE Vision & Mission OUR VISION APC-MGE products ensure availability wherever data is created, transmitted
More informationInnovative Data Center Energy Efficiency Solutions
Innovative Data Center Energy Efficiency Solutions Dr. Hendrik F. Hamann IBM T.J. Watson Research Center 2/8/2009 2007 IBM Corporation A holistic Challenge: Energy & Thermal Management Energy / thermal
More informationBeyond BREEAM Excellent DCs. Cobalt Data Centre Campus
Beyond BREEAM Excellent DCs Cobalt Data Centre Campus Campus Location - Newcastle Campus Site Plan Data Centre 2 Data Centre 1 Data Centre 3 Cobalt Business Park Power Delivery to Site National Grid Tynemouth
More informationbrightsolid Data Hall 1 Keysource Technical Specifications
brightsolid Data Hall 1 Keysource Technical Specifications Page 1 Introduction A Data Centre is a highly controlled environment that provides IT to external organisations seeking to outsource their requirements
More information84 kw, Tier 3, Direct Expansion, 937 ft 2
[Reference Design 42] 84 kw, Tier 3, Direct Expansion, 937 ft 2 DESIGN OVERVIEW Data Center IT Capacity 84 kw Target Availability Tier 3 Annualized PUE at 100% Load 1.712 Total Racks and Average Density
More informationImpact of Air Containment Systems
White Paper June 2012 WP-20 Impact of Air Containment Systems Reducing Energy Consumption Introduction: The Importance of Maintaining Data Center Cooling Energy Efficiency Data centers are mission-critical
More informationData center cooling evolution. The hottest way to save energy. Lucio Bustaffa: Product Development Manager BlueBox Group
Data center cooling evolution. The hottest way to save energy Lucio Bustaffa: Product Development Manager BlueBox Group Data Center overview What s happening in the web? 2 Data Center overview What s happening
More informationDCIM Data Center Infrastructure Management Measurement is the first step
DCIM Data Center Infrastructure Management Measurement is the first step Presented by Julius Neudorfer Sponsored by DCIM Data Center Infrastructure Management Measurement is the first step Presented by
More informationHow Liquid Cooling Helped Two University Data Centers Achieve Cooling Efficiency Goals. Michael Gagnon Coolcentric October
How Liquid Cooling Helped Two University Data Centers Achieve Cooling Efficiency Goals Michael Gagnon Coolcentric October 13 2011 Data Center Trends Energy consumption in the Data Center (DC) 2006-61 billion
More informationGreen IT and Green DC
Green IT and Green DC Alex SL Tay Regional Service Product Line Manager Site & Facilities Services, IBM ASEAN 1 What our clients are telling us We are running out of space in our data center We have environmental
More informationPlanning a Green Datacenter
Planning a Green Datacenter Dr. Dominique Singy Contribution to: Green IT Crash Course Organisator: Green IT Special Interest Group of the Swiss Informatics Society ETH-Zurich / February 13, Green Data
More information3300 kw, Tier 3, Chilled Water, 70,000 ft 2
[Reference Design 22] 3300 kw, Tier 3, Chilled Water, 70,000 ft 2 DESIGN OVERVIEW Data Center IT Capacity 1100 kw per Data Hall 3 Independent Data Halls Design Application Range This design can be applied
More informationMunters Data Center Cooling Solutions. Simon Young & Craig MacFadyen Munters Data Centers
Munters Data Center Cooling Solutions 1 Simon Young & Craig MacFadyen Munters Data Centers Introduction Vision Your Perfect Climate Mission Munters' mission is to be a globally leading supplier of energy
More informationDatacenter Efficiency Trends. Cary Roberts Tellme, a Microsoft Subsidiary
Datacenter Efficiency Trends Cary Roberts Tellme, a Microsoft Subsidiary Power Slashing Tools P3 Kill-A-WATT Measures min, max, and instantaneous voltage and current draw Calculates power (watts), kilowatt
More informationWelcome Association of Energy Engineers to the Microsoft Technology Center
Welcome Association of Energy Engineers to the Microsoft Technology Center Today s Agenda 10:00 10:30 What s new in data center energy efficiency planning and implementation? 10:30 11:00 ASHRAE data center
More informationPower Monitoring in the Data Centre
Power Monitoring in the Data Centre Fixed or Wireless Steve Strange RCDD ANIXTER INTERNATIONAL Agenda Energy Consumption Case Study Reasons to Monitor Power Monitoring Environmental Monitoring Asset Tags
More informationReducing Energy Consumption with
Reducing Energy Consumption with Passive Cooling Ian Cathcart, RCDD Technical Support Manager Technical Support Manager Chatsworth Products, Inc. Thermal Management: Mission Critical Data center heat loads
More informationHIGHLY EFFICIENT COOLING FOR YOUR DATA CENTRE
HIGHLY EFFICIENT COOLING FOR YOUR DATA CENTRE Best practices for airflow management and cooling optimisation DC ASSESSMENT SERVICES AISLE CONTAINMENT AIRFLOW MANAGEMENT Achieving true 24/7/365 operation
More informationThe Efficient Enterprise. All content in this presentation is protected 2008 American Power Conversion Corporation
Ee The Efficient Enterprise All content in this presentation is protected 2008 American Power Conversion Corporation Keystrokes Kilowatts Heat OUT Electricity IN Need for bandwidth exploding Going hyperbolic!
More informationTen Cooling Solutions to Support High-density Server Deployment. Schneider Electric Data Center Science Center White Paper #42
Ten Cooling Solutions to Support High-density Server Deployment Schneider Electric Data Center Science Center White Paper #42 1 Introduction 2 Introduction This paper provides 10 approaches for increasing
More informationTrading TCO for PUE? A Romonet White Paper: Part I
Trading TCO for PUE? A Romonet White Paper: Part I Executive Overview Most data center vendors claim to improve Power Usage Effectiveness (PUE). The problem with this is that focusing on reducing PUE makes
More informationPartner Introduction
P R E S E N T S Partner Introduction September 16, 2013 Today s Agenda The Market Opportunity The Cooling Capacity Factor (CCF) New service Benefits to Upsite Partners How to Sell Launch Plan & Support
More informationREPORT. Energy Efficiency of the San Diego Supercomputer Center and Distributed Data Centers at UCSD. Prepared for:
REPORT Energy Efficiency of the San Diego Supercomputer Center and Distributed Data Centers at UCSD Prepared for: San Diego Supercomputer Center 10100 John J Hopkins Drive San Diego, CA 92037 May 11, 2009
More informationA Data Center Heat Removal System That Saves... 80% Discover Inertech s Award-winning Data Center Heat Removal System
A Data Center Heat Removal System That Saves... Infrastructure Power Water up to 40% up to 80% up to 85% Discover Inertech s Award-winning Data Center Heat Removal System A Cool Solution; A Breakthrough
More informationIncreasing Data Center Efficiency through Metering and Monitoring Power Usage
White Paper Intel Information Technology Computer Manufacturing Data Center Efficiency Increasing Data Center Efficiency through Metering and Monitoring Power Usage To increase data center energy efficiency
More informationZTE ZXCR Series DX In-Row Air Conditioning Product Description
ZTE ZXCR Series DX In-Row Air Conditioning Product Description Requirements & Challenges Due to the rapid development of telecommunication technology, the related IT equipment s power consumption is increase
More informationEnergy Logic: Emerson Network Power. A Roadmap for Reducing Energy Consumption in the Data Center. Ross Hammond Managing Director
Energy Logic: A Roadmap for Reducing Energy Consumption in the Data Center Emerson Network Power Ross Hammond Managing Director Agenda Energy efficiency Where We Are Today What Data Center Managers Are
More informationProduct Brochure DENCO Close Control Units Row-DENCO. High Density Cooling for Data Centres
Product Brochure DENCO Close Control Units Row-DENCO High Density Cooling for Data Centres Data Centre Cooling Through a history in close control, we have developed a broad and deep understanding of how
More informationWhite paper adaptive IT infrastructures
Contents Executive summary... 4 Introduction... 5 Reference architecture... 6 Objective of a comprehensive regulation system... 8 First objective: optimal energy operating point... 8 Second objective:
More informationDCIM Solutions to improve planning and reduce operational cost across IT & Facilities
DCIM Solutions to improve planning and reduce operational cost across IT & Facilities Presented by: Chi Sen, Director, Data Centre Software Solutions, APJ & EMEA Schneider Electric Data Center Solutions
More informationData Center Enclosures Best Practices. Maximize the Efficiency of the Enclosure within a Data Center
Data Center Enclosures Best Practices Maximize the Efficiency of the Enclosure within a Data Center Things to ask before selecting Enclosures: Primary Use Severs or Patching, or both determines size. RMU
More informationHigh Efficient Data Center Cooling
Nordborg High Efficient Data Center Cooling Copenhagen Center on Energy Efficiency webinar 12. July 2017 Jörg Saar, Danfoss Cooling 1 Danfoss Cooling Contents 1. Short intro to Danfoss Cooling 2. Introduction
More informationData Center Optimized Controls
Data Center Optimized Controls Controls Agenda 30 min. Emerson Control Products icom (Dynamic Thermal Optimization) 20 min. Station Rotation Station 1: Controller Challenge Station 2: Wireless Demo 5 min.
More informationData Center Infrastructure Management (D.C.I.M.)
Data Center Infrastructure Management (D.C.I.M.) Garies Chong, RCDD, DCDC. BICSI Southeast Asia District Chair Managing Director of EMS Wiring Systems Pte Ltd Data Center Infrastructure Management (D.C.I.M.)
More informationRetro-Commissioning Report
10 Retro-Commissioning Report Retro-Commissioning Retro-Commissioning is the process for identifying intrinsic operational and energy related issues in the facilities DDC system and providing a mechanism
More informationIntroducing the Heat Wheel to the Data Center
Introducing the Heat Wheel to the Data Center Robert (Dr. Bob) Sullivan, Ph.D. Data Center Infrastructure Specialist KyotoCooling International Critical Facilities Round Table 1 A New Free Cooling Technique
More informationCombining Cold Aisle Containment with Intelligent Control to Optimize Data Center Cooling Efficiency
A White Paper from the Experts in Business-Critical Continuity TM Combining Cold Aisle Containment with Intelligent Control to Optimize Data Center Cooling Efficiency Executive Summary Energy efficiency
More informationScalable, Secure. Jason Rylands
Energy Efficient, Modular, Scalable, Secure Jason Rylands The planning, construction and operation of IT infrastructure for mission critical applications in reliable Datacentres represents a real challenge.
More informationHIGH DENSITY RACK COOLING CHOICES
WATERCOOLED HIGH PERFORMANCE COMPUTING SYSTEMS AQUILA WHITE PAPER HIGH DENSITY RACK COOLING CHOICES by Phil Hughes Reprinted with permission of Clustered Systems Company, Inc 1 THIS WHITE PAPER DISCUSSES
More informationsurvey, 71% of respondents listed Improving capacity planning as a top driver for buying DCIM 1.
:: In a recent Uptime Institute survey, 71% of respondents listed Improving capacity planning as a top driver for buying DCIM 1. 2 Maintain Assess Control ROI Monitor Optimize The Need for a Better Approach
More informationFACT SHEET: IBM NEW ZEALAND DATA CENTRE
FACT SHEET: IBM NEW ZEALAND DATA CENTRE IBM and the Data Centre IBM is the largest occupier of data centre space in the world and currently owns or occupies approximately one million square metres globally.
More informationHow High-Density Colocation and Enhanced Visibility Improve Business Performance
How High-Density Colocation and Enhanced Visibility Improve Business Performance Steven So Vice President Data Center Business Cloud Business Division NTT Com Asia Limited 11 Sep 2015 NTT Communications
More informationE e n rgy g y St S ud u y y Pr P og o r g ams December 2011
Energy Study Programs December 2011 1 Agenda Energy Study Programs Overview Recommissioning Engineering Studies Data Center Studies Custom Rebates What makes a good energy study? 2 Energy Study Program
More informationA Green Approach. Thermal
A Green Approach to Thermal Management Thermal Management - AGENDA Definitions & Thermal Facts Density Trends Rack Level Management Passive Solutions Thermal Sources & Green Solutions Data Center Layout
More informationMeasurement and Management Technologies (MMT)
IBM Systems Lab Services and Training Measurement and Management Technologies (MMT) Data Center Solutions for a Smarter Planet AGENDA IBM Energy Efficiency Program & Accomplishments IBM CO2 Reduction Commitment
More informationIs Data Center Free Cooling Feasible in the Middle East? By Noriel Ong, ASEAN Eng., PMP, ATD, PQP
Is Data Center Free Cooling Feasible in the Middle East? By Noriel Ong, ASEAN Eng., PMP, ATD, PQP This case study will evaluate the feasibility of data center free cooling in the Middle East using indirect
More informationFive Strategies for Cutting Data Center Energy Costs Through Enhanced Cooling Efficiency
Five Strategies for Cutting Data Center Energy Costs Through Enhanced Cooling Efficiency A White Paper from the Experts in Business-Critical Continuity TM Executive Summary As electricity prices and IT
More informationDC Energy, Efficiency Challenges
DC Energy, Efficiency Challenges Choosing a density strategy Implementing a high density environment Maximizing the efficiency benefit Anticipating the dynamic data center Key points on energy usage in
More informationOptimization in Data Centres. Jayantha Siriwardana and Saman K. Halgamuge Department of Mechanical Engineering Melbourne School of Engineering
Optimization in Data Centres Jayantha Siriwardana and Saman K. Halgamuge Department of Mechanical Engineering Melbourne School of Engineering Outline Background and Motivation Overview and scale of data
More informationFREEING HPC FROM THE DATACENTRE
FREEING HPC FROM THE DATACENTRE ku:l sistem TM COOLING REDEFINED www.iceotope.com ku:l sistem removes the need for inefficient air cooling technologies FREEING HPC FROM THE DATACENTRE Iceotope s patented
More informationData Center Infrastructure Management ( DCiM )
Page 1 Data Center Infrastructure Management ( DCiM ) DCiM is defined by technology researchers and analysts as the integration of information technology (IT) and facility management disciplines to centralize
More informationWhite Paper RiZone The Rittal Management Software for IT infrastructures
White Paper RiZone The Rittal Management Software for IT infrastructures Bernd Hanstein Markus Schmidt Thorsten Weller Copyright 2009 All rights reserved. Rittal GmbH & Co. KG Auf dem Stützelberg 35745
More informationMeasurement and Management Technologies (MMT) for more energy efficient Data Center and Telecommunication Facilities
Information and Communication Technology Portfolio Review San Francisco, CA March 2011 Project Name: Measurement and Management Technologies (MMT) for more energy efficient Data Center and Telecommunication
More informationEcolibrium. Cloud control. Keeping data centres cool. OCTOBER 2018 VOLUME 17.9 RRP $14.95 PRINT POST APPROVAL NUMBER PP352532/00001
Ecolibrium OCTOBER 2018 VOLUME 17.9 RRP $14.95 PRINT POST APPROVAL NUMBER PP352532/00001 Cloud control Keeping data centres cool. COVER FEATURE Cloud control Such is the growth in data centres globally
More information» BEST PRACTICES FOR AIRFLOW MANAGEMENT AND COOLING OPTIMISATION IN THE DATA CENTRE
» BEST PRACTICES FOR AIRFLOW MANAGEMENT AND COOLING OPTIMISATION IN THE DATA CENTRE CoolControl Cold Aisle Containment Blanking Panels Hot Aisle Containment Network Switch Cooling Data Centre Optimisation
More information<Insert Picture Here> Austin Data Center 6Sigma DC CFD Model
Austin Data Center 6Sigma DC CFD Model Keith Ward Keith Ward Data Center Facilities Engineering and Logistics Design Austin Data Center Statistics - Space Original AT&T Designed and
More informationAirflow Management s Role in Data Center Cooling Capacity
Airflow Management s Role in Data Center Cooling Capacity By Larry Mainers, CEO Subzero Engineering 2014 Subzero Engineering SUMMARY Airflow management (AFM) is changing the way data centers cool the IT
More informationEcotel Free Cool 5-15kW
Precision Air Conditioning Free-cooling Ecotel Free Cool 5-15kW + + Self-contained compact outdoor cabin cooler + + 100% free-cooling + + -48V DC supply option + + Easy serviceability (front component
More informationReducing Data Center Cooling Costs through Airflow Containment
FEATURE Reducing Data Center Cooling Costs through Airflow Containment Implementing a containment solution in the data center costs much less than the alternatives of adding air handlers or other supplemental
More informationCooling. Highly efficient cooling products for any IT application. For More Information: (866) DATA CENTER SOLUTIONS
Cooling > Highly efficient cooling products for any IT application. DATA CENTER SOLUTIONS For More Information: (866) 787-3271 Sales@PTSdcs.com End-to-End Cooling Solutions from the Closet to the Data
More information