1 How to Read the TIP Project Lis ngs The project lis ng is a complete list of all projects in the TIP amendment. The state is noted in the heading. Bistate projects are listed first, followed by Kansas, then projects. Below is a sample TIP amendment project lis ng. The numbered fields are described in the key below. SAMPLE TIP AMENDMENT PROJECT LISTING DRAFT nd Quarter 1 TIP #: Juris: CLAY COUNTY 3 Location/Improvement: SMITHVILLE LAKE TRAIL (HWY W TO 188TH ST.) County: CLAY 4 Project : PEDESTRIAN AND/OR BIKE WAYS Length (miles): 5 ID#: STP-3301(428) 6 State ID #: 7 12 Smithville Lake Trail (Hwy W to 188th St.) Cost (IN THOUSANDS) 2011 TE-MO $ New project 2011 LOCAL $133.5 $202.7 $ $ TIP #: The number assigned to TIP project, which is how an agency identifies a project. Juris: The lead public agency or municipality responsible for the project. 8 9 : Shows when each phase is scheduled to be obligated. : Indicates whether federal funds will be used in each phase. 3 Location/Improvement: Name of project, identifying what it is and where it is located. 10 : Indicates funding source abbreviation for each phase. 4 Project : Projects are classified into descriptive categories. 11 Total estimated federal and non-federal funds being spent on the project. 5 ID#: Identification number within a federal funding program. 12 Provides a short outline of the project. This may include type, scope and major features of the project. 6 State ID#: Identification number within a state funding program. 13 Describes what is being modified by the amendment. 7 : Shows phases of project, classified into categories. 14 Indicates the reason(s) for inclusion in the amendment.

2 Kansas TIP #: State #: KA Juris: KDOT FRP-A422(002) Co: JOHNSON KANSAS CITY METROPOLITAN REGION TRANSPORTATION IMPROVEMENT PROGRAM FISCAL YEARS - 3rd Quarter Location/Improvement: I-35: FROM 0.4 MILES SOUTH OF I-35/75TH ST., NORTH TO 0.2 MILES SOUTH OF I-35/67TH ST. Project : Reconstruction FRP-KS $870.3 STATE-KS (AC) $803.3 STATE-KS $89.3 STATE-KS (AC) $67.0 STATE-KS $7.4 CREDIT ($870.3) STATE-KS $74.4 Length (mi): 1 Widening of northbound and southbound lanes from 3 to 4-lane, increase northbound vertical clearance under 75th Street and modification of NB onramp and SB on & off-ramps. Project is authorized for PE, ROW & UTIL ONLY. Project created after the completion of the location study under KA The PE work phase will utilize AC in the amount of $803.3 K with conversion to FRP-KS in The UTIL work phase will utilize AC in the amount of $67 K with conversion to FRP-KS in The total project cost, including all work phases, is estimated at $17,406.2 K. This estimate should be used for planning purposes only. Adjust budget, scope and schedule to reflect the latest estimates $870.3 $171.1 $1,041.4 TIP #: State #: KA Juris: KDOT Co: JOHNSON Location/Improvement: US-69: BRIDGE #136 LOCATED AT JUNCTION US-69/I-35 IN JOHNSON COUNTY Project : (Bridge) STATE-KS (AC) $1,960.0 STATE-KS $490.0 NHPP-KS $1,960.0 STATE-KS $300.0 CREDIT ($1,960.0) Redeck, Paint Superstructure, Rebuild Abutments/Encase Beams, New Approach Slabs, Pavement Patching and/or Replacement. The CONST phase will utilize AC in the amount of $1,960 K with conversion to NHPP in. Adjust schedule to reflect the latest estimates $1,960.0 $790.0 $2,750.0 TIP #: State #: KA Juris: KDOT Co: JOHNSON Location/Improvement: BRIDGE #234 ON K-10 IN JOHNSON COUNTY Project : Bridge Rehabilitation STATE-KS $74.8 STATE-KS (AC) $299.2 NHPP-KS $299.2 STATE-KS $70.0 CREDIT ($299.2) Rail & Curb Repair, Mill & Patch Deck, Concrete Overlay, Replace EWS Joints & Patch EWS Headers and North East Gutter Repair. The CONST phase will utilize AC in the amount of $299.2 K with conversion to NHPP in. $299.2 $144.8 $444.0 Monday, August 06, 11:07 AM Page 1 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

3 Kansas TIP #: State #: KA Juris: KDOT $105.0 Co: JOHNSON Location/Improvement: SOUND WALL REPAIR IN JOHNSON COUNTY Project : Bridge Rehabilitation STATE-KS $90.0 STATE-KS $15.0 $105.0 Drill and grout anchor bars, replace soldier pile, steel caps, and masonry plates and replace precast wall panels TIP #: State #: KA Juris: KDOT Co: JOHNSON Location/Improvement: BRIDGE #325 LOCATED 1.5 MILES SOUTH WEST OF THE JOHNSON COUNTY LINE Project : Bridge Rehabilitation STATE-KS $32.5 STATE-KS (AC) $130.2 NHPP-KS $130.2 STATE-KS $29.6 CREDIT ($130.2) Expansion Joint Replacements and Patch the Deck as needed. Project will utilize AC in the amount of $130.2 K with conversion to NHPP in $130.2 $62.1 $192.3 TIP #: State #: KA Juris: KDOT Co: JOHNSON Location/Improvement: 207TH ST RECONSTRUCTION, HOMESTEAD LN TO WAVERLY RD Project : Reconstruction LOCAL $2,244.0 STATE-KS $8,976.0 LOCAL $116.0 STATE-KS $464.0 Reconstruction of Homestead Lane south of the diverging diamond interchange to 207th Street and 207th Street from Homestead Lane to Waverly Road. Project will include new bridge over Bull Creek and new 4-lane industrial parkway with turning lanes at major private entrances. $11,800.0 $11,800.0 Monday, August 06, 11:07 AM Page 2 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

4 Kansas TIP #: State #: KA Juris: KDOT Co: JOHNSON Location/Improvement: BRIDGE #103 (151ST STREET) LOCATED 8.05 MILES NORTH OF THE MIAMI/JOHNSON COUNTY LINE Project : Bridge Rehabilitation STATE-KS $102.4 STATE-KS (AC) $409.6 NHPP-KS $409.6 STATE-KS $80.0 CREDIT ($409.6) Curb repair, rail section repair/replace, mill deck, patch deck (polyester concrete), polyester concrete overlay and replace approach slabs. The CONST phase will utilize AC in the amount of $409.6 K with conversion to NHPP in. $409.6 $182.4 $592.0 TIP #: State #: KA Juris: KDOT $60.4 $0.6 Co: JOHNSON Location/Improvement: I-435 IN JOHNSON COUNTY GUARDRAIL UPGRADES Project : (Roadway) NHPP-KS $60.4 STATE-KS $0.6 $61.0 Guardrail Upgrades on I-435 in Johnson County TIP #: State #: N Juris: OLATHE STP-N064(101) Co: JOHNSON Location/Improvement: K-7 (PARKER ST), DENNIS TO SANTA FE TURN LANE ADDITIONS Project : Traffic Management STPM-KS $2,000.0 LOCAL $3,600.0 LOCAL $700.0 LOCAL $975.0 LOCAL $375.0 Length (mi): 1.0 This project will include the addition of turn lanes along K-7 (Parker St.) between Dennis Ave and Santa Fe. Right and left turn lanes will be installed at 8 potential intersections along the corridor. This project will also include updates to the ADA ramps and traffic signals as needed throughout the corridor. Adjust budget and schedule to reflect the latest estimates $2,000.0 $5,650.0 $7,650.0 Monday, August 06, 11:07 AM Page 3 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

5 Kansas TIP #: State #: KA Juris: KDOT Co: LEAVENWORTH Location/Improvement: BRIDGE #026 ON K-92 IN LEAVENWORTH COUNTY Project : Bridge Rehabilitation STATE-KS $57.0 NHPP-KS $228.0 STATE-KS $40.0 Replace Compression Joints (PPC Headers), Approach Slab Compression Joint (PCC Headers), Correct Drainage Issues at Pier 11 (Add grates, re-route the drain pipe) $228.0 $97.0 $325.0 TIP #: State #: U Juris: LANSING HPD-U211(301) Co: LEAVENWORTH Location/Improvement: DESOTO ROAD FROM IDA STREET TO EISENHOWER ROAD Project : Road Widening & Resurfacing HP-KS $1,272.1 HSIP-KS $200.0 LOCAL $6,312.2 HP-KS $730.9 LOCAL $723.0 LOCAL $305.3 Length (mi): 2 Widen DeSoto Road from two lanes to three lanes, install sidewalk on both sides of the road, install curb and gutter, flatten shoulder slopes, provide appropriate signage, and replace or partially replace existing traffic signal at intersection of Desoto Road and Eisenhower Road. Also includes box culvert stream crossings, storm sewers, and retaining walls. Include engineering, utlity relocation and right-of-way phases. Update the construction cost to the most current estimate and include construction engineering into the construction phase $2,203.0 $7,340.5 $9,543.4 TIP #: State #: Juris: BIKEWALKKC $250.0 $62.5 Co: REGIONAL Location/Improvement: SRTS: LOCAL SPOKES ACROSS THE KC REGION - KANSAS Project : Safety LOCAL $62.5 CMAQ-KS $250.0 $312.5 Length (mi): Local Spokes is a comprehensive SRTS education program that empowers youth to bike to school and improve their neighborhood. Components: -Bicycle Safety Education -Youth Ambassador Training -Public Engagement -Final Project. Arrival/dismissal evaluations and built environment assessments will inform programmatic need and implementation stage. New project N/A Monday, August 06, 11:07 AM Page 4 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

6 Kansas TIP #: State #: KA Juris: KDOT NHPP-4353(370) Co: WYANDOTTE Location/Improvement: I-435/STATE AVENUE INTERCHANGE, 0.5 MILES NORTH OF I-70 Project : (Roadway) NHPP-KS $2,682.0 STATE-KS (AC) $2,682.0 STATE-KS $298.0 CREDIT ($2,682.0) Construct a Diverging Diamond Interchange (DDI), including ramp improvements. Project is authorized for PE Only. The total project cost, including all work phases, is estimated at $38,170 K. This estimate should be used for planning purposes only. The PE work phase will utilize AC in the amount of $2,682 K with conversion to NHPP in Adjust budget to reflect the latest estimates $2,682.0 $298.0 $2,980.0 TIP #: State #: KA Juris: KDOT Co: WYANDOTTE Location/Improvement: I-435 IN WYANDOTTE COUNTY: 1.) I-435 FROM THE KANSAS RIVER BRIDGE N TO THE MISSOURI STATE LINE 2.) I-435 FROM.5 MILES NORTH OF THE K-5/I-435 JUNCTION TO THE MISSOURI STATE LINE. Project : Bridge Rehabilitation STATE-KS (AC) $7,903.7 STATE-KS $878.2 NHPP-KS $7,903.7 STATE-KS $83.6 CREDIT ($7,903.7) Length (mi): 11 Scope of work includes replacing the bridge approaches, 3 inch overlay, first lift spray paver and PCCP patching. The CONST phase will utilize AC in the amount of $7,903.7 K with conversion to NHPP in. Adjust budget to reflect the latest estimates $7,903.7 $961.8 $8,865.5 TIP #: State #: KA Juris: KDOT Co: WYANDOTTE Location/Improvement: I-70- LEWIS & CLARK VIADUCT REPAIR ON BRS #173, 177 &178 Project : Bridge Rehabilitation STATE-KS $311.3 STATE-KS (AC) $2,801.7 NHPP-KS $2,801.7 STATE-KS $56.6 CREDIT ($2,801.7) Bridge Repairs. The CONST phase will utilize AC in the amount of $2,801.7 K with conversion to NHPP in. Adjust budget and schedule to reflect the latest estimates $2,801.7 $367.9 $3,169.6 Monday, August 06, 11:07 AM Page 5 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

7 Kansas TIP #: State #: KA Juris: KDOT Co: WYANDOTTE Location/Improvement: I-70: BRIDGE #157 ON I-70 LOCATED AT I-70 WEST BOUND AND I-635 SOUTH BOUND Project : Bridge Rehabilitation STATE-KS $168.1 STATE-KS (AC) $1,513.2 NHPP-KS $1,513.2 STATE-KS $105.0 CREDIT ($1,513.2) Replace Deck and Barriers, Paint Girders and Bearings, Replace 13 Foot Approach Slabs and Abutment Backwall Protection. The CONST phase will utilize AC in the amount of $ K with conversion to NHPP in. Adjust budget and schedule to reflect the latest estimates $1,513.2 $273.1 $1,786.3 TIP #: State #: KA Juris: KDOT Co: WYANDOTTE Location/Improvement: BRIDGE #042 (42ND STREET) LOCATED 0.2 MILES NORTH OF OLD K-32 IN WYANDOTTE COUNTY Project : Bridge Rehabilitation STATE-KS $62.0 STATE-KS (AC) $248.0 NHPP-KS $248.0 STATE-KS $50.0 CREDIT ($248.0) Joint Replacement, Patch Deck as needed, Abutment #1: Reset Rockers, Clean & Paint Bearings, Clean Abutment Seat. Rebuild/Encase Abutment 1, Replace Approach Slabs $248.0 $112.0 $360.0 TIP #: State #: KA Juris: KDOT Co: WYANDOTTE Location/Improvement: BRIDGE #130 (TURKEY CREEK) ON US-69 LOCATED AT JUNCTION MERRIAM LANE/US-69 Project : Bridge Rehabilitation STATE-KS $130.0 STATE-KS (AC) $520.0 NHPP-KS $520.0 STATE-KS $100.0 CREDIT ($520.0) Replace Expansion Joints (3), Replace Bearings, Paint Girder Ends, Pier Repair, Concrete Surface Repair at both Abutments, Clean and Paint Bearings, Clean Bearing Seats and Replace Approaches $520.0 $230.0 $750.0 Monday, August 06, 11:07 AM Page 6 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

8 Kansas TIP #: State #: KA Juris: KDOT Co: WYANDOTTE Location/Improvement: RCB #534 (MILL CREEK DRAINAGE) LOCATED 3.75 MILES EAST OF I-435 IN WYANDOTTE COUNTY Project : Bridge Rehabilitation STATE-KS $6.5 NHPP-KS $58.5 STATE-KS $25.0 Replace Exit Left Wing (Failed) and Tie back Opposing Wing (Exit Left) $58.5 $31.5 $90.0 TIP #: State #: KA Juris: KDOT Co: WYANDOTTE Location/Improvement: BRIDGE #043 (SPEAKER ROAD) LOCATED 0.39 MILES NORTH OF OLD K-32 IN WYANDOTTE COUNTY Project : Bridge Rehabilitation STATE-KS $79.0 STATE-KS (AC) $316.0 NHPP-KS $316.0 STATE-KS $45.0 CREDIT ($316.0) Expansion Joint Replacement, Concrete Surface Repair, Abutment #1: Reset Rockers, Clean & Paint Bearings and Clean Abutment Seat. The CONST phase will utilize AC in the amount of $316 K with conversion to NHPP in. $316.0 $124.0 $440.0 TIP #: State #: KA Juris: KDOT Co: WYANDOTTE Location/Improvement: DISCOVERY PHASE OF THE 18TH STREET BRIDGE REPLACEMENT Project : Bridge Rehabilitation NHPP-KS $600.0 STATE-KS $150.0 STATE-KS (AC) $600.0 CREDIT ($600.0) Length (mi): 1 Preliminary (Discovery Report) for the replacement of the US-69 (18th Street) River Bridge in Wyandotte County The PE phase will utilize AC in the amount of $600 K with conversion to NHPP in. $600.0 $150.0 $750.0 Monday, August 06, 11:07 AM Page 7 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

9 Kansas TIP #: State #: KA Juris: KDOT $175.6 $1.7 Co: WYANDOTTE Location/Improvement: 1) I-435: BEGINNING AT THE NORTH EDGE OF THE KANSAS RIVER BRIDGE THENCE NORTH TO THE STATE LINE. 2) I-435: BEGINNING 0.51 MILE NORTH OF JUNCTION K-5/I-435 THENCE NORTH TO THE STATE LINE. Project : (Roadway) NHPP-KS $175.6 STATE-KS $1.7 $177.3 Guardrail Upgrade on I-435 in Wyandotte County Length (mi): 11 TIP #: State #: N Juris: UNIFIED GOVERNMENT OF WYANDOTTE COUNTY/KANSAS CITY TA-N063(401) $500.0 $730.3 Co: WYANDOTTE Location/Improvement: SAFE ROUTES KCK PHASE E: EDISON, WHITE & NOBLE PRENTIS Project : Safety TA-KS $500.0 LOCAL $485.0 LOCAL $160.6 LOCAL $84.7 $1,230.3 Length (mi): Project addresses the lack of sidewalks around schools along with a SRTS program that addresses childhood health problems, air quality, safety education and limited transportation choices. This inlcudes construction of new sidewalks and ADA pedestrian ramps within a quarter-mile radius of the following elementary schools: Edison, WA White and Noble Prentis to provide safer access for pedestrians and young bicyclists to and from schools. Adjust budget to reflect the latest estimates NA TIP #: State #: Juris: UNIFIED GOVERNMENT OF WYANDOTTE COUNTY/KANSAS CITY Co: WYANDOTTE Location/Improvement: METROPOLITAN AVENUE AREA BIKEWAY IMPROVEMENTS Project : Pedestrian and/or Bikeways TA-KS $56.0 LOCAL $66.5 CMAQ-KS $210.0 Length (mi): 2.2 Designate an on-street bikeway along Metropolitan Ave/Strong Ave from 12th Street to 42nd Street. Inccrease federal funding using CMAQ funding returned from other projects. $266.0 $66.5 $332.5 Monday, August 06, 11:07 AM Page 8 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

10 TIP #: State #: 4I2291 Co: CASS Location/Improvement: I-49: SCOPING FOR CAPACITY IMPROVEMENTS FROM 155TH STREET TO NORTH CASS PARKWAY Project : NHPP-MO $80.0 STATE-MO $20.0 NHPP-MO $70.0 STATE-MO $17.0 STATE-MO $10.0 NHPP-MO $40.0 STATE-MO $10.0 NHPP-MO $40.0 I-49: Scoping for capacity improvements from 155th Street to North Cass Parkway in Belton. Updating $230.0 $57.0 $287.0 TIP #: State #: 4I3129 Co: CASS Location/Improvement: SCOPING FOR INTERCHANGE IMPROVEMENTS AT I-49 AND M-58 Project : Reconstruction NHPP-MO $8.0 NHPP-MO $8.0 NHPP-MO $56.0 STATE-MO $14.0 NHPP-MO $8.0 Scoping for interchange improvements an I-49 and M-58 in Belton. Add preliminary engineering for $80.0 $20.0 $100.0 Monday, August 06, 11:07 AM Page 9 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

11 TIP #: State #: 4S3272 Co: CASS Location/Improvement: MO-58: INTERSECTION IMPROVEMENTS AT PRAIRIE ROAD. Project : Safety HSIP-MO $1,916.0 STATE-MO $213.0 HSIP-MO $130.0 STATE-MO $14.0 HSIP-MO $9.0 STATE-MO $1.0 HSIP-MO $46.0 STATE-MO $6.0 HSIP-MO $180.0 STATE-MO $20.0 HSIP-MO $14.0 STATE-MO $1.0 Length (mi): 1 MO-58: INTERSECTION IMPROVEMENTS AT PRAIRIE ROAD, RAYMORE. Added the construction phase $2,295.0 $255.0 $2,550.0 TIP #: State #: 4S3250 Co: CASS Location/Improvement: MO-7: IMPROVEMENTS FROM I-49 TO INDEPENDENCE STREET. Project : Reconstruction STATE-MO $662.0 STATE-MO (AC) $2,647.0 STP-MO $2,910.0 STATE-MO (AC) $52.0 STATE-MO $13.0 NHPP-MO $8.0 STATE-MO $43.0 STATE-MO (AC) $173.0 STATE-MO $6.0 STATE-MO (AC) $26.0 CREDIT ($2,910.0) STATE-MO (AC) $12.0 STATE-MO $3.0 Length (mi): 1 MO-7: Pavement resurfacing, sidewalks, and shoulder improvements from I- 49 to Independence Street, Harrisonville. Added the construction phase $2,918.0 $729.0 $3,647.0 Monday, August 06, 11:07 AM Page 10 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

12 TIP #: State #: 4S3286 Co: CASS Location/Improvement: RT-J: REPLACE BRIDGE DECK OVER YOUNG BRANCH Project : Reconstruction NHPP-MO $506.0 STATE-MO $127.0 NHPP-MO $41.0 STATE-MO $10.0 NHPP-MO $8.0 NHPP-MO $8.0 NHPP-MO $8.0 Rt-J: Replace bridge deck over Young Branch,.12 mile south of 217th Street and.34 mile northeast of Branic Drive. Project invloves bridge A2331. Added the construction phase $571.0 $143.0 $714.0 TIP #: State #: 4P3212D Co: CASS Location/Improvement: MO 2: INTERSECTION SIGHT DISTANCE IMPROVEMENTS AT BLINKER LIGHT ROAD NEAR HARRISONVILLE. Project : Safety HSIP-MO $489.0 STATE-MO $54.0 HSIP-MO $41.0 STATE-MO $5.0 HSIP-MO $29.0 STATE-MO $3.0 HSIP-MO $15.0 Intersection sight distance improvements at Blinker Light Road near Harrisonville. $574.0 $64.0 $638.0 Monday, August 06, 11:07 AM Page 11 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

13 TIP #: Location/Improvement: RT. A: PAVEMENT RESURFACING FROM RTE. 18 TO RTE. B. State #: 4S3308 Co: CASS Project : Resurfacing Length (mi): 7 Pavement resurfacing from Rte. 18 to Rte. B. STATE-MO $151.0 STATE-MO (AC) $605.0 STP-MO $671.0 STATE-MO $16.0 STATE-MO (AC) $66.0 CREDIT ($671.0) $671.0 $167.0 $838.0 TIP #: Location/Improvement: RT. D: PAVEMENT RESURFACING FROM RTE. Y TO RTE. A. State #: 4S3306 Co: CASS Project : Resurfacing Length (mi): 13 Pavement resurfacing from Rte. Y to Rte. A. STATE-MO (AC) $972.0 STATE-MO $243.0 STP-MO $1,076.0 STATE-MO (AC) $104.0 STATE-MO $27.0 CREDIT ($1,076.0) $1,076.0 $270.0 $1,346.0 TIP #: State #: 4S3302 Co: CASS Location/Improvement: RT. E: PAVEMENT RESURFACING FROM MO 58 TO THE JACKSON COUNTY LINE. Project : Resurfacing STATE-MO $91.0 STATE-MO (AC) $366.0 STP-MO $405.0 STATE-MO $10.0 STATE-MO (AC) $39.0 CREDIT ($405.0) Pavement resurfacing from MO 58 to the Jackson County Line. Length (mi): 4 $405.0 $101.0 $506.0 Monday, August 06, 11:07 AM Page 12 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

14 TIP #: Location/Improvement: RT. F: PAVEMENT RESURFACING FROM OLD RTE. 7 TO RTE. B State #: 4S3303 Co: CASS Project : Resurfacing Length (mi): 6 Pavement resurfacing from Old Rte. 7 to Rte. B STATE-MO (AC) $207.0 STATE-MO $52.0 STP-MO $229.0 STATE-MO (AC) $22.0 STATE-MO $6.0 CREDIT ($229.0) $229.0 $58.0 $287.0 TIP #: Location/Improvement: RT. N: PAVEMENT RESURFACING FROM RTE. Z TO HENRY COUNTY LINE. State #: 4S3311 Co: CASS Project : Resurfacing Length (mi): 8 Pavement resurfacing from Rte. Z to Henry County Line. STATE-MO (AC) $238.0 STATE-MO $59.0 STP-MO $264.0 STATE-MO (AC) $26.0 STATE-MO $6.0 CREDIT ($264.0) $264.0 $65.0 $329.0 TIP #: Location/Improvement: RT. O: PAVEMENT RESURFACING FROM RTE. 2 TO RTE. A. State #: 4S3317 Co: CASS Project : Resurfacing Length (mi): 9 Pavement resurfacing from Rte. 2 to Rte. A. STATE-MO (AC) $330.0 STATE-MO $82.0 STP-MO $365.0 STATE-MO (AC) $35.0 STATE-MO $9.0 CREDIT ($365.0) $365.0 $91.0 $456.0 Monday, August 06, 11:07 AM Page 13 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

15 TIP #: State #: 4S3307 Co: CASS Location/Improvement: RT. Y: PAVEMENT RESURFACING FROM RTE. YY TO KANSAS STATE LINE Project : Resurfacing STATE-MO (AC) $717.0 STATE-MO $179.0 STP-MO $794.0 STATE-MO (AC) $77.0 STATE-MO $19.0 CREDIT ($794.0) Pavement resurfacing from Rte. YY to Kansas State Line Length (mi): 8 $794.0 $198.0 $992.0 TIP #: State #: 4S3273 Co: CASS Location/Improvement: MO 58: GEOMETRICS AT THE INTERSECTION OF WARD RD. NEAR RAYMORE Project : (Roadway) HSIP-MO $3,100.0 STATE-MO $345.0 HSIP-MO $201.0 STATE-MO $23.0 HSIP-MO $6.0 STATE-MO $1.0 HSIP-MO $45.0 STATE-MO $5.0 HSIP-MO $180.0 STATE-MO $20.0 HSIP-MO $21.0 Geometrics at the intersection of Ward Rd. near Raymore $3,553.0 $396.0 $3,949.0 Monday, August 06, 11:07 AM Page 14 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

16 TIP #: State #: 4S3299 Co: CLAY Location/Improvement: KANSAS STREET: PAVEMENT RESURFACING, SIDEWALKS, CURB AND GUTTER AND TRAFFIC SIGNAL IMPROVEMENTS Project : Reconstruction LOCAL $3,063.0 STPM-MO $3,000.0 STATE-MO $157.0 NHPP-MO $627.0 STATE-MO $86.0 NHPP-MO $342.0 LOCAL $52.0 NHPP-MO $207.0 Length (mi): 1 Pavement resurfacing, sidewalks, curb and gutter and traffic signal improvements between I-35 and MO 291 in Liberty. $3,000,000 STP and $3,063,000 City of Liberty funds. Added the construction phase $4,176.0 $3,358.0 $7,534.0 TIP #: State #: 4I2006 Co: CLAY Location/Improvement: I-35: INTERCHANGE SOUTH OF M-92 AT 19TH Project : New LOCAL $18,117.0 LOCAL $10.0 LOCAL $2,472.0 LOCAL $770.0 LOCAL $684.0 Length (mi): 1 I-35; Scoping for an interchange south of M-92 at 19th St in Kearney Updating PE estimate $22,053.0 $22,053.0 Monday, August 06, 11:07 AM Page 15 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

17 TIP #: State #: 4S3083 Co: CLAY Location/Improvement: MO 152: BRIDGE, INTERCHANGE AND UPGRADING SIDEWALKS TO ADA TRANSITION PLAN COMPLIANCE OVER I-35 IN LIBERTY. PROJECT INVOLVES BRIDGE A0495. Project : (Bridge) LOCAL $3,000.0 NHPP-MO $10,091.0 STATE-MO $181.0 NHPP-MO $724.0 STATE-MO $429.0 NHPP-MO $1,718.0 NHPP-MO $8.0 Length (mi): 8 Bridge, interchange and upgrading sidewalks to ADA Transition Plan compliance over I-35 in Liberty. Project involves bridge A0495. $217,000 in Statewide Transportation Alternatives funds, $3,000,000 in STP Urban funds and $3,000,000 in City of Liberty funds. Updating project budget and schedule. $12,541.0 $3,612.0 $16,153.0 TIP #: State #: 4S3088 Co: CLAY Location/Improvement: US 169: AUXILLIARY LANES Project : New STATE-MO $151.0 NHPP-MO $605.0 STATE-MO $11.0 NHPP-MO $46.0 STATE-MO $37.0 NHPP-MO $148.0 Length (mi): 1 US-169: Add auxiliary lanes from north of I-29 to south of Englewood Road in Kansas City. New Projet $799.0 $199.0 $998.0 Monday, August 06, 11:07 AM Page 16 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

18 TIP #: State #: 4P Co: CLAY Location/Improvement: INTERSECTION IMPROVEMENTS AT M-291 AND KANSAS STREET IN LIBERTY Project : Reconstruction NHPP-MO $2,420.0 STATE-MO $605.0 NHPP-MO $482.0 STATE-MO $120.0 NHPP-MO $142.0 STATE-MO $35.0 NHPP-MO $25.0 STATE-MO $6.0 NHPP-MO $52.0 STATE-MO $13.0 Intersection improvements at M-291 and Kansas Street in Liberty Updating estimate $3,121.0 $779.0 $3,900.0 TIP #: State #: 4I Co: CLAY Location/Improvement: BRIDGE IMPROVEMENTS ON I-35 AT 128TH STREET Project : Reconstruction NHPP-MO $497.0 STATE-MO $124.0 NHPP-MO $49.0 STATE-MO $12.0 NHPP-MO $40.0 STATE-MO $10.0 NHPP-MO $40.0 STATE-MO $10.0 NHPP-MO $1.6 STATE-MO $0.4 Bridge improvements on I-35 at 128th Street. Involves bridge R0476. Updating estimate $627.6 $156.4 $784.0 Monday, August 06, 11:07 AM Page 17 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

19 TIP #: State #: 4P Co: CLAY Location/Improvement: M-92 : SAFETY IMPROVEMENTS ON M-92 FROM COMMERCIAL AVENUE TO RTE. 69 Project : Road Widening & Resurfacing HSIP-MO $6,357.0 STATE-MO $706.0 HSIP-MO $632.0 STATE-MO $70.0 HSIP-MO $254.0 STATE-MO $28.0 HSIP-MO $45.0 STATE-MO $5.0 HSIP-MO $9.0 STATE-MO $1.0 HSIP-MO $49.0 STATE-MO $5.0 Length (mi): 19 Adding shoulders and culvert extensions and intersection improvements from Commercial Avenue to Rte. 69. Resurfacing from Rte. DD to Nation Rd. Added the construction phase $7,346.0 $815.0 $8,161.0 TIP #: State #: 4I Co: CLAY Location/Improvement: I-435: BRIDGE DECK REPLACEMENTAT THE MISSOURI RIVER Project : Bridge Rehabilitation STATE-MO $5,508.0 NHPP-MO $22,032.0 STATE-MO $916.0 NHPP-MO $3,664.0 NHPP-MO $8.0 NHPP-MO $8.0 Length (mi): 1 Bridge deck replacement at the River. Project involves twin bridges A0767 Added the construction phase $25,712.0 $6,428.0 $32,140.0 Monday, August 06, 11:07 AM Page 18 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

20 TIP #: State #: 4P3235 Co: CLAY Location/Improvement: MO-92: PROJECT TO ADD SIDEWALKS BETWEEN MO 33 AND MARIMAC DRIVE IN KEARNEY Project : Pedestrian and/or Bike Ways STPM-MO $367.0 LOCAL $312.0 NHPP-MO $36.0 STATE-MO $9.0 NHPP-MO $204.0 STATE-MO $51.0 LOCAL $30.0 Length (mi): 1 Add sidewalk, drainage and turning lane along the Rte. 92 corridor from Rte. 33 to Marimack Drive. Added the construction phase $607.0 $402.0 $1,009.0 TIP #: State #: 4P3249 Co: CLAY Location/Improvement: MO-291: PAVEMENT IMPROVEMENTS FROM LEONARD STREET TO ROUTE 78 Project : Resurfacing NHPP-MO $6,178.0 STATE-MO $1,545.0 NHPP-MO $416.0 STATE-MO $104.0 NHPP-MO $64.0 STATE-MO $16.0 NHPP-MO $80.0 STATE-MO $20.0 NHPP-MO $8.0 Pavement resurfacing from Leonard Street to Route 78 Added the construction phase Length (mi): 11 $6,746.0 $1,687.0 $8,433.0 Monday, August 06, 11:07 AM Page 19 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

21 TIP #: State #: 4P3260 Co: CLAY Location/Improvement: MO-291: PAVEMENT RESURFACING FROM I-435 TO ORACHARD AVE. Project : Resurfacing Length (mi): 7 Pavement resurfacing from I-435 to Orchard Avenue. NHPP-MO $2,812.0 STATE-MO $703.0 NHPP-MO $188.0 Added the construction phase STATE-MO $46.0 NHPP-MO $32.0 STATE-MO $8.0 NHPP-MO $32.0 STATE-MO $8.0 NHPP-MO $8.0 $3,072.0 $767.0 $3,839.0 TIP #: State #: 4S3088B Co: CLAY Location/Improvement: US 169: AUXILLIARY LANES Project : New STATE-MO $228.0 NHPP-MO $912.0 STATE-MO $30.0 NHPP-MO $118.0 Length (mi): 1 US-169: Ramp acceleration lane extension between Englewood Road and I- 29. $1,030.0 $258.0 $1,288.0 Monday, August 06, 11:07 AM Page 20 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

22 TIP #: State #: 4P3295D Co: CLAY Location/Improvement: RT A: IMPROVE INTERSECTION SIGHT DISTANCE AT 112TH STREET. Project : Safety STATE-MO $99.0 NHPP-MO $886.0 STATE-MO $7.0 NHPP-MO $66.0 NHPP-MO $22.0 STATE-MO $7.0 NHPP-MO $54.0 STATE-MO $3.0 NHPP-MO $28.0 Improve intersection sight distance at 112th Street. $416,000 in Open Container funds. $1,056.0 $118.0 $1,174.0 TIP #: State #: 4S3320 Co: CLAY Location/Improvement: RT. CC: PAVEMENT RESURFACING FROM RT. C TO RT. 33. Project : Resurfacing Length (mi): 7 Pavement resurfacing from Rt. C to Rt. 33. STATE-MO $30.0 STATE-MO (AC) $118.0 STP-MO $134.0 STATE-MO $4.0 STATE-MO (AC) $16.0 CREDIT ($134.0) $134.0 $34.0 $168.0 Monday, August 06, 11:07 AM Page 21 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

23 TIP #: Location/Improvement: RT. D: PAVEMENT RESURFACING FROM RT. 69 TO RAY COUNTY LINE State #: 4S3322 Co: CLAY Project : Resurfacing Length (mi): 7 Pavement resurfacing from Rt. 69 to Ray County line STATE-MO $10.0 STATE-MO (AC) $41.0 STP-MO $51.0 STATE-MO $4.0 STATE-MO (AC) $15.0 CREDIT ($51.0) $51.0 $19.0 $70.0 TIP #: Location/Improvement: RT. E: PAVEMENT RESURFACING FROM 164TH STREET TO MO 92. State #: 4S3319 Co: CLAY Project : Resurfacing Length (mi): 3 Pavement resurfacing from 164th Street to MO 92. STATE-MO $27.0 STATE-MO (AC) $108.0 STP-MO $123.0 STATE-MO $4.0 STATE-MO (AC) $15.0 CREDIT ($123.0) $123.0 $31.0 $154.0 TIP #: Location/Improvement: RT. JJ: PAVEMENT RESURFACING FROM RT. H TO MO 210 State #: 4S3316 Co: CLAY Project : Resurfacing Length (mi): 4 Pavement resurfacing from Rt. H to MO 210 STATE-MO $39.0 STATE-MO (AC) $157.0 STP-MO $175.0 STATE-MO $5.0 STATE-MO (AC) $18.0 CREDIT ($175.0) $175.0 $44.0 $219.0 Monday, August 06, 11:07 AM Page 22 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

24 TIP #: State #: 4S3318 Co: CLAY Location/Improvement: RT. RA: PAVEMENT RESURFACING FROM 161ST STREET IN GREENVILLE TO MO 92. Project : Resurfacing STATE-MO $11.0 STATE-MO (AC) $37.0 STP-MO $44.0 STATE-MO $1.0 STATE-MO (AC) $7.0 CREDIT ($44.0) Pavement resurfacing from 161st Street in Greenville to MO 92. Length (mi): 1 $44.0 $12.0 $56.0 TIP #: State #: 4Q3234 Co: CLAY Location/Improvement: INSTALL KANSAS CITY SCOUT ITS DEVICES ON VARIOUS ROUTES NORTH OF THE MISSOURI RIVER IN CLAY AND PLATTE COUNTIES. Project : Traffic Management NHPP-MO $2,400.0 STATE-MO $600.0 STP-MO $2,450.0 NHPP-MO $200.0 STATE-MO $50.0 NHPP-MO $0.8 STATE-MO $0.2 CREDIT ($2,450.0) Install Kansas City Scout ITS devices on various routes north of the River in Clay and Platte Counties. $5,050.8 ($1,799.8) $3,251.0 TIP #: State #: 4I2006Z Co: CLAY Location/Improvement: I-35: NEW INTERCHANGE SOUTH OF M-92 AT 19TH Project : New NHPP-MO $3,218.0 NHPP-MO $2,500.0 NHPP-MO $2,500.0 Length (mi): 1 MoDOT payment to the City of Kearney for acceleration of city funds for the new I-35 interchange south of M-92 at 19th St in Kearney $8,218.0 $8,218.0 Monday, August 06, 11:07 AM Page 23 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

25 TIP #: Location/Improvement: US 169: INTERSECTION SAFETY IMPROVEMENTS AT 188TH STREET. State #: 4P3295 Co: CLAY Project : Safety Intersection safety improvements at 188th Street. STATE-MO $123.0 HSIP-MO $1,100.0 STATE-MO $8.0 Updating project estimate and schedule HSIP-MO $75.0 STATE-MO $3.0 HSIP-MO $28.0 STATE-MO $3.0 HSIP-MO $27.0 STATE-MO $120.0 HSIP-MO $480.0 STATE-MO $1.0 HSIP-MO $4.0 $1,714.0 $258.0 $1,972.0 TIP #: State #: Juris: BIKEWALKKC Co: JACKSON Location/Improvement: TROOST BRIDGE PLACEMAKING Project : Pedestrian and/or Bikeways TCSP-MO $54.9 TCSP-MO $35.8 TCSP-MO $88.3 Length (mi): Enhance the area of the Troost Bridge over Brush Creek and the connection to the Brush Creek Grail with the addition of a bike share station, bike parking, and other placemaking elements. N/A $179.0 $179.0 Monday, August 06, 11:07 AM Page 24 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

26 TIP #: State #: 4I Co: JACKSON Location/Improvement: I-29 PAVEMENT IMPROVEMENTS Project : Resurfacing NHPP-MO $2,519.0 STATE-MO $280.0 NHPP-MO $219.0 STATE-MO $24.0 NHPP-MO $36.0 STATE-MO $4.0 NHPP-MO $17.0 I-29 pavement improvements from Vivion Road to I-29/I-35 interchange in Kansas City Updating estimate $2,791.0 $310.0 $3,101.0 TIP #: State #: 4I2337 Co: JACKSON Location/Improvement: I-435; CORRIDOR IMRPOVEMENTS FROM THE KANSAS STATE LINE TO JUST WEST OF I-49 Project : New Bridge NHPP-MO $24,308.0 STATE-MO $6,077.0 NHPP-MO $19,193.0 STATE-MO $4,798.0 NHPP-MO $14,250.0 STATE-MO $750.0 STATE-MO $10.0 NHPP-MO $40.0 STATE-MO $30.0 NHPP-MO $120.0 STATE-MO $1,210.0 NHPP-MO $4,841.0 STATE-MO $20.0 NHPP-MO $80.0 Length (mi): 4 CORRIDOR IMRPOVEMENTS FROM THE KANSAS STATE LINE TO JUST WEST OF I-49. PROJECT INVOLVES TWIN BRIDGES A1240, A1662, A1427, and A0610. Updating project budget $62,832.0 $12,895.0 $75,727.0 Monday, August 06, 11:07 AM Page 25 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

27 TIP #: State #: 4P2316 $3,572.0 Co: JACKSON Location/Improvement: I-670; PAYBACK TO THE CITY OF KANSAS CITY FOR THE REPLACEMENT OF WYANDOTTE AND CENTRAL BRIDGES Project : STATE-MO $3,572.0 $3,572.0 Length (mi): 1 Payback to the city of Kansas City for the replacement of Wyandotte and Central bridges Updating payback amount TIP #: State #: 4P3015 Co: JACKSON Location/Improvement: US-24: BRIDGE REPLACEMENT AT VARIOUS LOCATIONS Project : New Bridge STATE-MO $1,232.0 NHPP-MO $4,929.0 STATE-MO $90.0 NHPP-MO $359.0 STATE-MO $23.0 NHPP-MO $92.0 STATE-MO $146.0 NHPP-MO $584.0 STATE-MO $38.0 NHPP-MO $148.0 Length (mi): 1 Bridge replacements and roadway grade improvements at the Union Pacific Railroad, Drainage Ditch and Fire Prairie Creek, 0.3 mile east of Winfrey Road, 0.1 mile west of Osage Street near Buckner. Project involves bridges J0806, J0807, J0810, J0811 and J0844 Added the construction phase $6,112.0 $1,529.0 $7,641.0 Monday, August 06, 11:07 AM Page 26 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

28 TIP #: State #: 4P3009 Co: JACKSON Location/Improvement: US-50: BRIDGE REPLACEMENT AT CHIPMAN ROAD IN LEE'S SUMMIT Project : Reconstruction STATE-MO $437.0 NHPP-MO $1,748.0 NHPP-MO $8.0 STATE-MO $10.0 NHPP-MO $40.0 STATE-MO $10.0 NHPP-MO $40.0 STATE-MO $10.0 NHPP-MO $40.0 STATE-MO $6.0 NHPP-MO $26.0 Bridge replacement at Chipman Road in Lee's Summit. Project involves bridges A3262 and A2482. Added the construction phase $1,902.0 $475.0 $2,377.0 Monday, August 06, 11:07 AM Page 27 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

29 TIP #: State #: 4I Co: JACKSON Location/Improvement: I-70; BRIDGE REPLACEMENT AT BLUE RIDGE BOULEVARD/US 40 LOCATIONS Project : Reconstruction STATE-MO $388.0 NHPP-MO $3,489.0 NHPP-MO $108.0 NHPP-MO $108.0 NHPP-MO $18.0 NHPP-MO $18.0 STATE-MO $12.0 STATE-MO $12.0 STATE-MO $22.0 NHPP-MO $198.0 STATE-MO $33.0 NHPP-MO $293.0 NHPP-MO $469.0 STATE-MO $52.0 Bridge replacement at Blue Ridge Boulevard/US 40 in Independence. Project involves bridge L0997. Added the construction phase $4,701.0 $523.0 $5,224.0 TIP #: State #: 4I3127 Co: JACKSON Location/Improvement: I-29: PAVEMENT PRESERVATION TREATMENT SOUTH OF GUINOTTE AVENUE TO THE DOWNTOWN LOOP Project : Reconstruction NHPP-MO $1,107.0 STATE-MO $123.0 NHPP-MO $78.0 STATE-MO $9.0 NHPP-MO $9.0 STATE-MO $1.0 NHPP-MO $14.0 STATE-MO $1.0 NHPP-MO $9.0 STATE-MO $1.0 Length (mi): 1 Pavement preservation treatment south of Guinotte Avenue to the Downtown Loop Added the construction phase $1,217.0 $135.0 $1,352.0 Monday, August 06, 11:07 AM Page 28 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

30 TIP #: State #: 4I3126 Co: JACKSON Location/Improvement: I-435; PAVEMENT RESURFACING FROM RTE. 78 TO RAYTOWN ROAD IN KANSAS CITY Project : Resurfacing NHPP-MO $1,835.0 STATE-MO $204.0 NHPP-MO $177.0 STATE-MO $20.0 NHPP-MO $12.0 STATE-MO $3.0 Length (mi): 3 I-435; Pavement improvements from Rte. 78 to Raytown Road in Kansas City. This project will be incorporated into the I-70 and I-435 interchange project 4I1597C Updated budget $2,024.0 $227.0 $2,251.0 TIP #: State #: 4I3124 Co: JACKSON Location/Improvement: I-70: PAVEMENT RESURFACING FROM EAST OF BLUE RIDGE CUTOFF TO STERLING ROAD IN KANSAS CITY. Project : Resurfacing NHPP-MO $1,207.8 STATE-MO $134.2 NHPP-MO $83.7 STATE-MO $9.0 STATE-MO $12.9 STP-MO $116.1 Length (mi): 1 Pavement resurfacing from east of Blue Ridge Cutoff to Sterling Road in Kansas City. Updating scope and budget $1,407.6 $156.1 $1,563.7 TIP #: State #: 4I3125 Co: JACKSON Location/Improvement: I-70: PAVEMENT RESURFACING FROM THE KANSAS STATE LINE TO MANCHESTER TRAFFICWAY Project : Resurfacing NHPP-MO $8,241.0 STATE-MO $916.0 NHPP-MO $764.0 STATE-MO $85.0 NHPP-MO $45.0 STATE-MO $5.0 NHPP-MO $27.0 STATE-MO $3.0 Length (mi): 8 Pavement resurfacing from the Kansas State line to Manchester Trafficway Added the construction phase $9,077.0 $1,009.0 $10,086.0 Monday, August 06, 11:07 AM Page 29 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

31 TIP #: State #: 4I3217 Co: JACKSON Location/Improvement: BRIDGE REPLACEMENT ON I-49 AT 140TH ST. Project : Reconstruction STATE-MO $315.0 NHPP-MO $1,261.0 STATE-MO $60.0 NHPP-MO $240.0 STATE-MO $57.0 NHPP-MO $228.0 STATE-MO $10.0 NHPP-MO $42.0 NHPP-MO $8.0 Bridge replacement at 140th Street, 1.3 miles south of Main Street and 0.9 mile north of 147th Street in Grandview. Project involves bridge A0119. Updating budget $1,779.0 $444.0 $2,223.0 TIP #: State #: 4S Co: JACKSON Location/Improvement: MO-7: PAVEMENT AND SIGNAL IMPROVEMENTS FROM VICTOR DRIVE TO WYATT ROAD IN BLUE SPRINGS. Project : Resurfacing NHPP-MO $1,230.0 STATE-MO $307.0 NHPP-MO $90.0 STATE-MO $22.0 NHPP-MO $40.0 STATE-MO $10.0 NHPP-MO $8.0 NHPP-MO $1.6 STATE-MO $0.4 Length (mi): 3 Pavement and signal improvements from Victor Drive to Wyatt Road in Blue Springs. Added the construction phase $1,369.6 $341.4 $1,711.0 Monday, August 06, 11:07 AM Page 30 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

32 TIP #: State #: 4S Co: JACKSON Location/Improvement: MO-7: ADD INTERSECTION TURN LANES AND NEW SIGNALS AT 8TH STREET/SOUTH AVENUE IN BLUE SPRINGS. Project : Vehicle Operations NHPP-MO $318.0 STATE-MO $80.0 NHPP-MO $24.0 STATE-MO $6.0 NHPP-MO $18.0 STATE-MO $4.0 NHPP-MO $8.0 NHPP-MO $8.8 STATE-MO $2.2 NHPP-MO $30.0 STATE-MO $8.0 Add intersection turn lanes and new signals at 8th Street/South Avenue in Blue Springs. Added the construction phase $406.8 $102.2 $509.0 TIP #: State #: 4I Co: JACKSON Location/Improvement: I-70: PAVEMENT RESURFACING AND GUARDRAIL FROM RTE. 7 TO LAFAYETTE COUNTY LINE. Project : Resurfacing NHPP-MO $5,325.0 STATE-MO $1,331.0 NHPP-MO $361.0 STATE-MO $90.0 NHPP-MO $80.0 STATE-MO $20.0 NHPP-MO $49.0 STATE-MO $12.0 NHPP-MO $1.6 STATE-MO $0.4 NHPP-MO $1.6 STATE-MO $0.4 Length (mi): 9 Pavement resurfacing and guardrail from Rte. 7 to Lafayette County line. Added the construction phase $5,818.2 $1,453.8 $7,272.0 Monday, August 06, 11:07 AM Page 31 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

33 TIP #: State #: 4S Co: JACKSON Location/Improvement: BLUE RIDGE BLVD: BRIDGE REPLACEMENT OVER RTE. 78, 1.1 MILES EAST OF I-435 AND 0.3 MILE WEST OF ARLINGTON AVENUE. Project : Reconstruction NHPP-MO $2,325.0 STATE-MO $581.0 NHPP-MO $171.0 STATE-MO $43.0 NHPP-MO $428.0 STATE-MO $107.0 NHPP-MO $40.0 STATE-MO $10.0 NHPP-MO $1.6 STATE-MO $0.4 NHPP-MO $160.0 STATE-MO $40.0 Bridge demolition at I-70 over Truman Road in Kansas City. Project involves bridge A0295. Added the construction phase $3,125.6 $781.4 $3,907.0 TIP #: State #: 4P3268 Co: JACKSON Location/Improvement: ADA TRANSITION PLAN AND SIDEWALK IMPROVEMENTS AT VARIOUS LOCATIONS IN THE URBAN KANSAS CITY DISTRICT. Project : Pedestrian and/or Bike Ways NHPP-MO $7,701.0 STATE-MO $1,925.0 NHPP-MO $525.0 STATE-MO $131.0 NHPP-MO $8.0 NHPP-MO $8.0 NHPP-MO $17.0 STATE-MO $4.0 ADA Transition Plan and sidewalk improvements at various locations in the Urban Kansas City District. Potential Design/Build project. $9,356,000 from Statewide Transportation Alternatives funds. Updating budget $8,259.0 $2,064.0 $10,323.0 Monday, August 06, 11:07 AM Page 32 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

34 TIP #: State #: 4S3287 Co: JACKSON Location/Improvement: US-24: BRIDGE REPLACEMENT OVER DELAWARE AVENUE/TRUMAN LIBRARY DRIVE 3.6 MILES EAST OF I-435 NEAR INDEPENDENCE. Project : Reconstruction NHPP-MO $1,465.0 STATE-MO $366.0 NHPP-MO $106.0 STATE-MO $26.0 NHPP-MO $160.0 STATE-MO $40.0 NHPP-MO $8.0 Bridge replacement over Delaware Avenue/Truman Library Drive 3.6 miles east of I-435 near Independence. Project involves bridge L0840. Added the construction phase $1,739.0 $434.0 $2,173.0 TIP #: State #: 4S3283 Co: JACKSON Location/Improvement: MO-350: SLIDE REPAIR ON WESTBOUND RAMP TO 63RD STREET. Project : (Roadway) Slide repair on westbound ramp to 63rd Street. NHPP-MO $574.0 STATE-MO $143.0 NHPP-MO $49.0 Added the construction phase STATE-MO $13.0 NHPP-MO $0.8 STATE-MO $0.2 $623.8 $156.2 $780.0 Monday, August 06, 11:07 AM Page 33 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

35 TIP #: State #: 4S3282 Co: JACKSON Location/Improvement: PAVEMENT RESURFACING FROM BANNISTER ROAD TO BLUE RIVER ROAD. Project : Resurfacing STATE-MO $330.0 STATE-MO (AC) $1,319.0 STP-MO $1,429.0 STATE-MO (AC) $90.0 STATE-MO $22.0 STATE-MO (AC) $12.0 STATE-MO $3.0 STATE-MO (AC) $8.0 STP-MO $8.0 CREDIT ($1,429.0) Pavement resurfacing from Bannister Road to Blue River Road. Added the construction phase Length (mi): 1 $1,437.0 $359.0 $1,796.0 TIP #: State #: 4S3085 Co: JACKSON Location/Improvement: US 169: BUCK O'NEIL BRIDGE ENVIRONMENTAL STUDY AND SHORT TERM REHABILITATION Project : Reconstruction NHPP-MO $30,554.0 STATE-MO $7,638.0 NHPP-MO $11,536.0 STATE-MO $2,884.0 NHPP-MO $2,902.0 STATE-MO $725.0 NHPP-MO $2,745.0 STATE-MO $686.0 NHPP-MO $0.8 STATE-MO $0.2 NHPP-MO $2,262.0 STATE-MO $565.0 Length (mi): 4 Bridge improvements over the River, 3.1 miles south of MO 9 and 0.1 miles north of I-70. Project involves bridges A4649 and A4646. Cost Share funds in amount of $750,000 for the NEPA study. Potential Design Build project Added the construction phase $49,999.8 $12,498.2 $62,498.0 Monday, August 06, 11:07 AM Page 34 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

36 TIP #: State #: 4S3328 Co: JACKSON Location/Improvement: MO 12: RESURFACING FROM I-435 TO SPRING STREET. Project : Resurfacing Length (mi): 4 Resurfacing from I-435 to Spring Street. STATE-MO $346.0 STATE-MO (AC) $1,385.0 STP-MO $1,487.0 Added the construction phase STATE-MO $23.0 STATE-MO (AC) $94.0 STATE-MO $1.0 STATE-MO (AC) $4.0 STATE-MO $1.0 STATE-MO (AC) $4.0 CREDIT ($1,487.0) $1,487.0 $371.0 $1,858.0 TIP #: State #: 4P3295B Co: JACKSON Location/Improvement: ADDING WRONG WAY, DO NOT ENTER AND ONE WAY SIGNING TO VARIOUS RAMP LOCATIONS, NOT INCLUDING I-70 AND I-29. Project : Safety NHPP-MO $731.0 STATE-MO $81.0 NHPP-MO $53.0 STATE-MO $6.0 NHPP-MO $4.5 STATE-MO $0.5 Adding Wrong Way, Do Not Enter and One Way Signing to various ramp locations, not including I-70 and I-29. $788.5 $87.5 $876.0 Monday, August 06, 11:07 AM Page 35 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

37 TIP #: State #: 4P3214C Co: JACKSON Location/Improvement: SIGNAL UPGRADES TO PORTIONS OF RTE. 24, RTE. 40 AND RTE. 78 IN THE URBAN KANSAS CITY AREA. Project : Vehicle Operations STATE-MO (AC) $595.0 STATE-MO $149.0 NHPP-MO $643.0 STATE-MO (AC) $44.0 STATE-MO $11.0 STATE-MO (AC) $4.0 STATE-MO $1.0 CREDIT ($643.0) Signal upgrades to portions of Rte. 24, Rte. 40 and Rte. 78 in the urban Kansas City area. $643.0 $161.0 $804.0 TIP #: State #: 4S3314 Co: JACKSON Location/Improvement: RTE. H: PAVEMENT RESURFACING FROM RTE. 24 TO I-70. Project : Resurfacing Length (mi): 9 Pavement resurfacing from Rte. 24 to I-70. NHPP-MO $790.0 STATE-MO $197.0 STP-MO $875.0 NHPP-MO $85.0 STATE-MO $22.0 CREDIT ($875.0) $1,750.0 ($656.0) $1,094.0 TIP #: Location/Improvement: RTE. F: PAVEMENT RESURFACING FROM 31ST STREET TO RTE. 50. State #: 4S3310 Co: JACKSON Project : Resurfacing Length (mi): 8 Pavement resurfacing from 31st Street to Rte. 50. NHPP-MO $833.0 STATE-MO $208.0 STP-MO $923.0 NHPP-MO $90.0 STATE-MO $22.0 CREDIT ($923.0) $1,846.0 ($693.0) $1,153.0 Monday, August 06, 11:07 AM Page 36 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

38 TIP #: State #: 4S3326 Co: JACKSON Location/Improvement: MO-7: ADD TURN LANES AT STRINGTOWN ROAD AND 155TH STREET (COUNTY LINE ROAD). Project : Safety HSIP-MO $959.0 STATE-MO $106.0 HSIP-MO $69.0 STATE-MO $8.0 HSIP-MO $57.0 STATE-MO $5.0 HSIP-MO $29.0 STATE-MO $3.0 HSIP-MO $47.0 STATE-MO $5.0 Add turn lanes at Stringtown Road and 155th Street (County Line Road). $1,004,000 in Open Container funds. $1,161.0 $127.0 $1,288.0 TIP #: State #: 4P3266B Co: JACKSON Location/Improvement: I-435: BRIDGE REHABILITATION AT I-470 AND I-49 Project : Bridge Rehabilitation STATE-MO (AC) $800.0 STATE-MO $200.0 STP-MO $903.0 STATE-MO (AC) $103.0 STATE-MO $26.0 CREDIT ($903.0) Length (mi): 3 Bridge rehabilitation at I-470 and I-49. Project involves bridges A6245, A6249, A6250, A6252 and A6254. $903.0 $226.0 $1,129.0 Monday, August 06, 11:07 AM Page 37 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

39 TIP #: State #: 4I3325 Co: JACKSON Location/Improvement: I-29: ADDING WRONG WAY, DO NOT ENTER AND ONE WAY SIGNING AT VARIOUS RAMP LOCATIONS ALONG I-29. Project : Safety NHPP-MO $460.0 STATE-MO $51.0 NHPP-MO $35.0 STATE-MO $4.0 NHPP-MO $18.0 Adding Wrong Way, Do Not Enter and One Way Signing at various ramp locations along I-29. $513.0 $57.0 $570.0 TIP #: State #: 4S3309 Co: JACKSON Location/Improvement: RTE. BB: PAVEMENT RESURFACING FROM RTE. 24 TO DUNCAN AVENUE. Project : Resurfacing Length (mi): 7 Pavement resurfacing from Rte. 24 to Duncan Avenue. STATE-MO (AC) $507.0 STATE-MO $127.0 STP-MO $562.0 STATE-MO (AC) $55.0 STATE-MO $14.0 CREDIT ($562.0) $562.0 $141.0 $703.0 TIP #: State #: 4P3212 Co: JACKSON Location/Improvement: RTE. H: IMPROVE SIGHT DISTANCE AT PINK HILL ROAD. Project : Safety Improve sight distance at Pink Hill Road. HSIP-MO $1,409.0 STATE-MO $157.0 HSIP-MO $126.0 Updating budget STATE-MO $14.0 HSIP-MO $53.0 STATE-MO $7.0 HSIP-MO $271.0 STATE-MO $30.0 $1,859.0 $208.0 $2,067.0 Monday, August 06, 11:07 AM Page 38 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

40 TIP #: State #: 4I Co: PLATTE Location/Improvement: I-435: PAVEMENT RESURFACING FROM I-29 TO COOKINGHAM DRIVE IN KANSAS CITY. Project : Resurfacing NHPP-MO $4,670.0 STATE-MO $519.0 NHPP-MO $392.0 STATE-MO $43.0 NHPP-MO $44.0 STATE-MO $5.0 NHPP-MO $22.0 STATE-MO $3.0 Length (mi): 6 Pavement resurfacing from I-29 to Cookingham Drive in Kansas City. Added the construction phase $5,128.0 $570.0 $5,698.0 TIP #: State #: 4I Co: PLATTE Location/Improvement: I-29: PAVEMENT OVERLAY AND MILLING FROM PLATTE COUNTY LINE TO RTE Project : Reconstruction NHPP-MO $7,086.0 STATE-MO $787.0 NHPP-MO $548.0 STATE-MO $61.0 NHPP-MO $90.0 STATE-MO $10.0 NHPP-MO $50.0 STATE-MO $6.0 NHPP-MO $1.6 STATE-MO $0.4 NHPP-MO $1.6 STATE-MO $0.4 Pavement overlay and milling from Platte County line to Rte Added the construction phase Length (mi): 10 $7,777.2 $864.8 $8,642.0 Monday, August 06, 11:07 AM Page 39 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

41 TIP #: State #: 4I Co: PLATTE Location/Improvement: MO 273: BRIDGE REPLACEMENT OVER I-29, IN TRACY. Project : Reconstruction NHPP-MO $3,502.0 STATE-MO $876.0 NHPP-MO $793.0 STATE-MO $198.0 NHPP-MO $368.0 STATE-MO $92.0 NHPP-MO $60.0 STATE-MO $15.0 NHPP-MO $55.0 STATE-MO $7.0 NHPP-MO $16.0 STATE-MO $4.0 Bridge replacement over I-29, in Tracy. Project involves bridge A0108. Added the construction phase $4,794.0 $1,192.0 $5,986.0 TIP #: State #: 4S3202 Co: PLATTE Location/Improvement: MO 9: SIGNALIZING INTERSECTION AND IMPROVING GEOMETRICS AT MATTOX RD. AND RTE. 9 Project : (Roadway) NHPP-MO $845.0 STATE-MO $61.0 LOCAL $150.0 NHPP-MO $240.0 STATE-MO $60.0 NHPP-MO $56.0 STATE-MO $14.0 NHPP-MO $8.0 Signalizing intersection and improving geometrics at Mattox Rd. and Rte. 9 Updating project estimate and schedule $1,149.0 $287.0 $1,436.0 Monday, August 06, 11:07 AM Page 40 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

42 TIP #: State #: 4S Co: PLATTE Location/Improvement: MO 9: PAVEMENT RESURFACING AND ADA TRANSITION PLAN IMPROVEMENTS FROM RTE. FF TO RTE. 45. Project : Resurfacing NHPP-MO $1,221.0 STATE-MO $305.0 NHPP-MO $154.0 STATE-MO $38.0 NHPP-MO $114.0 STATE-MO $29.0 NHPP-MO $1.6 STATE-MO $0.4 NHPP-MO $1.6 STATE-MO $0.4 NHPP-MO $19.0 STATE-MO $5.0 Length (mi): 2 Pavement resurfacing and ADA Transition Plan improvements from Rte. FF to Rte. 45. Added the construction phase $1,511.2 $377.8 $1,889.0 TIP #: State #: 4I3291 Co: PLATTE Location/Improvement: I-29: BRIDGE REPLACEMENT 1.8 MILES WEST OF RTE. 169 NEAR RIVERSIDE. Project : Reconstruction LOCAL $310.0 NHPP-MO $2,788.0 NHPP-MO $184.0 STATE-MO $21.0 NHPP-MO $256.0 STATE-MO $29.0 NHPP-MO $9.0 STATE-MO $1.0 NHPP-MO $270.0 STATE-MO $30.0 Bridge replacement 1.8 miles west of Rte. 169 near Riverside. Project involves twin bridges A1669. Added the construction phase $3,507.0 $391.0 $3,898.0 Monday, August 06, 11:07 AM Page 41 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

43 TIP #: State #: 4I3297 Co: PLATTE Location/Improvement: I-29: BRIDGE REPLACEMENT 0.8 MILE WEST OF RTE. 169 NEAR NORTHMOOR. Project : Reconstruction NHPP-MO $3,872.0 STATE-MO $430.0 NHPP-MO $257.0 STATE-MO $29.0 NHPP-MO $65.0 STATE-MO $7.0 NHPP-MO $459.0 STATE-MO $51.0 NHPP-MO $9.0 STATE-MO $1.0 Bridge replacement 0.8 mile west of Rte. 169 near Northmoor. Project involves bridge L0690. Added the construction phase $4,662.0 $518.0 $5,180.0 TIP #: State #: 4S3284 Co: PLATTE Location/Improvement: US 69: DRAINAGE IMPROVEMENTS AT FRONTIER STREET IN NORTHMOOR. Project : Reconstruction STATE-MO (AC) $505.0 STATE-MO $126.0 STP-MO $583.0 STATE-MO (AC) $78.0 STATE-MO $20.0 NHPP-MO $0.8 STATE-MO $0.2 CREDIT ($583.0) Drainage improvements at Frontier Street in Northmoor. Added the construction phase $583.8 $146.2 $730.0 Monday, August 06, 11:07 AM Page 42 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

44 TIP #: State #: 4P3275 Co: PLATTE Location/Improvement: RTE. 92: ADD NEW ROUNDABOUT AT THE INTERSECTION OF RTE. 45 SPUR. Project : Safety HSIP-MO $1,432.0 STATE-MO $159.0 HSIP-MO $138.0 STATE-MO $15.0 HSIP-MO $45.0 STATE-MO $5.0 HSIP-MO $45.0 STATE-MO $5.0 HSIP-MO $180.0 STATE-MO $20.0 Add new roundabout at the intersection of Rte. 45 Spur. Added the construction phase $1,840.0 $204.0 $2,044.0 TIP #: State #: 4P3276 Co: PLATTE Location/Improvement: RTE. 92: PAVEMENT RESURFACING FROM MISSOURI RIVER TO RTE. 273 Project : Reconstruction NHPP-MO $2,530.0 STATE-MO $633.0 NHPP-MO $168.0 STATE-MO $42.0 NHPP-MO $8.0 NHPP-MO $4.0 STATE-MO $1.0 NHPP-MO $8.0 Rte. 92: Pavement resurfacing from River to Rte. 273 Added the construction phase Length (mi): 8 $2,718.0 $680.0 $3,398.0 Monday, August 06, 11:07 AM Page 43 of 59 Kansas City Metropolitan Region TIP - 3rd Quarter

Kansas Division. January 31, 2018

Kansas Division. January 31, 2018 Division January 31, 6111 SW 29 th, Suite 100 Topeka, 66614 (785) 273-2600 (785) 273-2620 (fax) www.fhwa.dot.gov/ksdiv/index.htm Catherine M. Patrick, P.E. State Transportation Engineer Department of Transportation

More information

KANSAS CITY METROPOLITAN REGION TRANSPORTATION IMPROVEMENT PROGRAM FISCAL YEARS Thursday, September 07, :30 PM

KANSAS CITY METROPOLITAN REGION TRANSPORTATION IMPROVEMENT PROGRAM FISCAL YEARS Thursday, September 07, :30 PM Kansas TIP #: 341002 U-0163-01 Juris: DESOTO #: STP-U016(301) County: JOHNSON KANSAS CITY METROPOLITAN REGION TRANSPORTATION IMPROVEMENT PROGRAM FISCAL YEARS - Thursday, September 07, STP-KS $1,000.80

More information

County: King List of Amendment Projects: Approved 5/16/2017. Jurisdiction: Enumclaw. Project Number: ENM-6

County: King List of Amendment Projects: Approved 5/16/2017. Jurisdiction: Enumclaw. Project Number: ENM-6 Central Puget Sound Regional 2017-2020 Transportation Improvement Program Amendments and Corrections to be included in the 2017-20 STIP PSRC's Amendment 2017-04 County: King List of 17-04 Amendment Projects:

More information

Ministry of Transportation and Infrastructure jurisdiction (337 km) Federal Parks Canada jurisdiction (103 km)

Ministry of Transportation and Infrastructure jurisdiction (337 km) Federal Parks Canada jurisdiction (103 km) nfrastructure jurisdiction (337 km) HGHWAY 1 KAMLOOPS TO ALBERTA FOUR-LANNG PROGRAM Welcome Thank you for attending this community engagement on the Trans- Canada Highway 1 West Project, part of the Highway

More information

Dakota County Transportation CIP Process Requests from cities/townships

Dakota County Transportation CIP Process Requests from cities/townships City of Apple Valley Letter: e-mail w/traffic Engineer City of Apple Valley Engineer coordinating CIP Project County Traffic Staff is in the process of assessing Requests directly with Dakota County Traffic

More information

An Assessment of Congestion in the Kansas City Region using the MARC Travel Demand Model

An Assessment of Congestion in the Kansas City Region using the MARC Travel Demand Model An Assessment of Congestion in the Kansas City Region using the MARC Travel Demand Model The Congestion Management Process Federal Regulations state that all metropolitan planning organizations must carry

More information

BOARD OF SUPERVISORS 2017 TRANSPORTATION SUMMIT INFORMATION ITEM

BOARD OF SUPERVISORS 2017 TRANSPORTATION SUMMIT INFORMATION ITEM BOARD OF SUPERVISORS 2017 TRANSPORTATION SUMMIT INFORMATION ITEM Date of Meeting: # 9 SUBJECT: ELECTION DISTRICTS: STAFF CONTACTS: Public and Private Infrastructure Improvements Adjacent to the Dulles

More information

Feasibility Study Downtown Moorhead Railroad Grade Separation Moorhead, Minnesota July 2008

Feasibility Study Downtown Moorhead Railroad Grade Separation Moorhead, Minnesota July 2008 Feasibility Study Downtown Moorhead Railroad Grade Separation Moorhead, Minnesota July 2008 INTRODUCTION The City of Moorhead (City), along with the Fargo-Moorhead Metropolitan Council of Governments (FM

More information

THE SOUTHERN GATEWAY MANAGED LANES PROJECT. Public Meetings Summer 2015 June 23, June 25, July 7, July 9

THE SOUTHERN GATEWAY MANAGED LANES PROJECT. Public Meetings Summer 2015 June 23, June 25, July 7, July 9 THE SOUTHERN GATEWAY MANAGED LANES PROJECT Public Meetings Summer 2015 June 23, June 25, July 7, July 9 History & Background Began in 2001 as a Major Investment Study (MIS), Schematic, and Environmental

More information

THE SOUTHERN GATEWAY MANAGED LANES PROJECT. Public Meetings Summer 2015 June 23, June 25, July 7, July 9

THE SOUTHERN GATEWAY MANAGED LANES PROJECT. Public Meetings Summer 2015 June 23, June 25, July 7, July 9 THE SOUTHERN GATEWAY MANAGED LANES PROJECT Public Meetings Summer 2015 June 23, June 25, July 7, July 9 History & Background Began in 2001 as a Major Investment Study (MIS), Schematic, and Environmental

More information

KANSAS MAP CHANGES KANSAS DEPARTMENT OF TRANSPORTATION ROUTE COUNTY PROJECT WORK TYPE I 635 WYANDOTTE K GR&SU

KANSAS MAP CHANGES KANSAS DEPARTMENT OF TRANSPORTATION ROUTE COUNTY PROJECT WORK TYPE I 635 WYANDOTTE K GR&SU KANSAS MAP CHANGES KANSAS DEPARTMENT O TRANSPORTATION I 635 WYANDOTTE K 4890-01 GR&SU 12/23/2004 502101031 Re-CONSTRUCTION O I-635 ROM K-32 (KANSAS AVE.), NORTH TO JUST NORTH O US-24 (STATE AVE.). INCLUDES

More information

SCDOT TENTATIVE LETTINGS December 2018 Subject To Change Without Notice

SCDOT TENTATIVE LETTINGS December 2018 Subject To Change Without Notice SCDOT TENTATIVE LETTINGS December 2018 Subject To Change Without Notice 1 of 6 Date Generated: 10/30/2018 Projects Returned: 75 Let Date Contract ID Project ID Project Name Project Type County Route Work

More information

DESIGN CRITERIA MEMORANDUM

DESIGN CRITERIA MEMORANDUM State Route 49 Realignment Study DESIGN CRITERIA MEMORANDUM ATTACHMENT G SR 49 Realignment Study STATE ROUTE 49 El Dorado to Coloma El Dorado County, CA DESIGN CRITERIA MEMORANDUM Introduction The El

More information

Transportation Improvement Program. Project Lookup Lists

Transportation Improvement Program. Project Lookup Lists 2018-2021 Transportation Improvement Program Project Lookup Lists Project Lookup Lists with TIPID, Project Name and Web file page number for Exhibit 2 -- Project Descriptions Projects by Name Projects

More information

TRANSPORTATION DEPARTMENT Business Plan

TRANSPORTATION DEPARTMENT Business Plan TRANSPORTATION DEPARTMENT 2018 Business Plan Today s Agenda Mission Department Overview Planning Initiatives Commission Priorities and 2018 Budget Requests Five-year Plan Department of Transportation Mission

More information

($ millions) DRPA Rebuild PATCO Cars

($ millions) DRPA Rebuild PATCO Cars Delaware River Port Authority of Pennsylvania and New Jersey () Rebuild PATCO Cars DBNUM: DR046 This project will provide for the replacement of PATCOʹs existing car fleet, through complete rebuilding

More information

Northwest Needs Improvements Survey

Northwest Needs Improvements Survey PW5 NW 107th Ave One thousand feet N of NW 122nd St Okeechobee Rd Widen bridge over Miami Canal PW6 NW 82nd Ave NW 8th St NW 12th St Construct new 4-lane road PW7 NW 87 Ave NW 36th St NW 58th St Add 2-lanes

More information

STUDY REPORT #1 ADDENDUM

STUDY REPORT #1 ADDENDUM STUDY REPORT #1 ADDENDUM 1.0 PURPOSE OF ADDENDUM This document is an addendum to Study Report #1: Sub-System Planning Alternatives. The purpose of this addendum is to bridge the gap between the initial

More information

Appendix D Supportive Transportation Materials

Appendix D Supportive Transportation Materials Appendix D Supportive Transportation Materials D.1. Stakeholder Input and Coordination As noted in Section 1.7 of the main Master Plan document, there have been several opportunities for stakeholders to

More information

Transportation Improvement Program. Project Lookup Lists

Transportation Improvement Program. Project Lookup Lists 2018-2021 Transportation Improvement Program Project Lookup Lists Project Lookup Lists with TIPID, Project Name and Web file page number for Exhibit 2 -- Project Descriptions Projects by Name Projects

More information

2014 BOND PROGRAM UPDATE

2014 BOND PROGRAM UPDATE 2014 BOND PROGRAM UPDATE Presented to the City Council By the City Manager s Office August 11, 2015 1 Topics Previous Debt Programs 2014 Bond Program o Goals o Funding Commitments o Progress Communication

More information

Metropolitan Council. Transportation Division Proposed Transit Capital Program

Metropolitan Council. Transportation Division Proposed Transit Capital Program Metropolitan Council Transportation Division Proposed 2015-2020 Transit Capital Program Transportation Committee October 27, 2014 Goals of the 2015 Capital Program Simplify the process Standardize the

More information

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP): SEGMENT 3

NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP): SEGMENT 3 NORTH HOUSTON HIGHWAY IMPROVEMENT PROJECT (NHHIP): SEGMENT 3 Varuna A. Singh August 17, 2018 NHHIP OVERVIEW Project divided into three segments: Segment 1: I-45: from Beltway 8 to I-610 (9 mi) 45 Segment

More information

PRIORITIZATION MODEL RESULTS OTHER TRANSPORTATION

PRIORITIZATION MODEL RESULTS OTHER TRANSPORTATION PRIORITIZATION MODEL RESULTS OTHER TRANSPORTATION itization Project itization Rank Name Score 1 Transportation Plan Update 64.85 2 Signal Timing Optimization 54.15 3 Intelligent Transportation System (ITS)

More information

Scoping and Design Projects October Administrative Amendment Non MPO Project Changes

Scoping and Design Projects October Administrative Amendment Non MPO Project Changes County: Buchanan Route: RT DD 1S2192 Scoping for bridge and ramp improvements at I 29 interchange 1.0 mile east of Rte. 371, near Faucett. Project involves bridge A0051. Fed 320 / State 80 / Local 0 Future

More information

STATE STREET CORRIDOR

STATE STREET CORRIDOR CITY OF WEST LAFAYETTE AND PURDUE UNIVERSITY STATE STREET CORRIDOR March 11, 2015 1 March 11, 2015 2 STATE STREET CORRIDOR AGENDA STATE STREET CORRIDOR 1. Project Fundamentals Project History Project Goals

More information

Study Area and Location District PSA Ward ANC Phase Description G Planned Connecticut Avenue Northbound at Military Road Northwest

Study Area and Location District PSA Ward ANC Phase Description G Planned Connecticut Avenue Northbound at Military Road Northwest Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia Connecticut Avenue at Military Road NW Study Area and Location District PSA Ward ANC Phase Description

More information

Hennepin Avenue Downtown

Hennepin Avenue Downtown Hennepin Avenue Downtown Construction Kick-off Meeting Stakeholders, Owners, Managers January 14 & 17, 2019 Agenda Summary Background Principles Scope, Schedule, Budget Construction Utilities Roadway What

More information

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 1100 Block 4th Street NE

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 1100 Block 4th Street NE Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 11 Block 4th Street NE Study Area and Location District PSA Ward ANC Phase Description 1 14 6 6C Proposed

More information

DISTRIBUTION OF QUANTITIES

DISTRIBUTION OF QUANTITIES DISTRIBUTION OF QUANTITIES Index: 1 Table of Contents - Distribution of Quantities R.I. Contract - 2018-CB-059 Description Page 201.0415 REMOVE AND DISPOSE GUARDRAIL AND POST ALL TYPES 1 201.9901 REMOVE

More information

Bentley OpenRoads Workshop 2017 FLUG Fall Training Event

Bentley OpenRoads Workshop 2017 FLUG Fall Training Event Bentley OpenRoads Workshop 2017 FLUG Fall Training Event F-1E - QuickStart using OpenRoads ConceptStation Bentley Systems, Incorporated 685 Stockton Drive Exton, PA 19341 www.bentley.com Practice Workbook

More information

CONSTRUCTION & DEVELOPMENT MANUAL SUMTER COUNTY, FLORIDA

CONSTRUCTION & DEVELOPMENT MANUAL SUMTER COUNTY, FLORIDA CONSTRUCTION & DEVELOPMENT MANUAL SUMTER COUNTY, FLORIDA Original: June 1, 2004 Revised: May 31, 2005 Revised: August 8, 2006 Revised: September 1, 2006 Revised: August 20, 2007 Revised: November 1, 2011

More information

Supplemental Details - Capital Funding Source Summary Cap Fund Cap Fund Cap Fund - 21

Supplemental Details - Capital Funding Source Summary Cap Fund Cap Fund Cap Fund - 21 Supplemental Details - Capital Source Summary 2018 Cap Fund - 2 2019 Cap Fund - 12 2020 Cap Fund - 21 Brampton Public Library Automation Software & Hardware Upgrades Brampton Library - 4 Corners BramWest

More information

ROARING BROOK COMMUNITY INFORMATIONAL MEETING TACONIC STATE PARKWAY (TSP) AT PUDDING STREET INTERCHANGE

ROARING BROOK COMMUNITY INFORMATIONAL MEETING TACONIC STATE PARKWAY (TSP) AT PUDDING STREET INTERCHANGE ROARING BROOK COMMUNITY INFORMATIONAL MEETING TACONIC STATE PARKWAY (TSP) AT PUDDING STREET INTERCHANGE Town of Putnam Valley, Putnam County February 7, 2018 1 2 MEETING AGENDA Introductions (5 minutes)

More information

APPENDIX E. Expenditures by Department

APPENDIX E. Expenditures by Department APPENDIX E Expenditures by Department 199 AIRPORT 2019 AP.19.01 New T-Hangar Hangar Loan 100% 650,000 650,000 AP.19.02 Taxiway Reconfiguration and TWY D Sales Tax (Existing) 10% 300,000 Construction Federal

More information

APPENDIX F. Expenditures by Year

APPENDIX F. Expenditures by Year APPENDIX F Expenditures by Year 209 2019 AP.19.01 New T-Hangar Hangar Loan 100% 650,000 AP.19.02 Taxiway Reconfiguration and TWY D Sales Tax (Existing) 10% 300,000 Construction Federal 90% 2,700,000 3,000,000

More information

Gaston County GIS. Interactive Mapping Website

Gaston County GIS. Interactive Mapping Website Gaston County GIS Interactive Mapping Website The Gaston County GIS mapping website optimizes the available window viewing area and has interactive tools, collapsible menus and movable windows. This map

More information

Bentley ConceptStation Workshop 2017 FLUG Spring Training Event

Bentley ConceptStation Workshop 2017 FLUG Spring Training Event Bentley ConceptStation Workshop 2017 FLUG Spring Training Event 430 - QuickStart using OpenRoads ConceptStation Bentley Systems, Incorporated 685 Stockton Drive Exton, PA 19341 www.bentley.com Practice

More information

Page 2D-12 Revised the following language in the last sentence on the page from; as shown in Figure 2D-3. To; as shown in Chapter 2H, Figure 2H-35.

Page 2D-12 Revised the following language in the last sentence on the page from; as shown in Figure 2D-3. To; as shown in Chapter 2H, Figure 2H-35. IMPERIAL ROAD DESIGN MANUAL REVISIONS January, 2015 CHAPTER 2A Page 2A-1 Revised the following language at the end of the paragraph under PRELIMINARY ENGINEERING AUTHORIZATION from; Funding Allocation/Verification/Submittal

More information

Site 17 W3-160 KEY: District Department of Transportation 55 M Street, SE, Suite 400 Washington, DC 20003

Site 17 W3-160 KEY: District Department of Transportation 55 M Street, SE, Suite 400 Washington, DC 20003 Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia Connecticut Avenue at Calvert Street NW Study Area and Location District PSA Ward ANC Phase Description

More information

Study Area and Location District PSA Ward ANC Phase Description G Proposed 2900 Block Military Road Northwest Eastbound

Study Area and Location District PSA Ward ANC Phase Description G Proposed 2900 Block Military Road Northwest Eastbound Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 29 Block Military Road NW E/B Study Area and Location District PSA Ward ANC Phase Description 2 21 3

More information

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia DC Miles South of Pennsylvania Avenue SE

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia DC Miles South of Pennsylvania Avenue SE Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia DC 295.4 Miles South of Pennsylvania Avenue SE Study Area and Location District PSA Ward ANC Phase Description

More information

# 7. Date of Meeting: March 13, 2018 BOARD OF SUPERVISORS FINANCE/GOVERNMENT OPERATIONS AND ECONOMIC DEVELOPMENT COMMITTEE ACTION ITEM SUBJECT:

# 7. Date of Meeting: March 13, 2018 BOARD OF SUPERVISORS FINANCE/GOVERNMENT OPERATIONS AND ECONOMIC DEVELOPMENT COMMITTEE ACTION ITEM SUBJECT: BOARD OF SUPERVISORS FINANCE/GOVERNMENT OPERATIONS AND ECONOMIC DEVELOPMENT COMMITTEE ACTION ITEM Date of Meeting: March 13, 2018 # 7 SUBJECT: ELECTION DISTRICT: Contract Award/Roadway and Civil Design

More information

EXTENDING RED/PURPLE LINE REVENUE SERVICE TO EAST SIDE OF DOWNTOWN LOS ANGELES/ARTS DISTRICT

EXTENDING RED/PURPLE LINE REVENUE SERVICE TO EAST SIDE OF DOWNTOWN LOS ANGELES/ARTS DISTRICT 16 One Gateway Plaza Los Angeles, CA 90012-2952 213.922.2000 Tel metro. net PLANNING AND PROGRAMMING COMMITTEE MARCH 18, 2015 SUBJECT: ACTION: EXTENDING RED/PURPLE LINE REVENUE SERVICE TO EAST SIDE OF

More information

Study Area and Location District PSA Ward ANC Phase Description D Proposed 1900 Block Foxhall Road Northwest Southbound

Study Area and Location District PSA Ward ANC Phase Description D Proposed 1900 Block Foxhall Road Northwest Southbound Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 19 Block Foxhall Road NW S/B Study Area and Location District PSA Ward ANC Phase Description 2 25 3

More information

PUBLIC WORKS ORGANIZATIONAL CHART

PUBLIC WORKS ORGANIZATIONAL CHART PUBLIC WORKS ORGANIZATIONAL CHART C-108 Actual 2012-13 Adopted Year-End Estimated 2014-15 2015-16 PROGRAM EXPENSES/REVENUES Salaries & Benefits $ 1,725,030 $ 1,855,980 $ 1,676,130 $ 1,956,510 $ 1,979,470

More information

Study Area and Location District PSA Ward ANC Phase Description A Proposed I-395 Southwest after Exit 4, Eastbound

Study Area and Location District PSA Ward ANC Phase Description A Proposed I-395 Southwest after Exit 4, Eastbound Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia I-395 SW after Exit 4 E/B Study Area and Location District PSA Ward ANC Phase Description 1 71 8 8A

More information

Central Corridor. - Central Corridor. Management Committee, Light Rail Transit. Rail-Volution - Weaving Transit into Existing Communities

Central Corridor. - Central Corridor. Management Committee, Light Rail Transit. Rail-Volution - Weaving Transit into Existing Communities - Central Corridor Rail-Volution - Weaving Transit into Existing Communities Management Committee, October 31, 2009 June Improving 11, 2008 mobility Easing congestion Strengthening our communities Twin

More information

North Metro Corridor Draft Environmental Impact Statement (DEIS) Public Hearings. December 9 & 10, 2009

North Metro Corridor Draft Environmental Impact Statement (DEIS) Public Hearings. December 9 & 10, 2009 North Metro Corridor Draft Environmental Impact Statement (DEIS) Public Hearings December 9 & 10, 2009 1 Welcome & Introductions 2 3 What Are We Doing Here Tonight? Public Hearing for RTD North Metro Corridor

More information

C Line Rapid Bus 90% Design

C Line Rapid Bus 90% Design C Line Rapid Bus 90% Design Karyssa Jackson, Community Outreach Coordinator Shawn Walding, Senior Engineer Metro Transit TAAC August 2, 2017 1 Today s Discussion Informational Feedback from February Project

More information

MSAG and Map Clean-Up Projects

MSAG and Map Clean-Up Projects MSAG and Map Clean-Up Projects Master Street Address Guide (MSAG) The MSAG is a tabular listing of all streets with the low and high address ranges that fall within a specified community and a unique ESN

More information

HISTORIC AMERICAN ENGINEERING RECORD INDEX TO PHOTOGRAPHS. BLACK AND WHITE PHOTOGRAPHS OF HElM BRIDGE

HISTORIC AMERICAN ENGINEERING RECORD INDEX TO PHOTOGRAPHS. BLACK AND WHITE PHOTOGRAPHS OF HElM BRIDGE HISTORIC AMERICAN ENGINEERING RECORD Cerritos Channel Port oflong Beach Los Angeles County California BLACK AND WHITE PHOTOGRAPHS OF HElM BRIDGE Photographer: Stephen Schafer, September 2010 CA-HEIM-l

More information

West Seattle and Ballard Link Extensions. Downtown Open House and Neighborhood Forum September 11, 2018

West Seattle and Ballard Link Extensions. Downtown Open House and Neighborhood Forum September 11, 2018 West Seattle and Ballard Link Extensions Downtown Open House and Neighborhood Forum September 11, 2018 Agenda Why we re here today Alternatives development overview What we heard in Level 1 Level 2 alternatives

More information

Study Area and Location District PSA Ward ANC Phase Description A Existing 1700 Block North Portal Drive Northwest Southwest-bound

Study Area and Location District PSA Ward ANC Phase Description A Existing 1700 Block North Portal Drive Northwest Southwest-bound Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 17 Block North Portal Drive NW Study Area and Location District PSA Ward ANC Phase Description 4 41

More information

Council of State Governments. Takoma Langley Transit Center Purple Line Project Briefing. October 28, 2013

Council of State Governments. Takoma Langley Transit Center Purple Line Project Briefing. October 28, 2013 Council of State Governments Takoma Langley Transit Center Purple Line Project Briefing October 28, 2013 Takoma Langley Transit Center Purpose and Need Provide a safe, attractive and efficient facility

More information

South Mountain Freeway Interchange Selection

South Mountain Freeway Interchange Selection slide 1 South Mountain Freeway Interchange Selection Public Private Partnership (P3) Today s Agenda Project Overview Interchange Selection Pavement Selection Lawsuit Update Design and Construction Q&A

More information

Cedar Rapids ITS Deployment Project

Cedar Rapids ITS Deployment Project Cedar Rapids ITS Deployment Project Concept of Operations July 29, 2011 Table of Contents Section 1 Introduction Purpose Goal of ITS Deployments Section 2 Needs Assessment General Background Stakeholders

More information

Study Area and Location District PSA Ward ANC Phase Description A Proposed 6100 Block Georgia Avenue Northwest Southbound

Study Area and Location District PSA Ward ANC Phase Description A Proposed 6100 Block Georgia Avenue Northwest Southbound Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 6100 Block Georgia Avenue NW Study Area and Location District PSA Ward ANC Phase Description 4 402 4

More information

Site 40. Recreational Center

Site 40. Recreational Center Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia Georgia Avenue S/B at Missouri Avenue NW Study Area and Location District PSA Ward ANC Phase Description

More information

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia East Capitol Street at Southern Avenue NE

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia East Capitol Street at Southern Avenue NE Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia East Capitol Street at Southern Avenue NE Study Area and Location District PSA Ward ANC Phase Description

More information

2017 STP PROJECT APPLICATION (OREGON)

2017 STP PROJECT APPLICATION (OREGON) Project Title Section 1. Applicant Information Name of Lead Agency/ Organization Address Phone Number Name & Title of Contact Person Email Address Certified Local Public Agency (Yes/No) Section 2. Project

More information

TABLE OF CONTENTS. Section 2.0 GENERAL PLAN REQUIREMENTS 05/2011. Section 100 ROADWAY DESIGN 01/2016

TABLE OF CONTENTS. Section 2.0 GENERAL PLAN REQUIREMENTS 05/2011. Section 100 ROADWAY DESIGN 01/2016 TABLE OF CONTENTS The City Standard Manual was revised in 2010. Please see dates in the revised column for details that have been modified after 2010. PART 1 - DESIGN STANDARDS Section 1.0 ENGINEERING

More information

Recommendation to Board. Final Action

Recommendation to Board. Final Action MOTION NO. M2017-59 City of Seattle Center City Mobility Plan Agreement MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Operations and Administration Committee PROPOSED ACTION 05/04/2017 05/25/2017 Recommendation

More information

Final Major New Program List

Final Major New Program List TRAC Tier 1 Construction Commitments Projects are subject to change if the fiscal projections change. The figures denoted for project revenue are estimated as a planning tool only. All major new budget

More information

6.9 Intelligent Transportation Systems

6.9 Intelligent Transportation Systems 6.9 Intelligent Transportation Systems This chapter describes Intelligent Transportation Systems (). The chapter also describes the process that defines how agencies and systems are interconnected through

More information

Context Sensitive Case Study: Grand Avenue Bridge

Context Sensitive Case Study: Grand Avenue Bridge Context Sensitive Case Study: Grand Avenue Bridge MODERATOR: Craig Gaskill, TSH Engineering Joe Elsen, Colorado Department of Transportation - DOT Perspective / Client Brian Pettet, Pitkin County - Pitkin

More information

DISTRIBUTION OF QUANTITIES

DISTRIBUTION OF QUANTITIES DISTRIBUTION OF QUANTITIES Index: 1 Table of Contents - Distribution of Quantities R.I. Contract - 2018-CB-109 Description Page 201.0403 REMOVE AND DISPOSE SIDEWALKS 1 201.0407 REMOVE AND DISPOSE PAVEMENT

More information

Community Advisory Committee. June 5, 2017

Community Advisory Committee. June 5, 2017 Community Advisory Committee June 5, 2017 1 Today s Topics Call to Order/Introductions Approval of Minutes Project Overview Traffic Signal Coordination 60% Plans Update Advanced Construction: Bassett Creek

More information

GATEWAY. Action Plan JULY Gateway Action Plan DRAFT - July Portland Development Commission

GATEWAY. Action Plan JULY Gateway Action Plan DRAFT - July Portland Development Commission GATEWAY Action Plan JULY 2016 1 Gateway Action Plan DRAFT - July 2016 - Portland Development Commission INTRODUCTION: The City of Portland, the Portland Development Commission (PDC), and their many partners

More information

Utilization of TSMO Practices in Highway Construction Work Zones: A Case Study

Utilization of TSMO Practices in Highway Construction Work Zones: A Case Study Utilization of TSMO Practices in Highway Construction Work Zones: A Case Study James Webb, P.E., Iowa Department of Transportation Liz Finarty, P.E., Iowa Department of Transportation James Armstrong,

More information

2014 UNIFIED TRANSPORTATION PROGRAM (UTP) UPDATE

2014 UNIFIED TRANSPORTATION PROGRAM (UTP) UPDATE 2014 UNIFIED TRANSPORTATION PROGRAM (UTP) UPDATE Texas Transportation Commission June 26, 2014 Proposed amendments under consideration Funding-level adjustments Project list updates Projects under consideration

More information

Looking Ahead. A Context for the Next Twenty Year Needs Assessment. July 2013

Looking Ahead. A Context for the Next Twenty Year Needs Assessment. July 2013 Looking Ahead A Context for the Next Twenty Year Needs Assessment July 2013 A Larger Context for Twenty Year Needs Growing transit demand and complexity of travel paths and times Growing economy changing

More information

CITY OF KIRKLAND TRAFFIC IMPACT ANALYSIS GUIDELINES

CITY OF KIRKLAND TRAFFIC IMPACT ANALYSIS GUIDELINES CITY OF KIRKLAND TRAFFIC IMPACT ANALYSIS GUIDELINES SEPA TRANSPORTATION CONCURRENCY - ROAD IMPACT FEES Introduction Revised February 2004 These guidelines describe how to prepare a traffic study, or Traffic

More information

PROJECT TIMELINE. Next steps. Plan. Start of Service

PROJECT TIMELINE. Next steps. Plan. Start of Service PROJECT TIMELINE 2018 2019 2020 2021 2022 2023 WE ARE HERE Plan Develop Build Develop design options for termini, station locations, and transit operations Conduct environmental research Assess funding

More information

GATEWAY PROGRAM OVERVIEW AND UPDATE

GATEWAY PROGRAM OVERVIEW AND UPDATE January 12, 2017 GATEWAY PROGRAM OVERVIEW AND UPDATE John D. Porcari, Interim Executive Director Gateway Program Development Corporation 1 GATEWAY PROGRAM DEVELOPMENT CORPORATION» Incorporated in the state

More information

Mobile Mapping Solutions for Ohio s Integrated Transportation Network. Brian Foster, CP

Mobile Mapping Solutions for Ohio s Integrated Transportation Network. Brian Foster, CP Mobile Mapping Solutions for Ohio s Integrated Transportation Network Brian Foster, CP About Woolpert Established in 1911 Over 600 Professionals 25 Offices $12,000,000 invested in new technology in last

More information

Road Intersections Near Level Crossings: Intersection Awareness in Illinois. Brian Vercruysse Illinois Commerce Commission

Road Intersections Near Level Crossings: Intersection Awareness in Illinois. Brian Vercruysse Illinois Commerce Commission Road Intersections Near Level Crossings: Intersection Awareness in Illinois Brian Vercruysse Illinois Commerce Commission Illinois Freight & Passenger Rail Systems Metra Commuter Illinois Rail Crossing

More information

8a: Road Projects Time Horizon 1: (Funded TIP) Page 81

8a: Road Projects Time Horizon 1: (Funded TIP) Page 81 8a: Road Projects Time Horizon 1: 2016-2020 (Funded TIP) Page 81 2040 Metropolitan Transportation Plan Highway OR Non-Highway TIP Route/Facility Name Description From Cross Street To Amount Programmed

More information

8/8/2018 Council Approval Presentation. 8/14/2018 MOVEBR Infrastructure Enhancement and Traffic Mitigation Plan 1

8/8/2018 Council Approval Presentation. 8/14/2018 MOVEBR Infrastructure Enhancement and Traffic Mitigation Plan 1 8/8/2018 Council Approval Presentation 8/14/2018 MOVEBR Infrastructure Enhancement and Traffic Mitigation Plan 1 Speaker Panel Jamie Setze Executive Director, Capital Regional Planning Commission Stephen

More information

SUMMIT TECHNOLOGY CAMPUS 777 NW BLUE PARKWAY I 850 NW CHIPMAN ROAD LEE S SUMMIT MO 64086

SUMMIT TECHNOLOGY CAMPUS 777 NW BLUE PARKWAY I 850 NW CHIPMAN ROAD LEE S SUMMIT MO 64086 SUMMIT TECHNOLOGY CAMPUS 777 NW BLUE PARKWAY I 850 NW CHIPMAN ROAD LEE S SUMMIT MO 64086 INFALLIBLE INFRASTRUCTURE. The Summit Technology Campus is comprised of two buildings totaling approximately 1,037,000

More information

Metropolitan Council Transportation Committee. September 12, 2016

Metropolitan Council Transportation Committee. September 12, 2016 Metropolitan Council Welcome Commissioner Ulrich SCALE and Collective Impact in Scott County - Mayor Williams Regional Priority Corridors Highways Transit Moving Forward SCALE Scott County Association

More information

Corridor Management Committee. December 17, 2014

Corridor Management Committee. December 17, 2014 Corridor Management Committee December 17, 2014 1 Today s Topics Technical Issues/Issue Resolution Process Environmental Consultant Contract Update Advisory Committees Community Advisory Committee Business

More information

Record of Public Comment on Central Corridor SDEIS

Record of Public Comment on Central Corridor SDEIS Executive Summary Page 1 Executive Summary Project Background The Ramsey County Regional Rail Authority (RCRRA) initiated the Central Corridor scoping process in 2001 and conducted the Alternatives Analysis

More information

Fox River Grove, 20 Years Later. Brian Vercruysse, PE November 3, 2015 Arlington, TX

Fox River Grove, 20 Years Later. Brian Vercruysse, PE November 3, 2015 Arlington, TX Fox River Grove, 20 Years Later Brian Vercruysse, PE November 3, 2015 Arlington, TX Interconnect Awareness October 25, 1995 Fox River Grove, Illinois Everything that could go wrong went wrong Was the start

More information

PE Exam Review - Surveying Demonstration Problem Solutions

PE Exam Review - Surveying Demonstration Problem Solutions PE Exam Review - Surveying Demonstration Problem Solutions I. Demonstration Problem Solutions... 1. Circular Curves Part A.... Circular Curves Part B... 9 3. Vertical Curves Part A... 18 4. Vertical Curves

More information

MOTION NO. M Task Order 2 with the City of Des Moines for the Federal Way Link Extension

MOTION NO. M Task Order 2 with the City of Des Moines for the Federal Way Link Extension MOTION NO. M2018-30 Task Order 2 with the City of Des Moines for the Federal Way Link Extension MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Capital Committee 03/08/2018 Final Action Ahmad Fazel, DECM

More information

Westbard Concept Framework Plan Presentation. Workshop Wrap up November 18, November 18 Concept Framework Plan

Westbard Concept Framework Plan Presentation. Workshop Wrap up November 18, November 18 Concept Framework Plan November 18 Concept Framework Plan Westbard Concept Framework Plan Presentation Workshop Wrap up November 18, 2014 November 18 Concept Framework Plan Workshop Re cap Day 1: visioning session: characteristics

More information

Capital Rail Constructors: Quarterly Update to MWAA Board of Directors

Capital Rail Constructors: Quarterly Update to MWAA Board of Directors Dulles Corridor Metrorail Project Phase 2, Package A Capital Rail Constructors: Quarterly Update to MWAA Board of Directors Keith Couch Capital Rail Constructors January 2017 Agenda 1. Safety 2. Schedule

More information

Public Works 2017 Budget Presentation. Public Works What We Do

Public Works 2017 Budget Presentation. Public Works What We Do Public Works 2017 Budget Presentation Public Works What We Do The Public Works Department interacts with all citizens of the county and our visitors for which our work activities have a direct impact.

More information

Development of Standardized Bridge Systems

Development of Standardized Bridge Systems Development of Standardized Bridge Systems By Vijaya (VJ) Gopu, Ph.D., P.E. Civil and Environmental Engineering Department The University of Alabama in Huntsville Huntsville, Alabama Prepared by UTCA University

More information

Sewer System Capital Budget Process

Sewer System Capital Budget Process Sewer System Capital Budget Process Presentation to New Castle County Council Department of Special Services Committee Meeting Jason P. Zern, P.E. Operations Engineer March 1, 2016 1 Outline Review Asset

More information

# I-2. Date of Meeting: May 2, 2017 BOARD OF SUPERVISORS BUSINESS MEETING INFORMATION ITEM. Quarterly Metrorail Construction Status Report

# I-2. Date of Meeting: May 2, 2017 BOARD OF SUPERVISORS BUSINESS MEETING INFORMATION ITEM. Quarterly Metrorail Construction Status Report BOARD OF SUPERVISORS BUSINESS MEETING INFORMATION ITEM Date of Meeting: May 2, 2017 # I-2 SUBJECT: Quarterly Metrorail Construction Status Report ELECTION DISTRICTS: Ashburn/Broad Run STAFF CONTACTS: Alan

More information

Integrating Travel Demand Management into the Long-Range Planning Process 2017 AMPO

Integrating Travel Demand Management into the Long-Range Planning Process 2017 AMPO Integrating Travel Demand Management into the Long-Range Planning Process 2017 AMPO October 19, 2017 Chattanooga 2045 RTP Chattanooga 2045 RTP addresses both transportation supply and demand Continued

More information

Site 59 W5-147 KEY: District Department of Transportation 55 M Street, SE, Suite 400 Washington, DC 20003

Site 59 W5-147 KEY: District Department of Transportation 55 M Street, SE, Suite 400 Washington, DC 20003 Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia 11 Block Bladensburg Road NE SW/B Study Area and Location District PSA Ward ANC Phase Description 5

More information

Appendix D. Transportation Study

Appendix D. Transportation Study Appendix D Transportation Study Draft KUNZLER TERRACE MINE PROJECT Transportation Study Prepared for May 29 County of Mendocino Draft KUNZLER TERRACE MINE PROJECT Transportation Study Prepared for May

More information

NEW TxDOT CONGESTION RELIEF PROGRAM

NEW TxDOT CONGESTION RELIEF PROGRAM NEW TxDOT CONGESTION RELIEF PROGRAM REGIONAL TRANSPORTATION COUNCIL January 14, 2016 BACKGROUND Expedite congestion relief projects TxDOT to allocate $1.0 billion -$1.3 billion statewide Need early construction

More information

US 101 HOV PROJECT Status Report SBCAG BOARD MEETING JANUARY 21, 2016

US 101 HOV PROJECT Status Report SBCAG BOARD MEETING JANUARY 21, 2016 1 US 101 HOV PROJECT Status Report SBCAG BOARD MEETING JANUARY 21, 2016 Today s Presentation Outline 2 US 101 Widening Strategy 4 Phases Status of Phase IV: South Coast 101 HOV Project (Tony Harris) Phase

More information

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia Inside Southern part of 3rd Street Tunnel

Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia Inside Southern part of 3rd Street Tunnel Speed Limit and Safety Nexus Studies for Automated Enforcement Locations in the District of Columbia Inside Southern part of 3rd Street Tunnel Study Area and Location District PSA Ward ANC Phase Description

More information

NCTCOG MTP Policy Bundle Application for TXDOT

NCTCOG MTP Policy Bundle Application for TXDOT MTP Policy Application Acknowledgement I hereby certify that all information provided and contained herein is complete, accurate, and true. I am authorized to provide information on behalf of my agency.

More information

VTA s BART Silicon Valley Phase II Extension Project San Jose Downtown Association

VTA s BART Silicon Valley Phase II Extension Project San Jose Downtown Association VTA s BART Silicon Valley Phase II Extension Project San Jose Downtown Association August 24, 2017 THANK YOU! San Jose Downtown Association for inviting us & San Jose First United Methodist Church for

More information