F.No.3/23/2011-Trans Government of India Ministry of Power Shram Shakti Shawan, Rafi Marg

Similar documents
Reliance Infrastructure Limited

Government of India Ministry of Railways (Railway Board) No. 2000/Tele/TN/1 New Delhi, dated

2. Director (W &P) UPPTCL, Shakti Bhawan Extn,3rd floor, 14, Ashok Marg, Lucknow (Fax: )

Distribution List: Southern Region. 2. Chief Engineer (PSP&A II) Central Electricity Authority Sewa Bhawan, R.K.Puram, New Delhi

Central Electricity Authority PSPA-II Division Sewa Bhawan, R.K. Puram, New Delhi

Power Grid Corporation of India Limited. Analysts Presentation February 9, 2011

Network Development in Mumbai City Area The Tata Power Company Ltd. (Distribution Business)

DIVYASREE TECHNOPARK SEZ 26 th APPROVAL COMMITTEE MEETING. (1/2016 series) DATE: 14/03/2016. TIME: a.m.

Private D.Ed., Colleges Grant of Fresh /Renewal of Affiliation for the year in respect 163 Private D.EI.Ed colleges order issued.

Development of Infrastructure, through Private Sector participation.

Sub: Review of Performance of GRIDCO for the FY held on

Guidelines. Technical and Financial Support. State Wide Area Network (SWAN)

Advanced Ultra Power Transmission Consultancy

USER MANUAL For SYSTEMATICALLY MAINTAINING RECORDS OF PLAN FUND RELEASE INFORMATION

Government Resolution No of February 15, Resolution: Advancing National Regulation and Governmental Leadership in Cyber Security

FORUM LOAD DESPATCHERS (FOLD)

Marshall University Information Technology Council. Procedure ITP-16 IT INFRASTRUCTURE AUTHORIZATION PROCEDURE

Angola. Part. 1 Contact information. 1.1 Name

DIPLOMA COURSE IN INTERNAL AUDIT

Supply, Installation & Commissioning of CPU

HMT LIMITED (A Government of India Undertaking) HMT Bhavan, # 59, Bellary Road, Bangalore

ORISSA ELECTRICITY REGULATORY COMMISSION BIDYUT NIYAMAK BHAWAN UNIT VIII, BHUBANESWAR **********

AMR and SCADA in Outage Management System for MSEDCL Sangita B. Patil 1, Bapu K. Patil 2

NOTICE INVITING TENDERS (NIT)

CORRIGENDUM. Corrigendum to RFP No. SBI/GITC/PMD/ /402 dated

Connectivity for NeGP. Presented By: Anil Kumar Balani Director Department of Information Technology

Resolution: Advancing the National Preparedness for Cyber Security

Last Date of Submission : March 19, 2012 up to 3:00 p.m.

Information Technology Department Kolkata EOI NO.: BL/ /EOI/10 DUE ON : 07/10/2013 DATE : 16/09/2013

HIGH COURT OF HIMACHAL PRADESH, SHIMLA

Overview of Bangladesh Preparation for Interconnection with India. Arun Kumar Saha DGM Planning ( In Charge) PGCB

TENDER FOR SUPPLY AND INSTALLATION OF COMPUTER SYSTEM, SOFTWARE & UPS.

Ref. No. : MDI/ CCTV Cameras /2017 Date: May,9,2017

Subject: Reformulation of existing Postpaid Broadband Plans and launch of a new Unlimited Broadband Plan reg.

TERMS OF REFERENCE. Scaling-up Renewable Energy Program (SREP) Joint Mission. Lesotho

Sub: Online submission of Immovable Property Return (IPR) as on through Property Return & Intimation Module (PRI) module of HRMSreg.

up of SPMU in States/UTs under NeGP A

TENDER DOCUMENT NATIONAL INSTITUTE OF PUBLIC FINANCE AND POLICY. New Delhi SUPPLY OF LAN EQUIPMENTS AND INSTALLATION OF LAN IN THE CAMPUS

THE STATE TRADING CORPORATION OF INDIA LIMITED JAWAHAR VYAPAR BHAVAN, TOLSTOY MARG, NEW-DELHI

Terms of Reference for the Design, Development, Testing and Commissioning of a National Address Database for Malawi

PROCUREMENT, INSTALLATION, COMMISSIONING AND TESTING OF WI-FI SYSTEM OFC BACKBONE UPTO SWITCH AT SBIM, RAJARHAT CORRIGENDUM-VI DATED

Global Coordination and Support for National Processes. M. Isaora Zefania ROMALAHY Permanent Secretariat in charge of Aid Coordination

Indian Highway Management Company Limited (IHMCL) Invites sealed quotations for Supply of IT Equipment (Laptop, Desktop and Printer)

The background. Industrializing regions Strategic areas focused upon Less focus on efficiency and performance. Employment

Government of Gujarat, Science & Technology Department, G. R. No. LAN DST, Sachivalaya, Gandhinagar. Dated: 30 th July, 2004.

PAN INDIA INFRAPROJECTS PRIVATE LIMITED VENDOR REGISTRATION FORM. Enlistment of contractor for Electrical / Civil / Miscellaneous works

Prepared by the Joint Stock Company National Electric Grid of Kyrgyzstan for the Kyrgyz Republic and the Asian Development Bank.

GOVERNMENT OF INDIA MINISTRY OF COMMUNICATIONS DEPARTMENT OF TELECOMMUNICATIONS

Sector(s) Public administration- Information and communications (50%), General public administration sector (50%)

Digital government toolkit

SUPPLEMENTARY AGENDA POINTS FOR 496-OCC MEETING

Wireless Network (Neutral Host) Request for Proposals Update

APPROVAL PROCESS TO BE FOLLOWED FOR PROVISIONAL ACCREDITATION OF CBs UNDER FM CERTIFICATION SCHEME

CORRIGENDUM / AMENDMENT-1 TO REQUEST FOR PROPOSAL FOR REPLACEMENT OF OLD INTEL SERVERS

Provincial Land Tax Reform

INVITATION OF BIDS FOR TENDER

CPA (U) COURSE 2014/2015

Progress Report on the GCC Electricity Grid Interconnection in the Middle East

Please note that your offer should be only in the enclosed format duly signed by the authorised signatory on each page along with seal of your firm.

CENTRAL SECRETARIAT LIBRARY

Promoting Quality Infrastructure Investment in Africa

HARTEK POWER PVT LTD POWER SYSTEM BUSINESS CATALOGUE (Formerly known as Amtek Energy & Power Pvt Ltd)

ADB s Energy Program in Myanmar

Grievance Committee Primer (Short Guidelines)

Expression of Interest (EoI) for Transfer of Technology

WORLD TRADE ORGANIZATION

Important Announcement for students of erstwhile CA Intermediate/ Professional Education II Course

Figure 1: Summary Status of Actions Recommended in June 2016 Committee Report. Status of Actions Recommended # of Actions Recommended

WEBSITE NOTIFICATION

Expression of Interest (EoI) for Transfer of Technology

Post Graduate Diploma Course In O & M of Transmission & Distribution System

CIVIL AVIATION REQUIREMENT SECTION 2 - AIRWORTHINESS SERIES E PART XII EFFECTIVE : FORTHWITH

Use of Interactive Text Messaging (USSD) for data entry of Mandi prices and arrivals without internet

TWIN BUTTE ENERGY LTD. Stock Dividend Program FREQUENTLY ASKED QUESTIONS

Inviting Expression of Interest for. Leasing of Dark fiber on DMRC Network

Danish Policy on Underground Cabling of HV lines. Anders H Kristensen Danish Energy Agency

COUNCIL REPORT. Item Meeting date: August 13, 2018 Engineering & Public Works

Country Report : Bhutan. Organization: Disaster Management Division, Ministry of Home and Cultural Affairs. Minister. Secretary

SHIVAJI COLLEGE, UNIVERSITY OF DELHI RAJA GARDEN, RING ROAD NEW DELHI NOTICE INVITING TENDERS

Tamil Nadu: Current Power scenario and projects in pipeline

TENDER CONTENTS 1. TECHNICAL BID

B-1-1. Janet L. Fraser Director, Regulatory Affairs Phone: Fax:

Vidyut Kaushal. Power sector skill council (PSSC) Completes Skill Gap Analysis for Power Sector

NOTICE INVITING TENDER FOR ISO CERTIFICATION

MEMORANDUM OF UNDERSTANDING (MoU) FOR LONG PRODUCTS:

Additional Clause for Audio conferencing Additional Clause for Lawful Interception System. 12 Revised Price Bid 37

Zero Defect Zero Effect (ZED) Certification Scheme Rating Process

TARIFF APPLICATION FORM INSTRUCTIONS

SOFTWARE TECHNOLOGY PARKS OF INDIA MUMBAI (DIT, Ministry of Communications & Information Technology-Govt of India)

MSRDC OFFER DOCUMENT. Procurement of. Laptops and External Hard disk at MSRDC Office in Mumbai. February 2017

Decision D ATCO Electric Ltd. Crystal Lake 722S Substation Telecommunications Tower Replacement

Sub: Constitution of Committee for Preparation of Perspective Plan for Distribution Sector in Northern Region Regarding

Sarawak State Government Strategic ICT Planning Vision

Inviting Expression of Interest for. Leasing of Dark fiber on DMRC Network

STRATEGIC DIRECTION SUPPORTED: Organizational Sustainability.

MSRDC OFFER DOCUMENT. Procurement of. Desktops, Printers and Laptop at MSRDC Office in Mumbai. September 2018

ISO Responses to Questions about the Memorandum of Understanding between Valley Electric Association and the ISO

REQUEST FOR EXPRESSIONS OF INTEREST

Sub: Invitation of sealed quotations for Procurement of UPS systems for MDI Gurgaon

12 Approval of a New PRESTO Agreement Between York Region and Metrolinx

Transcription:

F.No.3/23/2011-Trans Government of India Ministry of Power Shram Shakti Shawan, Rafi Marg New Delhi, Dated, io" October, 2014 To 1. Chief Secretary(Power), Government of Arunachal Pradesh, Itanagar. 2. Chief Secretary (Power), Govt of Sikkim, Gangtok. 3. CMD, PGCIL, Gurgaon, Haryana. Subject: Comprehensive Scheme for Strengthening of Transmission & distribution in Arunachal Pradesh & Sikkim Sir, I am directed to convey the approval of the Competent Authority to the Comprehensive Scheme for Strengthening of Transmission & Distribution in Arunachal Pradesh & Sikkim. The scheme will be implemented as a Central Sector Scheme through Power Grid corporation of India Ltd (PGCIL) at an estimated cost of RsA,754A2 crore (at April, 2013 price level) with the completion schedule of 48 months from the date of release of first installment (post-investment approval) including the consultancy fee of 12% of the executed cost as per details given in Annexure-I. 2. The entire cost of the project will be borne by Government of India through the Plan Scheme of Ministry of Power. The States of Arunachal Pradesh and Sikk'rn will waivel reimburse State levied taxes and duties applicable on the project, as already committed by them. 3. Upon Commissioning of the Transmission System, the same shall be transferred to the owner State which would be responsible for carrying out Operation & Maintenance and other related activities at its own cost as per the terms & conditions in the MI~morandum of Understanding (MoU) to be signed in this regard between PGCIL and C; overnment of Arunachal Pradesh 1 Sikkim. A copy of the signed MoU may be submitted to Ministry of Power within two months. 4. The States Governments of Arunachal Pradesh and Sikkim shall ensure that there is no duplication of work between RGGVY and this scheme and that the present scheme is also duly integrated with the downstream distribution system. 5. The broad scope of work under the project is as follows: - Arunachal Pradesh i. 24 nos. of new 132 kv sub-stations with total additional 529 Megavolt Ampere (MVA) transformation capacity. ii. Augmentation of 15 MVA capacity at Daporijo. iii. 33 nos. of new transmission lines with total route length of 1917 km. Out of these, 7 nos. of 132kV lines have been planned to be initially ope ated at 33kV. iv. 70 nos. of 33kV substations with total 33/11 kv transformation capacity of 465 MVA about 1923 km of new 33kV lines.... 2/-

Sikkim - 2 - i. 7 nos of new 132/66 kv substations (590 MVA capacity) ii. 14 nos. of 66/11 kv substations (170 MVA). iii. 8 nos of 132 kv & 220 kv (initially charged at 132 kv) transrninsion lines (118 kms) and iv. 281 kms. of 66 kv lines. The detailed summary of works is attached at Annexure-II. 6. The year-wise breakup of fund requirement for the base cost is at Annexure-Ill. 7. PGCIL will submit quarterly report to the Ministry of Power indicating financial and physical progress of implementation of activities covered by this sanction. 8. This issues with the concurrence of Integrated Finance Division of Ministry of Power vide their Dy.No.11 03/JS&FA dated 8.10.2014. re-l Copy, along with enclosures, forwarded to the following: (S. enkateshwarlu) Under Secretary (Trans) Tele-fax: 011-2332 5242 Email: transdosk-mop@nic.in 1. Cabinet Secretariat [Kind Attn: Smt. Sanjukta Ray, Director (Cabinet), Rashtrpati Bhavan, New Delhi] with reference to minutes of the meeting of Cabins t Committee on Economic Affairs held on 15.9.2014 issued vide Cabinet Secretariat Memo No. CCEAl27/2014(i) dated 17.9.2014. 2. Prime Minister's Office (Kind Attn: Shri Satosh DVaidya, Director) with reference to their PMO 10 No. 210/31/C/29/2014-ES.1 dated 21.8.2014, for information. 3. Controller of Accounts, Ministry of Power, Sewa Bhavan, RK Puram, New Delhi. 4. Pay & Accounts Officer, Ministry of Power, New Delhi. 5. Principal Director of Audit, Economic & Service Ministry, AGCR Buildinq, New Delhi. 6. Chairperson, Central Electricity Authority, Sewa Bhavan, RK Puram, Now Delhi. 7. Secretary, Planning Commission, Yojana Bhavan, New Delhi. 8. Secretary, Department of Expenditure, North Block, New Delhi. 9. Secretary, Department of Economic Affairs, North Block, New Delhi. Copy for information to: PPS to Secretary(Power)/ (Trans)/US (Fin). AS(DC)/ JS (Trans)/.JS&FA/ Director

ANNEXURE-I (Page 1 of 2) ABSTRACT COST ESTIMATE (BASE COST) COMPREHENSIVE SCHEME FOR STRENGHTENING OF TRANSMISSION & DISTRIBUTION SYSTEM IN ARUNACHAL PRADESH (PRICE LEVEL APRIL'13) SI.No. Description A iount (Rs Crore) A Preliminary SUNey & Soil Investigation 8.2 B Land Acquisition for Substation and R&R Compensation 54.73 C Cost of Compensation for Transmission Lines i Compensation towards Crop, Tree & PTCC 62.65 ii Compensation towards forest 305.67 D Civil works i Infrastructure for Substations 96.33 ii Non Resident Buildings 37.20 iii Colony for Transmission Lines & Substations 221.26 E Equipment (Supply & Erection Cost) i Transmission Lines 1248.22 ii Substations 645.97 iii Voice & Data Connectivity 63.28 F Sub Total A To E 2743.51 G Contingency (@3% of F) 82.30 H Total Cost Excluding consultancy Fees 2825.81 I POWERGRID consultancy Fee 12% (excluding land and 373.64 R&R) and service tax thereon J Total Project Cost Incldg consultancy Fees 3199.45 K Interest During Construction N.A. Grand Total 3199.45 Note:1. IDC has not been considered as project is proposed to be funded by MoP from Gol Grant. 2.Entry Tax has not been considered, if any tax is applicable same needs to be waived by State 3. The above cost is inclusive of voice & data connectivity amounting to Rs. 63.28 Cr. 4.The above cost also includes: (i) Land and R&R cost: RS.54.73 Cr. (ii) Compensation towards Forest: RS.3D5.67 Cr.

ANNEXURE-I (Page 2 of 2) ABSTRACT COST ESTIMATE (BASE COST) COMPREHENSIVE SCHEME FOR STRENGHTENING OF TRANSMISSION & DISTRIBUTION SYSTEM IN SIKKIM (PRICE LEVEL APRIL'13) SLNo. Description Amount (Rs Crore) A Preliminary Survey & Soil Investigation 3.09 B Land Acquisition for Substation and R&R Compensation 108.5 C Cost of Compensation for Transmission Lines i Compensation towards Crop, Tree & PTCC 109.82 ii Compensation towards forest 13.16 0 Civil works i Infrastructure for Substations 70.26 ii Non Resident Buildings 25.61 iii Colony for Transmission Lines & Substations 64.54 E Equipment (Supply & Erection Cost) i Transmission Lines 580.01 ii Substations 341.08 iii Voice & Data Connectivity 26.76 F Sub Total A To E 1342.83 G Contingency (@3% of F) 40.32 H Total Cost Excluding consultancy Fees 1383.15 I POWERGRID Consultancy Fee 12%( excluding land and R&R) and service tax thereon 171.82 J Total Project Cost Incldg consultancy Fees 1554.97 K Interest During Construction N.A. Grand Total 1554.97 Note:1. IDC has not been considered as project is proposed to be funded by MoP from Gol Grant 2.Entry Tax has not been considered, if any tax is applicable same needs to oe waived by State. -- ---------- -------

Annexure-II (Page 1 of 2) I. Summary of scope of works proposed to be implemented in Arunc chal Pradesh (A) Scope of works under DPR of "Intra State : Arunach al Pradesh - Transmission I Sub-transmission(132kV & above)" Summary of the transmission / Sub transmission system planned for Arunachal Pradesh is as under: Transmission Line ~ 132 kv line (33 Nos.) : About 1917 kms. Sub-Station ~ New Substations (132kV) : 24 nos. ~ ~ Total Transformation Capacity (at 132kV level) : 529 MVA (8) Scope of works under DPR of "Intra State: Arunachal Pradesh - Distribution (Upto 33 kv)" Summary of the distribution system planned for Arunachal Prades is as under: 51. Description Qty. No. 1. 33 kv line feeders Nos 70 Length (in km.) 1923 2. 33/11 kv substations Nos of substations 70 Total MVA 465 - -"

An nexure-ii (Page 2 of 2) II. Summary of scope of works proposed to be implemented in Sikkim 1. Scope under Transmission I Sub-transmission System (132kV & ahove): (A) Scope of works of "Intra State: Sikkim - Transmission I Sull-transmission (132kV & above)" Summary of the transmission I Sub transmission system planned for Sikkim is as under: Transmission Line ~ 220kv & 132 kv line (8 nos.) : About 118 km Sub-Station ~ New Substations (132kV & 66kV) : 7 nos. ~ Total Transformation Capacity (at 132 & 66kV level) : 590 MVA 2. Scope under Distribution System (Upto 66 kv): (A) Scope of works under DPR of "Intra State: Sikkim - Distributi n (Upto 66 kv)" Summary of the distribution system planned for Sikkim is as under SI. Description Quantity No. 1 66 kv line feeders Nos. 23 Length (in km) - Dlc 116 Length (in km) - SIc 165 2 66/33 kv substations Nos. of substations 1 Total MVA 10 3 66/11 kv substations Nos. of substations 13 Total MVA 160

Annexure-III The year-wise break-up of fund requirement for base cost (Fiqures in Rs. Crore) State 2014-15 2015-16 2016-17 2017-18 2018-19 Total Arunachal Pradesh 157.25 622.84 739.54 1094.04 585.78 3199.45 Sikkim 76.43 305.77 346.09 547.60 279.08 1554.97 Total 233.68 928.61 1085.63 1641.64 864.86 4754.42