Accounting for Earth Curvature in Directional Drilling

Size: px
Start display at page:

Download "Accounting for Earth Curvature in Directional Drilling"

Transcription

1 Accounting for Earth Curvature in Directional Drilling Noel Zinn ExxonMobil Exploration Company Society of Petroleum Engineers Annual Technical Conference and Exhibition October

2 Homage to a Previous SPE Paper Directional Drilling and Earth Curvature Hugh Williamson and Harry Wilson SPE (1999) Williamson and Wilson explain 7 geodetic mistakes in the computation of deviated-well survey data Errors range from centimeters to 10 or more meters to hundreds of meters 2 I begin with homage to a previous paper. In an important contribution to the geodesy of directional drilling, authors Hugh Williamson and Harry Wilson discuss the causes - and offer cures - for 7 geodetic mistakes found in current oil field practice. The positional errors resulting from these mistakes range from a few centimeters to about 10 meters to hundreds of meters. 2

3 Mistakes of Earth Curvature 1- Different wellhead and target datums 2- Wrong wellhead and target datums 3- Imprecise grid convergence 4- Grid convergence change not accounted for 5- Grid scale factor not accounted for 6- Grid scale factor change not accounted for 7- Depth adjustment not applied Space Saver 3 Of the 7 mistakes cited by Williamson and Wilson, the 2 mistakes shown in white at the top are lapses in geodetic planning that must be prevented by prudent practice no matter how the survey is executed or computed. The 5 five mistakes in yellow are of a different character. These are not planning lapses or unavoidable measurement errors. They are computational mistakes that can be corrected by changes in software. Numbers 3, 4, 5 and 6 relate to the use of map projections to convert displacements (also known as departures) into geodetic coordinates. Mistakes number 4 and number 7 are common in the software I ve tested. These mistakes are not accounting for changes in convergence over the reach of a well and not adjusting for depth. 3

4 Mistakes of Earth Curvature 1- Different wellhead and target datums (<1000m) 2- Wrong wellhead and target datums ( 7m) 3- Imprecise grid convergence (<1m) 4- Grid convergence change not accounted for (15m) 5- Grid scale factor not accounted for (10m) 6- Grid scale factor change not accounted for (<1m) 7- Depth adjustment not applied (5.5m for 3500m average TVD) Well: 60 latitude / 10km extended reach 4 The 7 mistakes are detailed here with quantified positioning errors shown to the right for the extreme well detailed at the bottom of the slide. The well is high-latitude and extended in reach. The seventh mistake is quantified for a very deep well. These extreme features are within the scope of today s technology. Don't be concerned about the kilometer error shown on the first line. It won't happen to you and it's not the subject of this paper. 4

5 The Solutions Williamson and Wilson offer depth amplification and map-based applications of grid-north convergence and linear scale factor as the cure for 5 of the 7 mistakes This paper offers a simple alternative (LMP) that avoids grid north, requires no mapping corrections, is computationally efficient and equally accurate 5 Williamson and Wilson offer the application of depth amplification and mapbased corrections for convergence of the meridians and linear scale factor as the solution for the 5 computational mistakes. In this paper I take a radically different approach. I offer an alternative algorithm (called LMP) that converts True Vertical Depth and horizontal displacements directly into latitude and longitude without an intervening map projection, without convergence of the meridians and without linear scale factors. Instead, LMP uses three easily computed radii of the ellipsoidal Earth. Repeated computation of these radii is more efficient than computing map corrections. Grid north is avoided, and I ll have much to say about grid north in this talk. 5

6 The Four Survey Data Types Raw deviated- well survey data Native accelerometer, magnetometer, gyro, inertial and pipe-tally data - lots of it! Intermediate data (reduced/exchanged) Inclination, azimuth, measured depth, tool face Cubical coordinates TVD and N/S & E/W departures/displacements Geodetic coordinates Latitude, Longitude, Northing, Easting 6 To better understand the problems that LMP solves, I begin with the following taxonomy of survey data types and the formats in which these data are delivered. Raw survey data are those acquired by field instruments accelerometers, magnetometers, gyros, and of course pipe tally. These observations are acquired in great quantity and are rarely seen in the operating companies. Instead, raw data are reduced into intermediate data (inclination, azimuth, measured depth). Intermediate data is delivered as the permanent record of a well survey. Cubical or engineering - coordinates are True Vertical Depth and displacements in the N/S and E/W directions. Geodetic coordinates in the horizontal are either geographical coordinates (latitude and longitude) or projected coordinates (Northings and Eastings, or X s and Y s). TVD remains unchanged as the vertical coordinate. 6

7 Intermediate Survey Data into Cubical Coordinates Az1 Inc1 TVD D/U MD Az2 Disp E/W Disp N/S Inc2 7 If the first computation is the reduction of raw data into its intermediate form, the second computation is the reduction of intermediate data into cubical coordinates. In this graphic our survey stations are at diagonally opposite vertices of the box. The five measurements are the inclination and azimuth entering the box, the inclination and azimuth leaving the box and the difference in measured depth between the two vertices shown as the gentle curve. We must solve for three cubical coordinates: (1) N/S displacement, (2) E/W displacement and (2) delta TVD Down/Up. Simple formulas to accomplish this by different methods (including Minimum Curvature) are given by the API. 7

8 Cubical to Geodetic Coordinates Our project extracted from a cubical, flat earth Our project extracted from an ellipsoidal earth 8 Because the Earth is not a cube, cubical coordinates are an inadequate Reference System for important technical and safety issues, such as avoiding well collisions. Cubical coordinates must be converted into geodetic coordinates. The usual way to accomplish this is to relate cubical coordinates to Northings and Eastings determined with a map projection. This does work, but as previously mentioned - complete geodetic accuracy requires the computation and application of several corrections at every station along the well path. Unfortunately, these corrections are not always computed and applied. Errors result. Furthermore, map projections introduce grid north as an azimuth reference in addition to true north and magnetic north. Grid north is a common cause of mistakes in the management of survey data. 8

9 Depth Amplification Our project extracted from an ellipsoidal earth 9 If this graphic appears fuzzy to you, think of it as seismic data! Surveyors using conventional equipment have historically surveyed from hills, buildings or towers for better visibility. These surveyors always made a height reduction (or shortening) of the distances observed at these elevations to the surface of the ellipsoid. Because of Earth curvature, the vertical lines shown in white on either side of the graphic are not parallel (as they are in a cube). They tend to meet at the geocenter. As the elevation changes along two verticals, the horizontal distance between them changes (as shown in red). The geographical coordinates of the verticals don't change, just the distance between them. Similarly, a displacement at depth changes geographical coordinates faster than the same displacement near the surface. The seventh mistake cited by Williamson and Wilson is the lack of this correction. 9

10 Contractor Survey Formats Intermediate data and cubical and geodetic coordinates delivered in a spreadsheet Formats specific to survey companies Often referenced to grid north An unfortunate coupling of computational convenience with field acquisition True or magnetic north can be observed with instruments grid north cannot Grid north is a source of data-management confusion 10 Survey contractors typically deliver intermediate data, cubical coordinates and geodetic coordinates in a spreadsheet in formats that are specific to the specific contractors. Cubical coordinates are not the same as projected coordinates. Some presentations are well documented with respect to this distinction and the differences among true, magnetic and grid north. Some are not. As mentioned, the use of a map projection in the conversion of cubical to geodetic coordinates necessarily introduces grid north as an azimuth reference. Unlike true or magnetic north, which can be physically observed in the field with appropriate instruments, grid north is a mathematical abstraction. Grid north is a consequence of the grid parameters chosen for the projection, either by convention, for convenience or rather arbitrarily. Change the grid parameters, especially the central meridian, and grid north changes. In the operating companies a regional geological study may, indeed, require a change of grid parameters. Australian map projections reverse the sign convention for convergence! Grid north can also be found in field acquisition, for example, free gyros aligned with a platform grid-north reference. But the interpretation project using the data may be in a different projection altogether. These are just some reasons why this confusing coupling of computational convenience with acquisition and exchange can cause mistakes in the management of survey data. Grid north is best avoided - if possible. 10

11 Data Format Standards UK Offshore Operators Association UKOOA P7/2000: ASCII, intermediate and geodetic data, geodetically unambiguous. Minerals Management Service MMS P7/2000: required for US Federal OCS Clone of UKOOA P7/2000 POSC WITSML: XML raw acquisition data WellPathML: XML version of UKOOA P7 for intermediate and geodetic data 11 The UK Offshore Operators Association (UKOOA) has addressed the issue of inadequate documentation with the UKOOA P7/2000 format. The P7 format is geodetically unambiguous. It is widely used in Europe. In the United States the Minerals Management Service (MMS) now requires a clone of UKOOA P7/2000 (called MMS P7/2000) for wells spud in the Federal Outer Continental Shelf after July 26th of last year (2004). POSC (the Petrotechnical Open Standards Consortium) has two formats. WITSML (Wellsite Information Transfer Standard Markup Language) can capture raw survey data for exchange. WellPathML is emerging as an XML version of UKOOA P7 for intermediate, cubical and geodetic data. 11

12 Excerpt from UKOOA P7 Format T Convergence = +2 (2 E) Declination = +5 (5 E) G M 11 Survey M Declination = -7 (7 W) T G 28 Survey Azimuth Reference = Grid North (magnetic) survey azimuth = 11 Grid azimuth = = 14 Azimuth Reference = True North (magnetic) survey azimuth = 28 True azimuth = 28-7 = 21 From UKOOA Data Exchange Format P7/ One benefit of the UKOOA P7 format and its inheritors is the clarity of geodetic documentation. For example, this graphic from the P7 format offers guidance in reconciling true north, magnetic north, grid north and survey direction. 12

13 T Convergence = +2 ( 2 E) UKOOA P7: Edited Excerpt Declination = +5 ( 5 E) M 11 Survey M Declination = - 7 ( 7 W) T 28 Survey Azimuth Reference = Grid North (magnetic) survey azimuth = 11 Grid azimuth = = 14 Azimuth Reference = True North (magnetic) survey azimuth = 28 True azimuth = 28-7 = 21 From UKOOA Data Exchange Format P7/ Look how simple this graphic would be if we eliminate grid north from the computations! It can be done. 13

14 Different Routes from Cubical to Geodetic Coordinates Current Route 1- Intermediate data 2- Displacements / TVD 3- Apply grid convergence and scale corrections 4- Projected X/Y 5- Latitude / Longitude LMP Route 1- Intermediate data 2- Displacements / TVD 3- Divide by earth radii 4- Latitude / Longitude 5- Projected X/Y (grid north not required) 14 Considering some of the issues discussed so far, an ExxonMobil colleague (David M. Lee) proposed that well-path latitude and longitude be computed directly from cubical coordinates and the radius of the Earth, that is, without a map projection. I modified David s proposal for an ellipsoidal Earth with an infinite number of radii of curvature that vary as functions of latitude and azimuth. The result is Lee s Modified Proposal, or LMP. The current route to geodetic coordinates is that on the left. All the map corrections in step 3 are not always applied. Step 3 in the LMP route to the right of slide is to divide cubical displacements by radii of curvature. The results are differences in latitude and longitude, which are then summed. If projected coordinates are required, latitude and longitude can be converted into Northings and Eastings as is normally done, that is, with forward projection formulas. Deferring this conversion until needed is an advantage in the management of directional survey data. 14

15 Radii in the Meridian N ρ W E ρ Meridian Ellipse S 15 So, what are these radii of the curved Earth? This slide exhibits the varying radius of curvature in the meridian arc, which is the N/S ellipse of constant longitude. The radius of curvature in the meridian is called rho. Its length varies as a function of latitude. 15

16 Radii in Prime Vertical and Parallel 16 The E/W direction is somewhat more complicated. The prime vertical is the great circle in the E/W direction. It crosses the Equator. The radius of curvature in the prime vertical is called nu (and it s shown here). The parallel is the small circle of constant latitude in the E/W direction. The radius of curvature in the parallel of latitude is related to the radius of curvature in the prime vertical by the cosine of latitude. 16

17 Intermediate Quantities Given the semi-major axis (a) and reciprocal of flattening (rf) of the ellipsoid of the datum of the wellhead location Then the semi-minor axis (b) is: b = a /( 1 1/ rf ) And the eccentricity squared (e 2 ) is: e 2 = ( a b ) / a 17 This slide and the next exhibit the formulas for the radii of Earth curvature, which we ll touch on only briefly since they are documented in the paper. Every well has a surface location in latitude and longitude. Latitude and longitude are referenced to a geodetic datum. Every datum is associated with an ellipsoid. Every ellipsoid has a semi-major axis ( a ) and a reciprocal of flattening ( rf ). Given these quantities we can compute two other intermediate quantities, the semi-minor axis ( b ) and the eccentricity squared of the ellipsoid ( e-squared ). 17

18 Radii of Earth Curvature Radius of curvature in the meridian (ρ) is: ρ = a ( 1 e ) /(1 e sin φ) The prime vertical radius (ν) is: ν = a 2 2 /( 1 e sin φ) Radius of curvature in the parallel is: ν cosφ Given the latitude ( phi ) at every station along the wellbore, these simple formulas give the three radii of curvature discussed previously, rho, nu and the radius of curvature in the parallel. 18

19 LMP in Pseudocode 1. Divide N/S departure by the radius of curvature in the meridian minus TVD 2. Divide E/W departure by the radius of curvature in the prime vertical minus TVD and again by the cosine of latitude (φ) 3. Results are changes in latitude and longitude in radians respectively 19 So, how are these concepts implemented? LMP is expressed in pseudocode as follows: First, divide the N/S displacement by the computed radius of curvature in the meridian minus TVD. Subtracting TVD from the Earth radius accomplishes depth amplification. TVD is assumed to be referenced to the geoid, if not to the ellipsoid. Second, divide the E/W displacement by the computed radius of curvature in the prime vertical minus TVD and again by the cosine of geodetic latitude. Finally, these results are changes in latitude and longitude respectively expressed in radians. And we're done! 19

20 LMP in Matlab rad=180/pi; A= ; RF= ; B=A*(1-1/RF); E2=1-B^2/A^2; % Degrees in a radian % A is semi-major axis % RF is reciprocal of flattening % B is semi-minor axis % E2 is eccentricity squared load data.dat; % Load the data len=length(data); % Count number of survey stations Edeplast=data(1,6); Ndeplast=data(1,5); % Grab the departures latlast=data(1,7); lonlast=data(1,8); % Grab the surface geographicals for dex=1:len % Cycle through all the stations LATRAD=latlast/rad; % Degrees to radians R=A*(1-E2)/(sqrt(1-E2*sin(LATRAD)^2)^3); % Radius in the meridian N=A/sqrt(1-E2*sin(LATRAD)^2); % Radius in the prime vertical TVD=data(dex,4); % Grab the TVD Edep=data(dex,6); Ndep=data(dex,5); % Grab the departures dedep=edep-edeplast; dndep=ndep-ndeplast; % Difference the departures Edeplast=Edep; Ndeplast=Ndep; % Save the current departures dlat=rad*dndep/(r-tvd); % Delta geographicals with LMP... dlon=rad*dedep/(n-tvd)/cos(latrad); %... this is the main idea! lat=latlast+dlat; lon=lonlast+dlon; % Increment geographicals latlast=lat; lonlast=lon; % Save geographicals for next loop data(dex,9)=lat; data(dex,10)=lon; % Store the geographicals in data end 20 This slide, which exhibits LMP in Matlab code, is also documented in the paper, so we ll not dwell long upon it, either. The code is on the left. Comments are on the right. It is worth noting, however, that all the heavy lifting is done by only four lines of code, those highlighted in yellow. Two radii of curvature are computed here. The displacements are divided by the radii minus TVD here. The rest is bookkeeping. 20

21 Summary If grid-north and other mapping corrections are not applied, positioning errors result In general, these corrections are not applied Grid north is an unobservable mathematical abstraction, a cause of data-management mistakes, and best avoided LMP is accurate and computationally efficient, and it avoids the use of grid north 21 In summary, LMP is a simple, computationally efficient algorithm that eliminates 5 of the 7 mistakes cited by Williamson and Wilson. The two remaining mistakes pertain to the datum of the surface and target locations. They must be prevented by prudent geodetic practice whether LMP is used or not. An additional benefit of LMP is that neither grid north nor convergence of the meridians is needed for the computation of geodetic coordinates. This eliminates a common source of mistakes in the management of directional-well survey data. 21

Making the Most of Borehole Surveying

Making the Most of Borehole Surveying Making the Most of Borehole Surveying Prof Angus Jamieson University of the Highlands and Islands Video presentation available at www.uhi.ac.uk/surveying-summary This Presentation Covers... 1. Why survey

More information

Reduction of Field Observations

Reduction of Field Observations Reduction of Field Observations GNSS/GPS measurements or Latitudes, Longitudes, HAE: We re interested in projected coordinates, e.g., State Plane Survey measurements in a projected coordinate system, on

More information

Use of n-vector for Radar Applications

Use of n-vector for Radar Applications Use of n-vector for Radar Applications Nina Ødegaard, Kenneth Gade Norwegian Defence Research Establishment Kjeller, NORWAY email: Nina.Odegaard@ffi.no Kenneth.Gade@ffi.no Abstract: This paper aims to

More information

WHERE THEORY MEETS PRACTICE

WHERE THEORY MEETS PRACTICE world from others, leica geosystems WHERE THEORY MEETS PRACTICE A NEW BULLETIN COLUMN BY CHARLES GHILANI ON PRACTICAL ASPECTS OF SURVEYING WITH A THEORETICAL SLANT february 2012 ² ACSM BULLETIN ² 27 USGS

More information

State Plane Coordinates and Computations using them GISC Spring 2013

State Plane Coordinates and Computations using them GISC Spring 2013 State Plane Coordinates and Computations using them GISC-3325 - Spring 2013 Map Projections From UNAVCO site hosting.soonet.ca/eliris/gpsgis/lec2geodesy.html Taken from Ghilani, SPC State Plane Coordinate

More information

Navigation coordinate systems

Navigation coordinate systems Lecture 3 Navigation coordinate systems Topic items: 1. Basic Coordinate Systems. 2. Plane Cartesian Coordinate Systems. 3. Polar Coordinate Systems. 4. Earth-Based Locational Reference Systems. 5. Reference

More information

HP-35s Calculator Program Closure 7A

HP-35s Calculator Program Closure 7A Traverse Program using Latitude and Longitude and the Gauss Mid-Latitude Formulae Programmer: Dr. Bill Hazelton Date: March, 2008. Version: 1.0 Line Instruction Display User Programming Instructions J001

More information

Doc #: IDI06-11F Rev: 1.3 Issued: 22/02/18. Well Seeker PRO How To Guide Rev 1.3. Page 1 of 26

Doc #: IDI06-11F Rev: 1.3 Issued: 22/02/18. Well Seeker PRO How To Guide Rev 1.3. Page 1 of 26 Well Seeker PRO How To Guide Rev 1.3 Page 1 of 26 Contents 1.0 - Getting Started... 4 1.1 - Display... 4 2.0 - Creating a new Well... 5 2.1 - Unit Selection... 5 2.2 - New Instant Plan / Survey... 6 2.3

More information

COORDINATE TRANSFORMATION. Lecture 6

COORDINATE TRANSFORMATION. Lecture 6 COORDINATE TRANSFORMATION Lecture 6 SGU 1053 SURVEY COMPUTATION 1 Introduction Geomatic professional are mostly confronted in their work with transformations from one two/three-dimensional coordinate system

More information

Purpose : Understanding Projections, 12D, and the System 1200.

Purpose : Understanding Projections, 12D, and the System 1200. Purpose : Understanding Projections, 12D, and the System 1200. 1. For any Cad work created inside 12D, the distances entered are plane (Horizontal Chord) distances. 2. Setting a projection, or changing

More information

Higher Surveying Dr. Ajay Dashora Department of Civil Engineering Indian Institute of Technology, Guwahati

Higher Surveying Dr. Ajay Dashora Department of Civil Engineering Indian Institute of Technology, Guwahati Higher Surveying Dr. Ajay Dashora Department of Civil Engineering Indian Institute of Technology, Guwahati Module - 2 Lecture - 03 Coordinate System and Reference Frame Hello everyone. Welcome back on

More information

Fundamentals of Surveying MSS 220 Prof. Gamal El-Fiky

Fundamentals of Surveying MSS 220 Prof. Gamal El-Fiky Fundamentals of Surveying MSS 220 Prof. Gamal l-fiky Maritime Studies Department, Faculty of Marine Science King Abdulaziz University gamal_elfiky@yahoo.com Room 221 What is Surveying? Surveying is defined

More information

LOCAL GEODETIC HORIZON COORDINATES

LOCAL GEODETIC HORIZON COORDINATES LOCAL GEODETIC HOIZON COODINATES In many surveying applications it is necessary to convert geocentric Cartesian coordinates X,,Z to local geodetic horizon Cartesian coordinates E,N,U (East,North,Up). Figure

More information

Real Geodetic Map (Map without Projection) Abstract Keywords: 1. Introduction

Real Geodetic Map (Map without Projection) Abstract Keywords: 1. Introduction Real ( without Projection) Ahmad Shaker 1 Abdullah Saad 1 Abdurrahman Arafa 2* 1.Surveying Dep., Shoubra Faculty of Engineering, Benha University, Egypt 2.Manager of Surveying Dep. in Horse Company. Egypt

More information

This was written by a designer of inertial guidance machines, & is correct. **********************************************************************

This was written by a designer of inertial guidance machines, & is correct. ********************************************************************** EXPLANATORY NOTES ON THE SIMPLE INERTIAL NAVIGATION MACHINE How does the missile know where it is at all times? It knows this because it knows where it isn't. By subtracting where it is from where it isn't

More information

Data Rules. rules.ppdm.org. Dave Fisher & Madelyn Bell BUSINESS RULES WORKSHOP. March Business rules workshop Nov 2013

Data Rules. rules.ppdm.org. Dave Fisher & Madelyn Bell BUSINESS RULES WORKSHOP. March Business rules workshop Nov 2013 BUSINESS RULES WORKSHOP Data Rules Dave Fisher & Madelyn Bell rules.ppdm.org 1 March 2014 AGENDA Workshop objectives Definitions what is a data rule? It only grows with your help It takes longer then anyone

More information

VLA Test Memorandum 102. Site Coordinate Systems and Conversions. C. M. Wade 20 February 1974

VLA Test Memorandum 102. Site Coordinate Systems and Conversions. C. M. Wade 20 February 1974 VLA Test Memorandum 102 Site Coordinate Systems and Conversions C. M. Wade 20 February 1974 MAR 1 3 1974 Abstract The conversions between geodetic coordinates, the New Mexico State Plane Coordinate System,

More information

Fundamentals of Structural Geology Exercise: concepts from chapter 2

Fundamentals of Structural Geology Exercise: concepts from chapter 2 0B Reading: Fundamentals of Structural Geology, Ch 2 1) Develop a MATLAB script that plots the spherical datum (Fig. 2.1a) with unit radius as a wire-frame diagram using lines of constant latitude and

More information

Surveying. Session GPS Surveying 1. GPS Surveying. Carrier-Phase (RTK) Pseudo-Range (DGPS) Slide 1

Surveying. Session GPS Surveying 1. GPS Surveying. Carrier-Phase (RTK) Pseudo-Range (DGPS) Slide 1 GPS Surveying Slide 1 GPS Surveying Surveying Mapping Standalone Relative Relative Standalone Post-Processed Real-Time Static / Fast Static Kinematic Stop & Go Rapid-Static Carrier-Phase (RTK) Pseudo-Range

More information

3.1 Units. Angle Unit. Direction Reference

3.1 Units. Angle Unit. Direction Reference Various settings allow the user to configure the software to function to his/her preference. It is important to review all the settings prior to using the software to ensure they are set to produce the

More information

UNIVERSITY CALIFORNIA, RIVERSIDE AERIAL TARGET GROUND CONTROL SURVEY REPORT JOB # DATE: MARCH 2011

UNIVERSITY CALIFORNIA, RIVERSIDE AERIAL TARGET GROUND CONTROL SURVEY REPORT JOB # DATE: MARCH 2011 UNIVERSITY CALIFORNIA, RIVERSIDE AERIAL TARGET GROUND CONTROL SURVEY REPORT JOB # 2011018 DATE: MARCH 2011 UNIVERSITY CALIFORNIA, RIVERSIDE AERIAL TARGET GROUND CONTROL SURVEY REPORT I. INTRODUCTION II.

More information

COMP ARISON OF DIFFERENT ALGORITHMS TO TRANSFORM GEOCENTRIC TO GEODETIC COORDINATES. Alireza Amiri Seemkooei

COMP ARISON OF DIFFERENT ALGORITHMS TO TRANSFORM GEOCENTRIC TO GEODETIC COORDINATES. Alireza Amiri Seemkooei Survey Review 36, 286 (October 2002) COMP ARISON OF DIFFERENT ALGORITHMS TO TRANSFORM GEOCENTRIC TO GEODETIC COORDINATES Alireza Amiri Seemkooei Dept. of Surveying Engineering The University of Isfahan,

More information

Pad Drilling Using Magnetic MWD

Pad Drilling Using Magnetic MWD Pad Drilling Using Magnetic MWD Managing Magnetic Interference from nearby casing Neil Bergstrom, P.E. Wellbore Geodetic Specialist Devon Energy ISCWSA SPE Wellbore Positioning i Tech Section Denver 3

More information

RECOMMENDATION ITU-R P DIGITAL TOPOGRAPHIC DATABASES FOR PROPAGATION STUDIES. (Question ITU-R 202/3)

RECOMMENDATION ITU-R P DIGITAL TOPOGRAPHIC DATABASES FOR PROPAGATION STUDIES. (Question ITU-R 202/3) Rec. ITU-R P.1058-1 1 RECOMMENDATION ITU-R P.1058-1 DIGITAL TOPOGRAPHIC DATABASES FOR PROPAGATION STUDIES (Question ITU-R 202/3) Rec. ITU-R P.1058-1 (1994-1997) The ITU Radiocommunication Assembly, considering

More information

Collision Avoidance Calculations - Current Common Practice

Collision Avoidance Calculations - Current Common Practice Industry Steering Committee on Wellbore Survey Accuracy Collision Avoidance Calculations - Current Common Practice Introduction Many Operating companies and Directional Drilling contractors have policies

More information

Modern Navigation. Thomas Herring

Modern Navigation. Thomas Herring 12.215 Modern Navigation Thomas Herring Review of Wednesday Class Definition of heights Ellipsoidal height (geometric) Orthometric height (potential field based) Shape of equipotential surface: Geoid for

More information

TPC Desktop Series. Geodetic Learning Guide

TPC Desktop Series. Geodetic Learning Guide TPC Desktop Series Geodetic Learning Guide 1/18 NOTICE The information in this document is subject to change without notice. TRAVERSE PC. Inc. assumes no responsibility for any errors that may appear in

More information

New demands on the modeling of the continental shelf require the need for 3D graphics connected to seismic interpretation of seabed sediments.

New demands on the modeling of the continental shelf require the need for 3D graphics connected to seismic interpretation of seabed sediments. A New Approach to Mapping of the Continental Shelf Olav Egeland Manager of GeoCap AS, Norway. Website: www.geocap.no Email: olav.egeland@geocap.no Abstract New demands on the modeling of the continental

More information

High-Precision Positioning Unit 2.2 Student Exercise: Calculating Topographic Change

High-Precision Positioning Unit 2.2 Student Exercise: Calculating Topographic Change High-Precision Positioning Unit 2.2 Student Exercise: Calculating Topographic Change Ian Lauer and Ben Crosby (Idaho State University) Change is an inevitable part of our natural world and varies as a

More information

Improving Directional Survey Accuracy through Real-Time Operating Centers Shawn DeVerse, Surcon Ltd Stefan Maus, Magnetic Variation Services LLC

Improving Directional Survey Accuracy through Real-Time Operating Centers Shawn DeVerse, Surcon Ltd Stefan Maus, Magnetic Variation Services LLC All final manuscripts will be sent through an XML markup process that will alter the LAYOUT. This will NOT alter the content in any way. IADC/SPE-SPE-180652-MS-MS Improving Directional Survey Accuracy

More information

Section G. POSITIONAL ACCURACY DEFINITIONS AND PROCEDURES Approved 3/12/02

Section G. POSITIONAL ACCURACY DEFINITIONS AND PROCEDURES Approved 3/12/02 Section G POSITIONAL ACCURACY DEFINITIONS AND PROCEDURES Approved 3/12/02 1. INTRODUCTION Modern surveying standards use the concept of positional accuracy instead of error of closure. Although the concepts

More information

Distance in mm from nearest latitude line to location x 150 = seconds of latitude Distance in mm between latitude 2.5 tick marks (along the sides)

Distance in mm from nearest latitude line to location x 150 = seconds of latitude Distance in mm between latitude 2.5 tick marks (along the sides) LATITUDE FORMULA FOR 1:24000 SCALE WITH 2.5 TICK MARKS Distance in mm from nearest latitude line to location x 150 = seconds of latitude Distance in mm between latitude 2.5 tick marks (along the sides)

More information

FM CHAPTER 6 DIRECTION

FM CHAPTER 6 DIRECTION CHAPTER 6 DIRECTION Being in the right place at the prescribed time is necessary to successfully accomplish military missions. Direction plays an important role in a soldier's everyday life. It can be

More information

6-1. METHODS OF EXPRESSING DIRECTION

6-1. METHODS OF EXPRESSING DIRECTION CHAPTER 6 DIRECTION Being in the right place at the prescribed time is necessary to successfully accomplish military missions. Direction plays an important role in a soldier's everyday life. It can be

More information

High Accuracy Wellbore Surveys Multi-Station Analysis (MSA)

High Accuracy Wellbore Surveys Multi-Station Analysis (MSA) 1 High Accuracy Wellbore Surveys Multi-Station Analysis (MSA) Magnetic MWD measurement Uncertainty Conventional MWD Tools report their own orientation: Inclination, Azimuth, and Toolface. These reported

More information

UKOOA DATA EXCHANGE FORMAT P5/94 PIPELINE POSITION DATA

UKOOA DATA EXCHANGE FORMAT P5/94 PIPELINE POSITION DATA FOR UKOOA COUNCIL: 9 NOVEMBER 1994 [AGENDA ITEM 6.2] U.K. OFFSHORE OPERATORS ASSOCIATION (Surveying and Positioning Committee) UKOOA DATA EXCHANGE FORMAT P5/94 PIPELINE POSITION DATA UKOOA Data Exchange

More information

Fall 2016 Semester METR 3113 Atmospheric Dynamics I: Introduction to Atmospheric Kinematics and Dynamics

Fall 2016 Semester METR 3113 Atmospheric Dynamics I: Introduction to Atmospheric Kinematics and Dynamics Fall 2016 Semester METR 3113 Atmospheric Dynamics I: Introduction to Atmospheric Kinematics and Dynamics Lecture 5 August 31 2016 Topics: Polar coordinate system Conversion of polar coordinates to 2-D

More information

Mapping with Vectors

Mapping with Vectors GEOL 595 - Mathematical Tools in Geology Lab Assignment # 6 - Oct 2, 2008 (Due Oct 8) Name: Mapping with Vectors Paiute Monument in Inyo Mountains A. Where in Owen s Valley Are You? (Using Polar Coordinates)

More information

Well Unknown ID AKA EPSG: 3857

Well Unknown ID AKA EPSG: 3857 Well Unknown ID AKA EPSG: 3857 Pamela Kanu November 2016 WGS 1984 WEB MERCATOR ALIASES: AUXILIARY SPHERE, WKID: 3857, WKID: 102100, WKID: 102113, SHERICAL MERCATOR, WGS 84/PSEUDO-MERCATOR, OPEN LAYERS:

More information

# Import constants pi2, pip2, pip4 (2*pi, pi/2, pi/4). use Math::Trig ':pi';

# Import constants pi2, pip2, pip4 (2*pi, pi/2, pi/4). use Math::Trig ':pi'; NAME Math::Trig - trigonometric functions SYNOPSIS use Math::Trig; $x = tan(0.9); $y = acos(3.7); $z = asin(2.4); $halfpi = pi/2; $rad = deg2rad(120); # Import constants pi2, pip2, pip4 (2*pi, pi/2, pi/4).

More information

Drillstring Magnetic Interference

Drillstring Magnetic Interference Drillstring Magnetic Interference ISCWSA MWD Error Model Terms Harry Wilson ISCWSA 38, New Orleans, 3 October 2013 MWD Magnetic Azimuth Dominant error sources: Uncertainty associated with nominal declination

More information

Formulas and constants for the calculation of the Swiss conformal cylindrical projection and for the transformation between coordinate systems

Formulas and constants for the calculation of the Swiss conformal cylindrical projection and for the transformation between coordinate systems _ìåçéë~ãíñωêi~åçéëíçéçöê~ñáé lññáåéñ Ç ê~äçéíçéçöê~éüáé péñíáöéåëíê~ëëéosq `ejpmuqt~äéêå rññáåáçñéçéê~äéçáíçéçöê~ñá~ qéäéñçå HQNPNVSPONNN céçéê~älññáåéçñqçéçöê~éüó qéäéñ~ñ HQNPNVSPOQRV Formulas and constants

More information

Distance in mm from nearest latitude line to location x 150 = seconds of latitude Distance in mm between latitude 2.5 tick marks (along the sides)

Distance in mm from nearest latitude line to location x 150 = seconds of latitude Distance in mm between latitude 2.5 tick marks (along the sides) LATITUDE FORMULA FOR 1:24000 SCALE WITH 2.5 TICK MARKS Distance in mm from nearest latitude line to location x 150 = seconds of latitude Distance in mm between latitude 2.5 tick marks (along the sides)

More information

Basics of Computational Geometry

Basics of Computational Geometry Basics of Computational Geometry Nadeem Mohsin October 12, 2013 1 Contents This handout covers the basic concepts of computational geometry. Rather than exhaustively covering all the algorithms, it deals

More information

To graph the point (r, θ), simply go out r units along the initial ray, then rotate through the angle θ. The point (1, 5π 6. ) is graphed below:

To graph the point (r, θ), simply go out r units along the initial ray, then rotate through the angle θ. The point (1, 5π 6. ) is graphed below: Polar Coordinates Any point in the plane can be described by the Cartesian coordinates (x, y), where x and y are measured along the corresponding axes. However, this is not the only way to represent points

More information

September 23 rd 2010 ISCWSA Meeting Florence

September 23 rd 2010 ISCWSA Meeting Florence Could the minimum curvature wellbore reconstruction lead to unrealistic wellbore positioning? A directional step by step approach enables to address this issue Introduction Problem Positioning In SPE paper

More information

Navigational Aids 1 st Semester/2007/TF 7:30 PM -9:00 PM

Navigational Aids 1 st Semester/2007/TF 7:30 PM -9:00 PM Glossary of Navigation Terms accelerometer. A device that senses inertial reaction to measure linear or angular acceleration. In its simplest form, it consists of a case-mounted spring and mass arrangement

More information

Graphics and Interaction Transformation geometry and homogeneous coordinates

Graphics and Interaction Transformation geometry and homogeneous coordinates 433-324 Graphics and Interaction Transformation geometry and homogeneous coordinates Department of Computer Science and Software Engineering The Lecture outline Introduction Vectors and matrices Translation

More information

COMP30019 Graphics and Interaction Transformation geometry and homogeneous coordinates

COMP30019 Graphics and Interaction Transformation geometry and homogeneous coordinates COMP30019 Graphics and Interaction Transformation geometry and homogeneous coordinates Department of Computer Science and Software Engineering The Lecture outline Introduction Vectors and matrices Translation

More information

AADE-05-NTCE-67. A Gravity-Based Measurement-While-Drilling Technique Determines Borehole Azimuth From Toolface and Inclination Measurements

AADE-05-NTCE-67. A Gravity-Based Measurement-While-Drilling Technique Determines Borehole Azimuth From Toolface and Inclination Measurements AADE-05-NTCE-67 A Gravity-Based Measurement-While-Drilling Technique Determines Borehole Azimuth From Toolface and Inclination Measurements Herbert Illfelder, Ken Hamlin, Graham McElhinney - PathFinder

More information

1.1.1 Orientation Coordinate Systems

1.1.1 Orientation Coordinate Systems 1.1.1 Orientation 1.1.1.1 Coordinate Systems The velocity measurement is a vector in the direction of the transducer beam, which we refer to as beam coordinates. Beam coordinates can be converted to a

More information

To graph the point (r, θ), simply go out r units along the initial ray, then rotate through the angle θ. The point (1, 5π 6

To graph the point (r, θ), simply go out r units along the initial ray, then rotate through the angle θ. The point (1, 5π 6 Polar Coordinates Any point in the plane can be described by the Cartesian coordinates (x, y), where x and y are measured along the corresponding axes. However, this is not the only way to represent points

More information

DATA MANAGEMENT MODEL

DATA MANAGEMENT MODEL DATA MANAGEMENT MODEL InfoCoSM Arto Vuorela Vesa Roivas Jean-Pierre Houix 26-29.6.2006 INTRODUCTION This report is an intermediary report summarizing the main objectives to be reached by the end of July

More information

SSC-JE CIVIL ENGINEERING STUDY MATERIAL SURVEYING ENGINEERING STAFF SELECTION COMMISSION SURVEYING. Page 1 of 98 SSC-JE CIVIL ENGINEERING

SSC-JE CIVIL ENGINEERING STUDY MATERIAL SURVEYING ENGINEERING STAFF SELECTION COMMISSION SURVEYING. Page 1 of 98 SSC-JE CIVIL ENGINEERING Page 1 of 98 SSC-JE STAFF SELECTION COMMISSION CIVIL ENGINEERING STUDY MATERIAL ENGINEERING Page 2 of 98 SSC-JE Civil Engineering : Surveying syllabus Surveying: Principles of surveying, measurement of

More information

Ellipsoidal Gnomonic Projection via ECEF

Ellipsoidal Gnomonic Projection via ECEF x 10 6 6 4 Ellipsoidal Gnomonic Projection via ECEF 2 0-2 -4 Noel Zinn Hydrometronics LLC www.hydrometronics.com June 2010-8 -6-4 -2 0 2 4 6 8 x 10 6 Algorithm The following algorithm for an ellipsoidal

More information

Definition of Basic Polar Data Product

Definition of Basic Polar Data Product Definition of Basic Polar Data Product OPERA project 1d3: working document WD 02 03 Iwan Holleman and Gianmario Galli Date: September 22, 2003 1 1 Introduction During the OPERA project an additional deliverable

More information

Yandex.Maps API Background theory

Yandex.Maps API Background theory 8.02.2018 .. Version 1.0 Document build date: 8.02.2018. This volume is a part of Yandex technical documentation. Yandex helpdesk site: http://help.yandex.ru 2008 2018 Yandex LLC. All rights reserved.

More information

Chapter 8 Options (updated September 06, 2009)

Chapter 8 Options (updated September 06, 2009) Chapter 8 Options (updated September 06, 2009) Setting Up The Working Environment...................................................8-3 Options Library Manager.............................................................8-4

More information

Comprehensive Seismic Survey Design And Data Processing. Trimble GPSeismic TRANSFORMING THE WAY THE WORLD WORKS

Comprehensive Seismic Survey Design And Data Processing. Trimble GPSeismic TRANSFORMING THE WAY THE WORLD WORKS Comprehensive Seismic Survey Design And Data Processing Trimble GPSeismic GPSeismic GPSeismic has been continuously developed for over twenty-five years by engineers whose combined professional backgrounds

More information

SurvNET Lesson One - Processing an Assumed Coordinate System 2D Total Station Network

SurvNET Lesson One - Processing an Assumed Coordinate System 2D Total Station Network SurvNET Lesson One - Processing an Assumed Coordinate System 2D Total Station Network This tutorial is divided into two lessons covering the process of reducing and adjusting raw survey data into final

More information

In this chapter, we will investigate what have become the standard applications of the integral:

In this chapter, we will investigate what have become the standard applications of the integral: Chapter 8 Overview: Applications of Integrals Calculus, like most mathematical fields, began with trying to solve everyday problems. The theory and operations were formalized later. As early as 70 BC,

More information

Non-right Triangles: Law of Cosines *

Non-right Triangles: Law of Cosines * OpenStax-CNX module: m49405 1 Non-right Triangles: Law of Cosines * OpenStax This work is produced by OpenStax-CNX and licensed under the Creative Commons Attribution License 4.0 In this section, you will:

More information

ANGLES 4/18/2017. Surveying Knowledge FE REVIEW COURSE SPRING /19/2017

ANGLES 4/18/2017. Surveying Knowledge FE REVIEW COURSE SPRING /19/2017 FE REVIEW COURSE SPRING 2017 Surveying 4/19/2017 Surveying Knowledge 4 6 problems Angles, distances, & trigonometry Area computations Earthwork & volume computations Closure Coordinate systems State plane,

More information

Question: What are the origins of the forces of magnetism (how are they produced/ generated)?

Question: What are the origins of the forces of magnetism (how are they produced/ generated)? This is an additional material to the one in the internet and may help you to develop interest with the method. You should try to integrate some of the discussions here while you are trying to answer the

More information

Section 7.2 Volume: The Disk Method

Section 7.2 Volume: The Disk Method Section 7. Volume: The Disk Method White Board Challenge Find the volume of the following cylinder: No Calculator 6 ft 1 ft V 3 1 108 339.9 ft 3 White Board Challenge Calculate the volume V of the solid

More information

WHAT IS THE STRUVE GEODETIC ARC?

WHAT IS THE STRUVE GEODETIC ARC? WHAT IS THE STRUVE GEODETIC ARC? It has been known since ancient times that one can determine the height of any oblique triangle by knowing the exact length of one of its sides(the baseline) and two angles

More information

Flytec GPS. Distance Calculations for Competition Scoring

Flytec GPS. Distance Calculations for Competition Scoring Distance Calculations for Competition Scoring During the New Zealand Nationals there was a scoring issue regarding distance calculations prompting questions about how distances should be judged and what

More information

Alternative Solutions for RTK-GPS Applications in Building and Road Constructions

Alternative Solutions for RTK-GPS Applications in Building and Road Constructions Open Journal of Civil Engineering, 2015, 5, 312-321 Published Online September 2015 in SciRes. http://www.scirp.org/journal/ojce http://dx.doi.org/10.4236/ojce.2015.53031 Alternative Solutions for RTK-GPS

More information

Reference Systems for Surveying and Mapping CTB3310 Surveying and Mapping

Reference Systems for Surveying and Mapping CTB3310 Surveying and Mapping Delft University of Technology Reference Systems for Surveying and Mapping CTB3310 Surveying and Mapping Hans van der Marel ii The front cover shows the NAP (Amsterdam Ordnance Datum) datum point at the

More information

Horizontal and Vertical Origin Points of JGD2000 and Tsukuba VLBI observation point

Horizontal and Vertical Origin Points of JGD2000 and Tsukuba VLBI observation point Preface In Japan the geodetic datum was first determined about a hundred years ago in the Meiji era when the modern survey was inaugurated for making topographic maps all over Japan. The earth was represented

More information

Updating Autonomous Start to an RTK Field Survey (Part II)

Updating Autonomous Start to an RTK Field Survey (Part II) Updating Autonomous Start to an RTK Field Survey (Part II) Oscar R. Cantu Topcon University FTP Site For access to previously offered webinars and supporting documentation, please go to: ftp://tulive+topconuniversity.com:tulive@ftp.topconuniversity.com

More information

Trigonometry made somewhat easier

Trigonometry made somewhat easier Trigonometry made somewhat easier To understand trigonometry, it is most useful to first understand two properties of triangles: the Pythagorean theorem and the relationships between similar triangles

More information

Answers. Chapter 2. 1) Give the coordinates of the following points:

Answers. Chapter 2. 1) Give the coordinates of the following points: Answers Chapter 2 1) Give the coordinates of the following points: a (-2.5, 3) b (1, 2) c (2.5, 2) d (-1, 1) e (0, 0) f (2, -0.5) g (-0.5, -1.5) h (0, -2) j (-3, -2) 1 2) List the 48 different possible

More information

This paper was prepared for presentation at the Unconventional Resources Technology Conference held in San Antonio, Texas, USA, 1-3 August 2016.

This paper was prepared for presentation at the Unconventional Resources Technology Conference held in San Antonio, Texas, USA, 1-3 August 2016. URTeC: 2458828 Web-based Technologies for Real-time Directional Survey Quality Improvement Jarrod S. DeVerse*, Surcon Ltd., Denver, CO, United States; Stefan Maus, Magnetic Variation Services LLC, Westminster,

More information

Technical Document Compensating. for Tilt, Hard Iron and Soft Iron Effects

Technical Document Compensating. for Tilt, Hard Iron and Soft Iron Effects Technical Document Compensating for Tilt, Hard Iron and Soft Iron Effects Published: August 6, 2008 Updated: December 4, 2008 Author: Christopher Konvalin Revision: 1.2 www.memsense.com 888.668.8743 Rev:

More information

EE 570: Location and Navigation: Theory & Practice

EE 570: Location and Navigation: Theory & Practice EE 570: Location and Navigation: Theory & Practice Navigation Mathematics Tuesday 15 Jan 2013 NMT EE 570: Location and Navigation: Theory & Practice Slide 1 of 14 Coordinate Frames - ECI The Earth-Centered

More information

Part Five: Trigonometry Review. Trigonometry Review

Part Five: Trigonometry Review. Trigonometry Review T.5 Trigonometry Review Many of the basic applications of physics, both to mechanical systems and to the properties of the human body, require a thorough knowledge of the basic properties of right triangles,

More information

ENGI 3703 Surveying and Geomatics

ENGI 3703 Surveying and Geomatics Differential Level Errors We discussed the Canadian datum used in leveling and leveling methods and equipment in the field practice. However, there are a number of errors that we should consider in more

More information

Accurate Conversion of Earth-Fixed Earth-Centered Coordinates to Geodetic Coordinates

Accurate Conversion of Earth-Fixed Earth-Centered Coordinates to Geodetic Coordinates Accurate Conversion of Earth-Fixed Earth-Centered Coordinates to Geodetic Coordinates Karl Osen To cite this version: Karl Osen. Accurate Conversion of Earth-Fixed Earth-Centered Coordinates to Geodetic

More information

Module 4. Stereographic projection: concept and application. Lecture 4. Stereographic projection: concept and application

Module 4. Stereographic projection: concept and application. Lecture 4. Stereographic projection: concept and application Module 4 Stereographic projection: concept and application Lecture 4 Stereographic projection: concept and application 1 NPTEL Phase II : IIT Kharagpur : Prof. R. N. Ghosh, Dept of Metallurgical and Materials

More information

GLOBAL EDITION. Elementary Surveying. An Introduction to Geomatics FOURTEENTH EDITION. Charles D. Ghilani Paul R. Wolf

GLOBAL EDITION. Elementary Surveying. An Introduction to Geomatics FOURTEENTH EDITION. Charles D. Ghilani Paul R. Wolf GLOBAL EDITION Elementary Surveying An Introduction to Geomatics FOURTEENTH EDITION Charles D. Ghilani Paul R. Wolf Vice President and Editorial Director, ECS: Marcia Horton Executive Editor: Holly Stark

More information

NATIONAL RADIO ASTRONOMY OBSERVATORY VLA ANTENNA MEMORANDUM NO. 1. April 3, 1968 THE RELATIONSHIP BETWEEN ANTENNA SITES ON THE ARMS OF THE WYE

NATIONAL RADIO ASTRONOMY OBSERVATORY VLA ANTENNA MEMORANDUM NO. 1. April 3, 1968 THE RELATIONSHIP BETWEEN ANTENNA SITES ON THE ARMS OF THE WYE NATIONAL RADIO ASTRONOMY OBSERVATORY VLA ANTENNA MEMORANDUM NO. 1 April 3, 1968 THE RELATIONSHIP BETWEEN ANTENNA SITES ON THE ARMS OF THE WYE A. J. Burford INTRODUCTION This memorandum discusses two methods

More information

Convert Local Coordinate Systems to Standard Coordinate Systems

Convert Local Coordinate Systems to Standard Coordinate Systems BENTLEY SYSTEMS, INC. Convert Local Coordinate Systems to Standard Coordinate Systems Using 2D Conformal Transformation in MicroStation V8i and Bentley Map V8i Jim McCoy P.E. and Alain Robert 4/18/2012

More information

GEOG 4110/5100 Advanced Remote Sensing Lecture 4

GEOG 4110/5100 Advanced Remote Sensing Lecture 4 GEOG 4110/5100 Advanced Remote Sensing Lecture 4 Geometric Distortion Relevant Reading: Richards, Sections 2.11-2.17 Geometric Distortion Geometric Distortion: Errors in image geometry, (location, dimensions,

More information

TL LONGBOW v

TL LONGBOW v http://www.trantlogistics.com eric@trantlogistics.com for licensing and technical support nate@trantlogistics.com for sales and pricing USER'S MANUAL Directional Driller, Proximity, Planner Edition January

More information

13.1. Functions of Several Variables. Introduction to Functions of Several Variables. Functions of Several Variables. Objectives. Example 1 Solution

13.1. Functions of Several Variables. Introduction to Functions of Several Variables. Functions of Several Variables. Objectives. Example 1 Solution 13 Functions of Several Variables 13.1 Introduction to Functions of Several Variables Copyright Cengage Learning. All rights reserved. Copyright Cengage Learning. All rights reserved. Objectives Understand

More information

place value Thousands Hundreds Tens Units

place value Thousands Hundreds Tens Units Number add total altogether sum plus + take away subtract minus the difference multiply times lots of groups of product divide share equally remainder (rem.) digit two digit numbers three digit numbers

More information

ISO Ophthalmic instruments Corneal topographers. Instruments ophtalmiques Topographes de la cornée. Second edition

ISO Ophthalmic instruments Corneal topographers. Instruments ophtalmiques Topographes de la cornée. Second edition INTERNATIONAL STANDARD ISO 19980 Second edition 01-04-01 Ophthalmic instruments Corneal topographers Instruments ophtalmiques Topographes de la cornée Reference number ISO 19980:01(E) ISO 01 ISO 19980:01(E)

More information

Vectors and the Geometry of Space

Vectors and the Geometry of Space Vectors and the Geometry of Space In Figure 11.43, consider the line L through the point P(x 1, y 1, z 1 ) and parallel to the vector. The vector v is a direction vector for the line L, and a, b, and c

More information

Number/Computation. addend Any number being added. digit Any one of the ten symbols: 0, 1, 2, 3, 4, 5, 6, 7, 8, or 9

Number/Computation. addend Any number being added. digit Any one of the ten symbols: 0, 1, 2, 3, 4, 5, 6, 7, 8, or 9 14 Number/Computation addend Any number being added algorithm A step-by-step method for computing array A picture that shows a number of items arranged in rows and columns to form a rectangle associative

More information

Objectives for Terrain Week

Objectives for Terrain Week The Terrain Correction Chuck Connor, Laura Connor Potential Fields Geophysics: Terrain Week for Terrain Week Learn about the terrain correction The inner terrain correction Learn about The outer terrain

More information

Math For Surveyors. James A. Coan Sr. PLS

Math For Surveyors. James A. Coan Sr. PLS Math For Surveyors James A. Coan Sr. PLS Topics Covered 1) The Right Triangle 2) Oblique Triangles 3) Azimuths, Angles, & Bearings 4) Coordinate geometry (COGO) 5) Law of Sines 6) Bearing, Bearing Intersections

More information

Divisibility Rules and Their Explanations

Divisibility Rules and Their Explanations Divisibility Rules and Their Explanations Increase Your Number Sense These divisibility rules apply to determining the divisibility of a positive integer (1, 2, 3, ) by another positive integer or 0 (although

More information

HP-33S Calculator Program TM 1

HP-33S Calculator Program TM 1 Programmer: Dr. Bill Hazelton Date: March, 2005. Line Instruction Line Instruction Line Instruction T0001 LBL T U0022 STOP U0061 x < > y T0002 CL Σ U0023 RCL U U0062 x < 0? T0003 INPUT K U0024 RCL E U0063

More information

RAILWAY PROJECT Geodetic Reference System, Geodetic Control Network and Rail Construction Measurements

RAILWAY PROJECT Geodetic Reference System, Geodetic Control Network and Rail Construction Measurements RAILWAY PROJECT Geodetic Reference System, Geodetic Control Network and Rail Construction Measurements Railway Project 2 / 8 INDEX 1 Introduction... 3 2 Reference System... 3 2.1 Reference system... 3

More information

Understanding and Using Geometry, Projections, and Spatial Reference Systems in ArcGIS. Rob Juergens, Melita Kennedy, Annette Locke

Understanding and Using Geometry, Projections, and Spatial Reference Systems in ArcGIS. Rob Juergens, Melita Kennedy, Annette Locke Understanding and Using Geometry, Projections, and Spatial Reference Systems in ArcGIS Rob Juergens, Melita Kennedy, Annette Locke Introduction We want to give you a basic understanding of geometry and

More information

Lesson 7 Determining Direction. Key Terms. azimuth back azimuth degree grid azimuth grid north magnetic azimuth magnetic north true north

Lesson 7 Determining Direction. Key Terms. azimuth back azimuth degree grid azimuth grid north magnetic azimuth magnetic north true north Lesson 7 Determining Direction U.S. ARMY Key Terms J R O T C azimuth back azimuth degree grid azimuth grid north magnetic azimuth magnetic north true north WHAT YOU WILL LEARN TO DO Calculate direction

More information

DTM Based on an Ellipsoidal Squares

DTM Based on an Ellipsoidal Squares DM Based on an Ellipsoidal Squares KRZYSZOF NAUS Institute of Navigation and Hydrography Polish Naval Academy Śmidoicza 69, 8-3 Gdynia POLAND k.naus@am.gdynia.pl Abstract: - he paper presents the description

More information

Patch Test & Stability Check Report

Patch Test & Stability Check Report Patch Test & Stability Check Report Storebælt, 2009 SB Cable Project CT Offshore Final Report November, 2009 SB Cable Project November 2009 8-10 Teglbaekvej DK-8361 Hasselager Aarhus, Denmark Tel: +45

More information

ENGI 3703 Surveying and Geomatics

ENGI 3703 Surveying and Geomatics Angle Measurement: (Chapter 8) We have provided good coverage of distance measurement with total stations. However, our treatment of angle coverage will be light as this is covered adequately in the field

More information