Straw Detectors for the Large Hadron Collider. Dirk Wiedner

Size: px
Start display at page:

Download "Straw Detectors for the Large Hadron Collider. Dirk Wiedner"

Transcription

1 Straw Detectors for the Large Hadron Collider 1

2 Tracking with Straws Bd π π? B-Mesons properties? Charge parity symmetry violation? 2

3 Tracking with Straws Bd proton LHC Start 2007 π proton 14 TeV π? B-Mesons properties? 3

4 Tracking with Straws π π proton Bd proton B-Field? B-Mesons properties? Straw detector 4

5 Tracking with Straws π π proton Bd proton Track /Momentum! B-Field? B-Mesons properties? Straw detector 5

6 Drift time measurement time measurement 6

7 LHCb π π proton Bd proton B-Field? B-Mesons properties? Straw detector 7

8 LHCb π π proton Bd proton B-Field? B-Mesons properties? Straw detector 8

9 LHCb 20m 9

10 The Challenge The Goal: spacial resolution 200 m for 5 x 6m detector The conditions: 40 MHz collision rate (ev. 25 ns) >200 tracks per event 1.1 MHz Readout readout 10 krad 10

11 Straw Outer Tracker 5m Straws 6m 11

12 Straw Detector Production 12

13 Straw Detector Production two panels are mated straws in template: 100 μm precision anode wire tension test 13

14 Status of module production in HD Module 40 produced. Total of 67 modules will be built until end of the year. 14

15 Quarter Station 15

16 Quarter Station 5m Straw module 16

17 Straw Readout Electronics pulse at particle transition module: 128 straws optical Receiver board Readout board optical Receiver board optical Transmitter board Switch PC PC PC PC PC detector counting room 17

18 Straw Readout Electronics amplification/ discrimination module: 128 straws optical Receiver board Readout board optical Receiver board optical Transmitter board Switch PC PC PC PC PC detector counting room 18

19 Straw Readout Electronics time measurement t= module: 128 straws optical Transmitter board optical Receiver board Readout board optical Receiver board Switch PC PC PC PC PC detector counting room 19

20 Straw Readout Electronics 1.6 Gbit/s module: 128 straws optical Receiver board Readout board optical Receiver board optical Transmitter board Switch 120 m PC PC PC PC PC detector counting room 20

21 Straw Readout Electronics 19.2 GBit/s module: 128 straws optical Receiver board Readout board optical Receiver board optical Transmitter board Switch 2000 CPUs PC PC PC PC PC detector counting room 21

22 (OTIS) = Time to Digital Converter Readout window LHC clock (40 MHz) Signal from Preamp T coded 2+6 Bit Developed at the ASIC Lab HD now in production time resolution 0.5 ns Readout window: 75 ns 1.1 MHz readout rate 22

23 optical Transmitter board 1.6 Gbit/s throughput Jitter filter ( 7ps RMS) 23

24 optical Receiver board 19,2 Gbit/s Bit error rate <

25 Data transmission quality no ambiguities logic 1 logic 0 t=0 t=1 t=2 25

26 Full system test: 4 Modules from the production final electronics 26

27 results from e- test beam resolution [μm] 200 μm spacial resolution well met 200 μm working point 27

28 results from e- test beam 200 μm spacial resolution well met efficiency [%] 98% 98% efficiency working point 28

29 Summary 60% of straw modules produced in Heidelberg and optical readout electronics developed in Heidelberg, now in production 200 μm resolution well surpassed in full system test, all specifications are met 29

30 The PI Outer Tracker Crew management: Prof. Dr. F. Eisele and Prof. Dr. Ulrich Uwer module production and tests: Sebastian Bachmann, Iuri Bagaturi, Tanja Haas, Simon Rabenecker, Christian Rummel electronics: Jan Knopf, Ralf Muckerheide, Albert Rausch, Rudolf Rusyak, Uwe Stange, Ulrich Trunk, 30

31 Schema FE-Box TTC PC Module 4 Module 3 Module 2 Module 1 Scintillator Scintillator I²C + Laptop SiTelescope optical receivercard Stratix FE-Box 31

32 Beam profile Kanal Electron beam 7GeV Beam width 5cm 8 layers ea. 64 straws Triggerrate 1kHz noise <0.3 % 32

33 Test beam results Drift time max. 50 ns Efficiency >98% resolution better than 200 µm Readout works from straw to PC ns 33

34 ASDBLR (ATLAS DEMILL) with 12 ns shaping time 2x 8 channels per board 34

35 drift time [binary] Linearity Plot Hit Delay [ns] 35

36 front end box optical transmitter board water cooling 20W boards s 36

37 Readout board/l1-buffer Data from 24 halve modules LHCb wide standard Tasks: Deserialization Synchronization Processing Storage (60 ms = 65k Events) Ethernet data output to L1-Trigger and DAQ 37

38 LHCb Straw Detector: Momentum of charged particles 38

39 How do we meet the specs? 350 m2 of Straw detectors, 114 m2 made in HD each module 34 cm x 5 m high precision ~100 m light & tight Readout electronics from HD: Time to Digital Converters for < 1ns precision 1ns ~ 60 m Fiber optical readout with 650 GBit/s 39

The LHCb upgrade. Outline: Present LHCb detector and trigger LHCb upgrade main drivers Overview of the sub-detector modifications Conclusions

The LHCb upgrade. Outline: Present LHCb detector and trigger LHCb upgrade main drivers Overview of the sub-detector modifications Conclusions The LHCb upgrade Burkhard Schmidt for the LHCb Collaboration Outline: Present LHCb detector and trigger LHCb upgrade main drivers Overview of the sub-detector modifications Conclusions OT IT coverage 1.9

More information

The LHCb Upgrade. LHCC open session 17 February Large Hadron Collider Physics (LHCP) Conference New York, 2-7 June 2014

The LHCb Upgrade. LHCC open session 17 February Large Hadron Collider Physics (LHCP) Conference New York, 2-7 June 2014 The LHCb Upgrade LHCC open session 17 February 2010 Large Hadron Collider Physics (LHCP) Conference New York, 2-7 June 2014 Andreas Schopper on behalf of Motivation LHCb is a high precision experiment

More information

Velo readout board RB3. Common L1 board (ROB)

Velo readout board RB3. Common L1 board (ROB) Velo readout board RB3 Testing... Common L1 board (ROB) Specifying Federica Legger 10 February 2003 1 Summary LHCb Detectors Online (Trigger, DAQ) VELO (detector and Readout chain) L1 electronics for VELO

More information

First Operational Experience from the LHCb Silicon Tracker

First Operational Experience from the LHCb Silicon Tracker First Operational Experience from the LHCb Silicon Tracker 7 th International Hiroshima Symposium on Development and Application of Semiconductor Tracking Devices The LHCb Silicon Tracker Installation

More information

Electronics on the detector Mechanical constraints: Fixing the module on the PM base.

Electronics on the detector Mechanical constraints: Fixing the module on the PM base. PID meeting Mechanical implementation ti Electronics architecture SNATS upgrade proposal Christophe Beigbeder PID meeting 1 Electronics is split in two parts : - one directly mounted on the PM base receiving

More information

CMS FPGA Based Tracklet Approach for L1 Track Finding

CMS FPGA Based Tracklet Approach for L1 Track Finding CMS FPGA Based Tracklet Approach for L1 Track Finding Anders Ryd (Cornell University) On behalf of the CMS Tracklet Group Presented at AWLC June 29, 2017 Anders Ryd Cornell University FPGA Based L1 Tracking

More information

Modules and Front-End Electronics Developments for the ATLAS ITk Strips Upgrade

Modules and Front-End Electronics Developments for the ATLAS ITk Strips Upgrade Modules and Front-End Electronics Developments for the ATLAS ITk Strips Upgrade Carlos García Argos, on behalf of the ATLAS ITk Collaboration University of Freiburg International Conference on Technology

More information

Production and Quality Assurance of Detector Modules for the LHCb Silicon Tracker

Production and Quality Assurance of Detector Modules for the LHCb Silicon Tracker Production and Quality Assurance of Detector Modules for the LHCb Silicon Tracker Olaf Steinkamp for Dmytro Volyanskyy Physik-Institut der Universität Zürich 10th ICATPP Conference on Astroparticle, Particle,

More information

TORCH: A large-area detector for precision time-of-flight measurements at LHCb

TORCH: A large-area detector for precision time-of-flight measurements at LHCb TORCH: A large-area detector for precision time-of-flight measurements at LHCb Neville Harnew University of Oxford ON BEHALF OF THE LHCb RICH/TORCH COLLABORATION Outline The LHCb upgrade TORCH concept

More information

Level-1 Data Driver Card of the ATLAS New Small Wheel Upgrade Compatible with the Phase II 1 MHz Readout

Level-1 Data Driver Card of the ATLAS New Small Wheel Upgrade Compatible with the Phase II 1 MHz Readout Level-1 Data Driver Card of the ATLAS New Small Wheel Upgrade Compatible with the Phase II 1 MHz Readout Panagiotis Gkountoumis National Technical University of Athens Brookhaven National Laboratory On

More information

Endcap Modules for the ATLAS SemiConductor Tracker

Endcap Modules for the ATLAS SemiConductor Tracker Endcap Modules for the ATLAS SemiConductor Tracker RD3, Firenze, September 29 th, 23 Richard Nisius (MPI Munich) nisius@mppmu.mpg.de (For the ATLAS-SCT Collaboration) The plan of this presentation Introduction

More information

RT2016 Phase-I Trigger Readout Electronics Upgrade for the ATLAS Liquid-Argon Calorimeters

RT2016 Phase-I Trigger Readout Electronics Upgrade for the ATLAS Liquid-Argon Calorimeters RT2016 Phase-I Trigger Readout Electronics Upgrade for the ATLAS Liquid-Argon Calorimeters Nicolas Chevillot (LAPP/CNRS-IN2P3) on behalf of the ATLAS Liquid Argon Calorimeter Group 1 Plan Context Front-end

More information

The Intelligent FPGA Data Acquisition

The Intelligent FPGA Data Acquisition The Intelligent FPGA Data Acquisition Dominic Gaisbauer, Stefan Huber, Igor Konorov, Dmytro Levit, Prof. Dr. Stephan Paul, Dominik Steffen d.gaisbauer@tum.de Technische Universität München Institute for

More information

Upgrading the ATLAS Tile Calorimeter electronics

Upgrading the ATLAS Tile Calorimeter electronics ITIM Upgrading the ATLAS Tile Calorimeter electronics Gabriel Popeneciu, on behalf of the ATLAS Tile Calorimeter System INCDTIM Cluj Napoca, Romania Gabriel Popeneciu PANIC 2014, Hamburg 26th August 2014

More information

Full Offline Reconstruction in Real Time with the LHCb Detector

Full Offline Reconstruction in Real Time with the LHCb Detector Full Offline Reconstruction in Real Time with the LHCb Detector Agnieszka Dziurda 1,a on behalf of the LHCb Collaboration 1 CERN, Geneva, Switzerland Abstract. This document describes the novel, unique

More information

PoS(High-pT physics09)036

PoS(High-pT physics09)036 Triggering on Jets and D 0 in HLT at ALICE 1 University of Bergen Allegaten 55, 5007 Bergen, Norway E-mail: st05886@alf.uib.no The High Level Trigger (HLT) of the ALICE experiment is designed to perform

More information

SLAC Testbeam Data Analysis: High Occupancy Tracking & FE-I4 Cluster Study

SLAC Testbeam Data Analysis: High Occupancy Tracking & FE-I4 Cluster Study SLAC Testbeam Data Analysis: High Occupancy Tracking & FE-I4 Cluster Study DESY Summer Student Project 2014 Martin Klassen, University of Heidelberg, Germany September 27, 2014 Abstract In this report

More information

2008 JINST 3 S Online System. Chapter System decomposition and architecture. 8.2 Data Acquisition System

2008 JINST 3 S Online System. Chapter System decomposition and architecture. 8.2 Data Acquisition System Chapter 8 Online System The task of the Online system is to ensure the transfer of data from the front-end electronics to permanent storage under known and controlled conditions. This includes not only

More information

First results from the LHCb Vertex Locator

First results from the LHCb Vertex Locator First results from the LHCb Vertex Locator Act 1: LHCb Intro. Act 2: Velo Design Dec. 2009 Act 3: Initial Performance Chris Parkes for LHCb VELO group Vienna Conference 2010 2 Introducing LHCb LHCb is

More information

IEEE Nuclear Science Symposium San Diego, CA USA Nov. 3, 2015

IEEE Nuclear Science Symposium San Diego, CA USA Nov. 3, 2015 The New Front-End Electronics For the ATLAS Tile Calorimeter Phase 2 Upgrade Gary Drake Argonne National Laboratory, USA On behalf of the ATLAS TileCal System IEEE Nuclear Science Symposium San Diego,

More information

Performance of the ATLAS Inner Detector at the LHC

Performance of the ATLAS Inner Detector at the LHC Performance of the ALAS Inner Detector at the LHC hijs Cornelissen for the ALAS Collaboration Bergische Universität Wuppertal, Gaußstraße 2, 4297 Wuppertal, Germany E-mail: thijs.cornelissen@cern.ch Abstract.

More information

Construction of the Phase I upgrade of the CMS pixel detector

Construction of the Phase I upgrade of the CMS pixel detector Forward Pixel Barrel Pixel TECHNOLOGY AND INSTRUMENTATION IN PARTICLE PHYSICS 2017, May 22-26, 2017 Construction of the Phase I upgrade of the CMS pixel detector Satoshi Hasegawa Fermi National Accelerator

More information

A LVL2 Zero Suppression Algorithm for TRT Data

A LVL2 Zero Suppression Algorithm for TRT Data A LVL2 Zero Suppression Algorithm for TRT Data R. Scholte,R.Slopsema,B.vanEijk, N. Ellis, J. Vermeulen May 5, 22 Abstract In the ATLAS experiment B-physics studies will be conducted at low and intermediate

More information

Status of the TORCH time-of-flight detector

Status of the TORCH time-of-flight detector Status of the TORCH time-of-flight detector Neville Harnew University of Oxford (On behalf of the TORCH collaboration : the Universities of Bath, Bristol and Oxford, CERN, and Photek) August 7-9, 2017

More information

LHC Detector Upgrades

LHC Detector Upgrades Su Dong SLAC Summer Institute Aug/2/2012 1 LHC is exceeding expectations in many ways Design lumi 1x10 34 Design pileup ~24 Rapid increase in luminosity Even more dramatic pileup challenge Z->µµ event

More information

ATLAS, CMS and LHCb Trigger systems for flavour physics

ATLAS, CMS and LHCb Trigger systems for flavour physics ATLAS, CMS and LHCb Trigger systems for flavour physics Università degli Studi di Bologna and INFN E-mail: guiducci@bo.infn.it The trigger systems of the LHC detectors play a crucial role in determining

More information

Detector Control LHC

Detector Control LHC Detector Control Systems @ LHC Matthias Richter Department of Physics, University of Oslo IRTG Lecture week Autumn 2012 Oct 18 2012 M. Richter (UiO) DCS @ LHC Oct 09 2012 1 / 39 Detectors in High Energy

More information

Trigger Layout and Responsibilities

Trigger Layout and Responsibilities CMS EMU TRIGGER ELECTRONICS B. Paul Padley Rice University February 1999 Trigger Layout and Responsibilities Basic Requirements z Latency: < 3.2 us z Fully pipelined synchronous architecture, dead time

More information

RPC Trigger Overview

RPC Trigger Overview RPC Trigger Overview presented by Maciek Kudla, Warsaw University RPC Trigger ESR Warsaw, July 8th, 2003 RPC Trigger Task The task of RPC Muon Trigger electronics is to deliver 4 highest momentum muons

More information

Optimal Management of System Clock Networks

Optimal Management of System Clock Networks Optimal Management of System Networks 2002 Introduction System Management Is More Challenging No Longer One Synchronous per System or Card Must Design Source-Synchronous or CDR Interfaces with Multiple

More information

THE ATLAS INNER DETECTOR OPERATION, DATA QUALITY AND TRACKING PERFORMANCE.

THE ATLAS INNER DETECTOR OPERATION, DATA QUALITY AND TRACKING PERFORMANCE. Proceedings of the PIC 2012, Štrbské Pleso, Slovakia THE ATLAS INNER DETECTOR OPERATION, DATA QUALITY AND TRACKING PERFORMANCE. E.STANECKA, ON BEHALF OF THE ATLAS COLLABORATION Institute of Nuclear Physics

More information

SoLID GEM Detectors in US

SoLID GEM Detectors in US SoLID GEM Detectors in US Kondo Gnanvo University of Virginia SoLID Collaboration Meeting @ JLab, 05/07/2016 Outline Overview of SoLID GEM Trackers Design Optimization Large Area GEMs for PRad in Hall

More information

The new detector readout system for the ATLAS experiment

The new detector readout system for the ATLAS experiment LInk exange The new detector readout system for the ATLAS experiment Soo Ryu Argonne National Laboratory On behalf of the ATLAS Collaboration ATLAS DAQ for LHC Run2 (2015-2018) 40MHz L1 trigger 100kHz

More information

The GTPC Package: Tracking and Analysis Software for GEM TPCs

The GTPC Package: Tracking and Analysis Software for GEM TPCs The GTPC Package: Tracking and Analysis Software for GEM TPCs Linear Collider TPC R&D Meeting LBNL, Berkeley, California (USA) 18-19 October, 003 Steffen Kappler Institut für Experimentelle Kernphysik,

More information

APV-25 based readout electronics for the SBS front GEM Tracker

APV-25 based readout electronics for the SBS front GEM Tracker APV-25 based readout electronics for the SBS front GEM Tracker Authors: Evaristo Cisbani, Paolo Musico Date: 26/June/2014 Version: 1.0 APV-25 based readout electronics for the SBS front GEM Tracker...

More information

Results of Radiation Test of the Cathode Front-end Board for CMS Endcap Muon Chambers

Results of Radiation Test of the Cathode Front-end Board for CMS Endcap Muon Chambers Results of Radiation Test of the Cathode Front-end Board for CMS Endcap Muon Chambers B. Bylsma 1, L.S. Durkin 1, J. Gu 1, T.Y. Ling 1, M. Tripathi 2 1 Department of Physics, Ohio State University, Columbus,

More information

Fast pattern recognition with the ATLAS L1Track trigger for the HL-LHC

Fast pattern recognition with the ATLAS L1Track trigger for the HL-LHC Fast pattern recognition with the ATLAS L1Track trigger for the HL-LHC On behalf of the ATLAS Collaboration Uppsala Universitet E-mail: mikael.martensson@cern.ch ATL-DAQ-PROC-2016-034 09/01/2017 A fast

More information

Tracking and flavour tagging selection in the ATLAS High Level Trigger

Tracking and flavour tagging selection in the ATLAS High Level Trigger Tracking and flavour tagging selection in the ATLAS High Level Trigger University of Pisa and INFN E-mail: milene.calvetti@cern.ch In high-energy physics experiments, track based selection in the online

More information

3D-Triplet Tracking for LHC and Future High Rate Experiments

3D-Triplet Tracking for LHC and Future High Rate Experiments 3D-Triplet Tracking for LHC and Future High Rate Experiments André Schöning Physikalisches Institut, Universität Heidelberg Workshop on Intelligent Trackers WIT 2014 University of Pennsylvania May 14-16,

More information

BTeV at C0. p p. Tevatron CDF. BTeV - a hadron collider B-physics experiment. Fermi National Accelerator Laboratory. Michael Wang

BTeV at C0. p p. Tevatron CDF. BTeV - a hadron collider B-physics experiment. Fermi National Accelerator Laboratory. Michael Wang BTeV Trigger BEAUTY 2003 9 th International Conference on B-Physics at Hadron Machines Oct. 14-18, 2003, Carnegie Mellon University, Fermilab (for the BTeV collaboration) Fermi National Accelerator Laboratory

More information

Muon Reconstruction and Identification in CMS

Muon Reconstruction and Identification in CMS Muon Reconstruction and Identification in CMS Marcin Konecki Institute of Experimental Physics, University of Warsaw, Poland E-mail: marcin.konecki@gmail.com An event reconstruction at LHC is a challenging

More information

Adding timing to the VELO

Adding timing to the VELO Summer student project report: Adding timing to the VELO supervisor: Mark Williams Biljana Mitreska Cern Summer Student Internship from June 12 to August 4, 2017 Acknowledgements I would like to thank

More information

The CMS Computing Model

The CMS Computing Model The CMS Computing Model Dorian Kcira California Institute of Technology SuperComputing 2009 November 14-20 2009, Portland, OR CERN s Large Hadron Collider 5000+ Physicists/Engineers 300+ Institutes 70+

More information

SoLID GEM Detectors in US

SoLID GEM Detectors in US SoLID GEM Detectors in US Kondo Gnanvo University of Virginia SoLID Collaboration Meeting @ JLab, 08/26/2016 Outline Design Optimization U-V strips readout design Large GEMs for PRad in Hall B Requirements

More information

Validation of the front-end electronics and firmware for LHCb vertex locator.

Validation of the front-end electronics and firmware for LHCb vertex locator. Validation of the front-end electronics and firmware for LHCb vertex locator. Antonio Fernández Prieto Universidade de santiago de compostela, Spain E-mail: antonio.fernandez.prieto@cern.ch Pablo Vázquez

More information

Electron and Photon Reconstruction and Identification with the ATLAS Detector

Electron and Photon Reconstruction and Identification with the ATLAS Detector Electron and Photon Reconstruction and Identification with the ATLAS Detector IPRD10 S12 Calorimetry 7th-10th June 2010 Siena, Italy Marine Kuna (CPPM/IN2P3 Univ. de la Méditerranée) on behalf of the ATLAS

More information

Overview of SVT DAQ Upgrades. Per Hansson Ryan Herbst Benjamin Reese

Overview of SVT DAQ Upgrades. Per Hansson Ryan Herbst Benjamin Reese Overview of SVT DAQ Upgrades Per Hansson Ryan Herbst Benjamin Reese 1 SVT DAQ Requirements and Constraints Basic requirements for the SVT DAQ Continuous readout of 23 040 channels Low noise (S/N>20 to

More information

Charged particle detection performances of CMOS Pixel Sensors designed in a 0.18 µm CMOS process based on a high resistivity epitaxial layer

Charged particle detection performances of CMOS Pixel Sensors designed in a 0.18 µm CMOS process based on a high resistivity epitaxial layer Charged particle detection performances of CMOS Pixel Sensors designed in a 0.18 µm CMOS process based on a high resistivity epitaxial layer Jérôme Baudot on behalf of the PICSEL team of IPHC-Strasbourg

More information

THE ALFA TRIGGER SIMULATOR

THE ALFA TRIGGER SIMULATOR Vol. 46 (2015) ACTA PHYSICA POLONICA B No 7 THE ALFA TRIGGER SIMULATOR B. Dziedzic Tadeusz Kościuszko Cracow University of Technology, Institute of Physics Podchorążych 1, 30-084 Kraków, Poland K. Korcyl

More information

A flexible stand-alone testbench for facilitating system tests of the CMS Preshower

A flexible stand-alone testbench for facilitating system tests of the CMS Preshower A flexible stand-alone testbench for facilitating system tests of the CMS Preshower Paschalis Vichoudis 1,2, Serge Reynaud 1, David Barney 1, Wojciech Bialas 1, Apollo Go 3, Georgios Sidiropoulos 2, Yves

More information

The Trigger and Data Acquisition system for the NA62 experiment at CERN

The Trigger and Data Acquisition system for the NA62 experiment at CERN The Trigger and Data Acquisition system for the NA62 experiment at CERN M. Sozzi University of Pisa and INFN 11 th Pisa Meeting on Advanced Detectors Introduction for the unaware In year 2009 a.d. CERN

More information

Quad Module Hybrid Development for the ATLAS Pixel Layer Upgrade

Quad Module Hybrid Development for the ATLAS Pixel Layer Upgrade Quad Module Hybrid Development for the ATLAS Pixel Layer Upgrade Lawrence Berkeley National Lab E-mail: kedunne@lbl.gov Maurice Garcia-Sciveres, Timon Heim Lawrence Berkeley National Lab, Berkeley, USA

More information

Construction of a compact DAQ-system using DSP-based VME modules

Construction of a compact DAQ-system using DSP-based VME modules Abstract We have developed a DSP based data-acquisition syustem(daq) system, based on the DSP. The system utilizes VME boards with one or two s. Our intension was to consturct a compact DAQ framework which

More information

PSEC-4: Review of Architecture, etc. Eric Oberla 27-oct-2012

PSEC-4: Review of Architecture, etc. Eric Oberla 27-oct-2012 PSEC-4: Review of Architecture, etc. Eric Oberla 27-oct-2012 PSEC-4 ASIC: design specs LAPPD Collaboration Designed to sample & digitize fast pulses (MCPs): Sampling rate capability > 10GSa/s Analog bandwidth

More information

MiniDAQ1 A COMPACT DATA ACQUISITION SYSTEM FOR GBT READOUT OVER 10G ETHERNET 22/05/2017 TIPP PAOLO DURANTE - MINIDAQ1 1

MiniDAQ1 A COMPACT DATA ACQUISITION SYSTEM FOR GBT READOUT OVER 10G ETHERNET 22/05/2017 TIPP PAOLO DURANTE - MINIDAQ1 1 MiniDAQ1 A COMPACT DATA ACQUISITION SYSTEM FOR GBT READOUT OVER 10G ETHERNET 22/05/2017 TIPP 2017 - PAOLO DURANTE - MINIDAQ1 1 Overview LHCb upgrade Optical frontend readout Slow control implementation

More information

Improving Packet Processing Performance of a Memory- Bounded Application

Improving Packet Processing Performance of a Memory- Bounded Application Improving Packet Processing Performance of a Memory- Bounded Application Jörn Schumacher CERN / University of Paderborn, Germany jorn.schumacher@cern.ch On behalf of the ATLAS FELIX Developer Team LHCb

More information

Activity on GEM by the Rome group since last meeting

Activity on GEM by the Rome group since last meeting OLYMPUS Collaboration DESY 24/Feb/21 Activity on GEM by the Rome group since last meeting Salvatore Frullani / INFN-Rome Sanità Group 1 Outline DESY test beam 9-2 December SBS Technical Review JLab 22

More information

Scintillator-strip Plane Electronics

Scintillator-strip Plane Electronics Scintillator-strip Plane Electronics Mani Tripathi Britt Holbrook (Engineer) Juan Lizarazo (Grad student) Peter Marleau (Grad student) Tiffany Landry (Junior Specialist) Cherie Williams (Undergrad student)

More information

Time and position resolution of high granularity, high counting rate MRPC for the inner zone of the CBM-TOF wall

Time and position resolution of high granularity, high counting rate MRPC for the inner zone of the CBM-TOF wall Time and position resolution of high granularity, high counting rate MRPC for the inner zone of the CBM-TOF wall M. Petris, D. Bartos, G. Caragheorgheopol, M. Petrovici, L. Radulescu, V. Simion IFIN-HH

More information

The Belle Silicon Vertex Detector. T. Tsuboyama (KEK) 6 Dec Workshop New Hadrons with Various Flavors 6 7 Dec Nagoya Univ.

The Belle Silicon Vertex Detector. T. Tsuboyama (KEK) 6 Dec Workshop New Hadrons with Various Flavors 6 7 Dec Nagoya Univ. The Belle Silicon Vertex Detector T. Tsuboyama (KEK) 6 Dec. 2008 Workshop New Hadrons with Various Flavors 6 7 Dec. 2008 Nagoya Univ. Outline Belle Silicon vertex detector Upgrade plan R&D and beam tests

More information

Beam test measurements of the Belle II vertex detector modules

Beam test measurements of the Belle II vertex detector modules Beam test measurements of the Belle II vertex detector modules Tadeas Bilka Charles University, Prague on behalf of the Belle II Collaboration IPRD 2016, 3 6 October 2016, Siena, Italy Outline Belle II

More information

LHCb Online System BEAUTY-2002

LHCb Online System BEAUTY-2002 BEAUTY-2002 8th International Conference on B-Physics at Hadron machines June 17-21 2002 antiago de Compostela, Galicia (pain ) Niko Neufeld, CERN EP (for the LHCb Online Team) 1 Mission The LHCb Online

More information

GEANT4 is used for simulating: RICH testbeam data, HCAL testbeam data. GAUSS Project: LHCb Simulation using GEANT4 with GAUDI.

GEANT4 is used for simulating: RICH testbeam data, HCAL testbeam data. GAUSS Project: LHCb Simulation using GEANT4 with GAUDI. Status of GEANT4 in LHCb S. Easo, RAL, 30-9-2002 The LHCbexperiment. GEANT4 is used for simulating: RICH testbeam data, HCAL testbeam data. GAUSS Project: LHCb Simulation using GEANT4 with GAUDI. Summary.

More information

Burn-In Software Development. Taras Fedorchuk, Taras Shevchenko National University of Kyiv 3rd September 2018

Burn-In Software Development. Taras Fedorchuk, Taras Shevchenko National University of Kyiv 3rd September 2018 Burn-In Software Development Taras Fedorchuk, Taras Shevchenko National University of Kyiv 3rd September 2018 LHC Schedule Higher integrated luminosity higher radiation dose = Radiation damage to the detector!!

More information

CSC Trigger Motherboard

CSC Trigger Motherboard CSC Trigger Motherboard Functions of TMB Tests: Performance at summer 2003 test beam Radiation, magnetic fields, etc. Plans for TMB production and testing 1 Cathode LCT CSC Trigger Requirements Identify

More information

The performance of the ATLAS Inner Detector Trigger Algorithms in pp collisions at the LHC

The performance of the ATLAS Inner Detector Trigger Algorithms in pp collisions at the LHC X11 opical Seminar IPRD, Siena - 7- th June 20 he performance of the ALAS Inner Detector rigger Algorithms in pp collisions at the LHC Mark Sutton University of Sheffield on behalf of the ALAS Collaboration

More information

Alignment of the ATLAS Inner Detector tracking system

Alignment of the ATLAS Inner Detector tracking system Alignment of the ATLAS Inner Detector tracking system Instituto de Física Corpuscular (IFIC), Centro Mixto UVEG-CSIC, Apdo.22085, ES-46071 Valencia, E-mail: Regina.Moles@ific.uv.es The ATLAS experiment

More information

Electronics, Trigger and Data Acquisition part 3

Electronics, Trigger and Data Acquisition part 3 Electronics, Trigger and Data Acquisition part 3 Summer Student Programme 2016, CERN Roberto Ferrari Instituto Nazionale di Fisica Nucleare roberto.ferrari@pv.infn.it Event Building 2 Two Philosophies

More information

Integrated CMOS sensor technologies for the CLIC tracker

Integrated CMOS sensor technologies for the CLIC tracker Integrated CMOS sensor technologies for the CLIC tracker Magdalena Munker (CERN, University of Bonn) On behalf of the collaboration International Conference on Technology and Instrumentation in Particle

More information

Charged Particle Tracking at Cornell: Gas Detectors and Event Reconstruction

Charged Particle Tracking at Cornell: Gas Detectors and Event Reconstruction Charged Particle Tracking at Cornell: Gas Detectors and Event Reconstruction Dan Peterson, Cornell University The Cornell group has constructed, operated and maintained the charged particle tracking detectors

More information

ATLAS ITk Layout Design and Optimisation

ATLAS ITk Layout Design and Optimisation ATLAS ITk Layout Design and Optimisation Noemi Calace noemi.calace@cern.ch On behalf of the ATLAS Collaboration 3rd ECFA High Luminosity LHC Experiments Workshop 3-6 October 2016 Aix-Les-Bains Overview

More information

Direct photon measurements in ALICE. Alexis Mas for the ALICE collaboration

Direct photon measurements in ALICE. Alexis Mas for the ALICE collaboration Direct photon measurements in ALICE Alexis Mas for the ALICE collaboration 1 Outline I - Physics motivations for direct photon measurements II Direct photon measurements in ALICE i - Conversion method

More information

The Progress of TOF on BESIII

The Progress of TOF on BESIII The Progress of TOF on BESIII Yuekun Heng 1, Chong Wu 1, Zhijia Sun 1, Li Zhao 1,2, Cheng Li 2, Qi An 2, Shubin Liu 2, Jinjie Wu 2, Yuda Zhao 1,3, Fengmei Wang 1,4, Xiaojian Zhao 1, Feng Shi 1, Zhenghua

More information

The ALICE TPC Readout Control Unit 10th Workshop on Electronics for LHC and future Experiments September 2004, BOSTON, USA

The ALICE TPC Readout Control Unit 10th Workshop on Electronics for LHC and future Experiments September 2004, BOSTON, USA Carmen González Gutierrez (CERN PH/ED) The ALICE TPC Readout Control Unit 10th Workshop on Electronics for LHC and future Experiments 13 17 September 2004, BOSTON, USA Outline: 9 System overview 9 Readout

More information

LHC-B. 60 silicon vertex detector elements. (strips not to scale) [cm] [cm] = 1265 strips

LHC-B. 60 silicon vertex detector elements. (strips not to scale) [cm] [cm] = 1265 strips LHCb 97-020, TRAC November 25 1997 Comparison of analogue and binary read-out in the silicon strips vertex detector of LHCb. P. Koppenburg 1 Institut de Physique Nucleaire, Universite de Lausanne Abstract

More information

FELI. : the detector readout upgrade of the ATLAS experiment. Soo Ryu. Argonne National Laboratory, (on behalf of the FELIX group)

FELI. : the detector readout upgrade of the ATLAS experiment. Soo Ryu. Argonne National Laboratory, (on behalf of the FELIX group) LI : the detector readout upgrade of the ATLAS experiment Soo Ryu Argonne National Laboratory, sryu@anl.gov (on behalf of the LIX group) LIX group John Anderson, Soo Ryu, Jinlong Zhang Hucheng Chen, Kai

More information

Tracking and Vertex reconstruction at LHCb for Run II

Tracking and Vertex reconstruction at LHCb for Run II Tracking and Vertex reconstruction at LHCb for Run II Hang Yin Central China Normal University On behalf of LHCb Collaboration The fifth Annual Conference on Large Hadron Collider Physics, Shanghai, China

More information

The First Integration Test of the ATLAS End-Cap Muon Level 1 Trigger System

The First Integration Test of the ATLAS End-Cap Muon Level 1 Trigger System 864 IEEE TRANSACTIONS ON NUCLEAR SCIENCE, VOL. 50, NO. 4, AUGUST 2003 The First Integration Test of the ATLAS End-Cap Muon Level 1 Trigger System K. Hasuko, H. Kano, Y. Matsumoto, Y. Nakamura, H. Sakamoto,

More information

Performance of the MRPC based Time Of Flight detector of ALICE at LHC

Performance of the MRPC based Time Of Flight detector of ALICE at LHC Performance of the MRPC based Time Of Flight detector of ALICE at LHC (for the ALICE Collaboration) Museo Storico della Fisica e Centro Studi e Ricerche "Enrico Fermi", Rome, Italy Dipartimento di Fisica

More information

CSCS CERN videoconference CFD applications

CSCS CERN videoconference CFD applications CSCS CERN videoconference CFD applications TS/CV/Detector Cooling - CFD Team CERN June 13 th 2006 Michele Battistin June 2006 CERN & CFD Presentation 1 TOPICS - Some feedback about already existing collaboration

More information

The Phase-2 ATLAS ITk Pixel Upgrade

The Phase-2 ATLAS ITk Pixel Upgrade The Phase-2 ATLAS ITk Pixel Upgrade T. Flick (University of Wuppertal) - on behalf of the ATLAS collaboration 14th Topical Seminar on Innovative Particle and Radiation Detectors () 03.-06. October 2016

More information

The First Integration Test of the ATLAS End-cap Muon Level 1 Trigger System

The First Integration Test of the ATLAS End-cap Muon Level 1 Trigger System The First Integration Test of the ATLAS End-cap Muon Level 1 Trigger System K.Hasuko, H.Kano, Y.Matsumoto, Y.Nakamura, H.Sakamoto, T.Takemoto, C.Fukunaga, Member, IEEE,Y.Ishida, S.Komatsu, K.Tanaka, M.Ikeno,

More information

Timing distribution and Data Flow for the ATLAS Tile Calorimeter Phase II Upgrade

Timing distribution and Data Flow for the ATLAS Tile Calorimeter Phase II Upgrade Timing distribution and Data Flow for the ATLAS Tile Calorimeter Phase II Upgrade Fernando Carrió Argos on behalf of the ATLAS Tile Calorimeter Group Tile Calorimeter Segmented calorimeter of steel plates

More information

GEM TPC Anode Pad Shape Studies

GEM TPC Anode Pad Shape Studies GEM TPC Anode Pad Shape Studies a,b, S. Kappler a,c, B. Ledermann a, Th. Müller a, M. Ronan d TPC-Application Workshop Berkeley, 04/08/2006 a b SLAC, Menlo Park, USA c RWTH, Aachen d LBNL, Berkeley, USA

More information

Preparation for the test-beam and status of the ToF detector construction

Preparation for the test-beam and status of the ToF detector construction Preparation for the test-beam and status of the ToF detector construction C.Betancourt, A.Korzenev*, P.Mermod HPTPC-ToF meeting May 3, 2018 1 ToF and trigger Channels of the ToF DAQ system are self-triggered

More information

Front end electronics and system design for the NUSTAR experiments at the FAIR facility. FEE 2006 Workshop

Front end electronics and system design for the NUSTAR experiments at the FAIR facility. FEE 2006 Workshop Front end electronics and system design for the NUSTAR experiments at the FAIR facility Presented by Ian Lazarus on behalf of NUSTAR collaboration FEE 2006 Workshop Ian Lazarus NPG, CCLRC Daresbury Overview

More information

Investigation of Proton Induced Radiation Effects in 0.15 µm Antifuse FPGA

Investigation of Proton Induced Radiation Effects in 0.15 µm Antifuse FPGA Investigation of Proton Induced Radiation Effects in 0.15 µm Antifuse FPGA Vlad-Mihai PLACINTA 1,2, Lucian Nicolae COJOCARIU 1, Florin MACIUC 1 1. Horia Hulubei National Institute for R&D in Physics and

More information

Simulation of digital pixel readout chip architectures with the RD53 SystemVerilog-UVM verification environment using Monte Carlo physics data

Simulation of digital pixel readout chip architectures with the RD53 SystemVerilog-UVM verification environment using Monte Carlo physics data Journal of Instrumentation OPEN ACCESS Simulation of digital pixel readout chip architectures with the RD53 SystemVerilog-UVM verification environment using Monte Carlo physics data To cite this article:

More information

Ignacy Kudla, Radomir Kupczak, Krzysztof Pozniak, Antonio Ranieri

Ignacy Kudla, Radomir Kupczak, Krzysztof Pozniak, Antonio Ranieri *** Draft *** 15/04/97 *** MK/RK/KTP/AR *** ***use color print!!!*** RPC Muon Trigger Detector Control Ignacy Kudla, Radomir Kupczak, Krzysztof Pozniak, Antonio Ranieri $Ã&06 Ã*(1(5$/ RPC Muon Trigger

More information

First LHCb measurement with data from the LHC Run 2

First LHCb measurement with data from the LHC Run 2 IL NUOVO CIMENTO 40 C (2017) 35 DOI 10.1393/ncc/i2017-17035-4 Colloquia: IFAE 2016 First LHCb measurement with data from the LHC Run 2 L. Anderlini( 1 )ands. Amerio( 2 ) ( 1 ) INFN, Sezione di Firenze

More information

The LHCb VERTEX LOCATOR performance and VERTEX LOCATOR upgrade

The LHCb VERTEX LOCATOR performance and VERTEX LOCATOR upgrade Journal of Instrumentation OPEN ACCESS The LHCb VERTEX LOCATOR performance and VERTEX LOCATOR upgrade To cite this article: P Rodríguez Pérez Related content - Upgrade of the LHCb Vertex Locator A Leflat

More information

TEST, QUALIFICATION AND ELECTRONICS INTEGRATION OF THE ALICE SILICON PIXEL DETECTOR MODULES

TEST, QUALIFICATION AND ELECTRONICS INTEGRATION OF THE ALICE SILICON PIXEL DETECTOR MODULES TEST, QUALIFICATION AND ELECTRONICS INTEGRATION OF THE ALICE SILICON PIXEL DETECTOR MODULES I.A.CALI 1,2, G.ANELLI 2, F.ANTINORI 3, A.BADALA 4, A.BOCCARDI 2, G.E.BRUNO 1, M.BURNS 2, M.CAMPBELL 2, M.CASELLE

More information

Upgrade of the ATLAS Level-1 Trigger with event topology information

Upgrade of the ATLAS Level-1 Trigger with event topology information Upgrade of the ATLAS Level-1 Trigger with event topology information E. Simioni 1, S. Artz 1, B. Bauß 1, V. Büscher 1, K. Jakobi 1, A. Kaluza 1, C. Kahra 1, M. Palka 2, A. Reiß 1, J. Schäffer 1, U. Schäfer

More information

Data Quality Monitoring Display for ATLAS experiment

Data Quality Monitoring Display for ATLAS experiment Data Quality Monitoring Display for ATLAS experiment Y Ilchenko 1, C Cuenca Almenar 2, A Corso-Radu 2, H Hadavand 1, S Kolos 2, K Slagle 2, A Taffard 2 1 Southern Methodist University, Dept. of Physics,

More information

Determination of the aperture of the LHCb VELO RF foil

Determination of the aperture of the LHCb VELO RF foil LHCb-PUB-214-12 April 1, 214 Determination of the aperture of the LHCb VELO RF foil M. Ferro-Luzzi 1, T. Latham 2, C. Wallace 2. 1 CERN, Geneva, Switzerland 2 University of Warwick, United Kingdom LHCb-PUB-214-12

More information

Trigger and Data Acquisition at the Large Hadron Collider

Trigger and Data Acquisition at the Large Hadron Collider Trigger and Data Acquisition at the Large Hadron Collider Acknowledgments (again) This overview talk would not exist without the help of many colleagues and all the material available online I wish to

More information

A Triple-GEM Detector with Pixel Readout for High-Rate Beam Tracking

A Triple-GEM Detector with Pixel Readout for High-Rate Beam Tracking A Triple-GEM Detector with Pixel Readout for High-Rate Beam Tracking A. Austregesilo, F. Haas, B. Ketzer, I. Konorov, M. Krämer, A. Mann, T. Nagel, S. Paul TU München, Physik Department E18 11 th Vienna

More information

Performance of the GlueX Detector Systems

Performance of the GlueX Detector Systems Performance of the GlueX Detector Systems GlueX-doc-2775 Gluex Collaboration August 215 Abstract This document summarizes the status of calibration and performance of the GlueX detector as of summer 215.

More information

Readout Systems. Liquid Argon TPC Analog multiplexed ASICs SiPM arrays. CAEN 2016 / 2017 Product Catalog

Readout Systems. Liquid Argon TPC Analog multiplexed ASICs SiPM arrays. CAEN 2016 / 2017 Product Catalog Readout Systems Liquid Argon TPC Analog multiplexed ASICs SiPM arrays CAEN 2016 / 2017 Product Catalog 192 Readout Systems SY2791 Liquid Argon TPC Readout System The SY2791 is a complete detector readout

More information

arxiv:physics/ v1 [physics.ins-det] 18 Dec 1998

arxiv:physics/ v1 [physics.ins-det] 18 Dec 1998 Studies of 1 µm-thick silicon strip detector with analog VLSI readout arxiv:physics/981234v1 [physics.ins-det] 18 Dec 1998 T. Hotta a,1, M. Fujiwara a, T. Kinashi b, Y. Kuno c, M. Kuss a,2, T. Matsumura

More information