1 Rapid Deployment of a Post-Wildfire Flood Warning Network for Sonoma County Presented by: Scott Bores, Manager Field Engineering Charles Yost, Meteorologist 1
2 North Bay Wildfires of 2017 Tubbs Fire 36,807 Acres 22 Deaths 5,643 Structures Destroyed Nuns Fire 56,556 Acres 3 Deaths 1,355 Structures Destroyed 37 Fire 1,660 Acres 25 Structures Destroyed 2
3 Enhanced Flash Flooding Risk Debris Flows Advanced Early Warning Protection of life and property Need for Post Fire Flood Warning 3
4 Tubbs Fire Timeline Oct 8: Fire starts Oct 10: 0% containment 27,000 acres Oct 14: 50% containment 35,470 acres Oct 21: 94% containment 36,793 acres Oct 31: 100% containment 36,807 acres Perfect Storm Rainy Season Officially starts October 1 Usually first storms in November Unpredictable long term forecast Just last year 4
5 Project Timeline Completed in under 2 months JAN 17, 2018 FEB 28, 2018 Contract Quickly approving contract. Design Site placement, Radio Path Analysis, TDMA planning. Integration Working with Napa County. Leverage what is available. Installation Feb 26: In just 3 days - 22 Gauge Stations fully operational. Completion Fully functional ALERT2 flood warning network by Feb 28. 5
6 System Design Parts of an ALERT2 System Design Integration Software Hardware Installation
7 System Design Parts of an ALERT2 System 01 Design 02 Integration 03 Software 04 Hardware 05 Installation
8 01 Design 22 proposed locations 10 Rain / Stage 12 Rain Only Leverage existing USGS, CDEC, HADS, METAR sites Utilize Napa County Backbone Mt. St. Helena Repeater Adding base receive capability at Water Agency Office 8
9 01 Design Theoretical Path Analysis Determine if proposed locations will be received at the base station Is a repeater necessary to complete the task? Will some locations not be feasible? Redundancy? 9
10 01 Design ALERT2 System Layout Hybrid Network 1 Frequency Gauge to Base Gauge to Repeater 10
11 System Design Parts of an ALERT2 System 01 Design 02 Integration 03 Software 04 Hardware 05 Installation
12 02 Integration TDMA 120 Second frame length, shared with Napa 20 Seconds of frame blocked off for Sonoma Calculate repeater loading 31B for rain/stage, 500 ms slot 75B Allows 112 gauges for Napa, 40 for Sonoma 12
13 System Design Parts of an ALERT2 System 01 Design 02 Integration 03 Software 04 Hardware 05 Installation
14 03 Needed complete redundant solution Monitoring and notification most important Resilient Fast deployment Public gauges can initially be used Strong alarming Software Needs Parts of an ALERT2 System Ability to capture multiple sources of data and information Share data with public 14
15 03 Software Parts of an ALERT2 System Contrail Base Station + Contrail Server (locally installed) (remotely hosted) Contrail Server fast deployment Immediately start collecting USGS data Ready for network backbone Public website for outreach Virtualized base station software Servers replicate Redundant backup Hosted server takes brunt from public ALERT2 and Maintenance tools Inventory plus ALERT2 TDMA Manager 15
16 03 Software Parts of an ALERT2 System 16
17 System Design Parts of an ALERT2 System 01 Design 02 Integration 03 Software 04 Hardware 05 Installation
18 04 Hardware ALERT2 High Sierra Electronics Transmitter Keller Acculevel Pressure Transducer High Sierra Electronics Tipping Bucket High Sierra Electronics 1012 ALERT2 Decoder High Sierra Electronics Standpipes High Sierra Electronics Solar Panels Decagon Soil Moisture Sensors 18
19 System Design Parts of an ALERT2 System 01 Design 02 Integration 03 Software 04 Hardware 05 Installation
20 05 Installation Phase 1 Phase II Phase III Visit potential site locations. Physical Path Analysis Flag locations, conduit runs, 811 Discuss access and required equipment Infrastructure Installation Install standpipes and top section Install conduit Base station antenna Install Transmitters Install and calibrate pressure transducers Perform preventative maintenance Validate data 20
21 BALD MTN 21
22 Mccrea Trail 22
23 23
24 Data System fully operational on February 28 th 2.0+ Inches of rain started to fall on Feb 29 th First test of system Over 10 Inches of rain since system implemented 24
25 Data Sonoma Creek Downstream Calabazas 25
26 Data Rain Gauge Comparison 26
27 Future 3 Additional sites being installed next week Soil Moisture sensors to monitor ground saturation 6 Sensors per location assorted depths, 5 cm to 100 cm SDI-12 Water Quality Other Partner Networks Expansion of Network Soil Moisture Water Quality 27
28 Things to Consider for Quick Deployment Permitting Focus on right of ways Limit permitting Start early FCC Leverage what s available Existing neighboring networks USGS, HADS, METAR, CDEC Path Analysis Information & Technology Don t forget about I.T. Consider firewalls, DNS Servers, Networking Sales & Contracting Start discussing early Allow extra time for contracting process Other telemetry trypes Installation Flag and paint all locations Call 811 Discuss installation plans Vendors Partial shipments Expedited delivery Give heads up of incoming orders 28
29 29 Partnerships The key to success
30 Scott Bores and his staff at OneRain were instrumental in helping the Sonoma County Water Agency plan and implement a fully functional ALERT2 flood warning network within 3 months of having Board authorization for the project. The need on the heels of the October fires was imminent, and the pace at which we had to act was daunting. OneRain definitely stepped up to the plate to help us navigate this rapid deployment of our gage network. Their expertise and professionalism were invaluable throughout the process. Jay Jasperse Chief Engineer Sonoma County Water Agency 30
31 Thank You U.S. HEADQUARTERS OneRain Incorporated 1531 Skyway Drive Longmont, Colorado T: sonoma.onerain.com 31
County of Sonoma Agenda Item Summary Report
County of Sonoma Agenda Item Summary Report Agenda Item Number: 26 (This Section for use by Clerk of the Board Only.) Clerk of the Board 575 Administration Drive Santa Rosa, CA 95403 To: Board of Directors,
More informationWaste Water Collection System Wireless Monitoring Solutions
Waste Water Collection System Wireless Monitoring Solutions SSO Lift Station Rainfall Flow Meters Ground Water Flap Gate Pressure Relief Valve CSO Flow with A/V Sensor Waste Water Collection Monitoring
More informationWater Distribution System Wireless Monitoring Solutions
Water Distribution System Wireless Monitoring Solutions Pump Station Aquifer Level Tank Level Reservoir Level Rainfall Mag Meter Flow Hydrant Pressure Water Meter Flow Water Quality Water Hammer Pressure
More informationStandard F2P2 Messages
Standard F2P2 Messages F2P2 is short for UDFCD s Flash Flood Prediction Program Serving the greater Denver metropolitan area since 1979 in cooperation with NOAA s National Weather Service Standard Messages
More informationHL20-A Measurement and Control System
HL20-A Measurement and Control System HL20-A data acquisition system is a powerful data acquisition system suitable for various applications including meteorology, hydrology, ambient air pollution, agriculture,
More informationPRO11. Weather Station CaipoBase
Product Catalogue 2014 PRODUCT CATALOG PRO11. Weather Station CaipoBase... 3 PRO33. Rain Monitoring System CaipoRain... 4 PRO80. Soil Moisture system CaipoSM... 5 PRO58. Caipo-Mini. Caipos & Davis ISS...
More informationBUDGET WORKSHOP
1 2016-2018 BUDGET WORKSHOP Fire Eric L. Peterson Fire Chief Administration & Support Fire Prevention Emergency Operations 2 Overarching Business Trends Increased Property Tax Revenue Allows Fire to Address
More informationStem Beach Solar 1041 Application
Stem Beach Solar 1041 Application September 18 th, 2018 By: Stem Beach Solar LLC, Invenergy LLC 1401 17 th Street, Ste 1100 Denver, Colorado 80202 For: Pueblo County Agenda 1. About Invenergy 2. Project
More informationimetos ECO D3 USER MANUAL Version 1.0,
imetos ECO D3 USER MANUAL Version 1.0, 05-2018 Thank you for choosing an imetos for monitoring soil moisture data, agrometeorological variables and other environmental conditions. The imetos ECO D3 has
More informationEmergency Management Update. June 2018
Emergency Management Update June 2018 Overview 1. Emergency Management Guide Auditor General for Local Governments 2. Next Generation Radio System 3. Information Systems 4. 2018 Full Scale Earthquake Exercise
More informationProject Title: Dense distributed environmental sensing via wireless sensor networks
CONTINUING PROJECT REPORT YEAR: 2 (2011) WTFRC Project Number: TR-09-909 Project Title: Dense distributed environmental sensing via wireless sensor networks PI: George Kantor Organization: Sensible Machines,
More information2D Large Scale Automated Engineering for FEMA Floodplain Development in South Dakota. Eli Gruber, PE Brooke Conner, PE
2D Large Scale Automated Engineering for FEMA Floodplain Development in South Dakota Eli Gruber, PE Brooke Conner, PE Project Acknowledgments FEMA Region 8 Staff: Brooke Conner, PE Casey Zuzak, GISP Ryan
More informationPROFESSIONAL WIRELESS WEATHER STATION. Operation Manual - 1 -
PROFESSIONAL WIRELESS WEATHER STATION Operation Manual - 1 - OVERVIEW Outdoor sensor: 1. Wind Vane 2. Wind Speed Sensor 3. Solar panel 4. Battery compartment 5. LED Indicator: light on for 4 seconds during
More informationFlash Flood Guidance System with Global Coverage
Flash Flood Guidance System with Global Coverage Robert Jubach General Manager Hydrologic Research Center A Non-profit, Public Benefit Corporation http://www.hrc-lab.org Introduction Discuss a GLOBAL initiative
More informationUSGv6: US Government. IPv6 Transition Activities 11/04/2010 DISCOVER THE TRUE VALUE OF TECHNOLOGY
USGv6: US Government Dale Geesey Chief Operating Officer Auspex Technologies, LLC Phone: 703.319.1925 Fax: 866.873.1277 E-mail: dgeesey@auspextech.com Web: www.auspextech.com IPv6 Transition Activities
More informationFY Eric L. Peterson Fire Chief. Administration & Support. Emergency Operations. Fire Prevention ONE COUNTY. ONE FUTURE.
FY 2018 19 Eric L. Peterson Fire Chief Administration & Support Fire Prevention Emergency Operations ONE COUNTY. ONE FUTURE. KEY CHALLENGES / EMERGING ISSUES Dispatch service delivery improvements Wildfires,
More informationInformation Technology Procedure IT 3.4 IT Configuration Management
Information Technology Procedure IT Configuration Management Contents Purpose and Scope... 1 Responsibilities... 1 Procedure... 1 Identify and Record Configuration... 2 Document Planned Changes... 3 Evaluating
More informationSensor Technology. Summer School: Advanced Microsystems Technologies for Sensor Applications
Sensor Technology Summer School: Universidade Federal do Rio Grande do Sul (UFRGS) Porto Alegre, Brazil July 12 th 31 st, 2009 1 Outline of the Lecture: Philosophy of Sensing Instrumentation and Systems
More informationJourney to Secure and Automated Multi-cloud
Journey to Secure and Automated Multi-cloud 2018 Mark Hinckley WW SE and Partner Enablement Juniper Networks Agenda Evolution of Value [Chain] Rise of Enterprise Multicloud Network as the Security Platform
More information2 ESF 2 Communications
2 ESF 2 Communications THIS PAGE LEFT BLANK INTENTIONALLY Table of Contents 1 Introduction... 1 1.1 Purpose and Scope... 1 1.2 Relationship to Other ESF Annexes... 1 1.3 Policies and Agreements... 1 2
More informationUSERS CONFERENCE Copyright 2016 OSIsoft, LLC
HRSD - Bringing Time and Space Together for Operational Awareness in Waste Water Presented by Kimberly Peterson, Data Analysis Manager, HRSD Clay Wise, Chief of IT Operations & Support, HRSD Agenda Outline
More informationManaging a Million Data Points: A How-To Guide
Managing a Million Data Points: A How-To Guide Kimberly A. Coffie 1, Sarah A. Crawford 1, David L. Lane 1 Hampton Roads Sanitation District, Virginia Beach, VA 23455 Email: kcoffie@hrsd.com ABSTRACT The
More informationGENERATOR ADDENDUM TO MAGNOLIA GARDENS ASSISTED LIVING COMPREHENSIVE EMERGENCY MANAGEMENT PLAN
Contact Person: Philip McCollum - Administrator Magnolia Gardens Assisted Living AL Lic# 10314 3800 62 nd Avenue North Pinellas Park, FL 33781 Phone: 727.489.6440 GENERATOR ADDENDUM TO MAGNOLIA GARDENS
More informationBusiness Continuity and Disaster Recovery. Pennsylvania Emergency Management Agency (PEMA) Satellite Warning System/Rapid Notification Network
Business Continuity and Disaster Recovery Pennsylvania Emergency Management Agency (PEMA) Satellite Warning System/Rapid Notification Network Executive Summary Too often emergency management communication
More informationReston Town Center North Development. Community Update
Reston Town Center North Development Community Update May 31, 2017 1 Presentation Agenda Project Overview Site and Current Property Ownerships Development Plan/Grid of Streets Proposed Ownership Comprehensive
More informationTaking Government Cloud Adoption to the Next Level: In Brief. Quick tips & facts about cloud adoption from GovLoop
Taking Government Cloud Adoption to the Next Level: In Brief Quick tips & facts about cloud adoption from GovLoop Executive Summary With cloud firmly established in government, agencies are looking at
More informationResponse to Wood Buffalo Wildfire KPMG Report. Alberta Municipal Affairs
Response to Wood Buffalo Wildfire KPMG Report Alberta Municipal Affairs Background To ensure continuous enhancement and improvement of Alberta s public safety system, the Alberta Emergency Management Agency
More informationAll you need for data communications. Turnkey Solutions
All you need for data communications Turnkey Solutions Global presence Wireless data communications since 1986 SATEL SATEL is a Finnish telecommunications company that specialises in mission critical wireless
More informationPRO194. IrriWave Wireless Irrigation Control
Product Catalogue 2016 PRODUCT CATALOG PRO194. IrriWave Wireless Irrigation Control... 3 PRO11. Weather Station CaipoBase... 4 PRO11. Weather Station CaipoBaseLite... 5 PRO33. Rain Monitoring System CaipoRain...
More informationOutreach and Mitigation: A Convenient Partnership in Loss Reduction. Scott Schelling and Carver Struve, CFM
Outreach and Mitigation: A Convenient Partnership in Loss Reduction Scott Schelling and Carver Struve, CFM Purpose = Program Transformation Goal = Process Integration Risk Identification Community Engagement
More informationL&J engineering s Wireless Systems. Wireless Level Gauging. company
L&J engineering s Wireless Systems Wireless Level Gauging an company evolving wireless solutions Reliability. Convenience. Simplicity. L&J Engineering s line of wireless-ready products for the inventory
More informationInformation Needs and Flow for Disaster Management
Information Needs and Flow for Disaster Management WU Guoxiang Chief, Space Technology Applications Section Information, Communication and Space Technology Division UN ESCAP Disaster reduction measures
More informationErate 2.1 Category 1 Financials
Erate 2.1 Category 1 Financials Agenda Current Landscape in Texas and Category One Driving to Modernization Order Compliance Key Decisions to Success Resources Available to the Districts Securing the Future
More informationProposed Partnership: Toronto Mesh and the Campus Co-op
Proposed Partnership: Toronto Mesh and the Campus Co-op Developing Mesh Network Infrastructure for Resilience, Education, and Other Benefits Prepared by Dawn Walker and Milan Ilnyckyj 2018-01-19 In this
More informationReal-Time Health Monitoring of Civil Works to Enhance Emergency Action
Real-Time Health Monitoring of Civil Works to Enhance Emergency Action 2009 Dr. W. Allen Marr, PE President and CEO Geocomp Corporation Andrew R. Sachs Vice President for Crisis & Consequence Management
More informationVTA s BART Silicon Valley Phase II Extension Project San Jose Downtown Association
VTA s BART Silicon Valley Phase II Extension Project San Jose Downtown Association August 24, 2017 THANK YOU! San Jose Downtown Association for inviting us & San Jose First United Methodist Church for
More informationCouncil, 26 March Information Technology Report. Executive summary and recommendations. Introduction
Council, 26 March 2014 Information Technology Report Executive summary and recommendations Introduction This report sets out the main activities of the Information Technology Department since the last
More informationCTS-iCPE Gateway Controller User s Manual Version: Revision B1
CTS-iCPE Gateway Controller User s Manual Version: Revision B1 Trademarks Contents are subject to revision without prior notice. All other trademarks remain the property of their respective owners. Copyright
More informationSoutheast Florida Regional Climate Change Compact Update. Broward Climate Change Task Force February 16, 2017
Southeast Florida Regional Climate Change Compact Update Broward Climate Change Task Force February 16, 2017 Overview Recent Activities RCAP Update Forthcoming Efforts Regional Resilience Projects Summit
More informationFor more detailed instruction, see the KTA-282 user manual. This document is a condensed version; intended as a reference.
For more detailed instruction, see the KTA-282 user manual. This document is a condensed version; intended as a reference. Weather Station Setup Configuring the KTA-282 Connection Description V + Power
More informationSouth East Region THIRA
South East Region THIRA The THIRA follows a four-step process, as described in Comprehensive Preparedness Guide 201, Second Edition: 1. Identify the Threats and Hazards of Concern. Based on a combination
More informationInventory and Reporting Security Q&A
Inventory and Reporting Security Q&A General Q. What is Inventory Reporting, Collection, and Analysis? A. Inventory Reporting, Collection, and Analysis is a tool that discovers, collects, and analyzes
More informationSD-WAN. Managed Services. Expereo SD-WAN Managed Services Overview.
SD-WAN Managed Services Expereo SD-WAN Managed Services Overview www.expereo.com/sd-wan Contents 1 SD-WAN MANAGED SERVICES DESCRIPTION... 3 1.1 Consult & Design... 4 1.2 Procurement & Logistics... 4 1.3
More informationALERT2 System & Field Maintenance
ALERT2 System & Field Maintenance A Guide to ALERT2 Field Maintenance using your ALERT2 Field Decoder Austin Seback Arriving at your alert2 station Rain, Meteorology Stream Communication Software Field
More informationCorporate Security & Emergency Management Summary of Submitted 2015 Budget From Rates
Corporate Security & Emergency Management Summary of Submitted 2015 From Rates Service Expense 2014 2015 Revised Non Tax Revenue Net Tax Supported Expense Draft Non Tax Revenue Net Tax Supported Increase
More informationBest Practices for Incident Communications: Simplifying the Mass Notification Process for Government
Best Practices for Incident Communications: Simplifying the Mass Notification Process for Government Introduction State and local governments and their supporting agencies encounter emergency situations
More informationAN APPLICATION-CENTRIC APPROACH TO DATA CENTER MIGRATION
WHITE PAPER AN APPLICATION-CENTRIC APPROACH TO DATA CENTER MIGRATION Five key success factors Abstract IT organizations today are under constant business pressure to transform their infrastructure to reduce
More informationJames Schneider Advanced Materials and Technology
(CEC-90153) Minnesota DOT Deploy GCS900, Business Center HCE and VisionLink with the DOTs GEOPAK software to automatically monitor large scale excavation in Carver County James Schneider Advanced Materials
More informationIntegrated Water Resources Science and Services (IWRSS)
TOO MUCH POOR QUALITY TOO LITTLE Integrated Water Resources Science and Services (IWRSS) Collaborative Science, Services and Tools to Support Integrated and Adaptive Water Resources Management April, 2011
More informationINFORMATION SECURITY- DISASTER RECOVERY
Information Technology Services Administrative Regulation ITS-AR-1505 INFORMATION SECURITY- DISASTER RECOVERY 1.0 Purpose and Scope The objective of this Administrative Regulation is to outline the strategy
More informationHow to Write an MSSP RFP. White Paper
How to Write an MSSP RFP White Paper Tables of Contents Introduction 3 Benefits Major Items of On-Premise to Consider SIEM Before Solutions Security Writing an RFP and Privacy 45 Benefits Building an of
More informationPerspectives from the U.S. Federal Communications Commission: Lessons Learned on ICTs in Disaster Prevention and Relief
Perspectives from the U.S. Federal Communications Commission: Lessons Learned on ICTs in Disaster Prevention and Relief Thomas Sullivan International Bureau Federal Communications Commission July 2012
More informationNetworks
Networks +617 3222 2555 info@citec.com.au Queensland Government Network (QGN) Our Queensland Government Network (QGN) is central to the ICT services we provide. It is a government owned and managed network,
More informationMayhew Technology Solutions
Mayhew Technology Solutions Business Overview MTS offers design, engineering, and installation services for fiber optic, telecommunications, ISP, OSP, physical security, low voltage, and audio-visual systems.
More informationConstruction Phase Public Outreach Plan
Construction Phase Public Outreach Plan Updated: Jan. 16, 2018 Hennepin County Metro Transit City of Minneapolis 1. Public Engagement Phase Overview Construction of the C Line / Penn Avenue Improvements
More information6/5/ Michael Hojnicki Chief of Technology and Administrative Services
Technology Update 6/5/2018 - Michael Hojnicki Chief of Technology and Administrative Services Projects Completed in 2017 Open Checkbook Published Network & Phone Upgrade High Level Design Competitive Bid
More informationManage your environmental monitoring data with power, depth and ease
EQWin Software Inc. PO Box 75106 RPO White Rock Surrey BC V4A 0B1 Canada Tel: +1 (604) 669-5554 Fax: +1 (888) 620-7140 E-mail: support@eqwinsoftware.com www.eqwinsoftware.com EQWin 7 Manage your environmental
More informationIOWA INCIDENT MANAGEMENT TEAM
THE IOWA INCIDENT MANAGEMENT TEAM Providing Competent and Caring Assistance to Local Agencies 1 What we d like to share with you today: 1. The All-Hazards Incident Management Team (AHIMT) Concept 2. Details
More information5504 Thermocouple Analog Input Module
550 Thermocouple Analog Input Installation, Operation and Maintenance Setup Manual 5/9/0 Safety Information The information provided in this documentation contains general descriptions and/or technical
More informationNOAA TICAP. Robert Sears NOAA/OCIO/SDD/N-Wave
NOAA TICAP Robert Sears NOAA/OCIO/SDD/N-Wave N-Wave Program N-Wave is a program of Federal and contract staff that manage the NOAA Enterprise Network known as N-Wave, and also supports/aligns and executes
More informationNatural Disaster Preparation Checklist
Natural Disaster Preparation Checklist Weather patterns are clearly changing and natural disasters are becoming more frequent. In 2017, Hurricanes Harvey, Irma, and Maria devastated areas in the United
More informationChallenges of Multivendor Systems in Implementation of IIoT-ready PLCs. ISA/Honeywell Webinar 10 November 2016
Challenges of Multivendor Systems in Implementation of IIoT-ready PLCs ISA/Honeywell Webinar 10 November 2016 2 Before we begin: Challenges of Multivendor Systems in Implementation of IIoT-ready PLCs Listen
More informationUF CEMP Support Group Annex: IT Group
UF CEMP Support Group Annex: IT Group Lead Representatives Office of Vice President and Chief Information Officer (CIO) Supporting Departments External Partners Academic Technology Computing and Networking
More informationWhat should I do when something unexpected happens with an alert or warning?
These tips and quirks are intended to help emergency managers using the Integrated Public Alert & Warning System (IPAWS), Emergency Alert System (EAS), and Wireless Emergency Alerts (WEA) systems, and
More informationNext-Generation HCI: Fine- Tuned for New Ways of Working
www. Govtech.com Next-Generation HCI: Fine-Tuned for New Ways of Working - p. 1 February 21, 2018 Next-Generation HCI: Fine- Tuned for New Ways of Working Traditional data center management focuses mainly
More informationBME CLEARING s Business Continuity Policy
BME CLEARING s Business Continuity Policy Contents 1. Introduction 1 2. General goals of the Continuity Policy 1 3. Scope of BME CLEARING s Business Continuity Policy 1 4. Recovery strategies 2 5. Distribution
More informationM E M O R A N D U M. To: California State Lottery Commission Date: October 16, Item 9(c): Approval to Hire Project Management Consultant
M E M O R A N D U M To: California State Lottery Commission Date: From: Joan M. Borucki Director Prepared By: Linh Nguyen Chief Deputy Director Subject: Item 9(c): Approval to Hire Project Management Consultant
More informationTOUCH SCREEN WEATHER STATION (WIND AND AIR PRESSURE) WH-1080PC. Operation Manual
TOUCH SCREEN WEATHER STATION (WIND AND AIR PRESSURE) WH-1080PC Operation Manual About this manual Thank you and congratulations on selecting this professional weather station! We are positive you will
More informationDevelopment and Implementation of International and Regional Flash Flood Guidance (FFG) and Early Warning Systems. Project Brief
Development and Implementation of International and Regional Flash Flood Guidance (FFG) and Early Warning Systems Project Brief 1 SUMMARY The purpose of this project is the development and implementation
More informationNetwork Performance, Security and Reliability Assessment
Network Performance, Security and Reliability Assessment Presented to: CLIENT NAME OMITTED Drafted by: Verteks Consulting, Inc. 2102 SW 20 th Place, Suite 602 Ocala, Fl 34474 352-401-0909 ASSESSMENT SCORECARD
More informationPISMO BEACH COUNCIL AGENDA REPORT
PISMO BEACH COUNCIL AGENDA REPORT SUBJECT/TITLE: REVIEW OF INFORMATION TECHNOLOGY (IT) STATUS AND IT STRATEGIC PLAN IMPLEMENTATION UPDATE. RECOMMENDATION: 1. Receive the IT Status and Implementation Update.
More informationAccelerate Windows 10 deployments through telemetry driven insights using Upgrade Analytics
Accelerate Windows 10 deployments through telemetry driven insights using Upgrade Analytics Kim Kaae, Windows TSP, Microsoft Denmark +400M D E V I C E S R U N N I N G W I N D O W S 1 0 +52M I N BUSINESS
More informationA Strong Response Before, During and After. Hurricane Sandy. West Penn Power, Penelec and Met-Ed
A Strong Response Before, During and After Hurricane Sandy West Penn Power, Penelec and Met-Ed January 10, 2013 FirstEnergy s Presence in Pennsylvania Erie Towanda New Castle Easton Greensburg Johnstown
More informationIT Service Upgrades Announcement
IT Service Upgrades Announcement Beginning in late 2008, AgriLife Information Technology under the direction of the Office of the Vice Chancellor and Dean of Agriculture and Life Sciences conducted a study
More informationRemote Water Level Monitoring Technical Note Product: HOBO RX3000 Station
Product: HOBO RX3000 Station Summary: This technical note provides details on configuring the HOBO RX3000 Remote Monitoring Station with water level sensors with a 4-20mA output. The combination of the
More informationMaster Metering Using Your SCADA System
0 1 0 1 1 0 10 1 1 0 1 0 0 1 0 COPYRIGHT SCADAMETRICS Master Metering Using Your SCADA System Jim Mimlitz SCADAmetrics Why Integrate Master Meter Data Into The SCADA System? Track Distribution System Flows
More informationResilient Los Angeles
Resilient Los Angeles Resilient Los Angeles Marissa Aho, AICP Chief Resilience Officer Office of Los Angeles Mayor Eric Garcetti Introducing Resilient Los Angeles Resilience is a value that guides everything
More informationFor personal use only. Update Event & nearmap Solar
Update Event & nearmap Solar Update Event and nearmap Solar Paul Peterson Senior VP Product & Engineering 2 Current Clear Change Current What s on the ground now Clear Unrivalled clarity Change Monitor
More informationCisco IPICS Case Study: Cisco Safety and Security
Cisco IPICS Case Study: Cisco Safety and Security Cisco manages day-to-day safety and security incidents using IPICS. EXECUTIVE SUMMARY SAFETY AND SECURITY, CISCO SYSTEMS Corporate safety, security and
More informationHow to Prepare for Filing PGA s in ACE Presented for the NCBFAA Educational Institute February 23, 2016
How to Prepare for Filing PGA s in ACE Presented for the NCBFAA Educational Institute February 23, 2016 Agenda Overview & Definitions What agencies/products are involved Current status Timeline What happens
More informationAGENDA ITEM 14.3: PACIFIC RESILIENCE PROJECT
4 th Pacific Meteorological Council Solomon Islands 14 17 August 2017 AGENDA ITEM 14.3: PACIFIC RESILIENCE PROJECT Joint Presentation by Samoa And Tonga: Ofa Fa anunu, Director - Tonga Met. Services Mulipola
More informationSmart Wireless THUM Adapter
Reference Manual Smart Wireless THUM Adapter www.rosemount.com Reference Manual Smart Wireless THUM Adapter Smart Wireless THUM Adapter Smart Wireless THUM Adapter Hardware Revision 1 HART Device Revision
More informationIntroduction. We are excited about the possibility of bringing Google Fiber to your city and look forward to working with you.
Introduction Over the last few years, gigabit Internet has moved from idea to reality, with dozens of communities working hard to build networks with speeds capable of supporting the future of the Internet.
More informationWashington Metropolitan Area Transit Authority Board Action/Information Summary
Washington Metropolitan Area Transit Authority Board Action/Information Summary Action Information MEAD Number: 201697 Resolution: Yes No TITLE: MTPD Security Updates PRESENTATION SUMMARY: The Metro Transit
More informationCASE STUDY: RELOCATE THE DATA CENTER OF THE NATIONAL SCIENCE FOUNDATION. Alan Stuart, Managing Director System Infrastructure Innovators, LLC
CASE STUDY: RELOCATE THE DATA CENTER OF THE NATIONAL SCIENCE FOUNDATION Alan Stuart, Managing Director National Science Foundation s New Headquarters in Alexandria, Virginia 1. Introduction to the National
More informationThe Missouri Department of Transportation, in cooperation with its regional partners Illinois Department of Transportation, Metro and East West
The Future of St. Louis Intelligent Transportation The ITS Heart Of St. Louis The Missouri Department of Transportation, in cooperation with its regional partners Illinois Department of Transportation,
More informationThis guide will tell you all you need to know about the new Front Desk application which can be found on the main Peoria County GIS website.
New Front Desk Quick Guide, 2014 At a First Glance This guide will tell you all you need to know about the new Front Desk application which can be found on the main Peoria County GIS website. When you
More informationWHIRLYBIRD AUTOMATIC WEATHER STATION. Whirlybird Electronics Pvt Ltd 140, 2 nd Cross 13 th Main, BTM-I Bangalore
WHIRLYBIRD AUTOMATIC WEATHER STATION Whirlybird Electronics Pvt Ltd 140, 2 nd Cross 13 th Main, BTM-I Bangalore 560029 WHIRLYBIRD WWS-A is an Automatic weather station you can count on for reliable and
More informationPhysical Security Reliability Standard Implementation
Physical Security Reliability Standard Implementation Attachment 4b Action Information Background On March 7, 2014, the Commission issued an order directing NERC to submit for approval, within 90 days,
More informationUnderground Communications Infrastructure Guidelines Workgroup
Underground Communications Infrastructure Guidelines Workgroup We are a partner to our customers by providing a complementary suite of advanced mining and industrial technologies with a focus on the design,
More informationLegacy BaseStation 3200 Specification Sheet
The with V12.34 firmware from Baseline is an advanced smart controller that is ideal for everything from high-end residential properties to large commercial projects. The comprehensive features of the
More informationenalyzer enalyzer security
enalyzer enalyzer security A documentation that provides an in depth description, that can be read as is, or forwarded to IT departments demanding more technical information. Copenhagen, May 2018 www.enalyzer.com
More informationBUSINESS CONTINUITY. Topics covered in this checklist include: General Planning
BUSINESS CONTINUITY Natural and manmade disasters are happening with alarming regularity. If your organization doesn t have a great business continuity plan the repercussions will range from guaranteed
More informationAdvanced Two-Way Metering. Looking Forward
Advanced Two-Way Metering Looking Forward June 5 2017 Seeking board guidance today Beginning Detailed Technical Design & Request For Proposal Include Opt-Out & Opt-Up Alternatives Through the RFP Chelan
More informationTSA/FTA Security and Emergency Management Action Items for Transit Agencies
TSA/FTA Security and Emergency Management Action Items for Transit Agencies AACTION ITEM LIST Management and Accountability 1. Establish Written System Security Programs and Emergency Management Plans:
More informationPage G Wilkin County Multi-Hazard Mitigation Plan, 2017
Multi-Hazard Plan, 2017 Table G - 3. Actions Identified by the () (From Master Action Chart) Action Comments 2 All-Hazards 5 All-Hazards 6 All-Hazards Local Planning & Regulations Address lack of wireless
More informationBUSINESS DISASTER & TERRORISM PREPAREDNESS
BUSINESS DISASTER & TERRORISM PREPAREDNESS MINORITY CHAMBER OF COMMERCE, CYBER SECURITY FORUM MIAMI-DADE PUBLIC-PRIVATE PARTNERSHIP The Public-Private Partnership program incorporates the public and private
More informationThe Application of Timely, Credible and Actionable Intelligence
The Application of Timely, Credible and Actionable Intelligence David Davari 10/19/2018 Who Is Pinkerton Corporate Risk Management Trusted Experts: providing security solutions, consulting and corporate
More informationNUIT Tech Talk. Emergency Preparedness. March 1, Sharlene Mielke. Jay Bagley. Disaster Recovery / Business Continuity Coordinator
NUIT Tech Talk Emergency Preparedness March 1, 2011 Sharlene Mielke Disaster Recovery / Business Continuity Coordinator Jay Bagley Distributed Support Specialist Information and Systems Security/Compliance
More informationFor personal use only
FY 2014 Half-Year Results 27 February 2014 NEXTDC LIMITED ACN 143 582 521 H1 FY14 highlights for the half-year ended 31 December 2013 National network nearing completion Strong functional sales channel
More information