1 Security Upgrades Project (NMSSUP) Phase II, Los Alamos National Laboratory (LANL), Los Alamos, New Mexico Project Data Sheet is for Construction 1. Significant Changes The most recent DOE O 413.3B approved Critical Decision (CD) is CD-3B, Approve Start of Construction that was approved on December 16, 2009, with a Project Cost (TPC) of $245,166 and CD-4 is expected January Recent actions in Contingency, Prior Year Obligations, and Operating Costs for FY 2011 have reduced the TPC to $213,086. The contingency for the project had increased due to favorable construction bids received for the Utility Trunk, Utility Building, and Storm Water Detention Pond subproject; and the North Perimeter Intrusion, Detection, Assessment, and Delay System (PIDADS) subproject. Also the scope and related cost for the South PIDADS subproject has been withdrawn from the project temporarily until a revised PIDAS design can be estimated and implemented. There has been a small cost growth elsewhere in the project, and a minor scope increase to security systems, but the net impact has been an increase in contingency for the project. The increase in contingency and the scope increase have been approved through the NMSSUP baseline change process. The Acquisition Executive approved Baseline Change Proposal 5 on April 2, 2010, that added scope to the project s security systems, including additional cameras and an additional security sensor to the project. Baseline Change Proposal 4, approved by the Los Alamos Site Office on January 8, 2010, incorporated the contract value for the Utility subcontract into the baseline, with excess funds being added into the project contingency. Baseline Change Proposal 21, approved July 23, 2010, removed the South PIDADS scope, pending the redesign of the South PIDAS, with those funds added to the contingency as well. The net impact of these actions has been an increase in contingency of $27,484 for the project. The contingency amount includes the funds to execute the redesigned South PIDAS scope. The Office of Defense Nuclear Security has reduced the FY 2012 funding request for the project by $19,900. This reduction in funding request will be reflected in a reduced contingency amount for the project. Additionally, $8,500 in FY 2008 balances will be used by DOE for other higher priority needs, which will also be reflected in reduced contingency. The current Federal Project Director assumed responsibilities from a Federal Project Director that was at the appropriate level for this project. The current Federal Project Director is expecting to receive the appropriate level certification by June This PDS is an update of the FY 2011 PDS. Page 295

2 2. Design, Construction, and D&D Schedule (fiscal quarter or date) CD-0 PED D&D D&D CD-1 Complete CD-2 CD-3 CD-4 Start Complete FY QFY2002 2QFY2007 1QFY2008 1QFY2008 2QFY2008 3QFY2012 N/A N/A FY QFY2003 1QFY2007 1QFY2008 2QFY2008 4QFY2008 4QFY2011 N/A N/A FY /25/ /30/ /30/ /23/ /23/2009 2QFY2013 N/A N/A FY /25/ /30/ /30/ /23/ /16/2009 2QFY2013 N/A N/A CD-0 Approve Mission Need CD-1 Approve Alternative Selection and Cost Range CD-2 Approve Performance Baseline CD-3 Approve Start of Construction CD-4 Approve Start of Operations or Project Closeout D&D Start Start of Demolition & Decontamination (D&D) work D&D Complete Completion of D&D work CD-3 A CD-3B FY /23/2009 FY /16/2009 CD-3A Approve Start of Construction of four of the five subprojects: Utility Trunk, Utility Building, and Storm Water Detention Pond subproject; North PIDADS subproject; South PIDADS subproject; and the West Vehicle Access subproject. Additionally approve the procurement of long lead Government Furnished Equipment. CD-3B Approve Start of Construction for the last subproject: Entry Control Facility. 3. Baseline and Validation Status TEC, TEC, OPC OPC, PED Construction TEC, Except D&D D&D OPC, TPC FY ,755 25,245 N/A 240,000 FY , , ,809 25,245 N/A 25, ,054 a FY , , ,916 25,250 N/A 25, ,166 FY , , ,516 21,570 N/A 21, ,086 a The FY 2008 appropriated funding was reduced based on the rescission of 0.91 percent ($71,000) and use of prior year balances from construction projects ($82,000) in accordance with the FY 2008 Consolidate d Appropriations Act, (P.L ). Page 296

3 4. Project Description, Justification, and Scope Project Description The project is being conducted in accordance with the project management requirements in DOE O 413.3B and DOE M , Program and Project Management for the Acquisition of Capital Assets, and all appropriate project management requirements have been met. The Nuclear Materials Safeguards and Security Upgrades Project (NMSSUP) Phase II will support the viability of stockpile management and other current missions carried out in Technical Area (TA)-55 at the Los Alamos National Laboratory (LANL) by providing an effective, robust physical security system to address the core essential physical security systems, protection strategies, and security requirements. The LANL nuclear missions, as they currently exist and as they are planned in the future, require a reliable safeguards and security system to assure the protection and control of special nuclear materials (SNM), classified matter, and NNSA property. The nuclear materials operation at TA-55 involves the ability to securely store, move, process, and track nuclear materials that are attractive to the adversaries, both in terms of the quantity of materials and the forms. The NMSSUP Phase II project plays a key role in the support of this mission by replacing, or improving, the aging exterior physical security systems and installing enhanced systems to support a new protection strategy for the TA-55 site. The primary components of the project include, at a minimum: Perimeter Intrusion Detection, Assessment, and Delay System (PIDADS) East Vehicle and Pedestrian Entry Control Facility (ECF) Utility Infrastructure (to support the items above) West Vehicle Access (WVA) d Cost (TEC) 5. Financial Schedule App ropriations Obligations Costs PED a FY ,000 10,000 0 FY ,094 33, FY ,252 FY ,031 FY ,569 FY ,472, PED 43,094 43,094 43,094 a PED funds were appropriated in FY 2005 and FY 2006 under PED Line Item 05-D-170. b $8,500 reduction in FY 2008 Obligations used by DOE for other higher priority needs. Page 297

4 App ropriations Obligations Costs Construction FY 2008 b 4 0,050 40,050 0 FY , FY ,021 33,034 FY ,000 44,599 74,490 FY ,752 20,752 40,667, Construction 148, , ,422 TEC FY ,000 10,000 0 FY ,094 33, FY ,252 FY ,050 40,050 14,031 FY , ,800 FY ,021 35,506 FY ,000 44,599 74,490 FY ,752 20,752 40,667, TEC 191, , ,516 Other Project Cost (OPC) OPC except D&D Prior years cost 9,357 9,357 9,357 FY ,855 5,855 5,855 FY FY FY FY ,100 1,100 1,229 FY ,600 2,600 2,600 FY ,742 1,742 1,392 FY , OPC except D&D 21,570 21,570 21,570 D&D NA NA NA, D&D NA NA NA, OPC 21,570 21,570 21,570 Project Cost (TPC) Prior years cost 19,357 19,357 9,357 FY ,949 38,949 6,625 FY ,769 FY ,249 40,249 14,230 FY , ,871 FY ,100 44,121 36,735 FY ,600 47,199 77,090 FY ,494 22,494 42,059 FY , TPC 213, , ,086 Page 298

5 d Cost (TEC) 6. Details of Project Cost Current Previous Original Validated Baseline Design (PED) Design 4 1,133 41,133 43,094 Contingency 1, 961 1,961 0, PED (05-D-701) 43,094 43,094 43,094 Construction Site Preparation 38,542 41,711 42,447 Equipment 1 8,215 19,836 20,866 Other Construction 54,876 69,878 74,252 Contingency 3 6,789 45,397 39,257, Construction 148, , ,822, TEC 191, , ,916 Other Project Cost (OPC) OPC except D&D Conceptual Planning 11,925 11,925 11,925 Conceptual Design 4,473 4,473 3,700 Start-Up 4, 288 7,361 8,332 Contingency ,491 1,293, OPC except D&D 21,570 25,250 25,250 D&D D&D Contingency 0 0 0, D&D 0 0 0, OPC 21,570 25,250 25,250, TPC 213, , ,166 Contingency 37,673 48,849 40,550 Page 299

6 7. Schedule of Appropriation Requests Prior Years FY 2011 FY 2012 FY 2013 FY 2014 FY 2015 FY 2016 Outyears TEC 187,590 27, ,755 FY 2008 OPC 22, , ,245 TPC 210,443 27,823 1, ,000 TEC 186,644 27, ,809 FY 2009 OPC 22, , ,245 TPC 209,497 27,823 1, ,054 TEC FY 010 OPC TPC TEC 136,264 52,000 31, ,916 FY 2011 OPC 17,228 6,280 1, ,250 TPC 153,492 58,280 33, ,166 TEC 127,764 52,000 11, ,516 FY 2012 OPC 17,228 2,600 1, ,570 TPC 144,992 54,600 13, , Related Operations and Maintenance Funding Requirements Start of Operation or Beneficial Occupancy (fiscal quarter or date) 2QFY2013 Expected Useful Life (number of years) 50 Expected Future Start of D&D of this capital asset (fiscal quarter) 2QFY2063 (Related Funding requirements) Annual Costs Life Cycle Costs Current Previous Current Previous Operations 18,480 18,480 2,148,100 2,148,100 Maintenance 1,600 1,600 75,500 75,500, Operations & Maintenance 20,080 20,080 2,223,600 2,223, Required D&D Information The limited D&D is considered incidental to construction and has been included in the construction costs. Area Square Feet Area of new construction N/A Area of existing facility(s) being replaced N/A Area of additional D&D space to meet the one-for-one requirement N/A Name(s) and site location(s) of existing facility(s) to be replaced: N/A Page 300

7 10. Acquisition Approach NNSA has assigned management and execution of this project to LANS, LLC. Major contracts are through firm fixed-priced contracting. Interfaces between the contractor(s) and other entities at LANS, LLC, will be managed by a dedicated project team and minimized to facilitate clear lines of responsibilities and contractual obligations. The contracts will be incrementally funded by annual appropriations. Page 301

1. Significant Changes

1. Significant Changes 04-D-125, Chemistry and Metallurgy Research Building Replacement (CMRR) Project, Los Alamos National Laboratory (LANL), Los Alamos, New Mexico Project Data Sheet (PDS) is for Construction 1. Significant

More information

Facilities and Infrastructure Recapitalization Program

Facilities and Infrastructure Recapitalization Program Facilities and Infrastructure Recapitalization Program Program Mission The mission of the Facilities and Infrastructure Recapitalization Program (FIRP) is to restore, rebuild, and revitalize the physical

More information

GLOBAL THREAT REDUCTION INITIATIVE DOMESTIC SOURCE SECURITY OVERVIEW

GLOBAL THREAT REDUCTION INITIATIVE DOMESTIC SOURCE SECURITY OVERVIEW GLOBAL THREAT REDUCTION INITIATIVE DOMESTIC SOURCE SECURITY OVERVIEW GTRI Mission Mission: Reduce and protect vulnerable nuclear and radiological material located at civilian sites worldwide Goals: Convert

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Defense Security Service Date: February 2015 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 7: Operational Systems Development COST

More information

Agenda Item No. AGENDA ITEM BRIEFING

Agenda Item No. AGENDA ITEM BRIEFING AGENDA ITEM BRIEFING Submitted by: Billy Hamilton, Executive Vice Chancellor and Chief Financial Officer The Texas A&M University System Subject: Approval to Amend the FY 2016-FY 2020 Texas A&M University

More information

Exhibit R-2, RDT&E Budget Item Justification

Exhibit R-2, RDT&E Budget Item Justification PE NUMBER: 0604853F PE TITLE: Evolved Expendable Launch - EMD Exhibit R-2, RDT&E Budget Item Justification BUDGET ACTIVITY PE NUMBER AND TITLE Launch - EMD 0004 (U) Cost ($ in Millions) FY 2004 FY 2005

More information

NASA Policy Directive

NASA Policy Directive NASA Policy Directive NPD 8820.2D Effective Date: July 02, 2013 Expiration Date: July 02, 2018 COMPLIANCE IS MANDATORY Subject: Design and Construction of Facilities Responsible Office: Facilities Engineering

More information

Exhibit R-2, RDT&E Budget Item Justification February 2008

Exhibit R-2, RDT&E Budget Item Justification February 2008 PE NUMBER: 63432F PE TITLE: Polar MILSATCOM (Space) Exhibit R-2, RDT&E Budget Item Justification February 28 4 Advanced Component Development and Prototypes (ACD&P) 63432F Polar MILSATCOM (Space) ($ in

More information

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) June 2001

RDT&E BUDGET ITEM JUSTIFICATION SHEET (R-2 Exhibit) June 2001 COST ($ in Thousands) Actual FY 2003 FY 2004 FY 2005 FY 2006 FY 2007 Cost to Total Cost 4137 Range Standardization and Automation (RSA) 48,303 84,373 65,097 74,898 69,924 66,628 72,430 72,520 Continuing

More information

ART CENTER AND SATELLITE PLANT

ART CENTER AND SATELLITE PLANT CSU The California State University Office of Audit and Advisory Services CONSTRUCTION California State University, Bakersfield ART CENTER AND SATELLITE PLANT Audit Report 15-09 May 7, 2015 EXECUTIVE SUMMARY

More information

ELECTRICAL ENGINEERING & INSTRUMENTATION MECHANICAL ENGINEERING BIOLOGICAL & INDUSTRIAL ENGINEERING NUCLEAR ENGINEERING STRUCTURAL & CIVIL

ELECTRICAL ENGINEERING & INSTRUMENTATION MECHANICAL ENGINEERING BIOLOGICAL & INDUSTRIAL ENGINEERING NUCLEAR ENGINEERING STRUCTURAL & CIVIL ELECTRICAL ENGINEERING & INSTRUMENTATION MECHANICAL ENGINEERING BIOLOGICAL & INDUSTRIAL ENGINEERING NUCLEAR ENGINEERING STRUCTURAL & CIVIL ENGINEERING SYSTEMS INTEGRATION ELECTRONIC DATA MANAGEMENT PROJECT

More information

AGENDA Regular Commission Meeting Port of Portland Headquarters 7200 N.E. Airport Way, 8 th Floor August 13, :30 a.m.

AGENDA Regular Commission Meeting Port of Portland Headquarters 7200 N.E. Airport Way, 8 th Floor August 13, :30 a.m. AGENDA Regular Commission Meeting Port of Portland Headquarters 7200 N.E. Airport Way, 8 th Floor 9:30 a.m. Minutes Approval of Minutes: Regular Commission Meeting July 9, 2014 Executive Director Approval

More information

Georgia Institute of Technology Advanced Computing Technology Building. Draft Program. Vision Program Outline

Georgia Institute of Technology Advanced Computing Technology Building. Draft Program. Vision Program Outline Georgia Institute of Technology Advanced Computing Technology Building Draft Program Vision Program Outline Issued April 2, 2001 I N T R O D U C T I O N Scope This document is a summary of the Vision Session

More information

Working Together to Create Sustainable Success. APICS Board of Directors Meeting Update April 2012

Working Together to Create Sustainable Success. APICS Board of Directors Meeting Update April 2012 Working Together to Create Sustainable Success APICS Board of Directors Meeting Update April 2012 APICS Mission APICS builds and validates knowledge in supply ppy chain and operations management. We enable

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2014 Air Force DATE: April 2013 COST ($ in Millions) # ## FY 2015 FY 2016 FY 2017 FY 2018 Program Element - 0.000 0.000 5.853-5.853 5.961 6.181 6.290 6.404

More information

National Nuclear Security Administration. Los Alamos National Security, LLC Performance Evaluation Report (PER) NNSA Los Alamos Field Office

National Nuclear Security Administration. Los Alamos National Security, LLC Performance Evaluation Report (PER) NNSA Los Alamos Field Office National Nuclear Security Administration Los Alamos National Security, LLC Performance Evaluation Report (PER) NNSA Los Alamos Field Office Evaluation Period: October 2017 September 2018 December 3, 2018

More information

Federal Data Center Consolidation Initiative (FDCCI) Workshop III: Final Data Center Consolidation Plan

Federal Data Center Consolidation Initiative (FDCCI) Workshop III: Final Data Center Consolidation Plan Federal Data Center Consolidation Initiative (FDCCI) Workshop III: Final Data Center Consolidation Plan August 10, 2010 FDCCI Agenda August 10 th, 2010 1. Welcome Katie Lewin GSA Director Cloud Computing

More information

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #192

UNCLASSIFIED. UNCLASSIFIED Air Force Page 1 of 8 R-1 Line #192 Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) Years

More information

UNCLASSIFIED. UNCLASSIFIED R-1 Line Item #49 Page 1 of 10

UNCLASSIFIED. UNCLASSIFIED R-1 Line Item #49 Page 1 of 10 Exhibit R-2, PB 2010 Office of Secretary Of Defense RDT&E Budget Item Justification DATE: May 2009 3 - Advanced Technology Development (ATD) COST ($ in Millions) FY 2008 Actual FY 2009 FY 2010 FY 2011

More information

Program Management Office January, 2012

Program Management Office January, 2012 Program Management Office January, 2012 Clarify the Project Delivery Process (PDP) What is it? Why did it change? How were the changes determined? How was it approved? Show you where to get guidance Answer

More information

SAC PA Security Frameworks - FISMA and NIST

SAC PA Security Frameworks - FISMA and NIST SAC PA Security Frameworks - FISMA and NIST 800-171 June 23, 2017 SECURITY FRAMEWORKS Chris Seiders, CISSP Scott Weinman, CISSP, CISA Agenda Compliance standards FISMA NIST SP 800-171 Importance of Compliance

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Network Centric Collaborative Targeting FY 2012 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE F: Network Centric Collaborative Targeting FY 2012 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Air Force DATE: February 2011 COST ($ in Millions) FY 2010 FY 2011 FY 2013 FY 2014 FY 2015 FY 2016 To Program Element 8.126 13.367 7.348-7.348 7.526

More information

DOE Energy Savings Performance Contracts (ESPCs) and ESPC ENABLE

DOE Energy Savings Performance Contracts (ESPCs) and ESPC ENABLE Session: Third-Party Financing Options DOE Energy Savings Performance Contracts (ESPCs) and ESPC ENABLE Doug Culbreth Oak Ridge National Laboratory August 11, 2016 Rhode Island Convention Center Providence,

More information

Port Moresby Power Grid Development Project.

Port Moresby Power Grid Development Project. Environmental Monitoring Report Semi-annual Report January 2017 Port Moresby Power Grid Development Project. Prepared by PNG Power Limited for the Asian Development Bank. This Semi-annual Environmental

More information

ESC Conference: Energy Savings and Performance-Based Contracting Investment Initiative Update. Timothy D. Unruh PhD, PE, CEM.

ESC Conference: Energy Savings and Performance-Based Contracting Investment Initiative Update. Timothy D. Unruh PhD, PE, CEM. ESC Conference: Energy Savings and Performance-Based Contracting Investment Initiative Update July 29, 2014 Timothy D. Unruh PhD, PE, CEM Program Manager DOE FEMP 1 Energy Efficiency and Renewable Energy

More information

MOTION NO. M Task Order 2 with the City of Des Moines for the Federal Way Link Extension

MOTION NO. M Task Order 2 with the City of Des Moines for the Federal Way Link Extension MOTION NO. M2018-30 Task Order 2 with the City of Des Moines for the Federal Way Link Extension MEETING: DATE: TYPE OF ACTION: STAFF CONTACT: Capital Committee 03/08/2018 Final Action Ahmad Fazel, DECM

More information

Annual Report for the Utility Savings Initiative

Annual Report for the Utility Savings Initiative Report to the North Carolina General Assembly Annual Report for the Utility Savings Initiative July 1, 2016 June 30, 2017 NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY http://portal.ncdenr.org Page

More information

Reviewed by ADM(RS) in accordance with the Access to Information Act. Information UNCLASSIFIED.

Reviewed by ADM(RS) in accordance with the Access to Information Act. Information UNCLASSIFIED. Assistant Deputy Minister (Review Services) Reviewed by in accordance with the Access to Information Act. Information UNCLASSIFIED. Security Audits: Management Action Plan Follow-up December 2015 1850-3-003

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Data to Decisions Advanced Technology FY 2012 OCO

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8Z: Data to Decisions Advanced Technology FY 2012 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Office of Secretary Of Defense DATE: February 2011 BA 3: Advanced Development (ATD) COST ($ in Millions) FY 2010 FY 2011 Base OCO Total FY 2013 FY

More information

DFARS Cyber Rule Considerations For Contractors In 2018

DFARS Cyber Rule Considerations For Contractors In 2018 Portfolio Media. Inc. 111 West 19 th Street, 5th Floor New York, NY 10011 www.law360.com Phone: +1 646 783 7100 Fax: +1 646 783 7161 customerservice@law360.com DFARS Cyber Rule Considerations For Contractors

More information

FY Bay Area UASI Risk and Grants Management Program Update. November 14, 2013

FY Bay Area UASI Risk and Grants Management Program Update. November 14, 2013 FY 2013-2014 Bay Area UASI Risk and Grants Management Program Update November 14, 2013 Overview FY 2013 Bay Area UASI Risk and Grants Management Program May 2013 December 2013 Data Management Analysis

More information

# I-2. Date of Meeting: May 2, 2017 BOARD OF SUPERVISORS BUSINESS MEETING INFORMATION ITEM. Quarterly Metrorail Construction Status Report

# I-2. Date of Meeting: May 2, 2017 BOARD OF SUPERVISORS BUSINESS MEETING INFORMATION ITEM. Quarterly Metrorail Construction Status Report BOARD OF SUPERVISORS BUSINESS MEETING INFORMATION ITEM Date of Meeting: May 2, 2017 # I-2 SUBJECT: Quarterly Metrorail Construction Status Report ELECTION DISTRICTS: Ashburn/Broad Run STAFF CONTACTS: Alan

More information

Report to the Business Administration Committee

Report to the Business Administration Committee Report to the Business Administration Committee Recommendation to Award a Contract to Replace Wi-Fi Infrastructure Systems at Ronald Reagan Washington National Airport and Washington Dulles International

More information

Why UID? LeAntha Sumpter May 11, 2005

Why UID? LeAntha Sumpter May 11, 2005 Why UID? LeAntha Sumpter May 11, 2005 1 DoD, its coalition partners, and industry efficiently and effectively manage people, property, and intangible assets using globally unique identification 2 Ubiquitous

More information

Unofficial Comment Form Project Modifications to CIP Standards Requirements for Transient Cyber Assets CIP-003-7(i)

Unofficial Comment Form Project Modifications to CIP Standards Requirements for Transient Cyber Assets CIP-003-7(i) Unofficial Comment Form Project 2016-02 Modifications to CIP Standards Requirements for Transient Cyber Assets CIP-003-7(i) Do not use this form for submitting comments. Use the electronic form to submit

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO COST ($ in Millions) FY 2011 FY 2012 Base OCO Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total Program Element - - 38.094-38.094 38.503 39.587 40.754 41.292 Continuing Continuing

More information

CITY OF VANCOUVER ADMINISTRATIVE REPORT

CITY OF VANCOUVER ADMINISTRATIVE REPORT CITY OF VANCOUVER Supports Item No. 2 P&E Committee Agenda September 20, 2007 ADMINISTRATIVE REPORT Report Date: August 31, 2007 Author: Gordon Foy Phone No.: 604.873.7306 RTS No.: 06810 VanRIMS No.: Meeting

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8W: IT Software Development Initiatives. FY 2011 Total Estimate. FY 2011 OCO Estimate

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE D8W: IT Software Development Initiatives. FY 2011 Total Estimate. FY 2011 OCO Estimate Exhibit R-2, RDT&E Budget Item Justification: PB 2011 Washington Headquarters Service DATE: February 2010 COST ($ in Millions) FY 2009 Actual FY 2010 FY 2012 FY 2013 FY 2014 FY 2015 Cost To Complete Program

More information

UNCLASSIFIED FY 2016 OCO. FY 2016 Base

UNCLASSIFIED FY 2016 OCO. FY 2016 Base Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Air Force : February 2015 3600: Research, Development, Test & Evaluation, Air Force / BA 7: Operational Systems Development COST ($ in Millions) (+)

More information

MDCSystems. MICHAEL A. BAKER, P.E., M.S.E.M. Consulting Engineer

MDCSystems. MICHAEL A. BAKER, P.E., M.S.E.M. Consulting Engineer MDCSystems Providing Expert Solutions for Projects Worldwide MICHAEL A. BAKER, P.E., M.S.E.M. Consulting Engineer Education Drexel University, M.S., Engineering Management, Technology Assessment Brown

More information

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Tactical Data Links

UNCLASSIFIED. R-1 ITEM NOMENCLATURE PE N: Tactical Data Links Exhibit R-2, RDT&E Budget Item Justification: PB 2012 Navy DATE: February 2011 COST ($ in Millions) FY 2010 FY 2011 Total FY 2013 FY 2014 FY 2015 FY 2016 Navy Page 1 of 16 R-1 Line Item #183 To Complete

More information

UNCLASSIFIED. FY 2016 Base FY 2016 OCO

UNCLASSIFIED. FY 2016 Base FY 2016 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2016 Office of the Secretary Of Defense : February 2015 0400: Research, Development, Test & Evaluation, Defense-Wide / BA 7: Operational Systems Development

More information

The Project Charter. Date of Issue Author Description. Revision Number. Version 0.9 October 27 th, 2014 Moe Yousof Initial Draft

The Project Charter. Date of Issue Author Description. Revision Number. Version 0.9 October 27 th, 2014 Moe Yousof Initial Draft The Project Charter Project Title: VDI Data Center Design and Build Project Sponsor: South Alberta Data Centers Inc. (SADC Inc.) Project Customer: The City of Calgary Project Manager: Moe Yousof Document

More information

FY 2016 Results Presentation. 29 August 2016

FY 2016 Results Presentation. 29 August 2016 FY 2016 Results Presentation 29 August 2016 RIGHT INDUSTRY, RIGHT REGION INTERNATIONAL NETWORK HONG KONG LOS ANGELES INTERNATIONAL NETWORK (AS OF JUNE 2016) SINGAPORE Legend BRISBANE Metro Fibre Existing

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Defense Information Systems Agency DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 Base PE 0305208K: Distributed Common Ground/Surface Systems

More information

UNCLASSIFIED UNCLASSIFIED

UNCLASSIFIED UNCLASSIFIED : February 6 Exhibit R, RDT&E Budget Item Justification: PB : Research,, Test & Evaluation, / BA 5: System & Demonstration (SDD) COST ($ in Millions) FY 5 FY 6 R Program Element (Number/Name) PE 65A /

More information

Consolidated Financial Results for the Second Quarter, Fiscal 2018

Consolidated Financial Results for the Second Quarter, Fiscal 2018 Consolidated Financial Results for the Second Quarter, Fiscal 2018 Ⅰ. Consolidated Financial Results for the First Half, Fiscal 2018 Consolidated Financial Results for Fiscal 2018 Ⅱ. Supplementary Data

More information

Trends and Future Outlook of Task Order Contracts in Federal Government Contracting: Executive Summary. Dana Pinkava

Trends and Future Outlook of Task Order Contracts in Federal Government Contracting: Executive Summary. Dana Pinkava Trends and Future Outlook of Task Order Contracts in Federal Government Contracting: Executive Summary Dana Pinkava Scope and Methodology Scope: This report provides an overview of trends in Federal Agency

More information

IT Transformation Through ESPCs

IT Transformation Through ESPCs June 27, 2013 IT Transformation Through ESPCs Restricted Siemens AG 2013. All rights reserved. siemens.com/answers Contents Integration of IT with Facilities ESPCs as Related to Data Centers Measurement

More information

DoDD DoDI

DoDD DoDI DoDD 8500.1 DoDI 8500.2 Tutorial Lecture for students pursuing NSTISSI 4011 INFOSEC Professional 1 Scope of DoDD 8500.1 Information Classes: Unclassified Sensitive information Classified All ISs to include:

More information

A Regional Water Utility and the Private Sector Defining a Partnership for Infrastructure Delivery

A Regional Water Utility and the Private Sector Defining a Partnership for Infrastructure Delivery A Regional Water Utility and the Private Sector Defining a Partnership for Infrastructure Delivery Carmel Krogh Director Shoalhaven Water Shoalhaven City Council Shoalhaven City Council Structure Asset

More information

REPORT 2015/149 INTERNAL AUDIT DIVISION

REPORT 2015/149 INTERNAL AUDIT DIVISION INTERNAL AUDIT DIVISION REPORT 2015/149 Audit of the information and communications technology operations in the Investment Management Division of the United Nations Joint Staff Pension Fund Overall results

More information

NORTH CAROLINA NC MRITE. Nominating Category: Enterprise IT Management Initiatives

NORTH CAROLINA NC MRITE. Nominating Category: Enterprise IT Management Initiatives NORTH CAROLINA MANAGING RISK IN THE INFORMATION TECHNOLOGY ENTERPRISE NC MRITE Nominating Category: Nominator: Ann V. Garrett Chief Security and Risk Officer State of North Carolina Office of Information

More information

SRS Overview. Dave Hepner. Looking toward the future of the Savannah River Site

SRS Overview. Dave Hepner. Looking toward the future of the Savannah River Site SRS Overview Looking toward the future of the Savannah River Site Dave Hepner Department of Energy-Savannah River Director, Acquisition Operations Division Savannah River Site March 19, 2012 SRS: We know

More information

Figure 1: Summary Status of Actions Recommended in June 2016 Committee Report. Status of Actions Recommended # of Actions Recommended

Figure 1: Summary Status of Actions Recommended in June 2016 Committee Report. Status of Actions Recommended # of Actions Recommended Chapter 3 Section 3.05 Metrolinx Regional Transportation Planning Standing Committee on Public Accounts Follow-Up on Section 4.08, 2014 Annual Report In November 2015, the Standing Committee on Public

More information

OSD RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit)

OSD RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit) Exhibit R-2 0605140D8Z OSD RDT&E BUDGET ITEM JUSTIFICATION (R2 Exhibit) APPROPRIATION/ BUDGET ACTIVITY RDTE, Defense Wide BA 05 FY 2010 FY 2011 FY 2012 FY 2013 COST ($ in Millions) Estimate Estimate Estimate

More information

FLORIDA STATE UNIVERSITY MASTER PLAN 10 Utilities

FLORIDA STATE UNIVERSITY MASTER PLAN 10 Utilities UTILITIES ELEMENT NOTE: Unless otherwise noted, the goals, objectives and policies contained in this element shall guide development of the Main Campus and Southwest Campus in Tallahassee as well as the

More information

Nuclear Weapon Complex Transformation

Nuclear Weapon Complex Transformation Nuclear Weapon Complex Transformation Marty Schoenbauer Defense Programs 1 The Defense Programs Mission To strengthen and support United States security through nuclear deterrence by the capability to:

More information

The World Bank. Key Dates. Project Development Objectives. Component(s) Overall Ratings. Public Disclosure Copy

The World Bank. Key Dates. Project Development Objectives. Component(s) Overall Ratings. Public Disclosure Copy Implementation Status & Results Pakistan Balochistan Disaster Management Project (P127253) Operation Name: Balochistan Disaster Management Project (P127253) Project Stage: Implementation Seq.No: 4 Status:

More information

# 7. Date of Meeting: March 13, 2018 BOARD OF SUPERVISORS FINANCE/GOVERNMENT OPERATIONS AND ECONOMIC DEVELOPMENT COMMITTEE ACTION ITEM SUBJECT:

# 7. Date of Meeting: March 13, 2018 BOARD OF SUPERVISORS FINANCE/GOVERNMENT OPERATIONS AND ECONOMIC DEVELOPMENT COMMITTEE ACTION ITEM SUBJECT: BOARD OF SUPERVISORS FINANCE/GOVERNMENT OPERATIONS AND ECONOMIC DEVELOPMENT COMMITTEE ACTION ITEM Date of Meeting: March 13, 2018 # 7 SUBJECT: ELECTION DISTRICT: Contract Award/Roadway and Civil Design

More information

Revenues % % Gross operating margin % %

Revenues % % Gross operating margin % % Revenues 64.0 70.7 +10% 121.5 135.1 +11% Gross operating margin 34.0 34.8 +3% 63.5 69.5 +10% % of revenues 53.1% 49.3% 52.3% 51.5% Income from ordinary operations 7.8 8.7 +11% 16.1 16.7 +4% % of revenues

More information

DHS Overview of Sustainability and Environmental Programs. Dr. Teresa R. Pohlman Executive Director, Sustainability and Environmental Programs

DHS Overview of Sustainability and Environmental Programs. Dr. Teresa R. Pohlman Executive Director, Sustainability and Environmental Programs DHS Overview of Sustainability and Environmental Programs Dr. Teresa R. Pohlman Executive Director, Sustainability and Environmental Programs DHS Mission DHS Organization Getting to Know DHS Mission: Secure

More information

IT SECURITY RISK ANALYSIS FOR MEANINGFUL USE STAGE I

IT SECURITY RISK ANALYSIS FOR MEANINGFUL USE STAGE I Standards Sections Checklist Section Security Management Process 164.308(a)(1) Information Security Program Risk Analysis (R) Assigned Security Responsibility 164.308(a)(2) Information Security Program

More information

Your One Source for Federal Solutions

Your One Source for Federal Solutions Your One Source for Federal Solutions GSA Contract Vehicles Dedicated Federal and Technical Teams Local Presence, International Network About WESCO The WESCO Federal Advantage Government Team Commitment

More information

Outline. Why protect CUI? Current Practices. Information Security Reform. Implementation. Understanding the CUI Program. Impacts to National Security

Outline. Why protect CUI? Current Practices. Information Security Reform. Implementation. Understanding the CUI Program. Impacts to National Security Outline Why protect CUI? Impacts to National Security Current Practices CUI Program & Existing Agency Practices Information Security Reform CUI Registry 32CFR2002 NIST SP 800-171 (Rev 1) Federal Acquisition

More information

Eligible Fiber Options for the E-rate Program

Eligible Fiber Options for the E-rate Program Eligible Fiber Options for the E-rate Program 2017 E-rate Training 2017 Universal Service Administrative Co. 1 2017 Universal Service Administrative Co. AGENDA Identifying E-rate eligible fiber services

More information

Washington Headquarters Services Defense Facilities Directorate

Washington Headquarters Services Defense Facilities Directorate Washington Headquarters Services Defense Facilities Directorate Meeting Executive Order 13514 Federal Leadership in Environmental, Energy, and Economic Performance Crystall Merlino, LEED AP Engineering

More information

PUBLIC UTILITIES COMMISSION:

PUBLIC UTILITIES COMMISSION: PUBLIC UTILITIES COMMISSION: The Sixth Review of Its Professional Services Agreement For Management Services of Its Capital Improvement Program FINANCIAL AUDITS DIVISION 03017 January 12, 2006 SUMMARY

More information

Internal Audit Report. Electronic Bidding and Contract Letting TxDOT Office of Internal Audit

Internal Audit Report. Electronic Bidding and Contract Letting TxDOT Office of Internal Audit Internal Audit Report Electronic Bidding and Contract Letting TxDOT Office of Internal Audit Objective Review of process controls and service delivery of the TxDOT electronic bidding process. Opinion Based

More information

Appendix 12 Risk Assessment Plan

Appendix 12 Risk Assessment Plan Appendix 12 Risk Assessment Plan DRAFT December 13, 2006 Revision XX Qwest Government Services, Inc. 4250 North Fairfax Drive Arlington, VA 22203 A12-1 RFP: TQC-JTB-05-0001 December 13, 2006 REVISION HISTORY

More information

Proposal to Join the Locate Alliance Consortium and to Procure a Common Locate Service Provider Toronto Water and Transportation Services

Proposal to Join the Locate Alliance Consortium and to Procure a Common Locate Service Provider Toronto Water and Transportation Services STAFF REPORT ACTION REQUIRED Proposal to Join the Locate Alliance Consortium and to Procure a Common Locate Service Provider Toronto Water and Transportation Services Date: June 1, 2015 To: From: Wards:

More information

Energy Action Plan 2015

Energy Action Plan 2015 Energy Action Plan 2015 Purpose: In support of the Texas A&M University Vision 2020: Creating a Culture of Excellence and Action 2015: Education First Strategic Plan, the Energy Action Plan (EAP) 2015

More information

JUSTICE CENTER IMPLEMENTATION PLAN. Schedule of Project Activities

JUSTICE CENTER IMPLEMENTATION PLAN. Schedule of Project Activities Schedule of Project Activities Summary Project Schedule FY 07 FY 08 FY 09 FY 10 FY 11 FY 12 FY 13 FY 14 Pre-Design Preliminary Design Final Design Procurement Demolition/Site Prep Construction Phase I

More information

Business Requirements Specification (BRS)

Business Requirements Specification (BRS) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 Business Requirements Specification (BRS) Business Domain: Contract Management Business

More information

Senate Comprehensive Energy Bill

Senate Comprehensive Energy Bill Senate Comprehensive Energy Bill Both the House and Senate energy committees are currently in the process of developing comprehensive energy bills. The Senate Energy and Natural Resources Committee released

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE

UNCLASSIFIED R-1 ITEM NOMENCLATURE Exhibit R-2, RDT&E Budget Item Justification: PB 2013 Navy DATE: February 2012 COST ($ in Millions) FY 2011 FY 2012 FY 2014 FY 2015 FY 2016 FY 2017 To Program Element 1.511 1.447 1.756-1.756 1.792 1.827

More information

Competency Definition

Competency Definition Adult Children's Outreach Technical Teen Acquisition Adaptability The ability to effectively process library material orders; knowledge of vendor software, processes, products, and updates x x The ability

More information

ISACA Cincinnati Chapter March Meeting

ISACA Cincinnati Chapter March Meeting ISACA Cincinnati Chapter March Meeting Recent and Proposed Changes to SOC Reports Impacting Service and User Organizations. March 3, 2015 Presenters: Sayontan Basu-Mallick Lori Johnson Agenda SOCR Overview

More information

PISMO BEACH COUNCIL AGENDA REPORT

PISMO BEACH COUNCIL AGENDA REPORT PISMO BEACH COUNCIL AGENDA REPORT SUBJECT/TITLE: REVIEW OF INFORMATION TECHNOLOGY (IT) STATUS AND IT STRATEGIC PLAN IMPLEMENTATION UPDATE. RECOMMENDATION: 1. Receive the IT Status and Implementation Update.

More information

INFORMATION ASSURANCE DIRECTORATE

INFORMATION ASSURANCE DIRECTORATE National Security Agency/Central Security Service INFORMATION ASSURANCE DIRECTORATE CGS Signature Repository A Signature Repository provides a group of signatures for use by network security tools such

More information

2019 Capital Improvement Plan 2018 Adopted vs 2019 Request Executive CIP 2017 Adopted CIP

2019 Capital Improvement Plan 2018 Adopted vs 2019 Request Executive CIP 2017 Adopted CIP Police Department Capital Improvement Plan Project Summary Agency Priority # Light Bar Replacement Project 1 45,000 47,225 - - - - # North Police Station 4-100,000 - - - - # Police Building Improvements

More information

Florida ACCESS Mailing/Scanning/ Indexing Services

Florida ACCESS Mailing/Scanning/ Indexing Services Florida ACCESS Mailing/Scanning/ Indexing Services State of Florida Department of Children and Families ITN#: 01F12GC1 Submitted on: October 2, 2012, 12:00 p.m. EST Submitted by: Xerox State & Local Solutions,

More information

Staff Report City of Manhattan Beach

Staff Report City of Manhattan Beach Staff Report City of Manhattan Beach TO: Honorable Mayor Montgomery and Members of the City Council THROUGH: Geoff Dolan, City Manager FROM: Jim Arndt, Director of Public Works Dana Greenwood, City Engineer

More information

Oceansgate Plymouth University

Oceansgate Plymouth University Oceansgate Plymouth University Feb 2018 Patrick Hartop Head of City Deal patrick.hartop@plymouth.gov.uk Gareth Simmons Strategic Projects Director gareth.simmons@plymouth.gov.uk Why is this so important

More information

CASE STUDY: RELOCATE THE DATA CENTER OF THE NATIONAL SCIENCE FOUNDATION. Alan Stuart, Managing Director System Infrastructure Innovators, LLC

CASE STUDY: RELOCATE THE DATA CENTER OF THE NATIONAL SCIENCE FOUNDATION. Alan Stuart, Managing Director System Infrastructure Innovators, LLC CASE STUDY: RELOCATE THE DATA CENTER OF THE NATIONAL SCIENCE FOUNDATION Alan Stuart, Managing Director National Science Foundation s New Headquarters in Alexandria, Virginia 1. Introduction to the National

More information

Department of the Navy Data Server and Data Center Waiver Scope Matrix and FAQ

Department of the Navy Data Server and Data Center Waiver Scope Matrix and FAQ How to use this document in determining Data Server and Data Center Scope: The predominant factor in determining whether a proposed obligation falls under the Data Server and Data Center Waiver requirement

More information

NTTA Professional Services Procurement Process and Vendor Outreach Efforts

NTTA Professional Services Procurement Process and Vendor Outreach Efforts NTTA Professional Services Procurement Process and Vendor Outreach Efforts Anthony Coleman Director of Business Diversity May 1, 2013 Professional Services Procurement Act Chapter 2254 of the Government

More information

Metro REVISED SYSTEM SAFETY, SECURITY AND OPERATIONS COMMITTEE MARCH 19, 2015 SUBJECT: METRO RED LINE SCADA REPLACEMENT APPROVE CONTRACT MODIFICATION

Metro REVISED SYSTEM SAFETY, SECURITY AND OPERATIONS COMMITTEE MARCH 19, 2015 SUBJECT: METRO RED LINE SCADA REPLACEMENT APPROVE CONTRACT MODIFICATION Metro Los Angeles County Metropolitan Transportation Authority One Gateway Plaza Los Angeles, CA gooiz-2952 2~3 9zz z000 Tel rnetro.net REVISED SYSTEM SAFETY, SECURITY AND OPERATIONS COMMITTEE MARCH 19,

More information

Nuclear Waste Disposal

Nuclear Waste Disposal Nuclear Waste Disposal Page 503 Nuclear Waste Disposal Page 504 Nuclear Waste Disposal Proposed Appropriation Language For nuclear waste disposal activities to carry out the purposes of the Nuclear Waste

More information

APPROVE PROCUREMENT PROCESS FOR EQUIPMENT AND INSTALLATION

APPROVE PROCUREMENT PROCESS FOR EQUIPMENT AND INSTALLATION etro Metropolitan Transportation Authority One Gateway Plaza Los Angeles, CA 90012-2952 213. 922. 20( met,". OPERATIONS COMMITTEE JANUARY 20, 2005 SUBJECT: ACTION~ METRO RED LINE SEGMENT-! REMOTE TERMINAL

More information

CITY COUNCIL AGENDA REPORT

CITY COUNCIL AGENDA REPORT K.5 CITY COUNCIL AGENDA REPORT TYPE OF ITEM: Info/Consent AGENDA ITEM NO.: 5 DATE: December 6, 2016 TO: City Council THROUGH: Greg Nyhoff City Manager FROM: SUBJECT: Darwin Base Fire Chief Additional Appropriation

More information

Federal Data Center Consolidation Initiative (FDCCI) Workshop I: Initial Data Center Consolidation Plan

Federal Data Center Consolidation Initiative (FDCCI) Workshop I: Initial Data Center Consolidation Plan Federal Data Center Consolidation Initiative (FDCCI) Workshop I: Initial Data Center Consolidation Plan June 04, 2010 FDCCI Workshop I Agenda for June 4, 2010 1. Welcome Katie Lewin GSA Director Cloud

More information

Department of Defense Fiscal Year (FY) 2015 IT President's Budget Request Defense Contract Audit Agency Overview

Department of Defense Fiscal Year (FY) 2015 IT President's Budget Request Defense Contract Audit Agency Overview BMA 3.308 Mission Area Business System Breakout Appropriation PROCUREMENT 1.594 Total 31.395 Defense Business Systems 3.528 EIEMA 28.087 All Other Resources 27.867 FY 2015 ($M) FY 2015 ($M) OPERATIONS

More information

Metropolitan Council. Transportation Division Proposed Transit Capital Program

Metropolitan Council. Transportation Division Proposed Transit Capital Program Metropolitan Council Transportation Division Proposed 2015-2020 Transit Capital Program Transportation Committee October 27, 2014 Goals of the 2015 Capital Program Simplify the process Standardize the

More information

CONSTRUCTION MANAGEMENT CONSULTANT SUPPORT SERVICES CONTRACT

CONSTRUCTION MANAGEMENT CONSULTANT SUPPORT SERVICES CONTRACT 35 One Gateway Plaza Los Angeles, CA 90012-2952 213.922.2ooo Tel metro. net CONSTRUCTION COMMITTEE NOVEMBER 20, 2014 SUBJECT: ACTION: CONSTRUCTION MANAGEMENT CONSULTANT SUPPORT SERVICES CONTRACT INCREASE

More information

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO

UNCLASSIFIED R-1 ITEM NOMENCLATURE FY 2013 OCO COST ($ in Millions) FY 2011 FY 2012 Base OCO Total FY 2014 FY 2015 FY 2016 FY 2017 Cost To Complete Total Cost Total Program Element 8.306 7.299 10.429-10.429 11.464 12.492 12.840 13.010 Continuing Continuing

More information

Nokia Conference Call 1Q 2012 Financial Results

Nokia Conference Call 1Q 2012 Financial Results Nokia Internal Use Only Nokia Conference Call 1Q 2012 Financial Results April 19 th, 2012 15.00 Helsinki time 8.00 New York time Stephen Elop President & CEO Timo Ihamuotila CFO Matt Shimao Head of Investor

More information

Downtown Boise Multimodal Center

Downtown Boise Multimodal Center Treasure Valley High Capacity Transit Study Downtown Boise Multimodal Center Environmental Assessment June 2009 Prepared by the Federal Transit Administration and Valley Regional Transit. U.S. Department

More information

National Information Assurance (IA) Policy on Wireless Capabilities

National Information Assurance (IA) Policy on Wireless Capabilities Committee on National Security Systems CNSS Policy No. 17 National Information Assurance (IA) Policy on Wireless Capabilities This document prescribes minimum standards. Your department or agency may require

More information

Campus IT Modernization OPERATIONAL CONTINUITY FLEXIBLE TECHNOLOGY MODERNIZED SYSTEMS

Campus IT Modernization OPERATIONAL CONTINUITY FLEXIBLE TECHNOLOGY MODERNIZED SYSTEMS Campus IT Modernization OPERATIONAL CONTINUITY FLEXIBLE TECHNOLOGY MODERNIZED SYSTEMS Managing the Complexity of IT Modernization Constructing and modernizing a new campus is a complex undertaking, requiring

More information