STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION. Contract plans. Intelligent transportation systems plans

Size: px
Start display at page:

Download "STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION. Contract plans. Intelligent transportation systems plans"

Transcription

1 INDEX OF PLANS SHEET Contract plans A-1 UPGRADE - PHASE II KEY SHEET A-2 GENERAL NOTES A-3 MAP A-4 INSTALLATION NOTES A-5 A-6 EQUIPMENT INSTALLATION & CUT-OVER SEQUENCING NOTES A-7 PROPOSED NETWORK CONFIGURATION H-1 H-42 HUB SITES S-1 S-6 SPUR SITES R-1 R-24 REPEATER SITES T-1 T-32 TURNPIKE SITES E-1 E-4 EQUIPMENT DETAILS STATEWIDE ITS COMMUNICATIONS PROJECT Intelligent transportation systems plans NOTE: THE SCALE OF THESE PLANS MAY HAVE CHANGED DUE TO REPRODUCTION. STATEWIDE ITS Communications NETWORK UPGRADE PROJECT PHASE II GOVERNING STANDARDS AND SPECIFICATIONS: FLORIDA, DESIGN STANDARDS, CURRENT EDIITON, AND STANDARD SPECIFICATIONS R ROAD AND ENGINEER OF RECORD: TERRY POSEY, P.E. BRIDGE CONSTRUCTION, CURRENT EDITION, AS AMENDED BY CONTRACT DOCUMENTS. FDOT PROJECT MANAGER: RANDY PIERCE P.E. NO.: FLORIDA UPGRADE PHASE II KEY SHEET A-1 \\dotscoteo1\traffic_ops_data\public\tsmo\telcom\\ Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\1-Notes\A-Notes vsd Attachment 1 1

2 PROJECT : THESE PLANS AND TECHNICAL SPECIFICATIONS DELINEATE THE REQUIREMENTS R UPGRADING THE STATEWIDE ITS COMMUNICATIONS NETWORK () BY REPLACING ITS AGING NORTEL PASSPORT MULTI-SERVICE SWITCHES, ASN ROUTERS, BPS2000 SWITCHES, AND ETHERNET HUBS, WITH NOKIA 7705 SAR18 MULTIPROTOCOL LABEL SWITCHING (MPLS) DATA TRANSPORT EQUIPMENT. THIS PROJECT WILL SUPPLY, INSTALL, CONFIGURE, AND INTEGRATE NOKIA 7705 SAR18 SERVICE AGGREGATION ROUTERS WITH THE S EXISTING HARRIS DVM6-45 TDM MICROWAVE BACKBONE TO ENABLE CUT-OVER OF ITS TRAFFIC STATEWIDE, WITH MINIMAL IMPACT TO THE FDOT S OPERATIONS. THE VENDOR SHALL REFER TO THE TECHNICAL SPECIFICATIONS, CONTRACT PLANS, AND EQUIPMENT CONFIGURATION INTERFACE PARAMETERS LIST R DETAILED S OF THE SITES OF WORK, INSTALLATION REQUIREMENTS, PROVISIONING OF DATA SERVICES, AND INTERFACE REQUIREMENTS. THE VENDOR SHALL SUPPLY AND CONFIGURE A 7705 SAR-18 R EACH NODE. THE NEW MPLS NETWORK EQUIPMENT SHALL BE COMPATIBLE WITH THE MPLS LOW-LEVEL NETWORK DESIGNS ALREADY IMPLEMENTED IN THE FLORIDA KEYS MICROWAVE PROJECT AND THE DISTRICT 5 RTMC EXPANSION PROJECT, INCLUDING SEAMLESS INTEGRATION OF FDOT S MANAGEMENT AND ITS TRANSPORT SERVICES. THE LOW-LEVEL DESIGNS AND EQUIPMENT CONFIGURATION PARAMETERS R THE EXISTING PROJECTS WILL BE PROVIDED TO THE AWARDED VENDOR. THE VENDOR NETWORK DESIGNERS SHALL ATTEND A DESIGN WORKSHOP IN TALLAHASSEE AFTER A HIGH-LEVEL DESIGN HAS BEEN ACCEPTED. THE DESIGN WORKSHOP WILL BE AN INTERACTIVE SESSION TO FINALIZE AN APPROVED DESIGN OF THE MPLS CORE INCLUDING ALL SERVICES, IP ADDRESSES, AND OTHER DESIGN PARAMETERS. THE VENDOR SHALL STAGE ALL EQUIPMENT SUPPLIED BY THIS PROJECT IN A VENDOR SUPPLIED WAREHOUSE. THE STAGING OF THE EQUIPMENT SHALL BE FULLY INTERCONNECTED AND CONFIGURED AS IT WILL BE IN THE FIELD. THE VENDOR IS RESPONSIBLE R DESIGNING A STAGING ACCEPTANCE PLAN TO BE APPROVED BY THE FDOT. THE FDOT WILL WITNESS SYSTEM STAGING TESTING. THE STAGING ACCEPTANCE PLAN SHALL BE COMPLETELY MET BERE EQUIPMENT MAY BE DEPLOYED TO THE FIELD. THIS PROJECT S NETWORK ARCHITECTURE CENTERS AROUND A 14-NODE MPLS TRANSPORT CORE CONSISTING OF NOKIA 7705 SAR-18S LOCATED AT MICROWAVE BANDWIDTH AGGREGATION HUB SITES. INITIALLY, NOKIA 7705 SAR18 ROUTERS WILL BE INSTALLED AND PLACED INTO OPERATION ACROSS INTER-NODAL DS-1 AGGREGATION LINKS, OPERATING IN PARALLEL WITH THE EXISTING NORTEL PASSPORT NETWORK SWITCHING EQUIPMENT. THE FDOT S ITS CENTER-TO-CENTER (C2C) DATA SERVICES WILL THEN BE MIGRATED FROM THE NORTEL PASSPORT NETWORK EQUIPMENT TO THE 7705 SAR18 S TRANSPORT SERVICES. THE PROJECT WILL NEXT INSTALL 7705 SAR18 ROUTERS AT ALL MICROWAVE REPEATER SITES THROUGHOUT THE STATE, THEN MIGRATE NETWORK MANAGEMENT AND FIELD DATA NETWORK SERVICES FROM THE ASN ROUTERS, BPS2000, AND ETHERNET HUBS, TO THE 7705 SAR18 S TRANSPORT SERVICES. THE NORTEL PASSPORT 15000, WIDEBANK28, ASN ROUTER, BPS2000, AND ETHERNET HUB EQUIPMENT WILL BE DECOMMISSIONED AFTER SUCCESSFUL MIGRATION OF ALL FDOT DATA SERVICES TO THE 7705 SAR18 TRANSPORT NETWORK. THE DEPLOYED SYSTEM SHALL FEATURE COMPLETE INTEGRATION R OPERATIONS, ADMINISTRATION, MAINTENANCE, AND PROVISIONING (OAM&P) WITH NOKIA SERVICE AGGREGATION ROUTERS, NOKIA MPR-9500 MICROWAVE RADIOS, NOKIA OPTICAL TRANSPORT NETWORK EQUIPMENT, AND WITH THE GLOBAL NOKIA 5620 NETWORK FUNCTIONS MANAGER R PACKET, TO SUPPORT MICROWAVE RADIO-AWARE DYNAMIC TRAFFIC ENGINEERING. THE VENDOR SHALL UNINSTALL, REMOVE, AND PROPERLY DISPOSE OF ALL NORTEL PASSPORT 15000, WIDEBANK28, ASN ROUTER, BPS2000, AND BAYSTACK HUB EQUIPMENT, IN ACCORDANCE WITH FDOT PROCEDURES, PRIOR TO SYSTEM ACCEPTANCE. THE VENDOR SHALL UNINSTALL NETGUARDIAN RTUS, MULTITECH VOIP ROUTERS, TELCO SYSTEMS ACCESS60 CHANNEL BANK AND ACCESS60 REDUNDANCY CABLE HARNESSES, AND DELIVER THE EQUIPMENT TO THE FDOT. GENERAL NOTES: 1. THE VENDOR SHALL BE RESPONSIBLE R VERIFYING ALL CONDITIONS AND MEASUREMENTS RELATING TO THE WORK IN THE FIELD PRIOR TO PROCEEDING WITH INSTALLATION, REMOVAL, AND DISPOSAL ACTIVITIES. THE VENDOR SHALL COORDINATE ANY MODIFICATIONS REQUIRED WITH FDOT. 2. THE VENDOR IS RESPONSIBLE R ALL EQUIPMENT, MATERIALS, AND SERVICES REQUIRED TO COMPLETE THIS PROJECT. THE VENDOR IS RESPONSIBLE R VERIFYING THE COMPLETENESS OF MATERIALS REQUIRED AND SUITABILITY OF DEVICES TO MEET THESE PLANS. THE VENDOR SHALL PROVIDE AND INSTALL, WITHOUT CLAIM, ANY ADDITIONAL EQUIPMENT AND SERVICES REQUIRED R OPERATION PER THESE PLANS. 3. THE VENDOR SHALL BE RESPONSIBLE R DETERMINING LOCAL FACILITIES R DELIVERING, STORING, AND LEGALLY DISPOSING OF POST-INSTALLATION MATERIALS. 4. THE VENDOR SHALL PROTECT AND PRESERVE ALL EXISTING UTILITIES, EXCLUDING THOSE REQUIRING UPGRADES OR RELOCATION IN THESE PLANS, LOCATED WITHIN THE INSTALLATION LIMITS OF THE PROJECT. 5. THE VENDOR IS RESPONSIBLE R OBTAINING ANY PERMITS (DEP, SOUTH FLORIDA WATER MANAGEMENT DISTRICT, ETC.) AND MEETING BUILDING OFFICIAL REQUIREMENTS, INCLUDING ASSOCIATED FEES. THE VENDOR IS RESPONSIBLE R CONTACTING APPLICABLE BUILDING OFFICIALS R PERMIT APPLICATIONS AND SUBMITTING TO THE FDOT R SIGNATURE. 6. THE VENDOR SHALL SUBMIT ALL DETAILED DESIGN PLANS R FDOT REVIEW AND APPROVAL PER THESE PLANS AND SPECIFICATIONS. THE VENDOR SHALL NOT BEGIN INSTALLATION WORK UNTIL ALL DESIGN SUBMITTALS ARE APPROVED IN WRITING BY THE FDOT PROJECT MANAGER. 7. THE VENDOR SHALL SUBMIT AN INSTALLATION SCHEDULE TO FDOT R REVIEW AND APPROVAL. 8. THE VENDOR MUST COORDINATE ALL SITE WORK WITH FDOT. THE CONTACT PERSON IS RANDY PIERCE, ALL TOWER AND ANTENNA INSTALLATION WORK SHALL BE DONE BY TOWER CLIMBERS CERTIFIED BY COMTRAIN, OR APPROVED EQUIVALENT. 10. THE VENDOR SHALL COORDINATE EACH ELEMENT ON THE SCHEDULE WITH OTHER INSTALLATION ACTIVITIES AND SHOW EACH ACTIVITY IN PROPER SEQUENCE. FLORIDA GENERAL NOTES (CONT D): 11. THE VENDOR SHALL FIELD LOCATE ALL BURIED GROUNDING, CONDUITS, STRUCTURES, AND UTILITIES IN AND AROUND THE WORK AREA PRIOR TO COMMENCING ANY EXCAVATIONS. ALL DIGGING AND EXCAVATING INSIDE AND AROUND THE SITE COMPOUND SHALL BE PERRMED IN A MANNER CONSISTENT WITH GOOD ENGINEERING PRACTICES. THE USE OF HEAVY EXCAVATING MACHINERY IS NOT PERMITTED. 12. THE VENDOR SHALL RESTRICT PERSONNEL, THE USE OF EQUIPMENT, AND THE STORAGE OF MATERIALS TO AREAS WITHIN THE LIMITS OF INSTALLATION. ANY OFF-SITE STORAGE AREA IS THE RESPONSIBILITY OF THE VENDOR. 13. THE VENDOR SHALL PROVIDE SECURITY R HIS/HER EQUIPMENT AND SHALL CONDUCT HIS/HER OPERATIONS TO AVOID INTERFERENCE WITH FDOT'S NORMAL OPERATIONS. 14. ALL EXISTING DRIVEWAYS, EASEMENTS, AND GROUNDS SHALL BE PROTECTED OR RESTORED TO INITIAL CONDITION IF DAMAGED OR DISTURBED BECAUSE OF INSTALLATION WORK. 15. THE VENDOR SHALL PROVIDE AND MAINTAIN IN A NEAT AND SANITARY CONDITION SUCH ACCOMMODATIONS R THE USE OF HIS/HER EMPLOYEES AS MAY BE NECESSARY TO COMPLY WITH REGULATIONS OF THE OR THE DEPARTMENT OF HEALTH. NO NUISANCE WILL BE PERMITTED. 16. THE VENDOR SHALL BE RESPONSIBLE R REMOVING AND LEGALLY DISPOSING OF THE TRASH GENERATED FROM THE INSTALLATION, INCLUDING LUNCH BAGS AND DRINKS, DAILY. THE VENDOR SHALL NOT ALLOW TRASH TO BLOW AROUND OR AWAY FROM ANY CONSTRUCTION SITE. 17. ALL EQUIPMENT AND SERVICES FURNISHED BY THE VENDOR AS PART OF THIS PROJECT SHALL BE WARRANTED TO BE FREE FROM DEFECTS IN MATERIAL AND WORKMANSHIP. IN THE EVENT ANY SUCH DEFECTS IN EQUIPMENT OR SERVICES BECOME EVIDENT WITHIN THE WARRANTY PERIOD, THE VENDOR SHALL CORRECT THE DEFECT BY REPAIRING OR REPLACING THE DEFECTIVE COMPONENT OR EQUIPMENT AT NO COST TO FDOT DURING THE WARRANTY PERIOD. THE WARRANTY PERIOD SHALL BE A MINIMUM OF 12 MONTHS FROM DATE OF FINAL ACCEPTANCE. CLAIMS UNDER ANY OF THE WARRANTIES HEREIN ARE VALID IF MADE WITHIN 30 DAYS AFTER TERMINATION OF THE WARRANTY PERIOD. 18. THE VENDOR SHALL COLLECT PRODUCT DATA INTO A SINGLE SUBMITTAL R EACH ELEMENT OF INSTALLATION OR SYSTEM. PRODUCT DATA SHALL INCLUDE PRINTED INRMATION SUCH AS MANUFACTURER'S INSTALLATION INSTRUCTIONS AND PERRMANCE SPECIFICATIONS. 19. THE VENDOR SHALL SUBMIT (2) SETS OF AS-BUILT DRAWINGS DEPICTING THE LOCATION OF THE COMPONENTS OF THE COMMUNICATIONS FACILITIES WITH RESPECT TO LOCAL FEATURES AND BENCHMARKS. AS-BUILT DRAWINGS DEPICTING ANY FIELD CHANGES TO THE FACILITIES SHALL ALSO BE SUBMITTED. AS-BUILT DOCUMENTATION SHALL BE SUBMITTED IN ELECTRONIC RMAT, AS WELL AS PRINTED. ALL ITS FACILITY MANAGEMENT ATTRIBUTE RMS SHALL BE COMPLETED IN ACCORDANCE WITH THE TECHNICAL SPECIFICATIONS. APPLICABLE PUBLICATIONS AND STANDARDS: 1. ANSI/TIA-222-G, STRUCTURAL STANDARD R ANTENNA SUPPORTING STRUCTURES AND ANTENNAS, STRUCTURE CLASSIFICATION-III. 2. APPLICABLE MANUFACTURER S INSTRUCTIONS AND STANDARD PRACTICES. 3. APPLICABLE OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (O.S.H.A.) PRACTICES. 4. ASTM A123: STANDARD SPECIFICATION R: ZINC (HOT GALVANIZED) COATINGS ON PRODUCTS FABRICATED FROM ROLLED, PRESSED, AND RGED STEEL SHAPES, PLATES, BARS, AND STRIP. 5. ASTM A153: STANDARD SPECIFICATION R: ZINC COATING (HOT-DIP) ON IRON AND STEEL HARDWARE. 6. EIA-81: MEASURING GROUND RESISTANCE AND POTENTIAL GRADIENTS IN THE EARTH. 7. FLORIDA BUILDING CODE, CURRENT EDITION. 8. CURRENT FDOT STANDARD SPECIFICATIONS R ROAD AND BRIDGE DESIGN. 9. CURRENT FDOT DESIGN STANDARDS. 10. FEDERAL AVIATION ADMINISTRATION REGULATIONS. 11. FEDERAL COMMUNICATIONS COMMISSION REGULATIONS. 12. IEEE 837: STANDARD R QUALIFYING PERMANENT CONNECTIONS USED IN SUBSTATION GROUNDING. 13. NATIONAL ELECTRICAL CODE (NEC) (NFPA 70), CURRENT EDITION. 14. NEC ARTICLE 250: GROUNDING AND BONDING. 15. NIST: NATIONAL INSTITUTE OF STANDARDS AND TECHNOLOGY. 16. UL 467: STANDARDS R GROUNDING AND BONDING EQUIPMENT. 17. NATIONAL FIRE PROTECTION ASSOCIATION (NFPA 780) GENERAL NOTES \\dotscoteo1\traffic_ops_data\public\tsmo\telcom\\ Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\1-Notes\A-Notes vsd Attachment 1 2 A-2

3 Sumter Milton Pensacola Escambia Holt Mossy Head Santa Rosa Crestview DeFuniak Okaloosa STATEWIDE ITS Communications NETWORK (sicn) map Legend Interstate District 1 District 2 District 3 District 4 District 5 District 6 District 7 Repeater Site Sneads Weigh Station Caryville Aspalaga Quincy Walton Chipley Holmes Washington Bay Marianna Tallahassee Jackson Calhoun Liberty Gulf Franklin Gadsden Leon Wakulla Monticello Jefferson Madison Madison Taylor US 41 Greenville SR 222 CR 318 Ocala Lafayette Dixie Wildwood Wildwood Turnpike Hamilton Columbia Baker Suwannee Clermont Gilchrist Saint Catherine Orlando West Interchange Jessamine Temple Terrace Tampa DOT/FHP SR 6 Falmouth Tampa Maintenance Ruskin Pinellas Fruitville Jacaranda SR 136 Levy Orlando South Interchange Canoe Creek Service Plaza Union Citrus Hernando Pasco Alachua Putnam Hillsborough Manatee Sarasota Port Charlotte Lake City Bayshore Bradford Lee Estero Baldwin Sanderson Yulee Nassau Clay Marion Naples Hardee DeSoto Lake Charlotte Miles City Duval St. Johns Polk Collier County Rest Area Miccosukee Andytown Flagler Volusia Seminole Orange Osceola Highlands Glades Hendry Collier Brevard Okeechobee Monroe Jacksonville Saint Johns Rest Area SR 16 Gopher Ridge US 1 Weigh Station Ormond Beach Deland Wilson Road Indian River Port Orange Sanlando Springs St. Lucie Martin Palm Beach Broward Dade Edgewater Mims Cocoa FHP Kenansville Interchange June Park Yeehaw Junction Brevard County Line Site X 90th Avenue Indrio Road Fort Pierce Interchange Fort Pierce Maintenance Stuart Interchange Stuart Maintenance Jupiter Interchange West Palm Beach Interchange Lake Worth FHP Delray Beach Interchange Pompano Beach Interchange McArthur Interchange McArthur Okeechobee Interchange District 6 RTMC Coral Reef Interchange FLORIDA Sicn map \\dotscoteo1\traffic_ops_data\public\tsmo\telcom\\ Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\1-Notes\A-Notes vsd A-3 Attachment 1 3

4 INSTALLATION DESIGN PLAN: 1. THE VENDOR SHALL SUBMIT DETAILED DESIGN PLANS AND A DETAILED COMPREHENSIVE MATERIALS LIST R FDOT REVIEW AND APPROVAL PRIOR TO INSTALLATION WORK. 2. THE VENDOR SHALL SUBMIT A NETWORK LOW-LEVEL DESIGN AND EQUIPMENT CONFIGURATION INTERFACE PARAMETERS LIST, WHICH DEFINES THE NETWORK MPLS TRANSPORT SERVICES AND THE SERVICE ACCESS ROUTER INTERFACES. 3. THE NETWORK DESIGN SHALL BE REALIZED WITH NOKIA 7705 SAR-18 SERVICE AGGREGATION ROUTER, NOKIA 7750 SR-A8 SERVICE ROUTER, AND NOKIA MPR-9500 MICROWAVE PACKET RADIO TECHNOLOGY, TO PROVIDE COMPATIBILITY WITH THE FDOT S STATEWIDE ITS COMMUNICATIONS NETWORK MICROWAVE TDM DS-1 TRANSPORT BACKBONE, THE NOKIA NETWORK FUNCTIONS MANAGER R PACKET, AND NOKIA S MICROWAVE RADIO AWARE TRAFFIC ENGINEERING CAPABILITY. GENERAL INSTALLATION NOTES: 1. THE VENDOR SHALL SUBMIT A DETAILED OVERALL PROJECT PLAN TO BE APPROVED BY THE FDOT. THE PLANS SHALL INCLUDE AN EQUIPMENT INSTALLATION AND CUT-OVER SEQUENCING PLAN. THE PLAN SHALL INCLUDE A SCHEDULE OF EVENTS DETAILING EACH PHASE OF INSTALLATION, INCLUDING A PROJECTED TIMELINE. 2. THE VENDOR SHALL PROVIDE AND INSTALL ALL ETHERNET SWITCHING EQUIPMENT, ANCILLARY EQUIPMENT, SURGE PROTECTION, GROUNDING, RACKS, ANTENNAS, AND ASSOCIATED MOUNTING HARDWARE IN ACCORDANCE WITH THESE PLANS. ALL EQUIPMENT AND COMPONENT PARTS FURNISHED SHALL BE NEW, MEET OR EXCEED THE MINIMUM REQUIREMENTS STATED HEREIN, AND PERRM TO MANUFACTURER S SPECIFICATIONS. NO PART OR ATTACHMENT SHALL BE SUBSTITUTED OR APPLIED CONTRARY TO THE MANUFACTURER'S RECOMMENDATIONS AND STANDARD PRACTICES. 3. THE VENDOR SHALL FURNISH AND INSTALL ALL GPS ANTENNAS, COAXIAL CABLES, POWER CABLES, DATA CABLES, AND RESPECTIVE CONNECTORS, HARDWARE, ENTRY PORT BOOTS, SEALS, AND CONDUITS. 4. THE TRANSMISSION LINES SHALL BE INSTALLED IN SUCH A MANNER THAT DOES NOT VIOLATE THE MANUFACTURER S MAXIMUM TWIST, MINIMUM E-BEND RADIUS, AND MINIMUM H-BEND RADIUS SPECIFICATIONS. ANY ELLIPTICAL WAVEGUIDES OR OTHER TRANSMISSION LINES DAMAGED BY THE VENDOR SHALL BE REPLACED WITH NEW FULL-LENGTH WAVEGUIDES OR OTHER TRANSMISSION LINES, WITHOUT CLAIM, AND AT THE VENDOR S COST. 5. THE VENDOR IS RESPONSIBLE R VERIFYING CORRECT SIZE, GENDER, AND SUITABILITY OF ALL CABLE CONNECTORS AND SURGE PROTECTIVE DEVICES. HUB SITE INSTALLATION NOTES: 1. THE VENDOR SHALL PROVIDE AND INSTALL THE GPS ANTENNA SYSTEMS, ELECTRONIC EQUIPMENT, RACKS, SURGE PROTECTIVE DEVICES (SPD), AND LIGHTNING PROTECTION AND GROUNDING SYSTEMS PER THESE PLANS, IN ACCORDANCE WITH SHEETS H-1 THROUGH H ALL COAXIAL TRANSMISSION LINES SHALL BE EQUIPPED WITH SPDS PER THESE SPECIFICATIONS. ALL SPDS SHALL BE CONNECTED DIRECTLY TO THE BULKHEAD UPON ENTERING THE COMMUNICATIONS SHELTER. 3. THE VENDOR SHALL PROVIDE AND INSTALL -48 VDC A/B FUSE PANEL, NOKIA 7705 SAR-18 SERVICE AGGREGATION ROUTER, DSX PANEL, DS-1 SPDS, AND APPROPRIATE DIN MOUNTED ETHERNET SPDS INTO THE DESIGNATED RACK(S) SHOWN ON SITE-SPECIFIC BLDG INSTALLATION PLANS. THE VENDOR SHALL PROVIDE NEW RACKS AS SPECIFIED. HOWEVER, DUE TO SPACE CONSTRAINTS, SOME SITE INSTALLATIONS REQUIRE EQUIPMENT INTEGRATION INTO EXISTING RACKS. RACK SPACE ALLOCATIONS AND EXISTING RACKS PROVIDED BY OTHERS ARE SHOWN ON THE SITE-SPECIFIC BLDG INSTALLATION PLANS. 4. THE NEW EQUIPMENT RACKS SHALL BE EIA 19-INCH BY 7-FEET OPEN ALUMINUM RELAY EQUIPMENT RACKS BUD INDUSTRIES, MODEL ARR-1272-NATURAL, OR APPROVED EQUIVALENT. THE RACKS SHALL BE MOUNTED TO THE FLOOR USING RELAY RACK ANCHOR KITS B- LINE SYSTEMS MODEL SB-588-A, APPROVED EQUIVALENT. THE RELAY RACKS SHALL BE INSTALLED IN ACCORDANCE WITH THE CONTRACT PLANS. 5. THE VENDOR SHALL PROVIDE AND INSTALL INTERCONNECTION WIRING AND JUMPERS R POWER, ETHERNET, FIBER OPTIC, COAXIAL, AND DS-1, IN ACCORDANCE WITH THESE CONTRACT PLANS. 6. THE VENDOR SHALL CONFIGURE THE NOKIA 7705 SAR-18 EQUIPMENT IN ACCORDANCE WITH THE VENDOR S LOW-LEVEL NETWORK DESIGN TO ACHIEVE TRANSPORT AND INTERNETWORKING OPERATION OF THE DATA SERVICES AND ATTACHED DEVICES AS SPECIFIED ON THE EQUIPMENT CONFIGURATION INTERFACE PARAMETERS LIST. 7. THE VENDOR SHALL CUT-OVER THE INSTALLED SYSTEM IN ACCORDANCE WITH THE APPROVED EQUIPMENT INSTALLATION AND CUT- OVER SEQUENCING PLAN, AND TEST AND VERIFY ALL NETWORK SERVICES AND EQUIPMENT OPERATIONS. REPEATER AND SPUR SITE INSTALLATION NOTES: 1. THE VENDOR SHALL PROVIDE AND INSTALL THE ELECTRONIC EQUIPMENT, RACKS, SPDS, AND LIGHTNING PROTECTION AND GROUNDING SYSTEMS PER THESE PLANS, IN ACCORDANCE WITH SHEETS S-1 THROUGH S-6 R SPUR SITES, AND R-1 THROUGH R-24 R REPEATER SITES. 2. THE VENDOR SHALL PROVIDE AND INSTALL -48 VDC A/B FUSE PANEL, NOKIA 7705 SAR-18 SERVICE AGGREGATION ROUTER, DSX PANEL, DS- 1 SPDS, AND APPROPRIATE DIN MOUNTED ETHERNET SPDS INTO THE DESIGNATED RACK(S) SHOWN ON THE SITE-SPECIFIC BLDG INSTALLATION PLANS. THE VENDOR SHALL PROVIDE NEW RACKS AS SPECIFIED. HOWEVER, DUE TO SPACE CONSTRAINTS, SOME SITE INSTALLATIONS REQUIRE EQUIPMENT INTEGRATION INTO EXISTING RACKS. RACK SPACE ALLOCATIONS AND EXISTING RACKS PROVIDED BY OTHERS ARE SHOWN ON THE SITE-SPECIFIC BLDG INSTALLATION PLANS. 3. THE NEW EQUIPMENT RACKS SHALL BE EIA 19-INCH BY 7-FEET OPEN ALUMINUM RELAY EQUIPMENT RACKS BUD INDUSTRIES, MODEL ARR NATURAL, OR APPROVED EQUIVALENT. THE RACKS SHALL BE MOUNTED TO THE FLOOR USING RELAY RACK ANCHOR KITS B-LINE SYSTEMS MODEL SB-588-A, APPROVED EQUIVALENT. THE RELAY RACKS SHALL BE INSTALLED IN ACCORDANCE WITH THE CONTRACT PLANS. 4. THE VENDOR SHALL PROVIDE AND INSTALL INTERCONNECTION WIRING AND JUMPERS R POWER, ETHERNET, FIBER OPTIC, COAXIAL, AND DS-1, IN ACCORDANCE WITH THESE CONTRACT PLANS. 5. THE VENDOR SHALL CONFIGURE THE NOKIA 7705 SAR-18 EQUIPMENT IN ACCORDANCE WITH THE VENDOR S LOW-LEVEL NETWORK DESIGN TO ACHIEVE TRANSPORT AND INTERNETWORKING OPERATION OF THE DATA SERVICES AND ATTACHED DEVICES AS SPECIFIED ON THE EQUIPMENT CONFIGURATION INTERFACE PARAMETERS LIST. 6. THE VENDOR SHALL CUT-OVER THE INSTALLED SYSTEM IN ACCORDANCE WITH THE APPROVED EQUIPMENT INSTALLATION AND CUT-OVER SEQUENCING PLAN, AND TEST AND VERIFY ALL NETWORK SERVICES AND EQUIPMENT OPERATIONS. TURNPIKE SITE INSTALLATION NOTES: 1. THE VENDOR SHALL PROVIDE AND INSTALL THE GPS ANTENNA SYSTEMS, ELECTRONIC EQUIPMENT, RACKS, SPDS, AND LIGHTNING PROTECTION AND GROUNDING SYSTEMS PER THESE PLANS, IN ACCORDANCE WITH SHEETS T-1 THROUGH T ALL COAXIAL TRANSMISSION LINES SHALL BE EQUIPPED WITH SPDS PER THESE SPECIFICATIONS. ALL SPDS SHALL BE CONNECTED DIRECTLY TO THE BULKHEAD UPON ENTERING THE COMMUNICATIONS SHELTER. 3. THE VENDOR SHALL PROVIDE AND INSTALL -48 VDC A/B FUSE PANEL, NOKIA 7705 SAR-18 SERVICE AGGREGATION ROUTER, DSX PANEL, DS- 1 SPDS, APPROPRIATE DIN MOUNTED ETHERNET SPDS, AND DPS NETGUARDIAN RTU, DPS SPDS, INTO THE DESIGNATED RACK(S) SHOWN ON THE SITE-SPECIFIC BLDG INSTALLATION PLANS. THE VENDOR SHALL PROVIDE NEW RACKS AS SPECIFIED. HOWEVER, DUE TO SPACE CONSTRAINTS, SOME SITE INSTALLATIONS REQUIRE EQUIPMENT INTEGRATION INTO EXISTING RACKS. RACK SPACE ALLOCATIONS AND EXISTING RACKS PROVIDED BY OTHERS ARE SHOWN ON THE SITE-SPECIFIC BLDG INSTALLATION PLANS. 4. THE NEW EQUIPMENT RACKS SHALL BE EIA 19-INCH BY 7-FEET OPEN ALUMINUM RELAY EQUIPMENT RACKS BUD INDUSTRIES, MODEL ARR NATURAL, OR APPROVED EQUIVALENT. THE RACKS SHALL BE MOUNTED TO THE FLOOR USING RELAY RACK ANCHOR KITS B-LINE SYSTEMS MODEL SB-588-A, APPROVED EQUIVALENT. THE RELAY RACKS SHALL BE INSTALLED IN ACCORDANCE WITH THE CONTRACT PLANS. 5. THE VENDOR SHALL PROVIDE AND INSTALL THE WALL MOUNTED MULTITECH VOIP ROUTER, RED TELEPHONE, PUNCH BLOCKS, INTERCONNECT WIRING, AND LIGHTNING PROTECTION GROUND BONDING ON THE SHELTER TELCO BACKBOARD AS SHOWN ON SHEET E THE VENDOR SHALL CONNECT AND CONFIGURE THE EXISTING TELCO SYSTEMS ACCESS60 CHANNEL TO PROVIDE SNMP NETWORK MANAGEMENT SUPPORT AT EACH TURNPIKE SITE. INSTALL ETHERNET CONNECTION, WITH SPD, TO THE 7705 SAR18 AS SPECIFIED IN THE EQUIPMENT CONFIGURATION INTERFACE PARAMETERS LIST. 7. THE VENDOR SHALL PROVIDE AND INSTALL INTERCONNECTION WIRING AND JUMPERS R POWER, ETHERNET, FIBER OPTIC, COAXIAL, AND DS-1, IN ACCORDANCE WITH THESE CONTRACT PLANS. 8. THE VENDOR SHALL CONFIGURE THE NOKIA 7705 SAR-18 EQUIPMENT IN ACCORDANCE WITH THE VENDOR S LOW-LEVEL NETWORK DESIGN TO ACHIEVE TRANSPORT AND INTERNETWORKING OPERATION OF THE DATA SERVICES AND ATTACHED DEVICES AS SPECIFIED ON THE EQUIPMENT CONFIGURATION INTERFACE PARAMETERS LIST. 9. THE VENDOR SHALL CUT-OVER THE INSTALLED SYSTEM IN ACCORDANCE WITH THE APPROVED EQUIPMENT INSTALLATION AND CUT-OVER SEQUENCING PLAN, AND TEST AND VERIFY ALL NETWORK SERVICES AND EQUIPMENT OPERATIONS. DATE 8/7/18 REV. 1 ADD INSTALLATION OF SAFETY CLIMB SYSTEM SANLANDO SPRINGS NOTES 1 AND 2 DATE REV. FLORIDA Installation Notes \\dotscoteo1\traffic_ops_data\public\tsmo\telcom\\ Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\1-Notes\A-Notes vsd A-4 Attachment 1 4

5 EQUIPMENT INSTALLATION AND CUT-OVER SEQUENCING PLAN: 1. GENERAL 1.1 THE VENDOR SHALL SUBMIT A DETAILED EQUIPMENT INSTALLATION AND CUT-OVER SEQUENCING PLAN R APPROVAL BY FDOT. THE PLAN SHALL INCLUDE A DETAILED ORDER OF INSTALLATIONS, SERVICES CUT-OVER, TESTING, AND REMOVALS. 1.2 THE FDOT S NETWORK SYSTEMS ARE IN SERVICE AND CARRYING CRITICAL COMMUNICATIONS TRAFFIC. ANY DOWNTIME OF THE EXISTING SYSTEM MUST BE COORDINATED WITH THE FDOT PRIOR TO THE DOWNTIME OCCURRENCE. ALL WORK CLASSIFIED AS CAUSING LESS THAN FIVE MINUTES OF DOWNTIME REQUIRES A MINIMUM OF TWO DAYS PRIOR NOTICE. ALL WORK CLASSIFIED AS CAUSING FIVE MINUTES OR MORE DOWNTIME REQUIRES A MINIMUM OF TEN DAYS PRIOR NOTICE AND MUST BE COORDINATED WITH THE FDOT PRIOR TO OCCURRENCE. 1.3 THE VENDOR SHALL CONFIGURE, STAGE, AND TEST THE EQUIPMENT AND SERVICES IN A SYSTEM STAGING FACILITY BERE DEPLOYING TO THE FIELD. THE FDOT SHALL WITNESS AND ACCEPT THE TEST RESULTS BERE THE VENDOR INSTALLS THE EQUIPMENT IN THE FIELD AND CUTS-OVER SERVICES. 2. WILSON ROAD NFM-P, 7750 SERVICE ROUTER 2.1 RELOCATE NETWORK FUNCTIONS MANAGER R PACKET (NFM-P) SERVER FROM DISTRICT 6 RTMC AND INSTALL AND CONFIGURE INTO THE EXISTING WILSON RD 7705 SAR-18 RACK, SEE SHEET H-1 UPGRADE THE NFM-P SYSTEM HARDWARE AND SOFTWARE TO SUPPORT THE NOKIA EQUIPMENT, SERVICES, AND PROTOCOLS IMPLEMENTED BY THIS PROJECT. 2.2 INSTALL AND CONFIGURE THE 7750 SERVICE ROUTER INTO THE WILSON RD 7705 SAR-18 RACK, SEE SHEET H EXECUTE RECONFIGURATION OF THE 7705 TO ACTIVATE THE INTERIM EQUIPMENT CONFIGURATION PARAMETERS, SHEET A TEST AND VERIFY NFM-P OPERATIONS AMONG THE JACKSONVILLE, WILSON RD, SANLANDO SPRINGS, AND KEYS MICROWAVE NETWORK NODES. 3. HUB SITES MPLS CORE, MICROWAVE DS-1 TRANSMISSION LINKS 3.1 INSTALL 7705 SAR18 AT THE LLOWING HUB SITES: 1. PENSACOLA 2. CHIPLEY 3. TALLAHASSEE 4. LAKE CITY 5. WILDWOOD 6. TAMPA MAINTENANCE 7. JACARANDA 8. NAPLES 9. MCARTHUR 10. STUART MAINTENANCE 11. JUNE PARK 12. PORT ORANGE 3.2 ACTIVATE T2 #2 DROP/INSERT ON ALL DVM MUX A2/B2 M12 CARDS AT EACH REPEATER SITE LOCATED BETWEEN HUB SITES. 3.3 CUT-OVER DS-1 #1, AND #5-18 FROM EACH DVM6-45 MUX TO THE HUB SITE 7705 SAR-18 DS-1 BUNDLE AGGREGATION INTERFACES, IN ACCORDANCE WITH INTERIM EQUIPMENT CONFIGURATION INTERFACE PARAMETERS LIST. SITES DESIGNATED REQUIRE SPECIAL DS-1 CUT-OVER, IN ACCORDANCE WITH THE INTERIM EQUIPMENT CONFIGURATION PARAMETERS LIST: 1. PENSACOLA 2. CHIPLEY 3. TALLAHASSEE 4. LAKE CITY 5. WILDWOOD TAMPA MAINTENANCE CUT-OVER DS-1 #1, AND #5-18 FROM THE TEMPLE TERRACE COORDINATE SITE DVM6-45 TO THE EXISTING 7705 SAR18. CUT-OVER DS-1 #1, AND #5-18 FROM THE RUSKIN COORDINATE SITE DVM6-45 TO THE EXISTING 7705 SAR18. CUT-OVER DS-1 #1, #2, #5, #7, AND #8 FROM THE TAMPA FHP COORDINATE SPUR DVM10-8T TO THE EXISTING 7705 SAR JACARANDA 8. NAPLES 9. MCARTHUR 10. STUART MAINTENANCE 11. JUNE PARK 12. PORT ORANGE JACKSONVILLE CUT-OVER DS-1 #1, AND #5-18 FROM THE BALDWIN COORDINATE SITE DVM6-45 TO THE 7705 SAR18. CUT-OVER DS-1 #2, AND #5-28 FROM THE YULEE COORDINATE SPUR DVM6-45 TO THE 7705 SAR18. SOFTWARE RECONFIGURATION OF THE DS-1 BUNDLE IS REQUIRED. DS-1 #1, AND #5-18 FROM THE ST. JOHNS REST AREA COORDINATE SITE DVM6-45 ARE PRE-WIRED TO THE 7705 SAR-18, NO DS-1 CUT-OVER IS NEEDED. SANLANDO SPRINGS SOFTWARE RECONFIGURATION OF THE DS-1 BUNDLE IS REQUIRED.DS-1 #1, AND #5-18 FROM THE DELAND COORDINATE SITE DVM6-45 ARE PRE-WIRED TO THE EXISTING 7705 SAR18, NO DS-1 CUT-OVER NEEDED. 3. HUB SITES MPLS CORE, MICROWAVE DS-1 TRANSMISSION LINKS (CONT D) 3.4 COMMISSION THE INTERIM EQUIPMENT CONFIGURATION INTERFACE PARAMETERS AT ALL HUB SITES AND TEST HUB SITES MPLS CORE NETWORK OPERATION 3.5 PERRM INTERIM SITE EQUIPMENT INTERFACE PORT CUT-OVERS FROM AVAYA 8800/8600, BPS2000, ASN ROUTER, AND BAYSTACK HUB TO 7705 SAR18 AT EACH HUB SITE. SEE INTERIM EQUIPMENT CONFIGURATION INTERFACE PARAMETERS LIST. 3.6 CUT-OVER ALL ITS WAN SERVICES FROM THE PASSPORT TRANSPORT TO THE 7705 SAR18 HUB SITES MPLS CORE NOW TRANSPORTED ON DS-1 BUNDLE #9-18. (3-DAY PERRMANCE TEST) 4. SPUR SITES MPLS SEGMENTS, MICROWAVE DS-1 TRANSMISSION LINKS 4.1 INSTALL 7705 SAR18 AT EACH SPUR SITE: 1. SR6 2. YULEE 3. TAMPA DOT/FHP 4.2 SR6 SPUR SITE - CUT-OVER DS-1 #5-8 FROM THE DVM6-45 MUX TO THE 7705 SAR-18 DS-1 BUNDLE AGGREGATION INTERFACE. PERRM INTERIM SITE EQUIPMENT INTERFACE PORT CUT-OVERS FROM BPS2000, ASN ROUTER, AND BAYSTACK HUB TO 7705 SAR18 AT THE SPUR SITE. SEE INTERIM EQUIPMENT CONFIGURATION INTERFACE PARAMETERS LIST. 4.3 YULEE SPUR SITE - CUT-OVER DS-1 #2 AND #5-28 FROM THE DVM6-45 MUX TO THE 7705 SAR-18 DS-1 BUNDLE AGGREGATION INTERFACE. PERRM INTERIM SITE EQUIPMENT INTERFACE PORT CUT-OVERS FROM BPS2000, ASN ROUTER, AND BAYSTACK HUB TO 7705 SAR18 AT THE SPUR SITE. SEE INTERIM EQUIPMENT CONFIGURATION INTERFACE PARAMETERS LIST. 4.4 TAMPA DOT/FHP SPUR SITE - CUT-OVER DS-1 #1, #2, #5, #7, AND #8 FROM THE DVM10-8T MUX TO THE 7705 SAR-18 DS-1 BUNDLE AGGREGATION INTERFACE. PERRM INTERIM SITE EQUIPMENT INTERFACE PORT CUT-OVERS FROM BPS2000, ASN ROUTER, AND BAYSTACK HUB TO 7705 SAR18 AT THE SPUR SITE. SEE INTERIM EQUIPMENT CONFIGURATION INTERFACE PARAMETERS LIST. 4.5 COMMISSION THE INTERIM EQUIPMENT CONFIGURATION PARAMETERS AT THE SPUR SITES AND TEST SPUR SITES MPLS CORE NETWORK OPERATION (3-DAY PERRMANCE TEST). 5. REPEATER SITES MPLS SEGMENTS, MICROWAVE DS-1 TRANSMISSION LINKS 5.1 INSTALL 7705 SAR18 AT EACH REPEATER SITE ALONG THE LLOWING HUB-TO-HUB REPEATER SITES SEGMENTS: 1. PENSACOLA_CHIPLEY (6) 2. CHIPLEY_TALLAHASSEE (4) 3. TALLAHASSEE-LAKE CITY (5) 4. LAKE CITY_JACKSONVILLE (2) 5. LAKE CITY_WILDWOOD (4) 6. WILDWOOD_TAMPA MAINTENANCE (3) 7. TAMPA MAINTENANCE_JACARANDA (2) 8. JACARANDA_NAPLES (3) 9. NAPLES_MCARTHUR (4) 10. STUART MAINTENANCE_JUNE PARK (4) 11. JUNE PARK_PORT ORANGE (3) 12. PORT ORANGE_JACKSONVILLE (5) 13. PORT ORANGE_SANLANDO SPRINGS (1) 5.2 CUT-OVER DS-1 #1, AND #5-8 FROM EACH DVM6-45/CONSTELLATION MUX TO THE REPEATER SITE 7705 SAR-18 DS-1 BUNDLE AGGREGATION INTERFACES. PERRM INTERIM SITE EQUIPMENT INTERFACE PORT CUT-OVERS FROM BPS2000, ASN ROUTER, AND BAYSTACK HUB TO 7705 SAR18 AT ALL REPEATER SITES STATEWIDE. THE FALMOUTH REPEATER SITE REQUIRES SPECIAL SITE- SPECIFIC DS-1 CUT-OVER. SEE INTERIM EQUIPMENT CONFIGURATION INTERFACE PARAMETERS LIST. 5.3 COMMISSION THE INTERIM EQUIPMENT CONFIGURATION PARAMETERS AT ALL REPEATER SITES AND TEST REPEATER SITES MPLS CORE NETWORK OPERATION (3-DAY PERRMANCE TEST). FLORIDA EQUIPMENT INSTALLATION AND CUT-OVER SEQUENCING Notes \\dotscoteo1\traffic_ops_data\public\tsmo\telcom\\ Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\1-Notes\A-Notes vsd A-5 Attachment 1 5

6 6.TURNPIKE REPEATER SITES MPLS SEGMENT, MICROWAVE DS-1 TRANSMISSION LINKS 6.1 INSTALL 7705 SAR18, NETGUARDIAN RTU. AND MULTITECH VOIP, AT EACH SITE ALONG THE TURNPIKE WILDWOOD TO CORAL REEF MICROWAVE SYSTEM: 1. WILDWOOD TURNPIKE 2. CLERMONT 3. ORLANDO WEST 4. ORLANDO SOUTH (RTU AND VOIP PREINSTALLED) 5. CANOE CREEK 6. KENANSVILLE 7. YEEHAW JUNCTION 8. SITE X 9. RT PIERCE INTERCHANGE 10. STUART INTERCHANGE 11. JUPITER 12. WEST PALM BEACH 13. DELRAY BEACH 14. POMPANO BEACH 15. MCARTHUR INTERCHANGE 16. OKEECHOBEE 17. CORAL REEF 6.2 AT EACH SITE, CUT-OVER SITE-SPECIFIC DS-1 CHANNELS FROM EACH DVM6-45 MUX TO THE 7705 SAR-18 DS-1 BUNDLE AGGREGATION INTERFACES, IN ACCORDANCE WITH THE INTERIM EQUIPMENT CONFIGURATION INTERFACE PARAMETERS LIST. 6.3 INSTALL FIBER OPTIC TRANSMISSION PATHS FROM STUART INTERCHANGE TO STUART MAINTENANCE, AND MCARTHUR TO MCARTHUR INTERCHANGE. 6.4 PERRM INTERIM SITE EQUIPMENT INTERFACE PORT CUT-OVERS FROM BPS2000, ASN ROUTER, AND BAYSTACK HUB TO 7705 SAR18 AT CORAL REEF AND ORLANDO SOUTH. SEE INTERIM EQUIPMENT CONFIGURATION INTERFACE PARAMETERS LIST. 6.5 COMMISSION THE INTERIM EQUIPMENT CONFIGURATION PARAMETERS AT ALL TURNPIKE REPEATER SITES AND TEST REPEATER SITES MPLS CORE NETWORK OPERATION (3-DAY PERRMANCE TEST) 7.FINAL SITE EQUIPMENT INTERFACE PORT CONFIGURATION AND DS-1 LINKS CUT-OVER 7.1 AFTER SUCCESSFUL COMPLETION OF INTERIM SITE EQUIPMENT INTERFACE PORT CUT-OVERS AT ALL HUB, SPUR, AND REPEATER SITES: EXECUTE RECONFIGURATION OF ALL 7705 SAR18 ROUTERS TO ACTIVATE THE FINAL MPLS SERVICES AND SERVICES ACCESS PORTS NETWORK CONFIGURATIONS. SEE FINAL EQUIPMENT CONFIGURATION INTERFACE PARAMETERS LIST. (3- DAY PERRMANCE TEST) 7.2 CUT-OVER REMAINDER DS-1 #3, #4, AND #19-28 FROM EACH DVM6-45 MUX TO THE HUB SITE 7705 SAR-18 DS-1 BUNDLE AGGREGATION INTERFACES, IN ACCORDANCE WITH FINAL EQUIPMENT CONFIGURATION INTERFACE PARAMETERS LIST. SITES DESIGNATED REQUIRE SPECIAL DS-1 CUT-OVER, IN ACCORDANCE WITH THE FINAL EQUIPMENT CONFIGURATION INTERFACE PARAMETERS LIST. UNINSTALL AND DISPOSE OF PASSPORT 15000, WIDEBANK28, ASN ROUTER, BPS2000, BAYSTACK HUB. UNINSTALL #2 NETGUARDIAN EQUIPMENT FROM EACH HUB SITE AND DELIVER TO FDOT. HUB SITES: 1. PENSACOLA 2. CHIPLEY 3. TALLAHASSEE 4. LAKE CITY 5. WILDWOOD 6. TAMPA MAINTENANCE 7. JACARANDA JACKSONVILLE SOFTWARE RECONFIGURATION OF THE DS-1 BUNDLE IS REQUIRED. DS-1 #3, #4, AND #19-28 FROM THE ST. JOHNS REST AREA COORDINATE SITE DVM6-45 ARE PRE-WIRED TO THE EXISTING 7705 SAR-18, NO DS-1 CUT-OVER IS NEEDED. SANLANDO SPRINGS SOFTWARE RECONFIGURATION OF THE DS-1 BUNDLE IS REQUIRED. DS-1 #3, #4, AND #19-28 FROM THE DELAND COORDINATE SITE DVM6-45 ARE PRE-WIRED TO THE EXISTING 7705 SAR-18, NO DS-1 CUT-OVER IS NEEDED. NAPLES CUT-OVER REMAINDER DS-1 #3, #4, AND #19-26 FROM THE BAYSHORE COORDINATE SITE DVM6-45 MUX TO THE HUB SITE 7705 SAR-18 DS-1 BUNDLE AGGREGATION INTERFACE. CUT-OVER REMAINDER DS-1 #3, #4, AND #19-26 FROM THE MILES CITY COORDINATE SITE CONSTELLATION MUX TO THE HUB MCARTHUR CUT-OVER REMAINDER DS-1 #3, #4, AND #19-26 FROM THE ANDYTOWN COORDINATE SITE CONSTELLATION MUX TO THE HUB STUART MAINTENANCE CUT-OVER REMAINDER DS-1 #3, #4, #19-22, AND #24-28 FROM THE RT PIERCE COORDINATE SITE DVM6-45 MUX TO THE HUB EQUIPMENT INSTALLATION AND CUT-OVER SEQUENCING PLAN (CONT D): 7.FINAL SITE EQUIPMENT INTERFACE PORT CONFIGURATION AND DS-1 LINKS CUT-OVER (CONT D): JUNE PARK CUT-OVER REMAINDER DS-1 #3, #4, #19-22, AND #24-28 FROM THE COCOA FHP COORDINATE SITE DVM6-45 MUX TO THE HUB CUT-OVER REMAINDER DS-1 #3, #4, #19-22, AND #24-28 FROM THE BREVARD LINE COORDINATE SITE DVM6-45 MUX TO THE HUB PORT ORANGE CUT-OVER REMAINDER DS-1 #3, #4, AND #19-28 FROM THE ORMOND BEACH COORDINATE SITE DVM6-45 MUX TO THE HUB CUT-OVER REMAINDER DS-1 #3, #4, AND #19-28 FROM THE DELAND COORDINATE SITE DVM6-45 MUX TO THE HUB SITE 7705 SAR-18 DS-1 BUNDLE AGGREGATION INTERFACE. CUT-OVER REMAINDER DS-1 #3, #4, #19-22, AND #24-28 FROM THE EDGEWATER COORDINATE SITE DVM6-45 MUX TO THE HUB 7.5 CUT-OVER REMAINDER DS-1 #3 AND #4, FROM EACH DVM MUX TO EACH SPUR SITE 7705 SAR-18 DS-1 BUNDLE AGGREGATION INTERFACES, IN ACCORDANCE WITH FINAL EQUIPMENT CONFIGURATION INTERFACE PARAMETERS LIST. UNINSTALL AND DISPOSE OF ASN ROUTER, BPS2000, AND BAYSTACK HUB EQUIPMENT FROM EACH SPUR SITE: 1. SR6 2. YULEE 3. TAMPA DOT/FHP 7.6 CUT-OVER REMAINDER DS-1 #3 AND #4, FROM EACH DVM6-45 MUX TO EACH REPEATER SITE 7705 SAR-18 DS-1 BUNDLE AGGREGATION INTERFACES, IN ACCORDANCE WITH FINAL EQUIPMENT CONFIGURATION INTERFACE PARAMETERS LIST. UNINSTALL AND DISPOSE OF ASN ROUTER, BPS2000, AND BAYSTACK HUB EQUIPMENT FROM EACH REPEATER SITE. 7.7 CUT-OVER REMAINDER SITE-SPECIFIC DS-1S FROM EACH DVM6-45 MUX TO EACH TURNPIKE REPEATER SITE 7705 SAR-18 DS-1 BUNDLE AGGREGATION INTERFACES, IN ACCORDANCE WITH FINAL EQUIPMENT CONFIGURATION INTERFACE PARAMETERS LIST. UNINSTALL AND DISPOSE OF ASN ROUTER, BPS2000, AND BAYSTACK HUB EQUIPMENT FROM ORLANDO SOUTH AND CORAL REEF. 7.8 COMMENCE 20-DAY PERRMANCE TEST PERIOD. INSPECTION NOTES: 1. THE INSPECTION SHALL BE PERRMED BY THE VENDOR AND WITNESSED BY FDOT. THE VENDOR SHALL NOTIFY FDOT AT LEAST 10 DAYS PRIOR TO COMPLETION OF INSTALLATION. THE VENDOR AND FDOT SHALL VERIFY JOINTLY THAT ALL INSTALLATION WORK IS CORRECTLY INSTALLED AND FUNCTIONAL. 2. THE VENDOR SHALL NOTIFY FDOT AT LEAST TWO DAYS PRIOR TO COMPLETION OF GROUNDING INSTALLATION R INSPECTION. ANY BELOW GRADE GROUNDING INSTALLATIONS AND GROUND CONNECTIONS SHALL NOT BE BACKFILLED UNTIL INSPECTED AND APPROVED BY THE FDOT. GROUNDING SHALL BE INSPECTED R PROPER CONNECTION TYPES, TIGHTNESS, WORKMANSHIP, AND CONRMANCE WITH THE APPROVED DESIGN. ANY EXOTHERMIC BONDS THAT ARE DEEMED UNSATISFACTORY SHALL BE REPAIRED BY THE VENDOR WITH NEW BONDS, WITHOUT CLAIM. 3. ALL SITES SHALL BE INSPECTED TO BE FREE OF DECOMMISSIONED EQUIPMENT AND DEBRIS; AND THAT EXCAVATIONS ARE BACKFILLED AND COMPOUND RESTORED. 4. LLOWING THE COMPLETION OF INSPECTIONS AND FDOT APPROVAL OF THE PERRMANCE AND TEST CRITERIA BY FDOT, THE INSTALLED EQUIPMENT AND FACILITIES SHALL BE SUBJECTED TO A 20-DAY PERRMANCE PERIOD. R THE PURPOSE OF THE SUCCESSFUL PERRMANCE PERIOD, FAILURE OF OPERATION IS DEFINED AS THE FAILURE OF A MAJOR COMPONENT OR SERVICE OPERATION OF THE SITE (NETWORK SERVICES ROUTING, ELECTRONIC EQUIPMENT, ANTENNAS, ETC.). FLORIDA EQUIPMENT INSTALLATION AND CUT-OVER SEQUENCING Notes \\dotscoteo1\traffic_ops_data\public\tsmo\telcom\\ Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\1-Notes\A-Notes vsd Attachment 1 6 A-6

7 Pensacola Chipley DOT 6 REPEATERS Tallahassee SR 6 Falmouth 6 DS-1 Yulee Jacksonville 2 5 REPEATERS 2 REPEATERS Lake City 5 REPEATERS Wildwood 2 REPEATERS Port Orange STATEWIDE ITS Communications NETWORK (sicn) PROPOSED NETWORK CONFIGURATION 3 REPEATERS Wilson Rd 5620 SAM 7750 Service Router 3 REPEATERS June Park 19 DS-1 Tampa DOT/FHP Tampa Maintenance 9 REPEATERS TURNPIKE 19 DS-1 2 REPEATERS Jacaranda Stuart Turnpike Repeater Site Stuart Maintenance 3 REPEATERS TURNPIKE McArthur TPK Repeater Site Naples McArthur 18 DS-1 Okeechobee Turnpike Site Coral Reef Turnpike Site KEYS MICROWAVE NETWORK FLORIDA PROPOSED NETWORK CONFIGURATION \\dotscoteo1\traffic_ops_data\public\tsmo\telcom\\ Technology Replacement Plan\Phase 2 Contract Plans\Contract Plans\1-Notes\A-Notes vsd A-7 Attachment 1 7

Florida Courts E-Filing Authority Board. April Readiness Report

Florida Courts E-Filing Authority Board. April Readiness Report Florida Courts E-Filing Authority Board Monday, April 30, 2012 efiling Project Team eportal Usage Statistics January 1, 2011 March 31, 2012: Cases Filed = 116,535 7,769 per month Documents Filed = 136,371

More information

STATE OF FLORIDA CONTRACT NUMBER: ORDERING INSTRUCTIONS

STATE OF FLORIDA CONTRACT NUMBER: ORDERING INSTRUCTIONS ORDERING INSTRUCTIONS COMPANY: TOSHIBA AMERICA BUSINESS SOLUTIONS, INC. FEDERAL IDENTIFICATION NUMBER: 33-0865305 CONTRACT Primary contact person responsible for answering questions regarding the contract

More information

Tip Sheets for Running the Macro

Tip Sheets for Running the Macro Steps to Request Files from Data Manager to Export to Macro 1. LOG ON Go to: http://www.bdi2datamanager.com Use your administrator log-in and password or another log-in that has administrative privileges

More information

Florida Birth-to-Five Child Outcomes Measurement System

Florida Birth-to-Five Child Outcomes Measurement System TATS Tips For Running the Macro-LES 2017-2018 What IS a Macro? A Macro is a series of commands and functions that are stored and can be run whenever you need to perform the task. (Microsoft Office) The

More information

Florida Birth-to-Five Child Outcomes Measurement System

Florida Birth-to-Five Child Outcomes Measurement System TATS Tips For Running the Macro-LEA 2017-2018 What IS a Macro? A Macro is a series of commands and functions that are stored and can be run whenever you need to perform the task. (Microsoft Office) The

More information

CAPITAL PROJECTS PLAN

CAPITAL PROJECTS PLAN CAPITAL PLAN 2009-2010 STATE UNIVERSITY SYSTEM (SUS) ITEM 14 SUS MAINTENANCE 00 0407 10 106 UF 10,067,558 00 0407 10 104 FSU 3,869,171 00 0407 10 101 FAMU 1,336,857 00 0407 10 108 USF 3,684,068 00 0407

More information

Liaison Contact Information Brad Martin

Liaison Contact Information Brad Martin 11 Plantation Rd. DeBary, FL 32713 (800) 6538-4097 (386) 575-2000 sunshine811.com Thank you for your interest in becoming a member of Sunshine 811. Membership is mandatory per s.556.104 of the Underground

More information

FLORIDA DEPARTMENT OF JUVENILE JUSTICE Slot Utilization/Residential Programs Report June 19, 2018

FLORIDA DEPARTMENT OF JUVENILE JUSTICE Slot Utilization/Residential Programs Report June 19, 2018 FLORIDA DEPARTMENT OF JUVENILE JUSTICE Slot Utilization/Residential Programs Report June 19, 2018 Circuit Circuit 1 Escambia Boys Base Non-Secure 28 27 1 0 3 6 100.00% 07/12/2018 Circuit 1 Okaloosa Youth

More information

Pavement Management Graphic Reporting System Using Existing IBM Hardware and SAS Software

Pavement Management Graphic Reporting System Using Existing IBM Hardware and SAS Software 286 TRANSPORTATION RESEARCH RECORD 1311 Pavement Management Graphic Reporting System Using Existing IBM Hardware and SAS Software BRUCE T. DIETRICH The use of interactive computerized color graphics to

More information

CHARTER TOWNSHIP OF ALLENDALE, OTTAWA COUNTY, MICHIGAN WIRELESS COMMUNICATION FACILITIES APPLICATION

CHARTER TOWNSHIP OF ALLENDALE, OTTAWA COUNTY, MICHIGAN WIRELESS COMMUNICATION FACILITIES APPLICATION CHARTER TOWNSHIP OF ALLENDALE, OTTAWA COUNTY, MICHIGAN WIRELESS COMMUNICATION FACILITIES APPLICATION This application is to be completed in compliance with Article 25 of the Charter Township of Allendale

More information

MODIFIED SPECIAL PROVISION APPROVAL REQUEST (REV ) Date: 11/02/2015 District: 5 Type: Project Specific

MODIFIED SPECIAL PROVISION APPROVAL REQUEST (REV ) Date: 11/02/2015 District: 5 Type: Project Specific MODIFIED SPECIAL PROVISION APPROVAL REQUEST (REV 11-02-15) Date: 11/02/2015 District: 5 Type: Project Specific Letting Month: March 2016 FPID Number: 435443-2-52-01 Requested by: Mark Herring Office/Phone:

More information

DISTRICT 1A Escambia, Santa Rosa. DISTRICT 1B Walton, Okaloosa

DISTRICT 1A Escambia, Santa Rosa. DISTRICT 1B Walton, Okaloosa 8/7/2008 1 of 8 pages Randall Reese, M.D., Medical Pensacola Pediatrics, P.A. 1368 Country Club Road Gulf Breeze, FL 32563 (850) 934-9876 FAX (850) 916-0736 Email: randallreese@earthlink.net Satellite

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR MICROWAVE VEHICLE DETECTION SYSTEM

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR MICROWAVE VEHICLE DETECTION SYSTEM MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR MICROWAVE VEHICLE DETECTION SYSTEM ITS:CLC 1 of 6 APPR:LWB:DBP:07-31-13 FHWA:APPR:09-23-13 a. Description. This work consists of one or more

More information

SUPERVISORY CONTROL AND DATA ACQUISITION SYSTEM (SCADA)

SUPERVISORY CONTROL AND DATA ACQUISITION SYSTEM (SCADA) TECHNICAL SPECIAL PROVISION FOR SUPERVISORY CONTROL AND DATA ACQUISITION SYSTEM (SCADA) FINANCIAL PROJECT NO.: 428213-2-52-02 MARION COUNTY The official record of this Technical Special Provision is the

More information

District (K-12) ITV Contacts

District (K-12) ITV Contacts District (K-12) s Alachua County Schools (10) Joe Baldry Television Production Manager 3700 N.E. 53rd Avenue Gainesville FL 32609-2000 Phone: 352/995-6860 x267 352/955-6872 Email: baldrygj@sbac.edu Baker

More information

1. Section Lightning Protection for lightning protection system. D. The installation shall be in conformance with NEC Article 285.

1. Section Lightning Protection for lightning protection system. D. The installation shall be in conformance with NEC Article 285. SECTION 26 04 75 - SURGE PROTECTION DEVICES PART 1 - GENERAL 1.1 SUMMARY A. Applicable provisions of the General Conditions, Supplementary General Conditions and Special Conditions shall govern work performed

More information

Computer Network Design Guide Existing Systems 1 / 6

Computer Network Design Guide Existing Systems 1 / 6 COMPUTER NETWORK DESIGN GUIDELINE FOR EXISTING SYSTEMS DOCUMENT NUMBER: 16765 APPLICATION: ELEMENTARY, MIDDLE AND HIGH SCHOOL DATE OF ISSUE: 11-27-06 - First Issued NOTES: The attached guideline should

More information

Florida Procedures for the Launch of GED Computer-Based Testing

Florida Procedures for the Launch of GED Computer-Based Testing Eligibility to Test As of November 2012, all test takers in Florida are eligible to take both paper-based and computer-based versions of the exam. If a candidate has already tested on a paper-based format

More information

Strategic Intermodal System Funding Strategy

Strategic Intermodal System Funding Strategy Strategic Intermodal System Funding Strategy FIRST FIVE YEAR PLAN Multimodal FY 201 /201 through FY 201 /201 Capacity Projects on the Strategic Intermodal System State of Florida Department of Transportation

More information

17. Microwave Collocation 17.1 General

17. Microwave Collocation 17.1 General Original Page 1 17.1 General 17.1.1 General A. Unless otherwise specified herein, general regulations contained in Sections 1 through 4 and Sections 14 and 15 apply in addition to the regulations contained

More information

SPECIAL SPECIFICATION 1303 Lifelink

SPECIAL SPECIFICATION 1303 Lifelink 1993 Specifications CSJ 0024-08-110 SPECIAL SPECIFICATION 1303 Lifelink 1. Description. This Item shall govern for the furnishing and installation of LifeLink equipment in Fiber Hubs (existing and proposed)

More information

Master Hub Ethernet Switch (MHES)

Master Hub Ethernet Switch (MHES) TECHNICAL SPECIAL PROVISION FOR Master Hub Ethernet Switch (MHES) FINANCIAL PROJECT NO.: 428213-2-52-02 MARION COUNTY The official record of this Technical Special Provision is the electronic file signed

More information

SPECIFICATION STANDARD COPPER RISER AND INTRABUILDING CABLING

SPECIFICATION STANDARD COPPER RISER AND INTRABUILDING CABLING PART 1: GENERAL 1.01 SCOPE OF WORK A. The Designer and Contractor are responsible to be familiar with the provisions contained herein and with other Sections of this Specification as applicable to the

More information

EXHIBIT A FLORIDA DEPARTMENT OF TRANSPORTATION TECHNICAL SPECIFICATIONS FLORIDA KEYS ITS MICROWAVE SYSTEM FOR. March 28, 2016

EXHIBIT A FLORIDA DEPARTMENT OF TRANSPORTATION TECHNICAL SPECIFICATIONS FLORIDA KEYS ITS MICROWAVE SYSTEM FOR. March 28, 2016 EXHIBIT A FLORIDA DEPARTMENT OF TRANSPORTATION TECHNICAL SPECIFICATIONS FOR FLORIDA KEYS ITS MICROWAVE SYSTEM March 28, 2016 FILE: T:\KEYS MICROWAVE SYSTEM\TECHNICALSPECIFICATIONS\KEYSMW_TECHNICALSPECIFICATIONS_20160328.DOCX

More information

f) Telecommunications Equipment Rooms

f) Telecommunications Equipment Rooms SECTION 270000 - COMMUNICATIONS PART 1 - GENERAL 1.1 GENERAL REQUIREMENTS A. The Contractor is held responsible to be familiar with the provisions contained herein and with other Sections of this Specification

More information

SPECIAL SPECIFICATION 8143 Wireless Ethernet Radio System

SPECIAL SPECIFICATION 8143 Wireless Ethernet Radio System 2004 Specifications CSJ 0002-01-080 SPECIAL SPECIFICATION 8143 Wireless Ethernet Radio System 1. Description. Furnish and install Wireless Ethernet Radio System (WERS) links for pointto-point applications,

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION

MICHIGAN DEPARTMENT OF TRANSPORTATION MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR GROUNDING, BONDING, LIGHTNING PROTECTION AND SURGE PROTECTION FOR INTELLIGENT TRANSPORTATION SYSTEM EQUIPMENT ITS:CLC 1 of 5 APPR:LWB:DBP:07-31-13

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR MICROWAVE VEHICLE DETECTION SYSTEM

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR MICROWAVE VEHICLE DETECTION SYSTEM MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR MICROWAVE VEHICLE DETECTION SYSTEM ITS:CLC 1 of 5 APPR:JVG:DBP:06-29-17 FHWA:APPR:08-02-17 a. Description. This work consists of one or more

More information

ITS DEVICE INTEGRATION AND TESTING

ITS DEVICE INTEGRATION AND TESTING TECHNICAL SPECIAL PROVISION FOR ITS DEVICE INTEGRATION AND TESTING FINANCIAL PROJECT NO.: 435443-2-52-01 ORANGE COUNTY & SEMINOLE COUNTY The official record of this Technical Special Provision has been

More information

Expenditures Report, March 2017.xlsx

Expenditures Report, March 2017.xlsx 3/1/2017 91.50 Demko, Todd Check 3/2/2017 9,656.08 Florida Department of Revenue Check 3/2/2017 14,116.49 Heart of Florida United Way, Inc. Check 3/2/2017 11,349.66 Children of Inmates, Inc. Check 3/2/2017

More information

SPECIAL SPECIFICATION 1861 Premium Subrate Data Multiplexer and Distribution Panel

SPECIAL SPECIFICATION 1861 Premium Subrate Data Multiplexer and Distribution Panel 1993 Specifications CSJ s 0924-06-221, etc. & 0924-06-223 SPECIAL SPECIFICATION 1861 Premium Subrate Data Multiplexer and Distribution Panel 1. Description. This Item shall govern for the furnishing and

More information

Virginia State Fire Marshal s Office

Virginia State Fire Marshal s Office Virginia State Fire Marshal s Office Application for the USE of PYROTECHNICS INSIDE State-owned Buildings and OUTDOORS on State-owned Property Before a Proximate Audience 1. Applicant Name/Company: 2.

More information

Florida Statewide Regional Evacuation Study Program

Florida Statewide Regional Evacuation Study Program Florida Statewide Regional Evacuation Study Program Methodology and Support Documentation Volume 8 Florida Division of Emergency Management All Florida Regional Planning Councils Includes Hurricane Evacuation

More information

Communications. UNM IT/Telecommunications Guide Specification Communications

Communications. UNM IT/Telecommunications Guide Specification Communications The material below covers specific information we definitely want to be included in the contract documents and may not be a completed specification section. This material is to be highlighted in your preliminary

More information

Eaton s Innovative Technology Surge Suppression Guideform Specification Low Exposure DIVISION 16 SECTION 16289

Eaton s Innovative Technology Surge Suppression Guideform Specification Low Exposure DIVISION 16 SECTION 16289 PART 1 - GENERAL DIVISION 16 SECTION 16289 TRANSIENT VOLTAGE SURGE SUPPRESSION (TVSS) 1.1 RELATED DOCUMENTS General: Drawings and general provisions of the Contract, including General and Supplementary

More information

NZQA registered unit standard version 2 Page 1 of 7. Demonstrate basic knowledge of electronic security data protocols and cabling

NZQA registered unit standard version 2 Page 1 of 7. Demonstrate basic knowledge of electronic security data protocols and cabling Page 1 of 7 Title Demonstrate basic knowledge of electronic security data protocols and cabling Level 3 Credits 15 Purpose This unit standard is for electronic security installers engaged in the installation

More information

Eaton s Innovative Technology Surge Suppression Guideform Specification High Exposure DIVISION 16 SECTION 16289

Eaton s Innovative Technology Surge Suppression Guideform Specification High Exposure DIVISION 16 SECTION 16289 PART 1 - GENERAL DIVISION 16 SECTION 16289 TRANSIENT VOLTAGE SURGE SUPPRESSION (TVSS) 1 RELATED DOCUMENTS General: Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

CHILD WELFARE PRE-SERVICE TRAINING PROVIDERS March Pre-Service Provider CPI & FSC Pre-Service Provider CPI Pre-Service Provider - FSC

CHILD WELFARE PRE-SERVICE TRAINING PROVIDERS March Pre-Service Provider CPI & FSC Pre-Service Provider CPI Pre-Service Provider - FSC 1 Lakeview Center Contact: Gary Holloway Jr. UWF Child Welfare Training Town and Country Plaza Address: 3300 N. Pace Boulevard Suite 519 Pensacola, FL 32505 Phone: 850-598-0421 Email: GHolloway@uwf.edu

More information

SPECIAL SPECIFICATION 8371 Field Terminal Server

SPECIAL SPECIFICATION 8371 Field Terminal Server 2004 Specifications CSJ 0914-00-280 SPECIAL SPECIFICATION 8371 Field Terminal Server 1. Description. Furnish, install, and make fully operational a Field Terminal Server at designated locations as shown

More information

Certification Process & Procedures. Michelle Holmes Certification Administrator

Certification Process & Procedures. Michelle Holmes Certification Administrator Certification Process & Procedures Michelle Holmes Certification Administrator 407-825-7132 michelle.holmes@goaa.org Small Business Program Policies GOAA s Small Business Development Department administers

More information

DIVISION 16 SECTION Surge Protective Device Submittal (SPD)

DIVISION 16 SECTION Surge Protective Device Submittal (SPD) DIVISION 16 SECTION 16289 Surge Protective Device Submittal (SPD) PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. General: Drawings and general provisions of the Contract, including General and Supplementary

More information

I See Budget Amendment

I See Budget Amendment TAB13 City of Palmetto Agenda Item Meeting Date 02/06/2017 Presenter: Scott Tyler I Department: Police Department Title: 2017-03 FY16 Byrne Memorial Justice Assistance Grant- Rapid ID The Florida Department

More information

SECTION TRANSIENT VOLTAGE SURGE SUPPRESSION

SECTION TRANSIENT VOLTAGE SURGE SUPPRESSION SECTION 16709 TRANSIENT VOLTAGE SURGE SUPPRESSION PART 1 GENERAL 1.01 SUMMARY A. Section Includes: Transient Voltage Surge Suppression (TVSS) devices, also known as Surge Protective Devices (SPDs), for

More information

ADDENDUM NO. 5 DATE: January 14, 2015

ADDENDUM NO. 5 DATE: January 14, 2015 FLORIDA DEPARTMENT OF TRANSPORTATION Procurement Office 605 Suwannee Street, MS 20 Tallahassee, Florida 32399-0450 Phone: (850) 414-4568 Fax: (850) 414-4951 ADDENDUM NO. 5 DATE: January 14, 2015 BID#:

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION

MICHIGAN DEPARTMENT OF TRANSPORTATION MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR GROUNDING, BONDING, LIGHTNING PROTECTION AND SURGE PROTECTION FOR INTELLIGENT TRANSPORTATION SYSTEM EQUIPMENT ITS:CLC 1 of 6 APPR:MDW:JVG:06-08-18

More information

Qualified Partner Programme QPP. Installation Practice Felice Guarna Wetzikon, July 2001

Qualified Partner Programme QPP. Installation Practice Felice Guarna Wetzikon, July 2001 Qualified Partner Programme QPP Installation Practice Felice Guarna Wetzikon, Why installation quality Product performance must be preserved by an accurate installation Long term warranty requires design

More information

Florida Association for Pupil Transportation

Florida Association for Pupil Transportation EXECUTIVE COMMITTEE 2011-12 OFFICERS February 29, 2012 Greg Akin, President c/o Volusia District Schools GPAkin@volusia.k12.fl.us (386) 258-4677 ext 50544 Richard Duckworth, President-elect c/o Charlotte

More information

SPECIAL SPECIFICATION 1826 Field Ethernet Switch

SPECIAL SPECIFICATION 1826 Field Ethernet Switch 1993 Specifications CSJ 0521-04-223 SPECIAL SPECIFICATION 1826 Field Ethernet Switch 1. Description. Furnish, install, and make fully operational a Field Ethernet Switch at designated locations as shown

More information

Copper Riser And Intrabuilding Cabling

Copper Riser And Intrabuilding Cabling Copper Riser And Intrabuilding Cabling PART 1: GENERAL The Contractor is held responsible to be familiar with the provisions contained herein and with other Sections of this Specification as applicable

More information

SECTION FARE COLLECTION SYSTEM

SECTION FARE COLLECTION SYSTEM SECTION 17830 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes requirements for the Ticket Vending Machines (TVMs) and for the Clipper Network Card Interface Devices (CIDs) as a subsystem of the station

More information

SunGuide SM Disseminator Supplement

SunGuide SM Disseminator Supplement SunGuide SM Disseminator Supplement Inside This Issue Following is a compilation of quarterly progress reports provided by FDOT Districts and the Florida Turnpike Enterprise: District One Advanced Traffic

More information

Tarleton State University. Specifications

Tarleton State University. Specifications Tarleton State University Campus Communication Infrastructure Specifications Cabling Standards Summary This document identifies Tarleton State University communication infrastructure standards. The communication

More information

SPECIFICATION STANDARD

SPECIFICATION STANDARD PART 1: GENERAL 1.01 SCOPE OF WORK SPECIFICATION STANDARD A. Work covered by this Section shall consist of furnishing labor, equipment, supplies, materials, and testing unless otherwise specified, and

More information

KANABEC COUNTY HIGHWAY DEPARTMENT Chad T. Gramentz, P.E. County Engineer 903 Forest Avenue East Mora, MN

KANABEC COUNTY HIGHWAY DEPARTMENT Chad T. Gramentz, P.E. County Engineer 903 Forest Avenue East Mora, MN KANABEC COUNTY HIGHWAY DEPARTMENT Chad T. Gramentz, P.E. County Engineer 903 Forest Avenue East Mora, MN 55051 320-679-6300 Dear Property Owner: Kanabec County Culvert Policy implemented August 1, 1975

More information

SPECIAL SPECIFICATION 8885 Wireless Ethernet Radio (Backhaul) Link

SPECIAL SPECIFICATION 8885 Wireless Ethernet Radio (Backhaul) Link 2004 Specifications CSJ 0016-06-046, etc. SPECIAL SPECIFICATION 8885 Wireless Ethernet Radio (Backhaul) Link 1. Description. Furnish and install Wireless Ethernet Radio (WER) (Backhaul) Link in the 5.8

More information

SECTION TRANSIENT VOLTAGE SUPPRESSION FOR LOW-VOLTAGE ELECTRICAL POWER CIRCUITS

SECTION TRANSIENT VOLTAGE SUPPRESSION FOR LOW-VOLTAGE ELECTRICAL POWER CIRCUITS SECTION 264313 - TRANSIENT VOLTAGE SUPPRESSION FOR LOW-VOLTAGE ELECTRICAL POWER CIRCUITS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and

More information

and Network Interface Modules Installation Instructions

and Network Interface Modules Installation Instructions 4010-9817 and 4010-9821 Network Interface Modules Installation Instructions Cautions and Warnings DO NOT INSTALL ANY SIMPLEX PRODUCT THAT APPEARS DAMAGED. Upon unpacking your Simplex product, inspect the

More information

2019 AFC BOARD OF DIRECTORS

2019 AFC BOARD OF DIRECTORS 2019 AFC BOARD OF DIRECTORS 1. Executive Committee 2. Commission Chairs 3. Region Directors 4. Committee Chairs (Ex Officio) 5. Board Liaisons (Ex-Officio) EXECUTIVE COMMITTEE President - Marjorie McGee

More information

SCOPE OF SERVICES FIBER OPTIC NETWORK DESIGN CITY OF OVERLAND PARK, KANSAS

SCOPE OF SERVICES FIBER OPTIC NETWORK DESIGN CITY OF OVERLAND PARK, KANSAS 1.0 PROJECT ADMINISTRATION SCOPE OF SERVICES FIBER OPTIC NETWORK DESIGN CITY OF OVERLAND PARK, KANSAS Project Administration services shall consist of project management and other support services for

More information

UF-IFAS Jackson County Extension Office Marianna, FL 32448

UF-IFAS Jackson County Extension Office Marianna, FL 32448 Institute of Food and Agricultural Sciences 2741 Pennsylvania Ave. UF-IFAS Jackson County Extension Office Marianna, FL 32448 Information for the next Certified Pile Burners Course: The Florida Forest

More information

SPECIAL SPECIFICATION 6838 Wireless Ethernet Microwave Radio

SPECIAL SPECIFICATION 6838 Wireless Ethernet Microwave Radio 2004 Specifications CSJ 1068-02-124 SPECIAL SPECIFICATION 6838 Wireless Ethernet Microwave Radio 1. Description. Furnish and install Wireless Ethernet Microwave Radio (WEMR) as shown on the plans, as detailed

More information

VigorSwitch P1092 PoE Smart Lite Giga Switch Quick Start Guide

VigorSwitch P1092 PoE Smart Lite Giga Switch Quick Start Guide i VigorSwitch P1092 PoE Smart Lite Giga Switch Quick Start Guide Version: 1.0 Firmware Version: V1.01.03 (For future update, please visit DrayTek web site) Date: December 26, 2017 ii Intellectual Property

More information

ROAD COMMISSION FOR OAKLAND COUNTY SPECIAL PROVISION FOR VIDEO SURVEILLANCE MANAGEMENT SYSTEM (VSMS) SOFTWARE

ROAD COMMISSION FOR OAKLAND COUNTY SPECIAL PROVISION FOR VIDEO SURVEILLANCE MANAGEMENT SYSTEM (VSMS) SOFTWARE ROAD COMMISSION FOR OAKLAND COUNTY SPECIAL PROVISION FOR VIDEO SURVEILLANCE MANAGEMENT SYSTEM (VSMS) SOFTWARE RCOC:AJ PAGE 1 OF 5 RCOC12T819F 09/14/2015 a. Description. This work consists of the furnishing,

More information

Northwest Needs Improvements Survey

Northwest Needs Improvements Survey PW5 NW 107th Ave One thousand feet N of NW 122nd St Okeechobee Rd Widen bridge over Miami Canal PW6 NW 82nd Ave NW 8th St NW 12th St Construct new 4-lane road PW7 NW 87 Ave NW 36th St NW 58th St Add 2-lanes

More information

SPECIAL SPECIFICATION 1838 Computer Room VoIP Gateway/Gatekeeper

SPECIAL SPECIFICATION 1838 Computer Room VoIP Gateway/Gatekeeper 1993 Specifications CSJ 0521-04-223 SPECIAL SPECIFICATION 1838 Computer Room VoIP Gateway/Gatekeeper 1. Description. Furnish, install, and make fully operational a Computer Room Voice-over- Internet Protocol

More information

SPECIAL SPECIFICATION 8939 Retrofit Existing Fiber Optic Dynamic Message Sign System to LED

SPECIAL SPECIFICATION 8939 Retrofit Existing Fiber Optic Dynamic Message Sign System to LED 2004 Specifications CSJ 0025-02-194, 0017-10-261, 0017-10-268 & 0017-10-271 SPECIAL SPECIFICATION 8939 Retrofit Existing Fiber Optic Dynamic Message Sign System to LED 1. Description. Retrofit existing

More information

SPECIAL SPECIFICATION 6230 Fiber Optic RS-232 Data Modem

SPECIAL SPECIFICATION 6230 Fiber Optic RS-232 Data Modem 2004 Specifications CSJ 0924-06-258 SPECIAL SPECIFICATION 6230 Fiber Optic RS-232 Data Modem 1. Description. This Item shall govern for the furnishing and installation of Fiber Optic RS- 232 Data Modem

More information

Hosted VoIP Unified Communications Service

Hosted VoIP Unified Communications Service Request for Proposals: Hosted VoIP Unified Communications Service June 2018 Hosted VoIP Unified Communications Service Published: July 3, 2018 Responses Due: July 27, 2018 Submit bid to: Goleta Union School

More information

FLORIDA DEPTARTMENT OF TRANSPORTATION REQUEST FOR INFORMATION (RFI) SHORTEST PATH BRIDGING OVER THE ITS WAN

FLORIDA DEPTARTMENT OF TRANSPORTATION REQUEST FOR INFORMATION (RFI) SHORTEST PATH BRIDGING OVER THE ITS WAN RFI-DOT-14/15-9015-RC RPFD FLORIDA DEPTARTMENT OF TRANSPORTATION REQUEST FOR INFORMATION (RFI) SHORTEST PATH BRIDGING OVER THE ITS WAN The Department of Transportation, ITS Program of the Traffic Engineering

More information

PART 2 - General Terms and Conditions Original Sheet 1 SECTION 9 - Connections

PART 2 - General Terms and Conditions Original Sheet 1 SECTION 9 - Connections PART 2 - General Terms and Conditions Original Sheet 1 1. CONNECTIONS OF TERMINAL EQUIPMENT AND COMMUNICATION SYSTEMS TO EXCHANGE SERVICES 1.1. GENERAL PROVISIONS A. GENERAL Customer, or authorized user,

More information

Request for Proposal Palos Heights School District 128 Network Infrastructure and WIFI E-Rate Form 470: Palos Heights, IL 60463

Request for Proposal Palos Heights School District 128 Network Infrastructure and WIFI E-Rate Form 470: Palos Heights, IL 60463 Request for Proposal Network Infrastructure and WIFI E-Rate Form 470: 170062975 Date of Bid Due: On or before March 3, 2017 at 11:00 AM is requesting bids for E-Rate Category 2 Internal Connections as

More information

Managed WAN SLA. Contents

Managed WAN SLA. Contents Managed WAN SLA Contents Terminology... 2 Service Description... 2 Service Offerings... 2 Private Network Services... 2 Ethernet Connectivity... 2 T-1 Connectivity... 3 Other Connectivity... 3 Internet

More information

TECHNICAL SPECIAL PROVISION FOR. ITS Automatic Vehicle Identification System (AVI): Financial Project ID:

TECHNICAL SPECIAL PROVISION FOR. ITS Automatic Vehicle Identification System (AVI): Financial Project ID: TECHNICAL SPECIAL PROVISION FOR ITS Automatic Vehicle Identification System (AVI): Financial Project ID: 435443-2-52-01 ORANGE COUNTY & SEMINOLE COUNTY The official record of this Technical Special Provision

More information

A. The high quality, lightweight, varifocal manual iris lens shall be suitable for applications where scene and lighting requirements are consistent.

A. The high quality, lightweight, varifocal manual iris lens shall be suitable for applications where scene and lighting requirements are consistent. Section 00000 SECURITY ACCESS AND SURVEILLANCE ADEMCO VIDEO VARIFOCAL MANUAL IRIS LENS PART 1 GENERAL 1.01 SUMMARY The intent of this document is to specify the minimum criteria for the design, supply,

More information

A7. COIN TELEPHONE SERVICE

A7. COIN TELEPHONE SERVICE AT&T FLORIDA GENERAL EXCHANGE GUIDEBOOK Second Revised Page 1 FL-15-0096 EFFECTIVE: January 26, 2016 CONTENTS A7.1 Reserved for Future Use 1 A7.2 Reserved for Future Use 1 A7.3 Reserved for Future Use

More information

AURA BOCA COLONNADE Project #RW

AURA BOCA COLONNADE Project #RW LWDD Board Workshop 03/06/2018 - Agenda Item #3 AURA BOCA COLONNADE Project #RW-18-0027 March 6, 2018 Nicole Smith, Right-of-Way Coordinator SITE Looking East from Congress Avenue Congress Avenue L-42

More information

Unified Development Code. Public Workshop No. 3 November 7, 2017

Unified Development Code. Public Workshop No. 3 November 7, 2017 Unified Development Code Public Workshop No. 3 November 7, 2017 Purpose of the Project 2 The overall goal of the project is to bring together the County s Land Development Regulations (Chapter 74 of the

More information

The Narragansett Electric Company. d/b/a National Grid (Rhode Island Reliability Project) RIPUC Dkt. No Testimony of. Todd G. Kopoyan, P.E.

The Narragansett Electric Company. d/b/a National Grid (Rhode Island Reliability Project) RIPUC Dkt. No Testimony of. Todd G. Kopoyan, P.E. d/b/a National Grid (Rhode Island Reliability Project) RIPUC Dkt. No. 0 Testimony of Todd G. Kopoyan, P.E. February 0, 00 0 0 INTRODUCTION Q. Please state your name and business address. A. My name is

More information

Addendum # 2. Bid # Scoreboards (Softball Baseball Soccer) Addition Specification on Softball and Baseball

Addendum # 2. Bid # Scoreboards (Softball Baseball Soccer) Addition Specification on Softball and Baseball Addendum # 2 Bid # 20170328 Scoreboards (Softball Baseball Soccer) Addition Specification on Softball and Baseball NEVCO, INC. MODEL 1608 SCOREBOARD PART 1 - GENERAL 1.1 SUMMARY 1.2 REFERENCES A. American

More information

AT&T s SIP-Trunking Admin Guide

AT&T s SIP-Trunking Admin Guide AT&T s SIP-Trunking Admin Guide Prepared for the State of Florida Brought to you by AT&T October 16, 2017 P a g e 2 TABLE OF CONTENTS Preface... 5 Purpose of this Guide... 6 What is SIP Trunking?... 7

More information

Florida. Education and technology are two of our greatest social equalizers.

Florida. Education and technology are two of our greatest social equalizers. Corporate Social Responsibility Florida Education and technology are two of our greatest social equalizers. As the worldwide leader in networking, Cisco knows technology can be used to improve access to

More information

ARLINGTON COUNTY, VIRGINIA

ARLINGTON COUNTY, VIRGINIA ARLINGTON COUNTY, VIRGINIA County Board Agenda Item Meeting of December 12, 2015 DATE: December 1, 2015 SUBJECT: SP-84-U-15-1 USE PERMIT ASSOCIATED WITH A SITE PLAN for a telecommunications facility; located

More information

Filing Date: Effective Date: Issued pursuant to Telecom Regulatory Policy CRTC ,

Filing Date: Effective Date: Issued pursuant to Telecom Regulatory Policy CRTC , CARRIER ACCESS TARIFF CRTC 21462 TELUS Communications Company 2nd Revised Page 226-1 Cancels 1st Revised Page 226-1 226 Wholesale Internet ADSL Service 226.1 Service Description Wholesale Internet ADSL

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR TRAVEL TIME SYSTEM. UNIV:SRP 1 of 6 ITS:APPR:CLC:DBP:

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR TRAVEL TIME SYSTEM. UNIV:SRP 1 of 6 ITS:APPR:CLC:DBP: MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR TRAVEL TIME SYSTEM UNIV:SRP 1 of 6 ITS:APPR:CLC:DBP:02-02-12 a. Description. This work consists of furnishing, installing, integrating, and testing

More information

INSTRUCTION MANUAL RA 19-7B RACK ADAPTER HOT SWAP RACK ADAPTER FOR HSF SERIES POWER SUPPLIES

INSTRUCTION MANUAL RA 19-7B RACK ADAPTER HOT SWAP RACK ADAPTER FOR HSF SERIES POWER SUPPLIES INSTRUCTION MANUAL RA 19-7B RACK ADAPTER HOT SWAP RACK ADAPTER FOR HSF SERIES POWER SUPPLIES KEPCO INC. An ISO 9001 Company. MODEL RA 19-7B RACK ADAPTER ORDER NO. REV. NO. IMPORTANT NOTES: 1) This manual

More information

Communications Site Installation R56 Installer and Communications Site Inspector/Auditor version COMPETENCY REQUIREMENTS

Communications Site Installation R56 Installer and Communications Site Inspector/Auditor version COMPETENCY REQUIREMENTS Communications Site Installation R56 Installer and Communications Site Inspector/Auditor version COMPETENCY REQUIREMENTS The following is a listing of each topic considered necessary to be included in

More information

INSTRUCTION MANUAL RA 19-4B RACK ADAPTER HOT SWAP RACK ADAPTER FOR HSF SERIES POWER SUPPLIES

INSTRUCTION MANUAL RA 19-4B RACK ADAPTER HOT SWAP RACK ADAPTER FOR HSF SERIES POWER SUPPLIES INSTRUCTION MANUAL RA 19-4B RACK ADAPTER HOT SWAP RACK ADAPTER FOR HSF SERIES POWER SUPPLIES KEPCO INC. An ISO 9001 Company. MODEL RA 19-4B RACK ADAPTER ORDER NO. REV. NO. IMPORTANT NOTES: 1) This manual

More information

Quick Start Guide CJB1950ALAAB

Quick Start Guide CJB1950ALAAB Quick Start Guide 1 CJB1950ALAAB www.sar-tick.com This product meets applicable national SAR limits of 2.0W/kg. The specific maximum SAR values can be found in the section of this user guide. When carrying

More information

Data channel ports and LAN channel ports will be referred to as channel ports when distinction between the two is not required.

Data channel ports and LAN channel ports will be referred to as channel ports when distinction between the two is not required. DROP / INSERT NODES - Item No. CHANNEL PORTS - Item No. Special Provision No. 683S19 September 2007 1. SCOPE This Special Provision covers the requirements for the installation and testing of Field Drop

More information

ATTACHMENT A FSD WLAN PROGRAM SCOPE OF WORK IFB I NETWORK EQUIPMENT AND RELATED SERVICES

ATTACHMENT A FSD WLAN PROGRAM SCOPE OF WORK IFB I NETWORK EQUIPMENT AND RELATED SERVICES I. EXECUTIVE SUMMARY A. The intent of this Invitation for Bid (IFB) is to solicit proposals to provide solutions for Wide Area Networking (WAN), Local Area Networking (LAN), and Wireless Local Area Networking

More information

COMPUTER NETWORK WIRING SYSTEMS FOR PLCs

COMPUTER NETWORK WIRING SYSTEMS FOR PLCs SECTION 13744 COMPUTER NETWORK WIRING SYSTEMS FOR PLCs NOTE TO SPECIFIER: This section applies to primary learning centers only. PART 1 GENERAL 1.01 SUMMARY A. Section Includes: A complete computer network

More information

1510 MOTOR CONTROLLERS

1510 MOTOR CONTROLLERS SECTION 262913- MOTOR CONTROLLERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of contract, including general and supplementary conditions and Division 1 specification section,

More information

Managed WAN SLA. Contents

Managed WAN SLA. Contents Managed WAN SLA Contents Terminology... 2 Service Description... 2 General... 2 Levels and Offerings... 2 Private Network Services... 2 Features... 2 Internet Access... 3 Features... 3 Service Level Metrics...

More information

Verification Plan: Mitchell Hammock Road. Adaptive Traffic Signal Control System. Prepared by: City of Oviedo. Draft 1: June 2015

Verification Plan: Mitchell Hammock Road. Adaptive Traffic Signal Control System. Prepared by: City of Oviedo. Draft 1: June 2015 Verification Plan: Mitchell Hammock Road Adaptive Traffic Signal Control System Red Bug Lake Road from Slavia Road to SR 426 Mitchell Hammock Road from SR 426 to Lockwood Boulevard Lockwood Boulevard from

More information

City of Tampa Transportation Impact Fee Update Study. Presentation to Mayor Iorio February 23, 2009

City of Tampa Transportation Impact Fee Update Study. Presentation to Mayor Iorio February 23, 2009 City of Tampa Transportation Impact Fee Update Study Presentation to Mayor Iorio February 23, 2009 Presentation Overview ground Overview Impact Fee Districts Population and Employment Growth Transit Service

More information

UTILITY MARKING DEVICES. Naples City Council Workshop November 17, 2014 Presented by: Andrew Holland, P.E., Engineering Manager

UTILITY MARKING DEVICES. Naples City Council Workshop November 17, 2014 Presented by: Andrew Holland, P.E., Engineering Manager UTILITY MARKING DEVICES Naples City Council Workshop November 17, 2014 Presented by: Andrew Holland, P.E., Engineering Manager CITY OF NAPLES UTILITIES Reclaimed Water Sewer Force Mains Raw Water Potable

More information

CHAPTER WIRELESS TELECOMMUNICATION FACILITIES

CHAPTER WIRELESS TELECOMMUNICATION FACILITIES CHAPTER 19.85 WIRELESS TELECOMMUNICATION FACILITIES Section 19.85.010 PURPOSE 19.85.020 DEFINITIONS 19.85.030 APPLICABILITY 19.85.040 STANDARDS FOR WIRELESS TELECOMMUNICATION FACILITIES 19.85.050 LOCATIONAL

More information

FLORIDA DEPARTMENT OF COMMUNITY AFFAIRS DIVISION OF HOUSING AND COMMUNITY DEVELOPMENT BUILDING CODE COMMISSION

FLORIDA DEPARTMENT OF COMMUNITY AFFAIRS DIVISION OF HOUSING AND COMMUNITY DEVELOPMENT BUILDING CODE COMMISSION FLORIDA DEPARTMENT OF COMMUNITY AFFAIRS DIVISION OF HOUSING AND COMMUNITY DEVELOPMENT BUILDING CODE COMMISSION IN RE: PETITION FOR DECLARATORY STATEMENT BY VERIZON WIRELESS PERSONAL COMMUNICATIONS, LP

More information

SPI PowerNet requirements for the non-contestable Interface Works at Deer Park Terminal Station

SPI PowerNet requirements for the non-contestable Interface Works at Deer Park Terminal Station SPI PowerNet requirements for the non-contestable Interface Works at Deer Park Terminal Station SPI PowerNet Reference: ZD23 Version: 1.1 Issue date: 15 May 2014 Contents 1 Scope... 3 2 Deer Park Terminal

More information

Target Interface / Construction Compliance Inspection Checklist

Target Interface / Construction Compliance Inspection Checklist A. Targets Quantities meet DD9, applicable TC -, and CEHNC Design Guide 0-- Oriented to face firing line or firing positions/points B. Roads-Service, Lanes Number of lanes meets DD 9, applicable TC -,

More information