3-D Modeling Implementation
|
|
- Paula Moore
- 5 years ago
- Views:
Transcription
1 3-D Modeling Implementation Presented January 31, 2013 Douglas Townes FHWA Resource Center
2 WORKFLOW FOR ELECTRONIC DATA TRANSFER WHEN USING AMG IN CONSTRUCTION Charles Jahren, PhD Iowa State University
3 OVERALL DIAGRAM
4 FIRST SECTION
5 DETAILED SURVEY
6 DETAILED DESIGN
7 SECOND SECTION
8 Contractor Modeling Workflow
9 Contractor Modeling Workflow Obtain the data files and plans from the owner NO Are the electronic files included? YES Are the electronic files with vector data? YES NO
10 Contractor Modeling Workflow Paper CAD Drawings Import data into Software Import data into Software Shoot Survey Data. Verify with Owner Survey Data Verify Owner Survey Data Shoot survey Data. Verify with Owner Survey Data Digitize the site boundary, contours and other elements (tedious and time consuming) Verify/refine existing surface data in register Digitize the site boundary, contours and other elements (tedious and time consuming)
11 Contractor Modeling Workflow Build electronic data surfaces. Verify with the paper plans Build electronic data surfaces. Verify with the owner plans Build electronic data model from scratch Build electronic models using some owner data Build cyberspace project using 4-D Build the project in cyberspace using 4-D Build cyberspace project using 4-D Convert to machine ready file
12 Contractor Modeling Workflow Obtain the data files and plans from the owner NO Are the electronic files included? YES Are the electronic files with vector data? YES NO
13 Contractor Modeling Workflow Paper CAD Drawings Import data into Software Import data into Software Shoot Survey Data. Verify with Owner Survey Data Verify Owner Survey Data Shoot survey Data. Verify with Owner Survey Data Digitize the site boundary, contours and other elements (tedious and time consuming) Verify/refine existing surface data in register Digitize the site boundary, contours and other elements (tedious and time consuming)
14 Contractor Modeling Workflow Build electronic data surfaces. Verify with the paper plans Build electronic data surfaces. Verify with the owner plans Build electronic data model from scratch Build electronic models using some owner data Build cyberspace project using 4-D Build the project in cyberspace using 4-D Build cyberspace project using 4-D Convert to machine ready file
15 Contractor Modeling Workflow
16 What is the Take Away? Try to find a way to Green!
17 Implementing a Model Based Approach to Design at Wisconsin DOT August 21, 2012 WisDOT Methods Development
18 Topics WisDOT Civil 3D implementation status WisDOT model oriented design workflow Implementing 3D Surface Model Deliverable Future of Roadway Models at Wisconsin DOT Implementing Civil 3D Specific Delivery Requirements
19 WisDOT Model Concept Definitions 3D Surface Model Produced for projects with Grading work Includes surfaces for AMG operations of Grading, Base Course, and Paving Initial model deliverable requirement will be 3D Surface Models Roadway Model Evolution of model concept to include information for increased utility in design and construction processes, and ultimately expanded to downstream roadway lifecycle processes
20 Model-Based Design Part of WisDOT Implementation of 3D Technologies in Design & Construction Plan with Five Active Initiatives: Statewide Real-Time Kinematic GPS Network. DTM Data Collection. 3D Design. Automated Machine Guidance. Field Technology and Inspection.
21 Requirements of the Design Workflow Civil 3D Design Workflow goal to develop construction ready surface models during the design process Must produce surface models with sufficient detail to support AMG operations 3D Surface Model output must be synchronized with plan sheets
22 Model Sharing Pilots Determine Benefits of Providing 3D Roadway Models at Pre- Bid. Determine Utility of 3D Models for Bid Preparation. Establish Requirements for Construction Ready 3D Models Flowing from Design Process. Includes Model Content and Format. Field Test Construction Readiness of 3D Models. Identify and Implement any Changes to Design Workflows Necessary for Achievement of Construction Readiness in 3D Models.
23 Model Sharing Pilots Results Surface Model was used in bid preparation activity Plan activities to greater level of detail, reducing uncertainties Identify potential sites for borrow/waste, and communicate with property owners Surface models were construction ready validated design workflow Model content changes Add longitudinal breaklines as visual aids for operators Add surfaces for all subbase layers Staged models not needed for AMG operations
24 3D Surface Model Requirement WisDOT will implement a 3D Surface Model Delivery Requirement on projects starting after July Model content requirements and other details will be released Q4 of 2012.
25 3D Surface Model Content Concepts
26 3D Surface Model Content Concepts
27 3D Surface Model Content Concepts
28 3D Surface Model Content Concepts
29 3D Surface Model Content Concepts Surfaces Exist Top Finished Base Course Subbases Datum Pavement Surface model data density will be design speed dependent Surface models must be synchronized with plan sheets Additional content Longitudinal breaklines Horizontal alignments Vertical alignments Superelevation transition information Fully staged model requirement will be decided on project-by-project basis
30 Roadway Model Evolution Ability to increase information included with the 3D Model will grow Methods of accessing information will become easier WisDOT looking to expand use of Roadway Models in: o Design o Construction o Integration with GIS o Operations o Maintenance o Planning
31 How Can Our Roadway Model Goals Be Met? To answer this question WisDOT has: Learned more about how model design software functions & compatibility between software Monitored TransXML Development Monitored collaborative efforts between Bentley and Autodesk
32 Contractor s perspective Several of the following slides came from a presentation by Edgerton Contractors, Inc. of Oak Creek Wisconsin. They have been reproduced and paraphrased here as typical comments from a contractor using Automated Machine Guidance (AMG)
33 Typical Contractor Investment when incorporating AMG GPS represents 15% to 25% of the cost of new machines GPS machines require more frequent maintenance: pins, bushings, cutting edges Three full-time personnel: Data Manager, Survey Coordinator/Manager, Engineering Manager GPS Machine Guidance Training creation and distribution of YouTube style videos via the internet GPS Rover Training - annual classroom session, one-on-one, regular assessments, 12 month process Three year hardware development cycle Continuous software and hardware beta testing for new hardware
34 Typical Contractor Project Management changes Pre-build the project plan check and RFI s Night Work efficiencies improved Alignment-based design alternatives Design and Visualization of interim surfaces which provide drainage, construction access without over-excavating Match existing grades for temporary wideners or cross-overs Existing Grade to subgrade in one operation Planning tools / confidence to execute ever challenging construction sequences
35 Pre-Build the Project RFI (example) RFI: ECI-042, Wall 420 Horizontal Alignment of Wall Curve Table inconsistent with coordinate callout. N 0.05-ft, E 1.82-ft
36 Night Work Advantages of AMG at night: Accurate grading in spite of reduced visibility Increased safety due to fewer personnel on the ground
37 Design Alternatives Temporary Alignments: NSB-NWA Eliminated a traffic switch. Saved three weeks on the schedule.
38 Constructability Issues Interim Surfaces Visualization during planning Means and Methods Confirm safe slopes and adequate storm water control This is actually an example of 4-D design by the contractor
39 Team Effort The Team: Owner and contractor representatives CAD operators, surveyors, inspectors Skilled, take pride in their work, just want to build a good project Operational framework: Divide the work. Collaboration not competition. Share everything. Trust but verify. Success in this step solves half the problems.
40 Survey Control Points Owner specification must identify how site Site Calibration will occur One example: Designate a set of control points including a total of at least 6 horizontal and vertical points Owner selects and sets the control points. Owner s surveyor measures and then publishes XYZ coordinates on each point for all GPS users on the project. Contractor and owner share the responsibility of collaborating the set points. Contractor to set base station locations. Contractor verifies these points
41 Site Calibration Goal: Provide the generic information that can be used by anyone using any GPS system to stake or grade the site consistent with the Owner s surveyor-of-record. Definition: Published list of the NEZ coordinates and LLH coordinates for each control point. All users of the data must verify internal consistency of the data before using for construction.
42 Construction Surfaces Construction surfaces are defined as electronic data representation of the owner s design surfaces that can be loaded into survey and machine guidance instruments. Contractor is responsible for the creation and implementation of Construction Surfaces. The Contractor must verify that the construction surfaces match the owner s design surfaces before using the data in the field. Any and all errors are fixed by the Contractor prior to construction.
43 Construction Surfaces - Comments CAD files reduce model costs significantly. Format: Land XML Include: Alignments Horizontal and Vertical All surface lines on Plan Details Pre-Construction Topographic Survey Finish Grade Surface: break lines, not triangles ROW limits Utilities Structure lines, example: CL of bearing for bridge abutments Coordinate call-outs for truncated arcs, vertical and horizontal
44 Construction Surfaces Contractor Comments Send in an RFI on all inconsistencies. Visual checks are not adequate. Numerical checks to the 0.01-ft are required. Inspectors benefit by taking a high-profile role in checking the surface. The project gets built and inspected twiceonce in the office and a second time in the field. Conflicts/Claims are reduced
45 Questions???
5/17/2017. Steven Popke, PE Wisconsin DOT Bureau of Project Development Methods Development Unit
Steven Popke, PE Wisconsin DOT Bureau of Project Development Unit Wisconsin Department of Transportation since 2014 Assists with WisDOT spilot program for sharing design model data with construction contractors
More informationENHANCED DELIVERABLES AND THE DIGITAL JOBSITE NOVEMBER 14, 2018
ENHANCED DELIVERABLES AND THE DIGITAL JOBSITE NOVEMBER 14, 2018 Background CP Tech Center/Snyder & Associates team EDC-2 3D Engineered Models EDC-4 e-construction (Digital Construction Inspection) 2 What
More informationDelivering 3D Engineered Model Data for Highway Construction
Delivering 3D Engineered Model Data for Highway Construction Objectives After completing this module, you will be able to: Describe how 3D engineered models are created in design Describe how contractors
More informationDTFH61-13-C Addressing Challenges for Automation in Highway Construction
DTFH61-13-C-00026 Addressing Challenges for Automation in Highway Construction Learning Objectives Research Objectives Research Team Introduce Part I: Implementation Challenges and Success Stories Describe
More informationMoDOT s 3D Design Implementation, Electronic Deliverables, and E-Construction. Ashley Buechter, P.E. MoDOT CADD Support Engineer
MoDOT s 3D Design Implementation, Electronic Deliverables, and E-Construction Ashley Buechter, P.E. MoDOT CADD Support Engineer LADOTD Transportation Conference February 29, 2016 General Information and
More informationOverview September 7, 2017
Overview September 7, 2017 Purpose The purpose of this presentation is to provide an overview of the changes to the required deliverables and workflow for developing plans and models for Illinois DOT projects
More informationSession Objectives. Describe how 3D Models are created during design. Discuss what 3D Model outputs are useful in Construction
1 Session Objectives Describe how 3D Models are created during design Discuss what 3D Model outputs are useful in Construction Describe applications of 3D Models in Construction 2 Creating the 3D Design
More informationCivil 3-D PROFILE CREATION
Civil 3-D PROFILE CREATION 1 Alignment Overview: As in previous CAD versions, an alignment is a line that describes where you intend the centerline of your planned work to be. That s all. But, in Civil
More information3-D MODELING FOR MACHINE CONTROL
SHELLY & SANDS JOHN DOWALTER, PE, PS 3-D MODELING FOR MACHINE CONTROL Dale Carnegie Public Speaking Training Ben Stein s Public Speaking Training SHELLY & SANDS JOHN DOWALTER, PE, PS S&S Survey Manager
More informationQuality Control Checklist & Tools for Reviewing 3D Engineered Models
Quality Control Checklist & Tools for Reviewing 3D Engineered Models Production Support Office CADD Vern Danforth Description: In this session we will discuss 3D engineered models. Brief FDOT CADD/Industry
More informationTable of Contents. MDOT - Creating Model Line String and LandXML RID Files
Table of Contents General Information... 2 Part 1: Proposed Terrain Model Creation... 3 Option 1: Element Selection Method... 3 Proposed Top Surface... 3 Proposed Subsurface... 4 Option 2: Terrain from
More informationMobile LiDAR in Road Surface Quality Control and Renovation - Latest Development of Terrasolid Software
Geodesy, Mine Survey and Aerial Topography. At the turn of the centuries. Moscow 14 15 February 2013 Mobile LiDAR in Road Surface Quality Control and Renovation - Latest Development of Terrasolid Software
More informationLandXML.org 2.0. a Data Exchange Standard. for. Nathan Crews, Principal Schema Architect, LandXML.org
LandXML.org 2.0 a Data Exchange Standard for eplan LandXML Deliverable Nathan Crews, Principal Schema Architect, LandXML.org Outline LandXML.org 1999 Autodesk supported effort LandXML Standard Adoption
More informationBusiness Advantages of Using Electronic Engineering Data
Business Advantages of Using Electronic Engineering Data Dan Streett, PE & LS NYS Department of Transportation December 5, 2006 AGC/DOT Technical Conference Types of Electronic Engineering Data Created
More informationOCTOBER OTEC Session 75 Stringless 3D Paving
OCTOBER 03 2018 OTEC Session 75 Stringless 3D Paving Introductions Brian E Girouard, Trimble Inc Sales Engineer Paving Specialist Manager brian_girouard@trimble.com Brad Cunningham, SITECH Ohio SITECH
More informationAutodesk Civil 3D Fundamentals
Autodesk Civil 3D Fundamentals Course Length: 4 days The Autodesk Civil 3D Fundamentals training course is designed for Civil Engineers and Surveyors who want to take advantage of the Autodesk Civil 3D
More informationTitle: Improving Your InRoads DTM. Mats Dahlberg Consultant Civil
Title: Improving Your InRoads DTM Mats Dahlberg Consultant Civil Improving Your InRoads Digital Terrain Model (DTM) Digital Terrain Model A digital representation of a surface topography or terrain composed
More informationLandfill Grading Using GPS Machine Control
Landfill Grading Using GPS Machine Control NC SWANA April 2018 Presented by: Bernie Garrett, PE Garrett & Moore Inc. & Gabe Leach Cooper Barnette & Page Inc. 1 Purpose Work flow processes used by Engineers,
More informationODOT s Future with 3D Models
Ohio Department of Transportation Mark McCloud, CADD Manager, CADD and Mapping Services October 28 th, 2015 John R. Kasich, Governor Jerry Wray, Director www.transportation.ohio.gov FHWA Every Day Counts
More informationtechnical notes trimble business center software
technical notes trimble business center software A POWERFUL SURVEY DATA OFFICE SOFTWARE SUITE DESIGNED FOR TODAY'S FAST-PACED SURVEYING OFFICE, TRIMBLE BUSINESS CENTER SOFTWARE UNLOCKS THE POTENTIAL OF
More informationChapter 1: Introducing Roadway Modeling
Introducing Roadway Modeling Chapter 1: Introducing Roadway Modeling Chapter Overview The chapter addresses the following topics: How Roadway Modeling Works in InRoads Opening and Exploring Typical Section
More informationJames Schneider Advanced Materials and Technology
(CEC-90153) Minnesota DOT Deploy GCS900, Business Center HCE and VisionLink with the DOTs GEOPAK software to automatically monitor large scale excavation in Carver County James Schneider Advanced Materials
More informationMigrating from Autodesk Land Desktop to Autodesk Civil 3D CV42-3L
December 2-5, 2003 MGM Grand Hotel Las Vegas Migrating from Autodesk Land Desktop to Autodesk Civil 3D CV42-3L About the Speaker: Pete Kelsey is an Autodesk Authorized Consultant an Autodesk Certified
More informationFerrovia. BIM-Ready Railway Design Solution. by CGS Labs. Professional software solutions for Civil Engineering. (C) 2017 by CGS Labs
Ferrovia by CGS Labs BIM-Ready Railway Design Solution Professional software solutions for Civil Engineering (C) 2017 by CGS Labs Solution for Railway Design & Rail track Analysis Ferrovia is a professional,
More informationTrimble Business Center Software, v3.30
Trimble Business Center Software, v3.30 We are pleased to announce a new version of the Trimble Business Center software, version 3.30. This new version includes over 30 new features and enhancements increasing
More informationSection 7 - Introducing Roadway Modeling
Introducing Roadway Modeling Section 7 - Introducing Roadway Modeling Section Goals: Understand the Principles of InRoads Roadway Modeling Understand how to load Typical Section Libraries Understand how
More informationDigital Terrain Model V 6.5
TCP MDT Digital Terrain Model V 6.5 Professional Version Introduction The Professional Version is designed to assist users in all the phases of carrying out a Surveying or Civil Engineering project. Its
More informationAutoCAD Civil 3D 2011 ESSENTIALS
AutoCAD Civil 3D 2011 ESSENTIALS SDC PUBLICATIONS www.sdcpublications.com Schroff Development Corporation Table of Contents Table of Contents Preface...ix Module 1 The AutoCAD Civil 3D Interface... 1-1
More informationTCP MDT Digital Terrain Model - V7
TCP MDT Digital Terrain Model - V7 Professional Version Introduction The Professional Version is designed to assist the user at all stages of developing a project in the context of Topography and Civil
More information2/9/2016. Session Agenda: Implementing new Geospatial Technologies for more efficient data capture
Implementing new Geospatial Technologies for more efficient data capture Jay Haskamp Applied Geospatial Engineer Steve Richter VP Sales Session Agenda: Today s changing technologies and what lies ahead
More informationTips for a Good Meshing Experience
Tips for a Good Meshing Experience Meshes are very powerful and flexible for modeling 2D overland flows in a complex urban environment. However, complex geometries can be frustrating for many modelers
More informationGIS Mapping of Pipelines
GIS Mapping of Pipelines RJ Lumbrezer, PS Survey Manager DGL Consulting Engineers, LLC Ted Muns Sales Manager City Blueprint of Toledo 2016 Ohio GIS Conference Hyatt Regency Columbus September 28 30, 2016
More informationA 3D Scanner Based Technology for Land Levelling
A 3D Scanner Based Technology for Land Levelling Kunal Chakraborti, Rupam Ghosh Student, Dept of Civil Engineering, Modern Institute of Engineering & Technology, Bandel, Hooghly, West Bengal, India ABSTRACT:
More informationGeneral GPS TPS ROB X POLE VOL RDN RPL Jobs management System settings (units, precision, parameters, etc.)
XPAD Survey Modules XPAD Survey GPS TPS XPOLE General GPS TPS ROB XPOLE VOL RDN RPL Jobs management System settings (units, precision, parameters, etc.) Instruments GPS GPS TPS ROB XPOLE VOL RDN RPL Instrument
More informationTrimble s RoadLink Utility Tutorials
Trimble s RoadLink utility is an interface between third-party road definitions and Trimble survey devices. It lets you import or key in road definitions, view them graphically, edit them if required,
More informationNYSAPLS 50 th Anniversary Surveyor's Conference and Exhibition
Field to Finish - 3D Modeling and DTM (InRoads Survey and PowerSurvey Basics) Presenter: Gerald B. Danzy, Software/Product Consultant Bentley Systems, Incorporated 685 Stockton Drive Exton, PA 19341 www.bentley.com
More informationAutodesk Civil 3D versus Bentley MX Software
Autodesk Civil 3D 2007 Autodesk Civil 3D versus Bentley MX Software Executive Summary This white paper compares two generations of software technologies. Bentley MX, developed some 30 years ago and based
More informationThe Magic of a Dynamic Differential TIN Surface
The Magic of a Dynamic Differential TIN Surface Creg Dieziger Sr. Designer, Morrison-Maierle, Inc. CI3906 Ever wish that AutoCAD Civil 3D could create a dynamically linked subgrade surface, while you build
More informationSurvey Database to Surface Creation in Civil 3D
Survey Database to Surface Creation in Civil 3D For WSLS 2019 Institute by Russ Nicloy, MACER Technologies, Inc. Contents Survey Database to Surface Creation in Civil 3D... 2 Setting up the Survey Database...
More informationAirborne LiDAR Surveys and Data Delivery in the Pipeline Industry
Airborne LiDAR Surveys and Data Delivery in the Pipeline Industry Carlos Femmer Faron Olivier October 25, 2011 October 25, 2011 GITA GIS for Oil and Gas Pipeline 2011 Organization Fugro is a decentralized
More informationJANUARY 2017 WATER S END. Mobile Mapping. Station to Station. Decided Guidance Indoor application. Implementing BIM. A fixed boundary R E YEARS
JANUARY 2017 WATER S END Mobile Mapping Station to Station Decided Guidance Indoor application Implementing BIM A fixed boundary R LEB ATING E C 30 YEARS Indoor Mobile Mapping A unique approach to interior
More informationField to Finish and the New Survey Tools in AutoCAD Civil 3D 2013
Field to Finish Using AutoCAD Civil 3D Field to Finish and the New Survey Tools in AutoCAD Civil 3D 2013 Shawn Herring, Sr. Civil Application Engineer/Support & Training Manager Jason Jenkins, PLS Civil
More informationThe complete design environment for road planning & construction ANADELTA TESSERA.
The complete design environment for road planning & construction Short Description Short Description ANADELTA TESSERA Tessera is the professional, standards-based road design solution helping civil engineers
More informationInRoads File Types. Below is a list of the primary file types used for InRoads in the road design process.
Section 6 InRoads Basic File Types Retrieving InRoads Base Files Internal Naming Convention Alignment Styles and Surface Styles Alignment Point Abbreviations Feature Naming Conventions Project Defaults
More informationPave the Way to Better Profits. Trimble. Paving Solutions TRANSFORMING THE WAY THE WORLD WORKS
Pave the Way to Better Profits Trimble Paving Solutions TRANSFORMING THE WAY THE WORLD WORKS Solutions for the Complete Paving Job Site Productive, integrated and innovative solutions to keep you on track
More informationA New Dimension to Land Development and Subdivision Design: Application of AutoCAD Civil 3D
A New Dimension to Land Development and Subdivision Design: Application of AutoCAD Civil 3D Tarig Ali College of Engineering and Computer Science University of Central Florida Orlando, Florida taali@mail.ucf.edu
More informationTECHNICAL NOTES SURVEY PRO WITH TSX
SURVEY PRO WITH TSX TECHNICAL NOTES Survey Pro software from TDS is the data collection solution of choice for most North American surveyors 1. And with the addition of the Trimble TSX (Trimble Systems
More informationRoundabout Design Using AutoCAD Civil 3D 2010 Intersection Tools
Roundabout Design Using AutoCAD Civil 3D 2010 Intersection Tools Marie-Pierre Lebel Consortech Solutions CV214-1 Learn how to leverage the new intersection design tools from AutoCAD Civil 3D 2010 for use
More informationGeometric Layout for Roadway Design with CAiCE Visual Roads
December 2-5, 2003 MGM Grand Hotel Las Vegas Geometric Layout for Roadway Design with CAiCE Visual Roads Mathews Mathai CV32-3 This course describes and demonstrates various tools for defining horizontal
More informationX-PAD Ultimate. The Ultimate solution in the field. Works when you do
Works when you do X-PAD Ultimate The Ultimate solution in the field X-PAD Ultimate is a tailored, flexible, modular, ideal, customised software for high end topographic tasks, such as measure, stake-out,
More information3D Model Submittal Preparation Power GEOPAK SS2
3D Model Submittal Preparation Power GEOPAK SS2 General Information This document is intended to provide guidance in preparing the proposed 3D model data from Roadway Designer for submittal and is only
More informationAutoCAD Civil-3D Nyheter AutoCAD Civil-3D 2013
AutoCAD Civil-3D Nyheter AutoCAD Civil-3D 2013 Tesfaye Kebede Vianova systems New Features Civil-3D Pressure Pipe Network Volumes Dashboard Analysis Data Exchange Railway Design Corridor Design Survey
More informationRound Table Discussion Engineering Data Focus in DOTs IHEEP 2009 San Antonio, Texas September 27, 2009 Facilitator: Dan Belcher, Michigan DOT
Round Table Discussion Engineering Data Focus in DOTs IHEEP 2009 San Antonio, Texas September 27, 2009 Facilitator: Dan Belcher, Michigan DOT 1. Participants: Name and Position/Role in the DOT Dan Belcher,
More informationtechnical notes Trimble business CenTer software trimble BuSineSS Center your Complete office Solution
Trimble business CenTer software technical notes trimble BuSineSS Center your Complete office Solution designed for today's fast-paced surveying office, trimble Business Center unlocks the potential of
More informationSURPAC Surveying Software Version 5.65 for Windows XP/Vista/7/8/10
SURPAC Surveying Software Version 5.65 for Windows XP/Vista/7/8/10 Topographical, Engineering, Mining and Cadastral Surveying Applications Topographical, Engineering, Mining and Cadastral Surveying Applications
More informationRevit Architecture Syllabus Total duration: 80 hours (Theory 40 Hours + Lab 40 Hours)
Faculty Start Date End Date No of Students Revit Architecture Syllabus Total duration: 80 hours (Theory 40 Hours + Lab 40 Hours) Introduction About BIM Introduction to Autodesk Revit Architecture Revit
More informationMobile Mapping Solutions for Ohio s Integrated Transportation Network. Brian Foster, CP
Mobile Mapping Solutions for Ohio s Integrated Transportation Network Brian Foster, CP About Woolpert Established in 1911 Over 600 Professionals 25 Offices $12,000,000 invested in new technology in last
More informationFundamentals and Practices Sixth Edition
Online Instructor s Manual to accompany Surveying Fundamentals and Practices Sixth Edition Jerry Nathanson Michael T. Lanzafama Philip Kissam Upper Saddle River, New Jersey Columbus, Ohio Copyright 2011
More informationAED Design Requirements: Superelevation Road Design
US Army Corps of Engineers Afghanistan Engineer District AED Design Requirements: Various Locations, Afghanistan MARCH 2009 TABLE OF CONTENTS AED DESIGN REQUIREMENTS FOR SUPERELEVATION ROAD DESIGN VARIOUS
More information3D Milling. Tom Abell
3D Milling Tom Abell Trimble & 3D Milling as Part of the Resurfacing Process Design Measure Resurfacing From initial survey to finish surface Mill Compact Pave Content Data acquisition Creating data models
More informationDo More. Change the world in 3D. AutoCAD. Civil 3d
Do More. Change the world in 3D. AutoCAD Civil 3d 2010 A Powerful Building Information Modeling Solution for Civil Engineering AutoCAD Civil 3D software supports an integrated process focused on a coordinated
More informationProposed Resolution Joint Technical Committee on Electronic Engineering Data Title: Endorsement of TransXML
Proposed Resolution Joint Technical Committee on Electronic Engineering Data Title: Endorsement of TransXML WHEREAS, Advancements in technology are providing increasing opportunities and needs for the
More informationPresentation Overview
Stringless Concrete Paving STRINGLESS CONCRETE PAVING ACPA BUS TOUR AUGUST 5, 2015 Presentation Overview 1) Manufactures 2) Components needed for Stringless Paving 3) Conventional Methods VS Stringless
More information3D Modeling for Contractors
3D Modeling for Contractors The Constructible Model Joel Brown SITECH Ohio a construction technology partner for the 21 st Century Major brand vendor Work with hundreds of Civil Contractors Sales Support
More informationTECHNICAL NOTES TRIMBLE SURVEY CONTROLLER SOFTWARE
TRIMBLE SURVEY CONTROLLER SOFTWARE TECHNICAL NOTES The Trimble Survey Controller software is the data collection solution that will make your survey work faster, easier, and more productive than ever before.
More informationNewsletter 11. Faithfully yours, Shlomi Sivan, CEO Sivan Design D.S Ltd April, Sales Phone: , Ext: 4
Newsletter 11 The year ended Dec. 2006 was a very successful year for the CivilCAD 2006 software; with a growth of 70% in the sales volume, we have exceeded 3200 users, and 1000 customers. Our participation
More informationFINAL Examination Paper (COVER PAGE) Time : 8.00 am am Reading Time : 10 Minutes
Session : August 2013 FINAL Examination Paper (COVER PAGE) Programme : Diploma in Civil Engineering Course : EGC2170 : Surveying 2 Date of Examination : December 09, 2013 Time : 8.00 am 10.10 am Reading
More informationProgram Management Office January, 2012
Program Management Office January, 2012 Clarify the Project Delivery Process (PDP) What is it? Why did it change? How were the changes determined? How was it approved? Show you where to get guidance Answer
More informationLeica FlexField plus & Leica FlexOffice A Perfect Match
Leica FlexField & Leica FlexOffice A Perfect Match FlexField Onboard Software General File Management Data Import Data Export Status icon bar Instrument Protection with PIN Stake Out beep Map Select Programs
More information3D Technology in the Construction Continuum. Alabama DOT Pre-Construction Conference Montgomery AL May 03, 2016
3D Technology in the Construction Continuum Alabama DOT Pre-Construction Conference Montgomery AL May 03, 2016 Brian E Girouard, Sales Engineer, Milling-Paving-Compaction Specialist Civil Engineering &
More informationSERVICE TRANSITION ITIL INTERMEDIATE TRAINING & CERTIFICATION
SERVICE TRANSITION ITIL INTERMEDIATE TRAINING & CERTIFICATION WHAT IS ITIL ST? The intermediate level of ITIL offers a role based hands-on experience and in-depth coverage of the contents. Successful implementation
More informationBEFORE YOU BUY: SEVEN CRITICAL QUESTIONS TO ASK ABOUT LASER SCANNERS. Robert Gardiner
BEFORE YOU BUY: SEVEN CRITICAL QUESTIONS TO ASK ABOUT LASER SCANNERS Robert Gardiner Table of Contents Introduction... 3 Horizontal and Vertical Angular Accuracies... 4 Movement Tracking... 6 Range Limitations...
More informationControl System International a.s., Papírenská 114/5, Praha 6, Czech Republic Web site: www. controlsystem.cz,
129 Consequences of a complex using of 3D approach in the implementation of the road reconstruction - usage of TLS stop&go and usage of paving control system for milling machines Přikryl, M. and Kutil,
More informationRAILWAY PROJECT Geodetic Reference System, Geodetic Control Network and Rail Construction Measurements
RAILWAY PROJECT Geodetic Reference System, Geodetic Control Network and Rail Construction Measurements Railway Project 2 / 8 INDEX 1 Introduction... 3 2 Reference System... 3 2.1 Reference system... 3
More informationAEC Logic. AEC Terrain. A program to manage earth works in a construction project. Yudhishtirudu Gaddipati 29-Jun-13
AEC Logic AEC Terrain A program to manage earth works in a construction project Yudhishtirudu Gaddipati 29-Jun-13 Contents 1 Introduction:... 5 2 Program Launch... 5 2.1 How to Launch Program... 5 2.2
More informationGuideline for Importing Survey Data into Bentley Power InRoads v8i SS2
Guideline for Importing Survey Data into Bentley Power InRoads v8i SS2 I. REQUIREMENTS from the Geomatics/Survey Function: 1. A CAD-only drawing in.dwg file format ver. 2013, (that can be created natively
More informationSMS v D Summary Table. SRH-2D Tutorial. Prerequisites. Requirements. Time. Objectives
SMS v. 12.3 SRH-2D Tutorial Objectives Learn the process of making a summary table to compare the 2D hydraulic model results with 1D hydraulic model results. This tutorial introduces a method of presenting
More informationAutomated Road Segment Creation Process
David A. Noyce, PhD, PE Director and Chair Traffic Operations and Safety Laboratory Civil and Environmental Engineering Department Kelvin R. Santiago, MS, PE Assistant Researcher Traffic Operations and
More informationRoadway Alignments and Profiles
NOTES Module 15 Roadway Alignments and Profiles In this module, you learn how to create horizontal alignments, surface profiles, layout (design) profiles, and profile views in AutoCAD Civil 3D. This module
More informationLeica System 1200 Software Integrated Software for GPS1200 and TPS1200
Leica System 1200 Software Integrated Software for GPS1200 and TPS1200 Leica System 1200 Software System 1200 software includes SmartWorx the onboard TPS, GPS and RX1250 software and the Leica Geo Office
More informationBuilding Information Modeling
Chapter Building Information Modeling 1 Building information modeling (BIM) is an integrated workflow built on coordinated, reliable information about a project from design through construction and into
More informationSurfaces - Objectives
Surfaces - Objectives Cover the Basic DTM Point Types Creating a new InRoads Surface Surface processing in InRoads Loading 3D data into a Surface A bit about Surface Properties Overview of the View Surface
More informationTBC v License Matrix - Rev 0
Command Name Viewer (Unlicensed) Base Intermediate Advanced Advanced Drafting Aerial Photogrammetry Data Prep GIS Scanning Tunneling Category 3D Preset Views x x x x General Software 3D View Projection
More informationTECHNOLOGY SOLUTIONS TRANSFORMING CONSTRUCTION LAYOUT. Trimble Field Link TRANSFORMING THE WAY THE WORLD WORKS
TECHNOLOGY SOLUTIONS TRANSFORMING CONSTRUCTION LAYOUT Taking full advantage of the Trimble Tablet s processor and multi-touch screen functionality, has been designed to work the way you work. Featuring
More informationLesson 14: Design Reports
14 Lesson 14: Design Reports WELCOME! This lesson is about producing reports from the design data generated in the tutorial. Now that you have designed the commercial site, it is possible to extract information
More informationTerrestrial LiDAR. Patrick Crawford. Harnessing the Power of Big Data for Asset and Facility Management WHITE PAPER SHAFER, KLINE & WARREN
WHITE PAPER Terrestrial LiDAR Harnessing the Power of Big Data for Asset and Facility Management Patrick Crawford Team Leader, Geospatial Systems SHAFER, KLINE & WARREN Executive Summary Terrestrial LiDAR
More informationPE Exam Review - Surveying Demonstration Problem Solutions
PE Exam Review - Surveying Demonstration Problem Solutions I. Demonstration Problem Solutions... 1. Circular Curves Part A.... Circular Curves Part B... 9 3. Vertical Curves Part A... 18 4. Vertical Curves
More informationM. Sc. Josip Bosnjak, B.Sc.C.E. Denis Simenic, B.Sc.C.E. Hrvoje Bosnjak, B.Sc.C.E.
M. Sc. Josip Bosnjak, B.Sc.C.E. Denis Simenic, B.Sc.C.E. Hrvoje Bosnjak, B.Sc.C.E. 1. General Description 2. Aim of the Project 3. Lecture in details 4. Conclusions 1. General Description the process of
More informationTRIMBLE GEOMATICS OFFICE TECHNICAL NOTES
The Trimble Geomatics Office software is an important part of Trimble s total surveying solutions. Never has the collection, processing, and management of survey data been so easy. Surveyors and engineers
More informationContinuously Operating GPS Reference Network. Jim Waters, PE, RLS Assistant Director, Design Division
Continuously Operating GPS Reference Network Jim Waters, PE, RLS Assistant Director, Design Division TDOT began discussions internally about a possible Continuously Operating Reference Network in 1999
More informationTCP MDT Digital Terrain Model - V7.5
TCP MDT Digital Terrain Model - V7.5 Standard Version Introduction The Standard Version is suitable for carrying out all kinds of topographical survey projects, terrain profiles, volume calculations etc.
More informationAssessing the Accuracy of Stockpile Volumes Obtained Through Aerial Surveying
CASE STUDY Assessing the Accuracy of Stockpile Volumes Obtained Through Aerial Surveying Martin Remote Sensing share surveying insight DroneDeploy Introduction This report comes to us from Kelsey Martin,
More informationFRST 557. Lecture 9c. Switchbacks Vertical and Horizontal Design. Lesson Background and Overview:
FST 557 Lecture 9c Switchbacks Vertical and Horizontal Design J u s t g iv e it o n e try, a n d if it don t w o rk w e ll c a ll in th e road crew to fix er up Lesson Background and Overview: Switchbacks
More informationShould Contours Be Generated from Lidar Data, and Are Breaklines Required? Lidar data provides the most
Should Contours Be Generated from Lidar Data, and Are Breaklines Required? Lidar data provides the most accurate and reliable representation of the topography of the earth. As lidar technology advances
More informationAlaska Department of Transportation Roads to Resources Project LiDAR & Imagery Quality Assurance Report Juneau Access South Corridor
Alaska Department of Transportation Roads to Resources Project LiDAR & Imagery Quality Assurance Report Juneau Access South Corridor Written by Rick Guritz Alaska Satellite Facility Nov. 24, 2015 Contents
More informationTcpMDT Version 7.0 Summary of Differences with Version 6.5
Sumatra, 9 E-29190 Málaga (Spain) www.aplitop.com Tel.: +34 95 2439771 Fax: +34 95 2431371 TcpMDT Version 7.0 Summary of Differences with Version 6.5 CAD Versions supported TcpMDT 7 works with several
More informationA Streamlined and Automated Procedure for Identifying No-Passing Zones Using Existing Resources Available to the Nevada Department of Transportation
NDOT Research Report Report No. 638-16-803 A Streamlined and Automated Procedure for Identifying No-Passing Zones Using Existing Resources Available to the Nevada Department of Transportation June 2018
More information2015 HDR, all rights reserved.
2015 HDR, all rights reserved. An Alternative to HEC-GEORAS: Overview & Comparison of AutoCAD River & Flood Analysis Module Ron Branyon, PE, CFM George Doubleday, EIT, CFM Brandon Hilbrich, PE, CFM TFMA
More informationLicensed Features - Trimble Business Center v3.10
Licensed Features - Trimble Business Center v3.10 The following table lists the features available in Trimble Business Center based on the installed. Feature No License Base Complete Advanced Photogrammetry
More informationKEEPING DATA ACCURATE WITH THE DUSA APPLICATION
KEEPING DATA ACCURATE WITH THE DUSA APPLICATION Jenn Sylvester, Mapping Branch Team Lead Adam Breznicky, Mapping Branch Web Master Transportation Planning & Programming Division (TPP) ESRI International
More information