WORKING WITH ESTATES AT BANGOR UNIVERSITY
|
|
- Frederick French
- 6 years ago
- Views:
Transcription
1 IT and Estates - working together WORKING WITH ESTATES AT BANGOR UNIVERSITY IT and Estates - working together UCISA - Networking Group 29 February 2012 Austin Court, Birmingham
2 Who am I? Simone Barbaresi Deputy Director IT Services (infrastructure) Bangor University Twenty years in system administration Last twelve months: One Data Centre and two building refurbishments
3 What are we talking about Building Refurbishment Data centre Refurbishment Lessons learnt Questions
4 Same Boat
5 Already heard about CCTV Cables Door Access BMS Metering and Energy But there is so much more...
6 Building Refurbishment Riechel Halls of Residence Built in the 1940s Summer Million Refurbishment 100 Bedrooms Conference Venue
7 What will IT provide IT Infrastructure Services IT Infrastructure
8
9 Responsibilities May not be IT s responsibility (CCTV, lifts, etc) But needs IT co-ordination If not co-ordinated Chaotic... Random IT and Estates Staff IT Staff on site at random points Difficult to control IT staff resources Confusion for client and third parties Frustration for all
10 Infrastructure What the user sees... Infrastructure Services What the user doesn t see... IT Infrastructure
11
12 One more Item Simple to forget Simple to get wrong Simple to frustrate us all Labels
13 Test/Certifications OTDRs and copper tests schedules Test 10% of the installation before acceptance Be prepared to reject work
14 Relationships Crucial and vital Select the correct IT Lead Give and take
15 Communications Meetings Directory of contacts Project Management
16 Drawings Are essential Electronic Paper Confirm Data Points WAPs Comms Room Fibre Runs etc
17 Engineers in Estates and IT IT staff are engineers but IT staff are not M&E engineers Estates Staff Are M&E engineers but not Software engineers Domestic computing is not enterprise computing DIY/Domestic construction is not commercial construction Need to respect each other professional
18 Data Centre 30 years old Illegal refrigerant Faulty air con Fly-tipping site
19 Method Risk Report was vital Executive Buy In crucial Wasted months on a six way conversation:
20 How not to Do It... six way conversation ITS Data centre Specialists ESTATES ITS Data Centre Consultant Estates Consultant Estates M&E Designers
21 With Hindsight ITS Data centre Specialists ESTATES
22 Brief Medium Density Cabinets (approx 6KW) Design specification for 52 cabinets Day One: 20 Cabinets Generator for maximum design spec UPS for 100KW Air Con n+1 at 100KW Fire suppression PUE 1.5
23 Feature Creep Scope was changing Priority 1. Air Con 2. Generator 3. UPS 4. Fire Suppression Cabinet tender review caused loss of faith BU needs were not been addressed Data centre specialist was crucial
24 Identify the stakeholders ITS Third Parties Finance Users Estates Executive
25 Joint Project ITS nor Estates with experience in data centre builds Data Centre Specialists are essential Must Harness the talent in IT and Estates
26 Build Contract Awarded Tender issued Contract awarded Weekly Meetings Review costs Operate RFI: Request for Information
27 Keysource Work completed on schedule in 3 months Work completed on Budget Omissions and Extras balanced Excellent project management Excellent H&S Excellent advice Excellent partner Excellent quality of work
28 Equipment Relocation ITS took one month to relocate all kit Planned meticulously Minimum Down time
29 Before and After From chaos and mess Transformed into a modern installation
30 Maintenance Make it clear who is responsible BMS System Estates have the twenty four hours cover ITS does not Consider Contractor s active monitoring service
31 Lessons from Datacentre Reichel
32 Lessons Data Centre Must must be IT and Estates project Risk Report Crucial Executive Buy-in Stakeholder buy-in Estates and ITS Must work together Design and Build Tender to Data centre Specialists Weekly Review Meetings
33 Lessons Data Centre Identify the various leads Identify Roles and responsibilities Identify the project team Identify the risks
34 Lessons Data Centre Avoid Retrospective experts Avoid Local design experts Avoid Conflicts Do not change the Specification/Brief Review costs and control them Operate RFI: Request for Information
35 Cabling Standards University of Houston Warwick University telecomunications_cabling_specification_v4.pdf Imperial: Leeds University: PSA schedule of rates for building works ISBN: Pages
36 IT Standards BU IT Standards Keep it short, pages of details are never read Based on repeated questions from Contractors Not just the infrastructure Cabling standards in Measured Term Contract MTC covers BS standards BU IT Standards specific to Bangor
37 BU IT Standards Communication with ITS Requested Documents Costs and Budgets ITS Helpdesk and Requests BS Standards Labelling standard ITS Standards Request Spread sheet Infrastructure Service Summary IT Data Network Infrastructure LAN Connections Lead Times and installation dates Third Party contractors Strip Out and everything which has been discussed here
38 Future Rathbone Hand Over May Million Refurbishment Change of Use: Halls to Office IT Standards Quoting the draft
39 Future Halls Refurbishment - Garth 4 Million project 2014 For the first time: IT is now a stakeholder ITS at feasibility Specification review IT Standards submitted
40 Future Pontio. Open Million Project 5000 data points Arts and Innovation Centre Theaters, Lecture Rooms Public Wi-Fi and much much more
41
Data Center Consultants for the upcoming IIT Bombay HPC+BYOH Data Center
Data Center Consultants for the upcoming IIT Bombay HPC+BYOH Data Center IIT Bombay Computer Center invites Data Center Consultants to submit their bids for the contract for the design and project management
More informationData Centre Stockholm II, Sweden Flexible, advanced and efficient by design.
Data Centre Stockholm II, Sweden Flexible, advanced and efficient by design. TelecityGroup Kvastvägen 25-29 128 62 Sköndal Stockholm Sweden Tel: +46 (0) 8 799 3800 se.info@telecity.com www.telecitygroup.se
More informationA next generation Colocation data centre for Birmingham city centre
A next generation Colocation data centre for Birmingham city centre Presenter: Russel Smith The Exponential Growth in Data BIG Data Social Networking Cloud Multi Media Device Apps SMART Cities High density,
More informationData Centre. Design and Build. Everything you need to know about designing, installing and maintaining a. Data Centre
Data Centre Design and Build Everything you need to know about designing, installing and maintaining a Data Centre UPS Generators Maintenance Data Centre Design and Build Introduction You are looking to
More informationRack Colocation Hosting. Data Centre Solutions Expertly Engineered
Rack Colocation Hosting www.workspace-technology.com Data Centre Solutions Expertly Engineered We are committed to ensuring the very best data centre environment for your business Rack Colocation Hosting
More informationSurvey and Audit Service Schedule. Airflow and Thermal Imaging Survey Service Schedule. Data Centre Solutions Expertly Engineered
Survey and Audit Service Schedule Airflow and Thermal Imaging Survey Service Schedule Data Centre Solutions Expertly Engineered Consult optimisation, audit and survey services Data Centre Services Workspace
More information13.f Toronto Catholic District School Board's IT Strategic Review - Draft Executive Summary (Refer 8b)
AGENDA ADDENDU TE REGULAR EETING OF TE AUDIT COITTEE COITTEE PUBLIC SESSION Tuesday, June 6, 2017 6:30 P.. Pages 13. Staff Reports 13.f Toronto Catholic District School Board's IT Strategic Review - Draft
More information50 years Committed to Service with Integrity
www.adcock.co.uk 2 50 years Committed to Service with Integrity Welcome to Adcock, the UK s most successful independent climate control company Our achievements were recognised at the prestigious RAC Cooling
More informationMore than 85% of our work is either repeat business or referrals from satisfied customers, a statistic that we are very proud of.
Corporate Brochure More than 85% of our work is either repeat business or referrals from satisfied customers, a statistic that we are very proud of. Adcock Refrigeration and Air Conditioning Corporate
More informationWorld Class. Globally Certified. High Availability.
Intellicentre 2 World Class. Globally Certified. High Availability. Intellicentre 2 Macquarie Park, Sydney 2 Intellicentre 2 A new generation of data centre solutions. Australia s first showcase Tier III
More informationData Centre In A Box
Data Centre In A Box Data Centre In A Box Rittal s Data Centre In A Box replicates all of the key data centre capabilities but on a smaller scale. The Data Centre In A Box mitigates risk and provides compelling
More informationBT CNSP - new solutions for health and social care
BT CNSP - new solutions for health and social care The Health and Social Care Network (HSCN) will provide a reliable and efficient way for health and social care organisations to access and exchange information.
More informationDATA CENTRE & COLOCATION
DATA CENTRE & COLOCATION RISING DEMAND FOR HOSTED SERVICES When it comes to hosted IT infrastructure, organisations are looking for highly resilient, highly available and highly scalable facilities at
More informationMarine Institute Job Description
Marine Institute Job Description Position Contract Service Group Location Temporary Systems Administrator Team Leader Temporary Specified Purpose contract for a duration of up to 3 years Ocean Science
More informationSTRUCTURED CABLING UK WIDE SERVICES
STRUCTURED CABLING UK WIDE SERVICES Page 1 STRUCTURED CABLING UK WIDE SERVICES Contents 4 Section 1: Cabling Overview 5 Section 2: Our Partners 6 Section 3: Innovation 7 Section 4: Managed Services 8 Section
More informationResults for the year ending 31 March 2010.
Induction MITIE at a glance We re the strategic outsourcing and asset management company; FTSE 250 listed support services business with a track record of more than 20 years of growth; Revenues in excess
More informationProgramme Headlines. Project Headlines. Appendix - Watford 2020 Progress Update Report 8 November 2017
Completed by: Liam Hornsby Period from: 23 October 2017 Date completed: 6 November 2017 Period to: 6 November 2017 Current Programme Status Trend since last report Programme Headlines R R/A A/G G Worse
More informationDatacentre Milton Keynes Data sheet
Datacentre Milton Keynes Data sheet Data sheet Datacentre Milton Keynes Find us With 10 datacentres, over 4,500 racks and a 10Gb resilient core network between our datacentre locations, Pulsant has the
More informationData Centre Solutions. Data Centre Solutions Expertly Engineered
Data Centre Solutions www.workspace-technology.com Data Centre Solutions Expertly Engineered We will expertly deliver your data centre using our world-class skills and capabilities. Data Centre Solutions
More informationMarine Institute Job Description
Marine Institute Job Description Position Contract Service Group Location Temporary Scientific and Technical Officer (STO) - IT Systems Administrator Temporary specified purpose contract for a duration
More informationWA Govt Changing Cyber Security Landscape
Office of the Government Chief Information Officer GOVERNMERNT OF WESTERN AUSTRALIA WA Govt Changing Cyber Security Landscape Andrew Cann GCIO 16 August 2017 Key Principles to harness and drive cultural
More informationUKEF UK Export Finance. Transformation with the Microsoft Cloud
UKEF UK Export Finance Transformation with the Microsoft Cloud the customer overview Customer UKEF Website www.gov.uk/uk-export-finance Number of employees UKEF s fixed deadline had major financial implications,
More informationVersion: V2.0. Integrated Building. Architecture. 19 April dimension data advanced infrastructure
Version: V2.0 Integrated Building 19 April 2013 Architecture dimension data advanced infrastructure Agenda Framework for Implementation Case Studies Copyright Dimension Data 19 April 2013 2 Question Given
More informationUlster University Policy Cover Sheet
Ulster University Policy Cover Sheet Document Title DATA CENTRE ACCESS POLICY 3.2 Custodian Approving Committee Data Centre & Operations Manager ISD Committee Policy approved date 2017 09 08 Policy effective
More informationCABINET PLANNING SYSTEM PROCUREMENT
Report No: 163/2017 PUBLIC REPORT CABINET 19 September 2017 PLANNING SYSTEM PROCUREMENT Report of the Director for Places (Development & Economy) Strategic Aim: Sustainable Growth Key Decision: Yes Exempt
More information1. Introduction Adding Users... 4 Editing A Users Details... 5 Deleting Users Configuring network environment as aliases
1. Introduction... 3 2. Adding Users... 4 Editing A Users Details... 5 Deleting Users... 5 3. Configuring network environment as aliases... 6 4. Adding Categories... 7 5. Editing Categories... 8 6. Adding
More informationFROM LEGACY TO MICROSERVICES Lessons learned on the road to success by Miles & More
FROM LEGACY TO MICROSERVICES Lessons learned on the road to success by Miles & More Matthias Krohnen - Miles & More Manager IT, Lead Innovation Lab Torben Jäger - Red Hat Specialist Solution Architect
More informationUnit 14 plan installation and maintenance of hardware in a technology system
Unit 14 plan installation and maintenance of hardware in a technology system In this assessment I will be describing the purpose and client requirements for the hardware, I will produce a plan for installing
More informationDatacentre Newbridge Data sheet
Datacentre Newbridge Data sheet Data sheet Datacentre Newbridge Find us 7 Claylands Road Edinburgh EH28 8LF Scotland With 10 datacentres, over 4,500 racks and a 10Gb resilient core network between our
More informationManagement & Operations Excellence
Management & Operations Excellence Scott Roots Business Development Director EMEA Operational Excellence 2015 Uptime Institute, LLC The global Data Center Authority 1000+ Certifications in over 80 Countries
More informationBe more responsive with Vodafone One Net Business. Fixed phone and mobile communications through a single platform. Vodafone Power to you
Be more responsive with Vodafone One Net Business Fixed phone and mobile communications through a single platform. Vodafone Power to you Why responsiveness is crucial As a business, we understand your
More informationCorporate Profile. Fibre Network Integration Specialists
Corporate Profile Fibre Network Integration Specialists We provide simple, scalable and sustainable fibre infrastructure that fosters innovation and growth. 2 Name of Entity National Communications Infrastructure
More informationFact sheet VIENNA DATA CENTRE CAMPUS. Connect, transact and grow
Fact sheet VIENNA DATA CENTRE CAMPUS Connect, transact and grow WELCOME TO VIENNA Vienna is one of Europe s best connected cities, and is home to VIX, Austria s largest Internet exchange. In the North
More informationRail Services. Rail: Design, engineering and consultancy services
Rail Services Rail: Design, engineering and consultancy services We are TSP Projects TSP Projects is an award winning multi-disciplinary solutions business with extensive engineering capabilities and specialist
More informationContents. Introduction and Company Overview Mission Vision Values Key personnel Our Clients Certificates and Licences...
Contents Introduction and Company Overview... 3 Mission Vision Values... 4 Key personnel... 5 Our Clients... 6 Certificates and Licences... 6 Preventative Maintenance Sector... 13 Domestic Installation
More informationCOLOCATION 1/4 RACK RACK COLD AISLE CONTAINEMENT PRIVATE CAGE PRIVATE SUITE FLEXIBLE PRICING OPTIONS
1 COLOCATION Experience the most flexible datacenters for mission-critical infrastructure in a highly secure, efficient and reliable environment. Enjoy future-proof and agile colocation services that provide
More informationImplementing a CMDB. The Top 5 Lessons Learnt, 3 years after Implementation. Process Team. Configuration Management. Configuration CMDB CMDB
Process Team Configuration Configuration Management Management CMDB CMDB Implementing a CMDB The Top 5 Lessons Learnt, 3 years after Implementation Author: Author: Date: Date: Harvey Davison Harvey Davison
More informationEffective energy management services for all your needs
Effective energy management services for all your needs Discover our complete services offer Make the most of your energy sm Energy Challenge Supply Costs Sustainability Pressures Demand Efficiency When
More informationDatacentre Reading East 2 Data sheet
Datacentre Reading East 2 Data sheet Data sheet Datacentre Reading East 2 Find us With 10 datacentres, over 4,500 racks and a 10Gb resilient core network between our datacentre locations, Pulsant has the
More informationPolicy. Business Resilience MB2010.P.119
MB.P.119 Business Resilience Policy This policy been prepared by the Bi-Cameral Business Risk and Resilience Group and endorsed by the Management Boards of both Houses. It is effective from December to
More informationJourney to the Cloud At Derby City Council. Nick O Reilly Director of Digital Services
Journey to the Cloud At Derby City Council Nick O Reilly Director of Digital Services Contents Council Context Strategic Decision What cloud platform and why Implementation Challenges What Next Conclusion
More informationSchematic Design Overview Project Review Stakeholder Engagement Project Delivery Method Upcoming Milestones
Schematic Design Overview Project Review Stakeholder Engagement Project Delivery Method Upcoming Milestones Public Safety & Security Secure parking and access for Police, Sheriff, Judge Secure & segregated
More informationIncident Information Management Tool
Incident Information Management Tool Abstract: Flaws of current incident information management at CMS and CERN are discussed. A new data model for future incident database is proposed and briefly described.
More informationService Perfect all-round support package for your data centre
Service Perfect all-round support package for your data centre www.iqdata.info iqdata Service Das intelligente Rechenzentrum The specialist for IT infrastructure iqdata iqdata is the brand for complete
More informationBeverly D. Grappone Hall Certified LEED Silver Home of NHTI s State-of-the Art Nursing Simulation Center
Beverly D. Grappone Hall Certified LEED Silver Home of NHTI s State-of-the Art Nursing Simulation Center Project: Beverly D. Grappone Hall Facility Size: 30,500 sq. ft. Location: Concord, New Hampshire
More informationINTEGRATED BUILDING CONTROLS
SG Controls & Integration Limited Consultancy Design Commissioning Service INTEGRATED BUILDING CONTROLS www.sg-controls.co.uk IMPROVE EFFICIENCY HVAC Fenestration & Natural Vent Lighting (incl. Emergency)
More informationRFQ OIT-1 Q&A. Questions and Answers, in the order received.
Question Does the system have an existing SSP? Do they use a system like Xacta or CSAM to generate the SSP. Will they provide us the current POAM list? Will they provide scanning tools or we have to bring
More informationCOOLING WHAT ARE THE OPTIONS AND THE PROS AND CONS FOR THE VARIOUS TYPES OF DATACENTRES SERVER AND COMMS ROOMS
COOLING WHAT ARE THE OPTIONS AND THE PROS AND CONS FOR THE VARIOUS TYPES OF DATACENTRES SERVER AND COMMS ROOMS Dr Jon Summers Scientific Leader in Data Centers Part-time Academic in Thermofluids at the
More informationMedia Pack. ENERGY EFFICIENCY BRITISH MANUFACTURER TRAINING
Media Pack www.airedale.com BRITISH MANUFACTURER ENERGY EFFICIENCY CONTROLS SERVICE TRAINING 02 About Airedale Providing integrated thermal management solutions Differentiated through innovation and service
More informationADDENDUM #1. Date: 12/21/2018
Minnesota State Colleges and Universities Request for Proposals for Architectural and Engineering Services Physical Security Enhancements at St. Cloud State University Date: 12/21/2018 ADDENDUM #1 1. The
More informationApplied Information and Communication Technology
Edexcel GCE Applied Information and Communication Technology Unit 9: Communications and Networks 10 28 May 2010 Assessment window 3 weeks Time: 10 hours You must have: Short treasury tag, cover sheet Paper
More informationProviding premium colocation and networking solutions to end user clients
Challenge The Client Providing premium colocation and networking solutions to end user clients Charles Square is an independent IT consultancy focused on serving the comprehensive needs of commercial organisations
More informationA greenfield port. New Port Project, Qatar. written by: Martin Ashcroft research by: Jon Bradley
A greenfield port The New Port Project Steering Committee is tasked with the design and development of a port to meet the requirements of the Qatar National Vision 2030 written by: Martin Ashcroft research
More informationISE Canada Executive Forum and Awards
ISE Canada Executive Forum and Awards September 19, 2013 "Establishing a Cost Effective PCI DSS Compliance Program by Having a Can Do Attitude Della Shea Chief Privacy & Information Risk Officer Symcor
More informationFacilities. Maintenance. Sure Group
Facilities Maintenance Sure Group DELIVERING QUALITY SERVICE IN FACILITIES MAINTENANCE we keep our promises... this means delivering safe, reliable and quality Facilities Maintenance services... Delivering
More informationIT Progress Report. Presented by: Owen Brady Director of Information Technology. Board. 19 th March 2015
Item 6 IT Progress Report Presented by: Owen Brady Director of Information Technology Board 19 th March 2015 Action for Board: For information For consideration For decision Table of Contents 1. Executive
More informationCATCH ERRORS BEFORE THEY HAPPEN. Lessons for a mature data governance practice
CATCH ERRORS BEFORE THEY HAPPEN Lessons for a mature data governance practice A guide to working with cross-departmental teams to establish proactive data governance for your website or mobile app. 2 Robust
More informationCloud solution consultant
Cloud solution consultant Role brief Directorate Jisc technologies Base location Harwell or Bristol Grade B Job level 18 Job family Professional services Date 23/10/2017 Reports to Cloud services group
More informationHelping the channel capitalise on network transformation
Helping the channel capitalise on network transformation Next generation networks The network is changing Legacy networks are being crushed by the pressures of the digital era. They weren t built for the
More informationSECTION SPECIAL SYSTEMS. Website and Construction Cameras
PART 1 GENERAL SECTION 01121 SPECIAL SYSTEMS 1.01 WORK INCLUDED A. Project Construction Site Cameras and Video Streaming Servers B. Project Web site C. Network & Infrastructure D. Internet Connectivity
More informationJUSTICE SUB-COMMITTEE ON POLICING AGENDA. 2nd Meeting, 2014 (Session 4) Thursday 20 February 2014
JSP/S4/14/2/A JUSTICE SUB-COMMITTEE ON POLICING AGENDA 2nd Meeting, 2014 (Session 4) Thursday 20 February 2014 The Sub-Committee will meet at 1.00 pm in Committee Room 6. 1. Decision on taking business
More informationSHANGHAI We predict that, in the next three years, more companies will outsource their infrastructure needs and migrate their infrastructure
SHANGHAI We predict that, in the next three years, more companies will outsource their infrastructure needs and migrate their infrastructure platforms to cloud systems. Promotions will occur less often
More informationVOCATIONAL QUALIFICATIONS ENTRY CODES 2017/18. ocr.org.uk
VOCATIONAL QUALIFICATIONS ENTRY CODES 2017/18 ocr.org.uk Contents Introduction 1 Key to forms of assessment 1 Version control 2 1 Skills for Business 3 1.1 Administration (Business Professional) 3 1.2
More informationWORLDSKILLS STANDARD SPECIFICATION
WORLDSKILLS STANDARD SPECIFICATION Skill 02 Information Network Cabling WSC2015_WSSS02 THE WORLDSKILLS STANDARDS SPECIFICATION (WSSS) GENERAL NOTES ON THE WSSS The WSSS specifies the knowledge, understanding
More informationSTRATEGY STATEMENT OF QUALIFICATIONS
STRATEGY STATEMENT OF QUALIFICATIONS STOK IS YOUR VALUES- ALIGNED PARTNER IN THE DISCOVERY, CO-CREATION, AND DELIVERY OF HIGH- PERFORMANCE SPACES Salesforce Tower San Francisco, CA SERVICES LEED Platinum
More informationData Centre & Colocation in Birmingham. Flexible. Secure. Accredited.
Data Centre & Colocation in Birmingham Flexible. Secure. Accredited. Intercity - transforming your business Work Together. Work Anywhere. Work Securely. At Intercity Technology, we re driven by our people-first
More informationDUB4. An innovative data centre. Resilience. Power. Flexibility AT NORTHWEST BUSINESS PARK
DUB4 AT NORTHWEST BUSINESS PARK An innovative data centre Resilience. Power. Flexibility Unit 14 Northwest Business Park, Ballycoolin, Dublin 14 +353 1 4611200 ie.info@telecity.com www.telecity.ie Introducing
More informationWhite Paper: Installing Data Networks Using LinkWare Live SaaS
White Paper: Installing Data Networks Using LinkWare Live SaaS White Paper: Installing Data Networks Using LinkWare Live SaaS Software as a Service (SaaS) continues to grow in popularity across a wide
More information7 Best Practices for Increasing Efficiency, Availability and Capacity. XXXX XXXXXXXX Liebert North America
7 Best Practices for Increasing Efficiency, Availability and Capacity XXXX XXXXXXXX Liebert North America Emerson Network Power: The global leader in enabling Business-Critical Continuity Automatic Transfer
More informationRFQ OIT-1 Q&A. Questions and Answers, in the order received.
Question Does the system have an existing SSP? Do they use a system like Xacta or CSAM to generate the SSP. Will they provide us the current POAM list? Will they provide scanning tools or we have to bring
More informationSCOPE OF SERVICES FIBER OPTIC NETWORK DESIGN CITY OF OVERLAND PARK, KANSAS
1.0 PROJECT ADMINISTRATION SCOPE OF SERVICES FIBER OPTIC NETWORK DESIGN CITY OF OVERLAND PARK, KANSAS Project Administration services shall consist of project management and other support services for
More informationFact sheet for the switch to All IP in nursing homes
Fact sheet for the switch to All IP in nursing homes July 2017 Conversion to All IP telephony to be completed by the end of 2017 With All IP, Swisscom is providing the technical basis for the digitisation
More informationAt Hewlett Packard Enterprise, an HR Transformation
At Hewlett Packard Enterprise, an HR Transformation Workday platform delivers advanced tools for strategically managing HPEs human capital Generally, a project of this scope would take up to three years
More informationAchieve an average of four pieces of regional editorial coverage per month Attract 10 links back to the site (domain authority of more than 35).
Category: Integrated Campaign Company: Outwrite PR Entry title: Securing a hot reputation Brief and objectives: Jackson Fire & Security specialises in fire and security solutions. Outwrite was tasked with
More informationA GUIDE TO THE GRIEVANCE PROCESS IN THE DISTRICT OF COLUMBIA JAIL
A GUIDE TO THE GRIEVANCE PROCESS IN THE DISTRICT OF COLUMBIA JAIL The grievance process is complicated, so don t get frustrated, just read through this guide several times, and if you still don t understand
More informationMortality, Mayhem and You: Risk Management in Digital Health
Mortality, Mayhem and You: Risk Management in Digital Health Session #155, February 22, 2017 Todd Cooper, Exec. Director, Trusted Solutions Foundry Nicholas J. Mankovich, VP & CISO, BD Philip Raymond,
More informationCommunications Design Challenges for the
Communications Design Challenges for the Edmonton North LRT Extension Syl Santo, RCDD ITS Designer / Engineering Coordinator Stantec Consulting Presenter Background Syl Santo, RCDD Over 27 years of experience
More informationHigh Performance Computing (HPC) Data Center Proposal
High Performance Computing (HPC) Data Center Proposal Imran Latif, Facility Project Manager Scientific & Enterprise Computing Data Centers at BNL 10/14/2015 Quick Facts!! Located on 1 st floor in Building
More informationElectronic Security Solutions.
Electronic Security Solutions. Introduction to Mayflex Mayflex is a leading distributor of Converged IP Solutions. Part of our offering is an extensive range of electronic security products from a large
More informationINTELLIGENT INFRASTRUCTURES
INTELLIGENT INFRASTRUCTURES MENU 01. MENU 02. OUR MISSION 03. WHAT WE DO 04. PHYSICAL INFRASTRUCTURE 05. STRUCTURED CABLING 06. FIBRE SOLUTIONS 07. MOVES, ADDS AND CHANGES 08. DATA CENTRE SOLUTIONS 09.
More informationITIL : Professional Education Training. Innovative solutions for modern businesses.
ITIL : 2011 Professional Education Training Innovative solutions for modern businesses www.syzygal.com The ITIL Service Lifecycle ITIL (IT INFRASTRUCTURE LIBRARY) is a best practice framework for IT Service
More informationICT SERVICES
ICT SERVICES www.plymouthsciencepark.com ict@plymouthsciencepark.com 01752 772200 Introduction One of the many benefits to tenants resident on Plymouth Science Park is access to an extensive portfolio
More informationDatacentre Milton Keynes Hall C Data sheet
Datacentre Milton Keynes Hall C Data sheet Data sheet Datacentre Milton Keynes Hall C Find us With 10 datacentres, over 4,500 racks and a 10Gb resilient core network between our datacentre locations, Pulsant
More informationPretaGov Australia SaaS Hosting with Fully Managed Services, Support and Maintenance
PretaGov Australia SaaS Hosting with Fully Managed Services, Support and Maintenance Introduction to PretaGov PretaGov operates a Government Community Plone CMS (content management system) SaaS Cloud exclusively
More informationIntroduction. Read on and learn some facts about backup and recovery that could protect your small business.
Introduction No business can afford to lose vital company information. Small-business owners in particular must take steps to ensure that client and vendor files, company financial data and employee records
More informationData center relocation needs physical infrastructure availability evaluation and standardization. Martin Puš, SYSTEMING Prague, 4th October 2016
Data center relocation needs physical infrastructure availability evaluation and standardization Martin Puš, SYSTEMING Prague, 4th October 2016 DC relocation process What Reason of relocation? What to
More informationACTIVE SHOOTER RESPONSE CAPABILITY STATEMENT. Dynamiq - Active Shooter Response
ACTIVE SHOOTER RESPONSE CAPABILITY STATEMENT ACTIVE SHOOTER RESPONSE Responding to armed assault acts of terrorism and active shooter incidents Acts of terrorism and shootings in public places have become
More informationHIGH DENSITY DATACOM INTEGRATED COOLING SYSTEM.
HIGH DENSITY DATACOM INTEGRATED COOLING SYSTEM. SYSTEM LOGICA is the most advanced alternative to the problem of cooling of server rooms MONTAIR is the trademark which represents excellence on the market
More informationALCATEL-LUCENT OPENTOUCH SUITE FOR SMALL AND MEDIUM BUSINESSES Simplify your communications and maximise your business
ALCATEL-LUCENT OPENTOUCH SUITE FOR SMALL AND MEDIUM BUSINESSES Simplify your communications and maximise your business To succeed as a small or medium business (SMB), you need to keep customer satisfaction
More informationExperience server virtualization
Experience server virtualization Find the fast track to greater flexibility and lower costs Intel Xeon processor. As business priorities surge ahead, are you keeping pace? Today s IT infrastructures must
More informationUniversity of Northern Iowa Centric Project Web Site User Guide
University of Northern Iowa Centric Project Web Site User Guide Overview On all projects in excess of $1,000,000 and other select projects, the University of Northern Iowa utilizes an internet based project
More informationFREE INFORMATION GUIDE
FREE INFORMATION GUIDE Tel: 01925 751638 Fax: 01925 753819 Email: info@pwdatagroup.co.uk Visit: www.pwdatagroup.co.uk About PW Data Group PW Data Group are a well-established IT networking and technology
More informationRFQ No C014 Datacenter Colocation and Associated Support Services. December 4, 2017
RFQ No. 1-18-C014 Datacenter Colocation and Associated Support Services December 4, 2017 Questions and Answers Notice: Questions may have been edited for clarity and relevance. 1. Question: Do you have
More informationDefining FM Excellence
Your guide to the IFMA-RICS suite of credentials and professional development The IFMA-RICS Collaboration The most significant evolution in the history of facility management Suite of credentials Together,
More informationWelcome to a world where technology flows through the heart of your business environment. Welcome to CDC
Welcome to a world where technology flows through the heart of your business environment Welcome to CDC Overview 4 Urban Campus 5 Intelligent Campus Management Solution 6 Key Features 7 Integra Management
More informationEnhanced management of TECOM Group communities
Enhanced management of TECOM Group communities Dr Amina Al Rustamani Group CEO TECOM Group Over the past 16 years, TECOM Group has championed the creation of vibrant, collaborative communities and work
More informationGREEN DEFENCE FRAMEWORK
GREEN DEFENCE FRAMEWORK Approved by the North Atlantic Council in February 2014 GREEN DEFENCE FRAMEWORK OVERVIEW 1. Green Defence could, at this stage, be defined as a multifaceted endeavour cutting across
More informationStrengthening the Cybersecurity of Federal Networks and Critical Infrastructure
Strengthening the Cybersecurity of Federal Networks and Critical Infrastructure Executive Order 13800 Update July 2017 In Brief On May 11, 2017, President Trump issued Executive Order 13800, Strengthening
More informationTransforming the UK police force through digital technology. Switch to a new way of working with BT
Transforming the UK police force through digital technology Switch to a new way of working with BT Digital technology can improve every aspect of 21st century policing In recent years, policing in the
More informationAdvanced Network Consulting
Advanced Network Consulting ANC Corporate Overview Quick Facts: Small, Minority-Owned, Disadvantaged Founded: 2004 Cage Code: 5DEH3 DUNS Number: 167248272 GSA Contract Number: GS-35F-088CA Primary NAICS
More information