INFORMATION DAY. Fusion for Energy (F4E)

Size: px
Start display at page:

Download "INFORMATION DAY. Fusion for Energy (F4E)"

Transcription

1 INFORMATION DAY 26th November 2013, Zagreb Fusion for Energy (F4E) Part 5 - F4E Forthcoming Business Opportunities Anthony Courtial Business Intelligence Officer

2 Buildings (and site adaptation) 1/2 TB02-Lift and cranes [OPE-285] Signed with NKM Noel special cranes (Germany) TB03-Nuclear tokamak building/assembly hall/doors [OPE-286]: signed with VFR consortium (France-Spain) TB04- Mechanical & Electrical System [OPE- 301]: Signed with GDF-Suez consortium (France-Germany) TB05- Design & Build package [OPE-378]: Signed with Ferrovial Agroman SA (Spain) F4E and Croatian Industry for ITER - 26th November

3 Buildings (and site adaptation) 2/2 TB06- HV electrical Power distribution [OPE-428]: CFT under preparation (fine-tuning exchanges with IO target CFT Q4/2013) TB07-Design &Build package [OPE-429]: Signed with Ferrovial Agroman SA (Spain) TB08-site infrastructure [OPE-374]: Signed with COMSA SAU (Spain) TB13-Emergency electrical power distribution [OPE-540]: under preparation (on-going market survey) General strategy presentation updated in November F4E and Croatian Industry for ITER - 26th November

4 Magnets (1/2) PF Coils Awarded & signed 13th August 2013: ASG Superconductors 27.5M Under evaluation: Winding Tooling 1 [OPE-463] (Deadline was 23rd September 2013) Under preparation (tentative dates of CFT): Site & infrastructure Manager: February 2014 Additional tooling: March 2014 Impregnation tooling: March 2014 Manufacturing: June 2014 Cold test: July 2014 F4E and Croatian Industry for ITER - 26th November

5 Magnets (2/2) TF Coils On-Going: TF Coils Insertion (Negotiation phase terminated) Signature target Q F4E and Croatian Industry for ITER - 26th November

6 In Vessel Divertor Awarded: [OMF-444] Divertor Cassette bodies Under preparation: Cassette assembly (market survey to be launched) First Wall Awarded: [OPE-319] HHF test facility for in-vessel components. On-going: [OPE-489] Supply of CuCrZr plates; and full scale prototype (ongoing negotiation for both); grant on characterisation of plates (Oct 2013) Manifold On-going: Manufacturing of prototype F4E and Croatian Industry for ITER - 26th November

7 Remote Handling-Machine System Remote Handling On-Going: Divertor RHS [OMF-340-1]: Evaluation of Tenders on-going. Award foreseen 01/2014. Cask & Plug RHS [OMF-340-2]: Evaluation of Requests to Participate to the Dialogue on-going. Invitation to Dialogue foreseen 12/2013. Neutral Beam RHS (OMF-340): Evaluation of Requests to Participate completed. Invitation to Dialogue sent (5 companies). List communicated to ILOs. In-Vessel Viewing System (OMF-383): Evaluation of Requests to Participate on-going. Invitation to Dialogue foreseen 02/2014. F4E and Croatian Industry for ITER - 26th November

8 Cryo & Fuel Cycle Cryoplant Under evaluation: [OPE-376] (target award 12/2013). Tritium Plant Awarded: WDS tanks [OPE-500] to ENSA S.A 2.1M - Delivery +20 months Preliminary design of main WDS [OPE-421] to Kraftanlagen-Heidelberg 2M Cancelled: Conceptual design for Hydrogen Isotope Separation System [OPE-441]. Offers > eligible budget Vacuum pumping Under preparation: Supply of warm regeneration lines (target: beginning 2014) F4E and Croatian Industry for ITER - 26th November

9 TBM, Materials development and Engineering Support TBM & Materials Under preparation: EUROFER material market survey Engineering Support Under preparation: Thermal hydraulic & Fluid dynamic analysis Under evaluation: [OPE-468] provision of metrology support services [OFC-413] post-irradiation material characterization [OMF-508] Engineering support in electromagnetic & electromechanical analysis [OMF-466] provision of nuclear analysis Ancillary system F4E and Croatian Industry for ITER - 26th November

10 Neutral Beam & EC Power Supplies NBTF [Mitica/Prima/Spider] Under evaluation: [OPE-454] EC-Power Supply; [OPE-299] Superconducting magnet for the EU Gyrotron On-going: [OPE-520]: MITICA Vessel: target for CFT is Q4/2013 [OPE-307]: MITICA Cryoplant: target for CFT is Q [OPE-278]: AGPS-GRPS: target for CFT is Q4/2013 Awarded: [OPE-396]: SPIDER HVD and TL awarded to COELME SpA, 2.8M, Delivery +48 months F4E and Croatian Industry for ITER - 26th November

11 Diagnostics Diagnostics [bolometers, infrared tech, optical, reflectometers, dust measurement etc.] Under evaluation: [OFC-433] Port Integration (target award: early 2014) [OPE-449] Prototype LTCC (Low Temperature co-fired ceramic) pick-up coils GRANTS Under preparation: [GRT 403] Conceptual design and Interface Specifications of High Resolution Neutron Spectrometers. Rogowski coils; flux loops GRANTS Under evaluation: [FPA-408-CXRS] Core-plasma charge exchange recombination spectrometer [FPA-384] bolometers [FPA-409] Core-plasma LIDAR Thomson scattering diagnostic [GRT-519] ITER plasma magnetic control F4E and Croatian Industry for ITER - 26th November

12 Antennas & Plasma Engineering Antennas: EC launcher GRANTS Under evaluation: [GRT-519] ITER plasma magnetic control Under preparation: (Q4/2013) Physics and engineering modeling for plasma control and scenarios Additional heating systems analysis Disruption modeling and simulation Plasma control scenarios (engineering support) Antennas engineering support & analysis Scenario & plasma performance analysis Antennas F4E and Croatian Industry for ITER - 26th November

13 Conclusions F4E s projects offer vast opportunities to European industry, research laboratories and SMEs F4E seeks interaction with industry to engage in long term collaboration Croatia owns identified capabilities in Energetics, Cabling and Radio-transmitters Key Business Opportunities identified in the areas of Engineering Support, Diagnostics and Antennas / Plasma Engineering F4E and Croatian Industry for ITER - 26th November 2013

14 Follow us on:

EU Contribution to ITER Diagnostics. Glenn Counsell Project Manager Diagnostics Fusion for Energy

EU Contribution to ITER Diagnostics. Glenn Counsell Project Manager Diagnostics Fusion for Energy EU Contribution to ITER Diagnostics Glenn Counsell Project Manager Diagnostics Fusion for Energy 1 DIAGNOSTICS PROCUREMENTS EU SCOPE OF SUPPLY EU Industry EFLs EU is the largest supplier of Diagnostics

More information

Barcelona, 30/06/2017

Barcelona, 30/06/2017 Barcelona, 30/06/2017 F4E_D_293AHB Subject: In accordance with the provisions defined in Article 124 of the Commission Delegated Regulation (EU) No 1268/2012 1, the table below summarizes modifications

More information

FUSION FOR ENERGY The European Joint Undertaking for ITER and the Development of Fusion Energy

FUSION FOR ENERGY The European Joint Undertaking for ITER and the Development of Fusion Energy FUSION FOR ENERGY The European Joint Undertaking for ITER and the Development of Fusion Energy THE GOVERNING BOARD The Governing Board, DECISION OF THE GOVERNING BOARD ADOPTING THE PROJECT PLAN (2013 EDITION)

More information

Figure 9.1: The ITER construction site in October UK firm Atkins, as part of Engage

Figure 9.1: The ITER construction site in October UK firm Atkins, as part of Engage 9.1 OVERVIEW CCFE s industry programme, now operating under the auspices of the UK Atomic Energy Authority, has continued to play a very active role in involving British companies in fusion during the

More information

Partners for the Future of Energy: ITER and the Swiss Plasma Centre

Partners for the Future of Energy: ITER and the Swiss Plasma Centre Partners for the Future of Energy: ITER and the Swiss Plasma Centre Bernard Bigot Director-General ITER Organization Page 1 Congratulations: inauguration of Swiss Plasma Center q École Polytechnique Fédérale

More information

Remote Handling Connector as an important part of the ITER Diagnostics system

Remote Handling Connector as an important part of the ITER Diagnostics system Remote Handling Connector as an important part of the ITER Diagnostics system Finnfusion Seminar 4.6.2018 Karoliina Salminen, Research Team Leader Timo Määttä, Project Manager 1 ITER Diagnostics As an

More information

Segmentation of internal components and impact on maintenance for DEMO

Segmentation of internal components and impact on maintenance for DEMO Segmentation of internal components and impact on maintenance for DEMO F. Cismondi E. Magnani L.V. Boccaccini This presentation includes the works done under EFDA Contracts by CEA, EFET, FZK, and HAS 1

More information

European Spallation Source ERIC Contract Award Notices 2017

European Spallation Source ERIC Contract Award Notices 2017 European Spallation Source ERIC Contract Award Notices 2017 Month ESS Ref. Description Name of Company Award Value Duration March April June OCT-2017-111100- OCT-2016-600800002- ITT-2017-111700-002 OCT-2016-130303-

More information

Assolombarda, ITER, UNA VIA VERSO LA COMPETITIVITA GLOBALE? Roberto Adinolfi

Assolombarda, ITER, UNA VIA VERSO LA COMPETITIVITA GLOBALE? Roberto Adinolfi Assolombarda, 24-11-14 ITER, UNA VIA VERSO LA COMPETITIVITA GLOBALE? Roberto Adinolfi 1 1 ANSALDO INVOLVEMENT IN NUCLEAR FUSION Ansaldo has a long las-ng involvement in Nuclear Fusion Research Programs

More information

Market Survey. Technical Description Dismantling and Supply of Electrical Overhead Travelling (EOT) Cranes with a capacity up to 10 Tonnes

Market Survey. Technical Description Dismantling and Supply of Electrical Overhead Travelling (EOT) Cranes with a capacity up to 10 Tonnes EDMS No. 1995140 Group Code: EN-HE Market Survey Technical Description Dismantling and Supply of Electrical Overhead Travelling (EOT) Cranes with a capacity up to 10 Tonnes Abstract This Technical Description

More information

Cast3M www-cast3m.cea.fr

Cast3M www-cast3m.cea.fr SHIVA, APPLICATION BASÉE SUR SALOME POUR LE DIMENSIONNEMENT DES COUVERTURES TRITIGÈNES DES RÉACTEURS À FUSION : CONCEPT ET PREMIÈRES APPLICATIONS Cast3M www-cast3m.cea.fr Julien Aubert, G. Aiello (CEA/DEN/DM2S/SEMT/BCCR)

More information

Ingrid Mann EISCAT Scientific Association Background Project Status Opportunities

Ingrid Mann EISCAT Scientific Association Background Project Status Opportunities The EISCAT 3D Project Ingrid Mann EISCAT Scientific Association Background Project Status Opportunities Ingrid Mann, 29 February 2012 What is EISCAT 3D: New generation atmospheric radar: multi-static phased

More information

Rationale and Method for design of DEMO Breeding Blanket Poloidal Segmentation

Rationale and Method for design of DEMO Breeding Blanket Poloidal Segmentation EUROFUSION WPBB-CP(16) 15438 R Mozzillo et al. Rationale and Method for design of DEMO Breeding Blanket Poloidal Segmentation Preprint of Paper to be submitted for publication in Proceedings of 29th Symposium

More information

Research Infrastructures for All You could be Next! e-infrastructures - WP

Research Infrastructures for All You could be Next! e-infrastructures - WP Research Infrastructures for All You could be Next! e-infrastructures - WP2016-17 Anni Hellman DG CONNECT UKRO Annual Conference 2015 Horizon 2020 Bridging Research and Innovation Workprogramme 2014-2015

More information

Challenges and developments in fusion neutronics a CCFE perspective

Challenges and developments in fusion neutronics a CCFE perspective Challenges and developments in fusion neutronics a CCFE perspective A. Turner Applied Radiation Physics group SERPENT fusion neutronics workshop, Cambridge, June 2015 CCFE is the fusion research arm of

More information

3D Equilibrium Reconstruction for Stellarators and Tokamaks

3D Equilibrium Reconstruction for Stellarators and Tokamaks 3D Equilibrium Reconstruction for Stellarators and Tokamaks Samuel A. Lazerson 1 D. Gates 1, N. Pablant 1, J. Geiger 2, Y. Suzuki 3, T. Strait 4 [1] Princeton Plasma Physics Laboratory [2] Institute for

More information

Operational Services Procurement. Vendor Engagement Event 28 th March 2018

Operational Services Procurement. Vendor Engagement Event 28 th March 2018 Operational Services Procurement Vendor Engagement Event 28 th March 2018 Agenda Introductions from the Chair Alt HAN Company Technology Services Update Operational Services Procurement Process Scope and

More information

Italy - Information Day: 2012 FP7 Space WP and 5th Call. Peter Breger Space Research and Development Unit

Italy - Information Day: 2012 FP7 Space WP and 5th Call. Peter Breger Space Research and Development Unit Italy - Information Day: 2012 FP7 Space WP and 5th Call Peter Breger Space Research and Development Unit Content Overview General features Activity 9.1 Space based applications and GMES Activity 9.2 Strengthening

More information

Radiation Center Strategic Plan Mission, Vision, Goals and Strategies for Activities and Operations

Radiation Center Strategic Plan Mission, Vision, Goals and Strategies for Activities and Operations Radiation Center Strategic Plan 2012 Mission, Vision, Goals and Strategies for Activities and Operations July 2012 Radiation Center Strategic Plan 2012 Mission, Vision, Goals and Strategies for Activities

More information

Stakeholder consultation process and online consultation platform

Stakeholder consultation process and online consultation platform Stakeholder consultation process and online consultation platform Grant agreement no.: 633107 Deliverable No. D6.2 Stakeholder consultation process and online consultation platform Status: Final Dissemination

More information

ITER CTA NEWSLETTER. No. 7, APRIL 2002 INTERNATIONAL ATOMIC ENERGY AGENCY, VIENNA, AUSTRIA ISSN

ITER CTA NEWSLETTER. No. 7, APRIL 2002 INTERNATIONAL ATOMIC ENERGY AGENCY, VIENNA, AUSTRIA ISSN ITER CTA NEWSLETTER No. 7, APRIL 2002 INTERNATIONAL ATOMIC ENERGY AGENCY, VIENNA, AUSTRIA ISSN 1683 0555 MEETING OF THE ITER CTA PROJECT BOARD by Dr. V. Vlasenkov, PB Secretary The latest meeting of the

More information

CNIM BERTIN TECHNOLOGIES TPI WORLD NUCLEAR EXHIBITION PARIS. Hall 2A - Booth #J to 16 October 2014 Parc des Expositions - Le Bourget

CNIM BERTIN TECHNOLOGIES TPI WORLD NUCLEAR EXHIBITION PARIS. Hall 2A - Booth #J to 16 October 2014 Parc des Expositions - Le Bourget CNIM BERTIN TECHNOLOGIES TPI WORLD NUCLEAR EXHIBITION PARIS 14 to 16 October 2014 Parc des Expositions - Le Bourget Hall 2A - Booth #J35 CNIM, Bertin Technologies and TPI are exhibiting at WNE Paris This

More information

Evaluation of radiative power loading on WEST metallic in-vessel components

Evaluation of radiative power loading on WEST metallic in-vessel components Evaluation of radiative power loading on WEST metallic in-vessel components M-H. Aumeunier 1, P. Moreau, J. Bucalossi, M. Firdaouss CEA/IRFM F-13108 Saint-Paul-Lez-Durance, France E-mail: marie-helene.aumeunier@cea.fr

More information

Thesis Statement(s) High Field Utilization (I p /I tf ) needed to access! t ~ 1 and High I N

Thesis Statement(s) High Field Utilization (I p /I tf ) needed to access! t ~ 1 and High I N Thesis Statement(s) High Field Utilization (I p /I tf ) needed to access! t ~ 1 and High I N in an ultra-lowaspect-ratio torus (ULART) Operations in the PEGASUS ULART have shown the need for discharge

More information

FRIB Project Status and Plans for Initial Operation

FRIB Project Status and Plans for Initial Operation FRIB Project Status and Plans for Initial Operation 2016 Low Energy Community Meeting Thomas Glasmacher, FRIB Laboratory Director 12 August 2016 This material is based upon work supported by the U.S. Department

More information

Local Area Monitoring System (LAMS) for Microgrid

Local Area Monitoring System (LAMS) for Microgrid Local Area Monitoring System (LAMS) for Microgrid March 6, 2012 update for Korea Electrotechnology Research Institute Illinois Institute of Technology, Korea Electrotechnology Research Institute (KERI)

More information

Network Needs of US-China Fusion Research Collaborations

Network Needs of US-China Fusion Research Collaborations Network Needs of US-China Fusion Research Collaborations by Gheni Abla PERSISTENT SURVEILLANCE FOR PIPELINE PROTECTION AND THREAT INTERDICTION Presented at Chinese-American Networking Symposium 2013, Hangzhou,

More information

the way to new energy ITER Organization 2007 Annual Report

the way to new energy ITER Organization 2007 Annual Report the way to new energy ITER Organization 2007 Annual Report Foreword from the Chair of the ITER Council It gives me great satisfaction to introduce the first ITER Annual Report. 2007 was an historic turning

More information

Header. ITER Organization 2009 Annual Report

Header. ITER Organization 2009 Annual Report Header ITER Organization 2009 Annual Report 1 Contents 3 Executive Summary 9 Highlights by Department 19 Staffing & Financial Tables The photos included in this Annual Report, organized with the support

More information

Israel, 24 November Reaching New Heights in Astronomy

Israel, 24 November Reaching New Heights in Astronomy Reaching New Heights in Astronomy ESO and Industry Construction of world-class observatories Buildings, telescopes, instruments Only possible with strong involvement of industry Procurement by competitive

More information

DESIGN OF INFRARED FOR THE WEST PROJECT

DESIGN OF INFRARED FOR THE WEST PROJECT 1 st IAEA Technical Meeting on Fusion Data Processing, Validation and Analysis Nice, 1 st -3 rd of June 2015 DESIGN OF INFRARED THERMOGRAPHY DIAGNOSTICS FOR THE WEST PROJECT X. Courtois, MH. Aumeunier,

More information

FUSION FOR ENERGY. Annual Report 2011

FUSION FOR ENERGY. Annual Report 2011 FUSION FOR ENERGY Annual Report 2011 2011 Fact Sheet Name: Objectives: Location: Established: Founding Legal Act: Director: Governing Body: Subsidiary Bodies: Staff: The European Joint Undertaking for

More information

Alcator C-Mod Port Space 3/4/2011

Alcator C-Mod Port Space 3/4/2011 Alcator C-Mod Port Space 3/4/2011 A PORT 10 Inner Flange (2) 2 ¾ Flanges WASP probe(labombard) 10 Outer Flange????? 10 IR periscope(j.terry) O-Mode reflectometer (Marmar) Scanning probe (LaBombard) 6 window

More information

Atras Network Communications

Atras Network Communications Atras Network Communications Guide to Information and Communications Technology (ICT) Standards developed and published by the Telecommunications Industry Association (TIA) The Telecommunications Industry

More information

The GCC Interconnection Grid

The GCC Interconnection Grid GCC Interconnection Authority The GCC Interconnection Grid ME Power & Water Conference Abu Dhabi, UAE Nabeel H. Al-Maskati, PhD Hassan K. Al-Asaad, Asaad, MBA March 2007 Background Gulf Cooperation Council

More information

DT-ICT : Big data solutions for energy

DT-ICT : Big data solutions for energy DT-ICT-11-2019: Big data solutions for energy info day Stefano Bertolo, DG CONNECT Mario Dionisio, DG ENER Scientific Programme Officers Who we are DG CONNECT, Unit G1 Data Policy and Innovation DG ENERGY,

More information

Workshop: Innovation Procurement in Horizon 2020 PCP Contractors wanted

Workshop: Innovation Procurement in Horizon 2020 PCP Contractors wanted Workshop: Innovation Procurement in Horizon 2020 PCP Contractors wanted Supercomputing Centre Institute for Advanced Simulation / FZJ 1 www.prace-ri.eu Challenges: Aging Society Energy Food How we can

More information

ITER ORGANIZATION 2016 ANNUAL REPORT

ITER ORGANIZATION 2016 ANNUAL REPORT ITER ORGANIZATION 2016 ANNUAL REPORT THE YEAR AT A GLANCE JANUARY Scientist Fellow network launched FEBRUARY Monaco-ITER International Fusion Energy Days (MIIFED), third edition MARCH First components

More information

Topological Optimization Case Histories at GE Healthcare

Topological Optimization Case Histories at GE Healthcare 2018 VR&D Users Conference Experiences in Design Optimization Experiences in Design Optimization Topological Optimization Case Histories at GE Healthcare Doug Grant, Senior Mechanical Engineer Imaging

More information

SESAR Deployment and upcoming CEF Transport Calls ANS Consultative Board. Helsinki, 12 October 2015

SESAR Deployment and upcoming CEF Transport Calls ANS Consultative Board. Helsinki, 12 October 2015 SESAR Deployment and upcoming CEF Transport Calls Presentation @NEFAB ANS Consultative Board Helsinki, 12 October 2015 SESAR JU SESAR DM 2 entities, 1 project European ATM Master Plan R&D INDUSTRIALISATION

More information

Control systems for spallation target in China ADS systems

Control systems for spallation target in China ADS systems The 15th Intern. Conf. on Accelerator and Large Experimental Physics Control Systems (ICALEPCS15) Control systems for spallation target in China ADS systems Zhiyong He, Qiang Zhao,Wenjuan Cui,Yuxi Luo,

More information

Real-Time Machine Protection at ASDEX Upgrade with Near Infrared Cameras

Real-Time Machine Protection at ASDEX Upgrade with Near Infrared Cameras Real-Time Machine Protection at ASDEX Upgrade with Near Infrared Cameras S. Martinov, B. Sieglin, T. Lunt, R. Drube, A. Herrmann, and the ASDEX Upgrade Team Max-Planck-Institut für Plasmaphysik, EURATOM

More information

INSTITUTE OF NONDESTRUCTIVE TRAINING

INSTITUTE OF NONDESTRUCTIVE TRAINING PREPARATORY SEMINARS FOR ASNT LEVEL III EXAMINATION Course curriculum is specially designed & constantly updated to prepare you for the Similar exercises you will be expected to perform during the actual

More information

NIA Progress Report. Programme Summary. 31 July Electricity North West/NIA Programme Summary/31 July 2016 Page 1 of 10

NIA Progress Report. Programme Summary. 31 July Electricity North West/NIA Programme Summary/31 July 2016 Page 1 of 10 NIA Progress Report Programme Summary 31 July 2017 Electricity rth West/NIA Programme Summary/31 July 2016 Page 1 of 10 VERSION HISTORY Version Date Author Status Comments V1.0 4 July 2017 L Eyquem Draft

More information

ITER Wide Angle Viewing System Synthetic Measurements

ITER Wide Angle Viewing System Synthetic Measurements ITER Wide Angle Viewing System Synthetic Measurements M. Kocan, M. H. Aumeunier, M. De Bock, V. Martin, R. Pitts, R. Reichle, A. Sirinelli, G. Vayakis, M. Walsh, C. Watts, L. Zabeo Port Plugs & Diagnostics

More information

BSRIA Air Conditioning Worldwide Market Intelligence

BSRIA Air Conditioning Worldwide Market Intelligence 2013 BSRIA Air Conditioning Worldwide Market Intelligence Over 25 years experience researching key markets worldwide market intelligence in 94 Countries integrated technical and market expertise management

More information

M. Middleton, R.E. Williams, Bryan Eyers and Dan Khan NIST Center for Neutron Research TRTR 2016 August 25, 2016

M. Middleton, R.E. Williams, Bryan Eyers and Dan Khan NIST Center for Neutron Research TRTR 2016 August 25, 2016 Lessons Learned using a PLC for Process Control M. Middleton, R.E. Williams, Bryan Eyers and Dan Khan NIST Center for Neutron Research TRTR 2016 August 25, 2016 Lessons Learned using a PLC for Process

More information

Preemptive PREventivE Methodology and Tools to protect utilities

Preemptive PREventivE Methodology and Tools to protect utilities Preemptive PREventivE Methodology and Tools to protect utilities 2014 2017 With the financial support of FP7 Seventh Framework Programme Grant agreement no: 607093 1 Preemptive description Project objectives

More information

Presented by Wayne Arter CCFE, Culham Science Centre, Abingdon, Oxon., UK

Presented by Wayne Arter CCFE, Culham Science Centre, Abingdon, Oxon., UK Software Engineering for Fusion Reactor Design Presented by Wayne Arter CCFE, Culham Science Centre, Abingdon, Oxon., UK Software Engineering Assembly (SEA) - April 2018 1 Outline Show how we have produced

More information

Development and Demonstration of Remote Experiment System with High Security in JT-60U

Development and Demonstration of Remote Experiment System with High Security in JT-60U 1 FT/P2-22 Development and Demonstration of Remote Experiment System with High Security in JT-60U T. Ozeki 1), Y. Suzuki 1), T. Totsuka 1), K.Iba 2), S. Sakata 1), N. Miyato 1), A. Isayama 1), S. Ide 1),

More information

Space Radiation and Plasma Environment Monitoring Workshop 13 and 14 May ESTEC. Efacec Space Radiation Monitors MFS & BERM

Space Radiation and Plasma Environment Monitoring Workshop 13 and 14 May ESTEC. Efacec Space Radiation Monitors MFS & BERM Space Radiation and Plasma Environment Monitoring Workshop 13 and 14 May 2014 - ESTEC Efacec Space Radiation Monitors MFS & BERM Contents MFS & BERM Architecture Detectors Stack Reconstruction Algorithm

More information

EPICS on RTEMS Spring 2017 EPICS Collaboration H. Junkes (Fritz-Haber-Institut)

EPICS on RTEMS Spring 2017 EPICS Collaboration H. Junkes (Fritz-Haber-Institut) EPICS on RTEMS 4.12 H. Junkes (Fritz-Haber-Institut) Epics was portet to RTEMS 4.12 for MVME6100 and MVME2500 for fast data acquisition. Uses pva for storing ndntarray on archiverappliance. Overview of

More information

INSPIRE status report

INSPIRE status report INSPIRE Team INSPIRE Status report 29/10/2010 Page 1 of 7 INSPIRE status report Table of contents 1 INTRODUCTION... 1 2 INSPIRE STATUS... 2 2.1 BACKGROUND AND RATIONAL... 2 2.2 STAKEHOLDER PARTICIPATION...

More information

Building a Europe of Knowledge. Towards the Seventh Framework Programme

Building a Europe of Knowledge. Towards the Seventh Framework Programme Building a Europe of Knowledge Towards the Seventh Framework Programme 2007-2013 FP7 /1 EUROPEAN COMMISSION - Research DG - November 2005 EU research: the story so far 1952: ECSC treaty; first projects

More information

CORRIGENDUM No 2 TO TENDER DOSSIER, PROCUREMENT NOTICE AND CLARIFICATIONS FOR THE PROJECT. Supply of equipment for Croatian Asylum services

CORRIGENDUM No 2 TO TENDER DOSSIER, PROCUREMENT NOTICE AND CLARIFICATIONS FOR THE PROJECT. Supply of equipment for Croatian Asylum services Programme: CARDS 2004 Partner Country: Croatia CORRIGENDUM No 2 TO TENDER DOSSIER, PROCUREMENT NOTICE AND CLARIFICATIONS FOR THE PROJECT Supply of equipment for Croatian Asylum services Publication reference:

More information

FP7 Information & Communication Technologies. Rules of the Programme

FP7 Information & Communication Technologies. Rules of the Programme FP7 Information & Communication Technologies Rules of the Programme FP7/ICT Calls in Information Society 2009-2010 ICT Call 4, Closed Opened 19 November 2008: Close 1 April 2009 Joint Call with ENERGY,

More information

Budget Review Process (BRP) Preliminary List of Business Initiatives. Stakeholder Meeting April 10, 2017

Budget Review Process (BRP) Preliminary List of Business Initiatives. Stakeholder Meeting April 10, 2017 2017-18 Budget Review Process (BRP) Preliminary List of Business Initiatives Stakeholder Meeting April 10, 2017 Purpose / Agenda The purpose of this presentation is to: Provide stakeholders with a BRP

More information

Deliverable Monitoring of active participation of future suppliers of R&D. Author: Mr. Christophe Veys

Deliverable Monitoring of active participation of future suppliers of R&D. Author: Mr. Christophe Veys Deliverable 2.5.1 Monitoring of active participation of future suppliers of R&D Author: Mr. Christophe Veys Project co-funded by the European Commission within the Seventh Framework Programme Grant agreement

More information

Plasma Boundary Reconstruction using Fast Camera on the COMPASS Tokamak

Plasma Boundary Reconstruction using Fast Camera on the COMPASS Tokamak WDS'14 Proceedings of Contributed Papers Physics, 221 226, 2014. ISBN 978-80-7378-276-4 MATFYZPRESS Plasma Boundary Reconstruction using Fast Camera on the COMPASS Tokamak P. Hacek, 1,2 M. Berta, 2,3 J.

More information

Report from the OPERA PTB

Report from the OPERA PTB 23 January 2008 Report from the OPERA PTB A. Ereditato LHEP - University of Bern On behalf of the PTB: (D. Autiero, A.E., L. Stanco, G. Wilquet) 1 PTB update since November 2007 The PTB has worked on:

More information

Kent Wind Energy Networking Event. Wednesday 26 th September

Kent Wind Energy Networking Event. Wednesday 26 th September Kent Wind Energy Networking Event Wednesday 26 th September Consortium partners Dong Energy is a leading offshore wind developer, having built around half of all offshore wind farms globally. (50%) E.ON

More information

EuroHPC: the European HPC Strategy

EuroHPC: the European HPC Strategy HPC User Forum Campus Teratec, Bruyères-le-Châtel (F) 6-7 March 2018 EuroHPC: the European HPC Strategy Leonardo Flores Añover Senior Expert, HPC and Quantum Computing Unit DG CONNECT, European Commission

More information

Call for Papers GCC POWER 2011 GCC Cigre s Leading Electric Power Conference & Exhibition In the Gulf Region

Call for Papers GCC POWER 2011 GCC Cigre s Leading Electric Power Conference & Exhibition In the Gulf Region Call for Papers GCC POWER 2011 GCC Cigre s Leading Electric Power Conference & Exhibition In the Gulf Region Kuwait - November 2011 GCC Cigre, is pleased to announce its 7 th International Conference GCC

More information

Parallel computations for the auto-converted MCNP5 models of the ITER ECRH launcher

Parallel computations for the auto-converted MCNP5 models of the ITER ECRH launcher Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft Parallel computations for the auto-converted MCNP5 models of the ITER ECRH launcher A. Serikov, U. Fischer, R. Heidunger, L. Obholz, P. Spaeh,

More information

Network and Information Security Directive

Network and Information Security Directive Network and Information Security Directive Provisions + ENISA s activities Dr Evangelos Ouzounis Head of Secure Infrastructure and Services Unit, ENISA European Union Agency for Network and Information

More information

Date of publication: 11/07/2017

Date of publication: 11/07/2017 Questions & Answers INVITATION TO SHIFT2RAIL JU ASSOCIATED MEMBERS TO SUBMIT AN ANSWER IN VIEW OF THE REALIGNMENT OF THEIR ACTIVITIES AND ADDITIONAL COMMITMENT TO THE SHIFT2RAIL PROGRAMME Date of publication:

More information

United Nations Environment Programme

United Nations Environment Programme UNITED NATIONS United Nations Environment Programme Distr. GENERAL UNEP/OzL.Pro/ExCom/60/36 18 March 2010 EP ORIGINAL: ENGLISH EXECUTIVE COMMITTEE OF THE MULTILATERAL FUND FOR THE IMPLEMENTATION OF THE

More information

E-Rare ERA-Net for research programmes on rare diseases

E-Rare ERA-Net for research programmes on rare diseases E-Rare ERA-Net for research programmes on rare diseases Daria Julkowska French National Research Agency, ANR ERA-NET INFO DAY 15 December 2014,Bologna, Italy What is an ERA-Net? ERA-Net = European Research

More information

Standards for Smart Grids

Standards for Smart Grids Standards for Smart Grids Smart Grids & Cleanpower Conference 24/25 June 2010 http://bit.ly/cleanpower Keith Dickerson Chairman, WP3 of ITU-T Study Group 5 ETSI Board International Telecommunication Union

More information

Improvement of Infrared Imaging Video Bolometer Systems in LHD )

Improvement of Infrared Imaging Video Bolometer Systems in LHD ) Improvement of Infrared Imaging Video Bolometer Systems in LHD ) Kiyofumi MUKAI, Byron J. PETERSON, Shwetang N. PANDYA 1), Ryuichi SANO 1) and Muneji ITOMI 2) National Institute for Fusion Science, Toki

More information

Overview of the BATS Project

Overview of the BATS Project Overview of the BATS Project Context EC Digital Agenda objective is to deliver more than 30 Mbps to 100% of European households by 2020. Market forecast in 2020: in many European regions >50% households

More information

13174/15 AT/tl 1 DGE 2B

13174/15 AT/tl 1 DGE 2B Council of the European Union Brussels, 6 November 2015 (OR. en) 13174/15 ER 359 COEST 325 RELEX 833 INFORMATION NOTE From: General Secretariat of the Council To: Delegations Subject: External energy relations

More information

Energy Imbalance Market: PacifiCorp Stakeholder and Tariff Revision Plan

Energy Imbalance Market: PacifiCorp Stakeholder and Tariff Revision Plan Energy Imbalance Market: PacifiCorp Stakeholder and Tariff Revision Plan Document Version 1.9 Date Updated: January 17, 2014 The following document outlines PacifiCorp s Stakeholder and Tariff Revision

More information

APS-DPP, Denver, CO, October 2005, EAU. PEGASUS Toroidal Experiment University of Wisconsin-Madison

APS-DPP, Denver, CO, October 2005, EAU. PEGASUS Toroidal Experiment University of Wisconsin-Madison PEGASUS Extends ST Parameter Space Goals 12 1 Limits on β t and I p /I TF (kink) as A 1 - Overlap between tokamak and spheromak 8 6 4 Conventional Tokamaks Increase Aux. Heating Stability and confinement

More information

European Union Publication of Supplement to the Official Journal of the European Union

European Union Publication of Supplement to the Official Journal of the European Union European Union Publication of Supplement to the Official Journal of the European Union 2, rue Mercier, 2985 Luxembourg, Luxembourg +352 29 29 42 670 ojs@publications.europa.eu Info & on-line forms: http://simap.europa.eu

More information

EUDAT. Towards a pan-european Collaborative Data Infrastructure. Damien Lecarpentier CSC-IT Center for Science, Finland EUDAT User Forum, Barcelona

EUDAT. Towards a pan-european Collaborative Data Infrastructure. Damien Lecarpentier CSC-IT Center for Science, Finland EUDAT User Forum, Barcelona EUDAT Towards a pan-european Collaborative Data Infrastructure Damien Lecarpentier CSC-IT Center for Science, Finland EUDAT User Forum, Barcelona Date: 7 March 2012 EUDAT Key facts Content Project Name

More information

WELCOME. to the 1 st online DG CONNECT NIPS Study workshop. July 25, 2013

WELCOME. to the 1 st online DG CONNECT NIPS Study workshop. July 25, 2013 WELCOME to the 1 st online DG CONNECT NIPS Study workshop July 25, 2013 2 DG CONNECT NIPS Study online workshop Agenda topics Timing Facilitator Introduction and practicalities of the workshop 5 min Dan

More information

NURISP Overview. C. CHAULIAC, CEA, coordinator of the project F-P WEISS, FZD, chairman of the Governing Board

NURISP Overview. C. CHAULIAC, CEA, coordinator of the project F-P WEISS, FZD, chairman of the Governing Board C. CHAULIAC, CEA, coordinator of the project F-P WEISS, FZD, chairman of the Governing Board 1. The European frame and the NURISP objectives 2. The NURESIM roadmap 3. Partnership and organization 4. Budget

More information

Task Status Report to ExCo April 25-26th 2013, The Netherlands

Task Status Report to ExCo April 25-26th 2013, The Netherlands Task XVI Competitive Energy Services www.ieadsm.org IEA-DSM, Task XVI: Competitive Energy Services (ESCo-Services, Energy-Contracting) Task Status Report to ExCo April 25-26th 2013, The Netherlands Energetic

More information

TG5 Review: Infrastructure on top of the tank

TG5 Review: Infrastructure on top of the tank TG5 Review: Infrastructure on top of the tank Clean Room Status The Temporary Lock System The Final Lock System The Strings and The Matrix Béla Majorovits TG5 Review: Infrastructure on top of the tank

More information

Proposals for EC Funding for BELLA

Proposals for EC Funding for BELLA Proposals for EC Funding for BELLA Matthew Scott GÉANT General Assembly 15 th March 2016 Request for Resolution: Approval of Proposals for EC Funding for BELLA The GA is asked to resolve the following:

More information

Next Generation Strategy

Next Generation Strategy Realising the Benefits of Next Generation Access for Northamptonshire Superfast Northamptonshire: Next Generation Strategy Executive Summary Extending access to superfast broadband - A Consultation Contents

More information

EuroHPC Bologna 23 Marzo Gabriella Scipione

EuroHPC Bologna 23 Marzo Gabriella Scipione EuroHPC Bologna 23 Marzo 2018 Gabriella Scipione g.scipione@cineca.it EuroHPC - Europe's journey to exascale HPC http://eurohpc.eu/ What EuroHPC is a joint collaboration between European countries and

More information

Beam and Viewing Dump Positioning Inside TFTR for CTS Alpha-Particle Diagnostics

Beam and Viewing Dump Positioning Inside TFTR for CTS Alpha-Particle Diagnostics PFC/RR-91-12 Beam and Viewing Dump Positioning Inside TFTR for CTS Alpha-Particle Diagnostics D.Y. Rhee; P.P. Woskov MIT Plasma Fusion Center R. Ellis; H. Park Princeton Plasma Physics Laboratory July,

More information

A. Introduction. B. GTNEUT Geometric Input

A. Introduction. B. GTNEUT Geometric Input III. IMPLEMENTATION OF THE GTNEUT 2D NEUTRALS TRANSPORT CODE FOR ROUTINE DIII-D ANALYSIS (Z. W. Friis and W. M. Stacey, Georgia Tech; T. D. Rognlien, Lawrence Livermore National Laboratory; R. J. Groebner,

More information

PROGRESS ON A NEW DISRUPTION DATABASE

PROGRESS ON A NEW DISRUPTION DATABASE PROGRESS ON A NEW DISRUPTION DATABASE E.J. Strait with J. Wesley, A. Hyatt, D. Schissel Presented at ITPA Topical Group on MHD, Disruptions and Control Lisbon, Portugal, Nov. 8-10, 2004 ITPA DISRUPTION

More information

Media (NEM) Initiative

Media (NEM) Initiative Networked and Electronic Media (NEM) Initiative NEM Initiative and involvement of Game developers Possibilities for participation in the new EU funding work programme 2011 Dr.-Ing. Halid Hrasnica Eurescom

More information

The Go4IT project. Toward a TTCN-3 open environment for IPv6 protocols testing. Project identity card

The Go4IT project. Toward a TTCN-3 open environment for IPv6 protocols testing. Project identity card The Go4IT project Toward a TTCN-3 open environment for IPv6 protocols testing TTCN-3 User Conference 2006 - Berlin Project identity card Integrated Infrastructure Initiative Started in Nov 2005 30 month

More information

Jordi Palet Consulintel, CTO/CEO European IPv6 Task Force & Steering Committee IPv6 Forum, Education & Promotion WG

Jordi Palet Consulintel, CTO/CEO European IPv6 Task Force & Steering Committee IPv6 Forum, Education & Promotion WG Jordi Palet (jordi.palet@consulintel.es) Consulintel, CTO/CEO European IPv6 Task Force & Steering Committee IPv6 Forum, Education & Promotion WG Co-chair -1 The European Commission created the IPv6 TF

More information

ROSATOM. State atomic energy corporation Rosatom

ROSATOM. State atomic energy corporation Rosatom ROSATOM State atomic energy corporation Rosatom The experience of organizing an international consortium in the form of International Research Center based on Multipurpose Fast-Neutron Research Reactor

More information

Thermal and Optical Analyses of Retro-Reflector for Poloidal Polarimeter on ITER )

Thermal and Optical Analyses of Retro-Reflector for Poloidal Polarimeter on ITER ) Thermal and Optical Analyses of Retro-Reflector for Poloidal Polarimeter on ITER ) Ryota IMAZAWA, Yasunori KAWANO, Takehiro ONO and Yoshinori KUSAMA Japan Atomic Energy Agency, 801-1 Mukoyama, Naka 311-0193,

More information

Alexi Glover & Juha-Pekka Luntama SSA Programme Space Weather Segment, OPS-L ESA/ESAC, Madrid, Spain

Alexi Glover & Juha-Pekka Luntama SSA Programme Space Weather Segment, OPS-L ESA/ESAC, Madrid, Spain Alexi Glover & Juha-Pekka Luntama SSA Programme Space Weather Segment, OPS-L ESA/ESAC, Madrid, Spain Presentation Outline 1. SSA Programme short introduction 2. SWE Service Domains 3. Precursor Services

More information

nuclearsafety.gc.ca Implications of the Fukushima Daiichi Accidents for the New Builds Design Requirements in Canada

nuclearsafety.gc.ca Implications of the Fukushima Daiichi Accidents for the New Builds Design Requirements in Canada Implications of the Fukushima Daiichi Accidents for the New Builds Design Requirements in Canada R.P. Rulko () IAEA Technical Meeting on Evaluation of Nuclear Power Plant Design Safety in the Aftermath

More information

AGENDA Regular Commission Meeting Port of Portland Headquarters 7200 N.E. Airport Way, 8 th Floor August 13, :30 a.m.

AGENDA Regular Commission Meeting Port of Portland Headquarters 7200 N.E. Airport Way, 8 th Floor August 13, :30 a.m. AGENDA Regular Commission Meeting Port of Portland Headquarters 7200 N.E. Airport Way, 8 th Floor 9:30 a.m. Minutes Approval of Minutes: Regular Commission Meeting July 9, 2014 Executive Director Approval

More information

GA A22637 REAL TIME EQUILIBRIUM RECONSTRUCTION FOR CONTROL OF THE DISCHARGE IN THE DIII D TOKAMAK

GA A22637 REAL TIME EQUILIBRIUM RECONSTRUCTION FOR CONTROL OF THE DISCHARGE IN THE DIII D TOKAMAK GA A22637 TION FOR CONTROL OF THE DISCHARGE IN THE DIII D TOKAMAK by J.R. FERRON, M.L. WALKER, L.L. LAO, B.G. PENAFLOR, H.E. ST. JOHN, D.A. HUMPHREYS, and J.A. LEUER JULY 1997 This report was prepared

More information

IAEA Activities under the Nuclear Safety Action Plan

IAEA Activities under the Nuclear Safety Action Plan International Experts Meeting on Strengthening the Effectiveness of Research and Development in the Light of the Fukushima Daiichi Power Plant Accident February 16 20, 2015 IAEA Activities under the Nuclear

More information

Click to edit Master title style

Click to edit Master title style Greetings from the Serpent Developer Team 7th International Serpent UGM, Gainesville, FL, Nov. 6 9, 2017 Jaakko Leppänen VTT Technical Research Center of Finland Source code development: Click Jaakko to

More information

OAI Overview. Howard Thompson. Sr. Program Manager (440)

OAI Overview.  Howard Thompson. Sr. Program Manager (440) OAI Overview www.oai.org Howard Thompson Sr. Program Manager HowardThompson@oai.org (440) 962-3237 www.oai.org W.T. (Tom) Southards Director MTSBDC at KSU wsouthar@kent.edu (330) 672-0793 www.kent.edu/tech

More information

Design of embedded mixed-criticality CONTRol systems under consideration of EXtra-functional properties

Design of embedded mixed-criticality CONTRol systems under consideration of EXtra-functional properties EMC2 Project Conference Paris, France Design of embedded mixed-criticality CONTRol systems under consideration of EXtra-functional properties Funded by the EC under Grant Agreement 611146 Kim Grüttner

More information

Grid Code Planner EU Code Modifications GC0100/101/102/104

Grid Code Planner EU Code Modifications GC0100/101/102/104 Grid Code Planner EU Code Modifications GC0100/101/102/104 Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a

More information