APPROVED SUMMARY OF TSG-S MEETING for September 2006 in Xi an, China

Size: px
Start display at page:

Download "APPROVED SUMMARY OF TSG-S MEETING for September 2006 in Xi an, China"

Transcription

1 TSG-S Meeting Summary - - September 00 GPP-S Page of Title: Source: Clifton J. Barber TSG-S SECRETARY SUMMARY OF TSG-S MEETING for - September 00 in Xi an, China Representing KDDI CJ Barber Consulting Services 0 Saint Andrews Court Jonesboro, GA 0 (0) 0-9 () - fax cbarber@cjbarberconsulting.com Abstract: This document is a summary of the GPP TSG-S meetings that were held during the period of - September 00 in Xi an, China. Recommendations: For review and approval. Notice: 00 GPP KDDI grants a free, irrevocable license to GPP and its Organizational Partners to incorporate text or other copyrightable material contained in the contribution and any modifications thereof in the creation of GPP publications; to copyright and sell in Organizational Partner's name any Organizational Partner's standards publication even though it may include all or portions of this contribution; and at the Organizational Partner's sole discretion to permit others to reproduce in whole or in part such contribution or the resulting Organizational Partner's standards publication. KDDI is also willing to grant licenses under such contributor copyrights to third parties on reasonable, non-discriminatory terms and conditions for purpose of practicing an Organizational Partner's standard which incorporates this contribution. This document has been prepared by KDDI to assist the development of specifications by GPP. It is proposed to the Committee as a basis for discussion and is not to be construed as a binding proposal on KDDI. KDDI specifically reserves the right to amend or modify the material contained herein and to any intellectual property of KDDI other than provided in the copyright statement above.

2 TSG-S Meeting Summary - - September 00 GPP-S Page of During the period of - September 00, GPP TSG-S meetings were held at the Sheraton Xian Hotel in Xi an, China. This document is intended to summarize those proceedings. OPENING PLENARY. CALL TO ORDER AND OPENING REMARKS: The meeting was called to order on September 00 at :0 PM local time by TSG-S Chair, Nick Yamasaki (KDDI). The Chair welcomed the participants to Xi an. The meeting participants were requested to sign-in electronically using the server sign-in facility.. ATTENDANCE REGISTRATION AND ROLL CALL: A roll call of TSG-S active companies indicated companies in attendance out of active companies (% participation). Thus, meeting quorum was achieved. The Secretary noted that no proxy statements had been received for this meeting.. DISTRIBUTION AND NUMBERING OF CONTRIBUTIONS: Contributions were documented in S All contributions were distributed in soft copy format and made available from the LAN based server.. ADOPTION OF AGENDA: The proposed agenda (S ) was presented and reviewed. DECISION: The agenda was approved without objection as submitted (S ).. REVIEW AND APPROVAL OF PREVIOUS MEETING SUMMARY: The summary of the July 00 TSG-S meeting in Montreal, PQ, Canada (S ) was presented. DECISION: This summary was approved as submitted (S ).. REVIEW OF ACTION ITEMS FROM PREVIOUS MEETING: The following action items were left open from the July 00 meeting and require additional consideration: 00-0 The summary of the GPP SC and OP meetings for February 00 in Jeju, Korea (S ) was remanded to all WGs for review and action as appropriate with taking the lead on SC Action 00/0-0 and codification of "clean vs. rev marks" issues. This action remains OPEN until the October 00 closing Plenary. This action remains OPEN until the October 00 closing Plenary. 00-0: The TSG assignment of a new document number for MMD Policy Enhancements System Requirements was held open until the September 00 meeting. This action remains OPEN until the closing Plenary.. CORRESPONDENCE AND LIAISON REPORTS OP: No contributions.

3 TSG-S Meeting Summary - - September 00 GPP-S Page of SC: No contributions. GPP SECRETARIAT: The following correspondences were noted from the GPP Secretariat: correspondence dated August 00 regarding V&V review of S.P000-A v.0 Wireless Features Description: Emergency Services (S ) was presented from the GPP Secretariat. ACTION: This contribution was remanded to as FYI. correspondence dated August 00 regarding V&V review of S.P0-0 v0. All-IP Network Emergency Call Support Stage Requirements (S ) was presented from the GPP Secretariat. ACTION: This contribution was remanded to as FYI. correspondences regarding V&V review of S.P000-B v. Network Reference Model for Cdma000 Spread Spectrum Systems (S ) was presented from the GPP Secretariat. ACTION: This contribution was remanded to WG as FYI. correspondence dated 0 August 00 regarding V&V review of S.P00-A v. Enhanced Cryptographic Algorithms (S ) was presented from the GPP Secretariat. ACTION: This contribution was remanded to as FYI. correspondence dated 9 August 00 regarding SC level review of two () Work Item Worksheets (S ) was presented from the GPP Secretariat. ACTION: This contribution was remanded to as FYI. correspondence dated August 00 regarding update of WI GPP-00 for 'Enhanced Cryptographic Algorithms' and 'Common Security Algorithms' specifications (S ) was presented from the GPP Secretariat. ACTION: This contribution was remanded to for review and action as appropriate and to as FYI. correspondence dated August 00 regarding updated worksheet for GPP-00 A-Interface Flexibility Support (S ) was presented from the GPP Secretariat. ACTION: This contribution was remanded to as FYI. correspondence dated August 00 regarding Cancellation of an Approved Work Item GPP-000-A: Wideband Speech Codec for cdma000 Systems Mode Extension (S ) was presented from the GPP Secretariat. ACTION: This contribution was remanded to as FYI.

4 TSG-S Meeting Summary - - September 00 GPP-S Page of Correspondence dated August 00 regarding Proposed Work Item Review (S ) was presented from the GPP Secretariat. ACTION: This contribution was remanded to all WGs for review and comment with comments to be coordinated by. V&V comments on S.P00-0 Protocol Alignment Reference (S ) was presented from the GPP Secretariat. ACTION: This contribution was remanded to for review and action as appropriate. V&V comments on S.P0-0 All-IP Emergency Call Support (S ) was presented from the GPP Secretariat. ACTION: This contribution was remanded to for review and action as appropriate. correspondence dated September 00 regarding two () Work Items to be canceled (S ) was presented from the GPP Secretariat. ACTION: This contribution was remanded to as FYI. GPP Workplan files for September 00 (S ) was presented from the GPP Secretariat. ACTION: This contribution was remanded to all WGs for review and comment with comments to be coordinated by. TSG-A: The following contributions were discussed: Correspondence dated August 00 regarding GPP Overview Response (S ) was presented from TSG-A. ACTION: This contribution was remanded to the Secretary for review and action as appropriate. Correspondence dated August 00 regarding TSG-A Work Item, Stage, LS, and SC Documents for Review (S ) was presented from TSG-A. ACTION: This contribution was remanded to the and for review and action as appropriate. TSG-C: The following contributions were discussed: The TSG-C Liaison Report for July 00 (S ) was presented from the TSG-C Liaison as FYI for TSG-S. ACTION: The attachment to this report (00A) was remanded to for review and action as appropriate. Correspondence dated August 00 regarding Review of Work Item Worksheets (S ) was presented from TSG-C. ACTION: This contribution was remanded to for review and action as appropriate.

5 TSG-S Meeting Summary - - September 00 GPP-S Page of Correspondence dated August 00 regarding TSG-C Updates to GPP Workplan (S ) was presented from TSG-C. ACTION: This contribution was remanded to for review and action as appropriate. Correspondence dated August 00 regarding GPP Overview Presentation (S ) was presented from TSG-C. ACTION: This contribution was remanded to the Secretary for review and action as appropriate. TSG-X: The following contributions were discussed from TSG-X: Correspondence dated August 00 regarding Work Item Review (S ) was presented from TSG-X. ACTION: This contribution was remanded to for review and action as appropriate. Correspondence to SC ATE AdHoc dated August 00 regarding Feedback on Technology Evolution Framework for GPP Networks (S ) was presented from TSG-X as FYI for TSG-S. Correspondence dated August 00 regarding New Work Items (S ) was presented from TSG-X. ACTION: This contribution was remanded to for review and action as appropriate and to as FYI. Correspondence dated August 00 regarding Review of Draft E-UIMID Administration Procedures (S ) was presented from TSG-X. ACTION: This contribution was remanded to the Numbering AdHoc for review and action as appropriate. Correspondence to ITU-R SG dated August 00 regarding Liaison Statement to External Organisations on the Development of a PDNR ITU-R M.[IP CHAR] "Key Technical and Operational Requirements for Access Technologies to Support IP Applications Over Mobile Systems" in Response to Question ITU-R -/ (S ) was presented from TSG-X. ACTION: This contribution was remanded to and WG for review and comment with comments to be coordinated by. Correspondence to all TSGs dated August 00 regarding Status of PPP Free Operation Work Item (S ) was presented from TSG-X. ACTION: This contribution was remanded to and for review and action as appropriate and to as FYI. Correspondence to GPP TSG-SA dated August 00 regarding IMS Alignment and Evolution Workshop (S ) was presented from TSG-X. ACTION: This contribution was remanded to as FYI.

6 TSG-S Meeting Summary - - September 00 GPP-S Page of correspondences regarding IMS Evolution Workshop Invitation (S ) was presented from TSG-X. ACTION: This contribution was remanded to and for review and action as appropriate. TR: No contributions. ITU: An LS dated July 00 to GPP OPs regarding request for information on Recommendation Q. (S ) was presented from ITU-T SG9 as FYI for TSG-S. GPP: No contributions. GPP SA and TM: The following contributions were discussed: correspondence dated September 00 regarding IMS Harmonization and Subscription Management (SuM) common sessions (S ) was presented from GPP SA. ACTION: This contribution was remanded to WG for review and action as appropriate. An LS to ITU-T SG/NGNMFG dated September 00 regarding IMS Harmonization and new Rel- IMS Network Resource Model (S ) was presented from GPP SA. ACTION: This contribution was remanded to WG for review and action as appropriate. WiFi Alliance/IEEE 0: No contributions. OMA (Open Mobile Alliance): No contributions. CDG: The following contributions were discussed: Correspondence dated September 00 regarding CDG ETO Recommendations on SBC Development (S ) was presented from the CDG ETO as FYI for TSG-S. Correspondence dated September 00 regarding CDG ETO Recommendations on GPP Network Evolution (S ) was presented from the CDG ETO. ACTION: This contribution was remanded to and for review and action as appropriate. OTHER: National Emergency Number Association (NENA) liaison request to GPP (S ) was presented from NENA. ACTION: This contribution was remanded to all WGs for review and comment with comments to be coordinated by by the closing Plenary.

7 TSG-S Meeting Summary - - September 00 GPP-S Page of NEW/OLD BUSINESS: The following contributions were discussed: correspondences regarding SC Vice Chair comments on GPP Overview presentation (S ) was presented from the GPP SC Vice Chair. ACTION: This contribution was remanded to the Secretary for review and action as appropriate. An update of the GPP Overview presentation that was approved at the last meeting (S ) was presented by the Secretary. The contributor noted that the document had now been updated to resolve comments from TSG-A and from the GPP SC Vice Chair. DECISION: This presentation was approved without objection for forwarding to the GPP SC Chair for delivery at the Brazil workshop. GPP/CDG Press Release: GPP Ready to Meet the Future Market Needs Head On (S ) was presented as FYI for TSG-S. 9. WG BUSINESS: ISSUES: V&V comments on S.P0-0 All-IP Emergency Call Support (S ) was presented by Motorola. ACTION: This contribution was remanded to for review and action as appropriate. WG ISSUES: The following contributions were discussed: S.R00-0 All IP NAM revision Letter alignment with TSB- (S ) was presented by Motorola. ACTION: This contribution was remanded to WG for review and action as appropriate by the closing Plenary. (PMT) ISSUES: The following contributions were discussed: V&V comments on S.P00-0 Protocol Alignment Reference (S ) were presented by Motorola. ACTION: The contributor was requested to revise and resubmit the cover page of this contribution to clarify issues raised in the discussion. ISSUES: No additional contributions or issues were noted. WG ISSUES: No additional contributions or issues were noted. EQUIPMENT NUMBERING ADHOC ISSUES: No additional contributions or issues were noted. The Plenary was recessed on September 00 at : PM local time.

8 TSG-S Meeting Summary - - September 00 GPP-S Page of CLOSING PLENARY The Plenary was reconvened on September 00 at : PM local time by TSG-S Chair, Nick Yamasaki (KDDI). Quorum had been established at the opening Plenary and was not challenged at this session. There were no additional GPP individual member companies noted in attendance. 0. WORKING GROUP REPORTS: Report (S ) was presented by the Chair, Alex Gogic (QUALCOMM), as FYI. Documents being recommended for publication include the following: S.P0-0 v.0 All-IP Network Emergency Call Support Documents being recommended for V&V review include the following: None. Documents being recommended for TSG review include the following: S.P00-0 Packet-Switched Video Telephony Progressed the development of the following documents: S.P00-0 Packet-Switched Video Telephony S.P00-0 HRPD - cdma000 x Interworking SRD S.P0-0 All-IP Network Emergency Call Support MMD Enhanced Network Policy (New Business) The TSG and WG Chairs held offline discussions with the TSG-X Chair regarding the Work Items on Policy and Roaming Requirements. Initiated discussions on a Network Evolution SRD based on input from CDG ETO. Coordinated discussions among all TSGs regarding liaison request from NENA (National Emergency Number Association). Generated correspondence over the signature of the GPP SC Chair in part to request a presentation from NENA at the next meeting on Monday, 0 October 00 from :00 PM to :00 PM. DECISION: S.P00 was assigned without objection for MMD Policy Enhancement SRD. DECISION: Proposed correspondence to TSG-X regarding Requirements for MMD Enhanced Policy and MMD Roaming (S R) was approved without objection for transmission.

9 TSG-S Meeting Summary - - September 00 GPP-S Page 9 of DECISION: Proposed correspondence to NENA from GPP SC Chair regarding Liaison Request to GPP to Initiate Dialog and Request Comments on Draft NENA Location Requirements (S R) was approved without objection for forwarding to the GPP SC for transmission. DECISION: S.P00-0 v. PSVT Stage (S ) was approved without objection for TSG review. DECISION: Proposed correspondence to all TSGs regarding TSG review of S.P00-0 v.0 PSVT Stage (S R) was approved without objection for transmission with S and S A as attachments. DECISION: S.P0-0 v0.9 All-IP Emergency Call Support (S ) was approved without objection for publication as S.R0-0 v.0. ACTION: The work schedule (S A) were remanded to for review and action as appropriate. WG Report (S ) was presented by Scott Marin (Motorola) as FYI. Prepared S.P00-A All IP NAM for V&V review WG recommends that the currently unpublished S.R00-0 v..0 be designated as S.R00-A v..0 to align with TIA TSB--A. Therefore, the current work of S.P00-A will be designated as S.P00-B. DECISION: S.P00-B v.0. All IP NAM (S ) was approved without objection for V&V review by the GPP OPs and all TSGs with comments due on or before December 00. DECISION: Proposed correspondence to TIA TR-. regarding V&V of S.P00-B v.0. NAM and Version Alignment (S R) was approved without objection for transmission. PMT Report (S R) was noted by PMT Chair, Eileen Hadwen (NEC), as FYI. This report was not reviewed in detail. DECISION: The following WIs were approved without objection for TSG review as distributed by the PMT Manager: GPP-009: New Revision of CCAT (S C) GPP-000: MMD Policy Enhancements (S D) GPP-00: MMD Roaming (S E) DECISION: The following WIs were approved without objection for SC level review as distributed by the PMT Manager as available from the GPP website unless indicated as a contribution number below: GPP-009: Enhanced cdma000 Air Interface

10 TSG-S Meeting Summary - - September 00 GPP-S Page 0 of GPP-000: Version Update for cdma000 High Rate Packet Data Air Interface Specification GPP-00: GBA-U support in 'cdma000 Application of UICC' and ISIM GPP-00: Version update to be published as S.S00-A v.0 (S H) GPP-00: Preferred Cryptographic Profiles (PCP) GPP-00: Version Update for CDMA Card Application Toolkit (CCAT) Specification GPP-00: Development of a new specification for the HRPD air interface cdma000 Circuit Services Notification Application DECISION: SC.P v0., System Release Guide" for Release (S F) was approved without objection for presentation to the SC for publication as SC.R v.0 pending updates by Editor following close of the TSG Plenaries and alignment with publication completion of documents for the Release. SC.P v0. System Release Standardized Services and Features (S G) was noted as FYI for TSG-S. This document adds detail to the service and feature delivery set for Release. Development of this document will continue with the intention for to recommend for TSG review at the Closing Plenary next month. DECISION: Proposed correspondence to all TSGs regarding S.P00-0 v0., A Report on Feature Alignment between GPP Specifications (S ) was approved without objection for transmission with its attachment. DECISION: The V&V process on S.P00-0 v0. Report on Feature Alignment between GPP Specifications was terminated without objection to allow development on that document to continue. DECISION: Proposed correspondence to all TSGs regarding Input for Release Critical Work Items for Release (S R) was approved without objection for transmission. DECISION: Proposed correspondence to CDG regarding Input for Release Critical Work Items for Release - Request for Requirements (S R) was approved without objection for transmission. ACTION: V&V comments on S.P00-0 Protocol Alignment Reference (S R) from Motorola were remanded to for review and action as appropriate.

11 TSG-S Meeting Summary - - September 00 GPP-S Page of Report (S ) was presented by Chair, Adrian Escott (QUALCOMM), as FYI. Prepared S.P00-A v. Common Security Algorithms for V&V Progressed the development in the following areas: S.S00, S.S00, S.S00 Algorithms S.R00 NFCC Work Item S.P009, S.R0, S.P0 GBA PCP (Preferred Cryptographic Profiles) IMS security with G R-UIM Requirements for the Security Enhancements work has proposed modification of slide of the MMD presentation that was sent to TSG-X MMD SWG for inclusion in their review of the presentation. It is presented to TSG-S plenary as FYI. DECISION: S.P00-A v. Common Security Algorithms (S ) was approved without objection for V&V review by GPP OPs and all TSGs with comments due on or before October 00. WG did not meet. The Equipment Numbering AdHoc Report (S ) was presented by AdHoc Chair, Alex Gogic (QUALCOMM), as FYI. No action requested from Plenary at this time. 0. ADDITIONAL CORRESPONDENCES AND LIAISON REPORTS: OP: No contributions. SC: No contributions. GPP SECRETARIAT: correspondence dated September 00 regarding two () WIs adopted (S ) was presented from the GPP Secretariat. ACTION: This contribution was remanded to for review and action as appropriate. TSG-A: Correspondence dated September 00 regarding LBC Requirements (S ) was presented from TSG-A. ACTION: This contribution was remanded to and WG for review and action as appropriate. ACTION: The Chair took an action to include an overview of network evolution issues in the TSG-S Report to the upcoming GPP SC meeting. TSG-C: No contributions. TSG-X: No contributions.

12 TSG-S Meeting Summary - - September 00 GPP-S Page of TR: No contributions. TR AHAG: No contributions. ITU: No contributions. GPP: No contributions. GPP-SA and TM: No contributions. WiFi Alliance/IEEE 0: No contributions. OMA (Open Mobile Alliance): No contributions. CDG: No contributions. OTHER: No contributions.. NEW BUSINESS (continued): No contributions.. OLD BUSINESS (continued): The TSG-S Document Status Table (S ) was presented and reviewed. DECISION: This contribution (S R) was approved pending final review by WG Chairs and document Editors by COB Tuesday 9 September 00.. ADMINISTRATION AND OTHER BUSINESS: The future meeting schedule for TSG-S is noted as follows: 0 October - November 00 - December 00 - January 00 Radisson Hotel Northbrook in Northbrook, IL, USA Grand Wailea Hotel in Maui, Hawaii, USA The Fairmont Hotel Vancouver in Vancouver, BC, Canada ACTION: To accommodate the joint TSG meeting with NENA, the TSG-S opening Plenary in Northbrook will commence promptly at :00 PM and recess by :00 PM local time. The Chair proposed that the Chair consider request of funding for a Technical Writer to review TSG-S documents that have been approved for publication for proper and consistent style and format. He estimated one () working day review time for large document and possibly as few as two () hours for small documents. Although not explicitly reviewed during the meeting, the assignments, other than document remands, that were not completed at this meeting are summarized as follows: 00-0 The summary of the GPP SC and OP meetings for February 00 in Jeju, Korea (S ) was remanded to all WGs for review and action as appropriate with taking the lead on SC Action 00/0-0 and codification of "clean vs. rev marks" issues. This action remains OPEN until the October 00 closing Plenary.

13 TSG-S Meeting Summary - - September 00 GPP-S Page of The Chair took an action to include an overview of network evolution issues in the TSG-S Report to the upcoming GPP SC meeting To accommodate the joint TSG meeting with NENA, the TSG-S opening Plenary in Northbrook will commence promptly at :00 PM and recess by :00 PM local time. This meeting was adjourned on September 00 at approximately : PM local time.

14 This page intentionally left blank

15 TSG-S Meeting Summary - - September 00 GPP-S Page of A listing of the contributions for this meeting is itemized below: NUMBER SUBJECT OPENING PLENARY - GPP-S CONTRIBUTION REGISTER 00 AGENDA 00 Meeting Summary - July 00 - Montreal, PQ, Canada 00 TSG-C Liaison Report - July Correspondence dated August 00 regarding Review of Work Item Worksheets 00 Correspondence dated August 00 regarding TSG-C Updates to GPP Workplan 00 Correspondence dated August 00 regarding GPP Overview Response 00 Correspondence dated August 00 regarding TSG-A Work Item, Stage, LS, and SC Documents for Review 00 Correspondence dated August 00 regarding Work Item Review 009 Correspondence to SC ATE AdHoc dated August 00 regarding Feedback on Technology Evolution Framework for GPP Networks 00 Correspondence dated August 00 regarding New Work Items 0 Correspondence dated August 00 regarding Review of Draft E-UIMID Administration Procedures Correspondence to ITU-R SG dated August 00 regarding Liaison Statement to External Organisations on the Development of a PDNR ITU-R M.[IP CHAR] 0 Key Technical and Operational Requirements for Access Technologies to Support IP Applications Over Mobile Systems in Response to Question ITU-R -/ 0 Correspondence to all TSGs dated August 00 regarding Status of PPP Free Operation Work Item 0 Correspondence to GPP TSG-SA dated August 00 regarding IMS Alignment and Evolution Workshop 0 correspondence dated August 00 regarding V&V review of S.P000-A v.0 Wireless Features Description: Emergency Services 0 correspondence dated August 00 regarding V&V review of S.P0-0 v0. All-IP Network Emergency Call Support Stage Requirements 0 correspondences regarding V&V review of S.P000-B v. Network Reference Model for Cdma000 Spread Spectrum Systems 0 correspondence dated 0 August 00 regarding V&V review of S.P00-A v. Enhanced Cryptographic Algorithms SOURCE SECRETARY CHAIR SECRETARY TSG-C LIAISON TSG-C TSG-C TSG-A TSG-A TSG-X TSG-X TSG-X TSG-X TSG-X TSG-X TSG-X GPP SECRETARIAT GPP SECRETARIAT GPP SECRETARIAT GPP SECRETARIAT ACTION FYI FYI, A for SECRETARIAT FYI NUMBERING ADHOC, FYI WG

16 TSG-S Meeting Summary - - September 00 GPP-S Page of NUMBER SUBJECT SOURCE ACTION 09 correspondence dated 9 August 00 regarding SC level review of two () Work Item Worksheets GPP SECRETARIAT 00 correspondence dated August 00 regarding update of WI GPP-00 for 'Enhanced Cryptographic Algorithms' and 'Common Security Algorithms' specifications GPP SECRETARIAT 0 correspondence dated August 00 regarding updated worksheet for GPP-00 A-Interface Flexibility Support GPP SECRETARIAT 0 correspondence dated August 00 regarding Cancellation of an Approved Work Item GPP-000-A: Wideband Speech Codec for cdma000 Systems Mode Extension GPP SECRETARIAT 0 Correspondence dated August 00 regarding Proposed Work Item Review GPP PMT COORDINATOR ALL WGs 0 correspondences regarding SC Vice Chair comments on GPP Overview presentation SECRETARY SECRETARY 0 GPP/CDG Press Release: GPP Ready to Meet the Future Market Needs Head On GPP/CDG FYI 0 correspondences regarding IMS Evolution Workshop Invitation TSG-X, 0 correspondences September 00 regarding IMS Harmonization and Subscription Management (SuM) common sessions GPP SA WG 0 LS dated July 00 to GPP OPs regarding request for information on Recommendation Q. ITU-T SG9 FYI 09 National Emergency Number Association (NENA) liaison request to GPP NENA ALL WGs 00 Updated GPP Overview presentation SECRETARY 0 LS to ITU-T SG/NGNMFG dated September 00 regarding IMS Harmonization and new Rel- IMS Network Resource Model GPP TSG-SA WG 0 V&V comments on S.P00-0 Protocol Alignment Reference MOTOROLA REVISE AND RESUBMIT 0 V&V comments on S.P0-0 All-IP Emergency Call Support MOTOROLA 0 V&V comments on S.P00-0 Protocol Alignment Reference GPP SECRETARIAT 0 V&V comments on S.P0-0 All-IP Emergency Call Support GPP SECRETARIAT 0 correspondences September 00 regarding two () Work Items to be canceled GPP SECRETARIAT 0 GPP Workplan files - September 00 GPP SECRETARIAT ALL WGs 0 Correspondence dated September 00 regarding CDG ETO Recommendations on SBC Development CDG ETO, 09 S.R00-0 All IP NAM revision Letter alignment with TSB- MOTOROLA WG 00 Correspondence dated August 00 regarding GPP Overview Presentation TSG-C SECRETARY

17 TSG-S Meeting Summary - - September 00 GPP-S Page of NUMBER SUBJECT 0 Correspondence dated September 00 regarding CDG ETO Recommendations on GPP Network Evolution CLOSING PLENARY - GPP-S Document Status Table 0 Report 0 WG Report PMT Report Report WG Report Numbering AdHoc Report S.P00-B v.0. All IP NAM proposed V&V text Proposed correspondence to TIA TR-. regarding V&V of S.P00-B v.0. NAM and Version Alignment Source correspondence dated September 00 regarding two () WIs adopted S.P00-0 v. PSVT Stage proposed TSG review text Proposed correspondence to all TSGs regarding TSG review of S.P00-0 v.0 PSVT Stage Proposed correspondence to TSG-X regarding Requirements for MMD Enhanced Policy and MMD Roaming Proposed correspondence to NENA from GPP SC Chair regarding Liaison Request to GPP to Initiate Dialog and Request Comments on Draft NENA Location Requirements S.P0-0 v0.9 All-IP Emergency Call Support proposed publication text S.P00-A v. Common Security Algorithms proposed V&V text Proposed correspondence to all TSGs regarding S.P00-0 v0., A Report on Feature Alignment between GPP Specifications Proposed correspondence to all TSGs regarding Input for Release Critical Work Items for Release Proposed correspondence to CDG regarding Input for Release Critical Work Items for Release - Request for Requirements Correspondence dated September 00 regarding LBC Requirements SOURCE CDG ETO WG WG NUMBERING ADHOC WG WG GPP SECRETARIAT TSG-A ACTION, R FYI FYI FYI WIs FYI FYI FYI, WG

18 This page intentionally left blank

19 TSG-S Meeting Summary - - September 00 GPP-S Page 9 of NUMBER S.R000-0 S.R000-A S.R000-0 S.R000-A S.R000-B S.R000-0 S.R000-0 S.R000-0 S.R S.R000-0 S.R00-0 S.R00-0 S.R00-0 S.R00-0 S.R00-0 S.R00-0 S.R00-0 S.R00-0 S.R009-0 S.R00-0 S.R00-0 S.R00-0 S.R00-0 S.R00-0 S.R00-0 S.R00-0 S.S00-0 S.S00-0 S.S00-0 S.S00-A S.S00-xxx-B S.S00-xxx-C S.R009-0 S.R000-0 PUBLISHED TSG-S SPECIFICATIONS AND REPORTS TITLE GPP System Capability Guide v.0 GPP System Capability Guide v.0 GPP Service Implementation Guide v.0 GPP Network Reference Model (Rev. A) v.0 GPP Network Reference Model (Rev. B) v.0 Cellular Features Description (TIA/EIA--A Rev A) v.0 User Selective Call Forwarding (Stage ) v. Answer Hold (Stage ) v.0 User Identity Module (Stage ) (PN-) v.0 Preferred Language Enhancement (Stage ) (PN-9) v.0 Advice of Charge (Stage ) (PN-9) v.0 Rejection of Undesired Annoying Calls (Stage ) (PN-9) v.0 Global Emergency Call Origination (Stage ) v.0 Tandem Free Operation (Stage ) v.0 ISDN Interworking (Stage ) v.0 Automatic Code Gapping (Stage ) v.0 G Wireless Network Management System High Level Requirements (Stage ) v.0 Prepaid Services (Stage ) (PN-) v.0 Location Based System Services (LBSS) Stage v.0 Multimedia Streaming Stage v.0 Video Conferencing Stage v.0 High Speed Data Enhancements for cdma000 x Stage - Data Only v.0 WLL Stage v.0 WPP Stage v.0 High Speed Data Enhancements for cdma000 x Stage - Integrated Data and Voice (xev-dv) v.0 Personal Mobility Stage v.0 OAM&P Specification v.0 OAM&P Specification v.0 OAM&P Specification v.0 OAM&P Specification v.0 OAM&P Specification v.0 - parts 000 through 00 OAM&P Specification v.0 - parts 000 through 00 Access control based on call type Stage v.0 Broadcast Multicast Services Stage v.0 RESP WG WG UIM ID ADHOC S.R000-A Broadcast Multicast Services Stage v.0 WG WG WG WG WG WG WG

20 TSG-S Meeting Summary - - September 00 GPP-S Page 0 of NUMBER S.R00-0 S.R00-0 PUBLISHED TSG-S SPECIFICATIONS AND REPORTS TITLE ESA and ESP Stage v.0 Realm Configured Packet Data Session Dormancy Timer Stage v.0 RESP S.R00-0 S.R00-0 S.R00-0 S.R00-0 S.R00-0 S.R00-0 S.R00-0 S.R00-0 S.R00-A S.R000-0 S.R00-0 S.R00-0 S.S00-0 S.S00-0 S.S00-0 S.S00-A S.R00-0 S.R00-0 S.R009-0 S.R000-0 S.R00-0 S.R00-0 S.R00-0 S.P00-0 S.R00-A S.R00-0 S.R00-0 S.R00-0 S.R00-0 S.R009-0 S.R000-0 S.R000-A S.R00-0 S.R00-0 UIM ID Assignment Guidelines v.0 RESCINDED: Superseded by S.R009-0 GPP NAM v.0 GPP Evolution Document v.0 RESCINDED July 00 RESCINDED July 00 RESCINDED July 00 MEID Stage v.0 MEID Stage v.0 RESCINDED July 00 EMS Stage v.0 GPP System Release Guide v.0 Common Cryptographic Algorithms v.0 Interface Specification for Common Cryptographic Algorithms v.0 Enhanced Cryptographic Algorithms v.0 Enhanced Cryptographic Algorithms v.0 IP Based Service Architecture System Requirements v.0 IP Multimedia Domain System Requirements v.0 Legacy MS Domain Step- v.0 Removable User Identity Module (R-UIM) Mobile Equipment (ME) Interface Testing v.0 Immediate Messaging v.0 Presence Service v.0 Multimedia Messaging Stage v.0 RESCINDED Multimedia Messaging Stage v.0 Fast Call Setup Stage v.0 IP Based Location Services Stage v.0 Enhanced Call Recovery Stage v.0 LLA_ROHC Stage v.0 Header Stripping and Generation Stage v.0 GPP Process Guidelines v.0 PUBLISHED AS SC.R00-0 Legacy System Packet Data Surveillance Requirements v.0 IP System Packet Data Surveillance Requirements v.0 UIM WG WG NUM ADHOC NUM ADHOC UIM ID ADHOC S.R00-0 Internet Over-the-Air Handset Configuration Management v.0

21 TSG-S Meeting Summary - - September 00 GPP-S Page of NUMBER S.R00-0 S.R00-0 S.R00-0 S.S00-0 S.S00-A S.R009-0 S.R009-A S.R000-0 S.R00-0 S.R00-0 S.S00-0 S.R00-0 S.P00-0 S.S00-0 S.S00-A S.S00-B S.R00-0 S.R00-A S.R00-0 S.R009-0 S.R S.P009-0 S.R009-0 S.S009-0 S.R009-0 S.R009-0 S.R009-0 S.R009-0 S.P009-0 S.R S.R000-0 S.R00-0 S.R00-0 S.R00-0 S.R00-0 S.R00-0 S.R00-0 PUBLISHED TSG-S SPECIFICATIONS AND REPORTS TITLE Multimedia File Format Stage v.0 Accounting and Auditing Stage v.0 GPP Vision Document - PUBLISHED AS SC.R00-0 Common Security Algorithms v.0 Common Security Algorithms v.0 End-to-End QoS Stage v.0 End-to-End QoS v.0 Wide Band Speech Codec for CDMA 000 Systems Stage v.0 Enhanced Packet Data Air Interface Security Stage v.0 Broadcast-Multicast Service Security Framework v.0 Broadcast-Multicast Service Security Framework v.0 Packet PrePaid Services Stage v.0 GPP Equipment Numbering JEM Report and Conclusions - WITHDRAWN TO BE INCLUDED AS AN ANNEX IN S.R00 MEID STAGE GPP IMS Security Framework v.0 GPP IMS Security Framework v.0 GPP IMS Security Framework v.0 WLAN - cdma000 Interworking v.0 WLAN - cdma000 Interworking v.0 PUBLISHED AS SC.R00-0 PUBLISHED AS SC.R00-0 Network Initiated Data Sessions (NIDS) v.0 WITHDRAWN LMSD Step Stage v.0 cdma000 Network Performance Measurement Types v.0 Rm Interface Enhancements v.0 Support for ISIM on UICC v.0 TrFO v.0 PUBLISHED AS SC.R00-0 RESCINDED - //0 - Functionality included in X.P00 PUBLISHED AS SC.R00-0 System Requirements for PoC v.0 IOTA DM Stage v.0 PUBLISHED AS SC.P00-0 Network Firewall Configuration and Control Stage v.0 HAT Authentication System Requirements v.0 Hotlining System Requirements v.0 Packet Switched Video Telephony (PSVT) Stage v.0 RESP VISION ADHOC NUM ADHOC NUM ADHOC S.P00-0 RESCINDED - /0/0 - Unsponsored WI WG

22 TSG-S Meeting Summary - - September 00 GPP-S Page of PUBLISHED TSG-S SPECIFICATIONS AND REPORTS NUMBER TITLE RESP S.R00-0 HRPD-cdma000 x Interworking System Requirements v.0 S.S009-0 General Bootstrapping Architecture (GBA) Stage / specification v.0 S.S00-0 Location Services Security Framework Report v.0 S.R0-0 Expanded R-UIM Identifier Stage v.0 S.R0-0 General Bootstrapping Architecture (GBA) Stage Requirements v.0 S.R0-0 Enhanced cdma000 SRD v.0 S.S0-0 Security Mechanisms Using GBA v.0 S.R0-0 All-IP Emergency Call Support S.R0-0 Multimedia Priority Services Stage v.0 S.R0-0 Telephone Number Mapping (ENUM) Stage v.0

23 TSG-S Meeting Summary - - September 00 GPP-S Page of NUMBER S.P000-B TSG-S PROJECTS IN DEVELOPMENT TITLE Network Reference Model RESP WG S.P000-A Wireless Feature Descriptions S.P00-xxx-C S.P00-A S.P00-B S.P00-A S.P00-0 S.P00-A S.P009-A S.P00-0 S.P00-0 S.P0-0 S.P09-0 S.P00-0 OAM&P GPP NAM GPP NAM Enhanced Cryptographic Algorithms v.0 Protocol Alignment Reference Common Security Algorithms v.0 Definition of Performance Measurement Typs PSTV Stage (version update) HRPD-cdma000 x Interworking SRD (version update) PPP-Free Operation Stage Proximity Mobile Gateway Stage MMD Policy Enhancements SRD WG WG WG WG

24 TSG-S Meeting Summary - - September 00 GPP-S Page of GPP QUORUM ROLL CALL TSG-S (Systems and Services Aspects) Xi'an, China -Sep-0 INDIVIDUAL MEMBER COMPANY Attendance Attendance Consec Mtgs Voting Status Quorum Status Missed 9//00 9//00 (incl this Mtg) as of next Mtg as of next Mtg ALLTEL 0 BELL CANADA 0 0 CHINA UNICOM 0 0 DOCOMO US LABORATORIES 0 0 ERICSSON 0 0 FUJITSU 0 GEMALTO, AXALTO 0 HEWLETT PACKARD 0 0 HITACHI 0 0 HUAWEI 0 KDDI 0 KYOCERA LG ELECTRONICS LG TELECOM LUCENT 0 MOTOROLA 0 NEC 0 NOKIA NORTEL NETWORKS 0 QUALCOMM 0 RESEARCH IN MOTION 0 0 SAMSUNG 0 SPRINT/NEXTEL 0 TELCORDIA VERIZON WIRELESS 0 0 TOTALS 0 QUORUM CALCULATION % 0% ADDITIONS ALCATEL SHANGHIA BELL 0 RITT OBSERVERS AND GUESTS ARIB QUORUM STATUS NOTES: - HIGHLIGHTED ZERO = Must attend consecutive mtgs to be added to quorum list - NON-HIGHLIGHTED ZERO = Will be added to quorum list next mtg if they attend P = Letter of Proxy in effect

APPROVED SUMMARY OF TSG-S MEETING for February 2006 in Jeju, Korea

APPROVED SUMMARY OF TSG-S MEETING for February 2006 in Jeju, Korea Page of Title: Source: Clifton J. Barber SECRETARY SUMMARY OF TSG-S MEETING for 0- February 00 in Jeju, Korea 0 0 0 Representing KDDI CJ Barber Consulting Services 0 Saint Andrews Court Jonesboro, GA 0

More information

Title: Source: Abstract: Recommendation: Notice: Page 1. APPROVED SUMMARY OF 3GPP2 TSG-C MEETINGS for 5 October 2004 Interim Plenary Conference Call

Title: Source: Abstract: Recommendation: Notice: Page 1. APPROVED SUMMARY OF 3GPP2 TSG-C MEETINGS for 5 October 2004 Interim Plenary Conference Call Page Title: APPROVED SUMMARY OF GPP TSG-C MEETINGS for October 00 Interim Plenary Conference Call 0 0 0 Source: Clifton J. Barber SECRETARY Representing KDDI CJ Barber Consulting Services 0 Saint Andrews

More information

Abstract: This document is a summary of the 3GPP2 TSG-S meetings that were held during the period of 6-9 February 2012.

Abstract: This document is a summary of the 3GPP2 TSG-S meetings that were held during the period of 6-9 February 2012. Page of Title: Source: APPROVED SUMMARY OF TSG-S MEETING for - February 0 0 0 Clifton J. Barber TSG-S SECRETARY Representing KDDI CJ Barber Consulting Services 0 Saint Andrews Court Jonesboro, GA 0 (0)

More information

APPROVED SUMMARY OF TSG-C MEETING for 05 April 2007 Interim Plenary Conference Call

APPROVED SUMMARY OF TSG-C MEETING for 05 April 2007 Interim Plenary Conference Call TSG-C Meeting Summary 05 April 2007 C00-2007054-042R Page of 6 Title: 2 3 4 Source: APPROVED SUMMARY OF TSG-C MEETING for 05 April 2007 Interim Plenary Conference Call 5 6 7 8 9 0 2 3 4 5 6 7 8 9 20 2

More information

TSG-S Meeting Summary: July Seoul, Korea Page 1. APPROVED SUMMARY OF TSG-S MEETING for the period of July 2001 in Seoul, Korea.

TSG-S Meeting Summary: July Seoul, Korea Page 1. APPROVED SUMMARY OF TSG-S MEETING for the period of July 2001 in Seoul, Korea. TSG-S Meeting Summary: - July 00 - Seoul, Korea GPP-S00-0000-00 R Page Title: APPROVED SUMMARY OF TSG-S MEETING for the period of - July 00 in Seoul, Korea. 0 Source: Clifton J. Barber SECRETARY Tantivy

More information

APPROVED SUMMARY OF 3GPP2 TSG-C MEETING for 28 December 2001 conference call.

APPROVED SUMMARY OF 3GPP2 TSG-C MEETING for 28 December 2001 conference call. GPP-C00-00007-00R Page Title: APPROVED SUMMARY OF GPP TSG-C MEETING for 8 December 00 conference call. 7 8 9 0 7 8 9 0 7 Source: Clifton J. Barber SECRETARY Tantivy Communications 0 S. Babcock Street Melbourne,

More information

July 2004 TSG-X Meeting Summary

July 2004 TSG-X Meeting Summary X00-000-00 TITLE: July 00 TSG-X Meeting Summary DATE: August, 00 SOURCE: Terry Jacobson (TSG-X Secretary) Lucent Technologies Naperville, IL 0 Phone: -0-- FAX: -0-- email: terryjacobson@lucent.com Lucent

More information

3GPP2 TSG-A: Access Network Interfaces TSG (TSG-A) #79 Meeting Summary Beijing, China

3GPP2 TSG-A: Access Network Interfaces TSG (TSG-A) #79 Meeting Summary Beijing, China 3GPP2 TSG-A: Access Network Interfaces TSG (TSG-A) #79 Meeting Summary Beijing, China DATE: October 24, 2005 PLACE: PRESIDING: Beijing Friendship Hotel 1 Zhongguancun Nandajie Haidian District Beijing,

More information

TSG-X Plenary Meeting Report July 25 July 29, 2011 Ottawa, Canada

TSG-X Plenary Meeting Report July 25 July 29, 2011 Ottawa, Canada TSG-X Plenary Meeting Report July 25 July 29, 2011 Ottawa, Canada Chair: Vice-Chairs: Secretary: Meeting Location: Marvin Bienn, Tel: +1-972-583-2752, email: marvin.bienn@ericsson.com, Rajesh Bhalla, Tel:

More information

Guilin, China September 9, GPP2 TSG-SX. Meeting Summary #2 Miami, Florida

Guilin, China September 9, GPP2 TSG-SX. Meeting Summary #2 Miami, Florida DATE: June 3, 2013 3GPP2 TSG-SX Meeting Summary #2 Miami, Florida LOCATION: CHAIR: VICE CHAIR: SECRETARY: Miami, Florida Dr. Xiaowu (Frankle) Zhao, ZTE Yuezhen Wang, China Telecom Mike Dolan, Alcatel-Lucent

More information

3GPP2 TSG-A: Access Network Interfaces TSG (TSG-A) #112 Meeting Summary Orlando, FL USA

3GPP2 TSG-A: Access Network Interfaces TSG (TSG-A) #112 Meeting Summary Orlando, FL USA 3GPP2 TSG-A: Access Network Interfaces TSG (TSG-A) #112 Summary Orlando, FL USA DATE: July 21-24, 2008 LOCATION: PRESIDING: Ritz-Carlton Orlando Grande Lakes 4012 Central Florida Parkway Orlando, FL 32837

More information

System Release Guide for the (R4) Release of the cdma2000 System Specifications

System Release Guide for the (R4) Release of the cdma2000 System Specifications 3GPP2 SC.R2004-002-0 Version 1.0 Version Date: 25 October 2006 System Release Guide for the (R4) Release of the cdma2000 System Specifications Copyright Notice 3GPP2 and its Organizational Partners claim

More information

3GPP2 Access Network Interfaces TSG (TSG-A) #69 Meeting Summary

3GPP2 Access Network Interfaces TSG (TSG-A) #69 Meeting Summary 0 0 GPP Access Network Interfaces TSG (TSG-A) # Meeting Summary DATE: December, 00 PLACE: PRESIDING: PRESENT: Hyatt Regency Kauai Poipu Road Koloa, Hawaii USA George Turnipseed, Sprint Roger Edwards GPP

More information

Miami, Florida June 3, GPP2 TSG-SX. Meeting Summary #1 Busan, Korea

Miami, Florida June 3, GPP2 TSG-SX. Meeting Summary #1 Busan, Korea Meeting Summary #1 Busan, Korea DATE: March 11, 2013 LOCATION: Busan, Korea CHAIR: Dr. Xiaowu (Frankle) Zhao, ZTE VICE CHAIR: Yuezhen Wang, China Telecom Mike Dolan, Alcatel-Lucent SECRETARY: Eileen McGrath

More information

3GPP2 TSG-A: Access Network Interfaces TSG (TSG-A) #109 Meeting Summary Montreal, Quebec CANADA

3GPP2 TSG-A: Access Network Interfaces TSG (TSG-A) #109 Meeting Summary Montreal, Quebec CANADA 3GPP2 TSG-A: Access Network Interfaces TSG (TSG-A) #109 Meeting Summary Montreal, Quebec CANADA DATE: March 31 April 3, 2008 LOCATION: PRESIDING: Delta Centre-Ville Hotel 777 University Street Montreal,

More information

3GPP2 TSG-A: Access Network Interfaces TSG (TSG-A) #128 Meeting Summary Wailea, HI

3GPP2 TSG-A: Access Network Interfaces TSG (TSG-A) #128 Meeting Summary Wailea, HI 3GPP2 TSG-A: Access Network Interfaces TSG (TSG-A) #128 Summary Wailea, HI DATE: December 7-10, 2009 LOCATION: PRESIDING: Grand Wailea Hotel 3850 Wailea Alanui Drive Wailea, HI 96753 Dr. Xiaowu (Frankle)

More information

3GPP2 TSG-A: Access Network Interfaces TSG (TSG-A) #106 Meeting Summary Kauai, HI USA

3GPP2 TSG-A: Access Network Interfaces TSG (TSG-A) #106 Meeting Summary Kauai, HI USA 3GPP2 TSG-A: Access Network Interfaces TSG (TSG-A) #106 Meeting Summary Kauai, HI USA DATE: December 3-6, 2007 LOCATION: PRESIDING: Grand Hyatt Kauai 1571 Poipu Road Koloa, Kauai, HI 96756 USA Wasuke Sato,

More information

3GPP2 Access Network Interfaces TSG (TSG-A) #39 Draft Meeting minutes

3GPP2 Access Network Interfaces TSG (TSG-A) #39 Draft Meeting minutes 1 1 1 1 1 1 1 GPP Access Network Interfaces Technical Specification Group GPP Access Network Interfaces TSG (TSG-A) # Draft Meeting minutes DATE: May 1-1, 00 PLACE: PRESIDING: PRESENT: The Sutton Place

More information

3GPP2 SC PMT TITLE: Summary Report for the PMT Meeting October 13, 2014 SOURCE: Doug Dunn Kyocera Chair, PMT

3GPP2 SC PMT TITLE: Summary Report for the PMT Meeting October 13, 2014 SOURCE: Doug Dunn Kyocera Chair, PMT PMT-20141202-004 3GPP2 SC PMT TITLE: Summary Report for the PMT Meeting October 13, 2014 SOURCE: Doug Dunn Kyocera Chair, PMT pmt_chair@3gpp2.org ABSTRACT: This report summarizes the PMT meeting sessions.

More information

3GPP2 TSG-A: Access Network Interfaces TSG (TSG-A) #117 Meeting Summary Maui, HI

3GPP2 TSG-A: Access Network Interfaces TSG (TSG-A) #117 Meeting Summary Maui, HI 3GPP2 TSG-A: Access Network Interfaces TSG (TSG-A) #117 Meeting Summary Maui, HI DATE: December 1-5, 2008 LOCATION: PRESIDING: Grand Wailea Hotel 3850 Wailea Alanui Dr. Wailea, HI 96753 USA George Turnipseed,

More information

3GPP2 TSG-A: Access Network Interfaces Meeting Summary #137 Seattle, Washington

3GPP2 TSG-A: Access Network Interfaces Meeting Summary #137 Seattle, Washington DATE: January 24, 2011 LOCATION: PRESIDING: OPENING PLENARY 3GPP2 TSG-A: Access Network Interfaces Meeting Summary #137 Seattle, Washington Seattle, Washington 1. TSG-A Opening Remarks by TSG-A Chair Dr.

More information

3GPP2 From Geneva to San Francisco. Dr. Hideo Okinaka KDDI Corporation Chair, 3GPP2 Steering Committee

3GPP2 From Geneva to San Francisco. Dr. Hideo Okinaka KDDI Corporation Chair, 3GPP2 Steering Committee 3GPP2 From Geneva to San Francisco Dr. Hideo Okinaka KDDI Corporation Chair, 3GPP2 Steering Committee okinaka@kddi.com 2nd Informal Forum Summit 24-25 July 2003 Presentation Overview What is 3GPP2? 3GPP2

More information

3GPP2 Overview. Dr. Youn Kwan Kim Chair, 3GPP2 Steering Committee LG Telecom

3GPP2 Overview. Dr. Youn Kwan Kim Chair, 3GPP2 Steering Committee LG Telecom 3GPP2 Overview Dr. Youn Kwan Kim Chair, 3GPP2 Steering Committee LG Telecom ykkim@lgtel.co.kr cdma2000 India Workshop New Delhi, India 23 February 2005 Presentation Overview 3GPP2 is 3GPP2 Organization

More information

System Release 4 Standardized Services and Features

System Release 4 Standardized Services and Features 3GPP2 SC.R2004-003-0 Version 1.0 Date: August 20, 2009 System Release 4 Standardized Services and Features 2009 3GPP2 3GPP2 and its Organizational Partners claim copyright in this document and individual

More information

3GPP2 Access Network Interfaces TSG (TSG-A) #30 Draft Meeting minutes

3GPP2 Access Network Interfaces TSG (TSG-A) #30 Draft Meeting minutes 0 GPP Access Network Interfaces Technical Specification Group October 0, 00 GPP-A00-0000-00 GPP Access Network Interfaces TSG (TSG-A) #0 Draft Meeting minutes DATE: Monday Friday; August -, 00 PLACE: PRESIDING:

More information

3GPP2 Access Network Interfaces TSG (TSG-A) #25 Draft Meeting minutes

3GPP2 Access Network Interfaces TSG (TSG-A) #25 Draft Meeting minutes 1 1 GPP Access Network Interfaces Technical Specification Group April, 001 GPP-A00-000-00 GPP Access Network Interfaces TSG (TSG-A) Draft Meeting minutes DATE: Monday - Friday, March 1 1, 001 PLACE: PRESIDING:

More information

3GPP2 Access Network Interfaces TSG (TSG-A) #24 Draft Meeting minutes

3GPP2 Access Network Interfaces TSG (TSG-A) #24 Draft Meeting minutes 1 1 GPP Access Network Interfaces Technical Specification Group March 1, 001 GPP-A00-001r-00 GPP Access Network Interfaces TSG (TSG-A) # Draft Meeting minutes DATE: Monday - Friday, February 1 1, 001 PLACE:

More information

Mar 3,2005 THE TELECOMMUNICATION TECHNOLOGY COMMITTEE

Mar 3,2005 THE TELECOMMUNICATION TECHNOLOGY COMMITTEE TS-GB-S.R00-0v.0 HRPD Network Access Authentication for a Hybrid Access Terminal (HAT) with an R-UIM Used to Access Spread Spectrum Systems - System Requirements Mar,00 THE TELECOMMUNICATION TECHNOLOGY

More information

IMT-2000 MC-CDMA System

IMT-2000 MC-CDMA System IMT-2000 MC-CDMA System 1 Standard : ARIB STD-T64 IMT-2000 MC-CDMA System 2 Technical Report : ARIB TR-T13 IMT-2000 MC-CDMA System Published by Association of Radio Industries and Businesses (ARIB) 1-4-1

More information

DRAFT SUMMARY OF 3GPP2 TSG-C MEETINGS for 8-12 July 2002 in San Diego, CA (USA)

DRAFT SUMMARY OF 3GPP2 TSG-C MEETINGS for 8-12 July 2002 in San Diego, CA (USA) GPP-C00-0000-00 Page Title: Source: Phil Brown DRAFT SUMMARY OF GPP TSG-C MEETINGS for - July 00 in San Diego, CA (USA) 0 0 0 SECRETARY (acting) Ericsson Wireless Communications Lusk Blvd. San Diego, CA

More information

Networking Perspectives

Networking Perspectives TR45.2/2001.1.19- Draft Liaison Report to IFAST Meeting #15 Cellular Networking Perspectives Cellular Networking Perspectives Ltd. 2636 Toronto Cresc. NW Calgary, AB T2N 3W1 Canada Phone: +1-403-289-6609

More information

cdma2000 Technology Initiative

cdma2000 Technology Initiative cdma2000 Technology Initiative Dr. Eshwar Pittampalli Lucent Technologies pittampalli@lucent.com cdma2000 India Wkshop New Delhi, India 23 February 2005 Outline 3GPP2 TSG-C Organization Structure Air Interface

More information

Liaison Report to IFAST Meeting #22. Cellular. Networking. Perspectives

Liaison Report to IFAST Meeting #22. Cellular. Networking. Perspectives IFAST#22/2003.8.26- Liaison Report to IFAST Meeting #22 Cellular Networking Perspectives Cellular Networking Perspectives Ltd. 2636 Toronto Cresc. NW Calgary, AB T2N 3W1 Canada Phone: +1-403-289-6609 E-Mail:

More information

ESN Migration to MEID - Milestones & Timeline

ESN Migration to MEID - Milestones & Timeline Introduction: The following table is a working document maintained by the TR-45 ESN/UIM/MEID Ad Hoc Group ESN Migration to MEID - Milestones & Timeline Line Target Milestone / Action Notes Status Fora

More information

Draft Liaison Report to IFAST Meeting #16

Draft Liaison Report to IFAST Meeting #16 TR45.2/2001.5.11- Draft Liaison Report to IFAST Meeting #16 Cellular Networking Perspectives Ltd. 2636 Toronto Cresc. NW Calgary, AB T2N 3W1 Canada Phone: +1-403-289-6609 Fax: +1-403-289-6658 E-Mail: David.Crowe@cnp-wireless.com

More information

SIGNALING CONFORMANCE TEST SPECIFICATION FOR INTERWORKING OF CDMA2000 1X AND HIGH RATE PACKET DATA SYSTEMS REVISION A

SIGNALING CONFORMANCE TEST SPECIFICATION FOR INTERWORKING OF CDMA2000 1X AND HIGH RATE PACKET DATA SYSTEMS REVISION A C.S00-A Version 0. June 00 SIGNALING CONFORMANCE TEST SPECIFICATION FOR INTERWORKING OF CDMA000 X AND HIGH RATE PACKET DATA SYSTEMS REVISION A 00 GPP GPP and its Organizational Partners claim copyright

More information

Liaison Report to IFAST Meeting #18

Liaison Report to IFAST Meeting #18 TR45.2/2002.1.11-3GPP2 TSG-N/2002.1.11- IFAST18/02.01.22.14 Liaison Report to IFAST Meeting #18 Cellular Networking Perspectives Ltd. 2636 Toronto Cresc. NW Calgary, AB T2N 3W1 Canada Phone: +1-403-289-6609

More information

IMT-2000 MC-CDMA System

IMT-2000 MC-CDMA System IMT-2000 MC-CDMA System 1 Standard : ARIB STD-T64 IMT-2000 MC-CDMA System 2 Technical Report : ARIB TR-T13 IMT-2000 MC-CDMA System Published by Association of Radio Industries and Businesses (ARIB) 1-4-1

More information

WLAN Coexistence Liaison Report

WLAN Coexistence Liaison Report TR-41.3.9 03 08 015 Hewlett-Packard Company Worldwide Technical Regulations ====================================================================== Title: WLAN Coexistence Liaison Report Distribution: All

More information

Editor: David Crowe Phone Vol. 10, No. 1 January, The Development of cdma2000 Standards

Editor: David Crowe Phone Vol. 10, No. 1 January, The Development of cdma2000 Standards Cellular Networking Perspectives Editor: David Crowe Phone +1-403-289-6609 Email crowed@cnp-wireless.com Vol. 10, No. 1 January, 2001 In This Issue... The Development of cdma2000 Standards...p. 1 Understanding

More information

Partnership. Organizational Partners (SDOs) Market Representative Partners. Regional standards organizations:

Partnership. Organizational Partners (SDOs) Market Representative Partners. Regional standards organizations: 3GPP 3GPP 2017 1 Partnership Organizational Partners (SDOs) Regional standards organizations: ARIB (Japan), ATIS (USA), CCSA (China), ETSI (Europe), TTA (Korea), TTC (Japan), TSDSI (India) Market Representative

More information

CDMA International Roaming

CDMA International Roaming CDMA International Roaming IRT Overview CDG Roaming Webinar, September 2, 2010 Federico Nienstadt fnienstadt@cdg.org CDG International Roaming Team (IRT) Formally created in 2003 Mission: Provide an industry

More information

3GPP TS V6.4.0 ( )

3GPP TS V6.4.0 ( ) TS 22.234 V6.4.0 (2006-06) Technical Specification 3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Requirements on system to Wireless Local Area Network (WLAN)

More information

All-IP System MMD Roaming Technical Report

All-IP System MMD Roaming Technical Report GPP X.R00-0 Version.0 Version Date: August 00 All-IP System MMD Roaming Technical Report COPYRIGHT NOTICE GPP and its Organizational Partners claim copyright in this document and individual Organizational

More information

ISO/IEC JTC 1 N

ISO/IEC JTC 1 N ISO/IEC JTC 1 N 8667 2007-07-27 ISO/IEC JTC 1 Information Technology Replaces Document Type: Meeting Resolutions Document Title: Recommendations of the 24-26 July 2007 SWG-Directives Meeting, Paris, France

More information

ARIB TR-T13-C.R v1.0. cdma2000 Multimedia Services Evaluation Methodology: Software Tools

ARIB TR-T13-C.R v1.0. cdma2000 Multimedia Services Evaluation Methodology: Software Tools ARIB TR-T-C.R00-0 v.0 cdma000 Multimedia Services Evaluation Methodology: Software Tools Refer to "Notice" in the preface of ARIB TR-T for Copyrights Original Specification This standard, TR-T-C.R00-0

More information

Transcoder Free Operation

Transcoder Free Operation GPP S.R00-0 Version.0 Version Date: March 00 0 Transcoder Free Operation 0 Stage Requirements COPYRIGHT NOTICE GPP and its Organizational Partners claim copyright in this document and individual Organizational

More information

IEEE C /08

IEEE C /08 2003-01-10 IEEE C802.20-03/08 Project Title IEEE 802.20 Working Group on Mobile Broadband Wireless Access A Vision of an IP-based Cellular Network Date Submitted

More information

Prepaid Packet Data Service in cdma2000 Wireless IP Network

Prepaid Packet Data Service in cdma2000 Wireless IP Network GPP S.R00-0 Version.0 Date: September 00 Prepaid Packet Data Service in cdma000 Wireless IP Network Stage Requirements COPYRIGHT NOTICE GPP and its Organizational Partners claim copyright in this document

More information

3GPP TS V7.0.0 ( )

3GPP TS V7.0.0 ( ) TS 22.041 V7.0.0 (2007-03) Technical Specification 3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Operator Determined Barring (ODB) (Release 7) GLOBAL SYSTEM

More information

Dusseldorf, Germany Agenda item: th -20 th June, Status Report of SMG11 at SMG#32

Dusseldorf, Germany Agenda item: th -20 th June, Status Report of SMG11 at SMG#32 ETSI TC SMG#32 Tdoc SMG P-00-269 Dusseldorf, Germany Agenda item: 6.10 19 th -20 th June, 2000 Source: Chairman, SMG11 * Status Report of SMG11 at SMG#32 Executive Summary This document provides an overview

More information

IEEE P Wireless Personal Area Networks. TG9 KMP Minutes for November 2013 Plenary meeting, Dallas, TX USA

IEEE P Wireless Personal Area Networks. TG9 KMP Minutes for November 2013 Plenary meeting, Dallas, TX USA IEEE P802.15 Wireless Personal Area Networks Project Title Date Submitted Source Re: Abstract Purpose Notice Release IEEE P802.15 Working Group for Wireless Personal Area Networks (WPANs) TG9 KMP Minutes

More information

Test Plan for CDMA Mobile Stations

Test Plan for CDMA Mobile Stations Test Plan for CDMA Mobile Stations April 2009 Revision 5.4.1 CTIA Certification Program Interested parties may obtain permission to reproduce a limited number of copies by contacting CTIA at: CTIA Certification

More information

ARIB STD-T64-C.S v1.0. Mobile Equipment(ME) Conformance Testing with CSIM for cdma2000 Spread Spectrum Standards

ARIB STD-T64-C.S v1.0. Mobile Equipment(ME) Conformance Testing with CSIM for cdma2000 Spread Spectrum Standards ARIB STD-T-C.S00-0 v.0 Mobile Equipment(ME) Conformance Testing with CSIM for cdma000 Spread Spectrum Standards Refer to "Industrial Property Rights (IPR)" in the preface of ARIB STD-T for Related Industrial

More information

All-IP Core Network Multimedia Domain

All-IP Core Network Multimedia Domain 1 2 3 3GPP2 X.S0013-000-0 Version 1.0 Version Date: December, 2003 4 5 6 7 8 9 10 All-IP Core Multimedia Domain Overview 11 12 13 14 15 16 17 18 19 20 21 COPYRIGHT NOTICE 3GPP2 and its Organizational Partners

More information

TS-3GA (R99)v Operator Determined Call Barring

TS-3GA (R99)v Operator Determined Call Barring TS-3GA-22.041(R99)v.3.3.1 Operator Determined Call Barring May 29, 2001 THE TELECOMMUNICATION TECHNOLOGY COMMITTEE TS-3GA-22.041(R99)v.3.3.1 Operator Determined Call Barring 1. Application level

More information

3GPP2 Drafting Rules. SC.R1005-A Version 1.0 March GPP2

3GPP2 Drafting Rules. SC.R1005-A Version 1.0 March GPP2 SC.R00-A Version.0 March 00 GPP Drafting Rules 00 GPP GPP and its Organizational Partners claim copyright in this document and individual Organizational Partners may copyright and issue documents or standards

More information

Test Plan for CDMA Mobile Stations

Test Plan for CDMA Mobile Stations Test Plan for CDMA Mobile Stations September 2009 Revision 5.5 CTIA Certification Program Interested parties may obtain permission to reproduce a limited number of copies by contacting CTIA at: CTIA Certification

More information

Approved by General Counsel. TR-41.3 Meeting Report Date(s): 11/20/ /20/2014 Location: Tuscon, AZ Approved: 12/05/2014

Approved by General Counsel. TR-41.3 Meeting Report Date(s): 11/20/ /20/2014 Location: Tuscon, AZ Approved: 12/05/2014 Approved by General Counsel TR-41.3 Meeting Report Date(s): 11/20/2014-11/20/2014 Location: Tuscon, AZ Approved: 12/05/2014 TIA SUBCOMMITTEE MEETING REPORT TR-41.3 Analog and Digital Wireline Telephones

More information

Summary of cdma2000 Technology Workshop 14 June 2012 Guangzhou, China

Summary of cdma2000 Technology Workshop 14 June 2012 Guangzhou, China Summary of cdma2000 Technology Workshop 14 June 2012 Guangzhou, China Mr. David Crowe Chair, SC 2012 Workshop Planning AdHoc workshop chair@3gpp2.org Background As chartered by the 3GPP2 SC, the SC 2012

More information

ISO/IEC JTC1/SC7 /N3945

ISO/IEC JTC1/SC7 /N3945 ISO/IEC JTC1/SC7 Software and Systems Engineering Secretariat: CANADA (SCC) ISO/IEC JTC1/SC7 /N3945 2008-03-16 Document Type Calling Notice and Draft Agenda Calling Notice and Draft Agenda - JTC1/SC7 WG7

More information

Interoperability & Global PoC Standards

Interoperability & Global PoC Standards CDG Technology Forum CDMA PoC: Interoperability & Global PoC Standards Kalle Ahmavaara, Nokia, CDMA2000 Standardization kalle.ahmavaara@nokia.com 1 NOKIA San Diego, June 30 th, 2004 Interoperability between

More information

TS-3GB-S.R0079-0v1.0 Support for End-to-End QoS Stage 1 Requirements

TS-3GB-S.R0079-0v1.0 Support for End-to-End QoS Stage 1 Requirements TS-GB-S.R00-0v.0 Support for End-to-End QoS Stage Requirements Sep,00 THE TELECOMMUNICATION TECHNOLOGY COMMITTEE TS-GB-S.R00-0v.0 Support for End-to-End QoS Stage Requirements . Application level

More information

ETSI TS V (201

ETSI TS V (201 TS 123 234 V13.0.0 (201 16-10) TECHNICAL SPECIFICATION Universal Mobile Telecommunications System (UMTS); LTE; 3GPP system to Wireless Local Area Network (WLAN) interworking; System description (3GPP TS

More information

JP-3GA (R99) Unstructured Supplementary Service Data (USSD); Stage 1

JP-3GA (R99) Unstructured Supplementary Service Data (USSD); Stage 1 JP-3GA-22.090(R99) Unstructured Supplementary Service Data (USSD); Stage 1 Version 2 Nov 30, 2000 THE TELECOMMUNICATION TECHNOLOGY COMMITTEE JP-3GA-22.090(R99) Unstructured Supplementary Service Data Unit

More information

2. SA1 Release 11 Standardization Trends

2. SA1 Release 11 Standardization Trends 3GPP SA1 Release 11 Standardization Trends 3GPP SA1 Service Requirements Release 11 3GPP SA1 Release 11 Standardization Trends NTT DOCOMO Technical Journal At the 3GPP, which standardizes mobile communications

More information

ARIB STD-T64-C.S0015-C v1.0. Short Message Service (SMS) For Wideband Spread Spectrum Systems

ARIB STD-T64-C.S0015-C v1.0. Short Message Service (SMS) For Wideband Spread Spectrum Systems ARIB STD-T-C.S00-C v.0 Short Message Service (SMS) For Wideband Spread Spectrum Systems Refer to "Industrial Property Rights (IPR)" in the preface of ARIB STD-T for Related Industrial Property Rights.

More information

Status of IMS-Based Next Generation Networks for Fixed Mobile Convergence

Status of IMS-Based Next Generation Networks for Fixed Mobile Convergence Status of IMS-Based Next Generation Networks for Fixed Mobile Convergence Prepared for: WOCC 2007 Fuchun Joseph Lin Chief Scientist fjlin@research.telcordia.com Telcordia Technologies, Inc. April 28, 2007

More information

Standardization Trends of the Next Generation Network in ETSI TISPAN

Standardization Trends of the Next Generation Network in ETSI TISPAN Standardization Trends of the Next Generation Network in ETSI TISPAN Akira Kurokawa and Isao Higashi Abstract International standardization of the Next Generation Network is being actively discussed in

More information

Meeting Notes Project Modifications to CIP Standards Drafting Team June 28-30, 2016

Meeting Notes Project Modifications to CIP Standards Drafting Team June 28-30, 2016 Meeting Notes Project 2016-02 Modifications to CIP Standards Drafting Team June 28-30, 2016 Exelon Chicago, IL Administrative 1. Introductions / Chair s Remarks The meeting was brought to order by S. Crutchfield

More information

3GPP TS V8.1.0 ( )

3GPP TS V8.1.0 ( ) TS 29.205 V8.1.0 (2009-06) Technical Specification 3rd Generation Partnership Project; Technical Specification Group Core Network and Terminals; Application of Q.1900 series to bearer independent Circuit

More information

3GPP Work Item Description. Title: Study on Licensed-Assisted Access using LTE

3GPP Work Item Description. Title: Study on Licensed-Assisted Access using LTE 3GPP TSG RAN Meeting #65 Edinburgh, Scotland, 9-12 September 2014 RP-141397 revision of RP-140770 Source: Ericsson, Qualcomm, Huawei Title: Study on Licensed-Assisted Access using LTE Document for: Approval

More information

Leading The Way With CDMA. Adam Gould CTO, CDMA VP Technology Management and Strategy Nokia Mobile Phones Business Group 27 May 2004 NOKIA

Leading The Way With CDMA. Adam Gould CTO, CDMA VP Technology Management and Strategy Nokia Mobile Phones Business Group 27 May 2004 NOKIA Leading The Way With CDMA Adam Gould CTO, CDMA VP Technology Management and Strategy Nokia Mobile Phones Business Group 27 May 2004 1 NOKIA Agenda CDMA Market Outlook CDMA Technology Evolution Nokia in

More information

3GPP TS V ( )

3GPP TS V ( ) 3GPP TS 24.379 V13.1.1 (2016-06) Technical Specification 3rd Generation Partnership Project; Technical Specification Group Core Networks and Terminals; Mission Critical Push To Talk (MCPTT) call control;

More information

IEEE C /26. IEEE Working Group on Mobile Broadband Wireless Access <http://grouper.ieee.org/groups/802/20/>

IEEE C /26. IEEE Working Group on Mobile Broadband Wireless Access <http://grouper.ieee.org/groups/802/20/> 2003-03-09 IEEE C802.20-03/26 Project Title Date Submitted IEEE 802.20 Working Group on Mobile Broadband Wireless Access Architectural Attributes of an IP-based

More information

Network PMIP Support COPYRIGHT. 3GPP2 X.S Version 1.0 Date: December 5, 2008

Network PMIP Support COPYRIGHT. 3GPP2 X.S Version 1.0 Date: December 5, 2008 GPP X.S00-0 Version.0 Date: December, 00 COPYRIGHT GPP and its Organizational Partners claim copyright in this document and individual Organizational Partners may copyright and issue documents or standards

More information

Data Submitted Voice: Fax: SungCheol Chang Chulsik Yoon,

Data Submitted Voice: Fax: SungCheol Chang Chulsik Yoon, Project Title Data Submitted Source(s) IEEE 802.16 Broadband Wireless Access Working Group Modified TEK State Machine for the MBRA (Multicast & Broadcast ing Algorithm) 2004-11-04

More information

Agenda: 1) Determine what the appropriate format and content for the draft should be; and 2) Determine how the editorial team should move forward

Agenda: 1) Determine what the appropriate format and content for the draft should be; and 2) Determine how the editorial team should move forward 802.20-07/10 Minutes of the IEEE 802.20 editorial team conference call [These notes are a best effort recollection of what has been actually said during the conference call and also include text that was

More information

ISO/IEC JTC 1 N 13127

ISO/IEC JTC 1 N 13127 ISO/IEC JTC 1 N 13127 ISO/IEC JTC 1 Information technology Secretariat: ANSI (United States) Document type: Title: Status: Business Plan BUSINESS PLAN for JTC1/SC6, Telecommunications and Information Exchange

More information

ARIB STD-T53-C.S Circuit-Switched Video Conferencing Services

ARIB STD-T53-C.S Circuit-Switched Video Conferencing Services ARIB STD-T-C.S00-0 Circuit-Switched Video Conferencing Services Refer to "Industrial Property Rights (IPR)" in the preface of ARIB STD-T for Related Industrial Property Rights. Refer to "Notice" in the

More information

ARIB STD-T64-C.R1001-E v1.0. Administration of Parameter Value Assignments for cdma2000 Spread Spectrum Standards, Release E

ARIB STD-T64-C.R1001-E v1.0. Administration of Parameter Value Assignments for cdma2000 Spread Spectrum Standards, Release E ARIB STD-T-C.R00-E v.0 Administration of Parameter Value Assignments for cdma000 Spread Spectrum Standards, Release E Refer to "Industrial Property Rights (IPR)" in the preface of ARIB STD-T for Related

More information

3GPP TS V6.1.0 ( )

3GPP TS V6.1.0 ( ) TS 29.161 V6.1.0 (2005-06) Technical Specification 3rd Generation Partnership Project; Technical Specification Group Core Network and Terminals; Interworking between the Public Land Mobile Network (PLMN)

More information

ETSI TS V ( ) Technical Specification

ETSI TS V ( ) Technical Specification TS 122 088 V10.0.0 (2011-05) Technical Specification Digital cellular telecommunications system (Phase 2+); Universal Mobile Telecommunications System (UMTS); LTE; Call Barring (CB) supplementary services;

More information

C LDPC Coding Proposal for LBC. This contribution provides an LDPC coding proposal for LBC

C LDPC Coding Proposal for LBC. This contribution provides an LDPC coding proposal for LBC C3-27315-3 Title: Abstract: Source: Contact: LDPC Coding Proposal for LBC This contribution provides an LDPC coding proposal for LBC Alcatel-Lucent, Huawei, LG Electronics, QUALCOMM Incorporated, RITT,

More information

E2-E3: CONSUMER MOBILITY. CHAPTER-5 CDMA x OVERVIEW (Date of Creation: )

E2-E3: CONSUMER MOBILITY. CHAPTER-5 CDMA x OVERVIEW (Date of Creation: ) E2-E3: CONSUMER MOBILITY CHAPTER-5 CDMA 2000 1x OVERVIEW (Date of Creation: 01-04.2011) Page: 1 CDMA 2000 1X Overview Introduction CDMA (code division multiple access) is a mobile digital radio technology

More information

IEEE Broadband Wireless Access Working Group < WirelessMAN coexistence function primitives consolidation

IEEE Broadband Wireless Access Working Group <  WirelessMAN coexistence function primitives consolidation Project Title IEEE 802.16 Broadband Wireless Access Working Group WirelessMAN coexistence function primitives consolidation Date Submitted Sources 2008-05-02 Wu Xuyong Huawei, Huawei

More information

PROCEDURE FOR THE DEVELOPMENT OF EURACHEM GUIDANCE. Contents

PROCEDURE FOR THE DEVELOPMENT OF EURACHEM GUIDANCE. Contents Approved 2018-05-17 PROCEDURE FOR THE DEVELOPMENT OF EURACHEM GUIDANCE Contents PROCEDURE FOR THE DEVELOPMENT OF EURACHEM GUIDANCE... 2 Purpose... 2 Scope... 2 Responsible organisation... 2 Eurachem Guidance

More information

8 May 2018 IEEE P IEEE P Smart Grid TAG

8 May 2018 IEEE P IEEE P Smart Grid TAG IEEE P802.24 Smart Grid TAG Project Title IEEE P802.24 Smart Grid Technical Advisory Group Minutes-TAG-Mar-2018 Date Submitted Source Re: 9 May 2017 Benjamin A. Rolfe (Blind Creek Associates) 802.24 TAG

More information

ISO/IEC JTC 1 N 13145

ISO/IEC JTC 1 N 13145 ISO/IEC JTC 1 N 13145 ISO/IEC JTC 1 Information technology Secretariat: ANSI (United States) Document type: Title: Status: Business Plan BUSINESS PLAN FOR ISO/IEC JTC 1/SC 40, IT SERVICE MANAGEMENT AND

More information

IEEE P1564 Voltage Sag Indices Task Force Meeting

IEEE P1564 Voltage Sag Indices Task Force Meeting IEEE P1564 Voltage Sag Indices Task Force Meeting Dan Sabin Electrotek Concepts, Inc. d.sabin@ieee.org January14, 2013 Memphis, Tennessee, USA IEEE P1564 Task Force Meeting Agenda Introductions Patent

More information

ETSI TS V ( )

ETSI TS V ( ) TS 32 4 V5.0.0 (208-07) TECHNICAL SPECIFICATION Digital cellular telecommunications system (Phase 2+) (GSM); Universal Mobile Telecommunications System (UMTS); LTE; Telecommunication management; Subscription

More information

The 3GPP vision. Asok Chatterjee, Ericsson Inc. Chairman, 3GPP Project Co-ordination ordination Group

The 3GPP vision. Asok Chatterjee, Ericsson Inc. Chairman, 3GPP Project Co-ordination ordination Group The 3GPP vision Asok Chatterjee, Ericsson Inc. Chairman, 3GPP Project Co-ordination ordination Group ITU Seminar, Ottawa - May 2002 1 IMT-2000 The 5 IMT 2000 terrestrial interfaces agreed by ITU-R Direct

More information

Proposed Draft Report: IEEE 802 EC 5G/IMT-2020 SC

Proposed Draft Report: IEEE 802 EC 5G/IMT-2020 SC Proposed Draft Report: IEEE 802 EC 5G/IMT-2020 SC Document Number: IEEE 802-EC-16-0094-01-5GSG Date Submitted: Source: Roger Marks Voice: +1 802 capable EthAirNet Associates* E-mail: r.b.marks@ieee.org

More information

atl IP Telephone SIP Compatibility

atl IP Telephone SIP Compatibility atl IP Telephone SIP Compatibility Introduction atl has released a new range of IP Telephones the IP 300S (basic business IP telephone) and IP400 (Multimedia over IP telephone, MOIP or videophone). The

More information

IEEE 802 EC ITU standing committee

IEEE 802 EC ITU standing committee 1 IEEE 802 EC ITU standing committee Glenn Parsons - Ericsson glenn.parsons@ericsson.com +1 613 963 8141 November 2015 2 Agenda for November meeting Role of this standing committee IEEE membership in ITU

More information

Challenges of Global Roaming

Challenges of Global Roaming Challenges of Global Roaming Syed S. Husain WP1/SSG Chair Motorola, USA Systems Rio de Janeiro, Brazil 1 Outline Global roaming - Definition & Requirements Technical Areas of Concern Ongoing Standards

More information

ETSI TS V3.3.1 ( )

ETSI TS V3.3.1 ( ) Technical Specification Digital cellular telecommunications system (Phase 2+) (GSM); Universal Mobile Telecommunications System (UMTS); Operator Determined Barring (ODB) () GLOBAL SYSTEM FOR MOBILE COMMUNICATIONS

More information

ETSI TS V ( )

ETSI TS V ( ) TS 133 234 V14.0.0 (2017-04) TECHNICAL SPECIFICATION Universal Mobile Telecommunications System (UMTS); LTE; 3G security; Wireless Local Area Network (WLAN) interworking security (3GPP TS 33.234 version

More information

TS-3GB-S.R0005-Bv1.0 Network Reference Model for cdma2000 Spread Spectrum Systems

TS-3GB-S.R0005-Bv1.0 Network Reference Model for cdma2000 Spread Spectrum Systems TS-3GB-S.R0005-Bv1.0 Network Reference Model for cdma2000 Spread Spectrum Systems May 29, 2001 THE TELECOMMUNICATION TECHNOLOGY COMMITTEE TS-3GB-S.R0005-Bv1.0 Network Reference Model for cdma2000 Spread

More information

cdma2000 Femtocell Network: Overview

cdma2000 Femtocell Network: Overview GPP X.S00-000-A Version.0 Date: December cdma00 Femtocell Network: Overview COPYRIGHT GPP and its Organizational Partners claim copyright in this document and individual Organizational Partners may copyright

More information