Abstract: This document is a summary of the 3GPP2 TSG-S meetings that were held during the period of 6-9 February 2012.
|
|
- Rosemary Edwards
- 5 years ago
- Views:
Transcription
1 Page of Title: Source: APPROVED SUMMARY OF TSG-S MEETING for - February Clifton J. Barber TSG-S SECRETARY Representing KDDI CJ Barber Consulting Services 0 Saint Andrews Court Jonesboro, GA 0 (0) 0- (0) -0 fax cbarber@cjbarberconsulting.com Abstract: This document is a summary of the GPP TSG-S meetings that were held during the period of - February 0. Recommendations: For review and approval.
2 Page of During the period of - February 0, GPP TSG-S Plenary conference calls were held in parallel with the GPP super-meetings held at the Sheraton Nanjing Kingsley Hotel in Nanjing, China. This document is intended to summarize those proceedings. UUOPENING PLENARY. CALL TO ORDER AND OPENING REMARKS: The meeting was called to order on Monday February 0 at :0 PM local time by TSG-S Chair, Nick Yamasaki (KDDI). As a courtesy to the participants at the Nanjing supper-meeting, a meeting room was provided for those interested in the TSG-S opening Plenary activities. Call-in participants were registered via GoToMeeting. The super-meeting participants were requested to sign-in electronically using the server sign-in facility. The Chair noted that the URL for TSG-S sign-in is The contributions were made available from both the local LAN server and the GPP ftp site (ftp://ftp.gpp.net).. ATTENDANCE REGISTRATION AND ROLL CALL: A roll call of companies indicated that companies included on the list of active quorum members were present (0% participation). Thus, meeting quorum was achieved. The Secretary noted that no proxy statements had been received for this meeting.. INTRODUCTION AND NUMBERING OF CONTRIBUTIONS: Contributions were loaded onto the GPP LAN server and listed in the document register (S ).. AGENDA APPROVAL: The proposed agenda (S ) was presented. The following events for the week were noted: The opening and closing Plenaries will be held via GoToMeeting sessions. However, there will be no meeting room provided for the Nanjing meeting participants for the closing Plenary. A meeting of the TSG-S Vision AdHoc will be held on Wednesday February 0 during the :00-:00 PM time slot in TSG-C Plenary Room. DECISION: The agenda was approved without objection as modified by the discussion (S ).. APPROVAL OF PREVIOUS MEETING SUMMARY: The following contributions were discussed: The TSG-S meeting summary for September 0 that was held in Chengdu, China (S ) was presented. DECISION: This contribution was approved without objection as submitted.
3 Page of The TSG-S meeting summary for December 0 that was held in Kohala Coast, HI, USA (S R) was presented. DECISION: This contribution was approved without objection as submitted pending acceptance of all change marks.. REVIEW OF OUTSTANDING ACTIONS FROM PREVIOUS MEETING: The action items from the December 0 face-to-face meeting were noted as follows: 0-00 Need to approve Chengdu meeting summary in Nanjing. DECISION: This action was CLOSED without objection.. CORRESPONDENCE AND LIAISON REPORTS: OP: No contributions or discussion. SC: The following contributions were discussed: correspondence dated January 0 regarding SC 0 Workshop Planning AdHoc correspondence on status update (S ) was presented from the SC Chair. ACTION: This contribution was remanded to all WGs for review and comment with comments to be coordinated by. correspondence to the GPP OPs dated 0 January 0 regarding MRP Status Request - CDMA Certification Forum (CCF) (S ) was presented from the SC Chair as FYI for TSG-S. GPP SECRETARIAT: The following contributions were discussed: correspondence dated December 0 regarding SC level review of S.R00-0 v.0 Green Revised Energy Efficient Network (GREEN) Technology Initiatives Study for cdma000 Wireless Networks (S ) was presented from the GPP Secretariat. ACTION: This contribution was remanded to as FYI. correspondence dated December 0 regarding SC level review of S.R0-0 v.0 System Requirements for Unstructured Supplementary Services Data (S ) was presented from the GPP Secretariat. ACTION: This contribution was remanded to as FYI. correspondence dated December 0 regarding SC level review and approval of GPP-00 Self-Organizing Networks (SON) (S ) was presented from the GPP Secretariat. ACTION: This contribution was remanded to WG as FYI. MEID Administration Report for the period ending 0 June 0 (S ) was presented from the GPP Secretariat. ACTION: This contribution was remanded to as FYI. MEID Administration Report for the period ending July 0 (S ) was presented from the GPP Secretariat. ACTION: This contribution was remanded to as FYI.
4 Page of MEID Administration Report for the period ending August 0 (S ) was presented from the GPP Secretariat. ACTION: This contribution was remanded to as FYI. GPP Workplan files for February 0 (S ) was presented from the PMT Coordinator. ACTION: This contribution was remanded to all WGs for review and comment with comments to be coordinated by WG. TSG-A: Correspondence dated February 0 regarding EUTRAN-eHRPD Interworking Matrix (S ) was presented from TSG-A. ACTION: This contribution was remanded to for review and action as appropriate. TSG-C: The following contributions were discussed: TSG-C Liaison Report for December 0 in Chengdu, China (S ) was presented from the TSG-C Liaison as FYI for TSG-S. Correspondence dated December 0 regarding TSG-C review of GPP WIs (S ) was presented from TSG-C. ACTION: This contribution was remanded to WG for review and action as appropriate. Correspondence to the PMT Coordinator dated December 0 regarding work plan questions (S ) was presented from TSG-C. ACTION: This contribution was remanded to WG as FYI. Correspondence to ETSI dated December 0 regarding Tag Value Reservation request in ETSI TS 0 0 (S ) was presented from TSG-C. ACTION: This contribution was remanded to as FYI. Correspondence to all TSGs dated December 0 regarding E-UTRAN to HRPD Interworking Matrix (S ) was presented from TSG-C. ACTION: This contribution was remanded to for review and action as appropriate. Correspondence to TSG-X dated December 0 regarding request for feedback on draft revision of Supplement to ITU-T Q series (S ) was presented from TSG-C as FYI for TSG-S. TR. input to response to ITU-T SG regarding Machine Oriented Communication (S ) was liaised from TSG-C as FYI for TSG-S. TSG-X: The following contributions were discussed: Correspondence dated December 0 regarding review comments (S ) was presented from TSG-X. ACTION: This contribution was remanded to WG for review and action as appropriate. Correspondence dated December 0 regarding new WI proposal (S ) was presented from TSG-X. ACTION: This contribution was remanded to WG for review and action as appropriate.
5 Page of Correspondence dated December 0 regarding Vision AdHoc (S ) was presented from TSG-X. ACTION: This contribution was remanded to the Vision AdHoc for review and action as appropriate. Correspondence to the PMT Coordinator dated December 0 regarding workplan questions (S ) was presented from TSG-X. ACTION: This contribution was remanded to WG for review and action as appropriate. TIA: No contributions or discussion. ITU: No contributions or discussion. GPP: No contributions or discussion. GPP TSG-SA and TM: No contributions or discussion. IEEE or WiFi Alliance: No contributions or discussion. OMA: No contributions or discussion. CDG: No contributions or discussion. FEMTO FORUM: No contributions or discussion. Other: No contributions or discussion.. NEW/OLD BUSINESS: No contributions or discussion.. WORKING GROUP AND ADHOC BUSINESS: REQUIREMENTS: The following contributions were discussed: S.P0-0 v0. Machine-to-Machine Communication System Requirements (S ) was presented as FYI for TSG-S. DECISION: Proposed correspondence to all TSGs regarding accelerated TSG review of S.P0-0 MM SRD (S ) was approved without objection for transmission. DECISION: S.P0-0 v0. Remote Subscription Management (RSM) SRD (S ) was approved without objection as TSG Review Text. DECISION: Proposed correspondence to all TSGs regarding TSG Review of S.P0-0 v0. Remote Subscription Management (RSM) SRD (S R) was approved without objection for transmission with S attached. Meeting Notes on MM SRD Development for January and January 0 (S ) were presented from the Chair as FYI for TSG-S. Meeting Notes on Remote Subscription Management January and January 0 (S ) were presented from the and WG Chairs as FYI for TSG-S.
6 Page of WG ARCHITECTURE AND OAM&P: No contributions or discussion. WG PMT: The following contributions were discussed: correspondences regarding TSG-S electronic approval of PMT outputs from conference call on January 0 (S ) were presented as FYI for TSG-S. The following items had been approved electronically: GPP-000 Multiple HA/LMA Support for Network PMIP for promotion to TSG Review GPP WI Tracking Sheet dated January 0 for distribution to the other TSGs and for posting to the GPP ftp site (ftp://ftp.gpp.org/tsgs/working/gpp_wi_tracking_list- CURRENT). Proposed correspondence to all TSGs regarding WI(s) for TSG Review for distribution with GPP-000 and the WI Tracking Sheet attached. WG meeting summary for interim conference call on January 0 (S ) were presented as FYI for TSG-S. WG meeting summary for interim conference call on January 0 GPP Drafting Rules DRAFT (S ) were presented as FYI for TSG-S. WG SECURITY: No contributions or discussion. GPP VISION ADHOC: correspondence dated February 0 regarding TSG Support Requested for GPP Vision AdHoc (S ) was presented from the Vision AdHoc Chair as FYI for TSG-S. This session was recessed on Monday February 0 at : PM local time. CLOSING PLENARY The meeting was reconvened on Thursday February 0 at : PM local time by TSG-S Chair, Nick Yamasaki (KDDI). Quorum was established at the opening Plenary and not challenged at this time. One () additional GPP individual member company on the active TSG-S roster was noted in attendance. Participants were also requested to make sure they have signed in on the electronic sign-in sheet. 0. WORKING GROUP REPORTS: REPORT: DID NOT MEET
7 Page of WG REPORT: The WG report (S ) was presented by WG Chair, Scott Marin (NSN), as FYI. Documents being proposed for SC level review and publication: S.R0-A v.0 Femto NAM Documents being proposed for V&V review: NONE Documents being proposed for TSG review: NONE Documents being presented for baseline text approval: NONE Other items for Plenary approval: NONE Other items for Plenary Information S.R0-A v.0 - The editor presented proposed publication text. V&V comment resolution had completed at the Dec GPP meeting. S.P0 was held pending publication of X.S00-A, which happened in late Dec 0. ACTION: The WG development schedule (S A) was remanded to WG for review and action as appropriate. DECISION: S.P00-A Femto NAM (S A/B) was approved without objection for publication as S.R0-A v.0. DECISION: The comment disposition record for S.R00-A v.0 Femto NAM (S C) was approved without objection for distribution. DECISION: Proposed correspondence to TIA TR. regarding publication of S.R00-A v.0 Femto NAM (S ) was approved without objection for transmission, pending editorial modifications by the Secretary, with S attached. WG REPORT: The WG Report (S ) was presented by WG Chair, Clif Barber (KDDI), as FYI. The PMT has generated a tentative list of critical path WIs for Release and is forwarding to all TSGs for feedback with the objective of being able to submit the st draft to the SC meeting in April 0 in Chicago. DECISION: The following WI(s) were approved without objection for SC level review as coordinated by the GPP PMT Coordinator. The WIs so approved are available from the GPP website unless indicated as a contribution number below: GPP-0000 Multimedia Services Evaluation Document Point Releases to address TIA legal comments GPP-000 Revise Minimum Performance Specifications for the future frequency assignment plan in Japan GPP-000 Adding Single Receive Antenna Fading Channel Tests for Femto Cell Base Station and AN MPS
8 Page of 0 0 DECISION: The following WI(s) were approved without objection for TSG review: NONE DECISION: The WI Tracking Sheet dated February 0 (S A) was approved without objection recommended for distribution to the other TSGs and for posting to the GPP ftp site (ftp://ftp.gpp.org/tsgs/working/gpp_wi_tracking_list-current). DECISION: GPP-000 Supplementary Services for PSVT in MMD was retired without objection since all work has either been completed or transferred to GPP as part of the Common IMS. X.S00-0 v.0 was published in May 00. DECISION: X.S00-A v.0 was approved without objection to be listed as a supplemental document for Release. DECISION: Proposed correspondence to all TSGs regarding System Release (S R) was approved without objection for distribution and remanded to all WGs for review and action as appropriate. DECISION: Proposed correspondence to all TSGs regarding GPP Drafting Rules (S R) was approved without objection for distribution with its attachment. DECISION: Updates to the GPP Title Page Template for consistency with the GPP Drafting Rules (S ) were approved without objection to be recommended for electronic approval by the GPP SC pending acceptance of all change marks by the Secretary. The PMT meeting plan for 0 was noted as follows: MONTH PMT MEETING DATE(S) February 0 February 0 at :00 PM eastern GPP Drafting Rules March 0 March 0 April 0 - April 0 Chicago, IL, USA May 0 May 0 June 0 - June 0 Guangzhou/Bangkok? July 0 July 0 August 0 - August 0 USA? September 0 0 September 0 October 0 - October 0 Fukuoka, Japan November 0 November 0 December 0 - December 0 Maui, HI, USA WG REPORT: DID NOT MEET GPP VISION ADHOC REPORT: The Vision AdHoc Report (S ) was presented by Vision AdHoc Chair, Jane Brownley (Alcatel-Lucent), as FYI. Documents being presented for publication approval: NONE Documents being presented for V&V approval: NONE Documents being presented for TSG review approval: NONE
9 Page of Other items for Plenary approval: NONE Other items for Plenary information: The AdHoc agreed that the Vision document update should be a version update (SC.R00-0 v.0) instead of a new revision. The development of the Vision document will be contribution driven and is not required to be completed in time for the 0 Workshop. The AdHoc agreed to prioritize its efforts to work on the vision related agenda item for the 0 Workshop. No actions requested from the Plenary at this time.. ADDITIONAL CORRESPONDENCE AND LIAISON REPORTS: OP: No contributions or discussions. SC: No contributions or discussions. GPP SECRETARIAT: No contributions or discussions. TSG-A: The following contributions were discussed: Correspondence dated February 0 regarding TSG-A Work Item, Stage, LS, and SC Documents for Review (S ) was presented from TSG-A. ACTION: This contribution was remanded to and WG for review and action as appropriate. Correspondence to GPP RAN dated February 0 regarding support of EUTRAN-eHRPD SON (S ) was presented from TSG-A. ACTION: This contribution was remanded to review and action as appropriate. TSG-C: No contributions or discussions. TSG-X: No contributions or discussions. TIA: No contributions or discussions. ITU: No contributions or discussions. GPP: No contributions or discussions. GPP TSG-SA and TM: No contributions or discussions. IEEE or WiFi Alliance: No contributions or discussions. OMA: No contributions or discussions. CDG: No contributions or discussions. FEMTO FORUM: No contributions or discussions. OTHER: No contributions or discussions.. NEW BUSINESS (continued): No contributions or discussions.
10 Page 0 of 0 0. OLD BUSINESS (continued): The following issues were discussed: The TSG-S Document Status Table (S R) was presented. DECISION: This contribution was approved without objection for distribution as modified by the discussion (S R) pending final comments by document Editors and WG Chairs. ACTION: All document Editors and WG Chairs must review and comment with comments to be forwarded to the Chair by COB Tuesday February 0.. ADMINISTRATION, OPEN ACTION ITEMS, AND OTHER BUSINESS: The future meeting schedule for TSG-S was noted as follows: - April 0 Hyatt Regency Chicago in Chicago, IL, USA - June 0 TBD - August 0 TSG-S will not meet face-to-face Jane Brownley (Alcatel-Lucent) gave a brief verbal summary of the TSG Chair s breakfast this week: The Meeting Planner has requested input on the number of meetings needed for 0 and any dates which should be avoided. This information was requested before the Chicago meeting. The TSG-C correspondence regarding E-UTRAN/HRPD Interworking Matrix came into the TSG-S opening plenary (S ) and was remanded to WG- for action. TSG-C (and TSG-X) would like to see a single document with all of the scenarios consolidated in one place (similar to what TSG-S did for the common IMS mapping). This information is requested from to TSG-X before the Chicago meeting but they would accept it on Tuesday AM of that week if TSG-S approval is required. Although not explicitly reviewed during the meeting, the assignments, other than document remands and action items that were completed at this meeting, are summarized as follows: NONE The Plenary was adjourned on Thursday February 0 at :0 PM local time.
11 Page of NUMBER SUBJECT SOURCE ACTION OPENING PLENARY S DOCUMENT REGISTER SECRETARY FYI 00 AGENDA CHAIR APPROVED 00 TSG-S Meeting Summary December 0 Kohala Coast, HI, USA SECRETARY APPROVED R 00 TSG-C Liaison Report December 0 Kohala Coast, HI, USA TSG-C LIAISON FYI 00 Correspondence dated December 0 regarding TSG-C review of GPP WIs TSG-C WG 00 Correspondence to the PMT Coordinator dated December 0 regarding work plan questions TSG-C WG 00 Correspondence to ETSI dated December 0 regarding Tag Value Reservation request in ETSI TS 0 0 TSG-C 00 Correspondence to all TSGs dated December 0 regarding E-UTRAN to HRPD Interworking Matrix TSG-C 00 Correspondence to TSG-X dated December 0 regarding request for feedback on draft revision of Supplement to ITU-T Q series TSG-C FYI 00 Correspondence dated December 0 regarding review comments TSG-X WG 00 Correspondence dated December 0 regarding new WI proposal TSG-X WG 0 Correspondence dated December 0 regarding Vision AdHoc TSG-X VISION ADHOC 0 Correspondence to the PMT Coordinator dated December 0 regarding workplan questions TSG-X WG 0 correspondence dated December 0 regarding SC level review of S.R00-0 v.0 Green Revised Energy Efficient Network (GREEN) Technology GPP SECRETARIAT Initiatives Study for cdma000 Wireless Networks 0 correspondence dated December 0 regarding SC level review of S.R0-0 v.0 System Requirements for Unstructured Supplementary Services GPP SECRETARIAT Data 0 correspondence dated December 0 regarding SC level review and approval of GPP-00 Self-Organizing Networks (SON) GPP SECRETARIAT WG 0 MEID Administration Report for the period ending 0 June 0 GPP SECRETARIAT 0 MEID Administration Report for the period ending July 0 GPP SECRETARIAT 0 MEID Administration Report for the period ending August 0 GPP SECRETARIAT 0 correspondence dated January 0 regarding SC 0 Workshop SC CHAIR Planning AdHoc correspondence on status update ALL WGs 00 S.P0-0 v0. Machine-to-Machine Communication System Requirements FYI 0 GPP Workplan files February 0 PMT COORDINATOR 0 correspondence to the GPP OPs dated 0 January 0 regarding MRP Status Request - CDMA Certification Forum (CCF) SC CHAIR WG ALL WGs FYI
12 Page of NUMBER SUBJECT SOURCE ACTION 0 S.P0-0 v0. Remote Subscription Management (RSM) SRD proposed TSG Review Text /WG APPROVED 0 Proposed correspondence to all TSGs regarding TSG Review of S.P0-0 v0. Remote Subscription Management (RSM) SRD /WG APPROVED 0 Meeting Notes on MM SRD Development for January and January 0 FYI 0 Meeting Notes on Remote Subscription Management January and January 0 /WG FYI 0 WITHDRAWN 0 Proposed correspondence to all TSGs regarding accelerated TSG review of S.P0-0 MM SRD APPROVED 0 correspondence dated February 0 regarding TSG Support Requested for GPP Vision AdHoc VISION ADHOC FYI 00 correspondences regarding TSG-S electronic approval of PMT outputs from conference call on January 0 WG FYI 0 WG meeting summary for interim conference call on January 0 WG FYI 0 WG meeting summary for interim conference call on January 0 GPP Drafting Rules DRAFT WG FYI 0 TR. input to response to ITU-T SG regarding Machine Oriented Communication TSG-C FYI 0 Correspondence dated February 0 regarding EUTRAN-eHRPD Interworking Matrix TSG-A CLOSING PLENARY S Report DID NOT MEET 0 WG Report WG FYI 0 WG Report WG FYI Specific Attachments APPROVED 0 WG Report WG DID NOT MEET 0 GPP Vision AdHoc Report GPP VISION ADHOC FYI 0 Correspondence dated February 0 regarding TSG-A Work Item, Stage, LS, and SC Documents for Review TSG-A, WG 0 Correspondence to GPP RAN dated February 0 regarding Support of EUTRAN-eHRPD SON TSG-A 0 Proposed correspondence to all TSGs regarding System Release WG APPROVED R ALL WGs 0 Proposed correspondence to all TSGs regarding GPP Drafting Rules WG APPROVED R 0 S.P00-A Femto NAM proposed publication text WG APPROVED
13 Page of NUMBER SUBJECT SOURCE ACTION Proposed correspondence to TIA TR. regarding publication of S.R00-A v.0 Femto NAM WG APPROVED Updates to the GPP Title Page Template for consistency with the GPP Drafting Rules WG APPROVED
14 Page of PUBLISHED TSG-S SPECIFICATIONS AND TECHNICAL REPORTS NUMBER TITLE RESP S.R000-0 GPP System Capability Guide v.0 S.R000-A GPP System Capability Guide v.0 S.R000-0 GPP Service Implementation Guide v.0 S.R000-A GPP Network Reference Model (Rev. A) v.0 WG S.R000-B GPP Network Reference Model (Rev. B) v.0 WG S.R000-0 Cellular Features Description (TIA/EIA--A Rev A) v.0 S.R000-A Wireless Feature Descriptions v.0 S.R000-0 User Selective Call Forwarding (Stage ) v. S.R000-0 Answer Hold (Stage ) v.0 S.R000-0 User Identity Module (Stage ) (PN-) v.0 UIM ID ADHOC S.R000-0 Preferred Language Enhancement (Stage ) (PN-) v.0 S.R00-0 Advice of Charge (Stage ) (PN-) v.0 S.R00-0 Rejection of Undesired Annoying Calls (Stage ) (PN-) v.0 S.R00-0 Global Emergency Call Origination (Stage ) v.0 S.R00-0 Tandem Free Operation (Stage ) v.0 S.R00-0 ISDN Interworking (Stage ) v.0 S.R00-0 Automatic Code Gapping (Stage ) v.0 S.R00-0 G Wireless Network Management System High Level Requirements WG (Stage ) v.0 S.R00-0 Prepaid Services (Stage ) (PN-) v.0 S.R00-0 Location Based System Services (LBSS) Stage v.0 S.R00-0 Multimedia Streaming Stage v.0 S.R00-0 Video Conferencing Stage v.0 S.R00-0 High Speed Data Enhancements for cdma000 x Stage - Data Only v.0 S.R00-0 WLL Stage v.0 S.R00-0 WPP Stage v.0 S.R00-0 High Speed Data Enhancements for cdma000 x Stage - Integrated Data and Voice (xev-dv) v.0 S.R00-0 Personal Mobility Stage v.0 S.S00-0 OAM&P Specification v.0 WG S.S00-0 OAM&P Specification v.0 WG S.S00-0 OAM&P Specification v.0 WG S.S00-A OAM&P Specification v.0 WG S.S00-xxx-B OAM&P Specification v.0 parts 000 through 00 WG S.S00-xxx-C OAM&P Specification v.0 parts 000 through 00 WG S.S00-xxx-D OAM&P Specification v.0 parts 000 through 00 WG S.S00-E OAM&P Specification v.0 WG S.R00-0 Access control based on call type Stage v.0 S.R000-0 Broadcast Multicast Services Stage v.0 S.R000-A Broadcast Multicast Services Stage v.0 S.R00-0 ESA and ESP Stage v.0 S.R00-0 Realm Configured Packet Data Session Dormancy Timer Stage v.0 S.R00-0 UIM ID Assignment Guidelines v.0 NUMBERING ADHOC S.R00-0 RESCINDED: Superseded by S.R00-0 S.R00-0 GPP NAM v.0 WG
15 Page of PUBLISHED TSG-S SPECIFICATIONS AND TECHNICAL REPORTS NUMBER TITLE RESP S.P00-A GPP NAM v.0 WG S.R00-B GPP NAM v.0 WG S.R00-0 GPP Evolution Document v.0 WG S.R00-0 RESCINDED July 00 S.R00-0 RESCINDED July 00 S.R00-0 RESCINDED July 00 S.R00-0 MEID Stage v.0 NUM ADHOC S.R00-A MEID Stage v.0 NUM ADHOC S.R000-0 RESCINDED July 00 S.R00-0 EMS Stage v.0 S.R00-0 GPP System Release Guide v.0 WG S.S00-0 Common Cryptographic Algorithms v.0 WG S.S00-0 Interface Specification for Common Cryptographic Algorithms v.0 WG S.S00-0 Enhanced Cryptographic Algorithms v.0 WG S.S00-A Enhanced Cryptographic Algorithms v.0 WG S.R00-0 IP Based Service Architecture System Requirements v.0 S.R00-0 IP Multimedia Domain System Requirements v.0 S.R00-0 Legacy MS Domain Step- v.0 S.R000-0 Removable User Identity Module (R-UIM) Mobile Equipment (ME) UIM ID ADHOC Interface Testing v.0 S.R00-0 Immediate Messaging v.0 S.R00-0 Presence Service v.0 S.R00-0 Multimedia Messaging Stage v.0 S.P00-0 RESCINDED S.R00-A Multimedia Messaging Stage v.0 S.R00-0 Fast Call Setup Stage v.0 S.R00-0 IP Based Location Services Stage v.0 S.R00-0 Enhanced Call Recovery Stage v.0 S.R00-0 LLA_ROHC Stage v.0 S.R00-0 Header Stripping and Generation Stage v.0 S.R000-0 GPP Process Guidelines v.0 S.R000-A PUBLISHED AS SC.R00-0 WG S.R00-0 Legacy System Packet Data Surveillance Requirements v.0 WG S.R00-0 IP System Packet Data Surveillance Requirements v.0 WG S.R00-0 Internet Over-the-Air Handset Configuration Management v.0 S.R00-0 Multimedia File Format Stage v.0 S.R00-0 Accounting and Auditing Stage v.0 S.R00-0 GPP Vision Document - PUBLISHED AS SC.R00-0 VISION ADHOC S.S00-0 Common Security Algorithms v.0 WG S.S00-A Common Security Algorithms v.0 WG S.R00-0 End-to-End QoS Stage v.0 S.R00-A End-to-End QoS v.0 S.P00-B Common Security Algorithms V.0 WG S.R000-0 Wide Band Speech Codec for CDMA 000 Systems Stage v.0 S.R00-0 Enhanced Packet Data Air Interface Security Stage v.0 WG S.R00-0 Broadcast-Multicast Service Security Framework v.0 WG S.S00-0 Broadcast-Multicast Service Security Framework v.0 WG S.R00-0 Packet PrePaid Services Stage v.0
16 Page of PUBLISHED TSG-S SPECIFICATIONS AND TECHNICAL REPORTS NUMBER TITLE RESP S.P00-0 GPP Equipment Numbering JEM Report and Conclusions - WITHDRAWN TO BE INCLUDED AS AN ANNEX IN S.R00 MEID STAGE S.S00-0 GPP IMS Security Framework v.0 WG S.S00-A GPP IMS Security Framework v.0 WG S.S00-D OAM&P for cdma000 v.0 WG S.S00-B GPP IMS Security Framework v.0 WG S.R00-0 WLAN - cdma000 Interworking v.0 S.R00-A WLAN - cdma000 Interworking v.0 S.R00-0 PUBLISHED AS SC.R00-0 NUM ADHOC S.R00-0 PUBLISHED AS SC.R00-0 NUM ADHOC S.R000-0 Network Initiated Data Sessions (NIDS) v.0 S.P00-0 WITHDRAWN S.R00-0 LMSD Step Stage v.0 S.S00-0 cdma000 Network Performance Measurement Types v.0 WG S.R00-0 Rm Interface Enhancements v.0 S.R00-0 Support for ISIM on UICC v.0 S.R00-0 TrFO v.0 S.R00-0 PUBLISHED AS SC.R00-0 WG S.P00-0 RESCINDED - //0 - Functionality included in X.P00 S.R00-0 PUBLISHED AS SC.R00-0 WG S.R000-0 System Requirements for PoC v.0 S.R00-0 IOTA DM Stage v.0 S.R00-0 PUBLISHED AS SC.P00-0 WG S.R00-0 Network Firewall Configuration and Control Stage v.0 S.R00-0 HAT Authentication System Requirements v.0 S.R00-0 Hotlining System Requirements v.0 S.R00-0 Packet Switched Video Telephony (PSVT) Stage v.0 S.P00-0 RESCINDED - /0/0 - Unsponsored WI S.R00-0 HRPD-cdma000 x Interworking System Requirements v.0 S.S00-0 General Bootstrapping Architecture (GBA) Stage / specification WG v.0 S.S00-A General Bootstrapping Architecture (GBA) Stage / specification v.0 WG S.S00-0 Location Services Security Framework Report v.0 WG S.R0-0 Expanded R-UIM Identifier Stage v.0 S.R0-0 General Bootstrapping Architecture (GBA) Stage Requirements v.0 S.R0-0 Enhanced cdma000 SRD v.0 S.S0-0 Security Mechanisms Using GBA v.0 WG S.S0-A Security Mechanisms Using GBA v.0 WG S.R0-0 All-IP Emergency Call Support v.0 S.P0-0 PPP-Free Operation Stage CANCELLED July 00 S.R0-0 Multimedia Priority Services Stage v.0 S.R0-A Multimedia Priority Services Stage v.0 S.R0-0 Telephone Number Mapping (ENUM) Stage v.0
17 Page of PUBLISHED TSG-S SPECIFICATIONS AND TECHNICAL REPORTS NUMBER TITLE RESP S.R0-0 GPP Evolved Network SRD v.0 S.P0-0 Proximity Mobile Gateway Stage RESCINDED S.R0-0 Preferred Cryptographic Profiles v.0 WG S.R00-0 MMD Policy Enhancements SRD S.R0-0 Enhanced MMD Security Requirements Stage, WG S.R0-0 UMB NAM v.0 WG S.R0-0 VoIP Supplementary Services Feature Descriptions S.R0-0 System Enhancements for Femto and Pico Cells SRD v.0 S.S0-0 CAVE based IMS Security v.0 WG S.R0-0 HRPD and WiMAX Inter-Technology Handoff Stage Requirements S.R0-0 HRPD/XRTT and GPP E-UTRAN (LTE) Interworking and Inter- Technology Handoff Stage Requirements S.R0-A HRPD/XRTT and GPP E-UTRAN (LTE) Interworking and Inter- Technology Handoff Stage Requirements S.R00-0 Interworking and Inter-Technology Handoff for UMB and UTRA/E- UTRA Technologies Stage v.0 S.R0-0 IMS centralized Services Stage v.0 S.S0-0 Femtocell Security Framework v.0 WG S.P0-0 Call Localization Management Stage - RESCINDED S.R0-0 Evolution of Ultra Mobile Broadband SRD v.0 S.R0-0 Network Architecture Model for cdma000 Femto-Cell Enabled Systems v.0 WG S.R0-A Network Architecture Model for cdma000 Femto-Cell Enabled Systems v.0 WG S.R0-0 System Requirements for MSC Pool v.0 S.R0-0 Common IMS Impact to GPP Specifications WG S.R0-0 ehrpd Security Framework v.0 WG S.R0-0 Femto Systems Overview S.R00-0 Study for Green Revised Energy Efficient Network (GREEN) Technology Initiatives for cdma000 Wireless Networks v.0 S.R0-0 Study for Machine-to-Machine (MM) Communication for cdma000 Wireless Networks v.0 S.R0-0 Call-Back to an Emergency Call Origination (CECO) Stage Requirements v.0 S.R0-0 System Requirements for Extended Cell HRPD (xhrpd) v.0 S.R0-0 x Calling Party Number Presentation (CPNP) during CSFB and ecsfb Stage v.0 S.S0-0 Advanced Security Framework for (e)hrpd v.0 WG S.R0-0 System Requirements for Unstructured Supplementary Services Data v.0
18 Page of TSG-S PROJECTS IN DEVELOPMENT NUMBER TITLE RESP S.S00-E OAM&P Specification WG S.P00-0 Protocol Alignment Reference WG S.R0-0 Machine-to-Machine (MM) Communication System Requirements Document S.R0-0 Dynamic RAN Power Management Stage Requirements S.R0-0 Remote Provisioning of MS Credentials Stage Requirements S.R00-0 Self-Organizing Networks (SON) System Requirements Document
19 Page of
APPROVED SUMMARY OF TSG-S MEETING for September 2006 in Xi an, China
TSG-S Meeting Summary - - September 00 GPP-S00-0000-00 Page of Title: Source: Clifton J. Barber TSG-S SECRETARY SUMMARY OF TSG-S MEETING for - September 00 in Xi an, China 9 0 9 0 9 0 Representing KDDI
More informationAPPROVED SUMMARY OF TSG-S MEETING for February 2006 in Jeju, Korea
Page of Title: Source: Clifton J. Barber SECRETARY SUMMARY OF TSG-S MEETING for 0- February 00 in Jeju, Korea 0 0 0 Representing KDDI CJ Barber Consulting Services 0 Saint Andrews Court Jonesboro, GA 0
More informationTSG-X Plenary Meeting Report July 25 July 29, 2011 Ottawa, Canada
TSG-X Plenary Meeting Report July 25 July 29, 2011 Ottawa, Canada Chair: Vice-Chairs: Secretary: Meeting Location: Marvin Bienn, Tel: +1-972-583-2752, email: marvin.bienn@ericsson.com, Rajesh Bhalla, Tel:
More informationGuilin, China September 9, GPP2 TSG-SX. Meeting Summary #2 Miami, Florida
DATE: June 3, 2013 3GPP2 TSG-SX Meeting Summary #2 Miami, Florida LOCATION: CHAIR: VICE CHAIR: SECRETARY: Miami, Florida Dr. Xiaowu (Frankle) Zhao, ZTE Yuezhen Wang, China Telecom Mike Dolan, Alcatel-Lucent
More informationTSG-S Meeting Summary: July Seoul, Korea Page 1. APPROVED SUMMARY OF TSG-S MEETING for the period of July 2001 in Seoul, Korea.
TSG-S Meeting Summary: - July 00 - Seoul, Korea GPP-S00-0000-00 R Page Title: APPROVED SUMMARY OF TSG-S MEETING for the period of - July 00 in Seoul, Korea. 0 Source: Clifton J. Barber SECRETARY Tantivy
More informationMiami, Florida June 3, GPP2 TSG-SX. Meeting Summary #1 Busan, Korea
Meeting Summary #1 Busan, Korea DATE: March 11, 2013 LOCATION: Busan, Korea CHAIR: Dr. Xiaowu (Frankle) Zhao, ZTE VICE CHAIR: Yuezhen Wang, China Telecom Mike Dolan, Alcatel-Lucent SECRETARY: Eileen McGrath
More information3GPP2 TSG-A: Access Network Interfaces TSG (TSG-A) #112 Meeting Summary Orlando, FL USA
3GPP2 TSG-A: Access Network Interfaces TSG (TSG-A) #112 Summary Orlando, FL USA DATE: July 21-24, 2008 LOCATION: PRESIDING: Ritz-Carlton Orlando Grande Lakes 4012 Central Florida Parkway Orlando, FL 32837
More informationTitle: Source: Abstract: Recommendation: Notice: Page 1. APPROVED SUMMARY OF 3GPP2 TSG-C MEETINGS for 5 October 2004 Interim Plenary Conference Call
Page Title: APPROVED SUMMARY OF GPP TSG-C MEETINGS for October 00 Interim Plenary Conference Call 0 0 0 Source: Clifton J. Barber SECRETARY Representing KDDI CJ Barber Consulting Services 0 Saint Andrews
More information3GPP2 TSG-A: Access Network Interfaces TSG (TSG-A) #128 Meeting Summary Wailea, HI
3GPP2 TSG-A: Access Network Interfaces TSG (TSG-A) #128 Summary Wailea, HI DATE: December 7-10, 2009 LOCATION: PRESIDING: Grand Wailea Hotel 3850 Wailea Alanui Drive Wailea, HI 96753 Dr. Xiaowu (Frankle)
More information3GPP2 SC PMT TITLE: Summary Report for the PMT Meeting October 13, 2014 SOURCE: Doug Dunn Kyocera Chair, PMT
PMT-20141202-004 3GPP2 SC PMT TITLE: Summary Report for the PMT Meeting October 13, 2014 SOURCE: Doug Dunn Kyocera Chair, PMT pmt_chair@3gpp2.org ABSTRACT: This report summarizes the PMT meeting sessions.
More informationSystem Release Guide for the (R4) Release of the cdma2000 System Specifications
3GPP2 SC.R2004-002-0 Version 1.0 Version Date: 25 October 2006 System Release Guide for the (R4) Release of the cdma2000 System Specifications Copyright Notice 3GPP2 and its Organizational Partners claim
More informationAPPROVED SUMMARY OF TSG-C MEETING for 05 April 2007 Interim Plenary Conference Call
TSG-C Meeting Summary 05 April 2007 C00-2007054-042R Page of 6 Title: 2 3 4 Source: APPROVED SUMMARY OF TSG-C MEETING for 05 April 2007 Interim Plenary Conference Call 5 6 7 8 9 0 2 3 4 5 6 7 8 9 20 2
More information3GPP2 TSG-A: Access Network Interfaces TSG (TSG-A) #109 Meeting Summary Montreal, Quebec CANADA
3GPP2 TSG-A: Access Network Interfaces TSG (TSG-A) #109 Meeting Summary Montreal, Quebec CANADA DATE: March 31 April 3, 2008 LOCATION: PRESIDING: Delta Centre-Ville Hotel 777 University Street Montreal,
More information3GPP2 TSG-A: Access Network Interfaces Meeting Summary #137 Seattle, Washington
DATE: January 24, 2011 LOCATION: PRESIDING: OPENING PLENARY 3GPP2 TSG-A: Access Network Interfaces Meeting Summary #137 Seattle, Washington Seattle, Washington 1. TSG-A Opening Remarks by TSG-A Chair Dr.
More information3GPP2 TSG-A: Access Network Interfaces TSG (TSG-A) #106 Meeting Summary Kauai, HI USA
3GPP2 TSG-A: Access Network Interfaces TSG (TSG-A) #106 Meeting Summary Kauai, HI USA DATE: December 3-6, 2007 LOCATION: PRESIDING: Grand Hyatt Kauai 1571 Poipu Road Koloa, Kauai, HI 96756 USA Wasuke Sato,
More information3GPP2 TSG-A: Access Network Interfaces TSG (TSG-A) #79 Meeting Summary Beijing, China
3GPP2 TSG-A: Access Network Interfaces TSG (TSG-A) #79 Meeting Summary Beijing, China DATE: October 24, 2005 PLACE: PRESIDING: Beijing Friendship Hotel 1 Zhongguancun Nandajie Haidian District Beijing,
More information3GPP2 TSG-A: Access Network Interfaces TSG (TSG-A) #117 Meeting Summary Maui, HI
3GPP2 TSG-A: Access Network Interfaces TSG (TSG-A) #117 Meeting Summary Maui, HI DATE: December 1-5, 2008 LOCATION: PRESIDING: Grand Wailea Hotel 3850 Wailea Alanui Dr. Wailea, HI 96753 USA George Turnipseed,
More informationSystem Release 4 Standardized Services and Features
3GPP2 SC.R2004-003-0 Version 1.0 Date: August 20, 2009 System Release 4 Standardized Services and Features 2009 3GPP2 3GPP2 and its Organizational Partners claim copyright in this document and individual
More information3GPP2 Access Network Interfaces TSG (TSG-A) #69 Meeting Summary
0 0 GPP Access Network Interfaces TSG (TSG-A) # Meeting Summary DATE: December, 00 PLACE: PRESIDING: PRESENT: Hyatt Regency Kauai Poipu Road Koloa, Hawaii USA George Turnipseed, Sprint Roger Edwards GPP
More information3GPP2 From Geneva to San Francisco. Dr. Hideo Okinaka KDDI Corporation Chair, 3GPP2 Steering Committee
3GPP2 From Geneva to San Francisco Dr. Hideo Okinaka KDDI Corporation Chair, 3GPP2 Steering Committee okinaka@kddi.com 2nd Informal Forum Summit 24-25 July 2003 Presentation Overview What is 3GPP2? 3GPP2
More informationJuly 2004 TSG-X Meeting Summary
X00-000-00 TITLE: July 00 TSG-X Meeting Summary DATE: August, 00 SOURCE: Terry Jacobson (TSG-X Secretary) Lucent Technologies Naperville, IL 0 Phone: -0-- FAX: -0-- email: terryjacobson@lucent.com Lucent
More information3GPP2 Overview. Dr. Youn Kwan Kim Chair, 3GPP2 Steering Committee LG Telecom
3GPP2 Overview Dr. Youn Kwan Kim Chair, 3GPP2 Steering Committee LG Telecom ykkim@lgtel.co.kr cdma2000 India Workshop New Delhi, India 23 February 2005 Presentation Overview 3GPP2 is 3GPP2 Organization
More information3GPP2 Access Network Interfaces TSG (TSG-A) #39 Draft Meeting minutes
1 1 1 1 1 1 1 GPP Access Network Interfaces Technical Specification Group GPP Access Network Interfaces TSG (TSG-A) # Draft Meeting minutes DATE: May 1-1, 00 PLACE: PRESIDING: PRESENT: The Sutton Place
More information3GPP2 Access Network Interfaces TSG (TSG-A) #24 Draft Meeting minutes
1 1 GPP Access Network Interfaces Technical Specification Group March 1, 001 GPP-A00-001r-00 GPP Access Network Interfaces TSG (TSG-A) # Draft Meeting minutes DATE: Monday - Friday, February 1 1, 001 PLACE:
More informationAPPROVED SUMMARY OF 3GPP2 TSG-C MEETING for 28 December 2001 conference call.
GPP-C00-00007-00R Page Title: APPROVED SUMMARY OF GPP TSG-C MEETING for 8 December 00 conference call. 7 8 9 0 7 8 9 0 7 Source: Clifton J. Barber SECRETARY Tantivy Communications 0 S. Babcock Street Melbourne,
More information3GPP2 Access Network Interfaces TSG (TSG-A) #30 Draft Meeting minutes
0 GPP Access Network Interfaces Technical Specification Group October 0, 00 GPP-A00-0000-00 GPP Access Network Interfaces TSG (TSG-A) #0 Draft Meeting minutes DATE: Monday Friday; August -, 00 PLACE: PRESIDING:
More informationcdma2000 Technology Initiative
cdma2000 Technology Initiative Dr. Eshwar Pittampalli Lucent Technologies pittampalli@lucent.com cdma2000 India Wkshop New Delhi, India 23 February 2005 Outline 3GPP2 TSG-C Organization Structure Air Interface
More informationIMT-2000 MC-CDMA System
IMT-2000 MC-CDMA System 1 Standard : ARIB STD-T64 IMT-2000 MC-CDMA System 2 Technical Report : ARIB TR-T13 IMT-2000 MC-CDMA System Published by Association of Radio Industries and Businesses (ARIB) 1-4-1
More information3GPP2 Access Network Interfaces TSG (TSG-A) #25 Draft Meeting minutes
1 1 GPP Access Network Interfaces Technical Specification Group April, 001 GPP-A00-000-00 GPP Access Network Interfaces TSG (TSG-A) Draft Meeting minutes DATE: Monday - Friday, March 1 1, 001 PLACE: PRESIDING:
More informationIMT-2000 MC-CDMA System
IMT-2000 MC-CDMA System 1 Standard : ARIB STD-T64 IMT-2000 MC-CDMA System 2 Technical Report : ARIB TR-T13 IMT-2000 MC-CDMA System Published by Association of Radio Industries and Businesses (ARIB) 1-4-1
More informationMar 3,2005 THE TELECOMMUNICATION TECHNOLOGY COMMITTEE
TS-GB-S.R00-0v.0 HRPD Network Access Authentication for a Hybrid Access Terminal (HAT) with an R-UIM Used to Access Spread Spectrum Systems - System Requirements Mar,00 THE TELECOMMUNICATION TECHNOLOGY
More informationTranscoder Free Operation
GPP S.R00-0 Version.0 Version Date: March 00 0 Transcoder Free Operation 0 Stage Requirements COPYRIGHT NOTICE GPP and its Organizational Partners claim copyright in this document and individual Organizational
More informationESN Migration to MEID - Milestones & Timeline
Introduction: The following table is a working document maintained by the TR-45 ESN/UIM/MEID Ad Hoc Group ESN Migration to MEID - Milestones & Timeline Line Target Milestone / Action Notes Status Fora
More informationSCOPE OF ACCREDITATION TO ISO/IEC 17025:2005
SCOPE OF ACCREDITATION TO ISO/IEC 17025:2005 SGS NORTH AMERICA, INC. 15150 Avenue of Science, Suite 300 1 San Diego, CA 92128 Nathan Gieselman Phone: 858 592 7100 ELECTRICAL Valid To: July 31, 2018 Certificate
More informationStatus of IMS-Based Next Generation Networks for Fixed Mobile Convergence
Status of IMS-Based Next Generation Networks for Fixed Mobile Convergence Prepared for: WOCC 2007 Fuchun Joseph Lin Chief Scientist fjlin@research.telcordia.com Telcordia Technologies, Inc. April 28, 2007
More informationcdma2000 Femtocell Network: Overview
GPP X.S00-000-A Version.0 Date: December cdma00 Femtocell Network: Overview COPYRIGHT GPP and its Organizational Partners claim copyright in this document and individual Organizational Partners may copyright
More informationSummary of cdma2000 Technology Workshop 14 June 2012 Guangzhou, China
Summary of cdma2000 Technology Workshop 14 June 2012 Guangzhou, China Mr. David Crowe Chair, SC 2012 Workshop Planning AdHoc workshop chair@3gpp2.org Background As chartered by the 3GPP2 SC, the SC 2012
More informationNetworking Perspectives
TR45.2/2001.1.19- Draft Liaison Report to IFAST Meeting #15 Cellular Networking Perspectives Cellular Networking Perspectives Ltd. 2636 Toronto Cresc. NW Calgary, AB T2N 3W1 Canada Phone: +1-403-289-6609
More informationMulti-RAT Heterogeneous Networks. Presenter: S. Vasudevan, Technical Manager, Advanced Technology Standards
Multi-RAT Heterogeneous Networks Presenter: S. Vasudevan, Technical Manager, Advanced Technology Standards What are Multi-RAT Heterogeneous Networks Integrated Networks supporting a range of cell sizes
More informationLiaison Report to IFAST Meeting #22. Cellular. Networking. Perspectives
IFAST#22/2003.8.26- Liaison Report to IFAST Meeting #22 Cellular Networking Perspectives Cellular Networking Perspectives Ltd. 2636 Toronto Cresc. NW Calgary, AB T2N 3W1 Canada Phone: +1-403-289-6609 E-Mail:
More informationTest Plan for CDMA Mobile Stations
Test Plan for CDMA Mobile Stations April 2009 Revision 5.4.1 CTIA Certification Program Interested parties may obtain permission to reproduce a limited number of copies by contacting CTIA at: CTIA Certification
More informationETSI TS V9.0.0 ( ) Technical Specification
TS 129 277 V9.0.0 (2010-04) Technical Specification Universal Mobile Telecommunications System (UMTS); LTE; Optimized Handover Procedures and Protocols between EUTRAN Access and 1xRTT Access (3GPP TS 29.277
More informationApproved by General Counsel. TR-41.3 Meeting Report Date(s): 11/20/ /20/2014 Location: Tuscon, AZ Approved: 12/05/2014
Approved by General Counsel TR-41.3 Meeting Report Date(s): 11/20/2014-11/20/2014 Location: Tuscon, AZ Approved: 12/05/2014 TIA SUBCOMMITTEE MEETING REPORT TR-41.3 Analog and Digital Wireline Telephones
More informationDRAFT SUMMARY OF 3GPP2 TSG-C MEETINGS for 8-12 July 2002 in San Diego, CA (USA)
GPP-C00-0000-00 Page Title: Source: Phil Brown DRAFT SUMMARY OF GPP TSG-C MEETINGS for - July 00 in San Diego, CA (USA) 0 0 0 SECRETARY (acting) Ericsson Wireless Communications Lusk Blvd. San Diego, CA
More informationTest Plan for CDMA Mobile Stations
Test Plan for CDMA Mobile Stations September 2009 Revision 5.5 CTIA Certification Program Interested parties may obtain permission to reproduce a limited number of copies by contacting CTIA at: CTIA Certification
More informationETSI TS V (201
TS 132 441 V13.0.1 (201 17-01) TECHNICAL SPECIFICATION Digital cellular telecommunications system (Phase 2+) (GSM); Universal Mobile Telecommunications System (UMTS); LTE; Telecommunication management;
More information3GPP TS V9.5.0 ( )
Technical Specification 3rd Generation Partnership Project; Technical Specification Group Core Network and Terminals; Evolved Packet System (EPS); Optimized Handover Procedures and Protocols between E-UTRAN
More informationETSI TS V9.3.0 ( ) Technical Specification
TS 124 302 V9.3.0 (2010-06) Technical Specification Universal Mobile Telecommunications System (UMTS); LTE; Access to the 3GPP Evolved Packet Core (EPC) via non-3gpp access networks; Stage 3 (3GPP TS 24.302
More informationOn the road with 3GPP. 3GPP s Long Term Evolution and System Architecture Evolution projects
On the road with 3GPP 3GPP s Long Term Evolution and System Architecture Evolution projects 1 3GPP Evolution LTE AND SAE Francois COURAU TSG RAN Chairman 2 What 3GPP is A collaborative agreement between
More informationDraft Liaison Report to IFAST Meeting #16
TR45.2/2001.5.11- Draft Liaison Report to IFAST Meeting #16 Cellular Networking Perspectives Ltd. 2636 Toronto Cresc. NW Calgary, AB T2N 3W1 Canada Phone: +1-403-289-6609 Fax: +1-403-289-6658 E-Mail: David.Crowe@cnp-wireless.com
More informationCDMA International Roaming
CDMA International Roaming IRT Overview CDG Roaming Webinar, September 2, 2010 Federico Nienstadt fnienstadt@cdg.org CDG International Roaming Team (IRT) Formally created in 2003 Mission: Provide an industry
More informationEditor: David Crowe Phone Vol. 10, No. 1 January, The Development of cdma2000 Standards
Cellular Networking Perspectives Editor: David Crowe Phone +1-403-289-6609 Email crowed@cnp-wireless.com Vol. 10, No. 1 January, 2001 In This Issue... The Development of cdma2000 Standards...p. 1 Understanding
More informationExample. Section: PS 709 Examples of Calculations of Reduced Hours of Work Last Revised: February 2017 Last Reviewed: February 2017 Next Review:
Following are three examples of calculations for MCP employees (undefined hours of work) and three examples for MCP office employees. Examples use the data from the table below. For your calculations use
More informationETSI TS V8.6.0 ( ) Technical Specification
Technical Specification Universal Mobile Telecommunications System (UMTS); LTE; 3GPP Evolved Packet System (EPS); Optimized handover procedures and protocols between E-UTRAN access and cdma2000 HRPD Access;
More informationPartnership. Organizational Partners (SDOs) Market Representative Partners. Regional standards organizations:
3GPP 3GPP 2017 1 Partnership Organizational Partners (SDOs) Regional standards organizations: ARIB (Japan), ATIS (USA), CCSA (China), ETSI (Europe), TTA (Korea), TTC (Japan), TSDSI (India) Market Representative
More informationETSI TS V9.2.0 ( ) Technical Specification
Technical Specification Universal Mobile Telecommunications System (UMTS); LTE; Optimized Handover Procedures and Protocols between EUTRAN Access and cdma2000 HRPD Access () 1 Reference RTS/TSGC-0429276v920
More informationProposed Draft Report: IEEE 802 EC 5G/IMT-2020 SC
Proposed Draft Report: IEEE 802 EC 5G/IMT-2020 SC Document Number: IEEE 802-EC-16-0094-01-5GSG Date Submitted: Source: Roger Marks Voice: +1 802 capable EthAirNet Associates* E-mail: r.b.marks@ieee.org
More informationIEEE Working Group Opening Plenary 9 th July 2018
IEEE 802.3 Working Group Opening Plenary 9 th July 2018 David Law Chair, IEEE 802.3 Working Group dlaw@hpe.com Agenda, voter lists: http://www.ieee802.org/3/minutes/jul18/index.html IEEE 802.3 Working
More informationLiaison Report to IFAST Meeting #18
TR45.2/2002.1.11-3GPP2 TSG-N/2002.1.11- IFAST18/02.01.22.14 Liaison Report to IFAST Meeting #18 Cellular Networking Perspectives Ltd. 2636 Toronto Cresc. NW Calgary, AB T2N 3W1 Canada Phone: +1-403-289-6609
More informationSIGNALING CONFORMANCE TEST SPECIFICATION FOR INTERWORKING OF CDMA2000 1X AND HIGH RATE PACKET DATA SYSTEMS REVISION A
C.S00-A Version 0. June 00 SIGNALING CONFORMANCE TEST SPECIFICATION FOR INTERWORKING OF CDMA000 X AND HIGH RATE PACKET DATA SYSTEMS REVISION A 00 GPP GPP and its Organizational Partners claim copyright
More informationThe jungle of standards what is in the wild?
The jungle of standards what is in the wild? Torsten Soltmann Siemens Moscow What is the talk about? mobile and wireless services 3 G UMTS-TDD P-t-MP MSC GSM WLL UMTS 802.20 Release 99 EDGE WiFi W-CDMA
More informationJP-3GA (R99) Unstructured Supplementary Service Data (USSD); Stage 1
JP-3GA-22.090(R99) Unstructured Supplementary Service Data (USSD); Stage 1 Version 2 Nov 30, 2000 THE TELECOMMUNICATION TECHNOLOGY COMMITTEE JP-3GA-22.090(R99) Unstructured Supplementary Service Data Unit
More information3GPP TS V ( )
3GPP TS 24.379 V13.1.1 (2016-06) Technical Specification 3rd Generation Partnership Project; Technical Specification Group Core Networks and Terminals; Mission Critical Push To Talk (MCPTT) call control;
More informationETSI TC INT IMS Network Testing Group. Giulio Maggiore TC INT Chair
ETSI TC INT IMS Network Testing Group Giulio Maggiore TC INT Chair Summary Rationale IMS Interoperability Landscape 3 ETSI IMS Interoperability Event Preparation Backup slides with more innformation on:
More informationTISPAN. Defining the Next Generation Network
World Class Standards TISPAN Defining the Next Generation Network Chairman TISPAN, Rainer Münch R.Muench@alcatel-lucent.de TISPAN Workshop Beijing May 2008 World Class Standards Presentation Roadmap 1.
More informationIEEE Future Meetings
IEEE 802.3 Future Meetings Steve Carlson, Executive Secretary High Speed Design scarlson@ieee.org 1 Meetings Demystified 802.3 is growing We re now the largest 802 WG 802 has two types of meetings Plenary
More informationAll-IP System MMD Roaming Technical Report
GPP X.R00-0 Version.0 Version Date: August 00 All-IP System MMD Roaming Technical Report COPYRIGHT NOTICE GPP and its Organizational Partners claim copyright in this document and individual Organizational
More informationGrid Code Planner EU Code Modifications GC0100/101/102/104
Grid Code Planner EU Code Modifications GC0100/101/102/104 Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a
More informationAll-IP Core Network Multimedia Domain
1 2 3 3GPP2 X.S0013-000-0 Version 1.0 Version Date: December, 2003 4 5 6 7 8 9 10 All-IP Core Multimedia Domain Overview 11 12 13 14 15 16 17 18 19 20 21 COPYRIGHT NOTICE 3GPP2 and its Organizational Partners
More informationCDG Technology Forum Inter-Technology Networking
CDG Technology Forum Inter-Technology Networking The Impact of 4G on the Packet Core Network April 30, 2008 Gennady Sirota Vice President, Product Management Safe Harbor Statement This presentation contains
More informationETSI TS V ( )
Technical Specification LTE; Evolved Universal Terrestrial Radio Access Network (E-UTRAN); General aspects and principles for interfaces supporting Multimedia Broadcast Multicast Service (MBMS) within
More informationCITEL s s Focus on Cybersecurity and Critical Infrastructure Protection CITEL
CITEL s s Focus on Cybersecurity and Critical Infrastructure Protection Wayne Zeuch CITEL (Alcatel-Lucent) ITU Regional Workshop on Frameworks for Cybersecurity and CIIP Buenos Aires, Argentina October
More informationConvergence WLAN/CDMA Architecture. CDG Technology Forum October 7, 2005
Convergence WLAN/CDMA Architecture CDG Technology Forum October 7, 2005 Outline Introduction and Network Architecture Key elements to enable WLAN/CDMA services Access control Mobility management Summary
More information3GPP TS V6.4.0 ( )
TS 22.234 V6.4.0 (2006-06) Technical Specification 3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Requirements on system to Wireless Local Area Network (WLAN)
More informationETSI TS V ( )
TS 128 403 V14.0.0 (2017-04) TECHNICAL SPECIFICATION Universal Mobile Telecommunications System (UMTS); LTE; Telecommunication management; Performance Management (PM); Performance measurements for Wireless
More informationPush to Talk on Rev. A: Setting the New Standard
Push to Talk on Rev. A: Setting the New Standard by Dan Esposito Clarity Communication Systems, Inc. for the CDG Technology Forum on Unique Applications Enabled by CDMA2000 1xEV-DO Rev. A Thursday, November
More informationETSI TS V ( )
TS 132 130 V12.0.0 (2015-01) TECHNICAL SPECIFICATION Universal Mobile Telecommunications System (UMTS); LTE; Network sharing; Concepts and requirements (3GPP TS 32.130 version 12.0.0 Release 12) 1 TS 132
More informationFixed Mobile Convergence
Fixed Mobile Convergence Daniel McHugh Solutions Manager dmchugh2@alcatel-lucent.com www.alcatel-lucent.com Fixed Mobile Convergence Fixed Mobile Convergence (FMC) provides common and seamless services
More informationETSI documents published or circulated for vote/comment in January 2019
ETSI documents published or circulated for vote/comment in January 2019 ETSI documents issued under AP20190409. Comments should be sent to the named contact by 10/03/2019 ETSI identifier Title Committee
More informationMeeting Notes Project Modifications to CIP Standards Drafting Team June 28-30, 2016
Meeting Notes Project 2016-02 Modifications to CIP Standards Drafting Team June 28-30, 2016 Exelon Chicago, IL Administrative 1. Introductions / Chair s Remarks The meeting was brought to order by S. Crutchfield
More informationETSI TS V3.3.1 ( )
Technical Specification Digital cellular telecommunications system (Phase 2+) (GSM); Universal Mobile Telecommunications System (UMTS); Operator Determined Barring (ODB) () GLOBAL SYSTEM FOR MOBILE COMMUNICATIONS
More informationWireless Communication
Wireless Communication Hwajung Lee Key Reference: Prof. Jong-Moon Chung s Lecture Notes at Yonsei University Wireless Communications Bluetooth Wi-Fi Mobile Communications LTE LTE-Advanced Mobile Communications
More information3GPP TS V8.7.0 ( )
TS 23.237 V8.7.0 (2010-03) Technical Specification 3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; IP Multimedia Subsystem (IMS) Service Continuity; Stage
More informationFrom: Jean Johnson Sent: Wednesday, July 12, :06 PM To: Jean Johnson Subject: FW: Draft CEA-2013 (STB Energy Consumption) - IP statement/thomson
Page 1 of 5 From: Jean Johnson Sent: Wednesday, July 12, 2006 7:06 PM To: Jean Johnson Subject: FW: Draft CEA-2013 (STB Energy Consumption) - IP statement/thomson Jean From: Sipher Tom [mailto:tom.sipher@thomson.net]
More informationFT ETSI STANDARDS FOR PUBLIC COMMENT
FT ETSI STANDARDS FOR PUBLIC COMMENT The following ETSI documents are issued under the Public Enquiry PE20081017. Comments are welcome and should be addressed to the named contact to arrive by 12 September
More information4G, LTE and the Road to 5G
4G, LTE and the Road to 5G Part III Dr Stefan Parkvall Principal Researcher Ericson Research data1 data2 data3 data4 Recap Fundamental principle adapt to and exploit variations in radio channel quality
More informationUNITED STATES PATENT AND TRADEMARK OFFICE BEFORE THE PATENT TRIAL AND APPEAL BOARD
UNITED STATES PATENT AND TRADEMARK OFFICE BEFORE THE PATENT TRIAL AND APPEAL BOARD NOKIA SOLUTIONS AND NETWORKS US LLC; AND NOKIA SOLUTIONS AND NETWORKS OY, Petitioners v. HUAWEI TECHNOLOGIES CO. LTD.,
More informationPilsung AB Taegyun A Fathur AB Afif A Hari A Gary A Dhika AB April AB Mulya AB Yusuf AB Anin A Rizka B Dion AB Siska AB Mirel AB Hani AB Airita AB Next Generation Network Soft Switch Long-Term Evolution
More informationTS-3GB-S.R0079-0v1.0 Support for End-to-End QoS Stage 1 Requirements
TS-GB-S.R00-0v.0 Support for End-to-End QoS Stage Requirements Sep,00 THE TELECOMMUNICATION TECHNOLOGY COMMITTEE TS-GB-S.R00-0v.0 Support for End-to-End QoS Stage Requirements . Application level
More information1.1 Beyond 3G systems
1 Introduction The cellular wireless communications industry witnessed tremendous growth in the past decade with over four billion wireless subscribers worldwide. The first generation (1G) analog cellular
More informationCAN Wireless IP Network Overview and List of Parts
GPP X.S00-000-0 Version.0 Date: August, 00 CAN Wireless IP Network Overview and List of Parts COPYRIGHT GPP and its Organizational Partners claim copyright in this document and individual Organizational
More informationThe 3GPP Standardization Process
The 3GPP Standardization Process Asok Chatterjee, Ericsson Inc. Chairman, 3GPP Project Co-ordination ordination Group ICT/IMT-2000 Seminar Abidjan, Cote d Ivoire September 10, 2002 1 IMT-2000 The 5 IMT
More informationTS-3GA (R99)v Operator Determined Call Barring
TS-3GA-22.041(R99)v.3.3.1 Operator Determined Call Barring May 29, 2001 THE TELECOMMUNICATION TECHNOLOGY COMMITTEE TS-3GA-22.041(R99)v.3.3.1 Operator Determined Call Barring 1. Application level
More informationETSI TS V ( )
TECHNICAL SPECIFICATION LTE; Evolved Universal Terrestrial Radio Access Network (E-UTRAN); M1 data transport () 1 Reference RTS/TSGR-0336445vf00 Keywords LTE 650 Route des Lucioles F-06921 Sophia Antipolis
More informationETSI standards are enabling a global M2M solution. Enrico Scarrone, ETSI TC M2M Chairman, Telecom Italia 3 ETSI M2M workshop, Mandelieu, France, EU
ETSI standards are enabling a global M2M solution Enrico Scarrone, ETSI TC M2M Chairman, Telecom Italia 3 ETSI M2M workshop, Mandelieu, France, EU From (smart) phones to a world.. made of intelligent and
More informationInteroperability & Global PoC Standards
CDG Technology Forum CDMA PoC: Interoperability & Global PoC Standards Kalle Ahmavaara, Nokia, CDMA2000 Standardization kalle.ahmavaara@nokia.com 1 NOKIA San Diego, June 30 th, 2004 Interoperability between
More informationThe 3GPP vision. Asok Chatterjee, Ericsson Inc. Chairman, 3GPP Project Co-ordination ordination Group
The 3GPP vision Asok Chatterjee, Ericsson Inc. Chairman, 3GPP Project Co-ordination ordination Group ITU Seminar, Ottawa - May 2002 1 IMT-2000 The 5 IMT 2000 terrestrial interfaces agreed by ITU-R Direct
More informationMarek Hajduczenia, ZTE Corp.
Marek Hajduczenia, ZTE Corp marek.hajduczenia@zte.pt Extended EPON Study Group 802.3 Plenary meeting, Atlanta, GA, USA vember 2011 » Appointment of Recording Secretary» Welcome and introductions» Approve
More informationEvolution to A Common Core
Evolution to A Common Core Interworking Access Networks Mike Dolan April 2008 Outline Current Situation Multiple Core Networks Commonality at the Application Layer, IMS Converging on a Common Core Network
More information3GPP TS V7.0.0 ( )
TS 22.041 V7.0.0 (2007-03) Technical Specification 3rd Generation Partnership Project; Technical Specification Group Services and System Aspects; Operator Determined Barring (ODB) (Release 7) GLOBAL SYSTEM
More information