1 SURVEY RECORDS Berbera Hergeisa Tug Wajale Road SOMALILAND August 2013

2 GPS SURVEYS for AFRICA Satellite Surveys, Aerial Mapping, GIS VAT No Clifton Villas, Outeniqua Avenue, QUELLERINA, Tel. (0027) , P. O. Box 742, Florida Hills, 1716 Cell phone : , gps-africa.co.za gps-africa.co.za S U R V E Y R E P O R T GROUND CONTROL SURVEYS - BERBERA-HERGEISA ROAD, SOMALILAND The surveys system is UTM 38 North, WGS84 Datum, Geoid Model: Global 2008 Equipment used: Trimble R4 GPS receivers working in static mode. A. SURVEYS SYSTEM VERIFICATION. The co-ordinate system chosen for this surveys is based on WGS84 datum. It is a modern system, suitable to be incorporated with all international databases and Internet applications. The further advantage of this approach is that the network can be re-constructed even if all beacons on site are damaged or destroyed, by applying identical survey routines. The co-ordinates are calculated from World GPS Reference Stations using PPP (precise point positioning) technic. First evaluation was delivered by the Australian Geoscience Institute, the second evaluation from Canadian Spacial Reference Systems. A very good agreements between the above sources was found: 3,4 millilitres for Y,X and m in Z. B. SITE BEACONS Thirty five beacons were placed along the road in safe positions and in the manner illustrated on the sketch (page 04). Static observation for minutes at 5 second intervals were recorded at every beacon. The baselines between consecutive beacons were recorded for 30 minutes. Stations GPS 6, 13, 20, 26 and 31 were observed twice, being the last station of the day and a starting station the following day, dividing the route into six sections. These points were then evaluated by Auspos and CSRS and the mean value was accepted creating fixed points for the adjustments of all six road sections. Anylizing the results in all six sections, we found the differences between adjusted co-ordinates and Auspos co-ordinates to be between m. It is a very good comparison and also the perfect way to eliminate any possible errors and blunders in the system. Adjusted co-ordinates are accepted as final, see the list at page 05 and 06.

3 C. DETAIL SURVEYS (ANNOTATIONS) We driven the route four times when positioning GPS receivers and observed the details along the road. No power lines crossing the route were found. We offered to detail survey big bridge(s) but only culverts, sometimes double, triple and even quadruple were found. These are simple structures and no survey was required. Furthermore, we were informed that road engineers were working on this subject and had collected photographs and measurements. We did photograph the biggest culverts and measured the sizes. It will not be presented in this report but can be forwarded if required. D. SOFTWARE USED Trimble Business Centre, Pythagoras and Surpac. August 2013 Adam Paszkiewicz

4 BERBERA - HERGEISA - TUG WAJAKLE ROAD AIRPORT HARBOUR GPS 35 GPS 34 GPS 36 GPS 33 GPS 32 GPS 31 GPS 30 GPS 29 GPS 28 GPS 27 GPS 26 GPS 25 GPS 23 GPS 24 GPS 22 GPS 21 GPS 20 GPS 19 GPS 4 GPS 5 GPS 6 GPS 7 GPS 8 GPS 9 GPS 17 GPS 18 ETHIOPIAN BORDER GPS 1 GPS 2 GPS 3 GPS 10 GPS 11 GPS 13 GPS 16 GPS 12 GPS 14 GPS 15 HERGEISA TOWN

5 BERBERA - HERGEISA - TUG WAJALE ROAD BEACONS UTM 38 North WGS84 Global2008 Geoid GPS P16 GPS1Z Auspos GPS P16 GPS P16 GPS P16 GPS P16 GPS P16 GPS6Z Auspos GPS P16 GPS P16 GPS P16 GPS P16 GPS P16ROCK GPS P16 GPS P16 GPS13Z Auspos GPS P16 GPS P16 GPS P16 GPS P16 GPS P16 GPS P16 GPS P16 GPS20Z Auspos GPS P16 GPS P16 GPS P16 GPS P16 GPS P16 GPS P16 GPS26Z Auspos GPS P16 GPS P16 GPS P16 GPS P16ROCK GPS P16 GPS31Z Auspos GPS P16 GPS P16 GPS P16 GPS P16STONES GPS35Z Auspos GPS P16

6 GPS FIELD BOOK - BERBERA-HERGEISA-TAG WAJALE ROAD Point ID Feature Code Start Time Duration Field Metho File Name Ant. Height Antenna Method Ant Manufact Ant. Type GPS1 P /08/05 09:21 01:19:00 Static DAT Center of bumper Trimble R4 Internal GPS2 P /08/05 10:08 01:40:10 Static DAT Center of bumper Trimble R4-3 Internal GPS3 P /08/05 11:19 01:30:55 Static DAT Center of bumper Trimble R4 Internal GPS4 P /08/05 12:27 01:17:35 Static DAT Center of bumper Trimble R4-3 Internal GPS5 P /08/05 13:22 01:10:20 Static DAT Center of bumper Trimble R4 Internal GPS6 P /08/06 07:41 01:07:25 Static DAT Center of bumper Trimble R4-3 Internal GPS6 P /08/05 14:11 01:01:35 Static DAT Center of bumper Trimble R4-3 Internal GPS7 P /08/06 08:15 01:27:10 Static DAT Center of bumper Trimble R4 Internal GPS8 P /08/06 09:13 01:24:25 Static DAT Center of bumper Trimble R4-3 Internal GPS9 P /08/06 10:08 01:24:55 Static DAT Center of bumper Trimble R4 Internal GPS10 P /08/06 11:01 01:30:45 Static DAT Center of bumper Trimble R4-3 Internal GPS11 P16ROCK 2013/08/06 12:00 01:25:40 Static DAT Center of bumper Trimble R4 Internal GPS12 P /08/06 12:58 01:50:05 Static DAT Center of bumper Trimble R4-3 Internal GPS13 P /08/07 06:54 01:00:55 Static DAT Center of bumper Trimble R4 Internal GPS13 P /08/06 14:11 01:03:00 Static DAT Center of bumper Trimble R4 Internal GPS14 P /08/07 09:41 00:21:05 Static DAT Center of bumper Trimble R4-3 Internal GPS14 P /08/07 06:51 02:21:50 Static DAT Center of bumper Trimble R4-3 Internal GPS15 P /08/07 09:03 01:55:00 Static DAT Center of bumper Trimble R4 Internal GPS16 P /08/07 10:29 01:19:40 Static DAT Center of bumper Trimble R4-3 Internal GPS17 P /08/07 11:22 01:21:05 Static DAT Center of bumper Trimble R4 Internal GPS18 P /08/07 12:13 01:32:25 Static DAT Center of bumper Trimble R4-3 Internal GPS19 P /08/07 13:22 01:31:40 Static DAT Center of bumper Trimble R4 Internal GPS20 P /08/09 07:14 01:10:15 Static DAT Center of bumper Trimble R4-3 Internal GPS20 P /08/07 14:09 01:01:15 Static DAT Center of bumper Trimble R4-3 Internal GPS21 P /08/09 07:44 00:06:20 Static DAT Center of bumper Trimble R4 Internal GPS21R P /08/09 07:52 01:28:00 Static DAT Center of bumper Trimble R4 Internal GPS22 P /08/09 08:50 01:27:05 Static DAT Center of bumper Trimble R4-3 Internal GPS23 P /08/09 09:46 01:16:25 Static DAT Center of bumper Trimble R4 Internal

7 GPS24 P /08/09 10:43 01:06:45 Static DAT Center of bumper Trimble R4-3 Internal GPS25 P /08/09 11:27 02:03:00 Static DAT Center of bumper Trimble R4 Internal GPS26 P /08/10 07:52 01:01:05 Static DAT Center of bumper Trimble R4-3 Internal GPS26 P /08/09 12:17 01:01:10 Static DAT Center of bumper Trimble R4-3 Internal GPS27 P /08/10 08:13 01:33:35 Static DAT Center of bumper Trimble R4 Internal GPS28 P /08/10 09:18 01:26:35 Static DAT Bottom of ant mount Trimble R4-3 Internal GPS29 P /08/10 10:19 01:20:05 Static DAT Center of bumper Trimble R4 Internal GPS30 P16ROCK 2013/08/10 11:10 01:20:25 Static DAT Center of bumper Trimble R4-3 Internal GPS31 p /08/11 07:19 00:28:30 Static DAT Center of bumper Trimble R4 Internal GPS31 P /08/10 12:01 01:26:50 Static DAT Center of bumper Trimble R4 Internal GPS32 P /08/11 07:03 01:36:30 Static DAT Center of bumper Trimble R4-3 Internal GPS33 P /08/11 08:10 01:20:35 Static DAT Center of bumper Trimble R4 Internal GPS34 P /08/11 09:00 01:36:40 Static DAT Center of bumper Trimble R4-3 Internal GPS35 P16STONE 2013/08/11 10:07 01:29:15 Static DAT Center of bumper Trimble R4 Internal GPS36 P /08/11 11:05 04:10:15 Static DAT Center of bumper Trimble R4-3 Internal

8 Baseline Processing Report file:///c:/users/adam/appdata/local/temp/tbctemporal/cfvzoqjf.xk3/rpte882b4b5.html /08/19 Summary Session Details GPS2 - GPS1 (10:08:05 AM-10:40:30 AM) (S2) GPS2 - GPS3 (11:19:55 AM-11:48:15 AM) (S1) GPS3 - GPS4 (12:27:15 PM-12:50:50 PM) (S4) GPS4 - GPS5 (01:22:50 PM-01:44:50 PM) (S3) GPS5 - GPS6 (02:11:05 PM-02:33:10 PM) (S5) Project Information Name: C:\adam\Projects2013 \Gauf\Somaliland\GPS\TBO\Somali_Section1.vce Size: 226 KB Modified: 2013/08/19 08:08:57 AM (UTC:2) Time zone: South Africa Standard Time Reference number: Description: Observation From To Solution Type Baseline Processing Report Processing Summary H. Prec. Coordinate System Name: UTM Datum: WGS 1984 Zone: 38 North (45E) Geoid: GLOBAL2008_1 Vertical datum: V. Prec. Geodetic Az. Ellipsoid Dist. DHeight GPS2 --- GPS1 (B2) GPS2 GPS1 Fixed '05" GPS2 --- GPS3 (B1) GPS2 GPS3 Fixed '52" GPS3 --- GPS4 (B4) GPS3 GPS4 Fixed '25" GPS4 --- GPS5 (B3) GPS4 GPS5 Fixed '42" GPS5 --- GPS6 (B5) GPS5 GPS6 Fixed '56" Acceptance Summary Processed Passed Flag Fail Date: 2013/08/19 08:11:58 AM Project: C:\adam\Projects2013 \Gauf\Somaliland\GPS\TBO\Somali_Section1.vce Trimble Business Center

9 Baseline Processing Report file:///c:/users/adam/appdata/local/temp/tbctemporal/esuxuc1g.y0i/rpta46e5459.html /08/19 Summary Session Details GPS12 - GPS13 (02:11:30 PM-02:48:50 PM) (S7) GPS12 - GPS11 (12:58:45 PM-01:26:20 PM) (S6) GPS10 - GPS11 (12:00:40 PM-12:32:30 PM) (S5) GPS10 - GPS9 (11:01:45 AM-11:33:15 AM) (S4) GPS9 - GPS8 (10:08:20 AM-10:37:30 AM) (S3) GPS7 - GPS8 (09:13:05 AM-09:42:40 AM) (S2) GPS7 - GPS6 (08:15:30 AM-08:48:30 AM) (S1) Project Information Name: C:\adam\Projects2013 \Gauf\Somaliland\GPS\TBO\Somali_Section2.vce Size: 229 KB Modified: 2013/08/17 07:01:58 PM (UTC:2) Time zone: South Africa Standard Time Reference number: Description: Observation From To Solution Type Baseline Processing Report Processing Summary H. Prec. Acceptance Summary Coordinate System Name: UTM Datum: WGS 1984 Zone: 38 North (45E) Geoid: GLOBAL2008_1 Vertical datum: V. Prec. Geodetic Az. Ellipsoid Dist. DHeight GPS GPS13 (B7) GPS12 GPS13 Fixed '15" GPS GPS11 (B6) GPS12 GPS11 Fixed '34" GPS GPS11 (B5) GPS11 GPS10 Fixed '57" GPS GPS9 (B4) GPS10 GPS9 Fixed '39" GPS9 --- GPS8 (B3) GPS9 GPS8 Fixed '30" GPS7 --- GPS8 (B2) GPS8 GPS7 Fixed '57" GPS7 --- GPS6 (B1) GPS7 GPS6 Fixed '45" Processed Passed Flag Fail Date: 2013/08/19 08:10:03 AM Project: C:\adam\Projects2013 \Gauf\Somaliland\GPS\TBO\Somali_Section2.vce Trimble Business Center

10 Baseline Processing Report file:///c:/users/adam/appdata/local/temp/tbctemporal/i0w2atst.2jh/rpt223a6202.html /08/19 Summary Session Details GPS15 - GPS14 (09:41:00 AM-10:02:05 AM) (S2) GPS14 - GPS15 (09:03:20 AM-09:13:10 AM) (S3) GPS15 - GPS16 (10:29:15 AM-10:58:20 AM) (S4) GPS17 - GPS16 (11:22:15 AM-11:48:55 AM) (S5) GPS18 - GPS17 (12:13:35 PM-12:43:20 PM) (S6) GPS18 - GPS19 (01:22:05 PM-01:46:00 PM) (S7) GPS19 - GPS20 (02:09:50 PM-02:53:45 PM) (S8) GPS14 - GPS13 (06:54:40 AM-07:55:35 AM) (S1) Project Information Name: C:\adam\Projects2013 \Gauf\Somaliland\GPS\TBO\Somali_Section3.vce Size: 238 KB Modified: 2013/08/18 10:41:23 AM (UTC:2) Time zone: South Africa Standard Time Reference number: Description: Observation From To Solution Type Baseline Processing Report Processing Summary H. Prec. Acceptance Summary Coordinate System Name: UTM Datum: WGS 1984 Zone: 38 North (45E) Geoid: GLOBAL2008_1 Vertical datum: V. Prec. Geodetic Az. Ellipsoid Dist. DHeight GPS GPS14 (B2) GPS14 GPS15 Fixed '20" GPS GPS15 (B3) GPS14 GPS15 Fixed '20" GPS GPS16 (B4) GPS15 GPS16 Fixed '52" GPS GPS16 (B5) GPS16 GPS17 Fixed '25" GPS GPS17 (B6) GPS17 GPS18 Fixed '05" GPS GPS19 (B7) GPS18 GPS19 Fixed '54" GPS GPS20 (B8) GPS19 GPS20 Fixed '23" GPS GPS13 (B1) GPS14 GPS13 Fixed '02" Processed Passed Flag Fail

11 Baseline Processing Report file:///c:/users/adam/appdata/local/temp/tbctemporal/rsz4aaw0.4kk/rpt5f3242b3.html /08/19 Summary Session Details GPS25 - GPS26 (12:17:00 PM-01:18:10 PM) (S6) GPS25 - GPS24 (11:27:35 AM-11:50:40 AM) (S5) GPS23 - GPS24 (10:43:55 AM-11:03:20 AM) (S4) GPS22 - GPS23 (09:46:55 AM-10:17:30 AM) (S3) GPS21 - GPS22 (08:50:25 AM-09:20:45 AM) (S2) GPS21 - GPS20 (07:52:45 AM-08:25:10 AM) (S1) Project Information Name: C:\adam\Projects2013 \Gauf\Somaliland\GPS\TBO\Somali_Section4.vce Size: 295 KB Modified: 2013/08/18 10:48:04 AM (UTC:2) Time zone: South Africa Standard Time Reference number: Description: Observation From To Solution Type Baseline Processing Report Processing Summary H. Prec. Coordinate System Name: UTM Datum: WGS 1984 Zone: 38 North (45E) Geoid: GLOBAL2008_1 Vertical datum: V. Prec. Geodetic Az. Ellipsoid Dist. DHeight GPS GPS26 (B6) GPS25 GPS26 Fixed '33" GPS GPS24 (B5) GPS25 GPS24 Fixed '45" GPS GPS24 (B4) GPS24 GPS23 Fixed '12" GPS GPS23 (B3) GPS23 GPS22 Fixed '31" GPS GPS22 (B2) GPS22 GPS21 Fixed '29" GPS GPS20 (B1) GPS21 GPS20 Fixed '03" Acceptance Summary Processed Passed Flag Fail Date: 2013/08/19 08:15:17 AM Project: C:\adam\Projects2013 \Gauf\Somaliland\GPS\TBO\Somali_Section4.vce Trimble Business Center

12 Baseline Processing Report file:///c:/users/adam/appdata/local/temp/tbctemporal/j3z3xxjs.ycz/rpt919174d8.html /08/19 Summary Session Details GPS27 - GPS28 (09:18:30 AM-09:47:25 AM) (S8) GPS28 - GPS29 (10:19:00 AM-10:45:05 AM) (S9) GPS30 - GPS29 (11:10:50 AM-11:39:05 AM) (S10) GPS31 - GPS30 (12:01:35 PM-12:31:15 PM) (S11) GPS27 - GPS26 (08:13:50 AM-08:53:35 AM) (S7) Project Information Name: C:\adam\Projects2013 \Gauf\Somaliland\GPS\TBO\Somali_Section5.vce Size: 198 KB Modified: 2013/08/18 09:35:21 AM (UTC:2) Time zone: South Africa Standard Time Reference number: Description: Observation From To Solution Type Baseline Processing Report Processing Summary H. Prec. Coordinate System Name: UTM Datum: WGS 1984 Zone: 38 North (45E) Geoid: GLOBAL2008_1 Vertical datum: V. Prec. Geodetic Az. Ellipsoid Dist. DHeight GPS GPS28 (B8) GPS27 GPS28 Fixed '31" GPS GPS29 (B9) GPS28 GPS29 Fixed '33" GPS GPS29 (B10) GPS29 GPS30 Fixed '09" GPS GPS30 (B11) GPS30 GPS31 Fixed '22" GPS GPS26 (B7) GPS27 GPS26 Fixed '26" Acceptance Summary Processed Passed Flag Fail Date: 2013/08/19 08:16:41 AM Project: C:\adam\Projects2013 \Gauf\Somaliland\GPS\TBO\Somali_Section5.vce Trimble Business Center

13 Baseline Processing Report file:///c:/users/adam/appdata/local/temp/tbctemporal/dmvuqdq2.orn/rptcb736a66.html /08/19 Summary Session Details GPS34 - GPS33 (09:00:10 AM-09:30:35 AM) (S3) GPS34 - GPS35 (10:07:00 AM-10:36:50 AM) (S2) GPS36 - GPS35 (11:05:35 AM-11:36:15 AM) (S1) GPS32 - GPS33 (08:10:00 AM-08:40:10 AM) (S4) GPS32 - GPS31 (07:19:00 AM-07:47:30 AM) (S5) Project Information Name: C:\adam\Projects2013 \Gauf\Somaliland\GPS\TBO\Somali_Section6.vce Size: 195 KB Modified: 2013/08/18 09:03:42 AM (UTC:2) Time zone: South Africa Standard Time Reference number: Description: Observation From To Solution Type Baseline Processing Report Processing Summary H. Prec. Coordinate System Name: UTM Datum: WGS 1984 Zone: 38 North (45E) Geoid: GLOBAL2008_1 Vertical datum: V. Prec. Geodetic Az. Ellipsoid Dist. DHeight GPS GPS33 (B3) GPS33 GPS34 Fixed '16" GPS GPS35 (B2) GPS34 GPS35 Fixed '53" GPS GPS35 (B1) GPS35 GPS36 Fixed '57" GPS GPS33 (B4) GPS33 GPS32 Fixed '51" GPS GPS31 (B5) GPS32 GPS31 Fixed '49" Acceptance Summary Processed Passed Flag Fail Date: 2013/08/19 08:18:18 AM Project: C:\adam\Projects2013 \Gauf\Somaliland\GPS\TBO\Somali_Section6.vce Trimble Business Center

14 1 User Data All antenna heights refer to the vertical distance from the Ground Mark to the Antenna Reference Point (ARP). Station (s) Submitted File Antenna Type Antenna Height (m) Start Time End Time GPS1 GPS o NONE NONE /08/05 07:22: /08/05 08:40:30 2 Processing Summary Date User Stations Reference Stations Orbit Type 2013/08/05 07:22:00 GPS1 ANKR DRAG ETAD ISER ISKU IGS rapid ISSD MBAR NICO REUN ZAMB Remark: An IGS Rapid Orbit product has been used in this computation, IGS Rapid orbits are usually of very high quality. However, to ensure you achieve the highest quality coordinates please resubmit approximately 2 weeks after the observation session end to ensure the use of the IGS Final Orbit product. AUSPOS 2.0 Job Number: # 1488 User: surveys at gps-africa co za 2 c Commonwealth of Australia (Geoscience Australia) 2013

15 3 Computed Coordinates, ITRF2008 All computed coordinates are based on the IGS realisation of the ITRF2008 reference frame. All the given ITRF2008 coordinates refer to a mean epoch of the site observation data. All coordinates refer to the Ground Mark. 3.1 Cartesian, ITRF2008 Station X (m) Y (m) Z (m) GPS /08/2013 ANKR /08/2013 DRAG /08/2013 ETAD /08/2013 ISER /08/2013 ISKU /08/2013 ISSD /08/2013 MBAR /08/2013 NICO /08/2013 REUN /08/2013 ZAMB /08/ Geodetic, GRS80 Ellipsoid, ITRF2008 Geoid-ellipsoidal separations, in this section, are computed using a spherical harmonic synthesis of the global EGM2008 geoid. More information on the EGM2008 geoid can be found at Station Latitude Longitude Ellipsoidal Derived Above (DMS) (DMS) Height(m) Geoid Height(m) GPS ANKR DRAG ETAD ISER ISKU ISSD MBAR NICO REUN ZAMB AUSPOS 2.0 Job Number: # 1488 User: surveys at gps-africa co za 3 c Commonwealth of Australia (Geoscience Australia) 2013

16 4 Solution Information 4.1 Coordinate Precision - Geodetic, One Sigma Station σ East (m) σ North (m) σ Up (m) GPS ANKR DRAG ETAD ISER ISKU ISSD MBAR NICO REUN ZAMB Ambiguity Resolution - per baseline Baseline Ambiguities Resolved Baseline Length (km) MBAR - ZAMB 78.3 % ETAD - GPS % ISER - ISSD 75.0 % ANKR - NICO 68.2 % DRAG - NICO 81.5 % ETAD - MBAR 66.7 % REUN - ZAMB 76.2 % ISSD - NICO 70.4 % ISKU - ISSD 92.6 % MBAR - NICO 65.0 % AVERAGE 72.8% Please note for a regional solution, such as used by AUSPOS, an average ambiguity resolution of 50% or better for the network indicates a reliable solution. AUSPOS 2.0 Job Number: # 1488 User: surveys at gps-africa co za 4 c Commonwealth of Australia (Geoscience Australia) 2013

17 5 Computation Standards 5.1 Computation System Software Bernese GPS Software Version 5.0. GNSS system(s) GPS only. 5.2 Data Preprocessing and Measurement Modelling Data preprocessing Basic observable Modelled observable Ground antenna phase centre calibrations Tropospheric Model Tropospheric Estimation Map- Tropospheric ping Function Ionosphere Tidal displacements Atmospheric loading Satellite centre of mass correction Satellite phase centre calibration Satellite trajectories Earth Orientation Phase preprocessing is undertaken in a baseline by baseline mode using triple-differences. In most cases, cycle slips are fixed by the simultaneous analysis of different linear combinations of L1 and L2. If a cycle slip cannot be fixed reliably, bad data points are removed or new ambiguities are set up A data screening step on the basis of weighted postfit residuals is also performed, and outliers are removed. Carrier phase with an elevation angle cutoff of 10 and a sampling rate of 3 minutes. However, data cleaning is performed a sampling rate of 30 seconds. Elevation dependent weighting is applied according to 1/ sin(e) 2 where e is the satellite elevation. The code observable is only used for the receiver clock synchronisation. Double differences of the ionosphere-free linear combination. IGS08 absolute phase-centre variation model is applied. A priori model is the Saastamoinen-based hydrostatic mapped with the dry-niell. Zenith delay corrections are estimated relying on the wet- Niell mapping function in intervals of 2 hour. N-S and E-W horizontal delay parameters are solved for every 24 hours. Niell First-order effect eliminated by forming the ionosphere-free linear combination of L1 and L2. Solid earth tidal displacements are derived from the complete model from the IERS Conventions 2003, but ocean tide loading is not applied. Not applied IGS08 phase-centre variation model applied IGS08 phase-centre variation model applied Best available IGS products. Best available IGS products. AUSPOS 2.0 Job Number: # 1488 User: surveys at gps-africa co za 5 c Commonwealth of Australia (Geoscience Australia) 2013

18 5.3 Estimation Process Adjustment Station coordinates Troposphere Ionospheric correction Ambiguity 5.4 Reference Frame Terrestrial reference frame Australian datum Derived AHD Above-geoid heights Weighted least-squares algorithm. Coordinate constraints are applied at the Reference sites with standard deviation of 1mm and 2mm for horizontal and vertical components respectively. Zenith delay parameters and pairs of horizontal delay gradient parameters are estimated for each station in intervals of 2 hour and 24 hours. An ionospheric map derived from the contributing reference stations is used to aid ambiguity resolution using the QIF strategy Ambiguities are resolved in a baseline-by-baseline mode using Quasi-Ionosphere-Free (QIF) approach. IGS08 station coordinates and velocities mapped to the mean epoch of observation. GDA94 coordinates determined via Helmert transformation from ITRF using the Dawson and Woods (2010) parameters. For stations within Australia, AUSGeoid09 is used to compute AHD. AUSGeoid09 is the Australia-wide gravimetric quasigeoid model that has been a posteriori fitted to the Australian Height Datum Earth Gravitational Model EGM2008 released by the National Geospatial-Intelligence Agency (NGA) EGM Development Team is used to compute above-geoid heights. This gravitational model is complete to spherical harmonic degree and order 2159, and contains additional coefficients extending to degree 2190 and order AUSPOS 2.0 Job Number: # 1488 User: surveys at gps-africa co za 6 c Commonwealth of Australia (Geoscience Australia) 2013

19 CSRS-PPP (V ) GPS1 Data Start Data End Duration of Observations :21: :40: h 19m 0.00s Apri / Aposteriori Phase Std Apri / Aposteriori Code Std 0.015m / 0.006m 2.0m / 0.798m Observations Frequency Mode Phase and Code L1 and L2 Static Elevation Cut-Off Rejected Epochs Observation & Estimation Steps degrees 0.00 % 5.00 sec / 5.00 sec Antenna Model APC to ARP ARP to Marker TRMR4 NONE Ant. not in PPP (0 m) m (APC = antenna phase center; ARP = antenna reference point) Estimated Position for GPS o Latitude (+n) Longitude (+e) Ell. Height ITRF08 (2013) 9º º m Sigmas(95%) m m m Apriori 9º º m Estimated - Apriori m m m 95% Error Ellipse (dm) semi-major: 1.633dm semi-minor: 0.283dm semi-major azimuth: 95º UTM (North) Zone m (N) m (E) Scale Factors (point) (combined) (Coordinates from RINEX file used as apriori position) 09:18:12 UTC 2013/08/08 / GPS o 1 NRCan Rapid

20 Estimated Parameters & Observations Statistics NRCan Rapid 2 09:18:12 UTC 2013/08/08 / GPS o

21 09:18:12 UTC 2013/08/08 / GPS o 3 NRCan Rapid

22 NRCan Rapid 4 09:18:12 UTC 2013/08/08 / GPS o

23 09:18:12 UTC 2013/08/08 / GPS o 5 NRCan Rapid

24 NRCan Rapid 6 09:18:12 UTC 2013/08/08 / GPS o

25 ~~~ Disclaimer ~~~ Natural Resources Canada does not assume any liability deemed to have been caused directly or indirectly by any content of its PPP-On-Line positioning service. If you have any questions, please feel free to contact: Geodetic Survey Division Canada Centre for Remote Sensing Natural Resources Canada Government of Canada 615 Booth Street, Room 440 Ottawa, Ontario K1A 0E9 Phone: FAX: :18:12 UTC 2013/08/08 / GPS o 7 NRCan Rapid

26 CO-ORDINATE LIST: AUSTRALIAN GEOSCIENCE INSTITUTE GPS GPS GPS GPS GPS GPS GPS GPS GPS GPS PS PS PS PS PS PS PS PS PS PS PS PS PS PS PS PS PS PS PS PS PS PS PS PS PS PS PS PS PS PS PS

27 CO-ORDINATE LIST: AUSTRALIAN GEOSCIENCE INSTITUTE UTM 38 WGS84 GEOID MODEL: GLOBAL 2008 GPS1Z Auspos GPS2Z Auspos GPS3Z Auspos GPS4Z Auspos GPS5Z Auspos GPS6Z Auspos GPS7Z Auspos GPS8Z Auspos GPS9Z Auspos GPS10Z Auspos GPS11Z Auspos GPS12Z Auspos GPS13Z Auspos GPS14Z Auspos GPS15Z Auspos GPS16Z Auspos GPS17Z Auspos GPS18Z Auspos GPS19Z Auspos GPS20Z Auspos GPS21Z Auspos GPS22Z Auspos GPS23Z Auspos GPS24Z Auspos GPS25Z Auspos GPS26Z Auspos GPS27Z Auspos GPS28Z Auspos GPS29Z Auspos GPS30Z Auspos GPS31Z Auspos GPS32Z Auspos GPS33Z Auspos GPS34Z Auspos GPS35Z Auspos GPS36Z Auspos

28 Project information Coordinate System Name: Somali_Section1.vce Name: UTM Size: 177 KB Datum: WGS 1984 Modified: 8/8/ :17:07 AM (UTC:2) Zone: 38 North (45E) Reference number: Geoid: GLOBAL2008 Description: Vertical datum: Point List ID GPS1 GPS1Z GPS2 GPS2Z GPS3 GPS3Z GPS4 GPS4Z GPS5 GPS5Z GPS6 GPS6Z Easting Northing Elevation Feature Code P Auspos Auspos P Auspos P Auspos P Auspos P Auspos P16 8/18/ :23:58 AM Gauf\Somaliland\GPS\TBO\Somali_Section1.vce Trimble Business Center

29 Project information Coordinate System Name: Somali_Section2.vce Name: UTM Size: 228 KB Datum: WGS 1984 Modified: 8/17/2013 5:28:42 PM (UTC:2) Zone: 38 North (45E) Reference number: Geoid: GLOBAL2008 Description: Vertical datum: ID GPS6 GPS6Z GPS7 GPS7Z GPS8 GPS8Z GPS9 GPS9Z GPS10 GPS10Z GPS11 GPS11Z GPS12 GPS12Z GPS13 GPS13Z Point List Easting Northing Elevation Feature Code P Auspos P Auspos P Auspos P Auspos P Auspos P16ROCK Auspos P Auspos P Auspos Trimble Business Center 8/17/ :01:46 PM \Gauf\Somaliland\GPS\TBO\Somali_Section2.v ce

30 Project information Coordinate System Name: \Gauf\Somaliland\GPS\TBO\Somali_Section3.vce Name: UTM Size: 236 KB Datum: WGS 1984 Modified: 8/17/2013 2:48:15 PM (UTC:2) Zone: 38 North (45E) Reference number: Geoid: GLOBAL2008 Description: Vertical datum: Point List ID GPS13 GPS13Z GPS14 GPS14Z GPS15 GPS15Z GPS16 GPS16Z GPS17 GPS17Z GPS18 GPS18Z GPS19 GPS19Z GPS20 GPS20ZZ Easting Northing Elevation Feature Code P Auspos P Auspos P Auspos P Auspos P Auspos P Auspos P Auspos P Auspos 8/18/ :41:15 AM C:\adam\Projects2013\Gauf\Somaliland\GPS\TBO\Somali_Sectio n3.vce Trimble Business Center

31 Project information Coordinate System Name: Gauf\Somaliland\GPS\TBO\Somali_Section4.vce Name: UTM Size: 292 KB Datum: WGS 1984 Modified: 8/18/2013 8:18:12 AM (UTC:2) Zone: 38 North (45E) Reference number: Geoid: GLOBAL2008 Description: Vertical datum: Point List ID Easting Northing Elevation Feature Code GPS20 GPS20ZZ GPS21 GPS21Z GPS22 GPS22Z GPS23 GPS23Z GPS24 GPS24Z GPS25 GPS25Z GPS26 GPS26Z P Auspos P Auspos P Auspos P Auspos P Auspos P Auspos P Auspos 8/18/ :47:58 AM Gauf\Somaliland\GPS\TBO\Somali_Section4.vce Trimble Business Center

32 Project information Coordinate System Name: Gauf\Somaliland\GPS\TBO\Somali_Section5.vce Name: UTM Size: 90 KB Datum: WGS 1984 Modified: 8/18/2013 9:15:27 AM (UTC:2) Zone: 38 North (45E) Reference number: Geoid: GLOBAL2008 Description: Vertical datum: Point List ID GPS26 GPS26Z GPS27 GPS27Z GPS28 GPS28Z GPS29 GPS29Z GPS30 GPS30Z GPS31 GPS31Z Easting Northing Elevation Feature Code P Auspos P Auspos P16 Auspos failed P P16ROCK Auspos P16 Auspos 8/18/ :35:16 AM Somali_Section5.vce Trimble Business Center

33 Project information Coordinate System Name: Somali_Section6.vce Name: UTM Size: Datum: WGS 1984 Modified: Zone: 38 North (45E) Reference number: Geoid: GLOBAL2008 Description: Vertical datum: Point List ID GPS31 GPS31Z GPS32 GPS32Z GPS33 GPS33Z GPS34 GPS34Z GPS35 GPS35Z GPS36 GPS36Z Easting Northing Elevation Feature Code P Auspos P Auspos P Auspos P Auspos P16PLOOR Auspos P Auspos 8/18/ :02:43 AM Somali_Section6.vce Trimble Business Center

34 BENCH MARKS - BERBERA - HERGISA - TUG WAJALE ROAD Coordinate System UTM Zone 38 North Project Datum WGS84 Vertical Datum Geoid Model EGM2008 (Global) GPS mm peg in concrete, pre-marked beacon detail view GPS mm peg in concrete, pre-marked GPS mm peg in concrete, pre-marked GPS mm peg in concrete, pre-marked GPS mm peg in concrete, pre-marked

35 GPS mm peg in concrete, pre-marked GPS mm peg in concrete, pre-marked GPS mm peg in concrete, pre-marked GPS mm peg in concrete, pre-marked GPS mm peg in concrete, pre-marked GPS mm peg implanted into rock

36 GPS mm peg in concrete, pre-marked GPS mm peg in concrete, pre-marked GPS mm peg in concrete, pre-marked GPS mm peg in concrete, pre-marked GPS mm peg in concrete, pre-marked GPS mm peg in concrete, pre-marked

37 GPS mm peg in concrete, pre-marked GPS mm peg in concrete, pre-marked GPS mm peg in concrete, pre-marked GPS mm peg in concrete, pre-marked GPS mm peg in concrete, pre-marked GPS mm peg in concrete, pre-marked

38 GPS mm peg in concrete, pre-marked GPS mm peg in concrete, pre-marked GPS mm peg in concrete, pre-marked GPS mm peg in concrete, pre-marked GPS mm peg in concrete, pre-marked GPS mm peg in concrete, pre-marked

39 GPS mm peg implanted into rock GPS mm peg in concrete, pre-marked GPS mm peg in concrete, pre-marked GPS mm peg in concrete, pre-marked GPS mm peg in concrete, pre-marked GPS mm peg implanted into paving GPS mm peg - Moonsoor Hotel

UNIVERSITY CALIFORNIA, RIVERSIDE AERIAL TARGET GROUND CONTROL SURVEY REPORT JOB # DATE: MARCH 2011

UNIVERSITY CALIFORNIA, RIVERSIDE AERIAL TARGET GROUND CONTROL SURVEY REPORT JOB # DATE: MARCH 2011 UNIVERSITY CALIFORNIA, RIVERSIDE AERIAL TARGET GROUND CONTROL SURVEY REPORT JOB # 2011018 DATE: MARCH 2011 UNIVERSITY CALIFORNIA, RIVERSIDE AERIAL TARGET GROUND CONTROL SURVEY REPORT I. INTRODUCTION II.

More information

Surveying. Session GPS Surveying 1. GPS Surveying. Carrier-Phase (RTK) Pseudo-Range (DGPS) Slide 1

Surveying. Session GPS Surveying 1. GPS Surveying. Carrier-Phase (RTK) Pseudo-Range (DGPS) Slide 1 GPS Surveying Slide 1 GPS Surveying Surveying Mapping Standalone Relative Relative Standalone Post-Processed Real-Time Static / Fast Static Kinematic Stop & Go Rapid-Static Carrier-Phase (RTK) Pseudo-Range

More information

CONTENTS OF PRESENTATION

CONTENTS OF PRESENTATION SELCUK ONLINE PROCESSING SYSTEM WITH CASE STUDY IN IGNSS STATIONS Süleyman Sırrı MARAŞ, İsmail ŞANLIOĞLU and Bahadır AKTUĞ Turkey sanlioglu@selcuk.edu.tr CONTENTS OF PRESENTATION INTRODUCTION DESIGN OF

More information

How to Use GOCE Level 2 Products

How to Use GOCE Level 2 Products How to Use GOCE Level 2 Products Thomas Gruber 1), Reiner Rummel 1), Radboud Koop 2) 1) Institute of Astronomical and Physical Geodesy, Technical University Munich 2) Netherlands Institute for Space Research

More information

The 2012 Warkworth Observatory Local Tie Survey

The 2012 Warkworth Observatory Local Tie Survey The 2012 Warkworth Observatory Local Tie Survey Land Information New Zealand Record A1387321 Contents Executive Summary... 5 Acknowledgements... 5 1. Introduction... 1 2. Site Description... 2 3. Instrumentation...

More information

Purpose : Understanding Projections, 12D, and the System 1200.

Purpose : Understanding Projections, 12D, and the System 1200. Purpose : Understanding Projections, 12D, and the System 1200. 1. For any Cad work created inside 12D, the distances entered are plane (Horizontal Chord) distances. 2. Setting a projection, or changing

More information

Navigation coordinate systems

Navigation coordinate systems Lecture 3 Navigation coordinate systems Topic items: 1. Basic Coordinate Systems. 2. Plane Cartesian Coordinate Systems. 3. Polar Coordinate Systems. 4. Earth-Based Locational Reference Systems. 5. Reference

More information

TechnicalNotes. Trimble Total Control Software

TechnicalNotes. Trimble Total Control Software TechnicalNotes Trimble Total Control Software POWERFUL GEODETIC CONTROL FOR ALL SURVEY PROJECTS A survey is only as good as its control elements. Trimble Total Control software puts you in total control

More information

Chapter 8 Options (updated September 06, 2009)

Chapter 8 Options (updated September 06, 2009) Chapter 8 Options (updated September 06, 2009) Setting Up The Working Environment...................................................8-3 Options Library Manager.............................................................8-4

More information

William E. Dietrich Professor 313 McCone Phone Fax (fax)

William E. Dietrich Professor 313 McCone Phone Fax (fax) February 13, 2007. Contact information William E. Dietrich Professor 313 McCone Phone 510-642-2633 Fax 510-643-9980 (fax) bill@eps.berkeley.edu Project location: Northwest of the Golden Gate Bridge, San

More information

National GNSS/BDS CORS Services in China

National GNSS/BDS CORS Services in China National GNSS/BDS CORS Services in China Prof. Yamin Dang Chinese Academy of Surveying & Mapping E-mail:dangym@casm.ac.cn Outline 1 2 3 Reference Frame in China: CGCS 2000 GNSS/BDS CORS Service System

More information

The Determination of Telescope and Antenna Invariant Point (IVP)

The Determination of Telescope and Antenna Invariant Point (IVP) The Determination of Telescope and Antenna Invariant Point (IVP) John Dawson, Gary Johnston, and Bob Twilley Minerals and Geohazards Division, Geoscience Australia, Cnr Jerrabomberra Ave and Hindmarsh

More information

CHC Geomatics Office 2.0 User Guide

CHC Geomatics Office 2.0 User Guide CHC Geomatics Office 2.0 User Guide Revision 1.0 July 19, 2018 Table of Contents Table of Contents Table of Contents... 2 Preface... 11 Introduction... 11 Experience Requirements... 11 Technology and Service...

More information

Third Rock from the Sun

Third Rock from the Sun Geodesy 101 AHD LiDAR Best Practice The Mystery of LiDAR Best Practice Glenn Jones SSSi GIS in the Coastal Environment Batemans Bay November 9, 2010 Light Detection and Ranging (LiDAR) Basic principles

More information

Table of Contents 1 PURPOSE SCOPE DEFINITIONS PROCEDURE... 5

Table of Contents 1 PURPOSE SCOPE DEFINITIONS PROCEDURE... 5 Table of Contents 1 PURPOSE... 3 2 SCOPE... 3 3 DEFINITIONS... 4 4 PROCEDURE... 5 4.1 Overview - Performing a Site Calibration... 5 4.1.1 Upload Mine Grid Control... 6 4.1.2 Obtain SSM Data... 7 4.1.3

More information

Ground Control Report Ground Control Quality & Blind Check Points for the Coastal Northeast LiDAR project

Ground Control Report Ground Control Quality & Blind Check Points for the Coastal Northeast LiDAR project Ground Control Report Ground Control Quality & Blind Check Points for the Coastal Northeast LiDAR project State of Connecticut Project Eastern Portion USGS Task Order G10PD02143 and G10PD01027 Prepared

More information

OPUS Projects Manager Training

OPUS Projects Manager Training OPUS Projects Manager Training Step 4 : Network Adjustment ngs.opus.projects@noaa.gov 2013-08-07 Step 4 : Network Adjustment 1 I ve advanced to the second slide and I m reading it. Can you read this slide

More information

Consistency between CORS and NACN Egyptian Networks in Cairo and Nile Delta

Consistency between CORS and NACN Egyptian Networks in Cairo and Nile Delta Consistency between CORS and NACN Egyptian Networks in Cairo and Nile Delta 625 Mohammed El-Tokhey, Tamer F. Fath-Allah, Yasser M. Mogahed and Mohammed Mamdouh Public Works Department, Faculty of Engineering,

More information

Understanding GPS Processing and Results

Understanding GPS Processing and Results Maxwell Owusu ANSAH, Ghana Key words: Cadastre, Capacity building, CPD, Education, GPS, Positioning SUMMARY The use of Global Positioning Systems has undauntedly brought with it many welcome advances in

More information

Asymmetric Mapping Functions for CONT02 from ECMWF

Asymmetric Mapping Functions for CONT02 from ECMWF Asymmetric Mapping Functions for CONT2 from ECMWF Johannes Boehm, Marco Ess, Harald Schuh IGG, Vienna University of Technology Contact author: Johannes Boehm, e-mail: johannes.boehm@tuwien.ac.at Abstract

More information

A Simplified Parameter Transformation Model from ITRF2005 to any Static Geocentric Datum (e.g. GDA94) Richard Stanaway and Craig Roberts

A Simplified Parameter Transformation Model from ITRF2005 to any Static Geocentric Datum (e.g. GDA94) Richard Stanaway and Craig Roberts A Simplified Parameter Transformation Model from ITRF2005 to any Static Geocentric Datum (e.g. GDA94) Richard Stanaway and Craig Roberts School of Surveying and Spatial Information Systems University of

More information

THE EARTHS SURFACE IS CHANGING

THE EARTHS SURFACE IS CHANGING THE EARTHS SURFACE IS CHANGING Vertical Motion Associated with Subduction Hyndman and Wang, 1994 NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION National Ocean Service National Geodetic Survey Positioning

More information

FieldGenius 2010 Release Notes

FieldGenius 2010 Release Notes FieldGenius 2010 Release Notes This document contains the release notes for all FieldGenius 2010 releases. The latest release notes can be found at the end of the document. FieldGenius 2010 4.2.0 (Released

More information

National GNSS/BDS CORS Services in China

National GNSS/BDS CORS Services in China National GNSS/BDS CORS Services in China Prof. Yamin Dang Chinese Academy of Surveying & Mapping E-mail:dangym@casm.ac.cn Outline 1 2 3 Reference Frame in China: CGCS 2000 GNSS/BDS CORS Service System

More information

Introduction to GAMIT/GLOBK

Introduction to GAMIT/GLOBK Introduction to GAMIT/GLOBK Basic framework: GAMIT GAMIT: Series of programs that analyze GPS phase data to estimate parameters: Station positions (coordinates) assumed constant at epoch of data Satellite

More information

TcpGPS. User Manual. Installation. The steps below must be followed:

TcpGPS. User Manual. Installation. The steps below must be followed: TcpGPS User Manual Installation The steps below must be followed: 1. Decompress the file TcpGPSSetup.zip. 2. Execute the file vcredist_x86_vs2008.exe. This application will install the libraries required

More information

Activity Report of UN-GGIM-AP WG1- Geodetic Reference Framework for Sustainable Development

Activity Report of UN-GGIM-AP WG1- Geodetic Reference Framework for Sustainable Development Activity Report of UN-GGIM-AP WG1- Geodetic Reference Framework for Sustainable Development Work Plan of the WG1 (2012 2015) Asia-Pacific Reference Frame (APREF) Project ongoing Asia-Pacific Regional Geodetic

More information

Version 2.0 English. Leica GPS900 Technical Reference Manual

Version 2.0 English. Leica GPS900 Technical Reference Manual Version 2.0 English Leica GPS900 Technical Reference Manual Introduction Purchase Product identification Congratulations on the purchase of a GPS900 Series instrument. To use the product in a permitted

More information

How To Combined TPS and GPS adjustment

How To Combined TPS and GPS adjustment How To Combined TPS and GPS adjustment Version 4.4 Sweco Nederland B.V. All rights reserved Contents 1. Introduction 3 2. New MOVE3 Project 3 3. Options 4 4. Default standard deviations 6 5. Import GNSS/GPS

More information

Combination of GNSS and InSAR for Future Australian Datums

Combination of GNSS and InSAR for Future Australian Datums Combination of GNSS and InSAR for Future Australian Datums Thomas Fuhrmann, Matt Garthwaite, Sarah Lawrie, Nick Brown Interferometric Synthetic Aperture Radar Motivation Current situation Static Datum:

More information

Reduction of Field Observations

Reduction of Field Observations Reduction of Field Observations GNSS/GPS measurements or Latitudes, Longitudes, HAE: We re interested in projected coordinates, e.g., State Plane Survey measurements in a projected coordinate system, on

More information

Software for Land Development Professionals

Software for Land Development Professionals Software for Land Development Professionals SurvNET Carlson SurvNET is SurvCADD's Network Least Squares Reduction (NLSA) program. This module will perform a least squares adjustment and statistical analysis

More information

Horizontal Positional Accuracy (HPA) How is it calculated? Gord Gamble and Peter Goodier, Practice Advisory Department

Horizontal Positional Accuracy (HPA) How is it calculated? Gord Gamble and Peter Goodier, Practice Advisory Department Horizontal Positional Accuracy (HPA) How is it calculated? Gord Gamble and Peter Goodier, Practice Advisory Department In the December 2014 issue of The Link, the Practice Advisory Department published

More information

BILL HENNING, Prof LS.

BILL HENNING, Prof LS. BILL HENNING, Prof LS. GNSS MONUMENTS IN SPACE OPUS BASICS- ANTENNAS, RINEX FILES OPUS STATIC, RAPID STATIC AND SHARED EXAMINING OPUS RESULTS OPUS PROJECTS HYBRID TO GRAVIMETRIC GEOID MODELS CAVEATS FOR

More information

CORSnet-NSW: Towards State-wide CORS Infrastructure for NSW, Australia

CORSnet-NSW: Towards State-wide CORS Infrastructure for NSW, Australia CORSnet-NSW: Towards State-wide CORS Infrastructure for NSW, Australia Volker Janssen, Adrian White and Thomas Yan Dr Volker Janssen GNSS Surveyor (CORS Network) Survey Infrastructure and Geodesy NSW Land

More information

Box Calibration: Here I entered points 3 and 4 which are the only control points given to us in the plans.

Box Calibration: Here I entered points 3 and 4 which are the only control points given to us in the plans. Box Calibration: Trimble machine control does not like files that are derived from State Plane Coordinates or files that contain a Geoid. Trimble representatives want everyone to do a site calibration

More information

Base Configurations Carlson SurvCE

Base Configurations Carlson SurvCE There are six methods to set the stationary base position, organized into 2 categories: From New Position includes Read from GPS, Enter Lat/Long and Enter Grid System Coordinates. The From Known Position

More information

The Study for Mapping Policy and Topographic Mapping for Integrated National Development Plan in the Republic of the Philippines

The Study for Mapping Policy and Topographic Mapping for Integrated National Development Plan in the Republic of the Philippines The Study for Mapping Policy and Topographic Mapping for Integrated National Development Plan in the Republic of the Philippines Japan International Cooperation Agency (JICA) National Mapping and Resources

More information

W D-0049/004 EN

W D-0049/004 EN September 21, 2011 Contact Ground Survey Report, Lidar Accuracy Report, & Project Report New Madrid Seismic Zone Northeast of Memphis, Tennessee Contract Number: W91278-09D-0049/004 EN Project: C-10-026

More information

Impact of Satellite Positioning Services on State Survey Control Networks

Impact of Satellite Positioning Services on State Survey Control Networks Impact of Satellite Positioning Services on State Survey Control Networks Dr. Stefan Willgalis Ingenieurbüro für Geodäsie und Geoinformation Hanover, Germany XXIII International FIG Congress Munich, 09.10.2006

More information

University of Texas Center for Space Research ICESAT/GLAS Document: CSR SCF Release Notes for Orbit and Attitude Determination

University of Texas Center for Space Research ICESAT/GLAS Document: CSR SCF Release Notes for Orbit and Attitude Determination University of Texas Center for Space Research ICESAT/GLAS Document: CSR SCF Notes for Orbit and Attitude Determination Tim Urban Sungkoo Bae Hyung-Jin Rim Charles Webb Sungpil Yoon Bob Schutz Version 3.0

More information

ANGLES 4/18/2017. Surveying Knowledge FE REVIEW COURSE SPRING /19/2017

ANGLES 4/18/2017. Surveying Knowledge FE REVIEW COURSE SPRING /19/2017 FE REVIEW COURSE SPRING 2017 Surveying 4/19/2017 Surveying Knowledge 4 6 problems Angles, distances, & trigonometry Area computations Earthwork & volume computations Closure Coordinate systems State plane,

More information

Determination of Geoid and Transformation Parameters By Using GPS On The Region of Kadinhani in Konya

Determination of Geoid and Transformation Parameters By Using GPS On The Region of Kadinhani in Konya INTRODUCTION Determination of Geoid and Transformation Parameters By Using GPS On The Region of Kadinhani in Konya Fuat BASÇIFTÇI, Hasan Ç AGLA, Turgut AYTEN, Sabahattin Akkus, Ismail SANLIOGLU and Beytullah

More information

RAILWAY PROJECT Geodetic Reference System, Geodetic Control Network and Rail Construction Measurements

RAILWAY PROJECT Geodetic Reference System, Geodetic Control Network and Rail Construction Measurements RAILWAY PROJECT Geodetic Reference System, Geodetic Control Network and Rail Construction Measurements Railway Project 2 / 8 INDEX 1 Introduction... 3 2 Reference System... 3 2.1 Reference system... 3

More information

KAshima RAy-Tracing Service (KARATS)

KAshima RAy-Tracing Service (KARATS) KAshima RAy-Tracing Service (KARATS) Fast ray-tracing algorithms through numerical weather models for real-time positioning applications in East Asia T. Hobiger, R. Ichikawa, Y. Koyama, T. Kondo Overview

More information

Height Modernization Data Processing

Height Modernization Data Processing Height Modernization Data Processing CSRC Semi-annual Meeting San Francisco, May 14, 2004 (ftp.geodeticsolutions.com/pub/download/csrc/present.ppt) Data processing guidelines? Accuracy? Consistency with

More information

RECOMMENDATION ITU-R P DIGITAL TOPOGRAPHIC DATABASES FOR PROPAGATION STUDIES. (Question ITU-R 202/3)

RECOMMENDATION ITU-R P DIGITAL TOPOGRAPHIC DATABASES FOR PROPAGATION STUDIES. (Question ITU-R 202/3) Rec. ITU-R P.1058-1 1 RECOMMENDATION ITU-R P.1058-1 DIGITAL TOPOGRAPHIC DATABASES FOR PROPAGATION STUDIES (Question ITU-R 202/3) Rec. ITU-R P.1058-1 (1994-1997) The ITU Radiocommunication Assembly, considering

More information

Evidence Recorder Release Notes

Evidence Recorder Release Notes Evidence Recorder 7.1.0 Release Notes Released on: August 20, 2010 Important Notes We will be dropping support for several older builds of Evidence Recorder including: Allegro CE, Toughbook, Recon.Net,

More information

ANALYSIS OF THE GEOMETRIC ACCURACY PROVIDED BY THE FORWARD GEOCODING OF SAR IMAGES

ANALYSIS OF THE GEOMETRIC ACCURACY PROVIDED BY THE FORWARD GEOCODING OF SAR IMAGES ANALYSIS OF THE GEOMETRIC ACCURACY PROVIDED BY THE FORWARD GEOCODING OF SAR IMAGES V. Karathanassi, Ch. Iossifidis, and D. Rokos Laboratory of Remote Sensing, Department of Rural and Surveying Engineering,

More information

INDONESIA S GEOSPATIAL DATA INFRASTRUCTURE

INDONESIA S GEOSPATIAL DATA INFRASTRUCTURE INDONESIA S GEOSPATIAL DATA INFRASTRUCTURE Antonius B. Wijanarto Head of Center for Geodetic Control Network and Geodynamics GEOSPATIAL INFORMATION AGENCY srgi@big.go.id ONE GEO.REFERENCE (One Map Policy)

More information

SurvX 3.0 Software User Manual

SurvX 3.0 Software User Manual SurvX 3.0 Software User Manual (Android version) Content Chapter 1 Software Introduction...4 Chapter 2 SurvX installation and uninstallation... 4 2.1 SurvX Installation... 4 2.2 SurvX uninstallation...

More information

Presented at the FIG Working Week 2017, May 29 - June 2, 2017 in Helsinki, Finland

Presented at the FIG Working Week 2017, May 29 - June 2, 2017 in Helsinki, Finland Presented at the FIG Working Week 2017, May 29 - June 2, 2017 in Helsinki, Finland OUTLINE I INTRODUCTION II GNSS MEASUREMENTS AND METHODOLOGY III IV TEST RESULTS AND DISCUSSION Concluding Remarks ONE

More information

Project Report Lower Columbia River. Report Presented to:

Project Report Lower Columbia River. Report Presented to: December 29, 2005 Project Report Lower Columbia River Contract #2265-H Report Presented to: Puget Sound Lidar Consortium 1011 Western Avenue, Suite 500 Seattle, WA 98104 Phone: (206) 464-7090 Fax: (206)

More information

The GPS Data Campaign for the Slip Surface Estimation Ciloto Landslide Zone, West Java, Indonesia

The GPS Data Campaign for the Slip Surface Estimation Ciloto Landslide Zone, West Java, Indonesia The GPS Data Campaign for the Slip Surface Estimation Ciloto Landslide Zone, West Java, Indonesia { Vera SADARVIANA, Hasanuddin Zainal ABIDIN, Djoko SANTOSO, Joenil KAHAR and Achmad Ruchlihadiana TISNASENDJAJA

More information

LiDAR & Orthophoto Data Report

LiDAR & Orthophoto Data Report LiDAR & Orthophoto Data Report Tofino Flood Plain Mapping Data collected and prepared for: District of Tofino, BC 121 3 rd Street Tofino, BC V0R 2Z0 Eagle Mapping Ltd. #201 2071 Kingsway Ave Port Coquitlam,

More information

The GNSS CORS Cluster for the Northern Territory Australia

The GNSS CORS Cluster for the Northern Territory Australia Robert SARIB and Philip VERRALL, Australia Key words: GPS, GNSS, CORS, Positioning, Networks / Clusters SUMMARY This Poster Presentation will describe the GNSS network / cluster in the Northern Territory

More information

Wide-area kinematic GNSS

Wide-area kinematic GNSS Wide-area, sub-decimetre positioning for airborne LiDAR surveys using CORSnet-NSW Oscar L. Colombo GEST/Goddard Space Flight Center Maryland, USA Shane Brunker, Glenn Jones, Volker Janssen NSW Land & Property

More information

Determination of GDA94 coordinates for eighty-four stations of GPSnet in Victoria using the October 2012 GPS data set. Record 2014/08 GeoCat 78746

Determination of GDA94 coordinates for eighty-four stations of GPSnet in Victoria using the October 2012 GPS data set. Record 2014/08 GeoCat 78746 Record 2014/08 GeoCat 78746 Determination of GDA94 coordinates for eighty-four stations of GPSnet in Victoria using the October 2012 GPS data G. Hu, J. Dawson APPLYING GEOSCIENCE TO AUSTRALIA S MOST IMPORTANT

More information

Lewis County Public Works Department (County) GIS Mapping Division 350 N. Market Blvd. Chehalis, WA Phone: Fax:

Lewis County Public Works Department (County) GIS Mapping Division 350 N. Market Blvd. Chehalis, WA Phone: Fax: March 31, 2005 Project Report Lewis County, WA Contract #2262-H Report Presented to: Lewis County Public Works Department (County) GIS Mapping Division 350 N. Market Blvd. Chehalis, WA 98532-2626 Phone:

More information

10.1 Conversions. Grid to Geodetic

10.1 Conversions. Grid to Geodetic 10.1 Conversions Geodetic conversions work with the current geodetic settings. Convert grid coordinates to geodetic (Latitude/Longitude) or vice versa with any of the available projections. All results

More information

Geometric Approach to Position Determination in Space: Advantages and Limitations

Geometric Approach to Position Determination in Space: Advantages and Limitations Geometric Approach to Position Determination in Space: Advantages and Limitations OSU Dorota Grejner-Brzezinska and Tae-Suk Bae Department of Civil and Environmental Engineering and Geodetic Science The

More information

Teledyne PDS. Trailing Suction Hopper. Version April Teledyne RESON B.V. Stuttgartstraat AS Rotterdam The Netherlands

Teledyne PDS. Trailing Suction Hopper. Version April Teledyne RESON B.V. Stuttgartstraat AS Rotterdam The Netherlands Trailing Suction Hopper Teledyne PDS Version 1.1.0 April 2017 Teledyne RESON B.V. Stuttgartstraat 42-44 3047 AS Rotterdam The Netherlands Tel.: +31 (0)10 245 15 00 www.teledyne-reson.com Teledyne RESON

More information

SURPAC Surveying Software Version 5.65 for Windows XP/Vista/7/8/10

SURPAC Surveying Software Version 5.65 for Windows XP/Vista/7/8/10 SURPAC Surveying Software Version 5.65 for Windows XP/Vista/7/8/10 Topographical, Engineering, Mining and Cadastral Surveying Applications Topographical, Engineering, Mining and Cadastral Surveying Applications

More information

The Components of Deflection of the Vertical Calculations for Heights in Computations and Adjustments of Physical Projects

The Components of Deflection of the Vertical Calculations for Heights in Computations and Adjustments of Physical Projects The Components of Deflection of the Vertical Calculations for Heights in Computations and Adjustments of Physical Projects 1 Oduyebo Fatai Olujimi, 2 Ono Matthew N., 3 Eteje Sylvester Okiemute, 2 1, Professor,

More information

Convert Local Coordinate Systems to Standard Coordinate Systems

Convert Local Coordinate Systems to Standard Coordinate Systems BENTLEY SYSTEMS, INC. Convert Local Coordinate Systems to Standard Coordinate Systems Using 2D Conformal Transformation in MicroStation V8i and Bentley Map V8i Jim McCoy P.E. and Alain Robert 4/18/2012

More information

Manual Revision Situation

Manual Revision Situation HGO Data Post Processing Software Package Manual Manual Revision Situation Revision Date Revision Level 2012-07-27 1 Description HGO Data Post Processing Software Package Manual I HGO Data Post Processing

More information

Project Report Nooksack South Fork Lummi Indian Nation. Report Presented to:

Project Report Nooksack South Fork Lummi Indian Nation. Report Presented to: June 5, 2005 Project Report Nooksack South Fork Lummi Indian Nation Contract #2291-H Report Presented to: Lummi Indian Nation Natural Resources Department 2616 Kwina Road Bellingham, WA 98226 Point of

More information

Real Geodetic Map (Map without Projection) Abstract Keywords: 1. Introduction

Real Geodetic Map (Map without Projection) Abstract Keywords: 1. Introduction Real ( without Projection) Ahmad Shaker 1 Abdullah Saad 1 Abdurrahman Arafa 2* 1.Surveying Dep., Shoubra Faculty of Engineering, Benha University, Egypt 2.Manager of Surveying Dep. in Horse Company. Egypt

More information

Spring Term. Lecturer: Assoc. Prof. Dr. M. Zeki COŞKUN. Department of Geomatics Engineering

Spring Term. Lecturer: Assoc. Prof. Dr. M. Zeki COŞKUN. Department of Geomatics Engineering 2009 2010 Spring Term Lecturer: Assoc. Prof. Dr. M. Zeki COŞKUN Department of Geomatics Engineering e-mail : coskun@itu.edu.tr LEVELLING What is Levelling? Use of Levelling Levelling Terminology Types

More information

Principles of the Global Positioning System Lecture 15" Propagation Medium: Neutral atmosphere" Basic atmospheric structure"

Principles of the Global Positioning System Lecture 15 Propagation Medium: Neutral atmosphere Basic atmospheric structure 12.540 Principles of the Global Positioning System Lecture 15" Prof. Thomas Herring" Room 54-820A; 253-5941" tah@mit.edu" http://geoweb.mit.edu/~tah/12.540 " Propagation Medium: Neutral atmosphere" Summary"

More information

1. Introduction Surveying Method chosen depends on:

1. Introduction Surveying Method chosen depends on: 1. Introduction Surveying Method chosen depends on: by the purpose of the survey e.g. map making, location of specific points, definition of land ownership etc., by the nature of the survey itself e.g.

More information

SurvNET Lesson One - Processing an Assumed Coordinate System 2D Total Station Network

SurvNET Lesson One - Processing an Assumed Coordinate System 2D Total Station Network SurvNET Lesson One - Processing an Assumed Coordinate System 2D Total Station Network This tutorial is divided into two lessons covering the process of reducing and adjusting raw survey data into final

More information

High-Precision Positioning Unit 2.2 Student Exercise: Calculating Topographic Change

High-Precision Positioning Unit 2.2 Student Exercise: Calculating Topographic Change High-Precision Positioning Unit 2.2 Student Exercise: Calculating Topographic Change Ian Lauer and Ben Crosby (Idaho State University) Change is an inevitable part of our natural world and varies as a

More information

1. LiDAR System Description and Specifications

1. LiDAR System Description and Specifications High Point Density LiDAR Survey of Mayapan, MX PI: Timothy S. Hare, Ph.D. Timothy S. Hare, Ph.D. Associate Professor of Anthropology Institute for Regional Analysis and Public Policy Morehead State University

More information

Alternative Solutions for RTK-GPS Applications in Building and Road Constructions

Alternative Solutions for RTK-GPS Applications in Building and Road Constructions Open Journal of Civil Engineering, 2015, 5, 312-321 Published Online September 2015 in SciRes. http://www.scirp.org/journal/ojce http://dx.doi.org/10.4236/ojce.2015.53031 Alternative Solutions for RTK-GPS

More information

Up to 4 range measurements per pulse, including last 4 Intensity readings with 12-bit dynamic range for each measurement

Up to 4 range measurements per pulse, including last 4 Intensity readings with 12-bit dynamic range for each measurement Project PI: Hugo A. Gutierrez Jurado 1. ALTM Specifications This survey used an Optech GEMINI Airborne Laser Terrain Mapper (ALTM) serial number 06SEN195 mounted in a twin-engine Cessna Skymaster (Tail

More information

Title: Understanding Hyporheic Zone Extent and Exchange in a Coastal New Hampshire Stream Using Heat as A Tracer

Title: Understanding Hyporheic Zone Extent and Exchange in a Coastal New Hampshire Stream Using Heat as A Tracer Contact information Danna Truslow d.truslow@comcast.net Phone: 603-498-2916 Fax: 603-430-9102 Address: 1065 Washington Road Rye, NH 03970 Advisor: Jennifer Jacobs Advisor's email: jennifer.jacobs@unh.edu

More information

Chapter 2 File Management (updated September 5, 2009)

Chapter 2 File Management (updated September 5, 2009) Chapter 2 File Management (updated September 5, 2009) General Discussion.................................................................2-3 Creating New Project................................................................2-5

More information

Mapping Project Report Table of Contents

Mapping Project Report Table of Contents LiDAR Estimation of Forest Leaf Structure, Terrain, and Hydrophysiology Airborne Mapping Project Report Principal Investigator: Katherine Windfeldt University of Minnesota-Twin cities 115 Green Hall 1530

More information

GEOENGINE M.Sc. in Geomatics Engineering. Master Thesis by Jiny Jose Pullamthara

GEOENGINE M.Sc. in Geomatics Engineering. Master Thesis by Jiny Jose Pullamthara GEOENGINE M.Sc. in Geomatics Engineering Master Thesis by Jiny Jose Pullamthara Implementation of GNSS in Real-Time Positioning for an Outdoor Construction Machine Simulator Duration of Thesis : 6 months

More information

OLC Wasco County: Delivery One.

OLC Wasco County: Delivery One. OLC Wasco County: Delivery One www.quantumspatial.com January 2, 2014 Trimble R7 Receiver set up over GPS monument WASCO_02. Data collected for: Oregon Department of Geology and Mineral Industries 800

More information

Project Report Snohomish County Floodplains LiDAR Survey. Report Presented to:

Project Report Snohomish County Floodplains LiDAR Survey. Report Presented to: August 22, 2005 Project Report Snohomish County Floodplains LiDAR Survey Contract #2295-H Report Presented to: David Evans and Associates, Inc. (DEA) 1620 W. Marine View Drive, Suite 200 Everett, WA 98201

More information

Australia s national positioning program. Dr John Dawson, Section Leader Positioning

Australia s national positioning program. Dr John Dawson, Section Leader Positioning Australia s national positioning program Dr John Dawson, Section Leader Positioning Geoscience Australia s Role Geoscience Australia is Australia's pre-eminent public sector geoscience organisation Federal

More information

Chapters 1 9: Overview

Chapters 1 9: Overview Chapters 1 9: Overview Chapter 1: Introduction Chapters 2 4: Data acquisition Chapters 5 9: Data manipulation Chapter 5: Vertical imagery Chapter 6: Image coordinate measurements and refinements Chapters

More information

VECTOR. Vermont Enhanced CORS and Transmission Of Real-time Corrections. Network Status and Current Applications

VECTOR. Vermont Enhanced CORS and Transmission Of Real-time Corrections. Network Status and Current Applications VECTOR Vermont Enhanced CORS and Transmission Of Real-time Corrections Network Status and Current Applications Daniel J. Martin, National Geodetic Survey Bill Kules, Little River Survey Ron Tabor, Vermont

More information

Novel Real-Time Coordinate Transformations based on N-Dimensional Geo-Registration Parameters' Matrices

Novel Real-Time Coordinate Transformations based on N-Dimensional Geo-Registration Parameters' Matrices FIG Working Week 009, Eilat, Israel, -8 May 009 Novel Real-Time Coordinate Transformations based on N-Dimensional Geo-Registration Parameters' Matrices Sagi Dalyot, Ariel Gershkovich, Yerach Doythser Mapping

More information

The use of minimum curvature surface technique in geoid computation processing of Egypt

The use of minimum curvature surface technique in geoid computation processing of Egypt Arab J Geosci (2013) 6:1263 1272 DOI 10.1007/s12517-011-0418-0 ORIGINAL PAPER The use of minimum curvature surface technique in geoid computation processing of Egypt M. Rabah M. Kaloop Received: 25 June

More information

A Summary of the Data Analysis for Halifax GPS Precision Approach Trials Transport Canada Aviation/Cougar Helicopters Inc. University of New Brunswick

A Summary of the Data Analysis for Halifax GPS Precision Approach Trials Transport Canada Aviation/Cougar Helicopters Inc. University of New Brunswick A Summary of the Data Analysis for Halifax GPS Precision Approach Trials Transport Canada Aviation/Cougar Helicopters Inc. University of New Brunswick Attila Komjathy and Richard B. Langley Geodetic Research

More information

Simulation of GNSS/IMU Measurements. M. J. Smith, T. Moore, C. J. Hill, C. J. Noakes, C. Hide

Simulation of GNSS/IMU Measurements. M. J. Smith, T. Moore, C. J. Hill, C. J. Noakes, C. Hide Simulation of GNSS/IMU Measurements M. J. Smith, T. Moore, C. J. Hill, C. J. Noakes, C. Hide Institute of Engineering Surveying and Space Geodesy (IESSG) The University of Nottingham Keywords: Simulation,

More information

WHERE THEORY MEETS PRACTICE

WHERE THEORY MEETS PRACTICE world from others, leica geosystems WHERE THEORY MEETS PRACTICE A NEW BULLETIN COLUMN BY CHARLES GHILANI ON PRACTICAL ASPECTS OF SURVEYING WITH A THEORETICAL SLANT february 2012 ² ACSM BULLETIN ² 27 USGS

More information

Can VMF1 be improved by the use of new ray-tracing data?

Can VMF1 be improved by the use of new ray-tracing data? Geodätische Woche October 11-13, 2016 Hamburg, Germany Can VMF1 be improved by the use of new ray-tracing data? Daniel Landskron, Armin Hofmeister, Johannes Böhm Technische Universität Wien, Austria Troposphere

More information

Precise Kinematic GPS Processing and Rigorous Modeling of GPS in a Photogrammetric Block Adjustment

Precise Kinematic GPS Processing and Rigorous Modeling of GPS in a Photogrammetric Block Adjustment Precise Kinematic GPS Processing and Rigorous Modeling of GPS in a Photogrammetric Block Adjustment Martin Schmitz, Gerhard Wübbena, Andreas Bagge Geo++ GmbH D-30827 Garbsen, Germany www.geopp.de Content

More information

Can VMF1 be improved by the use of new ray-tracing data?

Can VMF1 be improved by the use of new ray-tracing data? IAG Commission 4 Symposium September 4-7, 2016 Wrocław, Poland Can VMF1 be improved by the use of new ray-tracing data? Daniel Landskron, Armin Hofmeister, Johannes Böhm Technische Universität Wien, Austria

More information

University of Texas Center for Space Research. ICESAT/GLAS CSR SCF Release Notes for Orbit and Attitude Determination

University of Texas Center for Space Research. ICESAT/GLAS CSR SCF Release Notes for Orbit and Attitude Determination University of Texas Center for Space Research ICESAT/GLAS CSR SCF Notes for Orbit and Attitude Determination Charles Webb Tim Urban Bob Schutz Version 1.0 August 2006 CSR SCF Notes for Orbit and Attitude

More information

Case Studies in SDI Components (Geodetic Datum, Data Transformations, Cadastre, Planning etc)

Case Studies in SDI Components (Geodetic Datum, Data Transformations, Cadastre, Planning etc) Case Studies in SDI Components (Geodetic Datum, Data Transformations, Cadastre, Planning etc) Momath NDIAYE, Senegal Key words: Case studies in SDI components (Geodetic Datum, Data Transformations, Cadastre,

More information

GMES TERRAFIRMA. Validation of existing processing chains in Terrafirma stage 2 LIST OF OSP DELIVERABLES EXTENDED

GMES TERRAFIRMA. Validation of existing processing chains in Terrafirma stage 2 LIST OF OSP DELIVERABLES EXTENDED GMES TERRAFIRMA ESRIN/Contract no. 19366/05/I-E Validation of existing processing chains in Terrafirma stage 2 LIST OF OSP DELIVERABLES EXTENDED 5 th July 2007 Final version - ERS M. Crosetto, M. Agudo

More information

Development of the geodetic coordinate system in Antarctica

Development of the geodetic coordinate system in Antarctica Trend Advances in Polar Science doi: 10.3724/SP.J.1085.2012.00181 September 2012 Vol. 23 No. 3: 181-186 Development of the geodetic coordinate system in Antarctica ZHANG Shengkai 1,2* & E Dongchen 1,2

More information

CHAPTER 10. Digital Mapping and Earthwork

CHAPTER 10. Digital Mapping and Earthwork CHAPTER 10 Digital Mapping and Earthwork www.terrainmap.com/rm22.html CE 316 March 2012 348 10.1 Introduction 349 10.2 Single Images 10.2.1 Rectified Photograph With a single photograph, X,Y data can be

More information

2017 OLC Silver Creek

2017 OLC Silver Creek 2017 OLC Silver Creek December 15, 2017 www.quantumspatial.com Data collected for: Oregon Department of Geology and Mineral Industries 800 NE Oregon Street Suite 965 Portland, OR 97232 Prepared by: Quantum

More information

Project Report Sauk-Suiattle Indian Tribe. Report Presented to:

Project Report Sauk-Suiattle Indian Tribe. Report Presented to: July 28, 2005 Project Report Sauk-Suiattle Indian Tribe Contract #2294-H Report Presented to: Sauk-Suiattle Indian Tribe 5318 Chief Brown Lane Darrington, WA 98241 Phone: (360) 436-0738 Fax: (360) 436-1092

More information