LGate 120 Installation Guide - Appendix

Size: px
Start display at page:

Download "LGate 120 Installation Guide - Appendix"

Transcription

1 LGate 120 Installation Guide - Appendix This guide contains information on RS485 and Ethernet connections to the LGate 120 3GY Version 1.1

2 Table of Contents Important Product Information 3 The LGate 120 Datalogger 4 Connecting to the Internet 5 Verifying Installation 6 Accessing Data on the Device 7 Inverter Direct Monitoring 10 SMA Sunny Boy 11 Power-One Aurora 13 Kaco Blueplanet 02xi 16 Fronius IG Plus 18 Emerson SPV 21 Eaton ISG PV 24 Additional Device Monitoring 26 Eaton Pow-R EVSE 26 IMT Weatherstation 29 LGate 120 FAQ 31 2

3 Important Product Information DANGER ELECTRICAL SHOCK HAZARD! All installation and servicing on the LGate 120 and accompanying products should only be performed by qualified personnel and only within the scope of these installation instructions.! Disconnect the LGate 120 from the power source (both the breaker to the LGate and the AC disconnect) when servicing the product.! The LGate is not intended for use in life-support applications. Important Warranty Information The LGate 120 is backed by the Locus Energy, LLC Hardware Limited Warranty. The following actions will void the warranty: Removing or disassembling any part of the LGate 120. Breaking the tamper seal on the LGate 120. Joining the RS485 or Ethernet cables to another conductor inside the meter socket. Installing or operating the LGate 120 in any way not specified by this installation guide. To obtain a copy of the Locus Energy, LLC Hardware Product Limited Warranty, please have your head office or program administrator contact your Locus Energy Account Manager. Recommended Installation Tool-kit for the LGate 120 Laptop Power drill Wire stripper Mounting screws Form 2S 200A meter socket Volt meter Ammeter / clamp meter Shielded twisted pair wire (for inverter direct monitoring only) Gel-filled crimps (for inverter direct monitoring only) Junction box (for inverter direct monitoring only) Network cable crimper RJ45 heads (for Ethernet connection only) 3

4 The LGate 120 Datalogger MAC ID LCD Screen RS485 / Modbus Wires RS485 / Modbus Wires (as shipped) Ethernet Port 4

5 PV Breaker Connecting to the Internet The LGate 120 requires a network connection to communicate. The cell modem is the primary method of communication; if there is no cellular reception or using the cell modem is not an option, then use the secondary method, installing an Ethernet cable. Preferred Connection Method - Cell Modem The LGate 120 comes installed with a cell modem. No additional configuration is necessary for this method. Note: Store the unused Ethernet cable inside the meter box with the coupler left on. Secondary Connection Method - Ethernet Cable Connect the LGate to a DHCP router with a CAT5 Ethernet cable, as shown below. Make sure this connection is continuous (i.e. the router is not regularly turned off). Note: If using the Ethernet connection, some additional configuration is required (see the Enabling the Ethernet Connection section on page 8 for more information). Note: Run the Ethernet cable in a separate conduit from power conductors, at least 1 Note: The LGate can hold up to months of data without an internet connection. Please ensure that the unit does not lose an internet connection for longer than 1.5 months to ensure that no data is lost. Utility PV System N L1 L2 Main Panel G LGate 120 LAN Connection DHCP Network Router or Switch L1 L2 Max. patch cable length: 300 Note: If this installation does not require inverter direct monitoring, the RS485 / Modbus Connection wires should be stored inside the meter base with the heat shrink cap left on. Note: When installing the meter in the meter base and securing the meter base cover, avoid pinching the RS485 / Modbus Connection and Ethernet Connection wires. 5

6 Verifying Installation Verify proper installation of the LGate 120 using the steps below. The correct LED screen configuration is marked with a symbol. 1. Internet Connection The phone icon on the LED screen indicates the network connection of the LGate 120. Solid phone icon: The last data packet was sent successfully. Blinking phone icon: 1. Blinking quickly: The last data packet was not sent successfully but the cellular signal strength (if applicable) is strong. 2. Blinking slowly: The last data packet was not sent successfully and the cellular signal strength (if applicable) is weak. No phone icon: The LGate 120 is not connected to the network. For an Ethernet cable connection, double-check the pin-out on the Ethernet cable (see the FAQ section on page 31 for more information). For a cell modem connection, contact technical support to troubleshoot. Note: After setting Cell mode to false, the phone icon will indicate network connectivity on the Local Area Network. 1. Blinking phone icon : The LGate has been assigned an IP address by the local router. 2. Solid phone icon : LGate is connected and sending data to the web server. 2. RS485 / Modbus Connection The switch icon indicates if any RS485 / Modbus devices are connected. If unsure whether inverter direct monitoring has been purchased for this project, contact your company, lease provider, or program admin. Switch icon is on: All external devices are communicating correctly (comm 1 or 2). Switch icon is off: At least one of the external devices is not communicating OR the LGate is not configured for external devices. Verify that all RS485 / Modbus connections are wired and terminated correctly and that the external devices are addressed accordingly. 6

7 Accessing Data on the Device Every LGate 120 device comes loaded with updated software, which provides: More secure data transfer to SolarOS; and The ability to log into the LGate with a laptop to view configuration settings. Logging into the LGate 1. Reset the LGate 120 by turning off the AC disconnect and breaker to the LGate for 30 seconds, then back on again. 2. Connect the LGate 120 directly to a laptop using the LGate s Ethernet cable. 3. In a web browser, enter in the address bar and select Enter A (see below). 4. Use the password B networkconfig and select the Login button to enter the password- protected menu (see below). A B 7

8 Navigating the Password-Protected Menu Once logged into the LGate 120, you can view the following information: 1. Basic information about the LGate: IP address, firmware type, and MAC ID A (see below) 2. All devices sending data and their instantaneous data readings (see below) 3. Network settings: cell C modem status, static IP address, proxy server, and B B A C Enabling the Ethernet Connection The LGate 120 comes preconfigured for a cellular connection. If the cellular option is not possible, enable the Ethernet Connection by selecting false in the Cell Mode drop-down menu and the Save Configuration button. Selecting true (the default value) in the Cell Mode drop-down menu enables the cellular connection. 8

9 Setting a Static IP Address The LGate can be configured for either a dynamic (DHCP) or static IP address (on a LAN connection only). A dynamic IP address allows the router to assign the LGate 120 an IP address automatically. If using the cell modem, the LGate can only use a dynamic IP address. A static IP address is a set IP address, used primarily for secured networks. This option is only available for LAN connections. A. To enable the dynamic IP address, select false in the Cell Mode drop-down list and Enabled (default value) in the DHCP Mode drop-down list in the Network Settings B. To configure the static IP address: 1. Select false in the Cell Mode drop-down list and Disabled in the DHCP Mode dropdown list in the Network Settings section A (see below). 2. Set the static address parameters: Static IP, Gateway, Net Mask, and DNS (see B below). 3. Set the proxy parameters: Proxy Address, Proxy Username, and Proxy Password (see C below). 4. Select the Save Configuration button. 5. Connect the LGate to the LAN. 6. Verify that the static address information is correct by checking that the phone icon on the screen of the LGate 120 comes on (see page 10 for more information). A B Record the static IP address of the LGate 120 for future reference C 9

10 Inverter Direct Monitoring Inverter direct monitoring is a monitoring feature that some companies purchase in addition to the core monitoring package. This feature should only be installed if it has been ordered for this particular project. If you are unsure if inverter direct monitoring has been purchased for this project, contact your company, lease provider, or program administrator. Best Practices for All Inverter Direct Installations Use shielded twisted pair cable for all communication lines; using unshielded cable will cause communication issues. Crimp all RS485 / Modbus wires outside of the meter base (i.e. in a junction box). Use one pair of twisted pair wires when wiring the RS485 / Modbus wires to the first inverter and from one inverter to the next in the daisy chain. This does not apply to Fronius inverters. (Note: The ground wire can come from any other twisted pair wire in the same cable) Limit unshielded portions of shielded cable to 1 at terminals. Shielded cable should not extend greater than 300 feet between the LGate and the first inverter, or between inverters. Run communication lines at least 1 foot away and in separate conduit from AC and DC power lines. Contents SMA Sunny Boy 11 Power-One Aurora 13 Kaco Blueplanet 02xi 16 Fronius IG Plus 18 Emerson SPV 21 Eaton ISG PV 24 10

11 SMA Sunny Boy! Each SMA inverter will require an RS485 Piggyback card in order to support inverter direct communication. Please contact SMA or your inverter vendor about purchasing this card (if necessary). Supported Models of SMA and SunPower SPR Inverters Sunny Boy 3000-US Sunny Boy 3800-US Sunny Boy 4000-US SMA Inverter Overview Sunny Boy 5000-US Sunny Boy 6000-US Sunny Boy 7000-US Sunny Boy 8000-US SunPower SPR-5000m SunPower SPR-6000m The RS485 RTU can be found on the left-middle side of the inside of the inverter. SMA Inverter Diagram RS485 RTU Extending RS485 / Modbus Wires Extend the RS485 / Modbus wires as shown below. Crimp blue and brown from LGate to inverter port 2 Crimp blue-white and brown-white from LGate to inverter port 7 Crimp orange, shield & signal from LGate to inverter port 5 Secure all other wires in the junction box To first inverter + - Gnd Shield Crimp wires outside of the meter base (i.e. in a junction box) 11

12 1. Connecting the LGate to Inverters Using shielded twisted pair cable, wire the first inverter to the RS485 / Modbus wires from the LGate (see the previous page for information on extending RS485 wires). Inverter #3 Jumper: Port A only Inverter #2 Jumper: not installed Inverter #1 Jumper: not installed Junction Box Last/Only Inverter Junction box for joining wires RS485 Piggyback card installed Shield wire secured but not terminated inside inverter housing Shield wire twisted but not terminated inside inverter housing 2. Addressing the Inverters Note: SMA inverters will automatically be assigned communication addresses by the LGate. No additional manual configuration is required. 3. Terminating the Daisy Chain For the last or only inverter in the chain, install a termination jumper on Port A only. For all other inverters, do not install any termination jumpers. jumper on Port A Last Inverter 12

13 Power-One Aurora! Power-One inverters often ship without terminal blocks included. Please contact Power-One or your inverter vendor about purchasing these (if necessary). Supported Models of Power-One Inverters Aurora Uno 3.0 Aurora Uno 3.8 Aurora Uno 3.6 Aurora Uno 4.2 Aurora Uno 4.6 Aurora Uno 5000 Power-One Inverter Overview The RS485 RTU can be found on the top-right side of the inside of the inverter. Power-One Inverter RS485 RTU Extending RS485 / Modbus Wires Extend the RS485 / Modbus wires as shown below. Crimp blue and brown from LGate to inverter port +T/R Crimp blue-white and brown-white from LGate to inverter port -T/R Crimp orange and shield from LGate to signal inverter port RTN Secure all other wires in the junction box To first inverter + - Gnd Shield Crimp wires outside of the meter base (i.e. in a junction box) 13

14 1. Connecting the LGate to Inverters Using shielded twisted pair cable, wire the first inverter to the RS485 / Modbus wires from the LGate (see the previous page for information on extending RS485 wires). Inverter #3 Switch: Turned to ON Inverter #2 Switch: Turned to OFF Inverter #1 Switch: Turned to OFF +T/R -T/R RTN +T/R -T/R RTN +T/R -T/R RTN Junction Box 1 1 Junction box for joining wires Middle Inverter Shield wire secured but not terminated inside inverter housing Shield wire twisted but not terminated inside inverter housing 2. Setting the Inverter Addresses Use the keys on the inverter menu to configure addresses: Note: Each inverter address must be set individually. Up & Down keys: scroll Enter key: select Power-One Inverter Menu 1. In the Main Menu, press Enter to select Settings ; the Password screen will appear (see diagram at right) 2. Enter the password 0000: press Up to find each value, then Enter to select the number and move on to the next value. 3. When finished entering the password, press Enter. 4. Press Enter in the next screen to select Address. 5. Set the inverter address: press Up to choose the value and Enter to move on to the next value (see the table at right for the address for each inverter). 6. Press Enter to save changes. Position Address 1st inverter etc. 14

15 3. Terminating the Daisy Chain For the last or only inverter in the chain, turn the termination switch to ON. switch Last/Only Inverter Types of Communication Terminals Power-One inverters have several types of terminals for inverter direct communication: terminal blocks and comm jacks. While the pin-out is different for each terminal block and comm jacks (as shown below), either option works for inverter direct communication. Power-One 3000, 3600, 4200 Inverters Gray terminal blocks (at right) Power-One 5000, 6000 Inverters Gray terminal blocks (in instructions) RJ12 Connector Pin-out 6 RTN 5 4 TR- 3 2 TR+ 1 Power-One with RJ12 Plug-ins RJ45 Connector Pin-out TR+ TR- RTN 15

16 Kaco Blueplanet 02xi! Make sure that each Kaco inverter has a com card of version LP210E or higher (to verify, see the image of the Kaco Inverter on the following page). Supported Models of Kaco Inverters Blueplanet 1502xi Blueplanet 2502xi Blueplanet 3502xi Kaco Inverter Overview The RS485 RTU is located in the connection box at the bottom of the inverter. Kaco Inverter RS485 RTU Extending RS485 / Modbus Wires Extend the RS485 / Modbus wires as shown below. Crimp blue and brown from LGate to inverter port B Crimp blue-white and brown-white from LGate to inverter port A Crimp orange and shield from LGate to inverter port G Secure all other wires in the junction box To first inverter + - Gnd Shield Crimp wires outside of the meter base (i.e. in a junction box) 16

17 1. Connecting the LGate to Inverters Using shielded twisted pair cable, wire the first inverter to the RS485 / Modbus wires from the LGate (see the previous page for information on extending RS485 wires). Inverter #3 Inverter #2 Inverter #1 The two sets of A, B, & G ports are interchangeable Switches: Turned to ON A Switches: Turned to OFF Switches: Turned to OFF B G A B G A B G A B G A B G A B G Junction Box Junction box for joining wires Middle Inverter Shield wire secured but not terminated inside inverter housing Shield wire twisted but not terminated inside inverter housing 2. Setting the Inverter Addresses Use the keys on the inverter menu to configure the addresses. Note: Each inverter address must be set individually. 1. Press both keys to access configuration mode. 2. Press 1 to scroll to Select the interface and settings of the RS485 address (see diagram at right). 3. Press 2 to switch to RS485 interface. 4. Press 1 to scroll to Address Setting menu 5. Press 2 to set inverter addresses: Inverter 1 (closest to LGate): 01 Inverter 2 (next in series): 02, etc. Configuration Keys 3. Terminating the Daisy Chain For the last or only inverter in the chain, turn the termination switches to ON. switches Last/Only Inverter 17

18 Fronius IG Plus! Each Fronius inverter will require an RS485 Com Card in order to support inverter direct communication and a termination plug to terminate the communication chain. Please contact Fronius or your inverter vendor to purchase these items. Supported Models of Fronius and SunPower SPR Inverters IG Plus 25 V-1 IG Plus 30 V-1 IG Plus 35 V-1 IG Plus 50 V-1 IG Plus 70 V-2 IG Plus 100 V-2 IG Plus 100 V-3 IG Plus 120 V-3 IG Plus 150 V-3 Fronius Inverter Overview The Com Card is placed on the bottom-right of the inside of the inverter. Com Card Fronius Inverter Fronius Inverter RTU 1. Connecting the LGate to Inverters Using shielded twisted pair cable, wire the first inverter to the RS485 / Modbus wires. Inverter #3 Plug: Installed Inverter #2 Plug: Not installed Inverter #1 Plug: Not installed IN OUT IN OUT IN OUT Junction Box Crimp blue to inverter blue Crimp blue-white to inverter blue-white Crimp brown to inverter green-white Crimp brown-white to inverter green Plug in Last/Only Inverter 18 Crimp orange to inverter brown-white

19 2. Configuring Inverters A. Setting the IG Number 1. Wait 5 minutes for the inverter to start up; when done, the display will show PV production. 2. Press Menu to reach the main menu. 3. Scroll (press Up) until SETUP appears on the top and press Enter. 4. Scroll until IG-NR appears and press Enter. 5. When the first digit flashes, press Up to select a value and then Enter when complete; repeat for the second digit, then press Enter to apply the changes. 6. For the first inverter (closest to the LGate), enter For the second inverter (second closest), enter 06 ; etc. Fronius Interface B. Setting the Communication Protocol 1. In the Setup Menu, press Menu 5 times to enter CODE, the password-protected menu. 2. Enter the access code 22742: press Up to find the value, then Enter to select the number and move on to the next value. 3. When finished entering the password, the code will flash; press Enter to enter the password-protected menu. Note: When in the password-protected menu, the inverter will go into standby mode and the light next to the screen will be red. Once changes have been made, the inverter will restart and the light will turn green. 4. Scroll to COMM and press Enter. 5. Scroll to Mode and press Enter. 6. Scroll to IFP and press Enter to choose IFP (Interface Protocol) mode. 19

20 2. Configuring Inverters C. Setting the Baud Rate 1. Back in the password-protected menu, scroll to IFP and press Enter. 2. Scroll to and press Enter. 3. Go to AC Sync mode by selecting ESC twice and pressing Menu twice. D. Resetting the Inverter & Datalogger 1. Reset by the Fronius inverter by turning the DC disconnect off then the AC disconnect off; then turn the AC disconnect on, followed by turning the DC disconnect on. 2. Reboot the LGate using the reset button or by turning the LGate breaker off and on. E. Verify that all settings in the above steps saved correctly. 3. Terminating the Daisy Chain For the last or only inverter in the chain, install a Fronius-supplied termination plug in the open Ethernet port. plug Plug in Last/Only Inverter 20

21 Emerson SPV Supported Models of Emerson and Dow Powerhouse Inverters SPV-3.5 SPV-5.0 Dow # Emerson Inverter Overview The inverter RTU is in the lower section of the inverter. Emerson Inverter Emerson Inverter RTU Extending RS485 / Modbus Wires Extend the RS485 / Modbus wires as shown below. Crimp blue and brown from LGate to inverter port A Crimp blue-white and brown-white from LGate to inverter port B Crimp orange and shield from LGate to inverter port Gnd Secure all other wires in the junction box To first inverter + - Gnd Shield Crimp wires outside of the meter base (i.e. in a junction box) 21

22 1. Connecting the LGate to Inverters Using shielded twisted pair cable, wire the first inverter to the RS485 / Modbus wires from the LGate (see the previous page for information on extending RS485 wires). Shield wire secured but not terminated inside inverter housing Shield wire twisted but not terminated inside inverter housing Junction box for joining wires Emerson SPV Inverter 1 G A B G A B Inverter #3 G A B G A B Inverter #2 G A B G A B Inverter #1 Junction Box Resistor: Switched to ON Resistor: Switched to OFF Resistor: Switched to OFF Address 3 Address 2 Address 1 2. Setting the Inverter Addresses The address has to be set for each inverter installed - inverter #1 is the closest inverter to the LGate in the communication chain, inverter #2 is the second closest, etc. Note: New inverters come preset with address #1. If the inverter was previously set to a different address, follow the LCD display to change the address. Emerson inverters use a knock interface to configure addresses, which requires tapping on the front of the inverter once powered up. Note: Pause between each set of knocks to allow the interface to register selections, as indicated by the symbol. Each set of knocks must be completed within 1 second. The interface will log out of Configuration Mode after 1 minute without activity and will not save any changes made. Step Knock Sequence 1. Accessing the Configuration Mode Accessing the Device Address Menu Addressing the Inverters A. Addressing an inverter as inverter #1 3 B. Addressing an inverter as inverter #2 1 3 C. Addressing an inverter as inverter #3, etc Saving changes & exiting Configuration Mode 3 22

23 3. Terminating the Daisy Chain For the last or only inverter in the chain, turn the termination switch to ON. Switch Emerson SPV Inverter 23

24 Eaton ISG PV Supported Models of Eaton ISG PV Inverters Eaton PV240 Eaton PV250 Eaton PV260 Eaton ISG PV Inverter Overview The inverter RTU can be found on the bottom-right side of the inside of the inverter. Eaton Inverter Eaton Inverter RTU 1. Connecting the LGate to Inverters Using shielded twisted pair cable, wire the first inverter to the RS485 / Modbus wires.! WARNING: RJ45 ports 7 and 8 on Eaton inverters are DC powered. Do not connect other devices to these ports. Inverter #3 Inverter #2 Inverter #1 T568B Ethernet Cable Switch: Turned to ON RJ45 Port 1 RJ45 Port 2 Switch: Turned to OFF RJ45 Port 1 RJ45 Port 2 Switch: Turned to OFF RJ45 Port 1 RJ45 Port 2 Junction Box Crimp blue to inverter orange-white Crimp blue-white to inverter orange Crimp brown to inverter green-white Crimp brown-white to inverter green RJ45 Port 1 Eaton Modbus RTU RJ45 Port 2 Crimp orange to inverter blue 24

25 2. Enabling RS485 Mode Set both dip switches on the left-hand side of the Modbus RTU to the ON position (down) to set the inverter to RS485 mode. Left-hand side dip switches turned to ON (down) 3. Addressing the Inverters RS485 Mode Enabled Note: Eaton inverters will automatically be assigned communication addresses by the LGate. No additional manual configuration is required. 4. Terminating the Daisy Chain For the last or only inverter in the chain, turn the right-hand side termination switches ON (down). Switches Turned ON (down) Switches Turned OFF (up) 25

26 Additional Device Monitoring This section covers additional devices that may be a part of the installation. If unsure whether to install these devices, contact your office, program administrator, or lease provider. Eaton Pow-R EVSE Supported Models of Eaton Pow-R EVSE Universal Receptacle Level 1 Level 1 Charging Station Level 2 Charging Station Eaton Pow-R EVSE Overview The Modbus RTU can be found within the device enclosure. Eaton Pow-R EVSE Modbus RTU Eaton Pow-R EVSE Extending RS485 / Modbus Wires Extend the RS485 / Modbus wires as shown below. Crimp blue and brown from LGate to EVSE port Data Line A Crimp blue-white and brown-white from LGate to EVSE port Data Line B Crimp orange and shield from LGate to EVSE ports Shield & Common signal ground Secure all other wires in the junction box To first inverter + - Gnd Shield Crimp wires outside of the meter base (i.e. in a junction box) 26

27 1. Connecting the LGate to Inverters Using shielded twisted pair cable, wire the first inverter to the RS485 / Modbus wires from the LGate (see the previous page for information on extending RS485 wires). Eaton Pow-R EVSE Shield wire secured but not terminated inside EVSE housing Shield wire twisted but not terminated inside EVSE housing Junction box for joining wires Common Shield Data Line B Device #3 Data Line A Common Shield Data Line B Device #2 Data Line A Common Shield Data Line B Device #1 Data Line A Junction Box Modbus Modbus Modbus 2. Addressing the Eaton Pow-R EVSE Set the address for each device according to its position in the communication chain, using the dip switches on SW1 as shown below. Moving the switch to the left turns it to the ON position. Modbus Address Device 1 1 OFF OFF OFF OFF ON Device 2 2 OFF OFF OFF ON OFF Device 3 3 OFF OFF OFF ON ON Device 4 4 OFF OFF ON OFF OFF etc. Dip Switches on SW1 27

28 3. Setting the Baud Rate In order to set the Baud Rate to 9600, turn both dip switches 2 and 3 on SW1 to the OFF position (to the right). 4. Terminating the Daisy Chain Dip Switches on SW1 If the Eaton Pow-R EVSE is the last device in a communication chain with at least 3 devices or the cable run from the LGate to a single device is greater than 100 feet, install a 150 ohm resistor between the data line wires at a connection point. Note: The 150 ohm resistor & connection point should be purchased separately. Connection Point 150 ohm Resistor CAT5 Shielded Cable Shield wire from previous device Ground wire from previous device (-) wire from previous device (+) wire from previous device Data Line A Data Line B Common Shield Last/Only Device 28

29 IMT Weather Station! This section covers the installation of the IMT Weather Station IMT Weatherstation will require an external 24V DC, 100mA power supply when connected to the LGate 320 Supported Models of IMT Weather Stations IMT Basic (Irradience Sensor only) Installing the Weather Station Mount the Irradiance Sensor parallel to the PC array, preferably on the same rack and away from the shade. If applicable, connect the Wind Sensor and Ambient Temperature Probe, avoiding enclosed and shaded areas. Mount at same tilt angle and orientation as PV array IMT Deluxe (includes Wind Sensor & Ambient Temp Probe) Irradiance Sensor 1. Powering the Weather Station Wind Sensor Ambient Temperature Probe Connect the red and thin black wires from the weather station pigtail to a DC power supply, Extend all wires with gel-filled crimp connectors in a junction box DC- Weather Station Weather station pigtail DC+ + - G 24V DC- wire from next device 24V DC+ wire from next device 24V DC- Port on LGate V DC+ Port on LGate AWG Wires (for other DC-powered devices) 29

30 2. Connecting the Weather Stations to the LGate Connect the weather station to the RS485 pigtail. Extend all wires with gel-filled crimp connectors in a junction box. connectors in a junction box.! IMT devices have no internal termination. If the weather station is at the end of a daisy chain with more than 3 devices, see section 3 below for termination information. Crimp blue and brown from LGATe to to IMT brown (Rs485+) Crimp blue-white and brown-white from LGate to IMT orange (RS485-) Crimp orange from LGate to IMT thick black (Data Ground) Secure all other wires in the junction box DC+ DC- Weather Station G + - Weather station pigtail 3. Connecting to a Modbus Chain with more than 3 Devices If the weather station is at the end of the daisy chain with more than 3 devices, a 120 ohm resistor should be installed between the brown and orange wires at a connection point.! The 120 ohm resistor and connection point should be purchased separately. Weather Station (Last Device) + - G 120 ohm Resistor Connection Point 30 CAT5 Shielded Cable Ground wire from previous device (-) wire from previous device (+) wire from previous device DC- wire from previous device DC+ wire from previous device Shield wire from previous device

31 LGate 120 3GY FAQ 1. What is shielded twisted pair cable? 2. How should the LGate 120 be connected to the internet when not using the cell modem? 3. What are the minimum requirements for internet access when not using the cell modem? 4. How do I set up a non-dhcp network connection? 1. What is shielded twisted pair cable? Locus Energy requires using shielded twisted pair cable for all RS485 and Modbus communication lines; shielded CAT5e cable is recommended. Using non-shielded wires will potentially cause electromagnetic interference (EMI) issues. Shield (drain) wire 4 Twisted pairs Shielding Shielded Twisted Pair Cable 2. How should the LGate 120 be connected to the internet when not using the cell modem? Most Local Area Network (LAN) connections are set up in one of two ways: Internet Modem Router LGate Connects the home network to the internet. It connects directly into the wall jack & has only one Ethernet port. Assigns an IP address & directs data to each device on the network. It is usually next to or on top of the modem. Provides extra Ethernet ports to additional devices. It only provides an extra physical connection point. Internet Modem Router Switch LGate 31

32 3. What are the minimum requirements for internet access when not using the cell modem? Continuous high-speed internet access (ex: DSL, cable, satellite) - dial-up will not work Dynamic IP (DHCP) network (see Non-DHCP Network Connections section below for alternatives) TCP port 80 open outbound with access to the primary DNS server, or port 443 for secure networks RJ-45 Ethernet connection 4. How do I set up a non-dhcp network connection? If the local network does not support open dynamic host configuration protocol (DHCP), either: A. Assign the LGate a DHCP reservation on the local network Contact the local network provider or network administrator and ask for a DHCP reservation, or dynamic reservation, for the MAC ID of the LGate; also confirm that Port 80 is open outbound. B. Configure the LGate with a static IP address See page 10 for information on how to set the static IP address on the LGate

33 5. How do I create an Ethernet cable? 8P8C connectors, or RJ45 heads, can be used to terminate CAT5 twisted pair cable to create an Ethernet line. The most common termination method for T568B cable is shown below and applies to both ends of the cable. T568B Pin Placement (clip facing toward page) 1 Orange-white 2 3 Orange 4 5 Green-white Blue Note: Ensure that wires reach the tip of the RJ45 head before crimping. It is not necessary to strip the wires. Ethernet Lights Locus Energy recommends using a CAT5 tester to make sure the Ethernet cable is live. Also check the Ethernet lights where the cable is plugged into the router or switch - both should be on or flashing (see image at right). 33

SolarVu Installation Guide for Sungrow SG60KU-M Inverter

SolarVu Installation Guide for Sungrow SG60KU-M Inverter TM SolarVu Installation Guide for Sungrow SG60KU-M Inverter Introduction TM SolarVu is an energy portal that enables remote monitoring of renewable energy generation sites over the internet. It requires

More information

for Fronius IG Plus V Inverters

for Fronius IG Plus V Inverters TM for Fronius IG Plus V Inverters SolarVuTM is an energy portal that enables remote monitoring of renewable energy generation sites over the internet. It requires the installation of a K135 gateway which

More information

Site Preparation. for AE250 Inverter Installation Guide. SolarVu

Site Preparation. for AE250 Inverter Installation Guide. SolarVu 5 Data 6 7 8 9 Site Preparation SolarVu for AE50 Inverter Installation Guide SolarVu is an energy portal that enables remote monitoring of renewable energy generation sites over the web. It requires the

More information

SolarVu Installation Guide For CSI-KTL-GS Three Phase Inverters

SolarVu Installation Guide For CSI-KTL-GS Three Phase Inverters SolarVu Installation Guide For CSI-KTL-GS Three Phase Inverters Introduction SolarVu is an energy portal that enables remote monitoring of renewable energy generation sites over the internet. It requires

More information

M GE825. SolarVu CL CL25000 Inverter Installation Guide

M GE825. SolarVu CL CL25000 Inverter Installation Guide Enclosure Gateway M504 P P2 P3 P4 *Not all devices inside enclosure are shown M504-485 Comm Board - GE4 Port Port2 Port3 Port4 To IO Power D+ D- C G 2D+ 2D- 2C 2G 3D+ 3D- 3C 3G 4D+ 4D- 4C 4G G Vo G Vin

More information

SolarVu Installation Guide for Sungrow SG30KU Inverters

SolarVu Installation Guide for Sungrow SG30KU Inverters SolarVu Installation Guide for Sungrow SG30KU Inverters Introduction SolarVu is an energy portal that enables remote monitoring of renewable energy generation sites over the internet. It requires the installation

More information

for AE 500NX Inverters Installation Guide COMMUNICATION SETTINGS (DEFAULT) SERIAL COMMS ADDRESS 22 8 RJ45 plug Viewed from pin side ORA-W ORA

for AE 500NX Inverters Installation Guide COMMUNICATION SETTINGS (DEFAULT) SERIAL COMMS ADDRESS 22 8 RJ45 plug Viewed from pin side ORA-W ORA Site Preparation SolarVu for AE 500NX Inverters Installation Guide SolarVu is an energy portal that enables remote monitoring of renewable energy generation sites over the web. It requires the installation

More information

DON T WASTE INSTALL TIME!

DON T WASTE INSTALL TIME! [ DON T WASTE INSTALL TIME! Before you go to the project site, read all sections of this manual that apply to your system specifications! [ COMMERCIAL INSTALLATION GUIDE v12_04_02 COMMERCIAL INSTALL GUIDE

More information

Power Xpert Meter 2000 Gateway Card Kit

Power Xpert Meter 2000 Gateway Card Kit Quick Start Guide IL02601011E Rev. 2 December 2011 PXM 2250 PXM 2260 IQ 250 IQ 260 Power Xpert Meter 2000 Gateway Card Kit Table of Contents Remove the Meter From Service.... 2 Disconnect Power Connections,

More information

Power Xpert Meter 2000 Gateway Card Kit

Power Xpert Meter 2000 Gateway Card Kit Quick Start Guide IL02601011E PXM 2250 PXM 2260 IQ 250 IQ 260 Power Xpert Meter 2000 Gateway Card Kit Table of Contents Remove the Meter From Service... 2 Disconnect Power Connections, CTs, and Modbus....

More information

Installation Guide for Power One PVI5000/6000 Inverters

Installation Guide for Power One PVI5000/6000 Inverters SolarVu TM Installation Guide for Power One PVI5000/6000 Inverters Introduction SolarVu TM is an energy portal that enables remote monitoring of renewable energy generation sites over the internet. It

More information

2016 MacroAir Technologies Toll Free: Fax:

2016 MacroAir Technologies Toll Free: Fax: 2016 MacroAir Technologies Toll Free: 866 668 3247 Fax: 909 890 2313 www.macroairfans.com 1 Table of Contents Caution & Safety... 2 Fan Network Ordering... 3 Controller Dimensions... 4 Controller Components...

More information

SolarVu Installation Guide For Fronius SYMO Inverters

SolarVu Installation Guide For Fronius SYMO Inverters TM SolarVu nstallation Guide For Fronius SYMO nverters ntroduction TM SolarVu is an energy portal that enables remote monitoring of renewable energy generation sites over the internet. t requires the installation

More information

DECK All-In-One Enclosure. Quick Installation Guide for Field Installers

DECK All-In-One Enclosure. Quick Installation Guide for Field Installers DECK All-In-One Enclosure Quick Installation Guide for Field Installers 1 Contents Legal Statement... 2 Preliminary Considerations... 2 Required Installation Tools and Materials... 2 Networking Information...

More information

Power Xpert Meter 2000 Gateway Card Kit

Power Xpert Meter 2000 Gateway Card Kit Quick Start Guide IL02601011E PXM 2250 PXM 2260 IQ 250 IQ 260 Power Xpert Meter 2000 Gateway Card Kit Table of Contents Remove the Meter From Service.... 2 Disconnect Power Connections, CTs, and Modbus....

More information

SolarEdge 10000A-US Inverter SolarVu Installation Guide

SolarEdge 10000A-US Inverter SolarVu Installation Guide INVERTER COM 2 D- SolarEdge 10000A-US Inverter SolarVu Installation Guide Introduction SolarVuTM is an energy portal that enables remote monitoring of renewable energy generation sites over the internet.

More information

SolarVu Installation Guide For SunEdison System Replacement

SolarVu Installation Guide For SunEdison System Replacement -V V L N SEEDS R SolarVu Installation Guide For SunEdison System Replacement Introduction SolarVu is an energy portal that enables remote monitoring of renewable energy generation sites over the internet.

More information

- +-+ Fig 1 Internet Connection. SolarVu Server. Fig 2 K135 to Sunergy inverters serial connections

- +-+ Fig 1 Internet Connection. SolarVu Server. Fig 2 K135 to Sunergy inverters serial connections SolarVu TM for Sustainable Energy Technologies Installation uide Site Preparation SolarVu TM is an energy portal that enables remote monitoring of renewable energy generation sites over the internet. It

More information

QUICK SETUP GUIDE. BCM2 Series Branch Circuit Monitors. Safety Information. Equipment Maintenance and Service. Raritan DANGER!

QUICK SETUP GUIDE. BCM2 Series Branch Circuit Monitors. Safety Information. Equipment Maintenance and Service. Raritan DANGER! QUICK SETUP GUIDE BCM2 Series Branch Circuit Monitors Safety Information DANGER! HAZARD OF ELECTRIC SHOCK, EXPLOSION, OR ARC FLASH Follow safe electrical work practices. See NFPA 70E in the USA, or applicable

More information

ControlKeeper 4. General Information. Connecting Relay Loads. Installation Sheet. Getting Started. Power Supply Wiring. Mounting the Cabinet

ControlKeeper 4. General Information. Connecting Relay Loads. Installation Sheet. Getting Started. Power Supply Wiring. Mounting the Cabinet General Information ControlKeeper 4 Installation Sheet Model# CK4-120NO- Model# CK4-277NO The ControlKeeper-4 model is shipped in one package and is configured with either a 120V or a 277V transformer.

More information

BCM2 Series Branch Circuit Monitors Quick Setup Guide

BCM2 Series Branch Circuit Monitors Quick Setup Guide BCM2 Series Branch Circuit Monitors Quick Setup Guide Safety Information DANGER! HAZARD OF ELECTRIC SHOCK, EXPLOSION, OR ARC FLASH Follow safe electrical work practices. See NFPA 70E in the USA, or applicable

More information

Flex Gateway Card. Installation and Operation Manual. For CPS 50kW/60kW 3-Phase String Inverters

Flex Gateway Card. Installation and Operation Manual. For CPS 50kW/60kW 3-Phase String Inverters Flex Gateway Card Installation and Operation Manual For CPS 50kW/60kW 3-Phase String Inverters CHINT POWER SYSTEMS AMERICA CO. Revision 1.0 - June 2017 1 Chapter 1 Overview 1.1 Product Description This

More information

QUICK SETUP GUIDE. BCM2 Series Branch Circuit Monitors. Safety Information. Equipment Maintenance and Service. Product Overview. Raritan DANGER!

QUICK SETUP GUIDE. BCM2 Series Branch Circuit Monitors. Safety Information. Equipment Maintenance and Service. Product Overview. Raritan DANGER! QUICK SETUP GUIDE BCM2 Series Branch Circuit Monitors Safety Information DANGER! HAZARD OF ELECTRIC SHOCK, EXPLOSION, OR ARC FLASH Follow safe electrical work practices. See NFPA 70E in the USA, or applicable

More information

Installation Guide: eohub and eogenius

Installation Guide: eohub and eogenius Installation Guide: eohub and eogenius Table of Contents 1 Introduction... 2 2 Wiring Connections for the Genius Charging stations and the serial bus... 3 2.1 Fitting termination resistors to the RS485

More information

Site Preparation. SolarVu. for Eaton PV250 5kW Inverter Installation Guide

Site Preparation. SolarVu. for Eaton PV250 5kW Inverter Installation Guide ite Preparation olarvu for Eaton PV0 kw Inverter Installation uide olarvu is an energy portal that enables remote monitoring of renewable energy generation sites over the web. It requires the installation

More information

Installation & Operations Manual

Installation & Operations Manual Installation & Operations Manual VoIP Command Center Made in the USA 3 Year Warranty N56W24720 N. Corporate Circle Sussex, WI 53089 800-451-1460 www.rathcommunications.com RP8500PBXVOIPG Ver. 3 10/18 Thank

More information

CRC220 and CRC221 INSTALLATION GUIDE. REF No.: DOC0014 ISSUE: 09

CRC220 and CRC221 INSTALLATION GUIDE. REF No.: DOC0014 ISSUE: 09 CRC220 and CRC221 INSTALLATION GUIDE REF No.: DOC0014 ISSUE: 09 30th July 2015 2 Contents CRC220 & CRC221 INSTALLATION GUIDE 1. Scope 1-1 2. Introduction 2-1 2.1 Features 2-1 2.1.1. PCB Features 2-1 2.1.2.

More information

ZN-7100-DE500-G V ac Wireless Access Point Quick Setup Guide

ZN-7100-DE500-G V ac Wireless Access Point Quick Setup Guide Bottom View ZN-7100-DE500-G V4 802.11ac Wireless Access Point Quick Setup Guide This Quick Setup Guide provides step-bystep instructions on how to set up your ZN- 7100-DE500-G V4 Wireless Access Point.

More information

Quick Installation Guide

Quick Installation Guide Quick Installation Guide DL-200 Cellular Data logger V1.2_201610 TABLE OF CONTENTS CHAPTER 1 INTRODUCTION... 4 1.1 CONTENTS LIST... 5 1.2 HARDWARE INSTALLATION... 6 1.2.1 WARNING... 6 1.2.2 SYSTEM REQUIREMENTS...

More information

Installation of advanced communications board and LG Chem RESU

Installation of advanced communications board and LG Chem RESU Installation of advanced communications board and LG Chem RESU Introduction This technical note shows how to set up an SP PRO for use with an LG Chem RESU lithium battery. It explains how to update the

More information

Wiring & Configuration for AE Solaron Inverters

Wiring & Configuration for AE Solaron Inverters DECK Monitoring LLC l 830 SW 10 th Ave, Ste #200 Portland, OR 97205 l www.deckmonitoring.com l 503.224.5546 Wiring & Configuration for AE Solaron Inverters Introduction It is the goal of this document

More information

DVG-6008S FXO VoIP Router

DVG-6008S FXO VoIP Router This product can be set up using Internet Explorer or Netscape Navigator, 6.x or above, with Javascript enabled DVG-6008S FXO VoIP Router Before You Begin You must have at least the following: A subscription

More information

Please read these instructions carefully before installing This will ensure an easy start and a great first customer experience with TS4 installation

Please read these instructions carefully before installing This will ensure an easy start and a great first customer experience with TS4 installation Please read these instructions carefully before installing This will ensure an easy start and a great first customer experience with TS4 installation INTERACTIVE INSTALLATION AND SAFETY MANUAL FOR TS4:

More information

QUICK SETUP GUIDE PMC-1000, PMC-1001, PMM-1000, PMB PM Series Power Meter. Safety Information. Equipment Maintenance and Service.

QUICK SETUP GUIDE PMC-1000, PMC-1001, PMM-1000, PMB PM Series Power Meter. Safety Information. Equipment Maintenance and Service. PM Series Power Meter QUICK SETUP GUIDE PMC-1000, PMC-1001, PMM-1000, PMB-1960 Safety Information DANGER! HAZARD OF ELECTRIC SHOCK, EXPLOSION, OR ARC FLASH Follow safe electrical work practices. See NFPA

More information

Installation Guide: eohub and eogenius

Installation Guide: eohub and eogenius Installation Guide: eohub and eogenius Table of Contents 1 Introduction... 2 2 Wiring Connections for the Genius Charging stations and the serial bus... 3 2.1 Fitting termination resistors to the RS485

More information

3G/4G OUTDOOR ROUTER Instruction Manual

3G/4G OUTDOOR ROUTER Instruction Manual 3G/4G OUTDOOR ROUTER Instruction Manual SKU: MRE401 1. Introduction With an integrated mobile modem and Wi-Fi amplifier, the MRE401 outdoor router can receive 3G/4G mobile phone signals and establish a

More information

Installation & User Manual

Installation & User Manual Contents Installation Instructions 3 Installation Diagrams 4 System Overview 6 Wiring Diagrams 8 Network Diagrams 9 Operation Instructions Fingerprint Enrollment 12 21 Wi-Enterprise Controller www.transmittersolutionssmart.com

More information

Quick Installation Guide for Field Installers

Quick Installation Guide for Field Installers 1 Quick Installation Guide for Field Installers 2 Contents Legal Statement 3 Required Installation Tools and Materials 3 Networking Information 3 Modbus Communication and Wiring 4 Modbus Network and Layout

More information

Quick Guide Flex Gateway G2

Quick Guide Flex Gateway G2 Quick Guide Flex Gateway G2 Revision 012219 Interface & Indicators B External Installation (Refer to Page 912) & DC in 9~24V Vin GND A B G NoLCD INV Port Switch Signal Terminating Res Switch Reboot Button

More information

Installation and Configuration Guide

Installation and Configuration Guide Installation and Configuration Guide Trademark Notices Comtrol, NS-Link, and DeviceMaster are trademarks of Comtrol Corporation. Microsoft and Windows are registered trademarks of Microsoft Corporation.

More information

Omega 4K / UHD Three-Input Switcher for HDMI and USB-C with HDBaseT and HDMI Outputs

Omega 4K / UHD Three-Input Switcher for HDMI and USB-C with HDBaseT and HDMI Outputs Omega 4K / UHD Three-Input Switcher for HDMI and USB-C with HDBaseT and HDMI Outputs Installation Guide The Atlona is a 3 1 switcher and HDBaseT transmitter with HDMI and USB-C inputs. It features mirrored

More information

Steady green On hook. Slow flashing green Off hook. Off Port not ready. Off No link. Fast flashing green Upgrading firmware.

Steady green On hook. Slow flashing green Off hook. Off Port not ready. Off No link. Fast flashing green Upgrading firmware. Product Features Product Features Top Panel Feature Description Steady green On hook. Phone Phone 2 Slow flashing green Off hook. Off Port not ready. Flashing green Transmitting or receiving data through

More information

GoodMeasure Connector Installation Guide

GoodMeasure Connector Installation Guide GoodMeasure Connector Installation Guide Before installation, check that you have a portable computer that you can use while on site to login to www.goodmeasure.net during the installation The Connector

More information

Serial Connection of HC900 Hybrid Controller to 900CS Control Station

Serial Connection of HC900 Hybrid Controller to 900CS Control Station Note: Ethernet connections will provide faster performance than RS-485 HC900 1. Remove HC900 CPU and set S2 Dip Switches for RS-485 unterminated Replace CPU & follow instructions per Installation and User

More information

Installing the Cisco AS5400XM Universal Gateway

Installing the Cisco AS5400XM Universal Gateway CHAPTER 3 Installing the Cisco AS5400XM Universal Gateway This chapter guides you through the installation of the Cisco AS5400XM universal gateway and includes the following sections: Setting Up the Chassis,

More information

Installation & User Manual V2.08

Installation & User Manual V2.08 YOUR SECURITY IS OUR PRIORITY Other products from GSD Contents Installation Instructions Installation Diagrams System Overview Wiring Diagrams Network Diagrams Operation Instructions Fingerprint Enrollment

More information

Quick Start Guide. Cisco SPA232D Mobility Enhanced ATA

Quick Start Guide. Cisco SPA232D Mobility Enhanced ATA Quick Start Guide Cisco SPA232D Mobility Enhanced ATA Package Contents Analog Telephone Adapter Ethernet Cable Phone Cable Power Adapter Quick Start Guide Product CD-ROM Welcome Thank you for choosing

More information

DMK 11A & 11A GPS Owners Manual

DMK 11A & 11A GPS Owners Manual DMK 11A & 11A GPS Owners Manual Table of Contents Section I Description of DMK 11A & 11A-GPS 1.1 Introduction 1.2 Background 1.3 Infrastructure Connection 1.4 Components 1.5 Input Protocols 1.6 Configuration

More information

Ethernet Network Card Installation and Operation Manual

Ethernet Network Card Installation and Operation Manual Ethernet Network Card Installation and Operation Manual Revision B 2017, Yaskawa - Solectria Solar Page 1 of 14 1. Overview 1.1 Introduction The Ethernet Network Card is used for monitoring and controlling

More information

Ethernet Interface Module

Ethernet Interface Module Interface Manual 1 Ethernet Interface Module SignalFire Number: ENET-DIN The SignalFire Ethernet Gateway has the following features: - Wide range DC power input. 6 to 36VDC - Power Over Ethernet (POE)

More information

Voltsys Inverter Control Unit

Voltsys Inverter Control Unit Voltsys Inverter Control Unit Coomanore North, Bantry, info@voltsys.com Co. Cork. Republic of Ireland tel. +353 (0) 27 52773 Contents Important Safety Instructions... 3 Controller Layout & Wiring... 4

More information

LED Indicators on the Device. No LED State Description. No power to AP. Green On

LED Indicators on the Device. No LED State Description. No power to AP. Green On SP220-C02 802.11ac Outdoor Access Point Quick Setup Guide This Quick Setup Guide provides step-bystep instructions on how to set up your Outdoor Access Point. After completing the steps described in this

More information

USB 3.1 CAT6A/7 EXTENDER

USB 3.1 CAT6A/7 EXTENDER USER MANUAL ICU504A USB 3.1 CAT6A/7 EXTENDER 24/7 AT OR VISIT BLACKBOX.COM Power Mode Config Status Link Video USB 2 USB 3 Power Mode Config Status Link Video USB 2 USB 3 TABLE OF CONTENTS PRODUCT OPERATION

More information

DTS 310. DIN Rail Mounted, Indoor Rated Revenue Grade Electrical Sub-meter. Page 1. Measurlogic MQ A

DTS 310. DIN Rail Mounted, Indoor Rated Revenue Grade Electrical Sub-meter. Page 1. Measurlogic MQ A DTS 310 DIN Rail Mounted, Indoor Rated Revenue Grade Electrical Sub-meter Page 1 1 PRODUCT OVERVIEW... 3 1.1 SUPPLIED ITEMS... 3 1.2 DOCUMENT CONVENTIONS... 4 1.3 PRODUCT SPECIFICATION... 4 1.3.1 Current

More information

Product Manual. QD2040a Ubiquity Site Gateway. Contents. Description. Features. Material List

Product Manual. QD2040a Ubiquity Site Gateway. Contents. Description. Features. Material List Product Manual QD2040a Ubiquity Site Gateway Description The QD2040a Ubiquity Site Gateway connects the site controller network with the central Ubiquity server. Features Site gateway to Ubiquity: enables

More information

Warning Before Installation. Package Contents EN - 1. Refer to your user's manual for the operating temperature.

Warning Before Installation. Package Contents EN - 1. Refer to your user's manual for the operating temperature. 510000221G Warning Before Installation English Power off the Network Camera as soon as smoke or unusual odors are detected. Do not place the Network Camera on unsteady surfaces. Do not insert sharp or

More information

2400 Series. Installation & Operations Manual. 42 Central Drive Farmingdale, NY

2400 Series. Installation & Operations Manual. 42 Central Drive Farmingdale, NY 2400 Series Installation & Operations Manual Made in the USA 42 Central Drive Farmingdale, NY 11735 631-777-5500 800-666-4800 www.alphacommunications.com AWD266 Rev. 07/18 Items Needed Included Command

More information

NETAFIM WILL NOT ACCEPT RESPONSIBILITY FOR DAMAGE RESULTING FROM THE USE OF NETAFIM'S PRODUCTS OR THE USE OF THIS MANUAL.

NETAFIM WILL NOT ACCEPT RESPONSIBILITY FOR DAMAGE RESULTING FROM THE USE OF NETAFIM'S PRODUCTS OR THE USE OF THIS MANUAL. [Type text] COPYRIGHT 2011, NETAFIM NO PARTS OF THIS PUBLICATION MAY BE REPRODUCED, STORED IN AN AUTOMATED DATA FILE OR MADE PUBLIC IN ANY FORM OR BY ANY MEANS, WHETHER ELECTRONIC, MECHANICAL, BY PHOTOCOPYING,

More information

Wireless RS485 for KACO Link

Wireless RS485 for KACO Link Wireless RS485 for KACO Link Introduction The SP PRO KACO Managed AC Coupling provides a method of linking the KACO Powador xx00 and Powador xx02 series grid tie inverters to the SP PRO AU or GO Series

More information

Quick Start Installation Guide

Quick Start Installation Guide istar Pro Quick Start Installation Guide Version B0 Part Number UM-069 January 2005 OVERVIEW This guide defines all of the commonly used connection methods to the istar Pro. It outlines how to wire readers

More information

LPG STM 94442A User s Manual

LPG STM 94442A User s Manual 1 LPG STM 94442A User s Manual This Manual belongs to: Company: 3 Table of Contents Features....... 4 Hardware Installation...5 Monitor Mounting Dimensions.....7 Monitor Specifications...8 Sender Specifications.....9

More information

Version 1.0c May 6, 2010 ATK3

Version 1.0c May 6, 2010 ATK3 Version 1.0c May 6, 2010 ATK3 Contents 1 Hardware 2 1.1 Inputs............................... 2 1.2 Outputs.............................. 3 1.3 RS485............................... 3 1.4 Ethernet..............................

More information

Installing the Enphase IQ Commercial Envoy

Installing the Enphase IQ Commercial Envoy QUICK INSTALL GUIDE (Model ENV-IQ-AM3-3P) Installing the Enphase IQ Commercial Envoy To install the Enphase IQ Commercial Envoy, read and follow all warnings and instructions in this Guide and in the Enphase

More information

Chore-Tronics IDM Board Instruction

Chore-Tronics IDM Board Instruction Chore-Tronics IDM Board Instruction Caution, Warning and Danger Decals have been placed on the equipment to warn of potentially dangerous situations. Care should be taken to keep this information intact

More information

ZN-7100-DE500-G V ac Wireless Access Point Quick Setup Guide

ZN-7100-DE500-G V ac Wireless Access Point Quick Setup Guide Bottom View ZN-7100-DE500-G V2 802.11ac Wireless Access Point Quick Setup Guide This Quick Setup Guide provides step-bystep instructions on how to set up your ZN- 7100-DE500-G V2 Wireless Access Point.

More information

PM Series Power Meter

PM Series Power Meter PM Series Power Meter Quick Setup Guide - PMC-1000, PMC- 1001, PMM-1000, PMB-1960 Safety Information DANGER! HAZARD OF ELECTRIC SHOCK, EXPLOSION, OR ARC FLASH Follow safe electrical work practices. See

More information

GPRS ADAPTER INSTALLATION AND USER MANUAL. for module version v2.24 and higher

GPRS ADAPTER INSTALLATION AND USER MANUAL. for module version v2.24 and higher GPRS ADAPTER INSTALLATION AND USER MANUAL for module version v2.24 and higher Table of contents 1 Main function of the Adapter...3 2 System operation...3 2.1 Transmission through GPRS...4 2.1.1 Router

More information

C5S120 Installation and Connection Guide

C5S120 Installation and Connection Guide C5S120 Installation and Connection Guide Version: V1.1 1. Cautions Please note the following cautions. Mis-operation may lead to personal injury or equipment failure: 1) Do not energize the system before

More information

BROADBAND 3G/4G MODEM Instruction Manual

BROADBAND 3G/4G MODEM Instruction Manual SKU: WRT2 BROADBAND 3G/4G MODEM Instruction Manual 1. Introduction With an integrated broadband cellular modem and Wi-Fi booster, the WRT2 3G/4G modem can receive 3G/4G mobile phone signals and establish

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS BACnet Communication Card RXRX-AY01 RECOGNIZE THIS SYMBOL AS AN INDICATION OF IMPORTANT SAFETY INFORMATION! WARNING THESE INSTRUCTIONS ARE INTENDED AS AN AID TO QUALIFIED, LICENSED

More information

CAM KIT FIELD INSTALLATION GUIDE Quick Installation Guide

CAM KIT FIELD INSTALLATION GUIDE Quick Installation Guide CAM KIT FIELD INSTALLATION GUIDE Quick Installation Guide PBN Controls Inc. support@pbncontrols.com Tech Support: +1 (866) 663-7337 Tech Mobile: +1 (905) 973-7808 This guide should serve as the installation

More information

Lifesize Icon Installation Guide October 2016

Lifesize Icon Installation Guide October 2016 Lifesize Icon Installation Guide October 2016 Lifesize Icon 400 Lifesize Icon 450 Lifesize Icon 600 Lifesize Icon 800 Preparing for Installation As you prepare to install your Lifesize video system, consider

More information

MODBUS RTU I/O Expansion Modules - Models C267, C277, and C287. Installation and Operations Manual Section 50

MODBUS RTU I/O Expansion Modules - Models C267, C277, and C287. Installation and Operations Manual Section 50 MODBUS RTU I/O Expansion Modules - Models C267, C277, and C287 Installation and Operations Manual 00-02-0651 09-01-09 Section 50 In order to consistently bring you the highest quality, full featured products,

More information

Industrial Serial Device Server

Industrial Serial Device Server 1. Quick Start Guide This quick start guide describes how to install and use the Industrial Serial Device Server. Capable of operating at temperature extremes of -10 C to +60 C, this is the Serial Device

More information

USB 2.0 RG port USB m Cat 5e Extender System. User Guide

USB 2.0 RG port USB m Cat 5e Extender System. User Guide USB 2.0 RG2204 4-port USB 2.0 100m Cat 5e Extender System User Guide Thank you for purchasing the USB 2.0 RG2204. Please read this guide thoroughly. This document applies to Part Numbers: 01-00294, 01-00295,

More information

POWERWISE INDAC SETUP MANUAL

POWERWISE INDAC SETUP MANUAL POWERWISE INDAC SETUP MANUAL REVISION: 2.2 INDAC & EMONITOR GATEWAY An installation guide for the PowerWise indac. 2013 PowerWise, Inc. This manual may contain proprietary information about the product

More information

HydroGuard Expert Pool Manual

HydroGuard Expert Pool Manual HydroGuard Expert Pool Manual Draft 09 May 2006 Swimming Pool Quality Communication and Monitoring Preface Intended Use This manual is for qualified and trained pool service technicians who will install

More information

USB Raven Port USB 3.1, 100m CAT 6a/7 Point-to-Point Extender System User Guide

USB Raven Port USB 3.1, 100m CAT 6a/7 Point-to-Point Extender System User Guide USB 3-2-1 Raven 3104 4-Port USB 3.1, 100m CAT 6a/7 Point-to-Point Extender System User Guide Thank you for purchasing the USB 3-2-1 Raven 3104. Please read this guide thoroughly. This document applies

More information

ETC Installation Guide

ETC Installation Guide Unison Foundry Overview The Unison Foundry provides fully-rated 20A relays for switched power control with 0 10V dimming for compatible fluorescent ballasts and LED drivers. The provides two outputs of

More information

MODEL 3312 LED

MODEL 3312 LED INSTALLATION INSTRUCTIONS FOR MODEL 3312 LED www.sportablescoreboards.com 1 Table of Contents DISCRIPTION... 3 THE SCOREBOARD SYSTEM SHOULD INCLUDE THE FOLLOWING PARTS:... 3 INSTRUCTIONS FOR REPORTING

More information

M215 (M215-60) Safety

M215 (M215-60) Safety M215 QUICK INSTALL GUIDE M215 (M215-60) Safety Important Safety Information This document contains important instructions to use during installation and maintenance of the Enphase M215 Microinverter. To

More information

Installation of the PCMeasure Movement Sensor (30114)

Installation of the PCMeasure Movement Sensor (30114) 1. Hardware: Installation of the PCMeasure Movement Sensor (30114) Connect the sensor to a serial or parallel port of the PC using one of the PCMeasure adaptors, or directly to the PCMeasure Ethernet Box.

More information

Please read these instructions carefully before installing This will ensure an easy start and a great first customer experience with TS4 installation

Please read these instructions carefully before installing This will ensure an easy start and a great first customer experience with TS4 installation Please read these instructions carefully before installing This will ensure an easy start and a great first customer experience with TS4 installation INTERACTIVE INSTALLATION AND SAFETY MANUAL FOR TS4:

More information

Installation Instructions. i-net Access Control Units. Part Code: IA-PCB IA-ACB IA-ACU IA-KIT

Installation Instructions. i-net Access Control Units. Part Code: IA-PCB IA-ACB IA-ACU IA-KIT Installation Instructions i-net Access Control Units Part Code: IA-PCB IA-ACB IA-ACU IA-KIT This device is configured for DHCP. Identity Access software will find this device, go to setup and controller,

More information

PVM1010 Inverter Data Monitoring Module

PVM1010 Inverter Data Monitoring Module PVM1010 Inverter Data Monitoring Module INSTALLATION MANUAL 97-600100-15-A03 Preface PV Powered PV Powered designs, manufactures, and markets the solar power industry s most reliable photovoltaic solar

More information

USB 2.0 RG2304GE-LAN. 4-Port USB 2.0 Gigabit Ethernet LAN Extender System. User Guide

USB 2.0 RG2304GE-LAN. 4-Port USB 2.0 Gigabit Ethernet LAN Extender System. User Guide USB 2.0 RG2304GE-LAN 4-Port USB 2.0 Gigabit Ethernet LAN Extender System User Guide Thank you for purchasing the USB 2.0 RG2304GE-LAN. Please read this guide thoroughly. This document applies to Part Numbers:

More information

Welcome. Unleash Your Phone

Welcome. Unleash Your Phone User Manual Welcome Unleash Your Phone For assistance with installation or troubleshooting common problems, please refer to this User Manual or Quick Installation Guide. Please visit www.vonage.com/vta

More information

UC-2000 Installation Manual Unicorn Computers Technology Limited

UC-2000 Installation Manual Unicorn Computers Technology Limited UC2000 Installation Manual Copyright 2003. All rights reserved. Table of Contents Specifications 2 Enclosure for the UC2000 Controller 3 Unicorn Access Control System Configuration 4 UC2000 Controller

More information

MGate 5105-MB-EIP Quick Installation Guide

MGate 5105-MB-EIP Quick Installation Guide MGate 5105-MB-EIP Quick Installation Guide Edition 2.2, March 2019 Technical Support Contact Information www.moxa.com/support Moxa Americas: Toll-free: 1-888-669-2872 Tel: 1-714-528-6777 Fax: 1-714-528-6778

More information

APC100. User Manual.

APC100. User Manual. APC100 User Manual www.audac.eu 2 Index Introduction 5 Precautions 6 Safety requirements 6 Caution servicing 7 EC Declaration of Conformity 7 Waste of Electrical and Electronic Equipment (WEEE) 8 Chapter

More information

REVO ELITE HD 30x Full-HD IR SPEED DOME NETWORK CAMERA

REVO ELITE HD 30x Full-HD IR SPEED DOME NETWORK CAMERA Quick Installation Guide REHSPTZ30-1 REVO ELITE HD 30x Full-HD IR SPEED DOME NETWORK CAMERA Please read this guide thoroughly before use and keep it handy for future reference. 1. Description The network

More information

MB40 & MB45 MODBUS TCP/IP Gateway Handbook

MB40 & MB45 MODBUS TCP/IP Gateway Handbook MB40 & MB45 MODBUS TCP/IP Gateway Handbook Version 1.2 29 July 2014 Environdata Australia Pty Ltd 42-44 Percy Street Warwick Queensland 4370 Australia Phone: (07) 4661 4699 Fax: (07) 4661 2485 International

More information

GSM-X. Communication module. Quick installation guide. Full manual is available on Firmware version 1.02 gsm-x_sii_en 08/18

GSM-X. Communication module. Quick installation guide. Full manual is available on   Firmware version 1.02 gsm-x_sii_en 08/18 GSM-X Communication module Quick installation guide Full manual is available on www.satel.eu Firmware version 1.02 gsm-x_sii_en 08/18 SATEL sp. z o.o. ul. Budowlanych 66 80-298 Gdańsk Poland tel. +48 58

More information

Home Automation Systems Installation Guide for FFI Actuator & Control Projects

Home Automation Systems Installation Guide for FFI Actuator & Control Projects Home Automation Systems Installation Guide for FFI Actuator & Control Projects This installation guide is for home automation systems such as Crestron, Lutron and others which communicate with FFI controllers

More information

Document Name: User Manual for SC10MK, Modbus RTU to Modbus TCP Converter

Document Name: User Manual for SC10MK, Modbus RTU to Modbus TCP Converter Document Name: User Manual for SC10MK, Modbus RTU to Modbus TCP Converter Login for the first time, please use http://192.168.1.100 To key in user name and password is for identifying authorization. Default

More information

ST-C5VRS-600 VIDEO AND RS232 EXTENDER Installation and Operation Manual

ST-C5VRS-600 VIDEO AND RS232 EXTENDER Installation and Operation Manual NTI R NETWORK TECHNOLOGIES INCORPORATED XTENDEX TM Series ST-C5VRS-600 VIDEO AND RS232 EXTENDER Installation and Operation Manual Manual 039 Rev. 3/13/03 WARRANTY INFORMATION The warranty period on this

More information

ZAVIO Outdoor IR Mini Dome. Quick Installation Guide

ZAVIO Outdoor IR Mini Dome. Quick Installation Guide ZAVIO Outdoor IR Mini Dome Quick Installation Guide 0 Quick Installation Guide Please follow the installation steps below to set up your IP Camera. Check the package contents with the list below. See P.1

More information

M250 (M LL) Safety

M250 (M LL) Safety M250 SAFETY M250 (M250-60-2LL) Safety Important Safety Information This document contains important instructions to use during installation of the Enphase M250 Microinverter. To reduce the risk of electrical

More information

Model 7416LED

Model 7416LED INSTALLATION INSTRUCTIONS FOR Model 7416LED www.sportablescoreboards.com 1 Table of Contents DESCRIPTION... 3 THE SCOREBOARD SYSTEM SHOULD INCLUDE THE FOLLOWING PARTS:... 3 INSTRUCTIONS FOR REPORTING SHIPPING

More information

Quick Start Guide. Mounting the Essential Plus and Elite

Quick Start Guide. Mounting the Essential Plus and Elite Quick Start Guide Congratulations on purchasing an Essential Plus or Elite access control system. This Quick Start Guide provides simple instructions on how to get the system up and running. For more detailed

More information