1 SCADA System Failure Impact Study at Lorne Park and Lakeview WTPs OWWA Conference 2014 May 5 th London, ON Shawn Xiong - Cole Engineering Jeff Hennings, Jason Little, Claudio Cuffolo - Region of Peel Dale Barker, Eric Zhang - OCWA

2 Presentation Outline Project Background Project Objectives Analysis Approach Recommendations

3 Background Lorne Park WTP and Lakeview WTP Supplies water to South Peel and York Region Owned by Peel Region and operated by OCWA

4 Background Employs advanced treatment process: membranes, UV, Ozone, BACC, GACC, and conventional filters Advanced SCADA system for automation

5 Background Failures have been experienced at both plants Adverse impact on the plants ability to maintain water production

6 Project Objectives Maintain three objectives during a SCADA failure event: Water quality Water production Compliance reporting

7 Project Objectives Establish critical process areas at each plant that are essential to the plant s ability to meet water quality and quantity requirements. Identify critical instruments for MOE compliance reporting. Review each critical process area to identify operational and data reporting problems that could occur if SCADA was disrupted.

8 Project Objectives Recommend operation procedures to follow during a SCADA failure for each of the problems identified above in order to minimize risks to water quality or quantity, or compliance reporting. Conduct network or SCADA failure modes and effect analysis (FMEA). Document the evaluation and recommendation in an organized format.

9 Analysis Approach A systematic analysis approach is required to analyze such a complex system with a multitude of subjects CAUSES FAILURE IMPACT DESIGN IMPROVEMENT EMERGENCY PREPAREDNESS PLAN

10 Analysis Approach AWWA G440 - Emergency Preparedness Practices AWWA M19 - Emergency Planning for Water Utilities AWWA J100 - Risk and Resilience Management of Water and Wastewater Systems

11 Analysis Approach Risk Management Framework Identify Risks Analyze Risks Evaluate Risks Treat Risks

12 Analysis Approach Risk Analysis Processes and Tools RAMCAP - Risk Analysis and Management for Critical Asset Protection HAZOP - HAZard and OPerability study FMEA - Failure Modes and Effect Analysis

13 Analysis Approach Combination of RAMCAP and FMEA FMEA *From AWWA, J-100

14 Analysis Approach Project Methodology Step 1 Asset Characterisation (RAMCAP Step 1) Step 2 Threat Characterization (RAMCAP Step 2) Step 3 FMEA Analysis (Consequence, Risk Analysis and Management, RAMCAP Step 3-7)

15 Asset Characterization Lorne Park MUG MEMBRANE AOUV GAC LOW LIFT RESERVOIR HIGH LIFT CONVENTIONAL FILTERS FILTER 9-12 UV

16 Critical Process Areas - Lorne Park Low Lift Pumping Plant 1 - MUG - Membranes Plant 1 MUG - AOUV System Plant 1 MUG - GAC Contactors Plant 2 - Filters No Plant 2 - Filters No UV High Lift Pumping Chemical Systems Coagulant, Bisulphite for WW supernatant dechlorination, Hypochlorite for disinfection

17 Compliance Intruments Lorne Park MEMBRANE/UV/GACC CONVENTIONAL FILTERS 9-12 & RESIDUAL MANAGEMENT CHEMICAL SYSTEM HIGH/LOW LIFT PUMP STATION CL2/pH FL CL COAG BW GAC BW SUPERNATANT CONTROL ROOM RESERVOIR LIT GAC FLOW LIT TIT TIT 87511

18 PLC & CCP Lorne Park

19 Threat Characterization SCADA System Failure Modes SCADA NETWORK FAILURE INSTRUMENT FAILURE SECURITY BREACH BUS NETWORK FAILURE RING SWITCH FAILURE CABLE FAILURE - FIBRE RING PANEL SWITCH FAILURE CABLE FAILURE - CAT6 CABLE CONTROLNET FAILURE MODBUS FAILURE DEVICENET FAILURE BOTH SERVERS FAIL VIRTUAL MACHINE CRASH PRIMARY SERVER FAILURE SECONDARY SERVER FAILURE CPU FAILURE I/O MODULE FAILURE RACK FAILURE POWER SUPPLY FAILURE SCADA SYSTEM FAILURE SCADA SERVER FAILURE POWER FAILURE PLC FAILURE

20 Threat Characterization Failure Modes SCADA Network Failure PLC Hardware Failure - Major ControlNet Failure Instrument Failure Failure Causes Detection Impacts Response /Remediation Ring Switch Software Failure (RSTP) - Unidirectional link - Duplex Mismatch - Software bug - etc Power Supply Failure - Remote Rack SCADA freezing All lights off at rack - Shutdown of the plant or process areas - Loss of compliance reporting - Loss of control of the Plant Loss of control of some equipment Remote Rack Failure All lights off at rack Loss of control of some equipment ControlNet Module Failure ControlNet Media Failure Compliance Instrument Failure - OK Status LED steady red, display "FAIL" - Module indicates "NET ERR" - Network Channel Status A/B red or flashing red - Fault alarm - Out of range alarm - Loss of Echo Loss of control of the affected process area Loss of control of the affected process area Shutdown network and reboot switches one by one Replace power supply Replace rack Test, reboot, or replace module Reconnect media - Loss of compliance data - Manual sampling and recording Criticality High Medium Medium High High High

21 FMEA Analysis Select Process/System for Evaluation Select Team Diagram system blocks Identify failure modes Identify failure causes Evaluate failure severity Evaluate failure probability Evaluate failure detection & rectification Calculate risk priority number (RPN) Recommend actions to reduce RPN

22 FMEA Analysis Failure impacts Water production Water quality Compliance reporting Operational resources

23 FMEA Analysis

24 FMEA Analysis

25 FMEA Analysis

26 FMEA Analysis Scoring of Failure Severity Score Severity Rationale 1 not perceptible No Effect 2 small 3 medium 4 significant This failure is not significant. Treatment process can continue with no interruption. This failure is significant enough to affect the treatment process system operation, compliance, water production, and water quality. Additional resources for plant operation are required. Inoperability of a significant process in the treatment plant. Significant requirement of additional resources to operate the process in local-manual mode. 5 very significant Total inoperability of the treatment plant

27 FMEA Analysis Scoring of Failure Probability Score Probability Rationale 1 improbable MTBF > 25 years 2 very small MTBF [ 10-25] years 3 Small MTBF [ 3-10] years 4 Medium MTBF [ 1-3] years 5 High MTBF < 1 years, or has occurred previously

28 FMEA Analysis Scoring of Failure Detection and Rectification Score Detection /Rectification 1 very probable 2 high 3 medium 4 small 5 very small Rationale Very probable and immediate detection and rectification of failure (<1 hr) Chance of discovery high, time to detect and rectify failure is short. (<4 hr) Time to detect and rectify the failure within a day. (<24 hr) Failure may be undetected for extended period of time or it may take days to troubleshoot and rectify the failure. (< 1 week) Very small chance of discovery or it will take a long time to rectify the failure (> 1 week)

29 Recommendations Design Improvement I/O distribution Redundant network cabling Environmental control for network equipment Local data recording Local operation of critical process equipment Signal communication for process control

30 Recommendations Operations Improvement Treatment process response to SCADA system failure Instrumentation response to SCADA system failure SCADA system maintenance

31 Recommendations Low Lift Pumps for Conventional Filters 9-12 Process Criticality: High Rationale: Supplies raw water to Plant 2. SCADA Communication Dependency: Local-Manual Operation: SCADA Failure Response: Additional Operational Resources Requirements: None. Low Lift Pump Operation Operate pump in Local-Manual mode from pump Control Gallery or Local Control Station. Start the required number of pumps based on filters feed flow requirement. Adjust flow control valve FCV16301/16302 to meet the flow setpoint and also to maintain a target level in Settled Water Conduit. (1)If SCADA network fails a.low Lift Pumps for Plant 2 can stay under SCADA control as there is no communication requirement between PLC-116 and PLC-398 to allow the operation of Low Lift Pumps (2)If PLC-116 fails a.check the feed flow demand for Plant 2 and start the appropriate number of low lift pumps. b.manually adjust the position of flow control valves FCV16301/16302 to achieve the target feed flow demand and also to maintain a target level in Settled Water Conduit. One operator is required to monitor and control the operation of the low lift pumps to maintain water supply to Plant 2 when operating the pumps in Local Manual mode.

32 Recommendations Emergency Preparedness Plan (EPP) Objectives: Emergency Response Team Communications Chart Plan Activation Component Specific Plans (process & instrumentation) Emergency Response and Recovery Training, Testing & Drilling

33 Recommendations Abnormal Event SCADA Problem? Actual/Probable Adverse Impact to Water Supply? NO OCWA designate contact Peel On-call SCADA Tech Peel SCADA follow with OCWA on action taken/ required YES OCWA ORO/Designate Contacts Peel On-call Compliance Rep. Activate EPP Communicates with internal/ external contacts per Communication Chart Engage the Emergency Response Team Determine Failure Impact and Affected Process Areas OCWA Follows Appropriate Treatment Process and Instrumentation Plans Calls in additional operations resources if required Treatment Process Recovery Event Documentation OCWA/Peel SCADA Troubleshoots the SCADA System Isolate event causes and apply remedial actions

34 Acknowledgement Regional Municipality of Peel Ontario Clean Water Agency AECOM CH2M Hill

Automation Intelligence Enlighten your automation mind..!

Automation Intelligence Enlighten your automation mind..! Friends, It brings us immense pleasure to introduce Automation intelligence a knowledge series about automation, innovation, solutions & Technology. This series will discuss about PLC, DCS, Drives, SCADA,

More information

SCADA Upgrades to Otay Water Treatment Plant

SCADA Upgrades to Otay Water Treatment Plant SCADA Upgrades to Otay Water Treatment Plant Standards Certification Education & Training Publishing Conferences & Exhibits Speaker: Dr. Noune Garounts 2012 ISA Water & Wastewater and Automatic Controls

More information

An Update on Security and Emergency Preparedness Standards for Utilities

An Update on Security and Emergency Preparedness Standards for Utilities An Update on Security and Emergency Preparedness Standards for Utilities Linda P. Warren, Launch! Consulting Safety and Security in the Workplace March 28, 2013 Overview 1 Review of AWWA Standards in Water

More information

Windsor Water Treatment Plant SCADA and Power Upgrades

Windsor Water Treatment Plant SCADA and Power Upgrades Windsor Water Treatment Plant SCADA and Power Upgrades John Stuart COO Windsor Utilities Commission Copyright 2011 Rockwell Automation, Inc. All rights reserved. Copyright 2011 Rockwell Automation, Inc.

More information

DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY ATTACHMENT A A-1: BACKGROUND AND CONTRACTOR QUALIFICATIONS A-2: SCOPE OF WORK

DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY ATTACHMENT A A-1: BACKGROUND AND CONTRACTOR QUALIFICATIONS A-2: SCOPE OF WORK DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY ATTACHMENT A A-1: BACKGROUND AND CONTRACTOR QUALIFICATIONS A-2: SCOPE OF WORK GOODS AND SERVICES CONTRACTS Page 1 of 5 RFP 16-PR-DEM-33 Comprehensive All-Hazards

More information

Presented by Joe Burns Kentucky Rural Water Association July 19, 2005

Presented by Joe Burns Kentucky Rural Water Association July 19, 2005 Infrastructure Security for Public Water and Wastewater Utilities Presented by Joe Burns Kentucky Rural Water Association July 19, 2005 Public Health Security and Bioterrorism Preparedness and Response

More information

T66 Central Utility Building (CUB) Control System Reliability, Optimization & Demand Management

T66 Central Utility Building (CUB) Control System Reliability, Optimization & Demand Management T66 Central Utility Building (CUB) Control System Reliability, Optimization & Demand Management Name Doug Demian Title Application Engineer Date November 7 & 8, 2012 Rev 5058-CO900C Copyright 2012 Rockwell

More information

WASTEWATER DISINFECTION FILTERED IN-PIPE TREATMENT

WASTEWATER DISINFECTION FILTERED IN-PIPE TREATMENT WASTEWATER DISINFECTION FILTERED IN-PIPE TREATMENT Proven TrojanUV Closed-Vessel Chambers for Reuse Disinfection. Validated, chemical-free disinfection from the industry leader Around the globe, wastewater

More information

PLC 23 DUAL MEDIA FILTERS 5 AND 6 SCADA SYSTEM OPERATION MANUAL. Revision 1.0 April 18, 2006

PLC 23 DUAL MEDIA FILTERS 5 AND 6 SCADA SYSTEM OPERATION MANUAL. Revision 1.0 April 18, 2006 PLC 23 DUAL MEDIA FILTERS 5 AND 6 SCADA SYSTEM OPERATION MANUAL Revision 1.0 April 18, 2006 PLC 23 DUAL MEDIA FILTERS 5 AND 6 SCADA SYSTEM OPERATION MANUAL Revision 1.0 April 18, 2006 Table of Contents

More information

Lowering Lifecycle Costs

Lowering Lifecycle Costs Lowering Lifecycle Costs with Intelligent Motor Control Centers Standards Certification Education & Training Publishing Conferences & Exhibits Speakers: Presented and Authored by Jeff M. Miller, PE, ENV

More information

Integration of Business Continuity, Emergency Preparedness, and Emergency Response

Integration of Business Continuity, Emergency Preparedness, and Emergency Response Integration of Business Continuity, Emergency Preparedness, and Emergency Response Continuity Insights Conference 2014 Julia Halsne Manager of Business Continuity East Bay Municipal Utility District Contents

More information

Getting the Most from Your SCADA Data

Getting the Most from Your SCADA Data Getting the Most from Your SCADA Data Standards Certification Education & Training Publishing Conferences & Exhibits Speaker: Emile Richard 2015 ISA Water / Wastewater and Automatic Controls Symposium

More information

Accord Builder. User Guide

Accord Builder. User Guide User Guide Document: V 3.6 User Guide R01 V3.6 User Guide R01 Page 1 of 110 Table of Contents 1 Introduction... 7 2 General Summary and Definitions... 8 2.1 Accord Platform and Plant... 8 2.2 PLC Control

More information

Secure Water Treatment (SWaT) Testbed

Secure Water Treatment (SWaT) Testbed Secure Water Treatment (SWaT) Testbed Version: 4.2 Last updated: 5 October 2018 Contact information: itrust@sutd.edu.sg Website: https://itrust.sutd.edu.sg/ INTRODUCTION Aim This documentation provides

More information

All-Hazards Approach to Water Sector Security & Preparedness ANSI-HSSP Arlington, VA November 9, 2011

All-Hazards Approach to Water Sector Security & Preparedness ANSI-HSSP Arlington, VA November 9, 2011 All-Hazards Approach to Water Sector Security & Preparedness ANSI-HSSP Arlington, VA November 9, 2011 Copyright 2009 American Water Works Association Copyright 2011 American Water Works Association Security

More information

LET YOUR DATA SPEAK! Data Analytics Strategy for Water Utilities

LET YOUR DATA SPEAK! Data Analytics Strategy for Water Utilities LET YOUR DATA SPEAK! Data Analytics Strategy for Water Utilities Date: February 2018 Outline 2 Data Analysis Overview Data Infrastructure Database Technologies Data Sources Data Analysis Methodologies

More information

Presentation Overview

Presentation Overview Upgrading Wilmette s SCADA System How to Keep Your Plant Up and Running during a Major Control System Overhaul Presented at T-CON 2013 Wednesday June 5, 2013 Ray S. Ames Jr., Senior Project Manager, Stanley

More information

Project Life Cycle Support (SCADA)

Project Life Cycle Support (SCADA) Project Life Cycle Support (SCADA) Texas Association of Clean Water Agencies Garland, TX March 26, 2010 Yehuda Morag CH2M HILL, Austin TX WBG030410171936AUS Agenda Introduction to SCADA Utility Managers

More information

Part 1 SCADA Technology Update

Part 1 SCADA Technology Update Part 1 SCADA Technology Update 2015 Joint Annual Meeting West Virginia AWWA West Virginia WEA Mark Place John P. Place, Inc. mplace@johnplaceinc.com Brief Historical Overview of SCADA Landmarks (Supervisory

More information

Report. Diemer Plant Improvements Program Audit Report. Internal Audit Report for January 2011

Report. Diemer Plant Improvements Program Audit Report. Internal Audit Report for January 2011 Report Office of the General Auditor January 31, 2011 Internal Audit Report for January 2011 Summary Three reports were issued during the month: Diemer Plant Improvements Program Audit Report Business

More information

SCADA Security at. City of Guelph Water Services

SCADA Security at. City of Guelph Water Services SCADA Security at City of Guelph Water Services Graham Nasby, P.Eng., PMP, CAP Water SCADA & Security Specialist City of Guelph Water Services 1 1 Rationale Our Reliance on SCADA for Operations & Compliance

More information

Using smart field devices to improve safety system performance

Using smart field devices to improve safety system performance Using smart field devices to improve safety system performance Safety monitoring software can use data from smart field devices to improve safety system performance and operation By Guillermo Pacanins,

More information

The standard base asset life used in the renewal programme and asset valuation for facility assets (major components) are shown in the table below:

The standard base asset life used in the renewal programme and asset valuation for facility assets (major components) are shown in the table below: 7.3.6 Facilities Background Plant is defined as asset components that pump, store or treat water. Key components include: Pumping stations - pumping of water to within the reticulation Treatment plants

More information

MBR Basins Automatic Operation

MBR Basins Automatic Operation 6.5.3.1 MBR Basins Automatic Operation The MBR basins receive flow from the MBR aeration basins and separate the solids from the MLSS to produce a high quality effluent. There are two MBR basins each with

More information

The J100 RAMCAP Method

The J100 RAMCAP Method The J100 RAMCAP Method 2012 ORWARN Conference Kevin M. Morley, PhD Security & Preparedness Program Manager AWWA--Washington, DC Water is Key to Daily Life Potable drinking water Sanitation Public Health

More information

Resiliency and the Need for Re-Thinking our Water Infrastructure. Andrew Bielanski U.S. Environmental Protection Agency June 25, 2015

Resiliency and the Need for Re-Thinking our Water Infrastructure. Andrew Bielanski U.S. Environmental Protection Agency June 25, 2015 Resiliency and the Need for Re-Thinking our Water Infrastructure Andrew Bielanski U.S. Environmental Protection Agency June 25, 2015 Presentation Goals & Focus Define What is Meant by Resiliency Explain

More information

How flowmeters perform self-verification

How flowmeters perform self-verification How flowmeters perform self-verification Here s how modern flowmeters verify their own measurement performance By Nathan Hedrick, Endress+Hauser, USA Process manufacturing and other industrial facilities

More information

Treatment Facility Asset Management and Risk Based Assessment. NE Texas WEAT Biennial Conference May 7, 2014

Treatment Facility Asset Management and Risk Based Assessment. NE Texas WEAT Biennial Conference May 7, 2014 Treatment Facility Asset Management and Risk Based Assessment NE Texas WEAT Biennial Conference May 7, 2014 Asset Management What is? A set of processes to minimize infrastructure life cycle costs at an

More information

INDUSTRIAL POWER GROUP DEPT.OF ELECTRICAL ENGINEERING NIT CALICUT

INDUSTRIAL POWER GROUP DEPT.OF ELECTRICAL ENGINEERING NIT CALICUT INDUSTRIAL AUTOMATION INDUSTRIAL POWER GROUP DEPT.OF ELECTRICAL ENGINEERING NIT CALICUT Industrial Automation Automation is encompassing virtually every walk of life. Automation solutions are required

More information

SCADA Software. 3.1 SCADA communication architectures SCADA system

SCADA Software. 3.1 SCADA communication architectures SCADA system 3 SCADA Software 3.1 SCADA communication architectures 3.1.1 SCADA system A supervisory control and data acquisition (SCADA) system means a system consisting of a number of remote terminal units (RTUs)

More information

City of Toledo WTP SCADA System Upgrade 2015

City of Toledo WTP SCADA System Upgrade 2015 City of Toledo WTP SCADA System Upgrade 2015 Dmytryka Jacobs Engineers, Inc. Selected to provide the required services for the WTP SCADA Upgrade Project Local Consulting Engineering Firm (Toledo Cleveland)

More information

The City of St. Petersburg (City) initiated

The City of St. Petersburg (City) initiated FWRJ Remote Facility Condition Inspections and Subsequent Integration into the City of St. Petersburg s Asset Management Program Laura Baumberger, Robert Labrie, and Rebecca Overacre The City of St. Petersburg

More information

Drinking Water Emergency Management Ministry of the Environment 2012 Drinking Water Leadership Summit October 25, 2012

Drinking Water Emergency Management Ministry of the Environment 2012 Drinking Water Leadership Summit October 25, 2012 Drinking Water Emergency Management Ministry of the Environment 2012 Drinking Water Leadership Summit October 25, 2012 Christine Campbell Team Leader, Drinking Water Emergency Planning Ministry of the

More information

Water Treatment >>> Core Business B

Water Treatment >>> Core Business B Water Treatment >>> Core Business B Siu Ho Wan Backup Telemetry System Davenham Engineering Limited Use Allen Bradley PLC 5 w/controlnet capability (~300 I/O) Provide the newest available communication

More information

Benefits of a SCADA Master Plan for Utilities

Benefits of a SCADA Master Plan for Utilities Benefits of a SCADA Master for Utilities Standards Certification Education & Training Publishing Conferences & Exhibits Speakers: Manoj Yegnaraman, Carollo Engineers, Inc. Norman Anderson, Polk County

More information

EPRO. Electric Infrastructure Protection Initiative EPRO BLACK SKY SYSTEMS ENGINEERING PROCESS

EPRO. Electric Infrastructure Protection Initiative EPRO BLACK SKY SYSTEMS ENGINEERING PROCESS EPRO Electric Infrastructure Protection Initiative EPRO BLACK SKY SYSTEMS ENGINEERING PROCESS EPRO BLACK SKY SYSTEMS ENGINEERING PROCESS The Role of Systems Engineering in Addressing Black Sky Hazards

More information

SECTION SCADA SYSTEM APPLICATIONS PROGRAMMING PART 1 - GENERAL 1.01 SCOPE OF WORK

SECTION SCADA SYSTEM APPLICATIONS PROGRAMMING PART 1 - GENERAL 1.01 SCOPE OF WORK SECTON 16925 SCADA SYSTEM APPLCATONS PROGRAMMNG PART 1 - GENERAL 1.01 SCOPE OF WORK A. Programming and configuration of the SCADA system (Server and Workstations) is by Owner Representative, herein defined

More information

18.0 CONTROLS PLATFORM AND AUTOMATION

18.0 CONTROLS PLATFORM AND AUTOMATION SEWPCC Upgrading/Expansion Conceptual Design Report SECTION 18 - Table of Contents 18.0 CONTROLS PLATFORM AND AUTOMATION...18.1 18.1 INTRODUCTION...18.1 18.2 SYSTEM INFORMATION...18.1 18.3 FUNCTIONAL REQUIREMENTS

More information

SCADA Network & Data Redundancy at Guelph Water

SCADA Network & Data Redundancy at Guelph Water SCADA Network & Data Redundancy at Guelph Water Ensuring Security of Supply for Operations and Compliance Graham Nasby Water SCADA & Security Specialist, Guelph Water Services Derek Wong Principal Consultant,

More information

Minimum Support Needed for a Reliable SCADA System

Minimum Support Needed for a Reliable SCADA System Minimum Support Needed for a Reliable SCADA System Speaker Bio Jeff Miller, PE, ISI ENV SP Dewberry Automation Manager MEP Service Line Raleigh, NC 22 years experience in Electrical / Instrumentation &

More information

CYBER SECURITY FOR WATER AND WASTEWATER UTILITIES PRESENTED BY: DAVID A. CHANDA, PE

CYBER SECURITY FOR WATER AND WASTEWATER UTILITIES PRESENTED BY: DAVID A. CHANDA, PE CYBER SECURITY FOR WATER AND WASTEWATER UTILITIES PRESENTED BY: DAVID A. CHANDA, PE Cyber Security A Hot Topic NotPetya Cyberattack 2018 Thales Data Threat Report Tempting Cedar Spyware Implementation

More information

Echotouch, EchoSpan & EchoSwitch Ultrasonic Liquid

Echotouch, EchoSpan & EchoSwitch Ultrasonic Liquid Echotouch, EchoSpan & EchoSwitch Ultrasonic Liquid The Echotouch, EchoSpan and EchoSwitch are innovative ultrasonic liquid level sensor families that replace float, conductance and pressure sensors that

More information

. SECTION SUPERVISORY CONTROL AND DATA ACQUISITION SYSTEM

. SECTION SUPERVISORY CONTROL AND DATA ACQUISITION SYSTEM . SECTION 13380 - SUPERVISORY CONTROL AND DATA ACQUISITION SYSTEM PART 1 - GENERAL 1.01 WORK OF THIS SECTION A. The CONTRACTOR shall furnish, install, configure, program, test and put into operation the

More information

ED17: Architectures for Process Safety Applications

ED17: Architectures for Process Safety Applications ED17: Architectures for Process Safety Applications Name Pete Skipp Title Process Safety Architect Date November 5 th & 6 th 2012 Copyright 2012 Rockwell Automation, Inc. All rights reserved. Agenda An

More information

Distributed Control Systems (DCS)

Distributed Control Systems (DCS) Training Title Distributed Control Systems (DCS) Training Duration 5 days Training Venue and Dates Distributed Control Systems (DCS) 5 13-17 May $3,300 Abu Dhabi In any of the 5 star hotel. The exact venue

More information

City Of London Environmental & Engineering Services Department Wastewater Treatment Operations

City Of London Environmental & Engineering Services Department Wastewater Treatment Operations City Of London Environmental & Engineering Services Department Wastewater Treatment Operations Greenway Pollution Control Centre 2014 Annual Report February 2015 Page 1 of 87 Summary This annual report

More information

The Connected Water Plant. Immediate Value. Long-Term Flexibility.

The Connected Water Plant. Immediate Value. Long-Term Flexibility. The Connected Water Plant Immediate Value. Long-Term Flexibility. The Water Industry is Evolving Reliable, safe and affordable access to water is not solely on the minds of water and wastewater managers.

More information

PLC 5 BIOTOWERS SCADA SYSTEM OPERATION MANUAL. Revision 1.0 May 15, 2006

PLC 5 BIOTOWERS SCADA SYSTEM OPERATION MANUAL. Revision 1.0 May 15, 2006 PLC 5 BIOTOWERS SCADA SYSTEM OPERATION MANUAL Revision 1.0 May 15, 2006 PLC 5 BIOTOWERS SCADA SYSTEM OPERATION MANUAL Revision 1.0 May 15, 2006 Table of Contents 1 Introduction... 4 2 Revision History...

More information

BUSINESS CONTINUITY MANAGEMENT PROGRAM OVERVIEW

BUSINESS CONTINUITY MANAGEMENT PROGRAM OVERVIEW BUSINESS CONTINUITY MANAGEMENT PROGRAM OVERVIEW EXECUTIVE SUMMARY CenturyLink is committed to ensuring business resiliency and survivability during an incident or business disruption. Our Corporate Business

More information

PLC 24 FERRIC CHLORIDE AND POLYMER SYSTEM SCADA SYSTEM OPERATION MANUAL. Revision 1.0 May 3, 2006

PLC 24 FERRIC CHLORIDE AND POLYMER SYSTEM SCADA SYSTEM OPERATION MANUAL. Revision 1.0 May 3, 2006 PLC 24 FERRIC CHLORIDE AND POLYMER SYSTEM SCADA SYSTEM OPERATION MANUAL Revision 1.0 May 3, 2006 PLC 24 FERRIC CHLORIDE AND POLYMER SYSTEM SCADA SYSTEM OPERATION MANUAL Revision 1.0 May 3, 2006 Table of

More information

SC2000 MOTOR PROTECTION ELECTRONICS, INC. INSTRUCTION MANUAL. (407) Phone: Website:

SC2000 MOTOR PROTECTION ELECTRONICS, INC. INSTRUCTION MANUAL. (407) Phone: Website: SC2000 INSTRUCTION MANUAL MOTOR PROTECTION ELECTRONICS, INC. 2464 Vulcan Road Apopka, Florida 32703 Phone: Website: (407) 299-3825 www.mpelectronics.com Operating Program Revision: 12 Revision Date: 8-27-14

More information

Small Business Storm Preparedness & Resiliency

Small Business Storm Preparedness & Resiliency Small Business Storm Preparedness & Resiliency Deborah Mills, CFM Dewberry Consultants, LLC Agenda Introduction to small business preparedness and resiliency Beverly MA, Brooklyn, New Orleans case studies

More information

Municipality Moves SCADA System from Desktop Computers to Terminal Services

Municipality Moves SCADA System from Desktop Computers to Terminal Services Municipality Moves SCADA System from Desktop Computers to Terminal Services Standards Certification Education & Training Publishing Conferences & Exhibits Speakers: Bosko Bob Loncar 2014 ISA Water / Wastewater

More information

Long-Term Power Outage Response and Recovery Tabletop Exercise

Long-Term Power Outage Response and Recovery Tabletop Exercise 1 Long-Term Power Outage Response and Recovery Tabletop Exercise After Action Report [Template] The After-Action Report/Improvement Plan (AAR/IP) aligns exercise objectives with preparedness doctrine to

More information

Authorized Systems Integrator. Automation Systems Telemetry & SCADA

Authorized Systems Integrator. Automation Systems Telemetry & SCADA Authorized Systems Integrator Automation Systems Telemetry & SCADA Horizons Engineering Switchgear Manufacturing Co. plc. is an Authorized System Integrator, Automation Partner for Schneider Electric Automation.

More information

Annual Training plan 2018

Annual Training plan 2018 Annual Training plan 2018 Leadership,, HR, Creativity, Secretary Courses Sr. No. Course Name Date Venue Fees U.S $ January 1. Time & Stress 7-11/1/2018 Abu Dhabi 2600 2. Legal Writing Skills 7-11/1/2018

More information

Comprehensive Networking Solutions

Comprehensive Networking Solutions Comprehensive Networking Solutions End to End Networking Solutions in the Water and Wastewater Sectors Standards Certification Education & Training Publishing Conferences & Exhibits Aug 5-7, 2014 Orlando,

More information

MEETING THE CHALLENGES OF UPGRADING THE PLANT CONTROL SYSTEM YIELDS MAJOR OPERATIONS BENEFITS

MEETING THE CHALLENGES OF UPGRADING THE PLANT CONTROL SYSTEM YIELDS MAJOR OPERATIONS BENEFITS MEETING THE CHALLENGES OF UPGRADING THE PLANT CONTROL SYSTEM YIELDS MAJOR OPERATIONS BENEFITS Mike Richardson Water Resources Manager, Cape Fear Public Utility Authority Nan Johnson VP Municipal Business,

More information

SPECIFICATIONS NB SKILLS PROVINCIAL COMPETITION AUTOMATION AND CONTROL APRIL 20, 2018-NBCC MONCTON LE 20 AVRIL-NBCC MONCTON

SPECIFICATIONS NB SKILLS PROVINCIAL COMPETITION AUTOMATION AND CONTROL APRIL 20, 2018-NBCC MONCTON LE 20 AVRIL-NBCC MONCTON NB Provincial Skills Competition Industrial Control (formerly called Automation & Control) SPECIFICATIONS NB SKILLS PROVINCIAL COMPETITION AUTOMATION AND CONTROL APRIL 20, 2018-NBCC MONCTON LE 20 AVRIL-NBCC

More information

How Power Problems Affect PLC Reliability

How Power Problems Affect PLC Reliability White Paper How Power Problems Affect PLC Reliability Michael A. Stout Vice President of Engineering Falcon Electric, Inc. www.falconups.com 2014 Falcon Electric, Inc. How Power Problems Affect PLC Reliability

More information

Ovation Ethernet Link Controller Module Data Sheet

Ovation Ethernet Link Controller Module Data Sheet Ovation Ethernet Link Controller Module Features: Provides native Ethernet connectivity capability at the I/O level Enables faster, more efficient integration of robust data from third-party devices Dedicated

More information

NV17-79 Interactive Operator Round Table Discussion swmoa.org 2 20-Apr May-17 D I I D D I

NV17-79 Interactive Operator Round Table Discussion swmoa.org 2 20-Apr May-17 D I I D D I NV17-66 PREPAREDNESS TOOLS AND RESOURCES 1 08-Mar-17 03-May-17 D D D D D D Proposed Methodology for Determining RO Unit Integrity for Pathogen Removal Credit NV17-71 and Regulatory Compliance swmoa.org

More information

WIRELESS REMOTE ASSET MONITORING & CONTROL

WIRELESS REMOTE ASSET MONITORING & CONTROL WIRELESS REMOTE ASSET MONITORING & CONTROL www.signal-fire.com info@signal-fire.com 978.212.2868 SIGNALFIRE TOOL KIT Free, easy to use PC configuration and diagnostics software. Supports wireless configuration

More information

Asset Management Made Easy. AWWA-PNWS Section Conference April 2018

Asset Management Made Easy. AWWA-PNWS Section Conference April 2018 Asset Management Made Easy AWWA-PNWS Section Conference April 2018 1 Agenda Asset Management basics Asset Management at SPU A few case studies 2 Definitions Asset management A process for maintaining a

More information

SCADA Solutions for Water and Wastewater Treatment Plants

SCADA Solutions for Water and Wastewater Treatment Plants SCADA Solutions for Water and Wastewater Treatment Plants Features Centralized control Increased reliability Improved management of treatment processes Reduced costs Preserved equipment investments Flexible

More information

SCADA System Specification. Vantage Pipeline Project # May 2013

SCADA System Specification. Vantage Pipeline Project # May 2013 SCADA System Specification Vantage Pipeline Project #201011 May 2013 Revision 0 Issued for Approval May 24, 2013 TABLE OF CONTENTS REVISION HISTORY:...2 1 PROJECT OVERVIEW...3 2 SCOPE AND PURPOSE...4 3

More information

REPORT TO COUNCIL City of Sacramento

REPORT TO COUNCIL City of Sacramento REPORT TO COUNCIL City of Sacramento 915 I Street, Sacramento, CA 95814-2604 www. CityofSacramento.org 14 Consent November 10, 2009 Honorable Mayor and Members of the City Council Agreement: Supervisory

More information

What is SCADA? What is Telemetry? What is Data Acquisition? Differences between SCADA and DCS? Components of SCADA. Field Instrumentation

What is SCADA? What is Telemetry? What is Data Acquisition? Differences between SCADA and DCS? Components of SCADA. Field Instrumentation SCADA Primer This document discusses the basics of SCADA systems. It serves as introduction for those who are not familiar with it, and as a reviewer for those who are already knowledgeable about the SCADA

More information

Creating A More Robust Facility Risk Assessment

Creating A More Robust Facility Risk Assessment Enhancing Resiliency: Creating A More Robust Facility Risk Assessment Brian Durand & Mark Norton DRJ Spring World 2010 Agenda Risk Assessment Overview Risk Assessment Overview Facility Risk Assessment

More information

Water Treatment Plant Upgrades to Open Secure Automation on Filter Controls

Water Treatment Plant Upgrades to Open Secure Automation on Filter Controls Case Study Water Treatment Plant Upgrades to Open Secure Automation on Filter Controls The city of Hot Springs, Arkansas projected that its antiquated filter controls would not be adequate to meet anticipated

More information

Municipal Line Card Automation Valves Measurement Process Control

Municipal Line Card Automation Valves Measurement Process Control Municipal Line Card Automation Valves Measurement Process Control We sell, apply, and service municipal-focused, high-quality specialty valves, measurement and automation products from best-in-class manufacturers

More information

PLC 22 WETLANDS & NITRIFYING BIO TOWERS SCADA SYSTEM OPERATION MANUAL. Revision 1.0 May 30, 2006

PLC 22 WETLANDS & NITRIFYING BIO TOWERS SCADA SYSTEM OPERATION MANUAL. Revision 1.0 May 30, 2006 PLC 22 WETLANDS & NITRIFYING BIO TOWERS SCADA SYSTEM OPERATION MANUAL Revision 1.0 May 30, 2006 PLC 22 WETLANDS & NITRIFYING BIO TOWERS SCADA SYSTEM OPERATION MANUAL Revision 1.0 May 30, 2006 Table of

More information

Cyber Security What Do I Need to Do Now?

Cyber Security What Do I Need to Do Now? Cyber Security What Do I Need to Do Now? PA AWWA 2016 Annual Conference Thursday, May 12, 2016 2:45 3:15 PM Presented by Dick McDonnell Authored by Jeff M. Miller, PE, ENV SP WARNING! Schneider Electric

More information

Chapter 18 SaskPower Managing the Risk of Cyber Incidents 1.0 MAIN POINTS

Chapter 18 SaskPower Managing the Risk of Cyber Incidents 1.0 MAIN POINTS Chapter 18 SaskPower Managing the Risk of Cyber Incidents 1.0 MAIN POINTS The Saskatchewan Power Corporation (SaskPower) is the principal supplier of power in Saskatchewan with its mission to deliver power

More information

Security Master Planning to Protect Water Resources Lara Kammereck John Saunders May 1, 2015

Security Master Planning to Protect Water Resources Lara Kammereck John Saunders May 1, 2015 Security Master Planning to Protect Water Resources Lara Kammereck John Saunders May 1, 2015 Who is Cascade Water Alliance? Joined together in 1999 350,000 residents 20,000 businesses City of Bellevue

More information

POWER SYSTEM DATA COMMUNICATION STANDARD

POWER SYSTEM DATA COMMUNICATION STANDARD POWER SYSTEM DATA COMMUNICATION STANDARD PREPARED BY: AEMO Systems Capability VERSION: 2 EFFECTIVE DATE: 1 December 2017 STATUS: FINAL Australian Energy Market Operator Ltd ABN 94 072 010 327 www.aemo.com.au

More information

Please refer to the above Request for Proposal (RFP) document in your possession and be advised of the following:

Please refer to the above Request for Proposal (RFP) document in your possession and be advised of the following: Lou Pagano Director Purchasing and Materials Management Division City Hall, 18 th Floor, West Tower 100 Queen Street West Toronto, Ontario M5H 2N2 Victor Tryl, Manager Professional Services November 23,

More information

DESIGN STANDARD DS 70-20

DESIGN STANDARD DS 70-20 Assets Delivery Group Engineering DESIGN STANDARD DS 70-20 Small Chlorination Systems (Water) Control Function Description VERSION 4 REVISION 12 AUGUST 2017 FOREWORD The intent of Design Standards is to

More information

PLC 4 PRIMARY SEDIMENTATION SYSTEM SCADA SYSTEM OPERATION MANUAL. Revision 1.0 May 15, 2006

PLC 4 PRIMARY SEDIMENTATION SYSTEM SCADA SYSTEM OPERATION MANUAL. Revision 1.0 May 15, 2006 PLC 4 PRIMARY SEDIMENTATION SYSTEM SCADA SYSTEM OPERATION MANUAL Revision 1.0 May 15, 2006 PLC 4 PRIMARY SEDIMENTATION SYSTEM SCADA SYSTEM OPERATION MANUAL Revision 1.0 May 15, 2006 Table of Contents 1

More information

MECHANICAL AND ELECTRICAL CONTRACTING, INSTALLATION, TESTING AND MAINTENANCE FOR THE WATER, PROCESS AND NUCLEAR INDUSTRIES

MECHANICAL AND ELECTRICAL CONTRACTING, INSTALLATION, TESTING AND MAINTENANCE FOR THE WATER, PROCESS AND NUCLEAR INDUSTRIES MECHANICAL AND ELECTRICAL CONTRACTING, INSTALLATION, TESTING AND MAINTENANCE FOR THE WATER, PROCESS AND NUCLEAR INDUSTRIES DESIGN INSTALLATION COMMISSIONING TESTING INSPECTION ABOUT US DETECTRONIC IS A

More information

Development of remote monitoring and control equipment with advanced communication functions

Development of remote monitoring and control equipment with advanced communication functions Development of remote monitoring and control equipment with advanced communication functions Ayuchi Kurosu, Nobukazu Teraoka, Keiichi Ohama [Summary] We have developed the NH Telemeter series of equipment

More information

PERSPECTIVES ON A J100 VULNERABILITY ASSESSMENT OUTCOMES AND LESSONS LEARNED BY MINNEAPOLIS WATER AUGUST 2016

PERSPECTIVES ON A J100 VULNERABILITY ASSESSMENT OUTCOMES AND LESSONS LEARNED BY MINNEAPOLIS WATER AUGUST 2016 PERSPECTIVES ON A J100 VULNERABILITY ASSESSMENT OUTCOMES AND LESSONS LEARNED BY MINNEAPOLIS WATER AUGUST 2016 Mr. Glen Gerads, Director of Minneapolis Water Mr. Andrew Ohrt, PE, Arcadis Agenda What is

More information

SCADA Control and Monitoring Of Groundwater Remediation Facilities: Past, Present and Planning For the Future

SCADA Control and Monitoring Of Groundwater Remediation Facilities: Past, Present and Planning For the Future SCADA Control and Monitoring Of Groundwater Remediation Facilities: Past, Present and Planning For the Future Obadiah Kilonzo 1 *, Kevin Fleming 1 1 Carolina Automation Systems, 313 F US Hwy 70 East, Garner,

More information

ControlEdge RTU Process Controller Product Information Note

ControlEdge RTU Process Controller Product Information Note Connected Plant ControlEdge RTU Process Controller Product Information Note ControlEdge RTUs are powerful, modular and scalable controllers capable of all remote automation and control applications. They

More information

Design and delivery of a Control System for an Aluminum Smelter. Skúli Björn Jónsson

Design and delivery of a Control System for an Aluminum Smelter. Skúli Björn Jónsson Design and delivery of a Control System for an Aluminum Smelter. Skúli Björn Jónsson Our experience Aluminum industry Building Management Systems Pharmaceuticals Food and Beverage Oil & Gas Today's Topics

More information

Tank terminal demonstrates the electrically operated solution for Emergency Shutdown Valves

Tank terminal demonstrates the electrically operated solution for Emergency Shutdown Valves Case Study Tank terminal demonstrates the electrically operated solution for Emergency Shutdown Valves Botlek Tank Terminal Case Study - 26th April 2013 Botlek Tank Terminal Case Study - 26th April 2013

More information

Industry Standards Utilities Engineering Technician

Industry Standards Utilities Engineering Technician Industry Standards Utilities Engineering Technician Utilities engineering technicians create and test technological equipment for consumer and commercial use. In the utilities industry, engineering technicians

More information

MOSCAD WIRELESS MONITORING AND CONTROL SOLUTIONS FOR THE WATER/WASTEWATER INDUSTRY

MOSCAD WIRELESS MONITORING AND CONTROL SOLUTIONS FOR THE WATER/WASTEWATER INDUSTRY MOSCAD WIRELESS MONITORING AND CONTROL SOLUTIONS FOR THE WATER/WASTEWATER INDUSTRY MOSCAD is a product born of Motorola s 60-year commitment to cutting edge technology. This quest for communications of

More information

SCADA S ROLE IN GETTING DRINKING WATER STANDARDS THERE!

SCADA S ROLE IN GETTING DRINKING WATER STANDARDS THERE! SCADA S ROLE IN GETTING DRINKING WATER STANDARDS THERE! Jan le Roux, Abbey Systems Limited, Manager Service Delivery ABSTRACT The purpose of the Drinking Water Standards for New Zealand (DWSNZ) is to ensure

More information

Industrial Automation

Industrial Automation Industrial Automation Automation is encompassing virtually every walk of life. Automation solutions are required right from agricultural to space technology. Plant Automation is the necessity for the manufacturing

More information

Details withheld at reviewer request. Process Design and Automation (Pty)Ltd Phone: +27 (0)

Details withheld at reviewer request. Process Design and Automation (Pty)Ltd Phone: +27 (0) Adroit Technologies End-user details Name: Details withheld at reviewer request SI details Name: Kobus Sutherland Designation: Director Company: Process Design and Automation (Pty)Ltd Phone: +27 (0)12

More information

CASE STUDY. TEC Telemetry of water and wastewater networks. Background- TEC presentation

CASE STUDY. TEC Telemetry of water and wastewater networks. Background- TEC presentation CASE STUDY TEC Telemetry of water and wastewater networks Project: Ramnad Combined Water Supply Scheme, India City: Trichy District, Tamilnadu Province Country: India Solution Type: Telemetry of water

More information

Project Profiles. Refinery & Chemical Systems

Project Profiles. Refinery & Chemical Systems Project Profiles Refinery & Chemical s Able-Baker Automation, Inc. P.O. Box 6368 Moraga, CA 94570 (USA) 1-510-601-9396 Fax: 1-510-601-9398 1-877-444-ABLE (2253) Home Page: www.able-baker.com Titanium Dioxide

More information

Telemetry & SCADA Solutions in the Water Industry. Presented by: Amir Amini, Business Development Manager, Process Automation, EMEA

Telemetry & SCADA Solutions in the Water Industry. Presented by: Amir Amini, Business Development Manager, Process Automation, EMEA Telemetry & SCADA Solutions in the Water Industry Presented by: Amir Amini, Business Development Manager, Process Automation, EMEA +34% Growingworld population +40% World population living under water

More information

New concept in automation: epac. November 2015

New concept in automation: epac. November 2015 New concept in automation: epac November 2015 21 st century megatrends are significantly changing the industrial world Connectivi ty Safety and Security Agility Scarcity of Resources 2 Connectivity 50

More information

An Overview of ISA-99 & Cyber Security for the Water or Wastewater Specialist

An Overview of ISA-99 & Cyber Security for the Water or Wastewater Specialist An Overview of ISA-99 & Cyber Security for the Water or Wastewater Specialist Standards Certification Education & Training Publishing Conferences & Exhibits Speakers: Bryan L. Singer, CISM, CISSP, CAP

More information

Identifying Critical Infrastructure Through the Use of Hydraulic Modeling to Support Asset Management

Identifying Critical Infrastructure Through the Use of Hydraulic Modeling to Support Asset Management Identifying Critical Infrastructure Through the Use of Hydraulic Modeling to Support Asset Management James P. Cooper, Prof. Engineer, Cert. Operator Acknowledgements Lisa Gresehover Kimberly Six Karem

More information

ECOTERRA Journal of Environmental Research and Protection

ECOTERRA Journal of Environmental Research and Protection ECOTERRA Journal of Environmental Research and Protection PC based data acquisition, monitoring and controlling techniques in wastewater treatment processes Leontin Catarig, Ciprian Pop, Csaba Bartha S.C.

More information

City of Detroit PlantPAx Process Library and WWW Accelerator Toolkit Save $ for Integrator and City of Detroit

City of Detroit PlantPAx Process Library and WWW Accelerator Toolkit Save $ for Integrator and City of Detroit Copyright 2012 Rockwell Automation, Inc. Inc. All All rights rights reserved. reserved. City of Detroit PlantPAx Process Library and WWW Accelerator Toolkit Save $ for Integrator and City of Detroit Hassan

More information

Safety Systems are the New Target Design Security Using Safety Methods

Safety Systems are the New Target Design Security Using Safety Methods SESSION ID: SBX4-W4 Safety Systems are the New Target Design Security Using Safety Methods Marty Edwards Director of Strategic Initiatives International Society of Automation (ISA) @ICS_Marty Disclaimer

More information