1 SECTION INSTRUMENTATION GENERAL PROVISIONS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. Work Scope: Provide engineering, furnishing, installing, PLC programming, calibrating, adjusting, testing, documenting, starting up, training, and all related activities required for a complete Control System (CS) for the Project. B. Section Includes: 1. Process computer system, including hardware, software, printers, monitors, and related equipment. 2. Field instruments, for monitoring flow, pressure, temperature, level, and other process parameters. 3. Instrument Accessories. 4. Human Machine Interface (HMI), along with the software requirements 5. Industrial Ethernet System, along with wireless system. 6. Instrument panels, includes field panels (FP) and local control panels (LCP). 7. Local Area Network (LAN) equipment and requirements. 8. Process analyzers, such as turbidity, ph, alkalinity, hydrogen sulfide, and other process variable. 9. Process control valves. 10. Program Logic Controllers (PLC), the programming and network requirements. 11. Uninterruptible Power Supply (UPS) and battery packs. 12. Cables, fiber optical, wiring, and related equipment. 13. Instrumentation Commissioning. 14. Training of OWNER S personnel. 15. Field testing, startup, and placing the process instrumentation and control system into service. C. Related Sections: 1. Section Top-End Equipment Requirements for the control system computers, printers, monitors and related physical components. 2. Section Programmable Logic Controllers (PLC) Requirements for PLC hardware and related equipment. 3. Division 17 Section Instrument Panels provides requirements for the field and local control panels. 4. Division 17 Section Instrumentation Accessories provides requirements for the instrumentation accessories to support the field instruments. 1.3 REFERENCES AND DEFINITIONS A. References: In case of conflict between the requirements of this Section and those of the listed standards, the requirements of this section shall prevail. B. ASTM International, Inc. (ASTM): 1. A 36 - Specification for Carbon Structural Steel 2. A 182 Specification for Forged or Rolled Alloy and Stainless Steel Pipe Flanges, Forged Fittings, and Valves and Parts for High-Temperature Service 3. A 269 Specification for Seamless and Welded Austenitic Stainless Steel Tubing for General Service 4. A 276 Specification for Stainless Steel Bars and Shapes 5. A 312 Specification for Seamless, Welded, and Heavily Cold Worked Austenitic Stainless Steel Pipes 6. B 32 Specification for Solder Metal Page 1 of 20 INSTRUMETNATION GENERAL PROVISIONS C:\Users\dfournier\Desktop\For \Division 17\17000 INSTRUMENTATION GENERATOR PROVISIONS.docx

2 7. B 68 Specification for Seamless Copper Tube, Bright Annealed 8. B 88 Specification for Seamless Copper Water Tube 9. D 1047 Specification for Poly(Vinyl Chloride) Jacket for Wire and Cable C. American National Standards Institute (ANSI): 1. Supplement to C37.90, Relays and Relay Systems Associated with Electric Power Apparatus (IEEE Std. 313), C37.90a. D. American Petroleum Institute (API): 1. RP Recommended Practices for the Design and Installation of Pressure- Relieving Systems in Refineries. 2. RP 550 Manual on Installation of Refinery Instruments and Control Systems. E. Instrument Society of America (ISA): 1. S5.1 Instrument Symbols and Identification 2. S5.4 Instrument Loop Diagrams 3. S7.3 Quality Standards for Instrument Air 4. S8.1 Instrument Enclosures for Industrial Environments 5. S20 - Specification Forms for Process Measurement and Control Instrumentation, Primary Elements, and Control Valves 6. S39.1 Control Valve Sizing Equations 7. S39.2 Control Valve Capacity Test Procedures 8. S Compatibility of Analog Signals for Electronic Industrial Process Instruments 9. S Process Instrumentation Terminology 10. RP 3.1 Flow Meter Installations, Seal and Condensate Chambers 11. RP 7.1 Pneumatic Control Circuit Pressure Test 12. RP12.6 Installation of Intrinsically Safe Systems for Hazardous )Classified) Locations 13. RP 20.1, 20.2 Specification Forms for Instruments F. National Electrical Manufacturers Association (NEMA): Enclosures for Electrical Equipment (1,000 Volts Maximum) 2. ICS 1 General Standards for Industrial Control and Systems G. Definitions: The definitions of terminology used in the Division 17 specifications or in any Section referencing Division 17, shall be as defined in ISA Standard S51.1, unless otherwise specified. Where terms used are not defined in ISA 51.1, or in these specifications, ANSI/IEEE Standard , ANSI/ISA S50.1 or other ISA standards shall apply. 1. Analog Device: Any sensor, transmitter, indicator, recorder, controller, computing relay, or control valve which transmits or receives an analog signal. Excludes the portion of a digital system or I/O subsystems. 2. Concealed Accessible: Out of general sight, but can easily reached by removing panels or access doors. 3. Concealed Inaccessible: Out of general sight and cannot be easily reached except by removing a permanent part of the building or using special tools. 4. Control Circuit: Any circuit operating at 24 volts AC or DC or more, whose principal purpose is the conveyance of information and not the conveyance of energy for the operation of an electrically powered device. 5. Control Room: An environmentally controlled room intended for housing digital control equipment, computers, large control panels, etc., and generally intended to be regularly occupied by operators. 6. Data Sheets: Data sheets as used in this specification shall comply with the requirements of ISA S20 as modified. 7. Device: An electronic or mechanical apparatus designed to perform a specific measurement of control function. 8. Electrical Isolation: a. Pertaining to an electrical node having no direct current path to another electrical node. As used in this specification, electrical isolation refers to a device with electrical inputs and/or outputs which are galvanically isolated from ground, the device case, the process fluid, and any separate power supply terminals, but such inputs and/or outputs are capable of being externally Page 2 of 20 INSTRUMETNATION GENERAL PROVISIONS C:\Users\dfournier\Desktop\For \Division 17\17000 INSTRUMENTATION GENERATOR PROVISIONS.docx

3 grounded without affecting the characteristics of the device or providing a path for circulation of ground currents. b. The terms "galvanic isolation," "electrical isolation", "isolation", or similar terms shall mean electrical isolation whenever used in Division 17, or whenever used in specifications for electrical control and instrumentation equipment in any other Divisions of these contract documents. c. Unless otherwise specified, electrical isolation for analog signal devices shall be rated 250 volts AC continuous; and 1500 volts AC for one minute, in accordance with ANSI/IEEE C Equipment: Machinery used in a process, e.g., pumps, mixers, fans, etc. 10. Exposed: Open to general view without removing panels, access doors, or a permanent part of the building. 11. Field: When used to refer to locations at the treatment facility, or in the transmission system, shall mean all outdoor locations, as well as all process and equipment areas. Unless otherwise specified, all areas shall be considered "field" locations except for administration and other office areas; control rooms; motor control centers and other electrical equipment rooms; dedicated HVAC rooms; and maintenance buildings. 12. Field Termination Point: Termination of a run of raceway from an instrument panel to the vicinity of a field instrument. 13. HMI: Human-Machine-Interface. The control system hardware and software associated with providing the CRT-based interface between system users and the control system. 14. Loop: Any combination of interconnected transmitters, receivers, switches, alarms, indicators, controllers, computers, or final control elements. 15. LPU: Local Processing Unit. Generic name of a panel that contains a PLC or RTU, and any necessary support devices for the operation of the panel. 16. Operating Accuracy: Conformity of indicated value to accepted standard value or true value throughout specified operating conditions with a confidence level of 95 percent includes, but is not limited to, hysteresis, linearity, and operating influence of temperature, pressure, supply voltage, and transmitter power supply. Operating accuracy for loop is defined as root-mean-square (RMS) of individual device operation accuracies. 17. Panel: An instrument support system which may be a flat surface, a partial enclosure, or a complete enclosure for instruments and other devices used in process control systems. Unless otherwise specified, the term panel shall be interpreted as a general term which includes flat panels, enclosures, cabinets, and consoles. 18. CS: Control System. 19. CSI: Control System Inegrator 20. PLC: Programmable Logic Controller. Field installed unit which monitors and controls devices located within the plant. The PLCs contain all logic necessary to monitor and control the system process located at the PLC location. 21. Power Circuit: Any circuit operating at 12 volts (AC or DC) or more, whose principal purpose is the conveyance of energy for the operation of an electrically powered device. 22. Process: A progressively continuing operation that consists of a series of controlled actions systemically directed toward a particular result, e.g., a process to mix, filter, heat, and/or cool air to a particular condition. 23. Response: The results of the act, or process of measuring the time difference between the time of a change in an input signal or a measured variable, and the time when the output, display, and final control element in the loop has changed to at least 60 percent of the change which should result from the input change. 24. RTU: Remote Terminal Unit. Field installed unit which monitors and controls devices, located away from the plant at remote locations. The RTUs contain all logic necessary to monitor and control the system process located at the remote location. 25. Rising/Falling: Terms used to define actions of discrete devices about their set points. a. Rising: Contacts close when an increasing process variable rises through the set point. b. Falling: Contacts close when a decreasing process variable falls through set point. 26. Signal Circuit: Any circuit operating at less than 80 volts AC or DC Page 3 of 20 INSTRUMETNATION GENERAL PROVISIONS C:\Users\dfournier\Desktop\For \Division 17\17000 INSTRUMENTATION GENERATOR PROVISIONS.docx

4 1.4 SUBMITTALS Signal types: a. Analog Signals, Current Type: 1) 4 to 20 ma dc signals conforming to ISA S ) Unless otherwise indicated for specific CS Subsystem components, use the following ISA S50.1 options: a) Transmitter Type: Number 2, two-wire. b) Transmitter Load Resistance Capacity: Class L. c) Fully isolated transmitters and receivers. b. Analog Signals, Voltage Type: 1 to 5 volts dc within panels where a common high precision dropping resistor is used. c. Discrete signals, two-state logic signals using dc or 120V ac sources as indicated. d. Pulse Frequency Signals: 1) Direct current pulses whose repetition rate is linearly proportional to process variable. 2) Pulses generated by contact closures or solid state switches as indicated. 3) Power source less than 30V dc. 28. Special Signals: Other types of signals used to transmit analog and digital information between field elements, transmitters, receivers, controllers, and digital devices. 29. Subsystem: A discrete subdivision of a system and an assemblage of parts, devices, or software modules designed to perform one or more of the specific tasks required for the system to accomplish its functions. 30. System: As assemblage of sometimes diverse parts, devices, or software modules serving a common set of measurement and control functions. 31. SCADA: Supervisory Control and Data Acquisition Panel: An instrument support system which may be a flat surface, a partial enclosure, or a complete enclosure for instruments and other devices used in process control systems. Unless otherwise specified or clearly indicated by the context, the term "panel" in these contract documents shall be interpreted as a general term which includes flat panels, enclosures, cabinets and consoles. 32. Time Resolution: The result of the act or process of rendering distinguishable events occurring at nearly the same time. 33. Two-Wire Transmitter: a. A transmitter which derives its operating power supply from the signal transmission circuit and therefore requires no separate power supply connections. b. As used in this specification, two-wire transmitter refers to a transmitter which provides a 4 to 20 milliampere current regulation of signal in a series circuit with an external 24 volt direct current driving potential and a maximum external circuit resistance of 600 ohms. 34. Unit: Any combination of equipment items interconnected in a predetermined manner, performing one or more controlled actions toward a particular result. A discrete subdivision of a process. 35. Division 17 Work: Whenever the terms "Division 17 work", "specified under Division 17" or "provided under Division 17" are used, they shall be interpreted as referring to all materials, labor, products, services, systems, etc., specified in Sections through 17999, inclusive, unless equipment shown or specified is clearly labeled as being provided under other parts of the contract. A. General Requirements: 1. Submittals shall be made in accordance with the requirements of this Section, the requirements of individual Division 17 Sections, and in accordance with Section Project Documentation. 2. Each submittal shall be complete, with all required information provided together at one time, and submitted in a sequence which provides the required information necessary for checking and approving a particular document at the time of the submittal Page 4 of 20 INSTRUMETNATION GENERAL PROVISIONS C:\Users\dfournier\Desktop\For \Division 17\17000 INSTRUMENTATION GENERATOR PROVISIONS.docx

5 3. Submittal Categories: Project submittals are divided into the following general categories: a. Design Submittals: Includes product data, shop drawings b. System Documentation Submittals: Includes operation and maintenance data, software manuals, and record documents. c. Testing Submittals: Includes requirements for system test plan, test procedures, and test reports. d. Training Submittals. B. Product Data: 1. Catalog Cuts: Instrument and control components, electrical devices, and mechanical devices: a. Catalog information, mark to identify proposed items and optional product features. b. Descriptive literature. c. External power and signal connections. d. Scaled drawings showing exterior dimensions and locations of electrical and mechanical interfaces. e. Test reports. 2. Component Data Sheets: Data sheets for instrument and control components. a. Format and Level of Detail: In accordance with ISA S20. b. Isolate component type identification type identification code and tag number on data sheet. c. Specific features and configuration data for each component: 1) Location or service. 2) Manufacturer and complete model number. 3) Size and scale range. 4) Set points. 5) Materials of construction. 6) Options included. 7) Name, address, and telephone number of manufacturer s local office, representative, distributor, or service facility. 3. Sizing and Selection Calculations: a. Primary Elements: Complete calculations plus process data used. Example, for flow elements, minimum and maximum values, permanent head loss, and assumptions made. b. Controlling, Computing and Function Generating Modules: Actual scaling factors with units and how they were computed. C. Shop Drawings: 1. General Requirements: a. Shop drawings, full-scaled details, wiring diagrams, catalog cuts, and descriptive literature. b. Identify proposed items and options. Identify installed spares and other provisions for future work (e.g., reserved panel space; unused components, wiring, and terminals). c. Legend and Abbreviations Lists: Complete definition of symbols and abbreviations used on this Project (e.g., engineering units, flow streams, instruments, structures, and other process items used in nameplates, legends, and data sheets). 2. Bill of Materials: List of required equipment. a. Group equipment items by enclosure and field, and within an enclosure, as follows: 1) Instrument and Control Components: By composite identification code. 2) Other Equipment: By equipment type. b. Data Included: 1) Equipment tag number. 2) Description. 3) Manufacturer, complete model number, and all options not defined by model number. 4) Quantity supplied Page 5 of 20 INSTRUMETNATION GENERAL PROVISIONS C:\Users\dfournier\Desktop\For \Division 17\17000 INSTRUMENTATION GENERATOR PROVISIONS.docx

6 5) Component identification code where applicable. 3. Panel Construction Drawings: a. Scale Drawings: Show dimensions and location of panel mounted devices, doors, louvers, subpanels, internal and external, and ventilation requirements. b. Panel Legend: List front of panel devices by tag numbers, nameplate inscriptions, service legends, and annunciator inscriptions. c. Bill of Materials: List devices mounted within panel that is not listed in panel legend. Include tag number, description, manufacturer, and model number. d. Construction Details: NEMA rating, materials, material thickness, structural stiffeners and brackets, lifting lugs, mounting brackets and tabs, door hinges and latches, and welding and other connection callouts and details. e. Construction Notes: Finishes, wire color schemes, wire ratings, wire and terminal block numbering and labeling scheme. 4. Panel Control Diagrams: For discrete control and power circuits. a. Diagram Type: Ladder diagrams. Include devices, related to discrete functions, which are mounted in or on the panel and that require electrical connections. Show unique rung numbers on left side of each rung. b. Item Identification: Identify each item with attributes listed. 1) Wires: Wire number and color. Cable number, if part of multi-conductor cable. Wire label designations on each end of a single wire shall be the same. 2) Terminals: Location (enclosure number, terminal junction box number, or MCC number), terminal strip number, and terminal block number. 3) Provide all jumpers, shielding, and grounding details. 4) Discrete Components: a) Tag number, terminal numbers, and location ( FIELD, enclosure number, or MCC number). b) Switching action (open or close on rising or falling process variable), set point value and units, and process variable description (e.g. Wet Well Level High). 5) Relay Coils: a) Tag number and its function. b) On right side of run where coil is located, list contact location by ladder number and sheet number. Underline normally closed contacts. 6) Relay Contacts: Coil tag number, function, and coil location (ladder rung number and sheet number). c. Show each circuit individually. No typical diagrams or typical wire lists will be permitted. d. Ground wires, surge protectors, and connections. e. Circuit Names: Show names corresponding to Circuit and Raceway Schedule for circuits entering and leaving a panel. 5. Panel Wiring Diagrams: Show point-to-point and terminal-to terminal wiring within panel. 6. Loop Diagrams: Individual wiring diagram for each analog or pulse frequency loop. a. Conform to the minimum requirements of ISA S5.4. b. Provide information listed ISA S5.4, paragraph 5.3, subparagraphs 2 and 6. c. Drawing Size: Individual 11-inch by 17-inch sheet for each loop. d. Divide loop diagram into areas for panel face, back-of-panel, and field. e. Show the following: 1) Terminal numbers, location of dc power supply, and location of common dropping resistors. 2) Switching contacts in analog loops and output contacts of analog devices. Reference specific control diagrams where functions of these contacts are shown. 3) Tabular summary on each diagram: a) Transmitting Instruments: Output capability. b) Receiving Instruments: Input impedance. c) Loop Wiring Impedance: Estimate based on wire sizes and lengths shown Page 6 of 20 INSTRUMETNATION GENERAL PROVISIONS C:\Users\dfournier\Desktop\For \Division 17\17000 INSTRUMENTATION GENERATOR PROVISIONS.docx

7 d) Total loop impedance. e) Reserve output capacity. 4) Circuit and raceway schedule names. 7. Interconnecting Wiring Diagrams: a. Diagrams, device designations, and symbols in accordance with NEMA ICS 1. b. Diagrams show bear Electrical Subcontractor signature attesting diagrams have been coordinated with electrical drawings. c. Show the following: 1) Electrical connections between equipment, consoles, panels, terminal junction boxes, and field mounted instruments. 2) Component and panel terminal board identification numbers and external wire and cable numbers. 3) Circuit names matching Circuit and Raceway Schedule. 4) Intermediate terminations between field elements and panels to terminal junction boxes and pull boxes. 5) Pull boxes. 8. Installation Requirements: a. Installation drawings shall show installation arrangements for all provided equipment, mounting and anchoring details, conduit entries into cabinets, and Control System electrical power supply distribution conduit and wiring. Data sheets and/or catalog cuts for mounting devices, anchors, wire and other incidental installation materials shall be included. b. Include modifications or further details required to adequately define installation of Instrument and Control components. c. Interface Cables: 1) Provide for review interface cable pin-out/cable makeup diagrams. This includes all network cables, radio to LPU/LPU cables, computer to LPU cables and printer cables. 2) All cables shall either be standard cables from the manufacturer or custom-made, without the use of gender changers, 9-25 pin converters, null modem adapters, etc. D. Information Submittals: 1. Factory functional and performance test reports and logs. 2. Manufacturer s Certification of Compliance. 3. Source quality-control reports. 4. Special shipping, storage and protection, and handling instructions. 5. Manufacturer s instructions for installation. 6. Manufacturer s Certificate of Proper Installation. 7. Qualification Data: For manufacturer, installer and manufacturer's representative. 8. Suggested spare parts list to maintain the equipment in service for a period of two years. Include a list of special tools required for checking, testing, parts replacement, and maintenance with current pricing information. 9. List special tools, materials, and supplies furnished with equipment for use prior to and during startup and for future maintenance. 10. Warranties and service agreements. 11. Preinstallation conference minutes. 12. Field quality-control reports. E. Operation and Maintenance Data: 1. In accordance with Division 1 Section Operation and Maintenance Data, and as specified in this Section. 2. Preventive Maintenance Instructions: a. Include all applicable visual examinations, hardware testing, and diagnostic hardware/software routines. b. Instructions the loading and use of test and diagnostic programs and special or standard test equipment shall be an integral part of these procedures. 3. Corrective Maintenance Instructions a. Include guides for locating malfunctions down to the card-replacement level with adequate details for quickly and efficiently locating the cause of an Page 7 of 20 INSTRUMETNATION GENERAL PROVISIONS C:\Users\dfournier\Desktop\For \Division 17\17000 INSTRUMENTATION GENERATOR PROVISIONS.docx

8 equipment malfunction, stating the probable source(s) of trouble, the symptoms, probable cause, and instructions for remedying the malfunction. b. Guides shall explain how to use on-line test and diagnostic programs for all devices and any special test equipment, if applicable. c. Corrective maintenance instructions shall include: 1) Explanations for the repair, adjustment, or replacement of all items, including printed circuit cards. 2) Schematic diagrams of electrical, mechanical, and parts location, illustrations, photographs, and sectional views providing details of mechanical assembly s equipment repair or replacement. 3) Include typical signal waveforms, logic levels, bit patterns, and related functions. 4) For mechanical items requiring field repair, information on tolerances, clearances, wear limits, and maximum bolt-down torques shall be supplied. 5) Information on the loading and use of special off-line diagnostic programs, tools, and test equipment, as well as any cautions or warnings which must be observed to protect personnel and equipment shall be included. 6) A list of test equipment and special tools required. 7) A list of all abbreviations and circuit symbols used. 8) Warranties, bonds and maintenance records, including proper procedures in the event of failures and instances which might affect the validity of warranties, bonds, or contracts. 9) A parts catalog enumerating every part to the lowest of card replaceable components. The description shall include component symbol, description, ratings, accuracy, manufacturer's name and address, manufacturer's part number, commercial equivalents, and quantity per assembly or subassembly. The parts catalog shall identify the appropriate locations of the parts and shall group each component by assemblies or subassemblies within each subsystem so that each component can be identified as being part of the next larger assembly. 4. A list of recommended spare parts that includes all parts necessary to maintain and repair control system components. The list shall identify the specific part or model number, description, manufacturer s name and address, commercial equivalents, unit price, lead time for delivery, and recommended quantity. The spare parts list shall indicate which components (by model and serial number) have been provided with the delivered system as part of the spares inventory. F. Software and Firmware Operational Documentation: 1. Software operating and upgrade manuals. a. Provide Original OEM Manuals in lieu of developing specific O&M Manuals b. Equipment, which does not have proper O&M Manuals, will require the development of specific Manual. 2. Program Software Backup: On magnetic media or compact disk, complete with data files. 3. Device address list. 4. Printout of software application and graphic screens. G. CS Record Documentation: 1. Upon completion of the field testing, the CSI shall provide the CS Record Documents. Documents, which have changed because of the engineering changes, contract changes, or error or omission, shall be updated and the revised documentation provided. 2. Provide as-built sets of: a. Source tapes, disk pack(s) or other storage media for all custom programs b. Loadable and executable object disk pack(s) of the software systems c. All previously delivered documents, with as-built updates d. OEM standard documentation Page 8 of 20 INSTRUMETNATION GENERAL PROVISIONS C:\Users\dfournier\Desktop\For \Division 17\17000 INSTRUMENTATION GENERATOR PROVISIONS.docx

9 3. Information shall include the operating systems, programs necessary for the operation and maintenance of the CS, and the programs supplied by the CPU/Microprocessor manufacturers, such as assembler, loaders, editors, compilers and diagnostics. 4. The CS Record Documentation, in conjunction with other documentation specified elsewhere, shall be sufficient to allow the OWNER to reconfigure or make additions or deletions to the System without assistance from the Manufacturer. H. CS Commissioning. 1. Provide CS Test Plan, procedures for system testing, and test reports in accordance with Section Startup, Testing, Commissioning and Training and as specified in Part 3 of this Section. 2. Provide the Training Manuals and Plan, training course outline and lessons, and other information as required by Section Startup, Testing, Commissioning and Training and as specified in Part 3 of this Section. 1.5 QUALITY ASSURANCE A. Control System Integrator (CSI) Qualifications: 1. Performs work required to select, furnish, configure, customize, debug, install, connect, calibrate, and place into operation all hardware and software specified within this section and in other sections. 2. Manufacturer shall be a "systems house," regularly engaged in the design and the installation of CS for the municipal water or wastewater industry. A "systems house" shall be an organization that complies with all of the following criteria: a. Employs a registered professional Control Systems Engineer or Electrical Engineer to supervise or perform the work required by this specification section. b. Employs personnel on this project who have successfully completed a manufacturer s training course on the configuration and implementation of the specific programmable controllers, computers and software proposed for this project. c. Has performed work of similar or greater complexity on at least three (3) projects within the last five (5) years and has implemented and completed at least one of these projects with the proposed HMI software. d. Has been in the water/wastewater industry performing the type of work specified in this specification section for the past five (5) continuous years. 3. Manufacturer shall maintain a fully equipped office/production facility with full-time employees capable of fabricating, configuring, installing, calibrating, troubleshooting, and testing the system specified herein. 4. Provide qualified repair personnel available and capable of reaching the Project facility within 24 hours. 5. Installation of the system need not be performed by the Manufacturer s employees; however, the Manufacturer shall provide on-site technical supervision of the installation. B. Installer Qualifications: Manufacturer's authorized representative who is trained and approved for installation of units required for this Project. C. Source Limitations: Provide equipment that is the product of one manufacturer to the maximum practical extent. Where this is not practical, all equipment of a given type shall be the product of one manufacturer. D. Calibration Instruments: Each instrument used for calibrating CS equipment shall bear the seal of a reputable laboratory certifying that instrument has been calibrated within the previous 12 months to a standard endorsed by the National Institute of Standards and Technology (NIST). E. Electrical Components, Devices, and Accessories: Listed and labeled as defined in NFPA 70, by a qualified testing agency, and marked for intended location and application. F. Preinstallation Conference: Conduct conference at Project site Page 9 of 20 INSTRUMETNATION GENERAL PROVISIONS C:\Users\dfournier\Desktop\For \Division 17\17000 INSTRUMENTATION GENERATOR PROVISIONS.docx

10 1.6 DELIVERY, STORAGE, AND HANDLING Page 10 of 20 INSTRUMETNATION GENERAL PROVISIONS C:\Users\dfournier\Desktop\For \Division 17\17000 INSTRUMENTATION GENERATOR PROVISIONS.docx A. Deliver, handle and store CS components in accordance with manufacturer s written instructions and the requirements of Division 1 Section Product Requirements. B. Specific requirement for the CS: 1. Provide site and warehouse storage facilities for CS equipment. 2. Prior to shipment, include corrosive-inhibitive vapor capsules in shipping containers and related equipment as recommended by capsule manufacturer. 3. Prior to installation, store items in dry indoor locations. Provide heating in storage areas for items subject to corrosion under damp conditions. 4. Cover panels and other elements that are exposed to dusty construction environments. 1.7 PROJECT CONDITIONS A. Operating Conditions: 1. Ambient Conditions: a. Provide equipment suitable for ambient conditions in accordance with environment requirement paragraphs specified below. b. Provide system elements to operate properly in the presence of radio degree Frequency fields produced by portable RF transmitters with output of five watts operated at 24 inches from instruments; in the presence of plant telephone lines, power lines and electrical equipment; and in the presence of digital data transmission systems. 2. Field Locations: Field equipment may be subjected to ambient temperatures from minus 20 degree F to 105 degree F, with direct radiation, and relative humidity from 45 to 100 percent with condensation. Field equipment will also experience rain, freezing rain, and snow. 3. Power Supply: Power supply will be 117 volts AC, single-phase, 60-hertz commercial power. Voltage variations will be at least plus or minus 8 percent. Certain loops shall have integral power supply as indicated on the drawings. B. Standard Environment Requirements: Unless otherwise noted, design equipment for continuous operation in these environments. 1. Freestanding Panels and Consoles: a. Inside, Air Conditioned: NEMA 12. b. Inside: NEMA Smaller Panels and Assemblies (that are not freestanding): a. Inside, Air Conditioned: NEMA 4X. b. All Other Locations: NEMA 4X. 3. Field Elements: Outside. C. Environmental Design Requirements: Following defines the types of environments referred to above. 1. Inside, Air Conditioned: a. Temperature: 1) Normal: 60 to 80 degree F. 2) With Up to 4-hour HVAC System Interruption: 40 to 105 degree F. b. Relative Humidity: 1) Normal: 10 percent, winter, to 70 percent, summer. 2) With Up to 4-hour HVAC System Interruption: 10 to 100 percent. c. NEC Classification: Nonhazardous. 2. Inside: a. Temperature: 20 to 104 degree F. b. Relative Humidity: 10 to 100 percent. c. NEC Classification: Nonhazardous. 3. Inside, Corrosive: a. Temperature: 20 to 104 degree F. b. Relative Humidity: 10 to 95 percent. c. Corrosive Environment: Hydrogen sulfide gas and ammonia. d. NEC Classification: Nonhazardous. 4. Outside:

11 a. Temperature: Minus 20 to 122 degree F, with direct radiation. b. Relative Humidity: 10 to 100 percent, rain, freezing rain and snow, as well as with condensation. c. NEC Classification: Nonhazardous. 5. Outside, Corrosive: a. Temperature: Minus 20 to 122 degree F. b. Relative Humidity: 10 to 100 percent, rain, freezing rain and snow. c. Corrosive Environment: Hydrogen sulfide gas. d. NEC Classification: Nonhazardous. D. Corrective Maintenance 1. Time Period: Two (2) years from date of Substantial Completion. 2. Services: Provide services of factory-trained service technicians for performing corrective maintenance on all system hardware and software for maintenance on CS. a. Provide a 24-hour, 7-day/week service hotline for telephone notification of system malfunctions. b. Within 2 hours from notification by the OWNER of defective CS operation, a qualified service representative will establish telephone contact with the OWNER'S maintenance personnel to discuss short-term corrective measures. c. If it is not possible to correct the defective operation as a result of the telephone contact, provide a qualified service representative at the location of the installed CS within 24 hours from initial notification. d. Service representative shall perform all necessary inspections and diagnostic tests to determine the source of the defect and to establish a corrective action plan. The corrective action plan shall be developed such that the defect is corrected as quickly as possible and with the least impact on the operation of the OWNER s facilities. e. Prior to beginning any repair or replacement procedure, review the corrective action plan with the OWNER informing of the planned course of action and to allow assessment of any impact it might have on the operation of the OWNER s facilities. f. Replacement or repair of the defective component will be accomplished using replacement parts from the spare parts inventory delivered with the system. If not, the corrective action plan shall include a detailed schedule for the planned course of action. g. Once the defect has been corrected, the corrective action plan shall be updated indicating the source of the defect and specific corrective action taken. A copy of the updated corrective action plan shall be delivered to the OWNER on the day the work is performed. h. Any spares from the onsite supply of spares used in correcting the system malfunction shall be replaced within 15 days. i. At OWNER'S option, OWNER maintenance personnel may participate in any corrective maintenance procedures. 3. If 24-hour response time is not provided, or other corrective maintenance requirements are not met, the OWNER shall have the right to obtain corrective maintenance from other sources and charge the CONTRACTOR reasonable costs of the alternative maintenance services, including parts, labor, travel, and subsistence. E. The OWNER, at OWNER'S option, may elect to employ its own maintenance staff to locate and remove a defective component. In this case the OWNER will return the defective component to a repair location as instructed by the CONTRACTOR. The CONTRACTOR shall repair or replace the defective component and return the properly working unit to the OWNER within 15 days. 1.8 SOFTWARE SERVICE AGREEMENT A. Technical Support: Beginning with Substantial Completion, provide software support for two (2) years. B. Upgrade Service: Update software to latest version at Project completion. Install and program software upgrades that become available within two (2) years from date of Page 11 of 20 INSTRUMETNATION GENERAL PROVISIONS C:\Users\dfournier\Desktop\For \Division 17\17000 INSTRUMENTATION GENERATOR PROVISIONS.docx

12 Substantial Completion. Upgrading software shall include operating system. Upgrade shall include new or revised licenses for use of software. 1. Provide 30 days' notice to Owner to allow scheduling and access to system and to allow Owner to upgrade computer equipment if necessary. 1.9 EXTRA MATERIALS A. Furnish extra materials that match products installed and that are packaged with protective covering for storage and identified with labels describing contents. B. Spare Parts: 1. During the system warranty period, the CONTRACTOR shall provide system repairs by initially replacing the defective component with one from the spares inventory. 2. The CONTRACTOR shall then replace the spare component. Rather than place the new component in the spares inventory, the CONTRACTOR shall replace the spare that had been installed in the system during the initial repair. This procedure shall ensure that all new components provided as spares are fully tested and compatible with the installed system. 3. Spare requirements as specified in other Division 17 sections. C. Special Tools: One of each type of special hand tool required to open or operate equipment, to remove or replace replaceable parts, remove or replace cable connectors, or to make required operational or maintenance adjustments. A special hand tool is any tool not readily available from local retail hardware stores. D. Test Equipment: 1. The CONTRACTOR shall provide a complete list of all tools, test equipment, and commercial software programs necessary for the proper maintenance of the system. This list shall contain the quantity recommended, model number, description, cost, and name and address of supplier. 2. Provide the testing equipment and tools as listed in Table 1, Division 17 Section Instrument Commissioning to the OWNER after their use in commissioning the CS. PART 2 - PRODUCTS 2.1 GENERAL REQUIREMENTS A. CS functions as shown on Drawings and as required for each loop. Furnished equipment items and devices as required. Furnish all materials, equipment, and software required to affect required system and loop performance. B. Manufacturers: Subject to compliance with requirements, CS design is based on the named manufacturers of equipment and materials. 1. If an item is proposed other than the named manufacturer, obtain approval from ENGINEER for such changes in accordance with Section Product Documentation. 2. If proposed item requires, i.e. different installation, wiring, raceway, enclosures, intrinsically safe barriers, and accessories, furnish equipment and work. C. Like Equipment Items: 1. Use products of one manufacturer and of the same series or family of models to achieve standardization for appearance, operation, maintenance, spare parts, and manufacturer s services. 2. Implement all same or similar functions in same or similar manner. For example, control logic, sequence of controls, and display layouts. D. Special Project Coordination Requirements: As a part of this contract, the instrumentation systems contractor shall coordinate with all the sub-systems suppliers and manufacturers, during bidding, construction, testing, installation and start-up phases of the project. The coordination is to assure that the instruments, and sub-systems are in compliance with the specifications and the central controls, and that the tie-ins and the interface signals are provided as required Page 12 of 20 INSTRUMETNATION GENERAL PROVISIONS C:\Users\dfournier\Desktop\For \Division 17\17000 INSTRUMENTATION GENERATOR PROVISIONS.docx

13 2.2 INFORMATION ON DRAWINGS Page 13 of 20 INSTRUMETNATION GENERAL PROVISIONS C:\Users\dfournier\Desktop\For \Division 17\17000 INSTRUMENTATION GENERATOR PROVISIONS.docx A. The following information is indicated on the drawings: 1. Loop diagram on flow sheet for each control loop. Diagrams are schematic in nature and intended only as a guide to work to be performed. 2. Approximate location of primary elements, instrument panels and final control elements. 3. Approximate location of instrumentation power junction boxes for instrument electrical power connection. 4. Location of electrical distribution panel boards for instrument electrical power. 5. Location of equipment having alarms and equipment status contacts. 6. Location of equipment being controlled by system. 7. General layout of instrument cabinets. 8. Instrument installation details. B. The following information is not shown on drawings, but shall be the responsibility of the CONTRACTOR to determine, furnish and coordinate with other divisions, based upon systems specified. Show this information on project record drawings. 1. Instrument loop drawings per ISA S5.4 minimum, desired and optional items. 2. Location of electrical distribution panel boards supplying power to any device supplied under this contract. 3. Detailed enclosure and instrument panel layouts, fabrication details and wiring diagrams. 4. Detailed system configuration. 5. Raceway and cable routing for instrumentation wiring. C. Instrument Tag Numbers: A shorthand tag numbers is used in the Loop Specifications. For example: PIT 2.3 LOOP SPECIFICATIONS A. Location: Division 17 Section System Configuration for a description of control loops for the CS. B. Organization: By unit process and loop number. C. Functional Requirements for Control Loops; 1. Shown on Drawings, in Panel Control Diagrams and Process and Instrumentation Diagrams (P&ID). P&ID format and symbols are in accordance with ISA S5.1, except as specified or shown on Drawings. 2. Supplemented by Control Loop Descriptions. D. Subheadings for Each Loop: 1. Functions: Clarifies functional performance of loop, including abstract of complex interlocks. 2.4 INSTRUMENT AND CONTROL COMPONENTS A. Components for Each Loop: Major components for each loop are listed in the Instrument Schedule referenced in Division 17 Section Instruments. 1. Comply with the various component specifications located in Division 17 Instrumentation sections, as well as in applicable Division 16 Electrical Sections. 2. Component General Requirements: a. Provide equipment of solid-state construction utilizing second source semiconductors, unless otherwise specified. Derate components to assure dependability and long-term stability. b. Provide printed or etched circuit boards of glass epoxy, hand or wave soldered, of sufficient thickness to prevent warping. Coat printed circuit boards in fieldmounted equipment with Plasite 7122, or approved equal, to protect against corrosion. c. Alignment and adjustments shall be non-critical, stable with temperature changes or aging and accomplished with premium grade potentiometers. Do not insert components of specially selected values into standard electronic assemblies to meet performance requirements.

14 d. Use parts indicated in instruction manuals, replaceable with standard commercial components of the same description without degrading performance of completed assembly. Do not use silver edge connectors or pins. B. Test Equipment: Use test equipment and instruments to simulate inputs and read outputs suitable for purpose intended and rated to an accuracy of at least five times greater than the required accuracy of device being calibrated. Such test equipment shall have accuracies traceable to the National Bureau of Standards as applicable. C. Components, Hazardous Area Location: 1. Assure equipment located in hazardous areas is suitable for applicable classification by use of explosion-proof housings or equipment and barriers approved as "intrinsically safe" by either UL or FM. 2. Locate barriers in cabinets at hazardous area boundaries. Use dual barriers in loops in order to prevent grounding loop at the barrier. D. Transient and Surge Isolation: 1. Requirements: Protect all power and communication and transmission/ receiving circuitry from any surge, including spikes up 1,000 volts peak and surges with a rise time of less than one microsecond. Use a combination of current limiting resistors, zener diodes, gas tube surge arresters and a fusible link which melts and shorts the surge to ground before the device circuitry is affected. 2. Personnel Safety: Provide protection adequate for personnel safety, which will prevent an erroneous output, change in calibration or failure of component other than fuse or fusible link. 2.5 NAMEPLATES AND TAGS A. Panel Nameplates: Enclosure identification located on the enclosure face. 1. Locations and Inscription: As shown. 2. Materials: Laminated plastic attached to panel with stainless steel screws. 3. Letters: 1/2-inch white on black background, unless otherwise noted. B. Component Nameplates, Panel Face: Component identification located on panel face under or near component. 1. Locations and Inscription: As shown. 2. Materials: Laminated plastic attached to panel with stainless steel screws. 3. Letters: 3/16-inch white on black background, unless otherwise noted. C. Component Nameplates, Back of Panel: Component identification located on or near component inside enclosure. 1. Locations and Inscription: As shown. 2. Materials: Adhesive backed laminated plastic. 3. Letters: 3/16-inch white on black background, unless otherwise noted. D. Legend Plates for Panel Mounted Pushbuttons, Lights, and Switches. 1. Inscriptions: Refer to Drawings. E. Service Legends: Component identification nameplate located on face of component. 1. Inscription: As shown. 2. Materials: Adhesive backed laminated plastic. 3. Letters: 3/16-inch white on black background, unless otherwise noted. F. Nametags: Component identification for field devices: 1. Inscription: Component tag number. 2. Materials: 16-gauge, Type 304 stainless steel. 3. Letters: 3/16-inch imposed. 4. Mounting: Affix to component with 16- or 18-gauge stainless steel wire or stainless steel Page 14 of 20 INSTRUMETNATION GENERAL PROVISIONS C:\Users\dfournier\Desktop\For \Division 17\17000 INSTRUMENTATION GENERATOR PROVISIONS.docx

15 2.6 CORROSION PROCEDURES A. Corrosion-Inhibiting Vapor Capsule Manufacturers: Provide corrosion inhibiting vapor release capsules, which emit an invisible, odorless, nontoxic vapor for passivation of iron, steel, copper, brass, and aluminum. 1. Hoffman Engineering Co.; Model A-HCT. 2. Northern Instruments; Model Zerust VC. 3. Wiegmann; Catalog No. WCV series. 2.7 SOURCE QUALITY CONTROL A. Scope: Inspect and test entire CS to ensure it is ready for shipment, installation, and operation. B. Location: Manufacturer s factory or ENGINEER approve staging site. C. Factory Demonstration Test (FDT)s 1. A specific installation and start up plan shall be developed prior t degree Factory Demonstration Test. 2. Conduct a FDT for verification that all equipment, software, and associated documentation perform as specified prior shipment. 3. Performed to verify that the equipment is manufactured and assembled correctly, is operating as designed, and is in compliance with the contractual requirements for the deliverables. 4. Performed tests verifying software and hardware comply with the functional and performance requirements. 5. FDT shall demonstrate compliance to each explicitly stated requirement in the specification. a. CONTRACTOR shall use a personal computer data base program to build a FDT cross reference table that lists each specification paragraph that imposes a uniquely identifiable technical requirement. b. CONTRACTOR shall add to the format a data field for the FDT test number of the test that is going to demonstrate compliance with the requirement. A second version of the table, sorted by test number, shall also be printed. c. This will make it possible to select any specification paragraph and identify the FDT test that should demonstrate the feature. The version ordered by test number can be used to verify the completeness of each test and shall be used during the FDT to check off the features demonstrated. 6. FDT shall include the following: a. Equipment Test and Verification: The FDT for the equipment (hardware) shall include individual end-item verification and integrated tests of all hardware. These tests shall include visual inspection verification and running the standard hardware diagnostic programs, plus all special diagnostic programs used by the CONTRACTOR to demonstrate that the hardware integration task has been completed. b. System Functional Test: The functional test shall exercise every specified system function and shall include, but not be limited to, the following: 1) Rigorous exercising of all devices both individually and collectively. 2) Verification of proper scanning and data acquisition of status and data points. 3) Verification of proper Control Strategy up/down loading to the LPUs. 4) Testing of all user interface functions. 5) Verification of all control operations to ensure that they result in the correct sequence of operation at all the LPUs. 6) Simulation of communication error conditions and demonstration of error detection and handling. 7) All specified display types, reports, and operator/user procedures must be shown to be implemented and verified for accuracy. 8) Create and process device failure conditions including LPU failure, Operator Workstation failure, peripheral failures, and failure of their devices associated with the CS. Special attention shall be given to Page 15 of 20 INSTRUMETNATION GENERAL PROVISIONS C:\Users\dfournier\Desktop\For \Division 17\17000 INSTRUMENTATION GENERATOR PROVISIONS.docx

SECTION ENCLOSED SWITCHES AND CIRCUIT BREAKERS

SECTION ENCLOSED SWITCHES AND CIRCUIT BREAKERS SECTION 262816 - ENCLOSED SWITCHES AND CIRCUIT BREAKERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division

More information

PIMA COUNTY REGIONAL WASTEWATER RECLAMATION DEPARTMENT SCADA STANDARDIZATION PROJECT TABLE OF CONTENTS

PIMA COUNTY REGIONAL WASTEWATER RECLAMATION DEPARTMENT SCADA STANDARDIZATION PROJECT TABLE OF CONTENTS PIMA COUNTY REGIONAL WASTEWATER RECLAMATION DEPARTMENT SCADA STANDARDIZATION PROJECT TABLE OF CONTENTS Section Page DIVISION 13 - SPECIAL CONSTRUCTION 13401 SCADA System, General Requirements... 13401-1

More information

SECTION VARIABLE FREQUENCY MOTOR CONTROLLERS (VFD)

SECTION VARIABLE FREQUENCY MOTOR CONTROLLERS (VFD) SECTION 26 29 23 VARIABLE FREQUENCY MOTOR CONTROLLERS (VFD) PART 1 -GENERAL 1.1 SYSTEM DESCRIPTION A. Definitions: The Variable Speed AC Motor Drive (hereafter referred to as "VFD") shall be designed to

More information

SECTION ELECTRIC METERING

SECTION ELECTRIC METERING SECTION 26 27 13 ELECTRIC METERING SPEC WRITER NOTES: Use this section only for NCA projects Delete between //----// if not applicable to project. Also delete any other item or paragraph not applicable

More information

SUPERVISORY CONTROL AND DATA ACQUISITION SYSTEM (SCADA)

SUPERVISORY CONTROL AND DATA ACQUISITION SYSTEM (SCADA) TECHNICAL SPECIAL PROVISION FOR SUPERVISORY CONTROL AND DATA ACQUISITION SYSTEM (SCADA) FINANCIAL PROJECT NO.: 428213-2-52-02 MARION COUNTY The official record of this Technical Special Provision is the

More information

SECTION PANELBOARDS

SECTION PANELBOARDS SECTION 16450 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes requirements for panelboards providing fault interrupting capability and overcurrent protective devices. 1.02 REFERENCE STANDARDS A.

More information

1510 MOTOR CONTROLLERS

1510 MOTOR CONTROLLERS SECTION 262913- MOTOR CONTROLLERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of contract, including general and supplementary conditions and Division 1 specification section,

More information

SECTION TRANSIENT VOLTAGE SUPPRESSION FOR LOW-VOLTAGE ELECTRICAL POWER CIRCUITS

SECTION TRANSIENT VOLTAGE SUPPRESSION FOR LOW-VOLTAGE ELECTRICAL POWER CIRCUITS SECTION 264313 - TRANSIENT VOLTAGE SUPPRESSION FOR LOW-VOLTAGE ELECTRICAL POWER CIRCUITS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and

More information

Governing Standards. All wiring and components shall meet the applicable requirements of the NEC.

Governing Standards. All wiring and components shall meet the applicable requirements of the NEC. 1.1 SCOPE. This section covers the furnishing and installation of Video Surveillance Systems (VSS), including Video Management System (VMS) software, Cameras, and all associated equipment, devices, and

More information

SPECIAL SPECIFICATION 1864 Pole Mounted Cabinet

SPECIAL SPECIFICATION 1864 Pole Mounted Cabinet 1993 Specifications CSJ s 0924-06-221,etc. & 0924-06-223 SPECIAL SPECIFICATION 1864 Pole Mounted Cabinet 1. Description. This specification describes the minimum acceptable requirements for a weatherproof

More information

SPECIAL SPECIFICATION 8939 Retrofit Existing Fiber Optic Dynamic Message Sign System to LED

SPECIAL SPECIFICATION 8939 Retrofit Existing Fiber Optic Dynamic Message Sign System to LED 2004 Specifications CSJ 0025-02-194, 0017-10-261, 0017-10-268 & 0017-10-271 SPECIAL SPECIFICATION 8939 Retrofit Existing Fiber Optic Dynamic Message Sign System to LED 1. Description. Retrofit existing

More information

(1986; Rev. 1989) Molded Case Circuit Breakers and Molded Case Switches. (1985; Rev. 1988) Enclosures for Electrical Equipment (1000 Volts Maximum)

(1986; Rev. 1989) Molded Case Circuit Breakers and Molded Case Switches. (1985; Rev. 1988) Enclosures for Electrical Equipment (1000 Volts Maximum) Section 16306 50/60-HERTZ (HZ) SOLID STATE FREQUENCY CONVERTER Index PART 1 GENERAL PART 2 PRODUCTS 1.1 References 2.1 Frequency Converters 1.2 Factory Tests 2.2 Conduit and Fittings 1.3 Submittals 2.3

More information

CONTRACT NO: T Division 13 SCADA AND INSTRUMENTATION DATE: August 2012 Page 1 of 1 DIVISION 13 SCADA AND INSTRUMENTATION

CONTRACT NO: T Division 13 SCADA AND INSTRUMENTATION DATE: August 2012 Page 1 of 1 DIVISION 13 SCADA AND INSTRUMENTATION CONTRACT NO: T-12-16 Division 13 SCADA AND INSTRUMENTATION 2011-03-15 DATE: August 2012 Page 1 of 1. DIVISION 13 SCADA AND INSTRUMENTATION CONTRACT NO. T-12-16 Division 13 TABLE OF CONTENTS 2011-03-15

More information

SPECIAL SPECIFICATION 6230 Fiber Optic RS-232 Data Modem

SPECIAL SPECIFICATION 6230 Fiber Optic RS-232 Data Modem 2004 Specifications CSJ 0924-06-258 SPECIAL SPECIFICATION 6230 Fiber Optic RS-232 Data Modem 1. Description. This Item shall govern for the furnishing and installation of Fiber Optic RS- 232 Data Modem

More information

UW Purchase Specification Section Central Cooling Water Meter Page 1 of 6

UW Purchase Specification Section Central Cooling Water Meter Page 1 of 6 Page 1 of 6 PART 1 GENERAL 1.01 DESCRIPTION A. Purpose 1. This section covers central cooling water meters for use in the Owner's central cooling water systems. 1.02 QUALIFICATIONS A. Approved manufacturers

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR MICROWAVE VEHICLE DETECTION SYSTEM

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR MICROWAVE VEHICLE DETECTION SYSTEM MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR MICROWAVE VEHICLE DETECTION SYSTEM ITS:CLC 1 of 6 APPR:LWB:DBP:07-31-13 FHWA:APPR:09-23-13 a. Description. This work consists of one or more

More information

Meter Enclosure and Equipment Standards

Meter Enclosure and Equipment Standards Meter Enclosure and Equipment Standards (a) (b) General Requirements: CITY OF OCALA UTILITY SERVICES METER ENCLOSURE AND EQUIPMENT STANDARDS: (1) To avoid the costs associated with having to replace unacceptable

More information

SECTION SURGE PROTECTION DEVICES. A. Section includes Surge Protection Devices for low-voltage power, control, and communication equipment.

SECTION SURGE PROTECTION DEVICES. A. Section includes Surge Protection Devices for low-voltage power, control, and communication equipment. SECTION 26 43 00 SURGE PROTECTION DEVICES PART 1 - GENERAL 1.1 SUMMARY A. Section includes Surge Protection Devices for low-voltage power, control, and communication equipment. 1.2 DEFINITIONS A. ATS:

More information

1. Section Lightning Protection for lightning protection system. D. The installation shall be in conformance with NEC Article 285.

1. Section Lightning Protection for lightning protection system. D. The installation shall be in conformance with NEC Article 285. SECTION 26 04 75 - SURGE PROTECTION DEVICES PART 1 - GENERAL 1.1 SUMMARY A. Applicable provisions of the General Conditions, Supplementary General Conditions and Special Conditions shall govern work performed

More information

SECTION ( ) LIGHTING CONTROL PANELBOARD

SECTION ( ) LIGHTING CONTROL PANELBOARD (26 24 16.02) LIGHTING CONTROL PANELBOARD PART 1 GENERAL 1.01 SCOPE A. The Contractor shall furnish and install Lighting Control Panelboards as specified and as shown on the contract drawings. B. The Lighting

More information

SECTION 16450: NON-AUTOMATIC TRANSFER SWITCH / QUICK CONNECT GENERATOR SWITCHBOARD <S> <OM>

SECTION 16450: NON-AUTOMATIC TRANSFER SWITCH / QUICK CONNECT GENERATOR SWITCHBOARD <S> <OM> SECTION 16450: NON-AUTOMATIC TRANSFER SWITCH / QUICK CONNECT GENERATOR SWITCHBOARD PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General

More information

SECTION SWITCHGEAR

SECTION SWITCHGEAR SECTION 26 23 13 SWITCHGEAR PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections,

More information

STATE OF NEW JERSEY BUREAUS OF ITS ENGINEERING AND SAFETY & DATA DEVELOPMENT DEPARTMENT OF TRANSPORTATION TRENTON, NEW JERSEY 08625

STATE OF NEW JERSEY BUREAUS OF ITS ENGINEERING AND SAFETY & DATA DEVELOPMENT DEPARTMENT OF TRANSPORTATION TRENTON, NEW JERSEY 08625 September 2011 STATE OF NEW JERSEY BUREAUS OF ITS ENGINEERING AND SAFETY & DATA DEVELOPMENT DEPARTMENT OF TRANSPORTATION TRENTON, NEW JERSEY 08625 MATERIAL SPECIFICATIONS FOR WEIGH-IN-MOTION SYSTEM The

More information

SECTION SURGE PROTECTIVE DEVICES

SECTION SURGE PROTECTIVE DEVICES SECTION 16289 PART 1 GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this

More information

3a. IEM Indoor Metal Clad Medium Voltage Switchgear 25KV a. Section INDOOR METAL CLAD MEDIUM VOLTAGE SWTICHGEAR (Std.

3a. IEM Indoor Metal Clad Medium Voltage Switchgear 25KV a. Section INDOOR METAL CLAD MEDIUM VOLTAGE SWTICHGEAR (Std. 3a. IEM Indoor Metal Clad Medium Voltage Switchgear 25KV 16346-1 3a. Section 16346 INDOOR METAL CLAD MEDIUM VOLTAGE SWTICHGEAR (Std. Relays) Part 1 General 1.1 CONDITIONS AND REQUIREMENTS: A. Refer to

More information

SECTION DISTRIBUTION SWITCHBOARDS

SECTION DISTRIBUTION SWITCHBOARDS PART 1 - GENERAL 1.1 DESCRIPTION: SECTION 26 24 11 This section specifies the furnishing, installation, and connection of the distribution switchboards. 1.2 RELATED WORK: A. Section 13 05 41, SEISMIC RESTRAINT

More information

SPECIAL SPECIFICATION 1861 Premium Subrate Data Multiplexer and Distribution Panel

SPECIAL SPECIFICATION 1861 Premium Subrate Data Multiplexer and Distribution Panel 1993 Specifications CSJ s 0924-06-221, etc. & 0924-06-223 SPECIAL SPECIFICATION 1861 Premium Subrate Data Multiplexer and Distribution Panel 1. Description. This Item shall govern for the furnishing and

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR TRAVEL TIME SYSTEM. UNIV:SRP 1 of 6 ITS:APPR:CLC:DBP:

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR TRAVEL TIME SYSTEM. UNIV:SRP 1 of 6 ITS:APPR:CLC:DBP: MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR TRAVEL TIME SYSTEM UNIV:SRP 1 of 6 ITS:APPR:CLC:DBP:02-02-12 a. Description. This work consists of furnishing, installing, integrating, and testing

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR MICROWAVE VEHICLE DETECTION SYSTEM

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR MICROWAVE VEHICLE DETECTION SYSTEM MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR MICROWAVE VEHICLE DETECTION SYSTEM ITS:CLC 1 of 5 APPR:JVG:DBP:06-29-17 FHWA:APPR:08-02-17 a. Description. This work consists of one or more

More information

SPECIAL SPECIFICATION 6146 Fiber Optic RS-232 Data Modem

SPECIAL SPECIFICATION 6146 Fiber Optic RS-232 Data Modem 2004 Specifications CSJ s 0508-07-027, 0177-06-064, 0271-04-067, 0389-13-049 SPECIAL SPECIFICATION 6146 Fiber Optic RS-232 Data Modem 1. Description. Furnish and install Fiber Optic RS-232 Data Modem (FO-MODEM)

More information

Table of Contents. Introduction... 2 Description...2 Specifications...3 Installation.. 5 Calibration.. 6 General Maintenance...7

Table of Contents. Introduction... 2 Description...2 Specifications...3 Installation.. 5 Calibration.. 6 General Maintenance...7 User's Manual: Series 330I Model 330I DC-Powered Three-Way Isolator Table of Contents Page Introduction... 2 Description....2 Specifications....3 Installation.. 5 Calibration.. 6 General Maintenance...7

More information

Liebert AccuVar (ACV Series) Surge Protective Device (SPD) (With Noise Filtering) GUIDE SPECIFICATIONS for a Parallel Surge Suppression System

Liebert AccuVar (ACV Series) Surge Protective Device (SPD) (With Noise Filtering) GUIDE SPECIFICATIONS for a Parallel Surge Suppression System Liebert AccuVar (ACV Series) Surge Protective Device (SPD) (With Noise Filtering) GUIDE SPECIFICATIONS for a Parallel Surge Suppression System Part 1 General 1.01 Summary A. These specifications describe

More information

AIR COOLED MODULAR RECTIFIER

AIR COOLED MODULAR RECTIFIER CONTROLLED POWER COMPANY SPECIFICATIONS AIR COOLED MODULAR RECTIFIER Spc1800a1 5JAN1999 SPECIFICATION S-1800-A MODULAR (REMOVABLE AND NON-REMOVABLE MODULES) AIR COOLED RECTIFIER Standard output power range:

More information

SECTION SOLID-STATE REDUCED VOLTAGE STARTERS

SECTION SOLID-STATE REDUCED VOLTAGE STARTERS SECTION 26 29 13.16 PART 1 - GENERAL 1.1 THE REQUIREMENT A. General: The CONTRACTOR shall provide solid-state reduced voltage motor starters, complete and operable, in accordance with the Contract Documents.

More information

PDI Modular Compact Remote Power Panel

PDI Modular Compact Remote Power Panel Guide Specifications (Revision 000, 6/17/2016) 1 GENERAL 1.1 Summary These specifications describe requirements for a remote power panel (RPP) distributing power to sensitive loads. These specifications

More information

Eaton s Innovative Technology Surge Suppression Guideform Specification Low Exposure DIVISION 16 SECTION 16289

Eaton s Innovative Technology Surge Suppression Guideform Specification Low Exposure DIVISION 16 SECTION 16289 PART 1 - GENERAL DIVISION 16 SECTION 16289 TRANSIENT VOLTAGE SURGE SUPPRESSION (TVSS) 1.1 RELATED DOCUMENTS General: Drawings and general provisions of the Contract, including General and Supplementary

More information

SECTION (16410) - ENCLOSED SWITCHES AND CIRCUIT BREAKERS

SECTION (16410) - ENCLOSED SWITCHES AND CIRCUIT BREAKERS SECTION 26 28 16 (16410) - ENCLOSED SWITCHES AND CIRCUIT BREAKERS PART 1 GENERAL 1.01 SUMMARY A. Section Includes: 1. Individually Mounted Switches and Circuit Breakers Used for the following: a. Service

More information

Eaton s Innovative Technology Surge Suppression Guideform Specification High Exposure DIVISION 16 SECTION 16289

Eaton s Innovative Technology Surge Suppression Guideform Specification High Exposure DIVISION 16 SECTION 16289 PART 1 - GENERAL DIVISION 16 SECTION 16289 TRANSIENT VOLTAGE SURGE SUPPRESSION (TVSS) 1 RELATED DOCUMENTS General: Drawings and general provisions of the Contract, including General and Supplementary Conditions

More information

Tempco Instruction Manual

Tempco Instruction Manual Tempco Instruction Manual 1/16 DIN Solid State Temperature Controller Relay Output Solid State Output For Heating Model Numbers: TEC-901, TEC-902, TEC-905 Temperature controls in this series are designed

More information

SPECIAL SPECIFICATION 8371 Field Terminal Server

SPECIAL SPECIFICATION 8371 Field Terminal Server 2004 Specifications CSJ 0914-00-280 SPECIAL SPECIFICATION 8371 Field Terminal Server 1. Description. Furnish, install, and make fully operational a Field Terminal Server at designated locations as shown

More information

DIVISION 16 SECTION Surge Protective Device Submittal (SPD)

DIVISION 16 SECTION Surge Protective Device Submittal (SPD) DIVISION 16 SECTION 16289 Surge Protective Device Submittal (SPD) PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. General: Drawings and general provisions of the Contract, including General and Supplementary

More information

Operating Instructions

Operating Instructions Introduction To protect the signal lines of field devices and systems in the cabinet against lightning. Pepperl+Fuchs covers the complete range of Surge Protection Barriers. Housing types Depending on

More information

SPECIAL SPECIFICATION 1826 Field Ethernet Switch

SPECIAL SPECIFICATION 1826 Field Ethernet Switch 1993 Specifications CSJ 0521-04-223 SPECIAL SPECIFICATION 1826 Field Ethernet Switch 1. Description. Furnish, install, and make fully operational a Field Ethernet Switch at designated locations as shown

More information

SECTION DISCONNECT SWITCHES

SECTION DISCONNECT SWITCHES SECTION 16440 DISCONNECT SWITCHES PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 01 Specification

More information

User s Manual. ACS550-PD 3R Irrigation Packaged Drive Supplement to ACS550-U1 User s Manual

User s Manual. ACS550-PD 3R Irrigation Packaged Drive Supplement to ACS550-U1 User s Manual User s Manual ACS550-PD 3R Irrigation Packaged Drive Supplement to ACS550-U1 User s Manual 2 ACS550-PD 3R Irrigation Packaged Drive ACS550 Drive Manuals GENERAL MANUALS ACS550-U1 User s Manual (1 200 HP)

More information

OVP2. The Over-Voltage Protector 2 (OVP2) Technical Literature

OVP2. The Over-Voltage Protector 2 (OVP2) Technical Literature The Over-Voltage Protector 2 (OVP2) Technical Literature INTRODUCTION The Over-Voltage Protector (OVP) design has been established since 1999 as the premier explosion-proof (Division 1) protection device

More information

User s Manual. ACS550-PD Stock 3R Irrigation Packaged Drive Supplement to ACS550-U1 User s Manual

User s Manual. ACS550-PD Stock 3R Irrigation Packaged Drive Supplement to ACS550-U1 User s Manual User s Manual ACS550-PD Stock 3R Irrigation Packaged Drive Supplement to ACS550-U1 User s Manual 2 ACS550-PD 3R Irrigation Packaged Drive ACS550 Drive Manuals GENERAL MANUALS ACS550-U1 User s Manual (1

More information

SECTION IDENTIFICATION FOR ELECTRICAL SYSTEMS

SECTION IDENTIFICATION FOR ELECTRICAL SYSTEMS SECTION 26 05 53 IDENTIFICATION FOR ELECTRICAL SYSTEMS PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Nameplates. 2. Labels. 3. Wire markers. 4. Conduit markers. 5. Underground Warning Tape. 6. Lockout

More information

SECTION LOW-VOLTAGE VARIABLE FREQUENCY DRIVES

SECTION LOW-VOLTAGE VARIABLE FREQUENCY DRIVES SECTION 26 29 23 LOW-VOLTAGE VARIABLE FREQUENCY DRIVES PART 1 GENERAL 1.1 DESCRIPTION A. Scope: 1. Contractor shall provide all labor, materials, equipment, services, and incidentals as shown, specified,

More information

Power Meter PowerMonitor 500

Power Meter PowerMonitor 500 ROCKWELL AUTOMATION PROCUREMENT SPECIFICATION PROCUREMENT SPECIFICATION PowerMonitor 500 NOTICE: The specification guidelines in this document are intended to aid in the specification of products. Specific

More information

MICHIGAN DEPARTMENT OF TRANSPORTATION

MICHIGAN DEPARTMENT OF TRANSPORTATION MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR GROUNDING, BONDING, LIGHTNING PROTECTION AND SURGE PROTECTION FOR INTELLIGENT TRANSPORTATION SYSTEM EQUIPMENT ITS:CLC 1 of 5 APPR:LWB:DBP:07-31-13

More information

SECTION VARIABLE FREQUENCY DRIVES

SECTION VARIABLE FREQUENCY DRIVES PART 1 GENERAL 1.01 DESCRIPTION This specification section establishes the requirements for variable frequency motor drives. The associated motor(s) shall be specified separate from the drive and listed

More information

SPECIAL SPECIFICATION 6274 Microwave Vehicle Detection System

SPECIAL SPECIFICATION 6274 Microwave Vehicle Detection System 2004 Specifications CSJ 2374-01-153, etc. SPECIAL SPECIFICATION 6274 Microwave Vehicle Detection System 1. Description. Furnish and install the microwave vehicle detection (MVD) system as shown in the

More information

5504 Thermocouple Analog Input Module

5504 Thermocouple Analog Input Module 550 Thermocouple Analog Input Installation, Operation and Maintenance Setup Manual 5/9/0 Safety Information The information provided in this documentation contains general descriptions and/or technical

More information

Zener Barriers Bulletin 937Z

Zener Barriers Bulletin 937Z Technical Data Zener Barriers Bulletin 937Z Topic Page Introduction 2 Mounting 2 Housing 3 Operating Principle 3 Specifications 6 Introduction Allen-Bradley Zener barriers are a cost-effective solution

More information

SPECIAL SPECIFICATION 1303 Lifelink

SPECIAL SPECIFICATION 1303 Lifelink 1993 Specifications CSJ 0024-08-110 SPECIAL SPECIFICATION 1303 Lifelink 1. Description. This Item shall govern for the furnishing and installation of LifeLink equipment in Fiber Hubs (existing and proposed)

More information

4110 HART Level Encoder

4110 HART Level Encoder 4110 HART Level Encoder Precision encoding instrument for transmission of level measurement from mechanical float gauges Features Universal connection - mounts to all standard float gauges Low maintenance

More information

.2 Section General Commissioning (Cx) Requirements. .3 Section Common Work Requirements - Electrical

.2 Section General Commissioning (Cx) Requirements. .3 Section Common Work Requirements - Electrical Issued for Review Section 26 28 16.01 Air Circuit Breakers Page 1 of 7 PART 1 GENERAL 1.1 GENERAL.1 This specification serves to define requirements for a replacement of low voltage circuit breaker of

More information

Relay Contact Output Modules

Relay Contact Output Modules Relay contact output modules offer dry circuits, that is, circuits without leakage current. Leakage currents are present on solid-state outputs; these currents are capable of energizing highly sensitive

More information

SPECIAL SPECIFICATION 8143 Wireless Ethernet Radio System

SPECIAL SPECIFICATION 8143 Wireless Ethernet Radio System 2004 Specifications CSJ 0002-01-080 SPECIAL SPECIFICATION 8143 Wireless Ethernet Radio System 1. Description. Furnish and install Wireless Ethernet Radio System (WERS) links for pointto-point applications,

More information

Scanner 2000 Steam Mass Flow Transmitter

Scanner 2000 Steam Mass Flow Transmitter 3352051/2 IM-P335-24 MI Issue 2 Scanner 2000 Steam Mass Flow Transmitter Installation and Maintenance Instructions 1. Safety information 2. Mechanical installation 3. Configuring software 4. Wiring procedures

More information

PowerFlex 400 AC Drive Guide Specification

PowerFlex 400 AC Drive Guide Specification PowerFlex 400 AC Drive Guide Specification Adjustable Frequency Drives with Bypass 3.0 50HP @ 208V AC 3.0 350HP @ 480V AC PART 1 GENERAL 1.01 Quality Assurance A. The manufacturer shall have minimum 5

More information

PART 1: GENERAL PART 2: PRODUCT. Effective: 12/29/10 Page 1 of 6 FECA-TE-104D

PART 1: GENERAL PART 2: PRODUCT. Effective: 12/29/10 Page 1 of 6 FECA-TE-104D Specification Number: 23 09 33 Product Name: FRENIC-Eco AC Drives for Variable Torque Fan & Pump Applications (1-125Hp at 208/230V and 1-900Hp at 460V) PART 1: GENERAL 1.01 SUMMARY A. This specification

More information

dv/dt filter compact plus Voltage Peak Limiter SINAMICS SINAMICS G120P dv/dt filter compact plus Voltage Peak Limiter Safety information 1 General 2

dv/dt filter compact plus Voltage Peak Limiter SINAMICS SINAMICS G120P dv/dt filter compact plus Voltage Peak Limiter Safety information 1 General 2 dv/dt filter compact plus Voltage Peak Limiter SINAMICS SINAMICS G120P dv/dt filter compact plus Voltage Peak Limiter Operating Instructions Safety information 1 General 2 Mechanical installation 3 Electrical

More information

Instruction Manual. M Pump Motor Controller. For file reference, please record the following data:

Instruction Manual. M Pump Motor Controller. For file reference, please record the following data: Instruction Manual M Pump Motor Controller For file reference, please record the following data: Model No: Serial No: Installation Date: Installation Location: When ordering replacement parts for your

More information

CLEANROOM CERTIFICATION AND ACCEPTANCE PROCEDURES

CLEANROOM CERTIFICATION AND ACCEPTANCE PROCEDURES CLEANROOM CERTIFICATION AND ACCEPTANCE PROCEDURES PART I--GENERAL 1.1 Work Included [Edit this specification to eliminate tests not required. Place tests in the desired sequence of performance] A. This

More information

2.) Cabinet setup and preset data shall, as standard, be fully user programmable on a per cabinet or system wide basis.

2.) Cabinet setup and preset data shall, as standard, be fully user programmable on a per cabinet or system wide basis. A21 DIMMER CABINET SPECIFICATION. GENERAL. A.) Overview. 1.) The dimmer cabinets shall be fully digital, designed specifically for architectural and entertainment lighting applications, and shall consist

More information

Series TFXB Ultra. Transit Time Ultrasonic Flow Meter, Clamp-on, Liquid, Single-Channel

Series TFXB Ultra. Transit Time Ultrasonic Flow Meter, Clamp-on, Liquid, Single-Channel Series TFXB Ultra Transit Time Ultrasonic Flow Meter, Clamp-on, Liquid, Single-Channel Part 1. General 1.1 Scope A. This section describes the requirements for an ultrasonic flow measurement transmitter

More information

Document C0. Use for:

Document C0. Use for: Date: July 27, 2015 Document C0 Use for: Connection of Electric Generation that will operate with an Open Transition (Category 1) between the Ameren System and the Generator or operate with a Synchronized

More information

1993 Specifications CSJ SPECIAL SPECIFICATION ITEM Transportation Management Console

1993 Specifications CSJ SPECIAL SPECIFICATION ITEM Transportation Management Console 1993 Specifications CSJ 0598-01-057 1.0 Description SPECIAL SPECIFICATION ITEM 6398 Transportation Management Console This Item shall govern for the furnishing and installation of Transportation Management

More information

Warning. Important. Always follow all local building electrical codes. PECCSUN3672DB46M PECCSUN3672EN46M

Warning. Important. Always follow all local building electrical codes. PECCSUN3672DB46M PECCSUN3672EN46M INSTALLATION INSTRUCTIONS PECCSUN672 Series Power Exhaust for York - 6 Ton Units Before Starting Installation Warning Severe injury can result from incorrect servicing. Only qualified HVAC service personnel

More information

SECTION WIRING DEVICES PART 1 - GENERAL. A. Drawings and Division 1 Specification Sections, apply to this Section.

SECTION WIRING DEVICES PART 1 - GENERAL. A. Drawings and Division 1 Specification Sections, apply to this Section. SECTION 16140 WIRING DEVICES 1.01 RELATED DOCUMENTS PART 1 - GENERAL A. Drawings and Division 1 Specification Sections, apply to this Section. 1.02 SUMMARY A. This Section includes receptacles, connectors,

More information

MT8050iE series. Installation Instruction (1) (2)

MT8050iE series. Installation Instruction (1) (2) MT8050iE series 3 Installation Instructions Installation Instruction Secure the operator panel in position, using all the fastening holes and the provided brackets and screws: (A) 1 Installation and Startup

More information

INSTRUCTION MANUAL RA 19-4B RACK ADAPTER HOT SWAP RACK ADAPTER FOR HSF SERIES POWER SUPPLIES

INSTRUCTION MANUAL RA 19-4B RACK ADAPTER HOT SWAP RACK ADAPTER FOR HSF SERIES POWER SUPPLIES INSTRUCTION MANUAL RA 19-4B RACK ADAPTER HOT SWAP RACK ADAPTER FOR HSF SERIES POWER SUPPLIES KEPCO INC. An ISO 9001 Company. MODEL RA 19-4B RACK ADAPTER ORDER NO. REV. NO. IMPORTANT NOTES: 1) This manual

More information

SECTION SWITCHBOARDS

SECTION SWITCHBOARDS SECTION 26 24 13 PART 1 - GENERAL 1.1 SUMMARY A. Work Included: 1. Switchboards 2. Commercial Metering Switchboards 3. Non-Utility Power Meters (Microprocessor-Based Metering Equipment) PART 2 - PRODUCTS

More information

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS www.altroniccontrols.com INSTALLATION INSTRUCTIONS EXACTA 21 MONITORING AND CONTROL SYSTEM CAUTION: The EXACTA 21 CONTROL SYSTEM is CSA CERTIFIED FOR use in Class I, GROUPS C & D, Division 2 hazardous

More information

Installation Instructions

Installation Instructions 50ES, 50EZ, 50GL, 50GS, 50GX, 50JS, 50JX, 50JZ, 50SD, 50SZ, 50VL, 50VT, 50XP, 50XZ 601A, 602A, 602B, 604A, 604B, 604D, 607C, 701A, 702A, 702B, 704A, 704B, 704D, 707C PA1P, PA2P, PA3P, PH1P, PH2P, PH3P

More information

PanelView Plus/VersaView CE Terminals and Display Modules

PanelView Plus/VersaView CE Terminals and Display Modules Installation Instructions PanelView Plus/VersaView CE Terminals and Display Modules (Catalog Numbers 2711P-xxxxxx, 6182H-xxxxxx) English Inside: Overview...2 For More Information...2 Modular Components...3

More information

MODEL 8000MP LEVEL SENSOR

MODEL 8000MP LEVEL SENSOR 1 MODEL 8000MP LEVEL SENSOR INSTRUCTIONS FOR INSTALLATION, OPERATION & MAINTENANCE VISIT OUR WEBSITE SIGMACONTROLS.COM 2 SERIES 8000MP LEVEL SENSOR 1. DESCRIPTION The Model 8000MP Submersible Level Sensor

More information

INSTRUCTION MANUAL RA 19-7B RACK ADAPTER HOT SWAP RACK ADAPTER FOR HSF SERIES POWER SUPPLIES

INSTRUCTION MANUAL RA 19-7B RACK ADAPTER HOT SWAP RACK ADAPTER FOR HSF SERIES POWER SUPPLIES INSTRUCTION MANUAL RA 19-7B RACK ADAPTER HOT SWAP RACK ADAPTER FOR HSF SERIES POWER SUPPLIES KEPCO INC. An ISO 9001 Company. MODEL RA 19-7B RACK ADAPTER ORDER NO. REV. NO. IMPORTANT NOTES: 1) This manual

More information

SPECIAL SPECIFICATION 1838 Computer Room VoIP Gateway/Gatekeeper

SPECIAL SPECIFICATION 1838 Computer Room VoIP Gateway/Gatekeeper 1993 Specifications CSJ 0521-04-223 SPECIAL SPECIFICATION 1838 Computer Room VoIP Gateway/Gatekeeper 1. Description. Furnish, install, and make fully operational a Computer Room Voice-over- Internet Protocol

More information

STATE OF NEW JERSEY DEPARTMENT OF TRANSPORTATION TRENTON, NEW JERSEY 08625

STATE OF NEW JERSEY DEPARTMENT OF TRANSPORTATION TRENTON, NEW JERSEY 08625 STATE OF NEW JERSEY DEPARTMENT OF TRANSPORTATION TRENTON, NEW JERSEY 08625 METRIC SPECIFICATIONS FOR VME BUS COMPUTER (FIELD TERMINAL VME BUS PROCESSOR ASSEMBLY) N.J. Specification No. Effective Date:

More information

SPECIAL SPECIFICATION 8885 Wireless Ethernet Radio (Backhaul) Link

SPECIAL SPECIFICATION 8885 Wireless Ethernet Radio (Backhaul) Link 2004 Specifications CSJ 0016-06-046, etc. SPECIAL SPECIFICATION 8885 Wireless Ethernet Radio (Backhaul) Link 1. Description. Furnish and install Wireless Ethernet Radio (WER) (Backhaul) Link in the 5.8

More information

Series F75 Fail-Safe Module Installation, Operation and Maintenance Instructions

Series F75 Fail-Safe Module Installation, Operation and Maintenance Instructions WCAIM2029 (Part 16022) Series F75 Fail-Safe Module Installation, Operation and Maintenance Instructions CAUTION: Flowserve recommends that all products that must be stored prior to installation be stored

More information

*REQUIRED* 169 Main Street 700 Plaza Middlesex Middletown, CT T: F:

*REQUIRED* 169 Main Street 700 Plaza Middlesex Middletown, CT T: F: ADDENDUM COVER & RECEIPT CONFIRMATION SHEET 169 Main Street 700 Plaza Middlesex Middletown, CT 06457 T: 860-343-8297 F: 860-343-9504 www.wright-pierce.com DATE: 9/6/16 ADDENDUM CONSISTS OF (Including this

More information

INSTRUCTION MANUAL RA 19-5B RACK ADAPTER HOT SWAP RACK ADAPTER FOR HSF SERIES POWER SUPPLIES

INSTRUCTION MANUAL RA 19-5B RACK ADAPTER HOT SWAP RACK ADAPTER FOR HSF SERIES POWER SUPPLIES INSTRUCTION MANUAL RA 19-5B RACK ADAPTER HOT SWAP RACK ADAPTER FOR HSF SERIES POWER SUPPLIES KEPCO INC. An ISO 9001 Company. MODEL RA 19-5B RACK ADAPTER ORDER NO. REV. NO. IMPORTANT NOTES: 1) This manual

More information

The Solid-State Decoupler (SSD)

The Solid-State Decoupler (SSD) The Solid-State Decoupler (SSD) Installation Instructions Introduction The Solid-State Decoupler (SSD) is a solid-state DC isolation/ac grounding (i.e., coupling) device design ed for use in conjunction

More information

Emery County Senior Center Green River 06/07

Emery County Senior Center Green River 06/07 SECTION 262726 - WIRING DEVICES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections,

More information

OPERATING INSTRUCTIONS 7 SERIES STATIC GENERATORS

OPERATING INSTRUCTIONS 7 SERIES STATIC GENERATORS OPERATING INSTRUCTIONS 7 SERIES STATIC GENERATORS GB Contents Page 1 Introduction 4 2 Safety 5 3 Use 6 4 Checking on Delivered Equipment 6 5 General Specification and Dimensions 7 6 Positioning 10 7 Operating

More information

Model 2657A-LIM-3 LO Interconnect Module

Model 2657A-LIM-3 LO Interconnect Module Keithley Instruments, Inc. 28775 Aurora Road Cleveland, Ohio 44139 1-888-KEITHLEY http://www.keithley.com Model 2657A-LIM-3 LO Interconnect Module User's Guide Description The Model 2657A-LIM-3 LO Interconnect

More information

SINAMICS. SINAMICS G120P dv/dt filter plus Voltage Peak Limiter. Safety information 1. General. Mechanical installation. Electrical installation 4

SINAMICS. SINAMICS G120P dv/dt filter plus Voltage Peak Limiter. Safety information 1. General. Mechanical installation. Electrical installation 4 Safety information 1 General 2 SINAMICS SINAMICS G120P dv/dt filter plus Voltage Peak Limiter Operating Instructions Mechanical installation 3 Electrical installation 4 Maintenance and servicing 5 Technical

More information

SINAMICS G130. Terminal Module 150 (TM150) Operating Instructions 03/2013 SINAMICS

SINAMICS G130. Terminal Module 150 (TM150) Operating Instructions 03/2013 SINAMICS SINAMICS G130 Operating Instructions 03/2013 SINAMICS s Safety information 1 General information 2 SINAMICS SINAMICS G130 Mechanical installation 3 Electrical installation 4 Technical specifications 5

More information

CONTROL MICROSYSTEMS Analog Output Module. Hardware Manual

CONTROL MICROSYSTEMS Analog Output Module. Hardware Manual 5304 Analog Output Module Hardware Manual CONTROL MICROSYSTEMS SCADA products... for the distance 48 Steacie Drive Telephone: 613-591-1943 Kanata, Ontario Facsimile: 613-591-1022 K2K 2A9 Technical Support:

More information

AirTest Model CN9000 Series Sensor Controller

AirTest Model CN9000 Series Sensor Controller AirTest Model CN9000 Series Sensor Controller AirTest Model CN9000 Series Sensor Controller THEORY OF OPERATION A basic CN9000 configuration consists of Input/Process/Display combination modules, a 3 relay

More information

INSTRUCTION MANUAL RA 19-6B RACK ADAPTER HOT SWAP RACK ADAPTER FOR HSF SERIES POWER SUPPLIES

INSTRUCTION MANUAL RA 19-6B RACK ADAPTER HOT SWAP RACK ADAPTER FOR HSF SERIES POWER SUPPLIES INSTRUCTION MANUAL RA 19-6B RACK ADAPTER HOT SWAP RACK ADAPTER FOR HSF SERIES POWER SUPPLIES KEPCO INC. An ISO 9001 Company. MODEL RA 19-6B RACK ADAPTER ORDER NO. REV. NO. IMPORTANT NOTES: 1) This manual

More information

Installation, Testing, and Operating Procedures 30 AMP PORTABLE AND PERMANENT SERIES GFCI SINGLE and MULTIPHASE

Installation, Testing, and Operating Procedures 30 AMP PORTABLE AND PERMANENT SERIES GFCI SINGLE and MULTIPHASE IMPORTANT! Please read all the information on this sheet. SAVE THESE INSTRUCTIONS! NOTICE BEFORE USING READ INSTRUCTIONS COMPLETELY. TO BE INSTALLED BY A QUALIFIED ELECTRICIAN IN ACCORDANCE WITH NATIONAL

More information

REQUIREMENTS FOR WIRELESS, WEB-BASED MONITORING EQUIPMENT AND SERVICES FOR PUMP STATION APPLICAITONS

REQUIREMENTS FOR WIRELESS, WEB-BASED MONITORING EQUIPMENT AND SERVICES FOR PUMP STATION APPLICAITONS REQUIREMENTS FOR WIRELESS, WEB-BASED MONITORING EQUIPMENT AND SERVICES FOR PUMP STATION APPLICAITONS MANUFACTURER REQUIREMENTS The Manufacturer of the equipment and provider of related services shall provide

More information

ANSI/TIA-568-C Cat 6A Field Test Specifications

ANSI/TIA-568-C Cat 6A Field Test Specifications This document has been prepared to aid consultants or engineers in developing contractual specifications covering the certification of Category 6A Permanent Links. It is offered as a general guide. Suitability

More information

SPECIAL SPECIFICATION 6027 Lane Control Signal Equipment

SPECIAL SPECIFICATION 6027 Lane Control Signal Equipment 2004 Specifications SPECIAL SPECIFICATION 6027 Lane Control Signal Equipment 1. Description. Furnish and install Lane Control Signal (LCS) equipment. 2. Material. Provide new, corrosion resistant materials

More information

S66 Series Electronic Fan Speed Control

S66 Series Electronic Fan Speed Control FANs 121, 125, 1628.3 Product/Technical Bulletin S66 Issue Date 0918 S66 Series Electronic Fan Speed Control The S66 Series Electronic Fan Speed Control is designed to modulate the speed of single-phase,

More information