Getting Started with Stormwater Asset Management

Size: px
Start display at page:

Download "Getting Started with Stormwater Asset Management"

Transcription

1 Getting Started with Stormwater Asset Management Fall Conference Broken Arrow, OK September 17, 2018 Trey Shanks CFM, IAM, PACP

2 Asset management roadmap STEP 4 Risk Based Analysis STEP 3 Establishment of Levels of Service STEP 2 Condition & Criticality Scoring STEP 5 Business Case for Projects/Activities STEP 6 CIP Forecast & O&M Strategies in reverse STEP 1 Asset Inventory & Data Gathering How am I going to fund needed improvements? How much do the improvements cost? What improvements are needed? What is the goal performance of the assets? What is the current condition of the assets? What are the assets?

3 Asset Management Balance Cost 3

4 Asset Manager Responsibility Council Senior Mgmt Options Cost Risk implications City goals Targets Risk appetite Cost Storm System Mgmt 4

5 Asset Management Model

6 Asset Management Subject Groups

7 Stormwater Management 8

8 Asset Management Maturity Assessment

9 Building an Asset Management Program STEP 6 What is our current system? STEP 4 STEP 5 Business Case for Projects/Activities CIP Forecast & O&M Strategies STEP 3 Risk Based Analysis STEP 1 STEP 2 Condition & Criticality Scoring Establishment of Levels of Service Asset Inventory & Data Gathering 10

10 Storm System Features Asset Inventory & Data Gathering

11 Field Inventory Asset Inventory & Data Gathering 12

12 Water Quality Compliance Asset Inventory & Data Gathering Inventory Streams Outfalls 13

13 Water Quality Compliance, Maintenance Asset Inventory & Data Gathering Inventory Streams Outfalls Drainage Network Asset Condition 14

14 Water Quality Compliance, Maintenance, CIP Asset Inventory & Data Gathering Inventory Streams Outfalls Drainage Network Asset Condition Size and Material Invert Elevations 15

15 Asset Size Asset Inventory & Data Gathering 16

16 Asset Material Grassed Rock, stone, gravel Concrete Asset Inventory & Data Gathering 17

17 Asset Condition Good Fair Poor Condition & Criticality Scoring 18

18 Assigning Pipe Condition Score Grade Description PACP* Defects A- Very Good Mild Defects Crack, Surface Roughness Increased, Aggregate Visible B- Good Structural Defects <= 10% Diameter. Minor Corrosion Fracture, Joint Offset, Aggregate Projecting C- Fair Structural Defects <= 25% Diameter. Moderate Corrosion Crack, Spalling, Defective Point Repair, Major Sag, Aggregate Missing D- Poor E- Very Poor Condition & Criticality Scoring Missing or Broken Pipe. Severe Borrosion. Collapse or Imminent Collapse Broken, Fracture, Reinforcement Projecting, Reinforcement Visible Holes, Collapse, Missing Wall *NASSCO Pipeline Assessment Certification Program 19

19 Assigning Pipe Condition Score A (Very Good) B (Good) C (Fair) Condition & Criticality Scoring D (Poor) E (Very Poor) 20

20 Criticality Assessment Risk Based Analysis 21

21 Building an Asset Management Program STEP 6 What is the goal performance? STEP 4 STEP 5 Business Case for Projects/Activities CIP Forecast & O&M Strategies STEP 3 Risk Based Analysis STEP 1 STEP 2 Asset Inventory & Data Gathering Condition & Criticality Scoring Establishment of Levels of Service Flood protection Biological natural habitat Recreational amenity Water quality treatment 22

22 Building an Asset Management Program STEP 6 What are our priorities? STEP 4 STEP 5 Business Case for Projects/Activities CIP Forecast & O&M Strategies STEP 3 Risk Based Analysis STEP 1 STEP 2 Condition & Criticality Scoring Establishment of Levels of Service AGE Asset Inventory & Data Gathering 23

23 Building an Asset Management Program STEP 6 What are our priorities? STEP 4 STEP 5 Business Case for Projects/Activities CIP Forecast & O&M Strategies STEP 3 Risk Based Analysis STEP 1 STEP 2 Condition & Criticality Scoring Establishment of Levels of Service CONDITION Asset Inventory & Data Gathering 24

24 Building an Asset Management Program STEP 6 What are our priorities? STEP 4 STEP 5 Business Case for Projects/Activities CIP Forecast & O&M Strategies STEP 3 Risk Based Analysis STEP 1 STEP 2 Condition & Criticality Scoring Establishment of Levels of Service Asset Inventory & Data Gathering 25

25 Risk Based Assessment Probability of Failure Condition Consequence of Failure Criticality Low Impact Medium Impact High Impact Very High Impact Very Good Good Fair Poor Very Poor Risk Based Analysis 26

26 Risk-Based Assessment Risk = Criticality x Condition Consequence of Asset Failure Loss of service Impact to public health/safety Impact to property Impact to other infrastructure Compliance impact Repair difficulty Public image Probability of Asset Failure Age Physical condition Performance Available capacity Maintenance history Risk Based Analysis 27

27 Condition Assessment Good Fair Poor Risk Based Analysis 28

28 Criticality Assessment High Risk Risk Based Analysis 29

29 Building an Asset Management Program What are our strategies for asset service? STEP 4 STEP 5 STEP 6 Business Case for Projects/Activities CIP Forecast & O&M Strategies STEP 3 Risk Based Analysis STEP 1 STEP 2 Condition & Criticality Scoring Establishment of Levels of Service Asset Inventory & Data Gathering 30

30 Project Prioritization System City Criteria Life Safety Property Damage Level of Service Goals Environmental Impact Project Cost Project Readiness Fiscal Efficiencies Council Goals Benchmarks Sustainable Practice Economic Impact Business Case for Projects/Activities 31

31 Project Prioritization System Criteria Environmental Impact Sustainable Practice Life Safety Property Damage Fiscal Efficiencies Project Cost Project Readiness Economic Impact Sum Rank 1 Environmental Impact Sustainable Practice Life Safety Property Damage Fiscal Efficiencies Project Cost Project Readiness Economic Impact Business Case for Projects/Activities Less Important Equally Important More Important 32

32 Project Prioritization System Property Damage Severity Point Scale Description Low 1 Project has no relation to property damage 2 Medium 3 4 High 5 Project provides protection for property or infrastructure with an estimated tax value of <$200,000 Project provides protection for property or infrastructure with an estimated tax value of $200,000 - $600,000 Project provides protection for property or infrastructure with an estimated tax value of $600,001 - $5,000,000 Project provides protection for property or infrastructure with an estimated tax value of >$5,000,000 Business Case for Projects/Activities 33

33 Project Prioritization System Business Case for Projects/Activities 34

34 Business Case Communication Business Case for Projects/Activities 35

35 Building an Asset Management Program What are our strategies for asset service? STEP 4 STEP 5 STEP 6 Business Case for Projects/Activities CIP Forecast & O&M Strategies STEP 3 Risk Based Analysis STEP 1 STEP 2 Condition & Criticality Scoring Establishment of Levels of Service Staffing Asset Inventory & Data Gathering 36

36 Building an Asset Management Program What are our strategies for asset service? STEP 4 STEP 5 STEP 6 Business Case for Projects/Activities CIP Forecast & O&M Strategies STEP 3 Risk Based Analysis STEP 1 STEP 2 Asset Inventory & Data Gathering Condition & Criticality Scoring Establishment of Levels of Service Staffing Equipment O&M Approach Capital Projects Funding Strategy Monitoring, Review Update and Improvement 37

37 Whole-Life Cost Planning When is the right time to replace a particular asset? Optimize planned investments to realize the greatest value from assets based on financial constraints, risk tolerance, and performance obligations CIP Forecast & O&M Strategies

38 Stormwater Budget Allocation Storm Drain Rehab Water Quality 1% 13% Maintenance 37% Flood Mitigation 44% Flood Warning 5% CIP Forecast & O&M Strategies 39

39 Conceptual Allocation in Dry Years Maintenance 30% Storm Drain Rehab 32% Flood Mitigation 20% Water Quality 13% CIP Forecast & O&M Strategies Flood Warning 5% 40

40 Conceptual Allocation in Wet Years Maintenance 30% Storm Drain Rehab Water Quality 1% 13% Flood Warning 5% Flood Mitigation 51% CIP Forecast & O&M Strategies 41

41 After High Impact Flood Event Storm Drain Rehab 1% Water Quality 5% Maintenance 20% Flood Mitigation 72% CIP Forecast & O&M Strategies Flood Warning 2% 42

42 Asset Management Drivers improved financial performance better informed asset investment decisions better managed risk improved services and outputs improved efficiency and effectiveness demonstrated compliance enhanced reputation improved organizational sustainability demonstrated social responsibility

43 Getting Started with Stormwater Asset Management Fall Conference Broken Arrow, OK September 17, 2018 Trey Shanks CFM, IAM, PACP

City of San Antonio Utilizing Advanced Technologies for Stormwater System Mapping and Condition Assessments

City of San Antonio Utilizing Advanced Technologies for Stormwater System Mapping and Condition Assessments City of San Antonio Utilizing Advanced Technologies for Stormwater System Mapping and Condition Assessments Prepared for: 2017 ESRI Users Conference Prepared by Noelle Gaspard, PE, GISP, CFM July 12,2017

More information

The City of St. Petersburg (City) initiated

The City of St. Petersburg (City) initiated FWRJ Remote Facility Condition Inspections and Subsequent Integration into the City of St. Petersburg s Asset Management Program Laura Baumberger, Robert Labrie, and Rebecca Overacre The City of St. Petersburg

More information

Treatment Facility Asset Management and Risk Based Assessment. NE Texas WEAT Biennial Conference May 7, 2014

Treatment Facility Asset Management and Risk Based Assessment. NE Texas WEAT Biennial Conference May 7, 2014 Treatment Facility Asset Management and Risk Based Assessment NE Texas WEAT Biennial Conference May 7, 2014 Asset Management What is? A set of processes to minimize infrastructure life cycle costs at an

More information

Traverse City Asset Management Plan

Traverse City Asset Management Plan Utilities and Public Services Larry LaCross, GISP, Asset Management/GIS Analyst Traverse City Department of Public Services Introduction About Traverse City (TC) TC Assets Department of Public Services

More information

Asset Management Made Easy. AWWA-PNWS Section Conference April 2018

Asset Management Made Easy. AWWA-PNWS Section Conference April 2018 Asset Management Made Easy AWWA-PNWS Section Conference April 2018 1 Agenda Asset Management basics Asset Management at SPU A few case studies 2 Definitions Asset management A process for maintaining a

More information

Addressing Deferred Maintenance with Advanced Facility Condition Assessments at the University of Arizona

Addressing Deferred Maintenance with Advanced Facility Condition Assessments at the University of Arizona Addressing Deferred Maintenance with Advanced Facility Condition Assessments at the University of Arizona Christopher M. Kopach, AVP, The University of Arizona; APPA President Phillip Saieg, Regional Technical

More information

City of Denton s Proactive Approach to Asset Management featuring InfoMaster & Cityworks

City of Denton s Proactive Approach to Asset Management featuring InfoMaster & Cityworks City of Denton s Proactive Approach to Asset Management featuring InfoMaster & Cityworks Presentation Scope Why asset management Software tools used in Denton asset management plan Detail discussion of

More information

Maximizing the University s Physical Assets (Part I): Facility Condition Assessment

Maximizing the University s Physical Assets (Part I): Facility Condition Assessment Maximizing the University s Physical Assets (Part I): Facility Condition Assessment Board of Regents Facilities and Operations Committee September 12, 2013 Agenda Program background Broadening our data

More information

City of San Antonio Utilizing Advanced Technologies for Stormwater System Mapping and Condition Assessments

City of San Antonio Utilizing Advanced Technologies for Stormwater System Mapping and Condition Assessments City of San Antonio Utilizing Advanced Technologies for Stormwater System Mapping and Condition Assessments Prepared for: Prepared by Noelle Gaspard, PE, GISP, CFM Agenda Purpose Project Overview Challenges

More information

METROPOLITAN SEWERAGE DISTRICT of Buncombe County, N.C. PIPE RATING PROGRAM. Aqua Salubris

METROPOLITAN SEWERAGE DISTRICT of Buncombe County, N.C. PIPE RATING PROGRAM. Aqua Salubris METROPOLITAN SEWERAGE DISTRICT of Buncombe County, N.C. PIPE RATING PROGRAM Aqua Salubris Pipe Rating Program What is it? A new, proactive program used to define and develop rehabilitation projects. The

More information

Capital Plan Prioritization Using Asset Management Strategies

Capital Plan Prioritization Using Asset Management Strategies Capital Plan Prioritization Using Asset Management Strategies PNCWA Webinar April 22, 2010 Marc W. Yarlott, P.E. Mission for Asset Management International Infrastructure Management Manual NAMS-- www.ipwea.org.au/nams/

More information

SAWS SSO Program Achievements

SAWS SSO Program Achievements SAWS SSO Program Achievements Jeff Haby, P.E. Vice President Production & Treatment September 21, 2018 September 21, 2018 Page 2 Path Forward Overview SAWS by the Numbers Consent Decree Key Elements Innovation

More information

CERTIFICATION vs. CERTIFICATE

CERTIFICATION vs. CERTIFICATE CERTIFICATION vs. CERTIFICATE Certification Training Certificate Focus Assessing current knowledge and skills usually broad in scope Training individuals to achieve knowledge and skills (usually focused

More information

Version 5.0 EXAM CONTENT MANUAL PREVIEW

Version 5.0 EXAM CONTENT MANUAL PREVIEW Version 5.0 EXAM CONTENT MANUAL PREVIEW APICS Certified in Production and Inventory Management Strategic Management of Resources Preview of CPIM Exam Content Manual Version 5.0 Please be aware, this is

More information

Sewer System Capital Budget Process

Sewer System Capital Budget Process Sewer System Capital Budget Process Presentation to New Castle County Council Department of Special Services Committee Meeting Jason P. Zern, P.E. Operations Engineer March 1, 2016 1 Outline Review Asset

More information

The standard base asset life used in the renewal programme and asset valuation for facility assets (major components) are shown in the table below:

The standard base asset life used in the renewal programme and asset valuation for facility assets (major components) are shown in the table below: 7.3.6 Facilities Background Plant is defined as asset components that pump, store or treat water. Key components include: Pumping stations - pumping of water to within the reticulation Treatment plants

More information

Enterprise Risk Management (ERM) and Cybersecurity. Na9onal Science Founda9on March 14, 2018

Enterprise Risk Management (ERM) and Cybersecurity. Na9onal Science Founda9on March 14, 2018 Enterprise Risk Management (ERM) and Cybersecurity Na9onal Science Founda9on March 14, 2018 Agenda Guiding Principles for Implementing ERM at NSF (Based on COSO) NSF s ERM Framework ERM Cybersecurity Risk

More information

2 Year Business Plan Utilities Business Support

2 Year Business Plan Utilities Business Support 2 Year Business Plan 2017-2018 Utilities Business Support Department Head: Jaret Dickie Title: Manager Phone: 403.529.8365 E-mail:jardic@medicinehat.ca Business Support Environmental Sustainability Utility

More information

Canadian Infrastructure Report Card

Canadian Infrastructure Report Card Chris McNally, P.Eng. Presentation to the Institute of Intergovernmental Relations June 2015 Project Sponsors: 1 The Problem According to Statistics Canada, the Gross stock of core public infrastructure

More information

Identifying Critical Infrastructure Through the Use of Hydraulic Modeling to Support Asset Management

Identifying Critical Infrastructure Through the Use of Hydraulic Modeling to Support Asset Management Identifying Critical Infrastructure Through the Use of Hydraulic Modeling to Support Asset Management James P. Cooper, Prof. Engineer, Cert. Operator Acknowledgements Lisa Gresehover Kimberly Six Karem

More information

Integrating Local and Regional Infrastructure Resilience through Market-Based Strategies. Niek Veraart

Integrating Local and Regional Infrastructure Resilience through Market-Based Strategies. Niek Veraart Integrating Local and Regional Infrastructure Resilience through Market-Based Strategies Niek Veraart TRB Annual Meeting Session 875 P14-6121 January 16, 2014 Regional Resilience Fundamentals Large geographic

More information

Contents. Critical Analysis Assessing Vulnerability October, Overview/Purpose of Criticality Analysis Criticality Analysis

Contents. Critical Analysis Assessing Vulnerability October, Overview/Purpose of Criticality Analysis Criticality Analysis Critical Analysis Assessing Vulnerability October, 2016 Murray, Smith & Associates, Inc. Washington APWA Conference Spokane, WA 1 Contents Overview/Purpose of Criticality Analysis Criticality Analysis

More information

Threat and Vulnerability Assessment Tool

Threat and Vulnerability Assessment Tool TABLE OF CONTENTS Threat & Vulnerability Assessment Process... 3 Purpose... 4 Components of a Threat & Vulnerability Assessment... 4 Administrative Safeguards... 4 Logical Safeguards... 4 Physical Safeguards...

More information

Independent Assurance Statement

Independent Assurance Statement Independent Assurance Statement Scope and Objectives DNV GL Business Assurance USA, Inc. (DNV GL) was commissioned by Lockheed Martin Corporation (Lockheed Martin) to conduct independent assurance of its

More information

Service Plan for Infrastructure Engineering

Service Plan for Infrastructure Engineering Service Plan for Infrastructure 2016-2019 Capital Regional District Date submitted: Revised: August 14, 2017 Table of Contents 1 Overview... 1 1.1 Division & Service Summary... 1 1.2 Organization Chart...

More information

2017 IESALC FALL TECHNOLOGY MEETING

2017 IESALC FALL TECHNOLOGY MEETING 2017 IESALC FALL TECHNOLOGY MEETING CONDUCTING AIRFIELD LIGHTING ASSESSMENTS TO IDENTIFY FUTURE CAPITAL IMPROVEMENT PROJECTS HYATT REGENCY DALLAS OCTOBER 22 26 2017 PRESENTED BY MARK A. MORLEY, P.E., RCDD

More information

Overview of PECO s Distribution Integrity Management Plan

Overview of PECO s Distribution Integrity Management Plan Overview of PECO s Distribution Integrity Management Plan PUC Gas Safety Seminar September 8, 2016 David Bonner, PE Robert Ridgeway, PE Agenda PECO Distribution System Overview DIMP Pillar #1 DIMP DIMP

More information

Baltimore City Department of Public Works

Baltimore City Department of Public Works Baltimore City Department of Public Works Bureau of Water and Wastewater WHEN IT BREAKS, IT POURS January 16, 2014 Presentation Outline Overview of Baltimore Water System Light Street Main Break Asset

More information

Critical Infrastructure Assessment

Critical Infrastructure Assessment Critical Infrastructure Assessment Everyday the products and services that support our standard of living flow, almost seamlessly, to and from our homes, communities, and government. Making this possible

More information

Supplemental Details - Capital Funding Source Summary Cap Fund Cap Fund Cap Fund - 21

Supplemental Details - Capital Funding Source Summary Cap Fund Cap Fund Cap Fund - 21 Supplemental Details - Capital Source Summary 2018 Cap Fund - 2 2019 Cap Fund - 12 2020 Cap Fund - 21 Brampton Public Library Automation Software & Hardware Upgrades Brampton Library - 4 Corners BramWest

More information

Balancing Compliance and Operational Security Demands. Nov 2015 Steve Winterfeld

Balancing Compliance and Operational Security Demands. Nov 2015 Steve Winterfeld Balancing Compliance and Operational Security Demands Nov 2015 Steve Winterfeld What is more important? Compliance with laws / regulations Following industry best practices Developing a operational practice

More information

TV Systems (800) TV Systems. Digital Universal Camera system.

TV Systems (800) TV Systems. Digital Universal Camera system. Digital Universal Camera system Improve the operational, environmental, and FInancIal performance of Your WasteWater system today! The CUES Digital Universal Camera (DUC) is a semi-autonomous, high resolution

More information

Final Benchmarking Policy and Procedures

Final Benchmarking Policy and Procedures Final Benchmarking Policy and Procedures Strategic Plan Task 3.1.1 Deliverable 2.2.3 Funded by Southern California Edison Company Local Government Strategic Plan Strategies Program 2013 2015 Program Period

More information

CITY COUNCIL AGENDA REPORT

CITY COUNCIL AGENDA REPORT K.5 CITY COUNCIL AGENDA REPORT TYPE OF ITEM: Info/Consent AGENDA ITEM NO.: 5 DATE: December 6, 2016 TO: City Council THROUGH: Greg Nyhoff City Manager FROM: SUBJECT: Darwin Base Fire Chief Additional Appropriation

More information

TSC Business Continuity & Disaster Recovery Session

TSC Business Continuity & Disaster Recovery Session TSC Business Continuity & Disaster Recovery Session Mohamed Ashmawy Infrastructure Consulting Pursuit Hewlett-Packard Enterprise Saudi Arabia Mohamed.ashmawy@hpe.com Session Objectives and Outcomes Objectives

More information

Applying Mitigation. to Build Resilient Communities

Applying Mitigation. to Build Resilient Communities Applying Mitigation to Build Resilient Communities The Hazards Around Us Think about the natural hazard that... poses the greatest risk to where you live or work OR has had the greatest impact on you personally

More information

Practical IT Research that Drives Measurable Results OptimizeIT Strategic Planning Bundle

Practical IT Research that Drives Measurable Results OptimizeIT Strategic Planning Bundle Practical IT Research that Drives Measurable Results OptimizeIT Strategic Planning Bundle Info-Tech Research Group 1 An IT Strategy must lay out a roadmap and budget for investment to establish the systems,

More information

BALTIMORE UTILITY ASSET MANAGEMENT DIVISION

BALTIMORE UTILITY ASSET MANAGEMENT DIVISION BALTIMORE UTILITY ASSET MANAGEMENT DIVISION Baltimore City s Asset Management Program Sustainable Best Management Practices in Transportation Workshop July 16, 2013 Rudy S. Chow, P.E. Bureau Head Alfred

More information

Small Business Storm Preparedness & Resiliency

Small Business Storm Preparedness & Resiliency Small Business Storm Preparedness & Resiliency Deborah Mills, CFM Dewberry Consultants, LLC Agenda Introduction to small business preparedness and resiliency Beverly MA, Brooklyn, New Orleans case studies

More information

The Project Charter. Date of Issue Author Description. Revision Number. Version 0.9 October 27 th, 2014 Moe Yousof Initial Draft

The Project Charter. Date of Issue Author Description. Revision Number. Version 0.9 October 27 th, 2014 Moe Yousof Initial Draft The Project Charter Project Title: VDI Data Center Design and Build Project Sponsor: South Alberta Data Centers Inc. (SADC Inc.) Project Customer: The City of Calgary Project Manager: Moe Yousof Document

More information

Facilities Master Plan Toronto Public Library Board Consultation

Facilities Master Plan Toronto Public Library Board Consultation STAFF REPORT INFORMATION ONLY Facilities Master Plan Toronto Public Library Board Consultation Date: May 28, 2018 20. To: From: Toronto Public Library Board City Librarian SUMMARY The purpose of this report

More information

Failing Systems: Desperate Measures for Desperate Times. Department of Environmental Quality

Failing Systems: Desperate Measures for Desperate Times. Department of Environmental Quality Failing Systems: Desperate Measures for Desperate Times Department of Environmental Quality Desperate Measures for Desperate Times Kim Colson, Division of Water Infrastructure, NC Department of Environmental

More information

RESILIENT UTILITY COALITION OF SOUTH FLORIDA

RESILIENT UTILITY COALITION OF SOUTH FLORIDA RESILIENT UTILITY COALITION OF SOUTH FLORIDA RUC MISSION The Resilient Utility Coalition seeks to advance utility infrastructure resiliency efforts in South Florida and provide essential value to its members

More information

SHARED SERVICES - INFORMATION TECHNOLOGY

SHARED SERVICES - INFORMATION TECHNOLOGY Updated: February, 00 EB-00-0 Exhibit D Page of SHARED SERVICES - INFORMATION TECHNOLOGY.0 INTRODUCTION 0 Information Technology ( IT ) refers to computer systems (hardware, software and applications)

More information

Labs21 Sub-Metering Guidelines for Laboratory Facilities

Labs21 Sub-Metering Guidelines for Laboratory Facilities DRAFT OUTLINE 6-17-10 Note: This draft outline is only a strawman to facilitate discussion. It is expected that it will be revised based on stakeholder review and input. Please provide comments using track

More information

Resiliency and the Need for Re-Thinking our Water Infrastructure. Andrew Bielanski U.S. Environmental Protection Agency June 25, 2015

Resiliency and the Need for Re-Thinking our Water Infrastructure. Andrew Bielanski U.S. Environmental Protection Agency June 25, 2015 Resiliency and the Need for Re-Thinking our Water Infrastructure Andrew Bielanski U.S. Environmental Protection Agency June 25, 2015 Presentation Goals & Focus Define What is Meant by Resiliency Explain

More information

Facility Condition Assessments

Facility Condition Assessments Facility Condition Assessments City Council Work Session: July 1, 2014 Department of Public Works Introduction Andrew Clough, Director, Public Works Phil Harrington, Deputy Director, Public Works Lorin

More information

A VULNERBILITY & RISK ASSESSMENT OF SEPTA S MANAYUNK/NORRISTOWN LINE

A VULNERBILITY & RISK ASSESSMENT OF SEPTA S MANAYUNK/NORRISTOWN LINE A VULNERBILITY & RISK ASSESSMENT OF S MANAYUNK/NORRISTOWN LINE : Laura Zale & Erik Johanson August 7, 2012 Southeastern Pennsylvania Transportation Authority Overview : Sixth largest public transportation

More information

Presentation on the Community Resilience Program

Presentation on the Community Resilience Program CIB Meeting Delft, The Netherlands May 21, 2015 Presentation on the Community Resilience Program Dr. Therese McAllister Engineering Laboratory National Institute of Standards and Technology U.S. Department

More information

5 Servicing Capacity Assignment for Aurora, East Gwillimbury and Newmarket

5 Servicing Capacity Assignment for Aurora, East Gwillimbury and Newmarket Clause 5 in Report No. 11 of Committee of the Whole was adopted, without amendment, by the Council of The Regional Municipality of York at its meeting held on June 28, 2018. 5 Servicing Capacity Assignment

More information

CPM Certification Examination

CPM Certification Examination CPM Certification Examination Preparation and Registration Information REAL ESTATE INSTITUTE of CANADA Institut canadien de l immeuble 5407 Eglinton Avenue West, Suite 208 Toronto ON M9C 5K6 Introduction

More information

LOUISVILLE UTILITY AND PUBLIC WORKS ADVISORY GROUP UTILITY OPERATIONS REVIEW

LOUISVILLE UTILITY AND PUBLIC WORKS ADVISORY GROUP UTILITY OPERATIONS REVIEW 14 Marrch 2012 LOUISVILLE UTILITY AND PUBLIC WORKS ADVISORY GROUP UTILITY OPERATIONS REVIEW OVERVIEW Introduction Industry Overview Management Best Practices Benchmarking Other Utility Governance Models

More information

NORTHPINE COMMUNITY IMPROVEMENT DISTRICT IMPLEMENTATION PLAN 01 st July th June 2022

NORTHPINE COMMUNITY IMPROVEMENT DISTRICT IMPLEMENTATION PLAN 01 st July th June 2022 1 Convene meeting Nominate and elect NCID board PROGRAM 1 MANAGEMENT, COMMUNICATION & OPERATIONS SRA Steering Committee Once at Inception Phase 1 N/A N/A N/A N/A Minutes of meeting and list of elected

More information

INTEGRATING HAZUS-MH DATA AND OUTPUTS TO A DECISION SUPPORT SYSTEM

INTEGRATING HAZUS-MH DATA AND OUTPUTS TO A DECISION SUPPORT SYSTEM Silvana V Croope, PhD HAZUS User Group Topic Specific Call 02/15/2011 INTEGRATING HAZUS-MH DATA AND OUTPUTS TO A DECISION SUPPORT SYSTEM BUILDING BLOCKS A complex problem to research Critical Infrastructure

More information

Appendix 2. Capital Funding Source Summary Table of Contents

Appendix 2. Capital Funding Source Summary Table of Contents Capital Source Summary Table of Contents 2016 Corporate Services APP 2-3 Mayor and Council APP 2-5 Office of the Chief Administrative Officer APP 2-5 Office of the Chief Operating Officer APP 2-5 Planning

More information

"Charting the Course... Certified Information Systems Auditor (CISA) Course Summary

Charting the Course... Certified Information Systems Auditor (CISA) Course Summary Course Summary Description In this course, you will perform evaluations of organizational policies, procedures, and processes to ensure that an organization's information systems align with overall business

More information

The Fine Art of Creating A Transformational Cyber Security Strategy

The Fine Art of Creating A Transformational Cyber Security Strategy SESSION ID: CXO-R11 The Fine Art of Creating A Transformational Cyber Security Strategy Jinan Budge Principal Security & Risk Analyst Forrester Research Andrew Rose Chief Security Officer Vocalink, A Mastercard

More information

Storm Drain Modeling HY-12 Rational Design

Storm Drain Modeling HY-12 Rational Design v. 10.1 WMS 10.1 Tutorial Learn how to design storm drain inlets, pipes, and other components of a storm drain system using FHWA's HY-12 storm drain analysis software and the WMS interface Objectives Define

More information

investing in resilience. reinvesting in communities.

investing in resilience. reinvesting in communities. Introduction The Infrastructure Challenge Chronic underinvestment in aging urban infrastructure Increasingly strained public resources The Need for Greater Resilience Higher risks of severe weather events

More information

Helping the C-Suite Define Cyber Risk Appetite. The executive Imperative

Helping the C-Suite Define Cyber Risk Appetite. The executive Imperative Helping the C-Suite Define Cyber Risk Appetite The executive Imperative Welcome Steve Schlarman GRC Strategist CISSP, CISM @steveschlarman Executive Priorities Growth is the highest priority. 54 % 25 %

More information

Asset Management and. Your Name

Asset Management and. Your Name Asset Management and Criticality: Creative Solutions Novato for our Facilities Environment Your Name Veolia Veolia Water Water North North America America October June 27th, 2010 2014 Mission for Asset

More information

Corporate Security & Emergency Management Summary of Submitted 2015 Budget From Rates

Corporate Security & Emergency Management Summary of Submitted 2015 Budget From Rates Corporate Security & Emergency Management Summary of Submitted 2015 From Rates Service Expense 2014 2015 Revised Non Tax Revenue Net Tax Supported Expense Draft Non Tax Revenue Net Tax Supported Increase

More information

2018 Priorities. Staff Lead Legend: 2 P age DCAO GMDS CAO GMEPW. Mayor and Council

2018 Priorities. Staff Lead Legend: 2 P age DCAO GMDS CAO GMEPW. Mayor and Council Priorities Table of Contents Executive Summary Page 3 Economic Development Page 4 Infrastructure Page 5 Safety and Security Page 6 Service Delivery Page 7 Social and Environmental Page 8 Operational Plan

More information

Public Works 2017 Budget Presentation. Public Works What We Do

Public Works 2017 Budget Presentation. Public Works What We Do Public Works 2017 Budget Presentation Public Works What We Do The Public Works Department interacts with all citizens of the county and our visitors for which our work activities have a direct impact.

More information

Infosec Europe 2009 Business Strategy Theatre. Giving Executives the Security Management Information that they Really Need

Infosec Europe 2009 Business Strategy Theatre. Giving Executives the Security Management Information that they Really Need Infosec Europe 2009 Business Strategy Theatre Giving Executives the Security Management Information that they Really Need Simon Marvell Managing Director simon.marvell@acuityrm.com Agenda 1. What financial

More information

Stephanie Stuckey Chief Resilience Officer

Stephanie Stuckey Chief Resilience Officer Stephanie Stuckey Chief Resilience Officer Helping cities around the world become more resilient to the physical, social and economic challenges that are a growing part of the 21st century. 2 100RC MEMBER

More information

EPRO. Electric Infrastructure Protection Initiative EPRO BLACK SKY SYSTEMS ENGINEERING PROCESS

EPRO. Electric Infrastructure Protection Initiative EPRO BLACK SKY SYSTEMS ENGINEERING PROCESS EPRO Electric Infrastructure Protection Initiative EPRO BLACK SKY SYSTEMS ENGINEERING PROCESS EPRO BLACK SKY SYSTEMS ENGINEERING PROCESS The Role of Systems Engineering in Addressing Black Sky Hazards

More information

Mainstreaming Disaster Risk Reduction in Critical Infrastructure Development and 2030 Agenda for Sustainable Development

Mainstreaming Disaster Risk Reduction in Critical Infrastructure Development and 2030 Agenda for Sustainable Development Mainstreaming Disaster Risk Reduction in Critical Infrastructure Development and 2030 Agenda for Sustainable Development SAARC Training Programme Regional Interagency Working Group on ICT 21 January 2018

More information

Redmond Facilities Strategic Management Plan Overview

Redmond Facilities Strategic Management Plan Overview Redmond Facilities Strategic Management Plan Overview Project Purpose + Provide guidance on how to best operate, maintain, and upgrade facilities now and in the future + Optimize maintenance staffing and

More information

Quality Infrastructure Investment: Resilient Approaches and Examples from East Asia and the Pacific

Quality Infrastructure Investment: Resilient Approaches and Examples from East Asia and the Pacific Quality Infrastructure Investment: Resilient Approaches and Examples from East Asia and the Pacific Jolanta Kryspin-Watson Lead Disaster Risk Management Specialist East Asia and Pacific Region Tokyo, February

More information

CYBERSECURITY RESILIENCE

CYBERSECURITY RESILIENCE CLOSING THE IN CYBERSECURITY RESILIENCE AT U.S. GOVERNMENT AGENCIES Two-thirds of federal IT executives in a new survey say their agency s ability to withstand a cyber event, and continue to function,

More information

Emergency Cooling Centres

Emergency Cooling Centres 53 Emergency Cooling Centres To: Financial Budget and Enrolment Committee Date: 09 May 2018 Report No.: 05-18-3388 Strategic Directions Make every school an effective school Recommendation It is recommended

More information

INSPECTION CAMERA MODEL NO: CIC2410 OPERATION & SAFETY INSTRUCTIONS PART NO: GC0116

INSPECTION CAMERA MODEL NO: CIC2410 OPERATION & SAFETY INSTRUCTIONS PART NO: GC0116 INSPECTION CAMERA MODEL NO: CIC2410 PART NO: 6470385 OPERATION & SAFETY INSTRUCTIONS GC0116 INTRODUCTION Thank you for purchasing this CLARKE Inspection Camera. Before attempting to use this product, please

More information

SP Energy Networks Business Plan

SP Energy Networks Business Plan SP Energy Networks 2015 2023 Business Plan Updated March 2014 Annex 132kV Substation Plant Strategy SP Energy Networks 29 March 2014 March 2014 Issue Date Issue No. Document Owner Amendment Details 17th

More information

Business Continuity Planning

Business Continuity Planning Business Continuity Planning The Unexpected Happens Be Ready Copyright -Business Survival Partners, llc. 2011 - All Rights Reserved www.survivalpartners.biz RISK 2 Risks to National Security A secure and

More information

Information Security Policy

Information Security Policy April 2016 Table of Contents PURPOSE AND SCOPE 5 I. CONFIDENTIAL INFORMATION 5 II. SCOPE 6 ORGANIZATION OF INFORMATION SECURITY 6 I. RESPONSIBILITY FOR INFORMATION SECURITY 6 II. COMMUNICATIONS REGARDING

More information

Emergency Management BC Update

Emergency Management BC Update Emergency Management BC Update Provincial Emergency Program Emergency Management BC Update on Initiatives Union of BC Municipalities 2016 Conference September 29, 2016 Agenda Emergency Management BC Overview

More information

Planning for Resiliency. June 20, 2017 Richard Tetreault, PE WSP USA Office Lead VT, NH, and ME

Planning for Resiliency. June 20, 2017 Richard Tetreault, PE WSP USA Office Lead VT, NH, and ME Planning for Resiliency June 20, 2017 Richard Tetreault, PE WSP USA Office Lead VT, NH, and ME 23,000 years ago there would have been more than 8,000 feet of glacier over our heads 2 Provide for the safe

More information

Critical Infrastructure Protection in the European Union

Critical Infrastructure Protection in the European Union 20 January, 2015 The European GNSS Programmes 1 ICG9, Prague 9-14 November 2014 Critical Infrastructure Protection in the European Union 20 January, 2015 The European GNSS Programmes 2 Each EU Member State

More information

Rethinking Information Security Risk Management CRM002

Rethinking Information Security Risk Management CRM002 Rethinking Information Security Risk Management CRM002 Speakers: Tanya Scott, Senior Manager, Information Risk Management, Lending Club Learning Objectives At the end of this session, you will: Design

More information

Session ID: CISO-W22 Session Classification: General Interest

Session ID: CISO-W22 Session Classification: General Interest Session ID: CISO-W22 Session Classification: General Interest Pain Points What are your two biggest information security-related pain points?* Mobile Device Security Security Awareness Training User Behavior

More information

DMA assessment & grading for improvement and monitoring. CwMAG Autumn Conference 'Demand for Quality'

DMA assessment & grading for improvement and monitoring. CwMAG Autumn Conference 'Demand for Quality' DMA assessment & grading for improvement and monitoring CwMAG Autumn Conference 2013 - 'Demand for Quality' DMA assessment & grading for improvement and monitoring A system to highlight where network deficiencies

More information

Risk: Security s New Compliance. Torsten George VP Worldwide Marketing and Products, Agiliance Professional Strategies - S23

Risk: Security s New Compliance. Torsten George VP Worldwide Marketing and Products, Agiliance Professional Strategies - S23 Risk: Security s New Compliance Torsten George VP Worldwide Marketing and Products, Agiliance Professional Strategies - S23 Agenda Market Dynamics Organizational Challenges Risk: Security s New Compliance

More information

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM

FY STATEWIDE TRANSPORTATION IMPROVEMENT PROGRAM Port Authority of New York and New Jersey () - Concrete Sea Wall East of Harrison Car Maintenance Facility DBNUM: PA1424 / UPC: 154090 will receive funding to construct a concrete sea wall to protect PATH

More information

<< Practice Test Demo - 2PassEasy >> Exam Questions CISM. Certified Information Security Manager. https://www.2passeasy.

<< Practice Test Demo - 2PassEasy >> Exam Questions CISM. Certified Information Security Manager. https://www.2passeasy. Exam Questions CISM Certified Information Security Manager https://www.2passeasy.com/dumps/cism/ 1.Senior management commitment and support for information security can BEST be obtained through presentations

More information

DATE: June 16, 2014 REPORT NO. PW Chair and Members Committee of the Whole Operations and Administration

DATE: June 16, 2014 REPORT NO. PW Chair and Members Committee of the Whole Operations and Administration PUBLIC WORKS COMMISSION DATE: June 16, 2014 REPORT NO. PW2014-053 TO: FROM: Chair and Members Committee of the Whole Operations and Administration Geoff Rae, MBA, P.Eng. General Manager, Public Works Commission

More information

Developing a Holistic Strategy To Achieve Community Health Resilience

Developing a Holistic Strategy To Achieve Community Health Resilience Developing a Holistic Strategy To Achieve Community Health Resilience Paula Scalingi, Director Pacific Northwest Center for Regional Disaster Resilience Pacific Northwest Border Health Alliance Seventh

More information

Managing IT Risk: The ISACA Risk IT Framework. 1 st ISACA Day, Sofia 15 October Charalampos (Haris)Brilakis, CISA

Managing IT Risk: The ISACA Risk IT Framework. 1 st ISACA Day, Sofia 15 October Charalampos (Haris)Brilakis, CISA Managing IT Risk: The ISACA Risk IT Framework Charalampos (Haris)Brilakis, CISA ISACA Athens Chapter BoD / Education Committee Chair Sr. Manager, Internal Audit, Eurobank (Greece) 1 st ISACA Day, Sofia

More information

APPENDIX A ASSESSMENT PROTOCOL

APPENDIX A ASSESSMENT PROTOCOL APPENDIX A ASSESSMENT PROTOCOL Stream segment Date River miles (from/to) A. Channel assessment A1. Current active/wet channel Degradation Revetment RIVER CORRIDOR ASSESSMENT SHEET 1 to 2.9 Severely Degraded

More information

FHWA RESILIENCE PRIMER

FHWA RESILIENCE PRIMER FHWA Resilience Primer Wisconsin Annual Planning Conference October 30, 2017 Sustainable Transportation and Resilience Roadmap Resilience Definitions Regulations Guidance FHWA Resources and Tools INVEST

More information

OCM ACADEMIC SERVICES PROJECT INITIATION DOCUMENT. Project Title: Online Coursework Management

OCM ACADEMIC SERVICES PROJECT INITIATION DOCUMENT. Project Title: Online Coursework Management OCM-12-025 ACADEMIC SERVICES PROJECT INITIATION DOCUMENT Project Title: Online Coursework Management Change Record Date Author Version Change Reference March 2012 Sue Milward v1 Initial draft April 2012

More information

GOVERNANCE, RISK MANAGEMENT AND COMPLIANCE TRENDS BY FCPAK ERIC KIMANI

GOVERNANCE, RISK MANAGEMENT AND COMPLIANCE TRENDS BY FCPAK ERIC KIMANI GOVERNANCE, RISK MANAGEMENT AND COMPLIANCE TRENDS BY FCPAK ERIC KIMANI CONTENTS Overview Conceptual Definition Implementation of Strategic Risk Governance Success Factors Changing Internal Audit Roles

More information

USAF Environmental Management System Update

USAF Environmental Management System Update Headquarters U.S. Air Force USAF Environmental Management System Update Maj Aaron Altwies HQ USAF/A7CAQ Why do EMS? EO 13423 mandates it Requires Fully implemented EMSs by Dec 2008 Audited by external

More information

2 1 S T C E NTURY INFRASTRUCTURE C OMMI S SION EXECUTIVE SUMMARY

2 1 S T C E NTURY INFRASTRUCTURE C OMMI S SION EXECUTIVE SUMMARY 2 1 S T C E NTURY INFRASTRUCTURE C OMMI S SION EXECUTIVE SUMMARY Prepared for Governor Rick Snyder The 21st Century Infrastructure Commission's research is composed of two major works: a full report and

More information

Next Generation Policy & Compliance

Next Generation Policy & Compliance Next Generation Policy & Compliance Mason Karrer, CISSP, CISA GRC Strategist - Policy and Compliance, RSA Core Competencies C33 2013 Fall Conference Sail to Success CRISC CGEIT CISM CISA Introductions...

More information

City of Dallas Emergency Operation Center Response to May 2015 Flood Events

City of Dallas Emergency Operation Center Response to May 2015 Flood Events City of Dallas Emergency Operation Center Response to May 2015 Flood Events Overview Storm Description Emergency Operations Overview After Action 2 Storm Description 3 Trinity River Watershed 4 Upper Trinity

More information

CIPMA CRITICAL INFRASTRUCTURE PROTECTION MODELLING & ANALYSIS. Overview of CIP in Australia

CIPMA CRITICAL INFRASTRUCTURE PROTECTION MODELLING & ANALYSIS. Overview of CIP in Australia CIPMA CRITICAL INFRASTRUCTURE PROTECTION MODELLING & ANALYSIS Overview of CIP in Australia Greg Scott Leader, Critical Infrastructure Project Risk & Impact Analysis Group Geoscience Australia Greg.Scott@ga.gov.au

More information

ESFRI Strategic Roadmap & RI Long-term sustainability an EC overview

ESFRI Strategic Roadmap & RI Long-term sustainability an EC overview ESFRI Strategic Roadmap & RI Long-term sustainability an EC overview Margarida Ribeiro European Commission DG Research & B.4 - Research Infrastructure Research and What is ESFRI? An informal body composed

More information

CASE STUDY OF COLLEGE OF THE DESERT S COMPUTER AIDED FACILITY MANAGEMENT IMPLEMENTATION

CASE STUDY OF COLLEGE OF THE DESERT S COMPUTER AIDED FACILITY MANAGEMENT IMPLEMENTATION CASE STUDY OF COLLEGE OF THE DESERT S COMPUTER AIDED FACILITY MANAGEMENT IMPLEMENTATION Ron Beeler Ava Hill Steve Renew Director, Facilities Services Kimon Onuma Principal Patrick Daniels Senior Project

More information

Annual Training plan 2018

Annual Training plan 2018 Annual Training plan 2018 Leadership,, HR, Creativity, Secretary Courses Sr. No. Course Name Date Venue Fees U.S $ January 1. Time & Stress 7-11/1/2018 Abu Dhabi 2600 2. Legal Writing Skills 7-11/1/2018

More information