ERCOT Control Center Situation Awareness

Size: px
Start display at page:

Download "ERCOT Control Center Situation Awareness"

Transcription

1 ERCOT Control Center Situation Awareness Michael E. Legatt, Ph.D. Principal Human Factors Engineer Monday, September 23, 2013

2 Copyright / Trademark The materials included within the presentation are the intellectual property of the Electric Reliability Council of Texas, Inc. All content contained herein, literary, pictorial, graphic or otherwise are copyright protected 2013, ERCOT, Inc., Michael E. Legatt, Ph.D. Macomber Map is a registered trademark of ERCOT, Inc. All rights reserved. September 23,

3 September 23, X

4 X September 23,

5 Situation Awareness the perception of the elements in the environment within a volume of time and space, the comprehension of their meaning, and the projection of their status in the near future. Endsley, 1988 ERCOT level: 23 million customers, 73% competitive choice (6.7 million meters, 15-minute data) 40,530 miles of high-voltage transmission Over 74 GW capacity, including over 10GW renewables Data ranging from 300 times per second to once every 4 seconds Many systems to handle network model, reliability, market, outages, etc. Control room operators need to see the big picture /decision support September 23,

6 History Need for situation awareness and user experience enhancements in control rooms Blackout of 2003 and other low-sa root causes Main issues: Need for wide-area and high-level views Alarm storm Dust storm Locations of equipment Navigation between one-lines Naming conventions for equipment Data integration across multiple systems Increased cognitive load as operators increasingly managing more tasks with more complex systems. This trend is only continuing (e.g., advanced metering) September 23,

7 Needs communications Fatigue / diet / exercise / tobacco / caffeine Reliability coordinators are not power systems engineers Power systems engineers are not reliability coordinators Collaborative process Shared stress Holistic analyses needed Agile software development Engagement of all players, leveraging different expertise Prototyping September 23,

8 Integrating technologies in ERCOT operations NMMS Post-Processor Substation One-Line Validation process Previously manual process Every substation one-line validated for topology and layout (~4.5k) One-lines that couldn t pass full validation are assigned to a network model coordinators Contingency process Breaker-to-breaker tracing One-lines are automatically generated (~ 11.5k) Single circuit contingencies auto-generated Special flags for transient (mid-model change) state, and for contingencyable/normal operation state Extracts include contingency deltas Double-circuit contingencies, tracing around seed elements Macomber Map topological model & one-lines Inclusion of OE Future models bulk changes covered in advance September 23,

9 Control Room Complexity September 23,

10 Black Start Simulations 10

11 ERCOT Black Start Preparedness Training ERCOT brings more than 700 TOs, QSEs and ERCOT operators together for annual simulations QSEs use simplified generation control systems to simulate unit restorations September 23,

12 ERCOT Black Start Preparedness Training TOs and ERCOT operators use Macomber Map to see wide area views and control only their equipment Participants each perform their roles against ERCOT s EMS training simulator Simulation of severe weather event, many transmission lines unavailable September 23,

13 Macomber Map Enhancements for Preparedness Training User Interface Enhancements to support: One-Line view/navigation (substation & breaker-tobreaker) Element control panel and switching capabilities for transmission operators Improved regional/island views Navigational support for reactive devices, next start units Generator status, synchroscope locations User action logging/auditing Integration of black start plan information September 23,

14 Human components of black start Fatigue Political pressure / media pressure Sustained vigilance Separation from loved ones Unknown event duration Cognizance of life-or-death nature, individual and societal Poor diet (e.g., high carbohydrate, sugar, caffeine) Nicotine withdrawal September 23,

15 Human components of black start Communications issues Three-way communications Positive communications Shared telephone conference / need for net control Humor to diffuse stress Hurry up and wait Different areas of responsibility mean many people waiting with little to do while others working September 23,

16 Overall Progress Of over 120,000 switching actions, operators made 4 errors. 1 st 39 hours (shortly after shift turnover) 2 nd 40 hours 3 rd 41 hours 4 th 48 hours 203 total simulation hours (starting at hour 35) Intentional load shedding in preparation for island pickup September 23,

17 Interesting facts TO behavior patterns different between 2012 and In 2012, with just one-line displays, operators moved more quickly and had more island collapses In 2013, using Macomber Map, operators moved more methodically, making significantly fewer switching errors. However, existing human errors still occurred likely due to fatigue/circadian rhythm. September 23,

18 Interesting facts Positive communications improved ERCOT/TO communications and efficiency, reduced self-reported stress September 23,

19 Interesting facts 2012 Simulation 27 GW restoration 17 simulator days for restoration 2013 Simulation 40 GW restoration 8.5 simulator days (203 hours) for restoration More than 120,000 switching actions, 4 errors September 23,

20 Into the future September 23,

21 Future of Macomber Map Current, Macomber Map is supported by a team of SMEs across ERCOT Ongoing enhancements and leveraging for various groups within ERCOT September 23,

22 Open Sourcing Macomber Map Open source initiative this year First, client code with data interfaces Early next year, addition of server-side code Groups that have expressed interest in Macomber Map: ISO/RTOs TDSPs & QSEs Academic Researchers Vendors September 23,

Analysis of EMS Outages

Analysis of EMS Outages Analysis of EMS Outages Venkat Tirupati, LCRA, Supervisor EMS SW & Advanced Applications NERC 3 rd Annual Monitoring and Situational Awareness Conference September 29-30, 2015 Agenda Introduction Common

More information

USE CASE 14 CONTROLLED ISLANDING

USE CASE 14 CONTROLLED ISLANDING I USE CASE 14 CONTROLLED ISLANDING Use Case Title Centralized application separates grid into islands to prevent blackout Use Case Summary Controlled islanding is a method that can significantly improve

More information

Software Technologies

Software Technologies The Power of Trust. The Future of Energy. MAINTAINING GRID SECURITY Analysis tools for off-line and on-line Dynamic Security Assessment 02 Maintaining grid security is a fundamental requirement for power

More information

Achieving Smarter Grid Operation With On-Line DSA Technology

Achieving Smarter Grid Operation With On-Line DSA Technology Achieving Smarter Grid Operation With On-Line DSA Technology Powercon 2014 October 20-22, 2014, Chengdu, China Lei Wang Powertech Labs Inc. 12388 88 th Avenue Surrey, BC, Canada A very simple version of

More information

SurvalentONE Distribution Management System

SurvalentONE Distribution Management System SurvalentONE Distribution Management System Analyze & Optimize Critical Grid Functions for Advanced System Monitoring & Control SurvalentONE ADMS The SurvalentONE ADMS platform is a fully integrated SCADA,

More information

Concept White Paper. Concepts for Proposed Content of Eventual Standard(s) for Project : Real-Time Monitoring and Analysis Capabilities

Concept White Paper. Concepts for Proposed Content of Eventual Standard(s) for Project : Real-Time Monitoring and Analysis Capabilities Concept White Paper Concepts for Proposed Content of Eventual Standard(s) for Project 2009-02: Real-Time Monitoring and Analysis Capabilities Real-time Monitoring and Analysis Capabilities Standard Drafting

More information

SDG&E s Accomplishments and Future Plans

SDG&E s Accomplishments and Future Plans SDG&E s Accomplishments and Future Plans Tariq Raman and Subbu Sankaran San Diego Gas & Electric Work Group Meeting October 23-24, 2018 San Diego Gas & Electric San Francisco SDG&E Los Angeles San Diego

More information

The various functions of an energy control center can be enumerated as under: 1. Load forecasting 6. Automatic generation control

The various functions of an energy control center can be enumerated as under: 1. Load forecasting 6. Automatic generation control ENERGY CONTROL CENTERS To generated, Transmission and Distribution system, Number of customers and Total investment. Installed capacity in India exceeds 206 GW with annual energy generated energy exceeding

More information

Grid Operations - Program 39

Grid Operations - Program 39 Grid Operations - Program 39 Program Description Program Overview In many ways, today's power system must be operated to meet objectives for which it was not explicitly designed. Today's transmission system

More information

Applying User Centered Design in the Development of Systems without User Interfaces

Applying User Centered Design in the Development of Systems without User Interfaces Applying User Centered Design in the Development of Systems without User Interfaces National Defense Industrial Association 14 th Annual Systems Engineering Conference October 27, 2011 Dr. W. David Reese,

More information

GridEx IV Panel Discussion

GridEx IV Panel Discussion GridEx IV Panel Discussion NERC GridSecCon October, 2016 1 Generation 254 GW Transmission Geography 120,000 Miles 22 States GridEx IV Panel Discussion Focus on Operations NERC GridSecCon October 20, 2016

More information

IMPROVING POWER SYSTEM RELIABILITY USING MULTIFUNCTION PROTECTIVE RELAYS

IMPROVING POWER SYSTEM RELIABILITY USING MULTIFUNCTION PROTECTIVE RELAYS IMPROVING POWER SYSTEM RELIABILITY USING MULTIFUNCTION PROTECTIVE RELAYS Armando Guzmán Schweitzer Engineering Laboratories, Inc. Pullman, WA 99163 A reliable power system maintains frequency and voltage

More information

Discovery Across Texas A Smart Grid Demo Grant Update

Discovery Across Texas A Smart Grid Demo Grant Update Discovery Across Texas A Smart Grid Demo Grant Update David Bogen Oncor Electric Delivery David.bogen@oncor.com NASPI Work Group Meeting October 5-6, 2010 1 Project participants Center for the Commercialization

More information

Texas Reliability Entity, Inc. Strategic Plan for 2017 TEXAS RE STRATEGIC PLAN FOR 2017 PAGE 1 OF 13

Texas Reliability Entity, Inc. Strategic Plan for 2017 TEXAS RE STRATEGIC PLAN FOR 2017 PAGE 1 OF 13 Texas Reliability Entity, Inc. Strategic Plan for 2017 TEXAS RE STRATEGIC PLAN FOR 2017 PAGE 1 OF 13 I. Vision A highly reliable and secure bulk power system in the Electric Reliability Council of Texas

More information

Evaluation of Business Cases for Smart Grid Solutions Kenny Mercado, Senior VP Electric Operations

Evaluation of Business Cases for Smart Grid Solutions Kenny Mercado, Senior VP Electric Operations Evaluation of Business Cases for Smart Grid Solutions Kenny Mercado, Senior VP Electric Operations April 21, 2015 CenterPoint Energy (CNP) Headquartered in Houston, Texas Serving 5.7 million electric &

More information

Smart Grid Operations - Clemson University Research, Education and Innovation-Ecosystem Opportunities

Smart Grid Operations - Clemson University Research, Education and Innovation-Ecosystem Opportunities Smart Grid Operations - Clemson University Research, Education and Innovation-Ecosystem Opportunities G. Kumar Venayagamoorthy, PhD, FIET, FSAIEE Duke Energy Distinguished Professor & Director & Founder

More information

Preparing for the Dynamic Grid of Future

Preparing for the Dynamic Grid of Future Preparing for the Dynamic Grid of Future Peter Hoffman, P.E. Duke Energy, Grid Solutions Engineering & Technology POWERING LIVES & COMMUNITIES Environmental Stewardship Reliable Service Affordable Rates

More information

Dispatcher Training Simulator (DTS) JOB AIDE

Dispatcher Training Simulator (DTS) JOB AIDE APPLICABILITY: System Operators or anyone operating the system via Peak s GE- Alstom. I. Purpose To provide System Operators a job aid on using the DTS, particularly within the restoration drill. II. Introduction

More information

SCADA MASTER CONTROLLER STACKED SERVICES EMULATOR DATA COLLECTOR

SCADA MASTER CONTROLLER STACKED SERVICES EMULATOR DATA COLLECTOR SCADA MASTER CONTROLLER STACKED SERVICES EMULATOR DATA COLLECTOR TM A N A LY T I C S S O F T WA R E S U I T E GridMaestro SCADA GridMaestro Master Controller GridMaestro SSE - Stacked Services Emulator

More information

REAL-TIME MONITORING DATA SPECIFICATION

REAL-TIME MONITORING DATA SPECIFICATION REAL-TIME MONITORING DATA SPECIFICATION Version 1 December 9, 2016 Revision History Version Date Reviewer Revisions 1 11/1/16 Mansion Hudson Initial document 1 Contents 1. DOCUMENT REVIEW... 3 2. DEFINITIONS...

More information

Vermont Outage Coordination and Planning

Vermont Outage Coordination and Planning Vermont Outage Coordination and Planning Objectives Convey VELCO s role within NE and VT for outage coordination Review VELCO and VT utility outage coordination process Identify outage scheduling challenges,

More information

Keep the Lights on and the Informa3on Flowing

Keep the Lights on and the Informa3on Flowing Keep the Lights on and the Informa3on Flowing Daniel Kirschen Donald W. and Ruth Mary Close Professor of Electrical Engineering University of Washington 1 Acknowledgements Prof. François Bouffard (McGill

More information

Real Time Monitoring of

Real Time Monitoring of Real Time Monitoring of Cascading Events Mladen Kezunovic Nan Zhang, Hongbiao Song Texas A&M University Tele-Seminar, March 28, 2006 Project Reports (S-19) M. Kezunovic, H. Song and N. Zhang, Detection,

More information

EARTH Ex 2017 Middle Planning Conference

EARTH Ex 2017 Middle Planning Conference EARTH Ex 2017 Middle Planning Conference 20 April 2017 Emergency All-sector Response to Transnational Hazards Exercise 23 August 2017 1 EARTH Ex 2017 MPC Sector Objectives Review EARTH Ex Plan, Concepts

More information

Emergency Support Function (ESF) #14a: UTILITIES: Central Electric & Steam. ESF Activation Contact: Cornell IPP Customer Service (607)

Emergency Support Function (ESF) #14a: UTILITIES: Central Electric & Steam. ESF Activation Contact: Cornell IPP Customer Service (607) Emergency Support Function (ESF) #14a: UTILITIES: Central Electric & Steam ESF Activation Contact: Cornell IPP Customer Service (607)255-5322 Primary Department I. Purpose: Cornell IPP: Utilities and Energy

More information

Standards Authorization Request Form

Standards Authorization Request Form Standards Authorization Request Form When completed, email this form to: sarcomm@nerc.com NERC welcomes suggestions to improve the reliability of the bulk power system through improved reliability standards.

More information

IEC61850 Maintenance approach. 2017, September the 27 th

IEC61850 Maintenance approach. 2017, September the 27 th IEC61850 Maintenance approach 2017, September the 27 th Javier Figuera Pozuelo (Madrid, 1976) has been working in the Spanish TSO (Red Eléctrica de España) since 2.001. First, as a Protection and Control

More information

Geomagnetic Disturbances

Geomagnetic Disturbances Geomagnetic Disturbances Managing Risk to the North American Power Grid Mark Olson, Reliability Standards Developer Worcester Polytechnic Institute Energy Symposium September 25, 2013 About NERC The North

More information

Modernizing the Grid for a Low-Carbon Future. Dr. Bryan Hannegan Associate Laboratory Director

Modernizing the Grid for a Low-Carbon Future. Dr. Bryan Hannegan Associate Laboratory Director Modernizing the Grid for a Low-Carbon Future Dr. Bryan Hannegan Associate Laboratory Director Aspen Energy Policy Forum July 5, 2016 40 YEARS OF CLEAN ENERGY RESEARCH Founded as Solar Energy Research Institute

More information

Agile and 360 Digital: Path to the Future of Energy. Michael Carlson

Agile and 360 Digital: Path to the Future of Energy. Michael Carlson Agile and 360 Digital: Path to the Future of Energy unrestricted Siemens AG 2016 usa.siemens.com/digitalgrid Michael Carlson 21 st Century Challenges Facing Utilities: Maintain Reliability, Resiliency,

More information

NERC Event Analysis Update Webinar. Hassan Hamdar Chair, Event Analysis Subcommittee October 20, 2016

NERC Event Analysis Update Webinar. Hassan Hamdar Chair, Event Analysis Subcommittee October 20, 2016 NERC Event Analysis Update Webinar Hassan Hamdar Chair, Event Analysis Subcommittee October 20, 2016 Webinar Agenda ERO Event Analysis Process Update Lesson Learned Presentation from Entity ERO Lessons

More information

Generation Interconnection Feasibility Study Report

Generation Interconnection Feasibility Study Report Project #169 Generation Interconnection Feasibility Study Report 7/2/2014 Regional Electric Transmission Planning TABLE OF CONTENTS Executive Summary... 3 Generator and Interconnection Data... 5 Study

More information

HIGH LEVEL REQUIREMENTS OF FAST SIMULATION AND MODELLING SUITE OF TOOLS FOR FUTURE SELF-HEALING DISTRIBUTION POWER SYSTEM

HIGH LEVEL REQUIREMENTS OF FAST SIMULATION AND MODELLING SUITE OF TOOLS FOR FUTURE SELF-HEALING DISTRIBUTION POWER SYSTEM HIGH LEVEL REQUIREMENTS OF FAST SIMULATION AND MODELLING SUITE OF TOOLS FOR FUTURE SELF-HEALING DISTRIBUTION POWER SYSTEM A. Valenti* I Bel ** S. Lee *EDF **EPRI E2I ConEdison France USA USA arnaud.valenti@edf.fr

More information

Advanced Protection and Control Technologies for T&D Grid Modernization

Advanced Protection and Control Technologies for T&D Grid Modernization Advanced Protection and Control Technologies for T&D Grid Modernization i-pcgrid Workshop San Francisco, CA March 31, 2016 Jeff Shiles, Principal Manager Protection & Automation Engineering Southern California

More information

Phasor Technology Research Road Map to Improve Grid Reliability and Market Efficiency. Presented to TAC on April 5, 2005 and PAC on April 22, 2005

Phasor Technology Research Road Map to Improve Grid Reliability and Market Efficiency. Presented to TAC on April 5, 2005 and PAC on April 22, 2005 Phasor Technology Research Road Map to Improve Grid Reliability and Market Efficiency Presented to TAC on April 5, 2005 and PAC on April 22, 2005 Background Power Grid has evolved from a vertically integrated

More information

Proposal for Development and Use of Node- Breaker Topology Representations for Offline and Real-time Study Models November 12, 2013

Proposal for Development and Use of Node- Breaker Topology Representations for Offline and Real-time Study Models November 12, 2013 Proposal for Development and Use of Node- Breaker Topology Representations for Offline and Real-time November 12, 2013 Rationale Background Interconnection wide powerflow and dynamics cases are currently

More information

Lessons Learned Implementing an IEC based Microgrid Power- Management System. K.A. GRAY, J.J. MRAZ* POWER Engineers, Inc.

Lessons Learned Implementing an IEC based Microgrid Power- Management System. K.A. GRAY, J.J. MRAZ* POWER Engineers, Inc. 21, rue d Artois, F-75008 PARIS CIGRE US National Committee http : //www.cigre.org 2015 Grid of the Future Symposium Lessons Learned Implementing an IEC 61850-based Microgrid Power- Management System K.A.

More information

Sacramen Sacr t amen o t Municipal Utility Dis t Dis rict t SMUD May Ma 10,

Sacramen Sacr t amen o t Municipal Utility Dis t Dis rict t SMUD May Ma 10, Sacramento Municipal Utility District SMUD May 10, 2010 1 SMUD Facts and Figures 900 Sq. Miles Service Area 585,500 Customers 1.4 million Area Population 10 Bulk Substations 473 Miles of Transmission Lines

More information

Florida Power & Light Company Hurricane Response Update. Eric Silagy President and CEO Florida Power & Light Company

Florida Power & Light Company Hurricane Response Update. Eric Silagy President and CEO Florida Power & Light Company Florida Power & Light Company Hurricane Response Update Eric Silagy President and CEO Florida Power & Light Company 35 counties Serving more than half of Florida 4.9 million customer accounts Majority

More information

SDG&E EPIC Program Overview

SDG&E EPIC Program Overview SDG&E EPIC Program Overview Presented by: Frank Goodman, SDG&E i-pcgrid Workshop March 30, 2018. All copyright and trademark rights reserved. Presentation overview SDG&E overview Project lists for three

More information

October 05, ECE 421 Session 12. Utility SCADA and Automation. Presented by: Chris Dyer

October 05, ECE 421 Session 12. Utility SCADA and Automation. Presented by: Chris Dyer ECE 421 Session 12 October 05, 2017 Utility SCADA and Automation Presented by: Chris Dyer Utility SCADA & Automation Chris Dyer, P.E. BSEE University of Idaho, 1997 SCADA & Automation Engineer POWER Engineers,

More information

Applications and Analysis Tools for Monitoring Dynamics on the Grid

Applications and Analysis Tools for Monitoring Dynamics on the Grid 1 Applications and Analysis Tools for Monitoring Dynamics on the Grid Phil Overholt Program Manager Office of Electricity Delivery and Energy Reliability (OE) Energy Infrastructure Modeling and Analysis

More information

Standard Authorization Request Form

Standard Authorization Request Form Standard Authorization Request Form Title of Proposed Standard: Project 2009-02: Real-time Reliability Monitoring and Analysis Capabilities Original Request Date: June 4, 2009 Revised Date: January 15,

More information

November 29, ECE 421 Session 28. Utility SCADA and Automation. Presented by: Chris Dyer

November 29, ECE 421 Session 28. Utility SCADA and Automation. Presented by: Chris Dyer ECE 421 Session 28 November 29, 2018 Utility SCADA and Automation Presented by: Chris Dyer Utility SCADA & Automation Chris Dyer, P.E. BSEE University of Idaho, 1997 SCADA & Automation Engineer POWER Engineers,

More information

Peak Reliability Coordination Services in the West March 30, 2018

Peak Reliability Coordination Services in the West March 30, 2018 Peak Reliability Coordination Services in the West March 30, 2018 Peak Reliability, 2018. 1 Peak Reliability Coordination Services in the West Peak s fundamental mission is to enhance and promote the reliability

More information

Uses of Operational and Non-Operational Data

Uses of Operational and Non-Operational Data Mladen Kezunovic Texas A&M University http://www.ee.tamu.edu/~pscp/index.html Uses of Operational and Non-Operational Data Research Seminar Abu Dhabi, UAE, March 8, 2007 Outline Introduction Background:

More information

Toward All-Hazards Security and Resilience for the Power Grid

Toward All-Hazards Security and Resilience for the Power Grid Toward All-Hazards Security and Resilience for the Power Grid Juan Torres Associate Laboratory Director, Energy Systems Integration National Renewable Energy Laboratory December 6, 2017 1 Grid Modernization

More information

NERC Overview and Compliance Update

NERC Overview and Compliance Update NERC Overview and Compliance Update Eric Ruskamp Manager, Regulatory Compliance August 17, 2018 1 Agenda NERC Overview History Regulatory Hierarchy Reliability Standards Compliance Enforcement Compliance

More information

DRAFT Risks and Mitigations for Losing EMS Functions

DRAFT Risks and Mitigations for Losing EMS Functions DRAFT Risks and Mitigations for Losing EMS Functions 1.0 Executive Summary Energy Management System (EMS) is a system of computer-aided tools used by System Operators to monitor, control, and optimize

More information

Lesson Learned Initiatives to Address and Reduce Misoperations

Lesson Learned Initiatives to Address and Reduce Misoperations Lesson Learned Initiatives to Address and Reduce Misoperations Primary Interest Groups Transmission Owners (TOs) Generator Owners (GOs) Problem Statement A registered entity experienced a high rate of

More information

HVDC in CSG Challenges and Solutions

HVDC in CSG Challenges and Solutions HVDC in CSG Challenges and Solutions LI, Licheng lilc@csg.cn LI, Peng lipeng@csg.cn China Southern Power Grid Co., Ltd June 2013 1 Outline I. Overview of CSG II. Overview of HVDC&UHVDC in CSG III. Challenges

More information

Create a sustainable, high-performance university campus.

Create a sustainable, high-performance university campus. Create a sustainable, high-performance university campus. Discover how to maximize efficiency, safety, and productivity with an integrated university infrastructure. Make the most of your energy SM Today

More information

Comments by the Northeast Power Coordinating Council FERC Reactive Power Technical Conference

Comments by the Northeast Power Coordinating Council FERC Reactive Power Technical Conference Introduction The Northeast Power Coordinating Council 1 (NPCC) is an international electric regional reliability council formed shortly after the 1965 Northeast Blackout to promote the reliability and

More information

IFC ENERGY STORAGE MARKET REPORT

IFC ENERGY STORAGE MARKET REPORT IFC ENERGY STORAGE MARKET REPORT DEVELOPMENTS AND OPPORTUNITIES FOR ENERGY STORAGE IN EMERGING MARKETS JANUARY 9, 2016 ANISSA DEHAMNA PRINCIPAL RESEARCH ANALYST NAVIGANT RESEARCH 1 / 2016 NAVIGANT CONSULTING,

More information

Advanced Monitoring Technologies for Grid Reliability, Market Efficiency, and Grid Security

Advanced Monitoring Technologies for Grid Reliability, Market Efficiency, and Grid Security Advanced Monitoring Technologies for Grid Reliability, Market Efficiency, and Grid Security CERTS Briefing for Kevin Kolevar, Director Office of Electricity and Energy Assurance Department of Energy Washington,

More information

Introduction: Model Relationships Network Model Overview Example Commercial Model Overview Component Hierarchy & Definitions Example of Structure

Introduction: Model Relationships Network Model Overview Example Commercial Model Overview Component Hierarchy & Definitions Example of Structure 1 2 3 Introduction: Model Relationships Network Model Overview Example Commercial Model Overview Component Hierarchy & Definitions Example of Structure MISO Functions Served by the Network Model by the

More information

Disclaimer Executive Summary Introduction Overall Application of Attachment Generation Transmission...

Disclaimer Executive Summary Introduction Overall Application of Attachment Generation Transmission... CIP-002-4 Cyber Security Critical Cyber Asset Identification Rationale and Implementation Reference Document September, 2010 Table of Contents TABLE OF CONTENts Disclaimer... 3 Executive Summary... 4 Introduction...

More information

Digital Substation Unrestricted Siemens AG 2017 siemens.com/digital-substation

Digital Substation Unrestricted Siemens AG 2017 siemens.com/digital-substation Digital Substation A Substation Why Should We Make It Digital? Adopt new business models Time to operation Quality assurance Business agility Avoid outages Investment security Ensuring grid availability

More information

Wide Area Monitoring and Control

Wide Area Monitoring and Control Wide Area Monitoring and Control Schweitzer Engineering Laboratories André du Plessis Copyright SEL 2015 SEL Headquarters: WA US Manufacturing: ID, IL, WA Invent, Design, Build, and Support the Systems

More information

Robust Topology Determination Based on Additional Substation Data from IEDs

Robust Topology Determination Based on Additional Substation Data from IEDs Robust Topology Determination Based on Additional Substation Data from IEDs M. Kezunovic 1, Fellow IEEE, T. Djokic, T. Kostic 2, Member IEEE Abstract This paper describes an approach for more robust power

More information

PJM Interconnection Smart Grid Investment Grant Update

PJM Interconnection Smart Grid Investment Grant Update PJM Interconnection Smart Grid Investment Grant Update Bill Walker walkew@pjm.com NASPI Work Group Meeting October 22-24, 2013 Acknowledgment: "This material is based upon work supported by the Department

More information

Microgrids: Building Blocks of the Smart Grid Adaptive Protection Schemes for Microgrids

Microgrids: Building Blocks of the Smart Grid Adaptive Protection Schemes for Microgrids Enrico Ragaini (ABB Low Voltage Products), Alexandre Oudalov (ABB Corporate Research), ISGT Europe 2012, Berlin Microgrids: Building Blocks of the Smart Grid Adaptive Protection Schemes for Microgrids

More information

AUTOMATION OF POWER DISTRIBUTION USING SCADA

AUTOMATION OF POWER DISTRIBUTION USING SCADA 1 2 ABSTRACT In every substation certain measurements, supervision, control, operation and protection functions are necessary. Traditionally these functions were performed manually by system operator from

More information

Grid Modernization at the Department of Energy

Grid Modernization at the Department of Energy Grid Modernization at the Department of Energy Kevin Lynn, Director of the Grid Integration Initiative Office of Energy Efficiency and Renewable Energy November 17, 2014 Electricity Plays a Vital Role

More information

RecordGraph Template Application Note

RecordGraph Template Application Note RecordGraph Template Application Note Objective This app note demonstrates how to use templates on RecordGraph and the benefits of applying them in analysis of B-PRO, F-PRO, L-PRO, T-PRO, TESLA records

More information

FERC Reliability Technical Conference Panel I: 2015 State of Reliability Report Introduction Overview of the State Of Reliability

FERC Reliability Technical Conference Panel I: 2015 State of Reliability Report Introduction Overview of the State Of Reliability : 2015 State of Reliability Report Remarks of Thomas Burgess, Vice President and Director of Reliability Assessment and Performance Analysis Introduction Chairman Bay and Commissioners, members of the

More information

Implementation of Wide Area Monitoring System for interconnected power system in India

Implementation of Wide Area Monitoring System for interconnected power system in India REETA-2K16 ǁ PP. 400-405 Implementation of Wide Area Monitoring System for interconnected power system in India B.Lahari 1, K.Gireeshma 2, B.S.Lokasree 3 1 (Electrical Power Systems, Sree Vidyanikethan

More information

Regional Group Nordic GRID DISTURBANCE AND FAULT STATISTICS

Regional Group Nordic GRID DISTURBANCE AND FAULT STATISTICS Regional Group Nordic GRID DISTURBANCE AND FAULT STATISTICS Table contents Table contents Page 1 INTRODUCTION... 4 1.1 Contact persons... 5 1.2 Guidelines the statistics... 5 1.3 Voltage levels in the

More information

Transmission, Risk and EPA Air Regulations

Transmission, Risk and EPA Air Regulations Transmission, Risk and EPA Air Regulations Bob Bradish, AEP NCSL/NARUC Transmission Policy Institute May 28, 2015 AEP Overview Headquartered in Columbus, Ohio, AEP is one of the largest electric utilities

More information

Cisco Technical Services Advantage

Cisco Technical Services Advantage Cisco Technical Services Advantage Cisco Technical Services Advantage goes beyond just fix it to help you achieve specific operational outcomes, so you can keep business processes running, accommodate

More information

CAPABILITIES. Quanta Technology, LLC Smart Solutions. Real Results. About Quanta Technology

CAPABILITIES. Quanta Technology, LLC Smart Solutions. Real Results. About Quanta Technology QT-C-002 032016 CAPABILITIES Quanta Technology, LLC Smart Solutions. Real Results About Quanta Technology Quanta Technology is an expertise-based, independent technical consulting and advisory services

More information

ATC Zone 2 Projects Update U.P. Energy Summit

ATC Zone 2 Projects Update U.P. Energy Summit ATC Zone 2 Projects Update U.P. Energy Summit Brett French Regional Manager of External Relations Michigan October 16, 2012 Helping to keep the lights on, businesses running and communities strong Project

More information

Chapter X Security Performance Metrics

Chapter X Security Performance Metrics DRAFT February 19, 15 BES Security s Working Group Page 1 of 7 Chapter X Security Performance s 1 3 3 3 3 0 Background The State of Reliability 1 report noted that the NERC PAS was collaborating with the

More information

The Smart Grid Technology and IP global scenario

The Smart Grid Technology and IP global scenario ICM Industrial INNOVATION & TECHNOLOGY TRANSFER The Smart Grid Technology and IP global scenario The Smart Energy opportunity for the Italian industry Rome, October22 nd 2013 ICM International ICM ADVISORS

More information

Analysis of EMS Outages

Analysis of EMS Outages Analysis of EMS Outages Venkat Tirupati, LCRA, Supervisor EMS & Advanced Applications NERC 2 nd Annual Monitoring and Situational Awareness Conference September 22, 2 Agenda Introduction Common themes

More information

Copyright 2013 OSIsoft, LLC. 1

Copyright 2013 OSIsoft, LLC. 1 1 Industry Benefits and Trends of "PI" for Utilities Presented by Ann Moore, OSIsoft, LLC PI System for Transmission 3 California ISO On the front Lines of the Power Grid - New York Times, October 2011

More information

Transmission Interconnection Handbook, Appendix F. System protection, generation interconnection, substation test, and telecommunication personnel

Transmission Interconnection Handbook, Appendix F. System protection, generation interconnection, substation test, and telecommunication personnel Utility Bulletin: TD-1013B-002 Publication Date: 07/03/2012 Rev: 0 Direct Transfer Trip (DTT) Telecommunication Options Summary Interconnection partners (customers) are requesting additional options for

More information

BC HYDRO REAL TIME OPERATIONS SYSTEM OPERATING ORDER 7T - 50

BC HYDRO REAL TIME OPERATIONS SYSTEM OPERATING ORDER 7T - 50 BC HYDRO REAL TIME OPERATIONS SYSTEM OPERATING ORDER 7T - 50 VOLTAGE STABILITY OPERATING LIMITS AND PROCEDURES FOR USING THE REAL TIME VOLTAGE STABILITY APPLICATION (RTVSA) Supercedes 7T-50 dated 02 May

More information

The Future of Real-Time Energy Management Systems For Transmission System Operations

The Future of Real-Time Energy Management Systems For Transmission System Operations San Francisco Chapter The Institute of Electrical and Electronic Engineers Power Engineering Society The Future of Real-Time Energy Management Systems For Transmission System Operations John Sell, EleQuant,

More information

Wide-Area Reliability Monitoring and Visualization Tools

Wide-Area Reliability Monitoring and Visualization Tools OE Visualization and Controls Peer Review Wide-Area Reliability Monitoring and Visualization Tools Carlos Martinez CERTS - Electric Power Group 21 October 2008 Washington, D.C. Presentation Outline Research

More information

Advanced Fuse-Saving Techniques. T. ROUSAN Ameren Illinois USA. J. JERMAKOWICZ S&C Electric Company USA

Advanced Fuse-Saving Techniques. T. ROUSAN Ameren Illinois USA. J. JERMAKOWICZ S&C Electric Company USA 21, rue d Artois, F-75008 PARIS CIGRE US National Committee http : //www.cigre.org 2015 Grid of the Future Symposium Advanced Fuse-Saving Techniques T. ROUSAN Ameren Illinois USA J. JERMAKOWICZ S&C Electric

More information

Outage Management System Pilot Roll-out: Division User Manual

Outage Management System Pilot Roll-out: Division User Manual Outage Management System Pilot Roll-out: Division User Manual February 2017 Table of Contents 1. Outage Management System... 2 1.1. Overall Objective... 2 1.2. Outage Categories... 2 1.3. Division User

More information

State of Reliability Report 2013

State of Reliability Report 2013 State of Reliability Report 2013 Jessica Bian, Director of Performance Analysis Reliability Assessment and Performance Analysis (RAPA), NERC Risk Issues Steering Committee Meeting, July 11-12, 2013 State

More information

ELECTRICITY SUPPLY SYSTEMS OF THE FUTURE

ELECTRICITY SUPPLY SYSTEMS OF THE FUTURE ELECTRICITY SUPPLY SYSTEMS OF THE FUTURE Rob Stephen President Cigre AFSEC conference March 2017 CIGRE Founded in 1921, CIGRE, the Council on Large Electric Systems, Our Mission:To be the world s foremost

More information

DOE Initiatives in the U.S. Transmission Sector

DOE Initiatives in the U.S. Transmission Sector DOE Initiatives in the U.S. Transmission Sector David Meyer Senior Advisor Office of Electricity Delivery and Energy Reliability Northeast Power Coordinating Council 2009 Annual Meeting Three Topics Today

More information

Introduction to the NYISO

Introduction to the NYISO Introduction to the NYISO Power Control Center Guilderland, NY July 21, 2011 1 Today s Topics NYISO History NYISO Roles & Governance NYISO Markets Building Reliability Emerging Trends 2 Evolution of the

More information

Blueprint Data Center

Blueprint Data Center Systems and Applications for Data Center Siemens Industy 1. Overview / Purpose In EM EA the datacenter market is seen as one of the fastest growing of the energy businesses. This blueprint is designed

More information

TADS. August 1, Jeff Schaller, Hydro One, Vice-Chair of TADS Working Group

TADS. August 1, Jeff Schaller, Hydro One, Vice-Chair of TADS Working Group TADS Transmission Availability Data System August 1, 2012 Jeff Schaller, Hydro One, Vice-Chair of TADS Working Group TADS Purpose The purpose ofthe Transmission Availability Data System Working Group (TADSWG)

More information

Southern California Edison. Leading the Way in Electricity TM

Southern California Edison. Leading the Way in Electricity TM Southern California Edison Leading the Way in Electricity TM Smart Metering Essentials at SCE End-Use Energy Reductions through Monitoring, Feedback, and Behavior Modification Precourt Institute for Energy

More information

SmartSacramento Distribution Automation

SmartSacramento Distribution Automation SmartSacramento Distribution Automation Presented by Michael Greenhalgh, Project Manager Lora Anguay, Sr. Project Manager Agenda 1. About SMUD 2. Distribution Automation Project Overview 3. Data Requirements

More information

Bridging The Gap Between Industry And Academia

Bridging The Gap Between Industry And Academia Bridging The Gap Between Industry And Academia 14 th Annual Security & Compliance Summit Anaheim, CA Dilhan N Rodrigo Managing Director-Smart Grid Information Trust Institute/CREDC University of Illinois

More information

Peter Overgaauw Pascal Stijns 27 Oct 2016 EXPERION PKS CONTROLS ELECTRICAL SYSTEMS TOO!

Peter Overgaauw Pascal Stijns 27 Oct 2016 EXPERION PKS CONTROLS ELECTRICAL SYSTEMS TOO! Peter Overgaauw Pascal Stijns 27 Oct 2016 EXPERION PKS CONTROLS ELECTRICAL SYSTEMS TOO! Abstract Gain a basic understanding of an electrical control management system Exposure to a number of technology

More information

Demonstration and Proposal for Transmission Owner (TO) Utilization of Dispatch Interactive Mapping Application (DIMA) Tool

Demonstration and Proposal for Transmission Owner (TO) Utilization of Dispatch Interactive Mapping Application (DIMA) Tool Demonstration and Proposal for Transmission Owner (TO) Utilization of Dispatch Interactive Mapping Application (DIMA) Tool Ed Kovler Jacqulynn Hugee November 2017 What is DIMA? 2 Aware of your surroundings?

More information

2 nd Annual NERC Monitoring and Situational Awareness Conference: FPL s Operational Technology Center

2 nd Annual NERC Monitoring and Situational Awareness Conference: FPL s Operational Technology Center 2 nd Annual NERC Monitoring and Situational Awareness Conference: FPL s Operational Technology Center Ed Batalla Director of Grid Control Systems Florida Power & Light Company Sept. 24, 2014 Florida Power

More information

DRAFT Reliability Guideline: Modeling Distributed Energy Resources in Dynamic Load Models

DRAFT Reliability Guideline: Modeling Distributed Energy Resources in Dynamic Load Models DRAFT Reliability Guideline: Modeling Distributed Energy Resources in Dynamic Load Models Problem Statement With the proliferation of distributed energy resources (DER), Transmission Planners must adapt

More information

2012 Grid of the Future Symposium. Demonstration of Pulsecloser Applications and Benefits in Ameren s Distribution Automation Program

2012 Grid of the Future Symposium. Demonstration of Pulsecloser Applications and Benefits in Ameren s Distribution Automation Program 21, rue d Artois, F-75008 PARIS CIGRE US National Committee http : //www.cigre.org 2012 Grid of the Future Symposium Demonstration of Pulsecloser Applications and Benefits in Ameren s Distribution Automation

More information

T&D Challenges and Opportunities

T&D Challenges and Opportunities T&D Challenges and Opportunities Mark McGranaghan Vice President, Power Delivery and Utilization Alberta Power Industry Consortium November 5, 2014 Tomorrow s Power System (vision) The Integrated Grid

More information

Carolina s 21 st Century Electric Grid

Carolina s 21 st Century Electric Grid Carolina s 21 st Century Electric Grid Bobby Simpson Director, Grid Investment Plan Integration Duke Energy 7x24 Exchange Carolinas Chapter Technical Summit How will you use electricity today to support

More information

A Collation & Analysis Methodology for Substation Event Data via a Web Interface (supporting COMTRADE, GOOSE & MMS Data Sources from Multiple Vendors)

A Collation & Analysis Methodology for Substation Event Data via a Web Interface (supporting COMTRADE, GOOSE & MMS Data Sources from Multiple Vendors) 1 A Collation & Analysis Methodology for Substation Event Data via a Web Interface (supporting COMTRADE, GOOSE & MMS Data Sources from Multiple Vendors) Abstract Author: Bruce Mackay Email Address: bruce.mackay@concogrp.com

More information

Southern Company Smart Grid

Southern Company Smart Grid Southern Company Smart Grid Smart Grid Investment Grant Update July 25, 2011 Southern Company Southern Company is one of the nations largest generators of electricity Has 4.4 million retail customers across

More information