Outage Management System Pilot Roll-out: Division User Manual

Size: px
Start display at page:

Download "Outage Management System Pilot Roll-out: Division User Manual"

Transcription

1 Outage Management System Pilot Roll-out: Division User Manual February 2017

2 Table of Contents 1. Outage Management System Overall Objective Outage Categories Division User Responsibilities Arranged Shutdown Process Step-1: Creating New Outage Request Step-2: Receive information on approval of outage from SLDC/ALDC Step-3: Option to Review draft/submitted/approved applications Step-3: Creating request for shutdown code Step-4: Receiving codes & entering outage details Step-5: Creating request for Restoration code Step-6: Receiving code for restoration & entering restoration details Emergency Shutdown Process Step-1: Creating request for shutdown Step-2: Receiving codes & entering outage details Step-3: Creating request for Restoration code Step-4: Receiving code for restoration & entering restoration details Tripping Step-1: Creating request for Restoration code Step-2: Receiving code for restoration & entering restoration details Process for Work permit Step-1: Creating request for Work permit Step-2: Receiving information of approval of work permit and entering actual time Reports Report Types Report generation process Transmission Elements Add/Edit Transmission elements User Profile Profile updating Page 1

3 1. Outage Management System 1.1. Overall Objective UPSLDC has initiated implementation of a web-based application for managing outages (shutdowns) of transmission network elements for maintenance or other purposes. This system will facilitate UPSLDC in receiving shutdown requests from division offices, processing and approving such requests, generating code for shutdown, restoration and keeping track of elements which are out of service at any specific instance. The following Transmission Elements are to be covered in this system (1) Lines, (2) Transformers, (3) Circuit Breakers, (4) Reactors, (5) Bus, (6) Bus couplers & Transfer Bus Coupler Outage Categories The following are four types of outages/shutdowns incorporated in the system: Arranged shutdown, Tripping, Emergency shutdown and Work Permit Division User Responsibilities ASD ESD Tripping Work Permit Step 1 Step 1 Step 1 Step 1 Creating new outage request Creating request for shutdown code Creating request for restoration code Creating request for work permit Step 2 Receive information on approval of outage Step 2 Receiving code for outage & entering outage details Step 5 Step 2 Receiving code for restoration & entering restoration details Step 2 Receiving information on work permit Step 3 Step 3 Creating request for shutdown code Creating request for restoration code Step 6 Step 4 Receiving code for outage & entering outage details Step 4 Receiving code for restoration & entering restoration details Step 5 Creating request for restoration code Step 6 Receiving code for restoration & entering restoration details Page 2

4 2. Arranged Shutdown Process 2.1. Step-1: Creating New Outage Request 1. Upon login from Division User ID, user would be directed to outage module home page. Click on the Create New Request as shown below 2. Select Type of Equipment, Voltage Level for which request is to be created and proceed to next page. Select Substation from the Dropdown menu and fill up the Start Date & Time (request can be created only 5 days in advance) and End Date & Time for Outage. 3. Division user can take shutdown for multiple time lines as mentioned below Page 3

5 4. Select element(s) and proceed to next page. 5. Click on Enter Outage to fill-up details of request and submit the Application (User can review the application by clicking Review Application ). Page 4

6 6. Division user also is required to upload relevant documents like Discom approval by selecting Upload New Document 7. Select document to upload 2.2. Step-2: Receive information on approval of outage from SLDC/ALDC 1. Division Users would receive information on approval of outage requests through , SMS & Messages in the Outage Management System dashboard. Page 5

7 2.3. Step-3: Option to Review draft/submitted/approved applications 1. Division user needs to select Application from the menu and the select the appropriate option to review the draft/submitted/approved applications 2. Review Draft Applications by selecting process Page 6

8 3. Review submitted Applications & option to withdraw submitted application 4. Provide reasons for withdraw & submit 5. Review submitted applications & option to withdraw the same 6. Provide reasons for withdraw & submit 2.4. Step-3: Creating request for shutdown code 1. Division Users would be able to see requests once they are approved from SLDC/ALDC. Click on Request for Shutdown Code to request for code for Shutdown. Page 7

9 2. Enter the Anticipated Shutdown Time and submit Step-4: Receiving codes & entering outage details 1. Login from Division User ID, Click as shown below to view Code granted by SLDC and ALDC. Page 8

10 2. Enter the actual time of shutdown to complete this process Step-5: Creating request for Restoration code 1. Division users shall raise request for restoration before restoring the element taken for outage. Click on Request for Restoration Code to request for code for restoration. Page 9

11 2. Enter the Anticipated restoration Time and submit Step-6: Receiving code for restoration & entering restoration details 1. Login from Division User ID, Click as shown below to view Code granted by SLDC and ALDC. Page 10

12 2. Division user to enter the actual energization date & time Page 11

13 3. Emergency Shutdown Process 3.1. Step-1: Creating request for shutdown 1. Division Users need to click on Request for Shutdown Code to request for code for Shutdown under Emergency shutdown. 2. Select Type of Equipment, Voltage Level for which request is to be created and proceed to next page. Select Substation from the Dropdown menu and fill up the Emergency shut down Date & Time and Anticipated restoration Date & Time for Outage. 3. Select element(s) and proceed to next page. Page 12

14 4. Select reason for shutdown & submit application 3.2. Step-2: Receiving codes & entering outage details 1. Login from Division User ID, Click as shown below to view Code granted by SLDC and ALDC. 2. Enter actual outage details & submit Page 13

15 3.3. Step-3: Creating request for Restoration code 1. Division users shall raise request for restoration before restoring the element taken for outage. Click on Request for Restoration Code under Emergency shutdown to request for code for restoration. 2. Enter anticipated restoration date & time and submit form Page 14

16 3.4. Step-4: Receiving code for restoration & entering restoration details 1. Login from Division User ID, Click as shown below to view Code granted by SLDC and ALDC. 2. Enter actual restoration date & time Page 15

17 Page 16

18 4. Tripping 4.1. Step-1: Creating request for Restoration code 1. Division users shall raise request for restoration before restoring the element taken for outage. Click on Request for Restoration Code under tripping to request for code for restoration. 2. Select Type of Equipment, Voltage Level for which request is to be created and proceed to next page. Select Substation from the Dropdown menu and fill up the tripping Date & Time and Anticipated restoration Date & Time for tripping. 3. Select elements & click next Page 17

19 4. Enter reason for tripping & other checklist and submit 4.2. Step-2: Receiving code for restoration & entering restoration details 1. Login from Division User ID, Click as shown below to view Code granted by SLDC and ALDC. 2. Enter actual restoration date & time and submit Page 18

20 Page 19

21 5. Process for Work permit 5.1. Step-1: Creating request for Work permit 1. Division users shall raise request for work permit. Click on Create new request under Work permit. 2. Select Type of Equipment, Voltage Level for which request is to be created and proceed to next page. Select Substation from the Dropdown menu and fill up the tripping Date & Time and Anticipated restoration Date & Time for tripping. 3. Select element for which work permit is requested & click next Page 20

22 4. Enter details of work to be undertaken and select appropriate check boxes and submit 5.2. Step-2: Receiving information of approval of work permit and entering actual time 1. Login from Division User ID, Click as shown below to view Code granted by SLDC and ALDC. 2. Enter actual start date & time and actual end date & time and submit the form Page 21

23 6. Reports 6.1. Report Types Following types of reports are available for Division user: 1. Running Outages 2. Completed Outages 3. Approved codes Division user can access reports on the various outages by accessing the following option in the Division dashboard 6.2. Report generation process 1. Division user can access the respective report by selecting from the menu. For illustration, report for approved codes is done as follows: Page 22

24 2. Select from date & to date, substation, voltage & outage type to generate the customized report 3. Report will be displayed after clicking on show data Page 23

25 7. Transmission Elements 7.1. Add/Edit Transmission elements 1. Division user can add/edit transmission elements in their Division. Select transmission elements option in the menu 2. Select substation 3. For modifying information of any element shown, click on the Enter Remarks and please fill in the remarks. Save the remarks. E.g. a. Transformer has been upgraded to 63MVA (132KV/33KV) b. Any correction in Voltage Level, Line Name or details of breaker, coupler, reactor etc. appearing. c. Maintenance Division of Line to be modified or 2 nd maintenance division to be added 4. For adding any new element not appearing in the list, record the comments in the Remarks box at the end of the page. a. Change of name of sub-station or division to be changed Page 24

26 b. Add new transformer, line, bus, coupler, breaker or reactor (please record all the details for each element as shown in the tables) Page 25

27 8. User Profile 8.1. Profile updating 1. Division user can update the profile by selecting the User profile option in the menu 2. Fill the appropriate fields and save Page 26

WHAT IS A BUS? FUNDAMENTALS OF BUS PROTECTION. Kevin Wright Senior Protection Engineer Sacramento Municipal Utility District

WHAT IS A BUS? FUNDAMENTALS OF BUS PROTECTION. Kevin Wright Senior Protection Engineer Sacramento Municipal Utility District WHAT IS A BUS? FUNDAMENTALS OF BUS PROTECTION Kevin Wright Senior Protection Engineer Sacramento Municipal Utility District 5 WHAT IS A BUS? All connections are at the same voltage. WHAT IS A BUS? All

More information

WON Security Guideline

WON Security Guideline WON Security Guideline Data Exchange Work Group October 7, 2015 155 rth 400 West, Suite 200 Salt Lake City, Utah 84103-1114 WON Security Guideline 1 Table of Contents Purpose... 1 Background... 1 Security

More information

High-Reliability Fault-Clearing System solution. Application Guide. Outdoor Distribution (15.5 kv through 38 kv) S&C ELECTRIC COMPANY

High-Reliability Fault-Clearing System solution. Application Guide. Outdoor Distribution (15.5 kv through 38 kv) S&C ELECTRIC COMPANY S&C Remote Supervisory V ista Outdoor Distribution (15.5 kv through 38 kv) Electric utility customers are increasingly concerned about the frequency and duration of outages they are experiencing, and are

More information

Revised Generation Interconnection Impact Study Report. For. Queue Position 31 ( Interconnection Customer )

Revised Generation Interconnection Impact Study Report. For. Queue Position 31 ( Interconnection Customer ) Revised Generation Interconnection Impact Study Report For Queue Position 31 ( Interconnection Customer ) September 22, 2004 1 Generation Interconnection System Impact Study Report I. Revision of Original

More information

PR PUB NLH 063 NLH 2015 Prudence Review Page 1 of 1

PR PUB NLH 063 NLH 2015 Prudence Review Page 1 of 1 PR PUB NLH 063 NLH 2015 Prudence Review Page 1 of 1 1 2 Q. Further to PR PUB NLH 037, please provide justification for the $26,600 spent on overtime costs for overhauling Sunnyside breaker B1L03. 3 4 5

More information

Small Generator Interconnection Facilities Study Report. Completed for. ( Interconnection Customer ) Proposed Interconnection Pavant substation

Small Generator Interconnection Facilities Study Report. Completed for. ( Interconnection Customer ) Proposed Interconnection Pavant substation Small Generator Interconnection Facilities Study Report Completed for ( Interconnection Customer ) Proposed Interconnection Pavant substation Original report dated February 17, 2016 Revised March 11, 2016

More information

E-Invoices Contractor Guide DRAFT v0.1. Facilities Technology Services June 5, 20013

E-Invoices Contractor Guide DRAFT v0.1. Facilities Technology Services June 5, 20013 E-Invoices Contractor Guide DRAFT v0.1 Facilities Technology Services June 5, 20013 Overview The E-Invoices application has been designed to streamline and facilitate the processing of schedule of values

More information

Approval...6. Current Revision...7. Introduction... 8 About PJM Manuals... 8 About This Manual... 8 Using This Manual...9

Approval...6. Current Revision...7. Introduction... 8 About PJM Manuals... 8 About This Manual... 8 Using This Manual...9 PJM Manual 07: PJM Protection Standards Revision: 3 Effective Date: May 24, 2018 Prepared by System Planning Division Transmission Planning Department PJM 2018 Table of Contents Table of Contents Approval...6

More information

REC Transmission Projects Company Limited (A wholly owned subsidiary of REC, a Navratna CPSE Under the Ministry of Power, Govt of India)

REC Transmission Projects Company Limited (A wholly owned subsidiary of REC, a Navratna CPSE Under the Ministry of Power, Govt of India) User Manual for Web Portal Application REC Transmission Projects Company Limited (A wholly owned subsidiary of REC, a Navratna CPSE Under the Ministry of Power, Govt of India) Page 1 of 60 Introduction

More information

Transmission Register PTO Admin User Manual. Version 1.0

Transmission Register PTO Admin User Manual. Version 1.0 Transmission Register PTO Admin User Manual Version 1.0 Table of Contents 1. INTRODUCTION... 3 1.1. Purpose...3 1.2. Scope...3 1.3. Definitions...3 2. COMPONENTS HOMEPAGE... 6 2.1. Find Components...6

More information

Honeywell Source Inspection Request Instructions

Honeywell Source Inspection Request Instructions Honeywell Source Inspection Request Instructions [Suppliers] 1) Access the website by going to https://hia.honeywell.com Frequently Asked Questions Q: I do not have an account, how do I request for one?

More information

Network Configuration Document Selection for New Substations Framework

Network Configuration Document Selection for New Substations Framework Network Configuration Document Selection for New Substations Current version: 20/06/2018 EXTERNAL USE Page 1 of 14 Table of contents 1. Introduction... 3 1.1 Purpose... 3 1.2 Scope... 3 1.3 References...

More information

SERIES RATED COMBINATIONS

SERIES RATED COMBINATIONS October 15, 2012 ELECTRICAL SECTION SERIES RATED COMBINATIONS The following information has been compiled from various equipment manufacture literature and the 22nd Edition of the BCEC for educational

More information

Transmission Expansion Advisory Committee JCPL Supplemental Projects

Transmission Expansion Advisory Committee JCPL Supplemental Projects Transmission Expansion Advisory Committee JCPL Supplemental Projects April 11, 2019 Needs Stakeholders must submit any comments within 10 days of this meeting in order to provide time necessary to consider

More information

Order No Compliance Filing Related to Interconnection Issues Proposed Transmission Interconnection Process

Order No Compliance Filing Related to Interconnection Issues Proposed Transmission Interconnection Process Order No. 1000 Compliance Filing Related to Interconnection Issues Proposed Transmission Interconnection Process Thinh Nguyen Manager, Interconnection Projects New York Independent System Operator Joint

More information

NERC Transmission Availability Data System (TADS): Element Identifier Data Submission Addendum

NERC Transmission Availability Data System (TADS): Element Identifier Data Submission Addendum Transmission Availability Data System (TADS) Element Identifier Data Submission Addendum May 28, 2013 3353 Peachtree Road NE NERC Transmission Availability Data System (TADS): Element Identifier Data Submission

More information

ATC Zone 2 Projects Update U.P. Energy Summit

ATC Zone 2 Projects Update U.P. Energy Summit ATC Zone 2 Projects Update U.P. Energy Summit Brett French Regional Manager of External Relations Michigan October 16, 2012 Helping to keep the lights on, businesses running and communities strong Project

More information

Title Substations - Base Safety & Operating Standards. Reference Number POP 07 - (RIC Standard: EP SP)

Title Substations - Base Safety & Operating Standards. Reference Number POP 07 - (RIC Standard: EP SP) Discipline Engineering Standard - NSW Category Electrical Title Reference Number POP 07 - (RIC Standard: EP 99 00 00 04 SP) Document Control Status Date Prepared Reviewed Endorsed Approved Mar 05 Standards

More information

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY

Memorandum. This memorandum requires Board action. EXECUTIVE SUMMARY California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Keith Casey, Vice President, Market & Infrastructure Development Date: May 21, 2014 Re: Decision on interconnection

More information

National Load Despatch Centre Power System Operation Corporation

National Load Despatch Centre Power System Operation Corporation Module on Procedure for Data Collection National Load Despatch Centre Power System Operation Corporation Background Algorithms/ Processes AC Load flow and transmission losses Slack bus determination- Average

More information

Power System Control And Smart Grid

Power System Control And Smart Grid Power System Control And Smart Grid The Technology Journey so far... 2005-07 2007-09 2009-11 2011-12 OMS Implementation ISO 27001- Security certification Basic DMS Application,SPM JGC DMS System & Distribution

More information

Commissioner of Geology and Mining Quarry Permit

Commissioner of Geology and Mining Quarry Permit Commissioner of Geology and Mining Quarry Permit User Manual Version 1.0 Date: April 2018 2016 (n)code Solutions A Division of GNFC Ltd Table of Contents Application URL... 3 Online user registration...

More information

Western Spirit Clean Line Project. Non Tariff Interconnection Facilities Study

Western Spirit Clean Line Project. Non Tariff Interconnection Facilities Study Western Spirit Clean Line Project Non Tariff Interconnection Facilities Study September 2017 Work Performed by: Public Service Company of New Mexico Foreword This technical report is prepared for Clean

More information

USER MANUAL FOR SHORT-TERM OPEN-ACCESS APPLICATION

USER MANUAL FOR SHORT-TERM OPEN-ACCESS APPLICATION USER MANUAL FOR SHORT-TERM OPEN-ACCESS APPLICATION MANAGEMENT SOFTWARE Maharashtra State Load Dispatch Centre (Maharashtra State Electricity Transmission Co. Ltd.) Developed & Prepared by India s Largest

More information

The Narragansett Electric Company. d/b/a National Grid (Rhode Island Reliability Project) RIPUC Dkt. No Testimony of. Todd G. Kopoyan, P.E.

The Narragansett Electric Company. d/b/a National Grid (Rhode Island Reliability Project) RIPUC Dkt. No Testimony of. Todd G. Kopoyan, P.E. d/b/a National Grid (Rhode Island Reliability Project) RIPUC Dkt. No. 0 Testimony of Todd G. Kopoyan, P.E. February 0, 00 0 0 INTRODUCTION Q. Please state your name and business address. A. My name is

More information

Small Generator Interconnection Facilities Study Report. Completed for Q0314 ( Interconnection Customer ) A Qualified Facility

Small Generator Interconnection Facilities Study Report. Completed for Q0314 ( Interconnection Customer ) A Qualified Facility Small Generator Interconnection Completed for Q0314 ( Interconnection Customer ) A Qualified Facility Proposed Interconnection PacifiCorp s 34.5-kV West Cedar Substation December 29, 2010 TABLE OF CONTENTS

More information

Guidelines for Submitting NERC Reliability Standards Required Documents to the SPP Reliability Coordinator and the SPP Balancing Authority Version 1

Guidelines for Submitting NERC Reliability Standards Required Documents to the SPP Reliability Coordinator and the SPP Balancing Authority Version 1 Guidelines for Submitting NERC Reliability Standards Required Documents to the SPP Reliability Coordinator and the SPP Balancing Authority Version 1 Revision History Version Effective Date Summary of Revisions

More information

1. Coordination of series-rated devices is permitted where indicated on Drawings.

1. Coordination of series-rated devices is permitted where indicated on Drawings. SECTION 16055 - OVERCURRENT PROTECTIVE DEVICE COORDINATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and

More information

Microlok Data Design Records (Addressing, File Control, Checking, and FAT Testing)

Microlok Data Design Records (Addressing, File Control, Checking, and FAT Testing) Discipline: Engineering (Signalling) Category: Procedure Microlok Data Design Records (Addressing, File Control, Checking, and FAT Testing) ESD-05-11 Applicability ARTC Network Wide Primary Source Signal

More information

Register for the Partner Ready Portal

Register for the Partner Ready Portal Register for the Partner Ready Portal Registration process for new users of registered HPE Partners February 2019 HPE Partner Ready Portal New user registration This step-by-step guide helps new users

More information

About Georgia Transmission Corporation (GTC)

About Georgia Transmission Corporation (GTC) About Georgia Transmission Corporation (GTC) Transmission-only, not-for-profit cooperative Formed in March 1997 from the restructuring of Oglethorpe Power Corporation (OPC) GTC provides network transmission

More information

CDOT Public Way Opening Permit

CDOT Public Way Opening Permit City of Chicago CDOT Public Way Opening Permit Restoration 10/21/2015 CDOT Public Way Opening Permit - Restoration Page i Table of Contents 1. Application Type... 1 Signing In to the E-Permit Application...

More information

SHUTDOWN NOTICE MANAGEMENT SYSTEM (SNM) Training Manual (Author) Version 1.0

SHUTDOWN NOTICE MANAGEMENT SYSTEM (SNM) Training Manual (Author) Version 1.0 SHUTDOWN NOTICE MANAGEMENT SYSTEM (SNM) Training Manual (Author) Version 1.0 15 February 2017 1 GENERAL INFORMATION General Information section explains in general terms the system and the purpose for

More information

Impulse switching module

Impulse switching module 8 156 PTM14250A-P DESIGO I/O modules Impulse switching module PTM14250A-P for AC 24250 V, single-stage, with manual switches, double module Signal converter for connection to P-bus and for delivering impulse

More information

.2 Section General Commissioning (Cx) Requirements. .3 Section Common Work Requirements - Electrical

.2 Section General Commissioning (Cx) Requirements. .3 Section Common Work Requirements - Electrical Issued for Review Section 26 28 16.01 Air Circuit Breakers Page 1 of 7 PART 1 GENERAL 1.1 GENERAL.1 This specification serves to define requirements for a replacement of low voltage circuit breaker of

More information

Reliability Standard Audit Worksheet 1

Reliability Standard Audit Worksheet 1 Reliability Standard Audit Worksheet 1 CIP-002-5.1 Cyber Security BES Cyber System Categorization This section to be completed by the Compliance Enforcement Authority. Audit ID: Registered Entity: NCR

More information

Inventor Portal User Guide USA Office of Commercialization and Industry Collaboration (OCIC)

Inventor Portal User Guide USA Office of Commercialization and Industry Collaboration (OCIC) Inventor Portal User Guide USA Office of Commercialization and Industry Collaboration (OCIC) Purpose: This guide is to (i) guide you through the steps to setup an Inventor Portal Account, and (ii) submit

More information

TABLE OF CONTENTS CHAPTER 1. PROTOCOL APPLICATION PROCESS OVERVIEW

TABLE OF CONTENTS CHAPTER 1. PROTOCOL APPLICATION PROCESS OVERVIEW IBC Creating Protocol Applications TABLE OF CONTENTS CHAPTER 1. PROTOCOL APPLICATION PROCESS OVERVIEW... 1.1 CHAPTER 2. GENERAL INFORMATION... 2.1 2.1. STARTING AND LOGGING IN... 2.1 2.2. USING NAVIGATION

More information

Feasibility Study on Load Flow and Short Circuit Project

Feasibility Study on Load Flow and Short Circuit Project Feasibility Study on Load Flow and Short Circuit Project 101813-01 Prepared by: Transmission Planning Department Cleco Corporation, Inc. 2180 St. Landry Hwy P.O. Box 70 St. Landry, LA 71367 Final November

More information

To the ETS Offset Notice Response Authorization Online Training Course

To the ETS Offset Notice Response Authorization Online Training Course Welcome To the ETS Offset Notice Response Authorization Online Training Course This process describes how an applicant can request authorization from the designated representative to create and submit

More information

EGCP-2. Application Note (Revision NEW, 4/2003) Original Instructions

EGCP-2. Application Note (Revision NEW, 4/2003) Original Instructions Application Note 51211 (Revision NEW, 4/2003) Original Instructions EGCP-2 Software Upgrade Kit Instructions for field conversion of EGCP-2 controls: 8406-120 A or B to 8406-120 C 8406-121 A or B to 8406-121

More information

BESNet User Manual. Exception Request Preparation for Registered Entities. June 29, 2014 Version 1-2

BESNet User Manual. Exception Request Preparation for Registered Entities. June 29, 2014 Version 1-2 Table of Contents BESNet User Manual Exception Request Preparation for Registered Entities June 29, 2014 Version 1-2 3353 Peachtree Road NE Suite 600, North Tower Atlanta, GA 30326 404-446-2560 www.nerc.com

More information

INTERCONNECTION FACILITIES STUDY REPORT

INTERCONNECTION FACILITIES STUDY REPORT Interconnection Request No. TI-08-0312 INTERCONNECTION FACILITIES STUDY REPORT Prepared by Tri-State Generation and Transmission Association, Inc. 1 of 7 DISCLAIMER OF WARRANTIES AND LIMITATION OF LIABILITIES

More information

Income Tax Department

Income Tax Department Income Tax Department User Guide for Verification of Cash Transactions on AIMS Module (Verification Guide) Version 1.0 (February 21, 2017) Document Version Control Version Date Remarks 1.0 21 st February

More information

WECC Criterion MOD-(11 and 13)-WECC-CRT-1.1

WECC Criterion MOD-(11 and 13)-WECC-CRT-1.1 WECC Criterion MOD-(11 and 13)-WECC-CRT-1.1 A. Introduction 1. Title: Steady State and Dynamic Data Requirements 2. Number: MOD-(11 and 13)-WECC-CRT-1.1 3. Purpose: To establish the consistent data requirements

More information

PARIVESH. Pro Active Responsive facilitation by Interactive and Virtuous Environmental Singlewindow Hub

PARIVESH. Pro Active Responsive facilitation by Interactive and Virtuous Environmental Singlewindow Hub https://parivesh.nic.in/ PARIVESH Pro Active Responsive facilitation by Interactive and Virtuous Environmental Singlewindow Hub Single window integrated system for Environment, Forest, Wildlife and CRZ

More information

Sub Regional RTEP Committee Mid-Atlantic First Energy MAAC

Sub Regional RTEP Committee Mid-Atlantic First Energy MAAC Sub Regional RTEP Committee Mid-Atlantic First Energy MAAC September 21, 2018 Penelec Transmission Zone Need Number: PN-2018-001 Consider upgrading transmission line equipment (switches, conductor, splices,

More information

1510 MOTOR CONTROLLERS

1510 MOTOR CONTROLLERS SECTION 262913- MOTOR CONTROLLERS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of contract, including general and supplementary conditions and Division 1 specification section,

More information

PRC System Protection Coordination Supplementary Reference

PRC System Protection Coordination Supplementary Reference PRC-001-2 System Protection Coordination Supplementary Reference Contents: Disclaimer... 2 Generator Protection Devices or Elements that May Require Coordination with Transmission or Distribution Protective

More information

STCP 04-3 Issue 005 Real Time Data Provision

STCP 04-3 Issue 005 Real Time Data Provision STCP 04-3 Issue 005 Real Time Data Provision STC Procedure Document Authorisation Party Name of Party Representative Signature Date National Grid Electricity Transmission plc SP Transmission plc Scottish

More information

Exercise 2. Single Bus Scheme EXERCISE OBJECTIVE DISCUSSION OUTLINE. The single bus scheme DISCUSSION

Exercise 2. Single Bus Scheme EXERCISE OBJECTIVE DISCUSSION OUTLINE. The single bus scheme DISCUSSION Exercise 2 Single Bus Scheme EXERCISE OBJECTIVE When you have completed this exercise, you will be familiar with electric power substations using the single bus scheme with bus section circuit breakers.

More information

Unofficial Comment Form Project Disturbance Monitoring

Unofficial Comment Form Project Disturbance Monitoring Unofficial Comment Form Project 2007-11 Disturbance Monitoring Please DO NOT use this form for submitting comments. Please use the electronic form to submit comments on the Standard Authorization Request

More information

etrakit User Manual City of Oceanside A guide for using the online permitting system, etrakit

etrakit User Manual City of Oceanside A guide for using the online permitting system, etrakit City of Oceanside A guide for using the online permitting system, etrakit City of Oceanside, 300 N Coast Hwy, Oceanside CA 92054 Planning: 760 435 3520 Building: 760 435 3950 Engineering: 760 435 5097

More information

Development trends in Substation Design

Development trends in Substation Design Development trends in Substation Design on behalf of SC B3 Hans-Erik Olovsson Convenor Activity Area 1 (AA1) «Substation concepts and development» hans-erik.olovsson@se.abb.com 1 Agenda Evolution of primary

More information

Operations ISO Version: 1.6. Effective Date: 8/02/2018. Fieldwork Guide. Fieldwork Guide

Operations ISO Version: 1.6. Effective Date: 8/02/2018. Fieldwork Guide. Fieldwork Guide REVISION HISTORY VERSION NO. (Must match header) DATE REVISED BY DESCRIPTION 1.0 6/6/2016 EDAS Created Document 1.1 6/29/2016 EDAS Updates to include all Meter Work and instruction 1.2 8/29/2016 EDAS Included

More information

HOW TO SUBMIT A SPECIAL TOPIC PRESENTATION OR TEST-FOCUSED WORKSHOP FOR THE 2014 NAN ANNUAL CONFERENCE Submission Deadline: April 1, 2014

HOW TO SUBMIT A SPECIAL TOPIC PRESENTATION OR TEST-FOCUSED WORKSHOP FOR THE 2014 NAN ANNUAL CONFERENCE Submission Deadline: April 1, 2014 HOW TO SUBMIT A SPECIAL TOPIC PRESENTATION OR TEST-FOCUSED WORKSHOP FOR THE 2014 NAN ANNUAL CONFERENCE Submission Deadline: April 1, 2014 1. Go to www.conferenceabstracts.com/nan2014.htm to access the

More information

Quick Go Live Checklist Expense Delegate

Quick Go Live Checklist Expense Delegate Quick Go Live Checklist Expense Delegate Login From the access.caltech.edu page, select CardQuest under Links to other applications. Your login will be your access.caltech user name and password. Profile

More information

Office of Oil and Gas Management Oil and Gas Reporting Electronic Unconventional Well Monthly Production Reporting Guide

Office of Oil and Gas Management Oil and Gas Reporting Electronic Unconventional Well Monthly Production Reporting Guide Office of Oil and Gas Management Oil and Gas Reporting Electronic Unconventional Well Monthly May 16, 2018 Version 1.2 Table of Contents Purpose... 2 Applications Support Help Desk Team... 2 Introduction...

More information

GARAGE SALE PERMIT APPLICATION ON LINE

GARAGE SALE PERMIT APPLICATION ON LINE GARAGE SALE PERMIT APPLICATION ON LINE The Village of Pinecrest makes it easy for you to apply for certain types of permits online using etrakit.net. This also includes garage sale permits. To access etrakit.net,

More information

M2500 Engine Controller Configuration Manual

M2500 Engine Controller Configuration Manual M2500 Engine Controller Configuration Manual Revision: 08-04-2011 Page 1 Contents 1 Preface... 4 2 Configuration from front panel... 5 2.1 Engine Controller Configuration... 6 2.1.1 RPM settings... 6 2.1.2

More information

HOW TO SUBMIT AN ORAL PAPER PRESENTATION FOR THE NAN ANNUAL CONFERENCE

HOW TO SUBMIT AN ORAL PAPER PRESENTATION FOR THE NAN ANNUAL CONFERENCE HOW TO SUBMIT AN ORAL PAPER PRESENTATION FOR THE NAN ANNUAL CONFERENCE Submission Deadline: March 30, 2018 1. Click here to access the submission site. 2. NAN Members enter your email address and Member

More information

DIGITAL FLEET, LLC (630)

DIGITAL FLEET, LLC (630) Contents Introduction 2 DVIR tags functionality 2 DVIR records 3 Reviewing a DVIR record 4 Add Mechanic feature to a user 6 Setup DVIR defect alerts 7 Introduction To provide an electronic means to meet

More information

Reference Guide for Students

Reference Guide for Students Ministry of Training, Colleges and Universities PARIS Program Approval and Registration Information System Reference Guide for Students February 2019 Table of Contents Table of Contents Introduction...

More information

Update on the Gulf Cooperation Council (GCC) Electricity Grid System Interconnection

Update on the Gulf Cooperation Council (GCC) Electricity Grid System Interconnection GULF COOPERATION COUNCIL INTERCONNECTION AUTHORITY Update on the Gulf Cooperation Council (GCC) Electricity Grid System Interconnection by: Adnan Al-Mohaisen, GM, GCCIA S. Sud, V.P., SNC-Lavalin Power

More information

EDS LONDON 33KV DISTRIBUTION NETWORK DESIGN AND CUSTOMER SUPPLIES

EDS LONDON 33KV DISTRIBUTION NETWORK DESIGN AND CUSTOMER SUPPLIES Network(s): Summary: ENGINEERING DESIGN STANDARD EDS 08-0150 LONDON 33KV DISTRIBUTION NETWORK DESIGN AND CUSTOMER SUPPLIES LPN This standard provides guidelines for the development of the 33kV distribution

More information

Getting Started with Community Gateway

Getting Started with Community Gateway Getting Started with Community Gateway For Mount Sinai PPS Partners (Non-Mount Sinai Employed) Mount Sinai PPS Mount Sinai PPS Getting Started with Community Gateway for Mount Sinai PPS Partners (Non-Mount

More information

Source Release Functional Workflow Overview

Source Release Functional Workflow Overview Source Release Functional Workflow Overview In PPAP-MetricStream, a valid user in either the SM or SQIE role can independently initiate a Source Release using the Create New Source Release link found on

More information

STCP22-1 Issue 003 Production of Models for GB System Planning

STCP22-1 Issue 003 Production of Models for GB System Planning STCP22-1 Issue 003 Production of Models for GB System Planning STC Procedure Document Authorisation Company Name of Party Representative Signature Date National Grid Electricity Transmission plc SP Transmission

More information

SUPPLEMENTARY AGENDA POINTS FOR 496-OCC MEETING

SUPPLEMENTARY AGENDA POINTS FOR 496-OCC MEETING SUPPLEMENTARY AGENDA POINTS FOR 496-OCC MEETING SA-1. GUJARAT ADDITIONAL AGENDA ITEMS: Chief Engineer, SLDC Gujarat vide mail dated 09.06.17 requested to discuss the following additional points in the

More information

HOW TO SUBMIT A CE WORKSHOP OR TEST-FOCUSED WORKSHOP FOR THE NAN ANNUAL CONFERENCE

HOW TO SUBMIT A CE WORKSHOP OR TEST-FOCUSED WORKSHOP FOR THE NAN ANNUAL CONFERENCE HOW TO SUBMIT A CE WORKSHOP OR TEST-FOCUSED WORKSHOP FOR THE NAN ANNUAL CONFERENCE Submission Deadline: March 29, 2019 1. Click here to access the submission site. 2. NAN Account Holders: please click

More information

Utility Implements Communications- Assisted Special Protection and Control Schemes for Distribution Substations

Utility Implements Communications- Assisted Special Protection and Control Schemes for Distribution Substations Utility Implements Communications- Assisted Special Protection and Control Schemes for Distribution Substations Michael. Duff City of College Station Payal Gupta, Dharmendra Prajapati, and Alex Langseth

More information

i-pcgrid Workshop 2014 PG&E Order No. 754 Analysis: Protection

i-pcgrid Workshop 2014 PG&E Order No. 754 Analysis: Protection i-pcgrid Workshop 2014 PG&E Order No. 754 Analysis: Protection 1 Process PG&E Order No. 754 Analysis Receive Bus List from Planning that Meet the Criteria in Table A Protection Computes Actual Clearing

More information

Enhancing Reliability of Legacy Systems with New Generation Low-Voltage Circuit Breaker Upgrades

Enhancing Reliability of Legacy Systems with New Generation Low-Voltage Circuit Breaker Upgrades Enhancing Reliability of Legacy Systems with New Generation Low-Voltage Circuit Breaker Upgrades May 2012 / 1910DB1202 by Hal Theobald, Product Manager, Schneider Electric Services and Reza Tajali, P.E.,

More information

IntelliTeam II Automatic Restoration System

IntelliTeam II Automatic Restoration System No system is too complex to automate with... IntelliTeam II Automatic Restoration System Introduced in 1997, the IntelliTeam Automatic Restoration System was the first product of its kind. Using peer-to-peer

More information

Supervisors of Elections DOS Online Grants System User Manual

Supervisors of Elections DOS Online Grants System User Manual Supervisors of Elections DOS Online Grants System User Manual Last Updated 1/18 OVERVIEW DOS Grants is the online application and management system for grants offered by the Department of State s Divisions

More information

REAL-TIME MONITORING DATA SPECIFICATION

REAL-TIME MONITORING DATA SPECIFICATION REAL-TIME MONITORING DATA SPECIFICATION Version 1 December 9, 2016 Revision History Version Date Reviewer Revisions 1 11/1/16 Mansion Hudson Initial document 1 Contents 1. DOCUMENT REVIEW... 3 2. DEFINITIONS...

More information

SPP Notification to Construct

SPP Notification to Construct SPP Notification to Construct December 21, 2015 Mr. Clarence Suppes Mid-Kansas Electric Company P.O. Box 170 Great Bend, KS 67530 RE: Notification to Construct Approved Reliability Network Upgrades Dear

More information

BC Hydro Open Access Transmission Tariff Effective: January 26, 2018 OATT Attachment Q-1 First Revision of Page 1

BC Hydro Open Access Transmission Tariff Effective: January 26, 2018 OATT Attachment Q-1 First Revision of Page 1 OATT Attachment Q-1 First Revision of Page 1 ATTACHMENT Q-1 Dynamic Scheduling This attachment contains the eligibility requirements and the terms and conditions for the provision of dynamic scheduling

More information

Approving P Card Expense Report

Approving P Card Expense Report Approving P Card Expense Report These instructions will cover how to approve P Card Expense Report. Requirements: A P Card Goods/Services Expense Report will be required for any goods and/ or service purchases

More information

Filling out the Pre-Trip Form

Filling out the Pre-Trip Form Filling out the Pre-Trip Form 1. Log into the TWF with your NetID and password once you click the link located on the top right of the www.travel.uconn.edu home page. 2. Once you log in a new WebForm will

More information

Smart Distribution Technology

Smart Distribution Technology Smart Distribution Technology Presentation Agenda Alabama Power Company, A Southern Company Distribution Automation Supervisory Control And Data Acquisition (SCADA) Multiple Address System (MAS) communications

More information

GC0102 Mod Title: EU Connection Codes GB Implementation Mod 3

GC0102 Mod Title: EU Connection Codes GB Implementation Mod 3 Stage 01: Modification Proposal Grid Code GC0102 Mod Title: EU Connection Codes GB Implementation Mod 3 Purpose of Modification: This modification (3/4) will set out within the Grid Code the following

More information

UNSW Apply Online agent homepage

UNSW Apply Online agent homepage UNSW Apply Online agent homepage Counsellor manual Part A: Requesting access STEP 1 Go to applyonline.unsw.edu.au/ agent-login and click Register Now STEP 2 At the following screen, accept Terms & Conditions

More information

Online Permit Manager User Manual

Online Permit Manager User Manual City of Westminster Community Development Department Online Permit Manager User Manual A guide for using the online permitting system, etrakit City of Westminster Community Development Department 4800

More information

Disturbance Monitoring and

Disturbance Monitoring and PRC-002-2 R1 Notification Disturbance Monitoring and Reporting Requirements Compliance Spring Workshop May 10, 2017 Objectives This presentation will discuss: Requirement R1 Part 1.2 notifications Definition

More information

HOW TO SUBMIT A POSTER PRESENTATION FOR THE NAN ANNUAL CONFERENCE Submission Deadline: April 1, 2016

HOW TO SUBMIT A POSTER PRESENTATION FOR THE NAN ANNUAL CONFERENCE Submission Deadline: April 1, 2016 HOW TO SUBMIT A POSTER PRESENTATION FOR THE NAN ANNUAL CONFERENCE Submission Deadline: April 1, 2016 1. Click here to access the submission site. 2. NAN Members enter your email address and Member ID number

More information

HOW TO SUBMIT AN ORAL PAPER PRESENTATION FOR THE NAN ANNUAL CONFERENCE

HOW TO SUBMIT AN ORAL PAPER PRESENTATION FOR THE NAN ANNUAL CONFERENCE HOW TO SUBMIT AN ORAL PAPER PRESENTATION FOR THE NAN ANNUAL CONFERENCE Submission Deadline: March 30, 2018 1. Click here to access the submission site. 2. NAN Account Holders: please click on the Login.

More information

Design, Control and Application of Modular Multilevel Converters for HVDC Transmission Systems by Kamran Sharifabadi, Lennart Harnefors, Hans-Peter

Design, Control and Application of Modular Multilevel Converters for HVDC Transmission Systems by Kamran Sharifabadi, Lennart Harnefors, Hans-Peter 1 Design, Control and Application of Modular Multilevel Converters for HVDC Transmission Systems by Kamran Sharifabadi, Lennart Harnefors, Hans-Peter Nee, Staffan Norrga, Remus Teodorescu ISBN-10: 1118851560

More information

1. Project Description

1. Project Description Page No: 1 of 16 1. Project Description 1.1 Introduction This document outlines protection, monitoring and control requirements for the shared network assets associated with establishment of Tarrone Terminal

More information

NERC Event Analysis Update Webinar. Hassan Hamdar Chair, Event Analysis Subcommittee October 20, 2016

NERC Event Analysis Update Webinar. Hassan Hamdar Chair, Event Analysis Subcommittee October 20, 2016 NERC Event Analysis Update Webinar Hassan Hamdar Chair, Event Analysis Subcommittee October 20, 2016 Webinar Agenda ERO Event Analysis Process Update Lesson Learned Presentation from Entity ERO Lessons

More information

PEOPLEADMIN USER S GUIDE. Sam Houston State University

PEOPLEADMIN USER S GUIDE. Sam Houston State University PEOPLEADMIN USER S GUIDE Sam Houston State University Revised 05/2015 PeopleAdmin, Inc. 816 Congress Avenue Suite 1800 Austin, TX 78701 TABLE OF CONTENTS INTRODUCTION... 5 GETTING STARTED... 6 SYSTEM

More information

NPCC Regional Reliability Reference Directory # 4 Bulk Power System Protection Criteria

NPCC Regional Reliability Reference Directory # 4 Bulk Power System Protection Criteria NPCC Regional Reliability Reference Directory # 4 Task Force on System Protection Revision Review Record: December 1 st, 2009 September 30 th, 2015 Adopted by the Members of the Northeast Power Coordinating

More information

On the Insert tab, the galleries include items that are designed to coordinate with the overall look of

On the Insert tab, the galleries include items that are designed to coordinate with the overall look of INVESTOR REGISTRATION PROCESS HEADING 1 On the Insert tab, the galleries include items that are designed to coordinate with the overall look of your document. You can use these galleries to insert tables,

More information

IEC61850 Maintenance approach. 2017, September the 27 th

IEC61850 Maintenance approach. 2017, September the 27 th IEC61850 Maintenance approach 2017, September the 27 th Javier Figuera Pozuelo (Madrid, 1976) has been working in the Spanish TSO (Red Eléctrica de España) since 2.001. First, as a Protection and Control

More information

Blackstart Hardware-in-the-loop Relay Testing Platform

Blackstart Hardware-in-the-loop Relay Testing Platform 21, rue d Artois, F-75008 PARIS CIGRE US National Committee http : //www.cigre.org 2016 Grid of the Future Symposium Blackstart Hardware-in-the-loop Relay Testing Platform R. LIU R. SUN M. TANIA Washington

More information

Water Treatment Chemicals. Sourcing 3.0 Overview October 26, 2011

Water Treatment Chemicals. Sourcing 3.0 Overview October 26, 2011 Water Treatment Chemicals Sourcing 3.0 Overview October 26, 2011 Agenda Accessing Sourcing 3.0 Sourcing 3.0 Overview Accessing Events Responding to an Event Where can I learn more? 2 Accessing Sourcing

More information

How To Look up Travel Expenses in WISER

How To Look up Travel Expenses in WISER WISER Expense Reporting Phase 1 WISER is a new reporting tool that is designed to modify and modernize your current data warehousing, retrieval and reporting requirements. In the future, you will see WISDM

More information

This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective.

This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed

More information

Transmission Interconnection Handbook, Appendix F. System protection, generation interconnection, substation test, and telecommunication personnel

Transmission Interconnection Handbook, Appendix F. System protection, generation interconnection, substation test, and telecommunication personnel Utility Bulletin: TD-1013B-002 Publication Date: 07/03/2012 Rev: 0 Direct Transfer Trip (DTT) Telecommunication Options Summary Interconnection partners (customers) are requesting additional options for

More information

Users Guide for Gasoline Delivery Vessels Data Entry

Users Guide for Gasoline Delivery Vessels Data Entry Users Guide for Gasoline Delivery Vessels Data Entry The following paragraphs and images are intended to guide you through the process of creating a user account, and entering data into the Gasoline Delivery

More information