Vermont Outage Coordination and Planning

Size: px
Start display at page:

Download "Vermont Outage Coordination and Planning"

Transcription

1 Vermont Outage Coordination and Planning

2 Objectives Convey VELCO s role within NE and VT for outage coordination Review VELCO and VT utility outage coordination process Identify outage scheduling challenges, increased with longer outages being requested in VT and NE Review outage risk management and strategies Convey that the results of system studies often dictates additional measures to be taken prior to, or during a planned system outage 2 2

3 Outage Coordination Process ISO-NE procedures define outage planning, studies, scheduling, and work execution OP-2 (Maintenance of Communications, Computers, Metering and Computer Support Equipment) OP-3 (Transmission Outage Scheduling) OP-5 (Generator and Dispatchable Asset Related Demand Maintenance and Outage Scheduling for outages) MLCC #7 (Processing Transmission Outage Applications) All planned outage/work requests are submitted in advance Long-term transmission outage process, >21 days Short-term transmission outage process, <21 days Unplanned outages Forced, less than five working days Emergency, requires immediate operator intervention ISO-NE tracks a variety of outage metrics 3 3

4 4 4 ISO-NE Metric Example Goal 2 Long Term by TO

5 Outage Coordination Process VELCO procedures define outage planning, studies, scheduling, and work execution OP-2 (Critical Communications, Computers, and Metering Systems Support) OP-3 (Outage / Maintenance Scheduling) OP-55 (EMS Contingency Analysis (CA) VELCO Switching and Tagging Rules Two experienced Outage Coordinators VELCO tracks and coordinates outage activity for the transmission and subtransmission assets in VT Coordinate directly with VT utilities having 24/7/365 control centers and with utilities having direct electrical connectivity BED, GMP-C, GMP-R, Lyndonville Electric, Stowe Electric, Village of Swanton, and VEC Coordinate directly with select generators, e.g. assigned as DE 5 5

6 Outage Coordination Process VELCO Operations conducts the Friday Morning Meeting where all short-term and longer-term outages are reviewed At a minimum, a one-month outlook is reviewed to give all entities the ability to plan and coordinate work One last check-in for the short-term and upcoming (next week s) work All VT utilities with control centers are invited to the meeting, and include several other utilities such as Stowe Normal attendees are BED, GMP-C, GMP-R, and VEC VELCO asks that for those assigned to attend these meetings, make an effort to attend each meeting, and assign an alternate when not available 6 6

7 7 7 VELCO Outage Scheduling and Switching

8 VELCO Outage Coordination and Planning 8 8

9 VELCO Outage Coordination and Planning 9 9

10 Outage Scheduling Challenges & Considerations Seasonal weather conditions, e.g. frozen ground System loading conditions Economic impacts within VT and external Must run generation Generation impact, i.e. curtailments ROW access and landowner considerations, e.g. planting and harvesting Competing internal and external to VT outage activity ISO-NE outage approvals take time for study work and inter-area coordination Projects scheduled first, get priority 10 10

11 Outage Scheduling Challenges and Considerations VT is uniquely positioned between NE, NY and Quebec operating control areas Major Transmission Elements (MTE) Require a greater level of coordination and are expected to follow longer lead times in scheduling outages Can have a significant impact on the reliable and/or economic operation VT has 18 transmission circuits identified as MTE s Schedule outages 90 days in advance Significant amount of internal and external transmission improvements Experiencing long-term outages, weeks and even months Need for work synergies and dovetailing outages Need for different strategies to reduce risk 11 11

12 Outage Risk Management Studies identify outages and associated N-1 contingencies of higher risk for area reliability and loss of load VELCO collaboration to identify ways to reduce risks Perform work hot were feasible Stage work so that assets can be restored each evening Schedule during more favorable seasonal conditions Leverage more crews to reduce outage window Crew work strategies to minimize emergency recall times for circuits When higher risk outages cannot be avoided, additional measures are taken 12 12

13 Additional Measures Strategic dispatch of Vermont generation assets and reactive resources to support pre and post contingent system operations Helicopter patrols of VELCO transmission assets Foot patrols of VELCO transmission assets Request for status reports of neighboring LCC assets Staffing for VELCO substation assets Prepositioning of VELCO maintenance crews for rapid deployment Detailed weather forecast assessment from VELCO weather consultant Real-time weather threat assessments for recalling work 13 13

14 Additional Measures Development of a VELCO System Operator action list for response to contingency scenarios Updates throughout the day from field personnel on progress of work, minimum restoration time and expected completion time Pre-contingency sectionalizing and/or arming of under-voltage load shedding to allow for controlled tripping or sectionalizing of load during an event Pre-contingency curtailment of work activity on adjacent circuits 14 14

15 15 15 Additional Measures

16 16 16 Additional Measures

17 17 17 Additional Measures

18 Conclusion Every outage, no matter how small, requires managing risk Due to system design and topology, some outages have a higher degree of regret VELCO works closely with internal and external to VT entities to effectively coordinate all outage activity VELCO and other transmission operators are managing much longer outages that create significant challenges Strategies to minimize risk, such as running generation is not feasible for these longer-term outages When higher risk outages cannot be avoided, additional measures are taken 18 18

19 19 19 Questions?

Southwest Power Pool Independent Coordinator of Transmission RELIABILITY PLAN for Entergy in the Southeastern Electric Reliability Council September

Southwest Power Pool Independent Coordinator of Transmission RELIABILITY PLAN for Entergy in the Southeastern Electric Reliability Council September Southwest Power Pool Independent Coordinator of Transmission RELIABILITY PLAN for Entergy in the Southeastern Electric Reliability Council September 23, 2009 TABLE OF CONTENTS INTRODUCTION A. RESPONSIBILITIES

More information

EMS-LECTURE 2: WORKING OF EMS

EMS-LECTURE 2: WORKING OF EMS EMS-LECTURE 2: WORKING OF EMS Introduction: Energy Management systems consists of several applications programs which are used by the operator in a control centre for effective decision making in the operation

More information

Data and Forecasting Summary

Data and Forecasting Summary Data and Forecasting Summary This article highlights the need for more integrated and aligned data systems within WPD and improved interfaces within the industry. It also looks at the increased need for

More information

Geomagnetic Disturbances

Geomagnetic Disturbances Geomagnetic Disturbances Managing Risk to the North American Power Grid Mark Olson, Reliability Standards Developer Worcester Polytechnic Institute Energy Symposium September 25, 2013 About NERC The North

More information

Monitor Your Distribution Grid

Monitor Your Distribution Grid Connected Energy Grid Management Improve reliability measures (SAIDI, SAIFI, CAIDI) Focus reliability improvements where they are needed most Improve volt/var control Optimize voltage for CVR Reduce outage

More information

Lesson Learned Initiatives to Address and Reduce Misoperations

Lesson Learned Initiatives to Address and Reduce Misoperations Lesson Learned Initiatives to Address and Reduce Misoperations Primary Interest Groups Transmission Owners (TOs) Generator Owners (GOs) Problem Statement A registered entity experienced a high rate of

More information

ONCOR INFRASTRUCTURE DEVELOPMENT

ONCOR INFRASTRUCTURE DEVELOPMENT ONCOR INFRASTRUCTURE DEVELOPMENT Ellen Buck Presentation to Leadership North Texas March 27, 2015 ONCOR: 100 YEARS AND COUNTING Largest Texas regulated utility More than 3,000 employees 10 million living

More information

HIGH LEVEL REQUIREMENTS OF FAST SIMULATION AND MODELLING SUITE OF TOOLS FOR FUTURE SELF-HEALING DISTRIBUTION POWER SYSTEM

HIGH LEVEL REQUIREMENTS OF FAST SIMULATION AND MODELLING SUITE OF TOOLS FOR FUTURE SELF-HEALING DISTRIBUTION POWER SYSTEM HIGH LEVEL REQUIREMENTS OF FAST SIMULATION AND MODELLING SUITE OF TOOLS FOR FUTURE SELF-HEALING DISTRIBUTION POWER SYSTEM A. Valenti* I Bel ** S. Lee *EDF **EPRI E2I ConEdison France USA USA arnaud.valenti@edf.fr

More information

NERC Event Analysis Update Webinar. Hassan Hamdar Chair, Event Analysis Subcommittee October 20, 2016

NERC Event Analysis Update Webinar. Hassan Hamdar Chair, Event Analysis Subcommittee October 20, 2016 NERC Event Analysis Update Webinar Hassan Hamdar Chair, Event Analysis Subcommittee October 20, 2016 Webinar Agenda ERO Event Analysis Process Update Lesson Learned Presentation from Entity ERO Lessons

More information

Procedure For NPCC Bulk Electric System Asset Database

Procedure For NPCC Bulk Electric System Asset Database Procedure For NPCC Bulk Electric System Asset Database Compliance Procedure 09 (CP-09) Revision 2 Table of Contents 1. Introduction and Purpose... 3 2. Responsibilities... 3 3. Overview... 3 4. Asset Database...

More information

GIS BASED VEGETATION MANAGEMENT INVENTORY SYSTEM

GIS BASED VEGETATION MANAGEMENT INVENTORY SYSTEM GIS BASED VEGETATION MANAGEMENT INVENTORY SYSTEM VT TRANSCO, VELCO, VETCO VT TRANSCO LLC: Owns the Assets Transmission Lines: 650 Miles of 115 kv to 450 kv D.C. Stations: 44 Acres of Rights-of-Way: Approx.

More information

REAL-TIME MONITORING DATA SPECIFICATION

REAL-TIME MONITORING DATA SPECIFICATION REAL-TIME MONITORING DATA SPECIFICATION Version 1 December 9, 2016 Revision History Version Date Reviewer Revisions 1 11/1/16 Mansion Hudson Initial document 1 Contents 1. DOCUMENT REVIEW... 3 2. DEFINITIONS...

More information

IEEE Power and Energy Society Entity Annual Report

IEEE Power and Energy Society Entity Annual Report IEEE Power and Energy Society Entity Annual Report 2017 Entity: Power System Operation, Planning and Economics Committee (PSOPE) Chair: Hong Chen Vice-Chairs: Luiz Barroso and Fran Li Secretary: Jianhui

More information

ISO-NE Demand response season preparation webinar

ISO-NE Demand response season preparation webinar ISO-NE Demand response 2017 season preparation webinar agenda What you need to know Program information recap Market history and expectations Up-to-date information Curtailment plans Communications drill

More information

IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO

IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO PREPARED BY: System Management (WA) DOCUMENT REF: SO_OP_WA_3805 VERSION: 1.0 EFFECTIVE DATE: 13/10/2017 STATUS: FINAL Approved for distribution

More information

Critical Asset Identification Methodology. William E. McEvoy Northeast Utilities

Critical Asset Identification Methodology. William E. McEvoy Northeast Utilities Critical Asset Identification Methodology William E. McEvoy Northeast Utilities Disclaimer This NPCC TFIST workshop provides a forum for the presentation and discussion of member experience in the implementation

More information

A Strong Response Before, During and After. Hurricane Sandy. West Penn Power, Penelec and Met-Ed

A Strong Response Before, During and After. Hurricane Sandy. West Penn Power, Penelec and Met-Ed A Strong Response Before, During and After Hurricane Sandy West Penn Power, Penelec and Met-Ed January 10, 2013 FirstEnergy s Presence in Pennsylvania Erie Towanda New Castle Easton Greensburg Johnstown

More information

PPL Electric Utilities Summer Readiness Overview June 2017

PPL Electric Utilities Summer Readiness Overview June 2017 SUMMARY PPL Electric Utilities Summer Readiness Overview June 2017 For PPL Electric Utilities (PPL Electric), summer readiness means the company must respond effectively to summer storms as well as provide

More information

Emergency Operations Center Management Exercise Evaluation Guide

Emergency Operations Center Management Exercise Evaluation Guide Emergency Operations Center Management Exercise Evaluation Guide I respectfully submit the completed Exercise Evaluation Guide for the Canopy Oaks Tabletop Exercise conducted March 25 2010 for the Leon

More information

2010 HURRICANE SEASON PREPARATION BRIEFING

2010 HURRICANE SEASON PREPARATION BRIEFING 2010 HURRICANE SEASON PREPARATION BRIEFING PSC Workshop May 17, 2010 Barbara Quinones, Director City of Homestead, Homestead Energy Services Today s Presentation System Overview Hurricane Experience Storm

More information

EPRI Research Plan for Advanced Distribution Automation. Mark McGranaghan Vice President EPRI Solutions, Inc

EPRI Research Plan for Advanced Distribution Automation. Mark McGranaghan Vice President EPRI Solutions, Inc Photo EPRI Research Plan for Advanced Distribution Automation Mark McGranaghan Vice President EPRI Solutions, Inc Frank R. Goodman, Jr. Technical Lead: Distribution Automation Electric Power Research Institute

More information

Network Configuration Document Selection for New Substations Framework

Network Configuration Document Selection for New Substations Framework Network Configuration Document Selection for New Substations Current version: 20/06/2018 EXTERNAL USE Page 1 of 14 Table of contents 1. Introduction... 3 1.1 Purpose... 3 1.2 Scope... 3 1.3 References...

More information

Agenda Event Analysis Subcommittee Conference Call

Agenda Event Analysis Subcommittee Conference Call Agenda Event Analysis Subcommittee Conference Call August 14, 2013 11:00 a.m. 1:00 p.m. Eastern Ready Talk Conference Call and Web Meeting Information: Dial-In: 1-866-740-1260 Access Code: 6517175 Security

More information

Blackout 2003 Reliability Recommendations

Blackout 2003 Reliability Recommendations Blackout 2003 Reliability Recommendations 2005 NPCC General Meeting The Cranwell Resort Lenox, MA September 29, 2005 Philip A. Fedora Director, Market Reliability Interface Northeast Power Coordinating

More information

Implementation Plan for Newly Identified Critical Cyber Assets and Newly Registered Entities

Implementation Plan for Newly Identified Critical Cyber Assets and Newly Registered Entities Implementation Plan for Newly Identified Critical Cyber Assets and Newly Registered Entities This Implementation Plan applies to Cyber Security Standards CIP-002-2 through CIP-009-2 and CIP-002-3 through

More information

EIM Entity Readiness Criteria May 6, 2015

EIM Entity Readiness Criteria May 6, 2015 EIM Entity Readiness Criteria May 6, 2015 FERC Directive Regarding Readiness Criteria We therefore direct CAISO to submit a compliance filing within 60 days of issuance of this order, to revise the EIM

More information

Automation Services and Solutions

Automation Services and Solutions Automation Services and Solutions Automate substation data acquisition and control to improve performance Maintain uninterrupted power services with proactive grid monitoring and controlling features.

More information

Implementation Plan for Newly Identified Critical Cyber Assets and Newly Registered Entities

Implementation Plan for Newly Identified Critical Cyber Assets and Newly Registered Entities Implementation Plan for Newly Identified Critical Cyber Assets and Newly Registered Entities This Implementation Plan applies to Cyber Security Standards CIP-002-2 through CIP-009-2 and CIP-002-3 through

More information

Preparing for the Dynamic Grid of Future

Preparing for the Dynamic Grid of Future Preparing for the Dynamic Grid of Future Peter Hoffman, P.E. Duke Energy, Grid Solutions Engineering & Technology POWERING LIVES & COMMUNITIES Environmental Stewardship Reliable Service Affordable Rates

More information

EMS / DMS. DISTRIBUTION MANAGEMENT SYSTEM- Functional Description

EMS / DMS. DISTRIBUTION MANAGEMENT SYSTEM- Functional Description EMS / DMS DISTRIBUTION MANAGEMENT SYSTEM- Content 1. INTRODUCTION... 4 2. MODES OF INTERACTION WITH THE SCADA SYSTEM... 5 2.1 Simulation Mode... 5 2.2 State Estimation Mode (See functional description

More information

SurvalentONE Distribution Management System

SurvalentONE Distribution Management System SurvalentONE Distribution Management System Analyze & Optimize Critical Grid Functions for Advanced System Monitoring & Control SurvalentONE ADMS The SurvalentONE ADMS platform is a fully integrated SCADA,

More information

IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO

IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO IMS INTERFACE MARKET PROCEDURE NETWORK OPERATORS AND AEMO PREPARED BY: System Management (WA) DOCUMENT REF: SO_OP_WA_3805 VERSION: 1.0 EFFECTIVE DATE: 13/10/2017 STATUS: DRAFT FOR CONSULTATION Approved

More information

Introduction: Model Relationships Network Model Overview Example Commercial Model Overview Component Hierarchy & Definitions Example of Structure

Introduction: Model Relationships Network Model Overview Example Commercial Model Overview Component Hierarchy & Definitions Example of Structure 1 2 3 Introduction: Model Relationships Network Model Overview Example Commercial Model Overview Component Hierarchy & Definitions Example of Structure MISO Functions Served by the Network Model by the

More information

1. Project Description

1. Project Description Page No: 1 of 16 1. Project Description 1.1 Introduction This document outlines protection, monitoring and control requirements for the shared network assets associated with establishment of Tarrone Terminal

More information

MOD Transmission Reliability Margin Implementation Document

MOD Transmission Reliability Margin Implementation Document Transmission Margin Implementation Document Transmission Margin Implementation Document For NERC Page 1 of 7 Transmission Margin Implementation Document 1.0 Purpose The California Independent System Operator

More information

Written Testimony of Michael A. Stoessl Group President, Cooper Power Systems On behalf of the National Electric Manufacturers Association

Written Testimony of Michael A. Stoessl Group President, Cooper Power Systems On behalf of the National Electric Manufacturers Association Written Testimony of Michael A. Stoessl Group President, Cooper Power Systems On behalf of the National Electric Manufacturers Association July 23, 2009 Before the U.S. House of Representatives Committee

More information

Data Center Operations Guide

Data Center Operations Guide Data Center Operations Guide SM When you utilize Dude Solutions Software as a Service (SaaS) applications, your data is hosted in an independently audited data center certified to meet the highest standards

More information

Regulatory Impacts on Research Topics. Jennifer T. Sterling Director, Exelon NERC Compliance Program

Regulatory Impacts on Research Topics. Jennifer T. Sterling Director, Exelon NERC Compliance Program Regulatory Impacts on Research Topics Jennifer T. Sterling Director, Exelon NERC Compliance Program The 2003 Blackout On August 14, 2003, an electric power blackout affected large portions of the Northeast

More information

PHASE I ENERGY STORAGE: LESSONS LEARNED

PHASE I ENERGY STORAGE: LESSONS LEARNED PHASE I ENERGY STORAGE: LESSONS LEARNED ESAG Meeting, June 28, 2018 Innovation Research and Development Table of Contents 1. History and Background 2. Pre-Commissioning: Challenges experienced 3. Project

More information

Supplemental Information

Supplemental Information Retirement of NPCC Directory# 3 Supplemental Information On April 1, 2015, NPCC Directory# 3 was retired upon the effective date of PRC-005-2 Protection System Maintenance which is subject to a 12 year

More information

Standards Authorization Request Justification

Standards Authorization Request Justification Standards Authorization Request Justification Project 2009-02 Real-time Monitoring and Analysis Capabilities NERC Report Title Report Date 1 of 30 3353 Peachtree Road NE Suite 600, North Tower Atlanta,

More information

NERC Overview and Compliance Update

NERC Overview and Compliance Update NERC Overview and Compliance Update Eric Ruskamp Manager, Regulatory Compliance August 17, 2018 1 Agenda NERC Overview History Regulatory Hierarchy Reliability Standards Compliance Enforcement Compliance

More information

Grid Operations - Program 39

Grid Operations - Program 39 Grid Operations - Program 39 Program Description Program Overview In many ways, today's power system must be operated to meet objectives for which it was not explicitly designed. Today's transmission system

More information

Real-time Power System Operation. Energy Management Systems. Introduction

Real-time Power System Operation. Energy Management Systems. Introduction 1 Real-time Power System Operation Energy Management Systems Introduction The time frame for Power Systems Operation varies from a few seconds to a week. To assist with the operation of the system, modern

More information

ACTIVE NETWORK MANAGEMENT FACILITATING THE CONNECTION OF DISTRIBUTED GENERATION AND ENHANCING SECURITY OF SUPPLY IN DENSE URBAN DISTRIBUTION NETWORKS

ACTIVE NETWORK MANAGEMENT FACILITATING THE CONNECTION OF DISTRIBUTED GENERATION AND ENHANCING SECURITY OF SUPPLY IN DENSE URBAN DISTRIBUTION NETWORKS ACTIVE NETWORK MANAGEMENT FACILITATING THE CONNECTION OF DISTRIBUTED GENERATION AND ENHANCING SECURITY OF SUPPLY IN DENSE URBAN DISTRIBUTION NETWORKS David OLMOS MATA Ali R. AHMADI Graham AULT Smarter

More information

Sapphire Wind Farm 330/33kV Substation

Sapphire Wind Farm 330/33kV Substation Signature projects: Projects: Project Edison AusNet Sapphire Wind Farm 330/33kV Substation TransGrid Zinfra constructed 330/33kV substation and transmission line as part of the cut in works for the Sapphire

More information

Panel II: Are We Prepared?

Panel II: Are We Prepared? Panel II: Are We Prepared? Light Light & Power Power A Northeast Utilities Company Emergency Preparedness & Response March 13, 2013 Energy, Environment and Economic Development Conference Douglas S. McCracken

More information

Standards. Howard Gugel, Director of Standards Board of Trustees Meeting May 5, 2016

Standards. Howard Gugel, Director of Standards Board of Trustees Meeting May 5, 2016 Standards Howard Gugel, Director of Standards Board of Trustees Meeting May 5, 2016 Real-time Monitoring and Analysis Reliability Benefits Ensure entities have capabilities for maintaining high quality

More information

Appendix 3 Disaster Recovery Plan

Appendix 3 Disaster Recovery Plan Appendix 3 Disaster Recovery Plan DRAFT March 5, 2007 Revision XX Qwest Government Services, Inc. 4250 North Fairfax Drive Arlington, VA 22203 A3-i RFP: TQC-JTB-05-0002 March 5, 2007 REVISION HISTORY Revision

More information

POWER SYSTEM DATA COMMUNICATION STANDARD

POWER SYSTEM DATA COMMUNICATION STANDARD POWER SYSTEM DATA COMMUNICATION STANDARD PREPARED BY: AEMO Systems Capability VERSION: 2 EFFECTIVE DATE: 1 December 2017 STATUS: FINAL Australian Energy Market Operator Ltd ABN 94 072 010 327 www.aemo.com.au

More information

Reliability Standard Audit Worksheet 1

Reliability Standard Audit Worksheet 1 Reliability Standard Audit Wksheet 1 EOP-008-2 Loss of Control Center Functionality This section to be completed by the Compliance Enfcement Authity. Audit ID: Registered Entity: NCR Number: Compliance

More information

EMERGENCY/DISASTER RESPONSE TEAM

EMERGENCY/DISASTER RESPONSE TEAM EMERGENCY/DISASTER RESPONSE TEAM For More Information Contact Us Toll-Free at: 1(888) 610-7769 at: (305) 670-6544 Security Alliance LLC. 8323 NW 12th Street, Suite# 218 Miami, Florida 33126 info@securityalliancegroup.com

More information

easyeventideas.com GUIDE

easyeventideas.com GUIDE easyeventideas.com Event Planning GUIDE 3-4 Months Before SET GOALS SET BUDGET What do you hope to achieve with this event? ---------------------------------------------- [ ] [ ] [ ] [ ] Estimated Total

More information

British Columbia Utilities Commission Reliability Standards with Effective Dates adopted in British Columbia

British Columbia Utilities Commission Reliability Standards with Effective Dates adopted in British Columbia Page 1 of 15 British Columbia Utilities Reliability Standards with s adopted in British Columbia BAL-001-2 Standard Real Power Balancing Control Performance R-14-16 July 1, 2016 BAL-002-1 1 Disturbance

More information

Reliability Standard Audit Worksheet 1

Reliability Standard Audit Worksheet 1 Reliability Standard Audit Worksheet 1 FAC-003-4 Transmission Vegetation Management. Registered Entity Name: Applicable Function(s): Applicable only for TO and GO Compliance Monitoring Method: RSAW Version:

More information

primary Control Center, for the exchange of Real-time data with its Balancing

primary Control Center, for the exchange of Real-time data with its Balancing A. Introduction 1. Title: Reliability Coordination Monitoring and Analysis 2. Number: IRO-002-5 3. Purpose: To provide System Operators with the capabilities necessary to monitor and analyze data needed

More information

Emergency Support Function (ESF) #14a: UTILITIES: Central Electric & Steam. ESF Activation Contact: Cornell IPP Customer Service (607)

Emergency Support Function (ESF) #14a: UTILITIES: Central Electric & Steam. ESF Activation Contact: Cornell IPP Customer Service (607) Emergency Support Function (ESF) #14a: UTILITIES: Central Electric & Steam ESF Activation Contact: Cornell IPP Customer Service (607)255-5322 Primary Department I. Purpose: Cornell IPP: Utilities and Energy

More information

Starlight. Downstream intelligence sharing Integrated Cloud Based Solution. Customized Budget Friendly Solution

Starlight. Downstream intelligence sharing Integrated Cloud Based Solution. Customized Budget Friendly Solution Modules Situational Awareness Solutions Software SAMS Cloud Based Real-Time Situational Awareness For Effective Intelligence Sharing and Incident Tracking Components: is a cloud based affordable solution

More information

What You Should Know About Communication Systems: Business Strategies and Options

What You Should Know About Communication Systems: Business Strategies and Options Doug Voda, PPMV Global Segment Leader for Smart Grid February 2015 NRECA TechAdvantage What You Should Know About Communication Systems: Business Strategies and Options The visionary Smart Grid Five Pillars

More information

IntelliTeam II Automatic Restoration System

IntelliTeam II Automatic Restoration System No system is too complex to automate with... IntelliTeam II Automatic Restoration System Introduced in 1997, the IntelliTeam Automatic Restoration System was the first product of its kind. Using peer-to-peer

More information

RELIABILITY OF THE BULK POWER SYSTEM

RELIABILITY OF THE BULK POWER SYSTEM RELIABILITY OF THE BULK POWER SYSTEM Jim Burley, VP of Compliance, Mitigation and Standards October 26, 2011 Promoting RELIABILITY and Mitigating RISKS to the Bulk Power System Context In the Beginning-2003

More information

Reliability Standard Audit Worksheet 1

Reliability Standard Audit Worksheet 1 Reliability Standard Audit Worksheet 1 CIP-002-5.1 Cyber Security BES Cyber System Categorization This section to be completed by the Compliance Enforcement Authority. Audit ID: Registered Entity: NCR

More information

Outage Coordination External Workshop. Jason Ausmus Manager, Operations Planning

Outage Coordination External Workshop. Jason Ausmus Manager, Operations Planning Outage Coordination External Workshop Jason Ausmus Manager, Operations Planning Outage Coordination Course 8 total CEHs for this course To get the CEHs, you will need to: o Be present for the entire class

More information

A. Introduction. B. Requirements and Measures

A. Introduction. B. Requirements and Measures A. Introduction 1. Title: Communications 2. Number: COM-001-3 3. Purpose: To establish Communication capabilities necessary to maintain reliability. 4. Applicability: 4.1. Functional Entities: 4.1.1. Transmission

More information

Standards Authorization Request Form

Standards Authorization Request Form Standards Authorization Request Form When completed, email this form to: sarcomm@nerc.com NERC welcomes suggestions to improve the reliability of the bulk power system through improved reliability standards.

More information

Critical Cyber Asset Identification Security Management Controls

Critical Cyber Asset Identification Security Management Controls Implementation Plan Purpose On January 18, 2008, FERC (or Commission ) issued Order. 706 that approved Version 1 of the Critical Infrastructure Protection Reliability Standards, CIP-002-1 through CIP-009-1.

More information

Power System Control And Smart Grid

Power System Control And Smart Grid Power System Control And Smart Grid The Technology Journey so far... 2005-07 2007-09 2009-11 2011-12 OMS Implementation ISO 27001- Security certification Basic DMS Application,SPM JGC DMS System & Distribution

More information

ATC Zone 2 Projects Update U.P. Energy Summit

ATC Zone 2 Projects Update U.P. Energy Summit ATC Zone 2 Projects Update U.P. Energy Summit Brett French Regional Manager of External Relations Michigan October 16, 2012 Helping to keep the lights on, businesses running and communities strong Project

More information

CIGRE U.S. National Committee

CIGRE U.S. National Committee CIGRE U.S. National Committee 2014 Grid of the Future Symposium October 20, 2014 Houston, TX New Tools for Managing Smart Switching Devices Chris McCarthy, Jason Lombardo S&C Electric Company CWG/9416P

More information

Pepco. Reliability Enhancement Plan. For. Montgomery County, Maryland. Including. Distribution System Overview and Reliability Initiatives

Pepco. Reliability Enhancement Plan. For. Montgomery County, Maryland. Including. Distribution System Overview and Reliability Initiatives l pepco A PHI Company Pepco Reliability Enhancement Plan For Montgomery County, Maryland Including Distribution System Overview and Reliability Initiatives August 2010 TABLE OF CONTENTS 1. Executive Summary.

More information

NSF Workshop Real Time Data Analytics for the Resilient Electric Grid. Data Driven Measuring and Enabling Resiliency of the Community Grids

NSF Workshop Real Time Data Analytics for the Resilient Electric Grid. Data Driven Measuring and Enabling Resiliency of the Community Grids www.inl.gov NSF Workshop Real Time Data Analytics for the Resilient Electric Grid Data Driven Measuring and Enabling Resiliency of the Community Grids Rob Hovsapian, Ph.D. Manager, Power and Energy Systems

More information

Peak Reliability. Reliability Coordinator Data Request and Specifications for Data Provision

Peak Reliability. Reliability Coordinator Data Request and Specifications for Data Provision Table of Contents I. Purpose... 2 II. Introduction... 2 III. Peak Roles and Responsibilities... 2 IV. Applicability and Obligations... 3 V. Questions and Comments... 6 VI. Data Request Spreadsheet... 6

More information

Chapter X Security Performance Metrics

Chapter X Security Performance Metrics DRAFT February 19, 15 BES Security s Working Group Page 1 of 7 Chapter X Security Performance s 1 3 3 3 3 0 Background The State of Reliability 1 report noted that the NERC PAS was collaborating with the

More information

COM Communications and Coordination

COM Communications and Coordination COM-002-2 Communications and Coordination February 27, 2014 Lonnie Lindekugel ~ SPP Jim Nail ~ City of Independence INTRODUCTION NERC Reliability Standard COM-002-2 (Communications and Coordination) serves

More information

EPRI GIS Interest Group GIS Data Correction

EPRI GIS Interest Group GIS Data Correction EPRI GIS Interest Group GIS Data Correction The Southern Company Serve 4.4 Million Retail Customers Generating Capacity : 42,000 MW 120,000 Square Miles Alabama Power Company Serves 1,431,334 Customers

More information

PECO 2013 Summer Readiness Overview June 28, 2013

PECO 2013 Summer Readiness Overview June 28, 2013 PECO June 28, 2013 Summer is here and PECO is ready. PECO bases its readiness on its reliability enhancement programs, preventative maintenance programs, and capacity planning. In addition, PECO initiated

More information

CAISO Metering & Telemetry Requirements. Jeremy Laundergan - Director, EnerNex November 8, 2012

CAISO Metering & Telemetry Requirements. Jeremy Laundergan - Director, EnerNex November 8, 2012 CAISO Metering & Telemetry Requirements Jeremy Laundergan - Director, EnerNex November 8, 2012 Background and Overview Both federal and state regulatory authorities are advocating the participation of

More information

ERCOT Control Center Situation Awareness

ERCOT Control Center Situation Awareness ERCOT Control Center Situation Awareness Michael E. Legatt, Ph.D. Principal Human Factors Engineer Monday, September 23, 2013 Copyright / Trademark The materials included within the presentation are the

More information

Reliability Coordinator Procedure

Reliability Coordinator Procedure No. Table of Contents Purpose... 1 1. Responsibilities... 2 2. Scope/ Applicability... 2 2.1. Background... 2 2.2. Scope... 2 2.3. Applicability... 3 3. Detail... 3 3.1. Format and Security Protocols...

More information

Chapter 2 State Estimation and Visualization

Chapter 2 State Estimation and Visualization Chapter 2 State Estimation and Visualization One obvious application of GPS-synchronized measurements is the dynamic monitoring of the operating conditions of the system or the dynamic state estimation

More information

Texas Reliability Entity, Inc. Strategic Plan for 2017 TEXAS RE STRATEGIC PLAN FOR 2017 PAGE 1 OF 13

Texas Reliability Entity, Inc. Strategic Plan for 2017 TEXAS RE STRATEGIC PLAN FOR 2017 PAGE 1 OF 13 Texas Reliability Entity, Inc. Strategic Plan for 2017 TEXAS RE STRATEGIC PLAN FOR 2017 PAGE 1 OF 13 I. Vision A highly reliable and secure bulk power system in the Electric Reliability Council of Texas

More information

Standards Authorization Request Form

Standards Authorization Request Form Standards Authorization Request Form When completed, email this form to: sarcomm@nerc.com NERC welcomes suggestions to improve the reliability of the bulk power system through improved reliability standards.

More information

Generation, Transmission, and End User Facilities

Generation, Transmission, and End User Facilities Procedures for Interconnection of Generation, Transmission, and End User To the Grand River Dam Authority Transmission System Table of Contents GRDA/SPP Interaction... 3 Standards... 3 Generation... 3

More information

Volt/VAR Control Options and How to Leverage AMI Data

Volt/VAR Control Options and How to Leverage AMI Data By Tom Helmer, Executive Consultant and Joseph Sottnik, P.E., Project Manager, Black & Veatch Published in the August 2012 issue of PowerGrid International Energy efficiency and operational optimization

More information

Implementation Plan for Version 5 CIP Cyber Security Standards

Implementation Plan for Version 5 CIP Cyber Security Standards Implementation Plan for Version 5 CIP Cyber Security Standards April 10September 17, 2012 Note: On September 17, 2012, NERC was alerted that some references in the Initial Performance of Certain Periodic

More information

Management & Operations Excellence

Management & Operations Excellence Management & Operations Excellence Scott Roots Business Development Director EMEA Operational Excellence 2015 Uptime Institute, LLC The global Data Center Authority 1000+ Certifications in over 80 Countries

More information

Health Facilities and Utility Providers

Health Facilities and Utility Providers Health Facilities and Utility Providers Strengthening the Partnership Ann Steeves, CEO HC-EMI November 2017 National Healthcare Coalition Preparedness Conference 2017 HC-EMI. All rights reserved. 1 Learning

More information

SE Engineering, PC strives to be a leader in the power system engineering field by providing our customers with the highest level of quality,

SE Engineering, PC strives to be a leader in the power system engineering field by providing our customers with the highest level of quality, SE Engineering, PC strives to be a leader in the power system engineering field by providing our customers with the highest level of quality, integrity, and innovation. Our mission is to offer the safest,

More information

TOP/IRO Standards. RC Users Group January 21, Vic Howell Manager, Operations Engineering Support

TOP/IRO Standards. RC Users Group January 21, Vic Howell Manager, Operations Engineering Support TOP/IRO Standards RC Users Group January 21, 2016 Vic Howell Manager, Operations Engineering Support Saad Malik Manager, Real-Time Operations Engineering New/Revised TOP & IRO Standards November 19, 2015,

More information

Agenda Event Analysis Subcommittee Conference Call

Agenda Event Analysis Subcommittee Conference Call Agenda Event Analysis Subcommittee Conference Call October 23, 2013 11:00 a.m. 1:00 p.m. Eastern Ready Talk Conference Call and Web Meeting Information: Dial-In: 1-866-740-1260 Access Code: 6517175 Security

More information

Proposed Convention for Numbering of NERC Reliability Standards Draft September 9, 2004

Proposed Convention for Numbering of NERC Reliability Standards Draft September 9, 2004 Proposed Convention for ing of NERC Reliability s Draft September 9, 2004 Introduction The Version 0 Drafting Team proposes to initiate a new convention for numbering NERC reliability standards concurrent

More information

ipcgrid 2015 March 26, 2015 David Roop Director Electric Transmission Operations Dominion Virginia Power

ipcgrid 2015 March 26, 2015 David Roop Director Electric Transmission Operations Dominion Virginia Power Substation Security and Resiliency Update on Accomplishments thus far ipcgrid 2015 March 26, 2015 David Roop Director Electric Transmission Operations Dominion Virginia Power Dominion Profile Leading provider

More information

Outage Management System Pilot Roll-out: Division User Manual

Outage Management System Pilot Roll-out: Division User Manual Outage Management System Pilot Roll-out: Division User Manual February 2017 Table of Contents 1. Outage Management System... 2 1.1. Overall Objective... 2 1.2. Outage Categories... 2 1.3. Division User

More information

Feasibility Study on Load Flow and Short Circuit Project

Feasibility Study on Load Flow and Short Circuit Project Feasibility Study on Load Flow and Short Circuit Project 101813-01 Prepared by: Transmission Planning Department Cleco Corporation, Inc. 2180 St. Landry Hwy P.O. Box 70 St. Landry, LA 71367 Final November

More information

Standard INT Dynamic Transfers

Standard INT Dynamic Transfers A. Introduction 1. Title: Dynamic Transfers 2. Number: INT-004-3 3. Purpose: To ensure Dynamic Schedules and Pseudo-Ties are communicated and accounted for appropriately in congestion management procedures.

More information

New Brunswick 2018 Annual Implementation Plan Version 1

New Brunswick 2018 Annual Implementation Plan Version 1 New Brunswick Energy and Utilities Board Reliability Standards, Compliance and Enforcement Program New Brunswick 2018 Annual Implementation Plan Version 1 December 28, 2017 Table of Contents Version History...

More information

UNDERGROUND HV SUBSTATION DESIGN

UNDERGROUND HV SUBSTATION DESIGN 3 for 2 Bundle Offer. SGD 2440 each for Team of 3! Topics Covered Underground Substations Overview Planning New Underground Substations S/S Design Overview Expert Course Faculty Leader In his 30 years

More information

STRATHCONA AREA TRANSMISSION UPGRADE PROJECT

STRATHCONA AREA TRANSMISSION UPGRADE PROJECT STRATHCONA AREA TRANSMISSION UPGRADE PROJECT September 2017 ProjeCt InFormation You are receiving this information because you are a landowner, resident, business owner, or occupant of property near a

More information

TECHNICAL REQUIREMENTS FOR INTERCONNECTION TO THE BLACK HILLS POWER TRANSMISSION SYSTEM

TECHNICAL REQUIREMENTS FOR INTERCONNECTION TO THE BLACK HILLS POWER TRANSMISSION SYSTEM TECHNICAL REQUIREMENTS FOR INTERCONNECTION TO THE BLACK HILLS POWER TRANSMISSION SYSTEM Version 1.2 May 28, 2009 Transmission Planning Department Revisions Rev. No. Date Description By Approval 1.0 8/10/06

More information

CIP Cyber Security Recovery Plans for BES Cyber Systems

CIP Cyber Security Recovery Plans for BES Cyber Systems A. Introduction 1. Title: Cyber Security Recovery Plans for BES Cyber Systems 2. Number: CIP-009-6 3. Purpose: To recover reliability functions performed by BES Cyber Systems by specifying recovery plan

More information