Energy Isolation: Module II: EI for the Authorized Employee Answer Key NSTC-16
|
|
- Harold Ross
- 6 years ago
- Views:
Transcription
1 North Slope Training Cooperative Energy Isolation Module II Answer Key (revision 6/2014) Energy Isolation: Module II: EI for the Authorized Employee Answer Key NSTC-16 (Authorized employees are required to complete the Module I and Module II Quizzes.) Name: Date: Company: ID No. 1. Control locks are keyed-alike locks used to protect process or equipment. Control locks are generally the. a) first on, last off (2014 ASH, p. 108, #3). b) last on, first off. c) first on, first off. d) last on, last off. 2. If an energy isolation device is being used for more than one energy isolation, then. a) one control lock can be used for both isolations. b) separate locks and tags must be applied for each isolation (2014 ASH, p. 110, #6). c) only separate personal locks must be applied for each isolation. d) no additional locks are necessary beyond the locks for the first isolation. 3. If an energy isolation device CANNOT be locked, then. a) a flag is attached to identify where the lock would have been installed. b) the device cannot be serviced. c) a Danger-Energy Isolation Only Tag is attached where the lock would have been installed (2014 ASH, p. 109 B). d) isolation will be accomplished by shutting down the facility.
2 4. A Danger-Energy Isolation Only Tag must be attached to locks to identify hazards related to energy isolations. Tags shall be:. Circle the correct answer(s). a) standardized with the same style, label, print, and format (2014 ASH, p. 109 A & C). b) able to withstand fire and chemical decomposition. c) stamped with a unique number on both the tag and the tag stub. d) all of the above. 5. The Operator is responsible for making sure that the Workers and/or Designated Workers have. Circle the correct answer(s). a) been notified of their rights to verify the energy isolations. b) signed in (initialed) on the Worker Log or Master Card. c) installed their personal lock(s) on the Lockbox. d) all of the above (2014 ASH, p. 109, E). 6. The Designated Worker is responsible for all lockout points for the work group and shall. Circle the correct answer(s). a) sign for each Worker in his group on the Worker Log or Master Card. b) ensure that each Worker in the group is notified of his right to verify the energy isolation. c) initial the Worker Log next to each Worker s name in his group (2014 ASH, p. 119). d) initial the Designated Worker block on the Energy Isolation List. 7. The Device Lock is a uniquely keyed lock. Circle the correct answer(s). a) attached by each Worker to the Energy Isolation Device. b) attached by the Operator (Isolator) to the Energy Isolation Device (2014 ASH, p. 118). c) attached by the Designated Worker to the Lockbox. d) attached by the Operator (Isolator) to the Lockbox APICC/NSTC - All rights reserved page 2 of 6
3 8. Control Locks are keyed alike locks that are color coded as follows (2014 ASH, pp ): a) Instrumentation: Green b) Mechanical: Brown c) Operations: Orange d) Electrical: Yellow e) Projects/Contractors/Vendors: White 9. The Operations First-Line Supervisor is responsible for. Circle the correct answer(s). a) proper preparation of process equipment for maintenance. b) ensuring the EI safeout procedure is in place and properly implemented. c) conducting periodic inspections to ensure the EI standard, Alaska Safety Handbooks, and company procedures are being followed. d) all of the above (2014 ASH, p. 118). 10. The Lockbox contains. Circle the correct answer(s). a) keys from uniquely keyed Device Locks (2014 ASH, p. 111). b) Danger Tags. c) keys from the Control Locks. d) the Worker Log and Energy Isolation List. 11. It is the responsibility of the to verify that all energy has been brought to a Zero Energy State by attempting to re-energize equipment from every location. a) Operations First-Line Supervisor b) Operator (2014 ASH, p. 118, F) c) Worker d) Designated Worker 2008 APICC/NSTC - All rights reserved page 3 of 6
4 12. Before work begins, each authorized Worker is required to. Circle the correct answer(s). a) attach a Device Lock to each energy isolation device. b) attach his Personal Lock, if not working under the Designated Worker s lock. c) print his name on the Worker Log (2014 ASH, p. 119, B & C). d) verify the energy isolations per the Energy Isolation List or Master Card with the Operator. 13. If equipment being serviced is not safe to start and the Worker has to leave the job without being replaced, he. a) leaves his Personal Lock in place until he returns, but signs out on the Worker Log. b) removes his Personal Lock, attaches a Device Lock, and signs out on the Worker Log. c) removes his Personal Lock, signs out on the Worker Log, and leaves the Control Lock in place (2014 ASH, p. 121). d) removes his Personal Lock, attaches a EI Only Danger Tag, and takes the stub to the Operator. 14. When one crew leaves and another comes in, communication must take place as to the types and locations of energy isolation devices and the hazards involved if these devices are removed. The outgoing crew members who need to communicate this information to their incoming counterparts are. a) the Outgoing Operator. b) the Outgoing Designated Worker. (See 2010 ASH, page 115, #3, C.) c) the Outgoing Worker. (See 2010 ASH, page 115, #5, A.) d) all of the above 2014 ASH, p. 115, #1, 3, and 5). 15. When the work is complete, the person responsible for verifying that all Worker locking devices and/or tags have been removed and all personnel have signed out on the Worker Log or Master Card is the. a) the Operations First-line Supervisor. b) the Designated Worker. c) the Operator (2014 ASH, p. 122, #2). d) the Facility Manager APICC/NSTC - All rights reserved page 4 of 6
5 16. Electrical equipment rated above 480 volts shall be isolated by. a) the Worker/Designated Worker. b) a qualified and authorized person or qualified electrician (2014 ASH, p. 114, #1, A). c) the Operations First-line Supervisor. d) the Operator. 17. When the tagout option is used for electrical isolation such as a circuit breaker that CANNOT be locked out, the shall isolate the energy source by. a) Operator (IA); disconnecting the main feed to the load side of the circuit. b) Operations First-line Supervisor; removing the isolating circuit element. c) Designated Worker; racking out the breaker. d) Qualified Electrician; removal of an isolating circuit element or racking out a breaker (2014 ASH, p. 114, #2). 18. Personal locks are. a) red locks applied to protect personnel working on de-energized equipment (2014 ASH, p. 108). b) red locks applied to prevent facility equipment from starting up. c) red locks applied to protect equipment from damage from unintentional start-up. d) red locks applied by Fire and Safety to protect the equipment and the process. 19. Which of the following are the preferred methods for pressure isolation? a) Blinding b) Disconnect/misalign c) Double block and bleed d) Single block isolation 20. Which of the following pressure isolation methods cannot be used in a confined space? a) Blinding b) Disconnect/misalign c) Double block and bleed (2014 ASH, p. 131) d) Single block isolation 2008 APICC/NSTC - All rights reserved page 5 of 6
6 21. Which of the following pressure isolation methods must be approved by the First Line Supervisor? a) Blinding b) Disconnect/misalign c) Double block and bleed d) Single block isolation (2014 ASH, p. 132) 22. Needle valves should not be used for bleeding off fluids during pressure isolation. a) True b) False 2008 APICC/NSTC - All rights reserved page 6 of 6
ARKANSAS TECH UNIVERSITY ENERGY SOURCE DETERMINATION
ENERGY SOURCE DETERMINATION In order to determine all energy sources for each piece of equipment, all questions must be answered. If the question does not apply, write NA in the blank. Circle yes or no
More informationUT Martin Environmental Health & Safety Safety Procedure
LOCKOUT/TAGOUT PROCEDURE UT Martin Environmental Health & Safety Safety Procedure EFFECTIVE DATE: 04/00, REVISED: 09/14 1. GENERAL Serious injuries and deaths occur every year when workers are repairing
More informationElements of a Lockout/Tagout Program
Elements of a Lockout/Tagout Program BWC Division of Safety & Hygiene Lockout Devices u Standardize All Locks and Tags. u Identify The User. u Must Be Durable. u Used Only For Lockout/Tagout. Identify
More informationLockout/Tagout Training:
Lockout/Tagout 1 Lockout/Tagout Lockout/Tagout is a set of safety procedures designed to reduce the risk of injury due to accidental activation of machinery or energizing of electrical systems during servicing
More informationControl of Hazardous Energy (Lockout/Tagout)
Control of Hazardous Energy (Lockout/Tagout) 29 CFR 1910.147 Presented by: ETTA, OSH Division, 919-807-2875 Objectives In this course, we will cover the following: The need for energy control procedures
More informationThis is a lock box with many personal safety locks attached. This is used when there are multiple devices in the field which need to be locked out.
AMD Group Lockout (Use of Lock Box) & Equipment Lock Out Report This is a lock box with many personal safety locks attached. This is used when there are multiple devices in the field which need to be locked
More informationHoneywell Safety Products. Lockout / Tagout. I Keep equipment from being set in motion & endangering workers.
Honeywell Safety Products Lockout / Tagout I Keep equipment from being set in motion & endangering workers 480 Honeywell Safety Products Lockout / Tagout Most industrial accidents are caused by the unexpected
More informationDirections for Using the MEMIC Form Step-by-Step Machine-Specific Lockout Description
This form was developed to help employers document lockout procedures when required under the OS standard 1910.147(c)(4)(i). uthorized employees must refer to the company lockout procedure to identify
More informationUNIVERSITY OF NOTRE DAME. Lock, Tag, Try (LTT) Zero Energy Procedure
UNIVERSITY OF NOTRE DAME Lock, Tag, Try (LTT) Zero Energy Procedure Key Revisions Updated: 1/4/17 Subcommittee Members David Baiers John Brown Mark Egierski Charles Farrell Douglas Healy Paul Kempf Eric
More informationIndustries. Switchgear Interlock Applications. Process safety Control. Power Distribution Power Generation Power Transmission.
Switchgear Interlock Applications Data Sheet Industries Power Distribution Power Generation Power Transmission Type DM Access Interlock with Spring Bolt Type PPS Interlock Quick-Trip ARC Flash Reduction
More informationLOCK OUT/TAG OUT. Energy Isolation. LOTO Application and Uses WHAT S INSIDE STEPS TO SAFELY PERFORM MACHINE MAINTENANCE:
WHAT S INSIDE LOCK OUT/TAG OUT Energy Isolation Most industrial accidents are caused by the unexpected energization or start-up of machines or equipment or by the uncontrolled release of energy. Many of
More informationConext CL-60 Inverter Firmware Upgrade Process
Conext CL-60 Inverter Firmware Upgrade Process http://solar.schneider-electric.com 976-0380-01-01/B August 2017 Application Note EXCLUSION FOR DOCUMENTATION UNLESS SPECIFICALLY AGREED TO IN WRITING, SELLER
More informationControl of Hazardous Energy (CHE)
Document Number: RGP0005A Revision Date: 2015/09/01 Revision: 8 Control of Hazardous Energy (CHE) Procedure Facility: Regional Wood Buffalo Area: General FLOC: Table of Contents Purpose... 2 Scope... 2
More informationPROTECT YOUR EMPLOYEES
THE GLOBAL EXPERT IN LOCKOUT TAGOUT SOLUTIONS PROTECT YOUR EMPLOYEES SAFETY PADLOCKS KEY TRACEABILITY Free key charting service: Records the key numbers used by customers, ensures no unintended duplication
More informationSt. Joseph s General Hospital LOCKDOWN EMERGENCY RESPONSE PLAN
St. Joseph s General Hospital LOCKDOWN EMERGENCY RESPONSE PLAN ERP Lockdown may be initiated in response to incidents originating within the facility, or incidents occuring in the community that have the
More informationInstallation Instructions
50ES, 50EZ, 50GL, 50GS, 50GX, 50JS, 50JX, 50JZ, 50SD, 50SZ, 50VL, 50VT, 50XP, 50XZ 601A, 602A, 602B, 604A, 604B, 604D, 607C, 701A, 702A, 702B, 704A, 704B, 704D, 707C PA1P, PA2P, PA3P, PH1P, PH2P, PH3P
More information110.4 Use of Equipment.
110.4 Use of Equipment. (A) Test Instruments and Equipment. 1 Testing. Only qualified persons shall perform tasks such as testing, troubleshooting, and voltage measuring within the limited approach boundary
More informationGROUND FAULT CIRCUIT INTERUPTERS
Title: GFCI Effective Date: 11/14/2014 Control Number: THG_0031 Revision Number: 1 Date: 10/21/2015 Annual Review Completed: 5/13/2015 GROUND FAULT CIRCUIT INTERUPTERS CONTENTS I. PURPOSE II. GENERAL REQUIREMENTS
More informationINSTALLATION INSTRUCTIONS
TM REPLACEMENT PARTS FOR USE WITH CX SERIES PANELS INSTALLATION INSTRUCTIONS Hubbell Control Solutions 9601 Dessau Road Building One Suite 100 Austin, TX 78754 Toll Free: 888-698-3242 Fax: 512-450-1215
More informationPERSONAL ELECTRICAL LOCKOUT KIT PERSONAL BASIC LOCKOUT KIT PERSONAL VALVE & ELECTRICAL LOCKOUT KIT PERSONAL VALVE LOCKOUT KIT LOCKOUT TAGOUT
PERSONAL ASIC LOCKOUT KIT Contains the basic devices needed to lock out common breakers, valves and plugs. PERSONAL ELECTRICAL LOCKOUT KIT Provides lockouts for use on most circuit breakers, electrical
More informationHEALTH AND SAFETY PROGRAM 207 Permit Writer Certification Procedure
Page 1 of 11 1.0 PURPOSE Axiall, Plaquemine Complex, has developed this procedure to establish guidelines and protocols to certify Safe Work Permit Writers and Confined Space Entry Supervisors. 2.0 SCOPE
More informationScanner 2000 Steam Mass Flow Transmitter
3352051/2 IM-P335-24 MI Issue 2 Scanner 2000 Steam Mass Flow Transmitter Installation and Maintenance Instructions 1. Safety information 2. Mechanical installation 3. Configuring software 4. Wiring procedures
More information3BLK 3BLU 3GRN 3RED 3WHT 3YLLO. Long Shackle Steel Body Locks
Locks Safety Series Padlocks Steel Body Padlocks This number three reinforced laminated steel padlock with colored bumper is ideal when locks may be subjected to physical abuse. With a 1-9/16 wide lock
More informationSEM3 - Embedded Micro Metering Module
SEM - Embedded Micro Metering Module Quick Reference Guide and Installation Instructions Scan QR Code for more information usa.siemens.com/sem Installation! DANGER Hazardous Voltage. Will cause death or
More informationPanduit Basic Rack PDU
Panduit Basic Rack PDU User Manual Release 1.0 Issue 1.0 Copyright 2014 Panduit Corp. All rights reserved. No part of this book shall be reproduced, stored in a retrieval system, or transmitted by any
More informationCircuit Breakers,Reclosers, Switches, and Fuses
Section 17 Circuit Breakers,Reclosers, Switches, and Fuses 170. ARRANGEMENT This rule requires circuit breakers, reclosers, switches, and fuses be accessible only to qualified persons. Section 17 is part
More informationPROCEDURE - TUMUT ISOLATION & LOCKOUT VPP OP-049 INTENT. Why. How
VPP9-09-9.4-OP-049 INTENT This procedure defines the steps to be taken to isolate and lockout energy sources to manage the risks associated with working on mill plant and Why It is a regulatory and risk
More informationPart No. Z , IA Mar OPERATION MANUAL. High Voltage Digitalmeter A
Part No. Z1-109-820, IA001704 Mar. 2011 OPERATION MANUAL High Voltage Digitalmeter 149-10A Use of Operation Manual Please read through and understand this Operation Manual before operating the product.
More informationCELLULAR TELEPHONE USE POLICY
CLACKAMAS COUNTY EMPLOYMENT POLICY & PRACTICE (EPP) EPP # 50 Implemented: 01/01/03 Clerical Update: 09/05, 11/06, 12/07 CELLULAR TELEPHONE USE POLICY DEFINITION: References to cell phones include cell
More informationPart No. Z , IA Nov OPERATION MANUAL. High Voltage Digitalmeter A
Part No. Z1-109-920, IA001723 Nov. 2005 OPERATION MANUAL High Voltage Digitalmeter 149-30A Use of Operation Manual Please read through and understand this Operation Manual before operating the product.
More informationModel 8020-KHV. Kelvin Keithley Triaxial Connector Card. Description / October 2014 *P * 1
Keithley Instruments 28775 Aurora Road Cleveland, Ohio 44139 1-800-935-5595 http://www.keithley.com Model 8020-KHV Kelvin Keithley Triaxial Connector Card Description The Model 8020-KHV Keithley HV Connector
More informationPage 1 of 19 www.osha.gov A-Z Index: A B C D E F G H I J K L M N O P Q R S T U V W X Y Z Search OSHA Regulations (Standards - 29 CFR) The control of hazardous energy (lockout/tagout). - 1910.147 Regulations
More informationMANUFACTURING TECHNICAL INSTRUCTIONS - SAFETY. Subject: Control Reliability for Machinery & Equipment
DAIMLERCHRYSLER MANUFACTURING TECHNICAL INSTRUCTIONS - SAFETY Subject: Control Reliability for Machinery & Equipment ISSUE DATE: January 3, 2005 EFFECTIVE DATE: January 31, 2005 REVIEW DATE. June 26, 2007
More informationDNB Power and Control System Information and Interim Safety Procedures. Version draft 5/06/08
DNB Power and Control System Information and Interim Safety Procedures Version draft 5/06/08 DNB Power and Control System Information There are four sources of power for the DNB in the power supply and
More informationWBS HARDWIRED SERIES 4-60KVA MAINTENANCE BYPASS SWITCH
WBS HARDWIRED SERIES 4-60KVA MAINTENANCE BYPASS SWITCH Man 440 Issue 7 1 1. INTRODUCTION... 3 2. INSTALLATION... 3 2.1 Connection of the Mains Supply... 3 2.2 Connection of the Input to the UPS... 4 2.3
More informationQGV Units with G-120 Drives IMMEDIATE ACTION REQUIRED IMPORTANT PRODUCT SAFETY NOTICE
Service Alert Communications To: All Quincy Distributors From: Quincy Compressor Subject: Service Alert #389 Date: 02/01/2013 QGV Units with G-120 Drives IMMEDIATE ACTION REQUIRED IMPORTANT PRODUCT SAFETY
More informationModel 8020-STC. Kelvin Standard Triaxial Connector Card. Description / October 2014 *P * 1
Keithley Instruments 28775 Aurora Road Cleveland, Ohio 44139 1-800-935-5595 http://www.keithley.com Model 8020-STC Kelvin Standard Triaxial Connector Card Description The Model 8020-STC Kelvin Standard
More informationRemoval of Hardware ESD, Independent of Safety Logic Solver
Removal of Hardware ESD, Independent of Safety Logic Solver by Sam Roy Executive summary This is a discussion to remove independent hardware based Emergency Shutdown for Logic Solver as identified in ANSI/ISA-84.00.01-2004,
More informationInstallation, Testing, and Operating Procedures 30 AMP PORTABLE AND PERMANENT SERIES GFCI SINGLE and MULTIPHASE
IMPORTANT! Please read all the information on this sheet. SAVE THESE INSTRUCTIONS! NOTICE BEFORE USING READ INSTRUCTIONS COMPLETELY. TO BE INSTALLED BY A QUALIFIED ELECTRICIAN IN ACCORDANCE WITH NATIONAL
More informationTest Asset Optimization Services Power Line Utilization Module (PLUM) DATA SHEET
Test Asset Optimization Services Power Line Utilization Module (PLUM) DATA SHEET Description A Power Line Utilization Module (PLUM) is a device used to monitor the utilization and health parameters of
More informationCELLULAR TELEPHONE USE POLICY
CLACKAMAS COUNTY EMPLOYMENT POLICY & PRACTICE (EPP) EPP # 50 Implemented: 01/01/03 Clerical Update: 09/05, 11/06, 12/07, 09/17 CELLULAR TELEPHONE USE POLICY DEFINITION: References to cellular telephones,
More informationObtaining Documentation and Submitting a Service Request, page xvii Safety Warnings, page xvii Safety Guidelines, page xx
Preface Obtaining Documentation and Submitting a Service Request, page xvii Safety s, page xvii Safety Guidelines, page xx Obtaining Documentation and Submitting a Service Request For information on obtaining
More informationAppendix I: LOAD OPERATING AGREEMENT
PG&E Transmission Interconnection Handbook Appendix I: LOAD OPERATING AGREEMENT Purpose The following agreement establishes operating responsibilities and associated procedures for communications between
More informationHospitality Pre-Sales Questionnaire
End Customer Name: End Customer Industry: Motorola Dealer: Motorola SST: Teldio Rep: INITIAL NOTES 1 What mobile communication devices are used today? (If MOTOTRBO, please specify model) Are there any
More informationThis 4200-RM Rack Mount Kit is for installation in 4200-CAB series cabinets only.
Keithley Instruments, Inc. 28775 Aurora Road Cleveland, Ohio 44139 (440) 248-0400 Fax: (440) 248-6168 www.keithley.com Model 4200-RM Rack Mount Kit Packing List Introduction NOTE This 4200-RM Rack Mount
More informationPanduit Basic Rack PDU with Local Meter
Panduit Basic Rack PDU with Local Meter User Manual Release 1.0 Issue 1.0 Copyright 2014 Panduit Corp. All rights reserved. No part of this book shall be reproduced, stored in a retrieval system, or transmitted
More informationSafely Testing Circuit Breakers Using a Dual Ground Method. With the Vanguard CT-7000 S3 and CT-8000 S3
Safely Testing Circuit Breakers Using a Dual Ground Method With the Vanguard CT-7000 S3 and CT-8000 S3 Vanguard Instruments Company, Inc. 1520 S. Hellman Ave. Ontario, California 91761, USA TEL: (909)
More informationMobrey Hydratect 2462
Mobrey Hydratect 2462 Functional Safety Manual Functional Safety Manual Functional Safety Manual Table of Contents Contents 1Section 1: Introduction 1.1 Scope and purpose of the safety manual..................................
More informationPower Supply Installation
Power Supply Module Overview, on page Installation Guidelines, on page 4 Installing or Replacing an AC Power Supply, on page 6 Installing a DC Power Supply, on page 7 Finding the Power Supply Module Serial
More informationUnderstanding SCCR. THE BEST ELECTRICAL CONTROLS BUSINESS ON THE PLANET! Unmatched Service Superior Product Quality Advantage Pricing
Understanding SCCR What is SCCR? When it comes to industrial machinery, it s critical to ensure that electrical panels are designed and built with the proper SCCR to maintain the system, eliminate downtime
More informationZC Series Zone Monitoring Controllers
ZC Series Zone Monitoring Controllers Installation Instructions MANUAL Reset Controllers Model Description Part Number ZC-1 1 Zone Controller 0421 ZC-2 2 Zone Controller 0422 ZC-3 3 Zone Controller 0423
More informationMitigating Arc Flash Hazards
1910DB1402 / March, 2015 by Antony Parsons, Ph.D., P.E. and Reza Tajali, P.E. Schneider Electric Engineering Services Make the most of your energy SM Contents 1.0 Introduction... 3 2.0 What is Arc Flash
More informationMC-3 Master Control Unit
MC-3 Master Control Unit Customer Product Manual Issued 4/03 For parts and technical support, call the Industrial Coating Systems Customer Support Center at (800) 433-939 or contact your local Nordson
More informationA Complete Lockout Tagout Solution Valve Lockouts Electrical Lockouts Lockout Tags Padlocks Lockout Kits Graphical Lockout Procedure Software
Lockout Tagout Catalog A Complete Lockout Tagout Solution Valve Lockouts Electrical Lockouts Lockout Tags Padlocks Lockout Kits Graphical Lockout Procedure Software Gate Valve Lockout Gate Valve Lockouts
More informationB60 Domestic Voltage Optimisation Unit. Installation Manual
Installation Manual V2.2 June 2015 PRODUCT ADVISORY NOTICE This product must be installed by a competent person in accordance with the IEE Wiring Regulations, BS7671 (17th Edition or later) and current
More informationDocument C0. Use for:
Date: July 27, 2015 Document C0 Use for: Connection of Electric Generation that will operate with an Open Transition (Category 1) between the Ameren System and the Generator or operate with a Synchronized
More informationB60 PVM Domestic Voltage Optimisation Unit. Installation Manual
Installation Manual V2.2 November 2015 PRODUCT ADVISORY NOTICE This product must be installed by a competent person in accordance with the IEE Wiring Regulations, BS7671 (17th Edition or later) and current
More information1. Introduction. 2. Design. Safety and Emergency Stop Circuit Design Standard. Safety and Emergency Stop Circuit Design Standard.
Safety and Emergency Stop Circuit Design Standard The Safety and Emergency Stop Circuit Design Standard provide design criteria and specifications for safety and emergency stop circuits used in General
More informationATS-16 HV USER MANUAL. Automatic Transfer Switch 16A / 230Vac V090318
ATS-16 HV Automatic Transfer Switch 16A / 230Vac USER MANUAL V090318 SAFETY Intended use The ATS-16 HV device serves as a power source selector to provide improved power supply for connected loads. ATS-16
More informationStalking the Elusive and Somewhat Strange PV System
A series of articles on photovoltaic (PV) power systems and the National Electrical Code by John Wiles PERSPECTIVES ON PV Stalking the Elusive and Somewhat Strange PV System Photo 1. Framed PV modules
More information120VAC Interface Option Cards for V7/ V74X / GPD315 Drives
YASKAWA 120VAC Interface Option Cards for V7/ V74X / GPD315 Drives INSTRUCTIONS Upon receipt of the product and prior to initial operation, read these instructions thoroughly, and retain for future reference.
More informationAuxiliary Link Control Panel. Technical Manual
Auxiliary Link Control Panel Technical Manual 0997961_D 2017 Valmont Industries, Inc., Valley, NE 68064 USA. All rights reserved. www.valleyirrigation.com 2 Table of Contents AUXILIARY LINK CONTROL PANEL
More informationInjury & Illness. Yes No
Safety Shield Injury & Illness 66. Has the company trained employees about how to report an injury? If yes, please provide the policy AND the training sign-in sheet in the supporting documentation. 67.
More informationGreat Western Painting Assured Equipment Grounding Conductor Program OR Ground Fault Circuit Interrupter (GFCI)
Assured Equipment Grounding Conductor Program OR Ground Fault Circuit Interrupter (GFCI) GROUND FAULT CIRCUIT INTERRUPTERS Wiring design and protection. - 1926.404 Our company uses ground fault circuit
More informationETSI EN V1.2.1 ( )
EN 302 999 V1.2.1 (2013-03) European Standard Safety; Remote Power Feeding Installations; Safety requirements for the erection and operation of information technology installations with remote power feeding
More informationModel 2600B-PM V Protection Module with 1 A Clamp. Description / April 2015 *PPA * 1
Keithley Instruments 28775 Aurora Road Cleveland, Ohio 44139 1-800-935-5595 http://www.keithley.com Model 2600B-PM-1 200 V Protection Module with 1 A Clamp Description The Model 2600B-PM-1 200 V Protection
More informationFOR SERVICE TECHNICIAN S USE ONLY
Tech Sheet Do not discard DANGER WARNING Electrical Shock Hazard Only authorized technicians should perform diagnostic voltage measurements. After performing voltage measurements, disconnect power before
More informationStep 1 - ilockitout Setup
ilockitout Pro ilockitout is a cloud-based ipad program that will allow you to manage your entire Control of Hazardous Energy program in a unique way. By syncing your procedures in the cloud, your Energy
More informationFUNCTIONAL TEST PROCEDURE FOR THE GYROSCOPE SUSPENSION SYSTEM (GSS) AFT CONTROL UNIT (ACU) SUBSYSTEM. GP-B Procedure P0715 Rev September 22, 2000
P0715 Rev. September 22, 2000 W. W. Hansen Experimental Physics Laboratory STANFORD UNIVERSITY STANFORD, CALIFORNIA 94305-4085 Gravity Probe B Relativity Mission FUNCTIONAL TEST PROCEDURE FOR THE GYROSCOPE
More informationANNEALSYS RAPID THERMAL ANNEALER STANDARD OPERATING PROCEDURE
ANNEALSYS RAPID THERMAL ANNEALER STANDARD OPERATING PROCEDURE Purpose of this Instrument: Rapid thermal annealing, compound semiconductor annealing, and crystallization and densification. Location: Engineering
More informationPLEASE, DON T FORGET YOUR MANUAL!
Versa-Bale V4 By PSI Waste Equipment Services, Inc. Versa-Bale V4 SUPPORT www.versa-bale.net Phone: 352-742-4774 Fax: 407-992-9389 E-mail or Text: support@versa-pak.net Introduction The purpose of this
More informationInstallation and Operations Manual. Electronic copies available at (Rev_ )
Installation and Operations Manual Electronic copies available at www.aquariitech.com/downloads/axceleronmanual Axceleron Installation and Operations Manual AXCELERON FIXTURE INSTALLATION... 1 Introduction...
More informationAgilent 34401A 6½ 桁マルチメータ ユーザーガイド
Agilent 34401A 6½ 桁マルチメータ ユーザーガイド Safety Information General Do not use this product in any manner not specified by the manufacturer. The protective features of this product may be impaired if it is used
More informationCVU-200-KIT. 200 V Bias Tee Kit. Description. Parts list / October 2014 *P A* 1
Keithley Instruments 28775 Aurora Road Cleveland, Ohio 44139 1-800-935-5595 http://www.keithley.com CVU-200-KIT 200 V Bias Tee Kit Description The CVU-200-KIT Bias Tee Kit consists of three 2600-RBT-200
More informationLockout Tagout Solutions
Gate Valve Lockout Gate Valve Lockouts Made of rugged injection-molded polypropylene Service temperatures from 25 F to 200 F Unique knockout center accommodates OS&Y or rising stem valves Accepts locks
More informationModel 2460-KIT. Screw Terminal Connector Kit. Description / September 2014 *P * 1
Keithley Instruments 28775 Aurora Road Cleveland, Ohio 44139 1-800-935-5595 http://www.keithley.com Model 2460-KIT Screw Terminal Connector Kit Description The Model 2460-KIT Screw Terminal Connector Kit
More informationPosi-Lok Plugs and Panels
THE SAFEST ELECTRICAL SYSTEM FOR HIGH AMPERAGE CONNECTIONS, POSI-LOK IS PART OF THE CAM-LOK FAMILY OF CONNECTORS. THE GROUND ALWAYS MAKES FIRST AND BREAKS LAST ALL POSI-LOK SYSTEMS ARE UL LISTED AND CSA
More informationB60 Domestic Voltage Optimisation Unit. Installation Manual
Govna B60PVM Voltage Optimisation Unit Govna B60PVM Voltage Optimisation Unit B60 Domestic Voltage Optimisation Unit Web: www.renewableenergyhub.co.uk Email: info@renewableenergyhub.co.uk Phone: 0845 862
More informationLV MCC with Arc Flash Mitigation (AFM) Units
LV MCC with Arc Flash Mitigation (AFM) Units Technical Tuesday June 30, 2015 Imagination at work. Markets Oil and Gas Petro-Chemical Mining and metals Pulp and paper Mass-production manufacturing Water
More informationCVU-3K-KIT. 3 kv Bias Tee Kit. Description. Parts list / October 2014 *P * 1
Keithley Instruments 28775 Aurora Road Cleveland, Ohio 44139 1-800-935-5595 http://www.keithley.com CVU-3K-KIT 3 kv Bias Tee Kit Description The CVU-3K-KIT Bias Tee Kit consists of three bias tees for
More informationBrooks Models MT3809G Metal Tube Variable Area Flowmeters HART Handheld DD Installation & Operation Manual
Installation and Operation Manual Supplement Brooks Models MT3809G Metal Tube Variable Area Flowmeters HART Handheld DD Installation & Operation Manual Installation and Operation Manual Supplement Essential
More informationCompany started by Harry Soref in Milwaukee, Wisconsin in 1921
Safety Series & Security Solutions Lockout Tagout 1. Who is Master Lock? 2. What is Lockout? 1. Introduction 2. International Lockout Standards 3. Master Lock Solutions 4. Master Lock Service 5. Products
More informationAn Urgent Bulletin from CSA Group
An Urgent Bulletin from CSA Group Photovoltaic Equipment No. 5 Date: September 21, 2015 See Attachment 1 for Effective Dates. See Attachment 1 for Application Due Dates Announcing: Publication of List
More informationPart No. Z , IA Jul OPERATION MANUAL. High Voltage Digitalmeter A
Part No. Z1-109-820, IA001705 Jul. 2016 OPERATION MANUAL High Voltage Digitalmeter 149-10A Use of Operation Manual Please read through and understand this Operation Manual before operating the product.
More informationHow to Monitor a Site with SiteBook
Overview This user guide describes how to monitor the Work Health and Safety (WHS) status of subcontractors and workers on work sites using SiteBook. The following topics are covered: 1. Monitoring Subcontractor
More informationG5 PDU Installation Guide
G5 PDU Installation Guide 1 Contents Before You Begin... 3 Overview... 3 Important Safety Information... 3 Required Tools... 5 Section 1 Introduction... 6 Classification Overview... 6 Features... 7 Form
More informationMultiphase Flowmeter FlowSys TopFlow Multiphase Meter Operations Manual
Issue/Rev. 0.1 (5/05) Multiphase Flowmeter FlowSys TopFlow Multiphase Meter Operations Manual Bulletin MNMP003 Contents Section 1 Introduction... Page 3 Section 2 TopFlow MultiPhase Meter... Page 4 Sensor
More informationTEA, Inc. CORPORATE HEALTH AND SAFETY PROGRAM
CORPORATE HEALTH AND SAFETY PROGRAM Updated June 24, 2013 August 12, 2013 Prepared by 10636 Linkwood Court Baton Rouge, Louisiana 70810 Phone: (225) 767-3880 Fax: (225) 767-3883 TABLE OF CONTENTS Section
More informationB60 Domestic Voltage Optimisation Unit
B60 Domestic Voltage Optimisation Unit Installation Manual V1.2 Nov 2013 1 P a g e PRODUCT ADVISORY NOTICE This product must be installed by a competent person in accordance with the IEE Wiring Regulations,
More informationLockout/Tagout and Safety Products
Lockout/Tagout and Safety Products The IDEAL Advantage Training IDEAL has developed a variety of training programs and materials to help electricians use products correctly and efficiently. For more details
More informationModel 7705 Control Module
www.keithley.com Model 7705 Control Module User s Guide PA-696 Rev. D / October 2006 A G R E A T E R M E A S U R E O F C O N F I D E N C E Safety Precautions The following safety precautions should be
More informationBNI IOL A027 BNI IOL A027
BNI IOL-771-000-A027 BNI IOL-772-000-A027 IO-Link Version 1.1 Universel IO-Link Interface With undervoltage / broken coil detection User s Guide Inhalt 1 Notes to the user 2 1.1. About this guide 2 1.2.
More information(JSA) Job Safety Analysis Program. Safety Manual. 1.0 Purpose. 2.0 Scope. 3.0 Regulatory References. 4.0 Policy
Page 1 of 7 1.0 Purpose Job Safety Analysis is a primary element of the Hazard Identification and Mitigation Management Process. JSA s are completed daily to identify and evaluate hazards associated with
More informationPV Rapid Shutdown device
PV Rapid Shutdown device Installation and Operation Manual Solis-RSD-1G(1:1) Solis-RSD-1G(2:2) Manufacturer: Ginlong (Ningbo) Technologies Co.,Ltd., Ningbo, Zhejiang, P.R.China US Office: 565 Metro Pl.
More informationFT Flexitest Family. Switches, Covers and Test Plugs
FT Flexitest Family Switches, Covers and Test Plugs FT Flexitest Switches Description The flexibility provided by the FT case design evolved into a separate family of molded base test switches for testing
More informationInstallation, Operation, and Service Manual SIEMENS HEALTHCARE INTEGRATED ELECTRICAL CABINET
Technical Publications SIEMENS HEALTHCARE INTEGRATED ELECTRICAL CABINET for ARTIS Q / Q.ZEN / ONE ARTIS ZEEGO / ZEEGO.ZEN ARTIS ZEE MULTIPURPOSE SINGLE PLANE IECAX480V125A Main Disconnect Panel Bevco Engineering
More informationPM Series Power Meter
PM Series Power Meter Quick Setup Guide - PMC-1000, PMC- 1001, PMM-1000, PMB-1960 Safety Information DANGER! HAZARD OF ELECTRIC SHOCK, EXPLOSION, OR ARC FLASH Follow safe electrical work practices. See
More informationCOOPER POWER SERIES. RS-485 digital communications accessory board installation and operation instructions. Voltage Regulators MN225074EN
Voltage Regulators MN225074EN Effective March 2017 Supersedes January 2012 (S225-40-7) RS-485 digital communications accessory board installation and operation instructions COOPER POWER SERIES DISCLAIMER
More informationModel 2380 Rack-Mount Kit
Keithley Instruments 28775 Aurora Road Cleveland, Ohio 44139 1-800-935-5595 http://www.tek.com/keithley Model 2380 Rack-Mount Kit Installation Instructions Introduction The Model 2380 Fixed Rack-Mount
More informationQUICK SETUP GUIDE PMC-1000, PMC-1001, PMM-1000, PMB PM Series Power Meter. Safety Information. Equipment Maintenance and Service.
PM Series Power Meter QUICK SETUP GUIDE PMC-1000, PMC-1001, PMM-1000, PMB-1960 Safety Information DANGER! HAZARD OF ELECTRIC SHOCK, EXPLOSION, OR ARC FLASH Follow safe electrical work practices. See NFPA
More information