1 HAA Tools Roadmap October 26, 2016 PHAAUG Face to Face Meeting April Freeman Reliability Services Engineer

2 Situational Awareness View 2 The proposal for Situational Awareness View is for filtering and grouping contingencies o No notes or attachments are supported igrid displays have an underlying XML file that feeds the display o Exploring the option of updating the XML file based on the subscriptions that you maintain as part of RTCA Alarming o Your subscriptions would feed your own custom RTCA igrid display

3 Automating Studies Peak is planning to work with one of our customers to test the ability for you to automate topology changes due to outages in STNET studies Peak will provide you with the file format required to input data, you will be responsible for creating outage files in correct format. 3

4 Automation Considerations Updates to the file management tool Peak needs to figure out: o Shared Folder o Load data may need to include data for all entities so may not be available for automatic input in first trial 4

5 What else should we focus on? Voltage Stability Analysis SMTNET Dynamic Limit Assessments 5

6 Voltage Stability Analysis 6 Voltage Stability Analysis in STNET allows the user o To stress any case to see where the limit of the system is by applying a custom scenario to predefined interfaces Network copy of current case Study case with contingencies applied Planning case o Get a precise idea of how much load can be added to the system before there is an invalid solution

7 VSA Custom Scenarios 7 Define Source Area(s) o Define specific units to include/exclude Define Sink Area (s) o Define specific loads to include/exclude Define an Interface o Define all lines that you want to monitor between source/sink Define maximum increase & iteration step size (MW) for stressing system

8 VSA Considerations Peak to define custom scenarios for you Need to figure out o If interfaces can be created for HAA only There is the ability to create interfaces via the UI, but it will probably get deleted after each new case is loaded into a clone o If custom display(s) needs to be created Can HAA users see others scenarios 8

9 SMTNET Multiple Timepoint Network Study Performs look ahead study for each timepoint For each timepoint, it reads scheduled outages, generation profile, load forecast, and interchange schedule data. Max No. of timepoints: 12 (configurable) 9

10 Overview 1. Create multiple timepoints Analyst Trigger Study Summary 6. Store violation For every timepoint 2. Read databases smtnet netmom ctgs rasmom 5. Run Contingency Analysis STCA 3. Update schedules and flat file data 4. Run Power Flow NPF netmom ctgs rasmom 10

11 User Interface 11

12 Performing Multi Timepoint Study Start Task Retrieve latest NETMOM, CTGS, RASMOM databases Create Time Points 12

13 Performing Multi Timepoint Study Initialize Timepoints Read input data In-Service, Out of Service equipment data Area load forecast data Area net Interchange Schedules Generation profile 13

14 Performing Multi Timepoint Study Review Input Data igrid display Run Solution Sequence with just PWRFLOW 14

15 Performing Multi Timepoint Study 15

16 Performing Multi Timepoint Study Review basecase violations 16

17 Performing Multi Timepoint Study Run Solution Sequence with Contingency Analysis 17

18 Results Run Solution Sequence with Contingency Analysis 18

19 Results 19

20 Additional features Enable/Disable contingency groups Enable/Disable certain RAS schemes Each timepoint can be linked to a different savecase Various savecase creation options 20

21 SMTNET Considerations Peak is not currently performing multi timepoint studies o Process driven, not application driven Licensing with GE 21

22 Dynamic Limit Assessment IROLs/SOLs Total Transfer Capability 22

23 Thank you April Freeman (360)

TOP/IRO Standards. RC Users Group January 21, Vic Howell Manager, Operations Engineering Support

TOP/IRO Standards. RC Users Group January 21, Vic Howell Manager, Operations Engineering Support TOP/IRO Standards RC Users Group January 21, 2016 Vic Howell Manager, Operations Engineering Support Saad Malik Manager, Real-Time Operations Engineering New/Revised TOP & IRO Standards November 19, 2015,

More information

Standard INT Dynamic Transfers

Standard INT Dynamic Transfers A. Introduction 1. Title: Dynamic Transfers 2. Number: INT-004-3 3. Purpose: To ensure Dynamic Schedules and Pseudo-Ties are communicated and accounted for appropriately in congestion management procedures.

More information

Standard INT Dynamic Transfers

Standard INT Dynamic Transfers Standard INT-004-3.1 Dynamic Transfers A. Introduction 1. Title: Dynamic Transfers 2. Number: INT-004-3.1 3. Purpose: To ensure Dynamic Schedules and Pseudo-Ties are communicated and accounted for appropriately

More information

Peak V&R R-T Voltage Security Assessment (VSA) Tool Validation 9/9/2014, JSIS. Hongming Zhang EMS Applications Manager, PEAK RC

Peak V&R R-T Voltage Security Assessment (VSA) Tool Validation 9/9/2014, JSIS. Hongming Zhang EMS Applications Manager, PEAK RC Peak V&R R-T Voltage Security Assessment (VSA) Tool Validation 9/9/2014, JSIS Hongming Zhang EMS Applications Manager, PEAK RC Agenda Peak-ROSE project deliverables. ROSE VSA scenarios validation strategy.

More information

Peak Reliability Coordination Services in the West March 30, 2018

Peak Reliability Coordination Services in the West March 30, 2018 Peak Reliability Coordination Services in the West March 30, 2018 Peak Reliability, 2018. 1 Peak Reliability Coordination Services in the West Peak s fundamental mission is to enhance and promote the reliability

More information

Southwest Power Pool Independent Coordinator of Transmission RELIABILITY PLAN for Entergy in the Southeastern Electric Reliability Council September

Southwest Power Pool Independent Coordinator of Transmission RELIABILITY PLAN for Entergy in the Southeastern Electric Reliability Council September Southwest Power Pool Independent Coordinator of Transmission RELIABILITY PLAN for Entergy in the Southeastern Electric Reliability Council September 23, 2009 TABLE OF CONTENTS INTRODUCTION A. RESPONSIBILITIES

More information

Project Consideration of Commission Directives in Order No. 693

Project Consideration of Commission Directives in Order No. 693 Project 2009-02 Consideration of Commission Directives in Order Order P 905-906 Further, consistent with the NOPR, the Commission directs the ERO to modify IRO-002-1 to require a minimum set of tools that

More information

Introduction: Model Relationships Network Model Overview Example Commercial Model Overview Component Hierarchy & Definitions Example of Structure

Introduction: Model Relationships Network Model Overview Example Commercial Model Overview Component Hierarchy & Definitions Example of Structure 1 2 3 Introduction: Model Relationships Network Model Overview Example Commercial Model Overview Component Hierarchy & Definitions Example of Structure MISO Functions Served by the Network Model by the

More information

This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective.

This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Standard Development Timeline This section is maintained by the drafting team during the development of the standard and will be removed when the standard becomes effective. Development Steps Completed

More information

Path Operations post WECC TOP 007 Rob Witham, WAPA RMR TSS Supervisor

Path Operations post WECC TOP 007 Rob Witham, WAPA RMR TSS Supervisor Path Operations post WECC TOP 007 Rob Witham, WAPA RMR TSS Supervisor May 10, 2017 ISAS Salt Lake City, UT WECC Standard TOP 007 WECC 1a Title: System Operating Limits Purpose: To limit instances where

More information

System Operations Division. PR-OC-229 Update Registers, Notifications, CANs, Update Transpower Website

System Operations Division. PR-OC-229 Update Registers,  Notifications,  CANs, Update Transpower Website System Operations Division PR-OC-229 Update Registers, Email Notifications, Email CANs, Update Transpower Website This Procedure is part of the Outages and Constraints process within Transpower System

More information

Real-time Power System Operation. Energy Management Systems. Introduction

Real-time Power System Operation. Energy Management Systems. Introduction 1 Real-time Power System Operation Energy Management Systems Introduction The time frame for Power Systems Operation varies from a few seconds to a week. To assist with the operation of the system, modern

More information

Peak Reliability. Reliability Coordinator Data Request and Specifications for Data Provision

Peak Reliability. Reliability Coordinator Data Request and Specifications for Data Provision Table of Contents I. Purpose... 2 II. Introduction... 2 III. Peak Roles and Responsibilities... 2 IV. Applicability and Obligations... 3 V. Questions and Comments... 6 VI. Data Request Spreadsheet... 6

More information

Specifics of Implementation

Specifics of Implementation Specifics of Implementation Defining Criteria Filtering ModelCondition ModelFilter Conditional Contingency Actions CriteriaStatus = POSTCHECK ModelExpression (lookup tables) RemedialAction Complexity of

More information

FNM Expansion Training Webinar

FNM Expansion Training Webinar FNM Expansion Training Webinar Cynthia Hinman Lead Client Trainer August 11, 2014 The information contained in these materials is provided for general information only and does not constitute legal or

More information

2016 Fall ITO Stakeholder Meeting. Topics in Operations

2016 Fall ITO Stakeholder Meeting. Topics in Operations 2016 Fall ITO Stakeholder Meeting Topics in Operations 11/17/2016 TOP-003-3 Requirement R1. Each Transmission Operator shall maintain a documented specification for the data necessary for it to perform

More information

System Operations Division. PR-OC-213_Conduct Peer Review of a Manual Security Constraint

System Operations Division. PR-OC-213_Conduct Peer Review of a Manual Security Constraint System Operations Division PR-OC-213_Conduct Peer Review of a Manual Security Constraint This Doc Template is part of the Document Management process within Transpower System Operations and can be found

More information

Modeling of RAS and Relays in Power Flow Contingency Analysis. Jamie Weber

Modeling of RAS and Relays in Power Flow Contingency Analysis. Jamie Weber Modeling of RAS and Relays in Power Flow Contingency Analysis Jamie Weber weber@powerworld.com 217 384 6330 ext. 13 2001 South First Street Champaign, Illinois 61820 +1 (217) 384.6330 support@powerworld.com

More information

Procedures for cross-border transmission capacity assessments PROCEDURES FOR CROSS-BORDER TRANSMISSION CAPACITY ASSESSMENTS.

Procedures for cross-border transmission capacity assessments PROCEDURES FOR CROSS-BORDER TRANSMISSION CAPACITY ASSESSMENTS. PROCEDURES FOR CROSS-BORDER TRANSMISSION CAPACITY ASSESSMENTS October 2001 1/13 Table of contents 1 INTRODUCTION... 4 2 GENERAL GUIDELINES... 5 3 BASE CASE CONSTRUCTION... 6 3.1 NETWORK MODEL... 6 3.1

More information

Solutions for transmission network management

Solutions for transmission network management EM SG SOLutions Solutions for transmission network management Energy Management Smart Grid Solutions Solutions for Transmission Network Management Overview Operator Training Simulator Blackout Prevention

More information

DRAFT Risks and Mitigations for Losing EMS Functions

DRAFT Risks and Mitigations for Losing EMS Functions DRAFT Risks and Mitigations for Losing EMS Functions 1.0 Executive Summary Energy Management System (EMS) is a system of computer-aided tools used by System Operators to monitor, control, and optimize

More information

Reliability Coordinator Procedure

Reliability Coordinator Procedure No. Table of Contents Purpose... 1 1. Responsibilities... 2 2. Scope/ Applicability... 2 2.1. Background... 2 2.2. Scope... 2 2.3. Applicability... 3 3. Detail... 3 3.1. Format and Security Protocols...

More information

EMS-LECTURE 2: WORKING OF EMS

EMS-LECTURE 2: WORKING OF EMS EMS-LECTURE 2: WORKING OF EMS Introduction: Energy Management systems consists of several applications programs which are used by the operator in a control centre for effective decision making in the operation

More information

MISO Online Dynamic Security Assessment(DSA) Raja Thappetaobula Senior Advisor MISO

MISO Online Dynamic Security Assessment(DSA) Raja Thappetaobula Senior Advisor MISO 1 MISO Online Dynamic Security Assessment(DSA) Raja Thappetaobula Senior Advisor MISO 2 MISO Overview MISO is an independent, non-profit, memberbased organization committed to reliability. We serve as

More information

Midwest ISO. Module B- Network Integration Transmission Service Overview. Vikram Godbole Lead, Transmission Service Planning October 20, 2010

Midwest ISO. Module B- Network Integration Transmission Service Overview. Vikram Godbole Lead, Transmission Service Planning October 20, 2010 Midwest ISO Module B- Network Integration Transmission Service Overview Vikram Godbole Lead, Transmission Service Planning October 20, 2010 DISCUSSION POINTS 1. What is NITS 2. How to get Designated NITS

More information

Concept White Paper. Concepts for Proposed Content of Eventual Standard(s) for Project : Real-Time Monitoring and Analysis Capabilities

Concept White Paper. Concepts for Proposed Content of Eventual Standard(s) for Project : Real-Time Monitoring and Analysis Capabilities Concept White Paper Concepts for Proposed Content of Eventual Standard(s) for Project 2009-02: Real-Time Monitoring and Analysis Capabilities Real-time Monitoring and Analysis Capabilities Standard Drafting

More information

HIGH LEVEL REQUIREMENTS OF FAST SIMULATION AND MODELLING SUITE OF TOOLS FOR FUTURE SELF-HEALING DISTRIBUTION POWER SYSTEM

HIGH LEVEL REQUIREMENTS OF FAST SIMULATION AND MODELLING SUITE OF TOOLS FOR FUTURE SELF-HEALING DISTRIBUTION POWER SYSTEM HIGH LEVEL REQUIREMENTS OF FAST SIMULATION AND MODELLING SUITE OF TOOLS FOR FUTURE SELF-HEALING DISTRIBUTION POWER SYSTEM A. Valenti* I Bel ** S. Lee *EDF **EPRI E2I ConEdison France USA USA arnaud.valenti@edf.fr

More information

ENERGY MANAGEMENT SYSTEM. ABB Ability Network Manager EMS Operational confidence.

ENERGY MANAGEMENT SYSTEM. ABB Ability Network Manager EMS Operational confidence. ENERGY MANAGEMENT SYSTEM ABB Ability Network Manager EMS Operational confidence. 2 ABB ABILITY NETWORK MANAGER EMS ABB Ability Network Manager Energy Management System The ever-increasing demand for power

More information

Standards Authorization Request Justification

Standards Authorization Request Justification Standards Authorization Request Justification Project 2009-02 Real-time Monitoring and Analysis Capabilities NERC Report Title Report Date 1 of 30 3353 Peachtree Road NE Suite 600, North Tower Atlanta,

More information

Enhanced Curtailment Calculator Update

Enhanced Curtailment Calculator Update Enhanced Curtailment Calculator Update December 13, 2017 Member Advisory Committee Meeting Brett Wangen Chief Engineering and Technology Officer Jeremy West Manager, Interconnection Reliability Initiatives

More information

Dispatcher Training Simulator (DTS) JOB AIDE

Dispatcher Training Simulator (DTS) JOB AIDE APPLICABILITY: System Operators or anyone operating the system via Peak s GE- Alstom. I. Purpose To provide System Operators a job aid on using the DTS, particularly within the restoration drill. II. Introduction

More information

Model Parts and Assembly. Jay Britton Britton Consulting LLC

Model Parts and Assembly. Jay Britton Britton Consulting LLC Model Parts and Assembly Jay Britton Britton Consulting LLC jay.britton@comcast.net WG13 Ref Model for a Network Analysis Case Physical Network Model Parts Repository Full Model Parts Incremental Model

More information

TOP-010-1(i) Real-time Reliability Monitoring and Analysis Capabilities

TOP-010-1(i) Real-time Reliability Monitoring and Analysis Capabilities A. Introduction 1. Title: Real-time Reliability Monitoring and Analysis Capabilities 2. Number: TOP-010-1(i) 3. Purpose: Establish requirements for Real-time monitoring and analysis capabilities to support

More information

Appendix 6: Description of an example methodology and software for FTR grid design and determining FTR rentals

Appendix 6: Description of an example methodology and software for FTR grid design and determining FTR rentals Appendix 6: Description of an example methodology and software for FTR grid design and determining FTR rentals 1. Introduction The Authority has developed prototype software applications for the FTR manager

More information

Market Participant User Guide ISO Reliability Requirements Application (IRR UI)

Market Participant User Guide ISO Reliability Requirements Application (IRR UI) Market Participant User Guide ISO Reliability Requirements Application (IRR UI) Version 1 Last Revised: November 21, 2011 ISO Public 1 of 84 Table of Contents 1. Introduction... 5 1.1 Resource Adequacy

More information

Residual Auction Revenue Rights

Residual Auction Revenue Rights Residual Auction Revenue Rights Brian Chmielewski Sr. Analyst, Market Simulation Department Market Implementation Committee November 2, 2016 Overview Auction Revenue Rights (ARRs) prorated in Stage 1B

More information

Residual Auction Revenue Rights

Residual Auction Revenue Rights Residual Auction Revenue Rights Brian Chmielewski Sr. Analyst, Market Simulation Department Markets and Reliability Committee November 17, 2016 Overview Auction Revenue Rights (ARRs) prorated in Stage

More information

Real Time Monitoring of

Real Time Monitoring of Real Time Monitoring of Cascading Events Mladen Kezunovic Nan Zhang, Hongbiao Song Texas A&M University Tele-Seminar, March 28, 2006 Project Reports (S-19) M. Kezunovic, H. Song and N. Zhang, Detection,

More information

Minnesota Hosting Capacity Analysis

Minnesota Hosting Capacity Analysis Minnesota Hosting Capacity Analysis MIPSYCON November 8, 2017 Chris Punt, P.E. Outline What is Hosting Capacity? Background DRIVE Results Visualization Accuracy Timeline Next Steps 2 What is Hosting Capacity?

More information

Interconnection Feasibility Study Report GIP-IR377-FEAS-R1

Interconnection Feasibility Study Report GIP-IR377-FEAS-R1 Interconnection Feasibility Study Report GIP-IR377-FEAS-R1 Generator Interconnection Request 377 40 MW Wind Generating Facility Renfrew, NS Mar. 6, 2012 Control Centre Operations Nova Scotia Power Inc.

More information

The Future of Real-Time Energy Management Systems For Transmission System Operations

The Future of Real-Time Energy Management Systems For Transmission System Operations San Francisco Chapter The Institute of Electrical and Electronic Engineers Power Engineering Society The Future of Real-Time Energy Management Systems For Transmission System Operations John Sell, EleQuant,

More information

Achieving Smarter Grid Operation With On-Line DSA Technology

Achieving Smarter Grid Operation With On-Line DSA Technology Achieving Smarter Grid Operation With On-Line DSA Technology Powercon 2014 October 20-22, 2014, Chengdu, China Lei Wang Powertech Labs Inc. 12388 88 th Avenue Surrey, BC, Canada A very simple version of

More information

Installation Guide and Users Manual

Installation Guide and Users Manual DSATools TM Dynamic Security Assessment Software VSAT Voltage Security Assessment Tool VERSION 6.0 Installation Guide and Users Manual A product of Powertech Labs Inc. 12388-88 th Avenue Tel: (604) 590-7500

More information

Standard CIP Cyber Security Critical Cyber As s et Identification

Standard CIP Cyber Security Critical Cyber As s et Identification A. Introduction 1. Title: Cyber Security Critical Cyber Asset Identification 2. Number: CIP-002-4 3. Purpose: NERC Standards CIP-002-4 through CIP-009-4 provide a cyber security framework for the identification

More information

Member Impacting Project Overview Data Push

Member Impacting Project Overview Data Push Member Impacting Project Overview Data Push Page 1 Table of Contents Table of Contents... 2 Executive Summary... 4 Business Impact... 4 Technical Impact... 5 Technical Implementation... 6 Cutover/Back-out

More information

On-line Estimation of Power System Security Limits

On-line Estimation of Power System Security Limits Bulk Power System Dynamics and Control V, August 26-31, 2001, Onomichi, Japan On-line Estimation of Power System Security Limits K. Tomsovic A. Sittithumwat J. Tong School of Electrical Engineering and

More information

Year Assessment Preliminary Needs

Year Assessment Preliminary Needs 2018 10-Year Assessment Preliminary Needs Stakeholder and Customer Presentation March 1, 2018 Jeremy Voigt Purpose Key Study Assumptions Reminder Summarize Preliminary Changes to Needs Solicit Input on

More information

Residual Auction Revenue Rights Enhancement

Residual Auction Revenue Rights Enhancement Residual Auction Revenue Rights Enhancement Brian Chmielewski Sr. Analyst, Market Simulation Department Markets and Reliability Committee December 22, 2016 Solution Package Overview - Package A Proposed

More information

Transient Stability Analysis with PowerWorld Simulator

Transient Stability Analysis with PowerWorld Simulator Transient Stability Analysis with PowerWorld Simulator T14: Large-Scale Simulation Examples 2001 South First Street Champaign, Illinois 61820 +1 (217) 384.6330 support@powerworld.com http://www.powerworld.com

More information

British Columbia Utilities Commission Reliability Standards with Effective Dates adopted in British Columbia

British Columbia Utilities Commission Reliability Standards with Effective Dates adopted in British Columbia Page 1 of 15 British Columbia Utilities Reliability Standards with s adopted in British Columbia BAL-001-2 Standard Real Power Balancing Control Performance R-14-16 July 1, 2016 BAL-002-1 1 Disturbance

More information

PowerWorld Simulator 17 What s New in Simulator. Mark Laufenberg

PowerWorld Simulator 17 What s New in Simulator. Mark Laufenberg PowerWorld Simulator 17 What s New in Simulator Mark Laufenberg lauf@powerworld.com 217 384 6330 ext. 10 2001 South First Street Champaign, Illinois 61820 +1 (217) 384.6330 support@powerworld.com http://www.powerworld.com

More information

N ORTH A MERICAN ELECTRIC RELIABILITY COUNCIL

N ORTH A MERICAN ELECTRIC RELIABILITY COUNCIL Michehl R. Gent President and CEO N ORTH A MERICAN ELECTRIC RELIABILITY COUNCIL Princeton Forrestal Village, 116-390 Village Boulevard, Princeton, New Jersey 08540-5731 The Honorable Patrick H. Wood III,

More information

Phasor Technology Research Road Map to Improve Grid Reliability and Market Efficiency. Presented to TAC on April 5, 2005 and PAC on April 22, 2005

Phasor Technology Research Road Map to Improve Grid Reliability and Market Efficiency. Presented to TAC on April 5, 2005 and PAC on April 22, 2005 Phasor Technology Research Road Map to Improve Grid Reliability and Market Efficiency Presented to TAC on April 5, 2005 and PAC on April 22, 2005 Background Power Grid has evolved from a vertically integrated

More information

SIGUARD System for Phasor Data Processing

SIGUARD System for Phasor Data Processing SIGUARD System for Phasor Data Processing Real Time Visualization and Disturbance Recording Dan Murray Siemens Energy, Inc. System Description SIGUARD is a software-based Phasor Data Concentrator Data

More information

Optimal Power System Management with SIGUARD

Optimal Power System Management with SIGUARD Optimal Power System Management with SIGUARD Unrestricted www.siemens.com/siguard SIGUARD Suite Increase of Observability, Controllability, Security and Operator Awareness SIGUARD PDP Phasor Data Processing

More information

Regulatory Impacts on Research Topics. Jennifer T. Sterling Director, Exelon NERC Compliance Program

Regulatory Impacts on Research Topics. Jennifer T. Sterling Director, Exelon NERC Compliance Program Regulatory Impacts on Research Topics Jennifer T. Sterling Director, Exelon NERC Compliance Program The 2003 Blackout On August 14, 2003, an electric power blackout affected large portions of the Northeast

More information

savvi Digital I/O Tool User Guide savvi 5.3 & 5.4

savvi Digital I/O Tool User Guide savvi 5.3 & 5.4 savvi 5.3 & 5.4 Table of Contents 1 savvi Digital I/O Tool - User Guide... 2 1.1 functional description... 2 1.2 component description... 2 1.3 Installation... 2 1.4 Configuration... 2 1.5 client Operations...

More information

MOD Transmission Reliability Margin Implementation Document

MOD Transmission Reliability Margin Implementation Document Transmission Margin Implementation Document Transmission Margin Implementation Document For NERC Page 1 of 7 Transmission Margin Implementation Document 1.0 Purpose The California Independent System Operator

More information

November 9, Revisions to the Violation Risk Factors for Reliability Standards IRO and TOP

November 9, Revisions to the Violation Risk Factors for Reliability Standards IRO and TOP !! November 9, 2016 VIA ELECTRONIC FILING Jim Crone Director, Energy Division Manitoba Innovation, Energy and Mines 1200-155 Carlton Street Winnipeg MB R3C 3H8 RE: Revisions to the Violation Risk Factors

More information

PAP13 - Harmonization of IEEE C with IEC and Precision Time Synchronization

PAP13 - Harmonization of IEEE C with IEC and Precision Time Synchronization PAP13 - Harmonization of IEEE C37.118 with IEC 61850 and Precision Time Synchronization 12 July 2010 Use Cases Related to Mapping IEEE C37.118 with IEC 61850 as Proposed for Draft IEC 61850-90-5 Synchrophasor

More information

2017 RTEP Assumptions for Western Sub-Region

2017 RTEP Assumptions for Western Sub-Region CLICK TO EDIT MASTER TITLE STYLE Click to edit Master text styles 2017 RTEP Assumptions for Western Sub-Region CLICK 2017 RTEP TO EDIT Assumptions MASTER TITLE STYLE Click Duquesne to edit uses Master

More information

primary Control Center, for the exchange of Real-time data with its Balancing

primary Control Center, for the exchange of Real-time data with its Balancing A. Introduction 1. Title: Reliability Coordination Monitoring and Analysis 2. Number: IRO-002-5 3. Purpose: To provide System Operators with the capabilities necessary to monitor and analyze data needed

More information

CAISO Metering & Telemetry Requirements. Jeremy Laundergan - Director, EnerNex November 8, 2012

CAISO Metering & Telemetry Requirements. Jeremy Laundergan - Director, EnerNex November 8, 2012 CAISO Metering & Telemetry Requirements Jeremy Laundergan - Director, EnerNex November 8, 2012 Background and Overview Both federal and state regulatory authorities are advocating the participation of

More information

Model Parts and Assembly. Jay Britton Britton Consulting LLC

Model Parts and Assembly. Jay Britton Britton Consulting LLC Model Parts and Assembly Jay Britton Britton Consulting LLC jay.britton@comcast.net WG13 Ref Model for a Network Analysis Case Physical Network Model Parts Repository Full Model Parts Incremental Model

More information

Power System Controls

Power System Controls Power System Controls Control Schemes Ref: A. P. Meliopoulos, Power System Modeling, 1990-2006 Voltage Control The objective of this control loop is to regulate the voltage at the terminals of the generator.

More information

Steve Ashbaker Director Operations. NASPI Workgroup Meeting February 21, 2013 Atlanta, GA

Steve Ashbaker Director Operations. NASPI Workgroup Meeting February 21, 2013 Atlanta, GA Steve Ashbaker Director Operations NASPI Workgroup Meeting February 21, 2013 Atlanta, GA September 8, 2011 Event Update May 1 FERC/NERC Inquiry Report issued o 27 Recommendations in 8 categories July 26

More information

How to blend backup and high availability

How to blend backup and high availability How to blend backup and high availability Complete data protection explained Complete data protection Backup and high availability are both essential forms of protection that fulfill different roles within

More information

ERO Enterprise IT Projects Update

ERO Enterprise IT Projects Update ERO Enterprise IT Projects Update Stan Hoptroff, Vice President, Chief Technology Officer and Director of Information Technology Technology and Security Committee Meeting November 6, 2018 Agenda ERO IT

More information

Data Quality and Integrity Investigation in Laboratories (Analytical)

Data Quality and Integrity Investigation in Laboratories (Analytical) Data Quality and Integrity Investigation in Laboratories (Analytical) Dr. Ademola O. Daramola, DHSc., MPH Assistant Country Director International Relations Specialist (Drug) US FDA Office of International

More information

Geomagnetic Disturbances

Geomagnetic Disturbances Geomagnetic Disturbances Managing Risk to the North American Power Grid Mark Olson, Reliability Standards Developer Worcester Polytechnic Institute Energy Symposium September 25, 2013 About NERC The North

More information

Unofficial Comment Form Project Real-time Monitoring and Analysis Capabilities IRO and TOP-010-1

Unofficial Comment Form Project Real-time Monitoring and Analysis Capabilities IRO and TOP-010-1 Project 2009-02 Real-time Monitoring and Analysis Capabilities IRO-018-1 and TOP-010-1 DO NOT use this form for submitting comments. Use the electronic form to submit comments on IRO- 018-1 Reliability

More information

WAProtector Power System Wide Area Monitoring Protection and Control

WAProtector Power System Wide Area Monitoring Protection and Control WAProtector Power System Wide Area Monitoring Protection and Control Bojan Mahkovec, Dr. Tadeja Babnik ELPROS, Slovenia Flavio Rabello NOVAKOASIN, Brasil Brasil April 2010 1 Presentation outline Presentation

More information

Forced and Planned Outage Substitution, RAAIM Pre-Calc

Forced and Planned Outage Substitution, RAAIM Pre-Calc Forced and Planned Outage Substitution, RAAIM Pre-Calc RSI 2017 Training January 17, 2018 1:00PM The information contained in these materials is provided for general information only and does not constitute

More information

EIM Entity Readiness Criteria May 6, 2015

EIM Entity Readiness Criteria May 6, 2015 EIM Entity Readiness Criteria May 6, 2015 FERC Directive Regarding Readiness Criteria We therefore direct CAISO to submit a compliance filing within 60 days of issuance of this order, to revise the EIM

More information

USE CASE 14 CONTROLLED ISLANDING

USE CASE 14 CONTROLLED ISLANDING I USE CASE 14 CONTROLLED ISLANDING Use Case Title Centralized application separates grid into islands to prevent blackout Use Case Summary Controlled islanding is a method that can significantly improve

More information

TOP-001 v3 and v4 Monitoring Non-BES and Data Exchange Requirements. FRCC Spring RE Workshop April 17-18, 2018

TOP-001 v3 and v4 Monitoring Non-BES and Data Exchange Requirements. FRCC Spring RE Workshop April 17-18, 2018 TOP-001 v3 and v4 Monitoring Non-BES and Data Exchange Requirements FRCC Spring RE Workshop April 17-18, 2018 Objectives Background Reference Documents TOP-001-3 to TOP-001-4 Changes o R10 (TOP) Monitoring

More information

Synchrophasors and Next Generation Energy Management Systems (EMS)

Synchrophasors and Next Generation Energy Management Systems (EMS) Synchrophasors and Next Generation Energy Management Systems (EMS) Manu Parashar Celebrating the Visions of Synchrophasor Pioneers: Arun Phadke and Jim Thorp May 9 th, 2013 Analog Data Acquisition Changing

More information

Chapter 2 State Estimation and Visualization

Chapter 2 State Estimation and Visualization Chapter 2 State Estimation and Visualization One obvious application of GPS-synchronized measurements is the dynamic monitoring of the operating conditions of the system or the dynamic state estimation

More information

Draft Proposal for the Allocation of Congestion Revenue Rights to Merchant Transmission

Draft Proposal for the Allocation of Congestion Revenue Rights to Merchant Transmission The following White Paper proposes a draft methodology for determining the incremental amount of transfer capability that would be the basis for the quantity of Merchant Transmission CRRs to be allocated

More information

RC Coordination Efforts

RC Coordination Efforts RC Coordination Efforts WECC RC FORUM JULY 19, 2018 CAISO, Peak, SPP, and AESO Steering Group Purpose and Participants Provide Update on Recent RC Coordination Activities Provide Opportunity for Interested

More information

PJM Emergency Procedures

PJM Emergency Procedures PJM Emergency Procedures Capacity Performance / Performance Assessment Hour (CP/PAH) related changes Production Release slated for May 5, 2016 Dave Hislop Manager, Outage Analysis Technologies Operating

More information

Small Generator Interconnection System Impact Study Report. Completed For Q0047

Small Generator Interconnection System Impact Study Report. Completed For Q0047 Small Generator Interconnection Completed For Q0047 Proposed Interconnection PacifiCorp s Existing Goshen Rigby 69 kv Line March 7, 2005 1.0 Description of the Generation Facility Q0047 ( Interconnection

More information

Southwest Power Pool Portal Market Participant General User s Guide

Southwest Power Pool Portal Market Participant General User s Guide Southwest Power Pool Portal Market Participant General User s Guide 1. Overview... 4 1.1 User Roles... 4 1.1.1 Market Participant Level Roles... 4 1.1.2. Asset Owner Level Roles... 4 1.1.3. Market Operations

More information

Connection of Distributed Generation to Enel's Network in the Transition Period from Passive Networks to Smartgrids.

Connection of Distributed Generation to Enel's Network in the Transition Period from Passive Networks to Smartgrids. Connection of Distributed Generation to Enel's Network in the Transition Period from Passive Networks to Smartgrids. Fabio Cazzato, Simone Botton ENEL Distribuzione The evolution of regulatory scenario

More information

Public Service Company of New Mexico. Public Transmission Planning Meeting March 2, 2017 Albuquerque, NM

Public Service Company of New Mexico. Public Transmission Planning Meeting March 2, 2017 Albuquerque, NM Public Service Company of New Mexico Public Transmission Planning Meeting March 2, 2017 Albuquerque, NM Agenda Introduction Agenda Additions Stakeholder Process PNM 10-Year Plan Development Regional Activities

More information

Resource Adequacy Pre-Market Simulation Training Workshop

Resource Adequacy Pre-Market Simulation Training Workshop Resource Adequacy Pre-Market Simulation Training Workshop Focusing on the following initiatives: Reliability Services Initiative (RSI) Capacity Procurement Mechanism (CPM) Replacement October 21, 2015

More information

Contingency Reserve Sharing; Ancillary Services Market. Presented to the JCM Joint Stakeholder Meeting

Contingency Reserve Sharing; Ancillary Services Market. Presented to the JCM Joint Stakeholder Meeting Contingency Reserve Sharing; Ancillary Services Market Presented to the JCM Joint Stakeholder Meeting 1 Agenda Products and Nature of Current Services Contingency Reserve Sharing Group (CRSG) Agreement

More information

Standards Authorization Request Form

Standards Authorization Request Form Standards Authorization Request Form When completed, email this form to: sarcomm@nerc.com NERC welcomes suggestions to improve the reliability of the bulk power system through improved reliability standards.

More information

OVERVIEW: KEY APPLICATIONS

OVERVIEW: KEY APPLICATIONS WECC Reliability Coordinator Website OVERVIEW: KEY APPLICATIONS presented by Kirk Stewart, Manager Applications Agenda WECCRC.org Website Wide-Area Views (WAV) Historical Data Archiving and Reporting My

More information

USE CASE 13 ADAPTIVE TRANSMISSION LINE PROTECTION

USE CASE 13 ADAPTIVE TRANSMISSION LINE PROTECTION H USE CASE 13 ADAPTIVE TRANSMISSION LINE PROTECTION Use Case Title Adaptive Transmission Line Protection Use Case Summary The requirements for improvement in the performance of protection relays under

More information

CIP-014. JEA Compliance Approach. FRCC Fall Compliance Workshop Presenter Daniel Mishra

CIP-014. JEA Compliance Approach. FRCC Fall Compliance Workshop Presenter Daniel Mishra CIP-014 JEA Compliance Approach FRCC Fall Compliance Workshop Presenter Daniel Mishra Acronyms & Terminologies DHS Department of Homeland Security JEA It s not an acronym JSO Jacksonville Sheriff's Office

More information

Duplicate Detection addon for Dynamics CRM by Cowia

Duplicate Detection addon for Dynamics CRM by Cowia Duplicate Detection addon for Dynamics CRM by Cowia Table of Contents Supported versions... 2 Trial... 2 License Activation... 2 YouTube Video... 3 Setup with example... 3 1. First step is to disable the

More information

Multi User Operations Training Simulator. Trainers Workshop Reception

Multi User Operations Training Simulator. Trainers Workshop Reception : Multi User Operations Training Simulator Trainers Workshop Reception July 26, 2012 2001 South First Street Champaign, Illinois 61820 +1 (217) 384.6330 Scott R. Dahman, P.E. scott@powerworld.com http://www.powerworld.com

More information

Always an eye to security

Always an eye to security Always an eye to security SIGUARD the perfect supervision of your power system www.siemens.com/siguard Answers for infrastructure and cities. Keeping the overview SIGUARD is a suite of innovative software

More information

User Guide. Document Version: 1.0. Solution Version:

User Guide. Document Version: 1.0. Solution Version: User Guide Document Version: 1.0 Solution Version: 365.062017.3.1 Table of Contents Product Overview... 3 How to Install and Activate Attachment to SharePoint Solution?... 4 Configuration Settings in Attachment

More information

TSC Long Term Vision and Integrated Capacity Management ALEXANDER WIRTH, SWISSGRID AG TSC OPERATIONAL MANAGER

TSC Long Term Vision and Integrated Capacity Management ALEXANDER WIRTH, SWISSGRID AG TSC OPERATIONAL MANAGER TSC Long Term Vision and Integrated Capacity Management ALEXANDER WIRTH, SWISSGRID AG TSC OPERATIONAL MANAGER Agenda 1. TSC who we are and where we want to go 2. Integrated Capacity Management from tinkering

More information

Perry. Lakeshore. Avon. Eastlake

Perry. Lakeshore. Avon. Eastlake Perry Lorain Avon Lakeshore Eastlake Ashtabula Mansfield Sammis Beaver Valley Conesville Tidd Burger & Kammer Muskingum Perry Lorain Avon Lakeshore Eastlake Ashtabula Mansfield Sammis Beaver Valley Conesville

More information

UCT Application Development Lifecycle. UCT Business Applications

UCT Application Development Lifecycle. UCT Business Applications UCT Business Applications Page i Table of Contents Planning Phase... 1 Analysis Phase... 2 Design Phase... 3 Implementation Phase... 4 Software Development... 4 Product Testing... 5 Product Implementation...

More information

RELIABILITY OF THE BULK POWER SYSTEM

RELIABILITY OF THE BULK POWER SYSTEM RELIABILITY OF THE BULK POWER SYSTEM Jim Burley, VP of Compliance, Mitigation and Standards October 26, 2011 Promoting RELIABILITY and Mitigating RISKS to the Bulk Power System Context In the Beginning-2003

More information

Data Miner 2 Release Notes Release 18.09

Data Miner 2 Release Notes Release 18.09 Data Miner 2 Release Notes Release 18.09 Release Date: September 24, 2018 New Features: 1. New feeds These feeds will be available from September 25, 2018 onwards Enhancements: Real Time Temperature Sets

More information