1 Denmarks Cable Policy Landsnet Annual meeting 2014 March 20th 2014 Jens Møller Birkebæk Director, International Affairs 1
2 About Energinet.dk 3
3 Interconnector capacity 3
4 Agenda Danish Cable Policy 1. Political framework 1. Guidelines for undergrounding of the transmission grid 2. Background for the guidelines 2.Challenges in undergrounding 1. Research programme (DANPAC) 3. HVAC cables 1. Some pros and cons 4. Status of undergrounding 5. Q & A 4
5 Political framework (1) Guidelines for undergrounding and expansion The Danish parliament adopted in 2008 guidelines for undergrounding and expansion of the electricity grid: 400 kv: a) It is the aim, that all 400 kv lines shall be undergrounded - following technological development and respecting security of supply and socio-economical aspects. b) Visual enhancement in sensitive areas by undergrounding or rerouting. c) Due to urgent demand to grid expansion, three projects can be launched as overhead lines for commissioning until
6 Political framework (2) Guidelines for undergrounding and expansion 132/150 kv: a) All new 132/150 kv lines shall be established as cables. b) All existing 132/150 kv lines shall be undergrounded. c) A long-term coherent implementation plan shall be developed as a basis for the undergrounding projects. d) Undergrounding of windpower connection and overhead lines in urban areas shall be given high priority. 6
7 Political framework (3) Guidelines for undergrounding and expansion Distribution grid (below 100 kv): All new lines shall be established as underground cables. Presently on-going undergrounding of the existing distribution network shall continue. 60 kv A major part of the distribution lines is already undergrounded. 10 kv and 0,4 kv The low voltage distribution grid is almost 100% undergrounded. 7
8 Background for the guidelines Grid development was significantly challenged in the early 2000-period Increased wind-power generation created a strong demand for grid expansion and reinforcement Strong local opposition to new overhead lines stalled all the needed grid development Green transition 20 March
9 Electricity Infrastructure Committee Nominated in 2007 by the Minister of Energy Report on the future technical need and opportunities for reinforcements in the Danish transmission network considering: Planned increase in wind energy Increased interconnector capacity to neighboring TSOs Environmental and landscape aspects Cost estimation and community consequences for different alternatives Ensuring the transmission network robustness and free market forces Members of the Electricity Infrastructure Committee : Energinet.dk (convener) Representatives from the local transmission companies (132/150 kv owners) The Danish Energy Agency Ministries of Finance, Energy and Climate and Environment Political representatives from local municipalities in Denmark 9
10 Electricity Infrastructure Committee - Report 5 principles were analysed 400 kv B New lines in cables C New lines in cables One new line in existing track D New overhead lines in existing tracks E New overhead lines A Complete undergrounding F No reinforcements 400 kv Visual improvement of existing 400 kv overhead lines with lower towers in a new design and undergrounding in selected sensitive areas 132/150 kv Undergrounding new and all existing 132/150 kv Undergrounding part of existing 132/150 kv Total cost M Principle C was selected by Danish parliament 10
11 Challenges related to undergrounding Design concepts for an underground transmission network on 132/150 kv level and for long 400 kv cables not available in-house at Energinet.dk and limited experience was available globally. The concern was that: Critical technical considerations could be overlooked due to lack of experience. Solutions become too expensive. R&D project (DANPAC) was launched to setup design guide lines for a cable based transmission network ensuring technically and economically optimal solutions. 11
12 DANPAC - R&D project in HVAC cables System related Optimisation of the 132 kv and 150 kv network structure. Protection concept for cables in the transmission network. Optimise the reactive compensation in the transmission network. Voltage stability analysis for the network and find the best solutions Transient studies Find the dimensioning studies and the needed modelling detail. Black-Start study for the network according to the Cable Action Plan. Component related Dynamic load optimisation in a cable based transmission grid Maximizing the cable lengths. Controlled backfill. Optimize the layout of cables in Denmark. Quality procedure for laying kv cables in Denmark. Set up maintenance guidelines for cable systems. Online location of faults on AC cables in underground transmission systems and faster repair of cable faults. On-site parameter measurement techniques. 20 March 2014 Landsnet Annual Meeting 12
13 HVAC cables - Pros and cons HVAC cables Pros Less public resistance against new cable lines than new overhead lines. Utilization of short-time ampacity of underground cables Cables are not sensitive to weather conditions (wind, lightning, icing of the conductors, ) HVAC cables Cons Two 400 kv cable systems are needed to get the same transmission capacity as an one overhead line. 5-6 times more expensive than an overhead line system. High capacitance of HVAC cables. 400 kv cable system needs to be compensated for every km. Maintenance is difficult and costly The short circuit level of the grid is the limiting factor for the cable lengths Cables need well defined thermal conditions in their cable trench. 13
14 Status - 132/150 kv grid Total 2,600 km cables untill : 10% of the total plan has been completed 20 March 2014 Landsnet Annual Meeting 14
15 Status kv grid Development and visual enhancement Total 250 km new cable and 200 km new overhead lines until 2025 Design Visual 15
16 400 kv Lillebælt project Visual enhancement in sensitive nature and urban area 16
17 Visual enhancement 17
18 18
19 Benefits for Energinet.dk from political guidelines A general public understanding of the need for grid development as a consequence of the Green Transition Long term optimal planning of grid development and optimal implementation plans Public processes connected to grid development proved less emotional and faster Research programs have increased knowledge and allow for cost saving of grid expansion projects Knowledge sharing with TSO and other industry partners 19
20 Thank you for your attention 20
Danish Policy on Underground Cabling of HV lines. Anders H Kristensen Danish Energy Agency
Danish Policy on Underground Cabling of HV lines Anders H Kristensen Danish Energy Agency Background Local opposition to new overhead HV lines has always been strong, but the voice has been low The strength
More informationRegional Group Nordic GRID DISTURBANCE AND FAULT STATISTICS
Regional Group Nordic GRID DISTURBANCE AND FAULT STATISTICS Table contents Table contents Page 1 INTRODUCTION... 4 1.1 Contact persons... 5 1.2 Guidelines the statistics... 5 1.3 Voltage levels in the
More informationCollector System Design Considerations for Wind Farms. Sean Carr Ernst Camm S&C Electric Co.
Collector System Design Considerations for Wind Farms Sean Carr Ernst Camm S&C Electric Co. 1 Overview Challenges in wind farm collector systems Design considerations for collector systems Summary The
More informationELECTRICITY SUPPLY SYSTEMS OF THE FUTURE
ELECTRICITY SUPPLY SYSTEMS OF THE FUTURE Rob Stephen President Cigre AFSEC conference March 2017 CIGRE Founded in 1921, CIGRE, the Council on Large Electric Systems, Our Mission:To be the world s foremost
More informationUtility Interconnection. Highlights of the New Fast Track Process Proposed by FERC and Changes to IEEE 1547
Utility Interconnection Highlights of the New Fast Track Process Proposed by FERC and Changes to IEEE 1547 1 4/16/2013 Agenda Review of Status of Distributed Energy Resources Standards Changes Review of
More informationCall for Papers GCC POWER 2011 GCC Cigre s Leading Electric Power Conference & Exhibition In the Gulf Region
Call for Papers GCC POWER 2011 GCC Cigre s Leading Electric Power Conference & Exhibition In the Gulf Region Kuwait - November 2011 GCC Cigre, is pleased to announce its 7 th International Conference GCC
More informationBACKGROUND PAPER. Sub-Regional Platform on Disaster Risk Reduction
BACKGROUND PAPER Sub-Regional Platform on Disaster Risk Reduction Niamey, Niger 11-14 November 2013 1 BACKGROUND The ECOWAS Policy on Disaster Risk Reduction adopted by West African Heads of State and
More informationFinal Report. Mini Project TET Group nr 7 - Project nr 4. Students: Hans Lavoll Halvorson, NTNU
Final Report Mini Project TET4190 28.10.2010 Optimal Distance for connection of offshore wind farm with AC cable with SVC or STATCOM To increase the distance compensation technologies such as SVC and STATCOM
More informationUnderground HV Cable Research- Health Index for HV solid cables
Underground HV Cable Research- Health Index for HV solid cables Maxi Faridi Innovation Engineer, UK Power Networks maxi.faridi@ukpowernetworks.co.uk Dawn O Brien Principal Consultant, EA Technology dawn.o
More informationFACTS and HVDC for Grid Connection of Large Wind Farms
David Larsson Power-Gen Europe 2005 Milan, Italy FACTS and HVDC for Grid Connection of Large Wind Farms www.abb.com/facts FACTS Agenda Wind Generators Response to Grid Faults PICTURE JPG-FORMAT WEB OPTIMIZED
More informationMODULAR HUB AND SPOKE 17 NOVEMBER 2017
MODULAR HUB AND SPOKE 17 NOVEMBER 2017 Executive Summary Future North Sea offshore wind farms will increasingly be located further from shore. The longer distances to shore and generally deeper waters
More informationChristian PAYERL, Poznan, 20 th May, 2009 ABB FACTS Grid connection of Wind Farms. ABB Group May 22, 2009 Slide 1
Christian PAYERL, Poznan, 20 th May, 2009 ABB FACTS Grid connection of Wind Farms May 22, 2009 Slide 1 FACTS Applications Flexible AC Transmission Systems May 22, 2009 Slide 4 System Studies - Grid Codes
More informationCross-Border participation in the GB Capacity Market. Elaine O Connell 15 th January 2015
Cross-Border participation in the GB Capacity Market Elaine O Connell 15 th January 2015 Agenda Capacity Market Results Cross border participation in the GB Capacity Market Next Steps 2 Capacity Market
More informationPlug and Operate Transformer Technology
Plug and Operate Transformer Technology Deepal Shah PFISTERER deepal.shah@pfisterer.com by and Andre Goessler PFISTERER andre.goessler@pfisterer.com 1 THE POWER CONNECTION We have always worked closely
More informationIntegrating Climate Change and Sustainable Development in Development Planning and Budgeting
Regional Forum on Climate Change Finance and Sustainable Development 1-3 September 2015, Jakarta, Indonesia Integrating Climate Change and Sustainable Development in Development Planning and Budgeting
More informationInspiration to a common EU data base for energy data time series
Inspiration to a common EU data base for energy data time series Paul-Frederik Bach Consultant in the development of energy systems http://pfbach.dk/ 14 November 2014 European Physical Society Energy Group
More informationOwner/Operator Forum 12 December
Owner/Operator Forum 12 December Steve Halsey DG Development Manager Today s Agenda Transition to DSO Breakout session What we do the role of the DNO Our vision Welcome and Introduction (DNO) Distribution
More informationWECC Criterion MOD-(11 and 13)-WECC-CRT-1.1
WECC Criterion MOD-(11 and 13)-WECC-CRT-1.1 A. Introduction 1. Title: Steady State and Dynamic Data Requirements 2. Number: MOD-(11 and 13)-WECC-CRT-1.1 3. Purpose: To establish the consistent data requirements
More informationIntroduction to transmission network characteristics - technical features. Slobodan Markovic Danka Todorovic EKC Tirana,
Introduction to transmission network characteristics - technical features Slobodan Markovic Danka Todorovic EKC Tirana, 15.12.2016 1 Interconnectors An interconnector is a structure which enables energy
More informationStatic Var Compensator: Effect of Fuzzy Controller and Changing Membership Functions in its operation
International Journal of Electrical Engineering. ISSN 0974-2158 Volume 6, Number 2 (2013), pp. 189-196 International Research Publication House http://www.irphouse.com Static Var Compensator: Effect of
More informationDemand for sustainable power is growing worldwide. Energy producers are broadening their offerings for a quickly evolving marketplace.
Power delivery Demand for sustainable power is growing worldwide. Energy producers are broadening their offerings for a quickly evolving marketplace. Forward-thinking power grid design This evolution has
More informationPortable Power Solutions
http://siemens.com/energy/portable-power-solutions Portable Power Solutions Plug and play High Voltage E-Houses, skids and mobile high voltage substations up to 420 kv Plug & play solutions for flexible
More informationResponse to Draft Guidelines of Good Practice on Electricity Grid Connection and Access (E08-ENM-09-03)
securing competitive energy for industry June 2009 Response to Draft Guidelines of Good Practice on Electricity Grid Connection and Access (E08-ENM-09-03) 1. IFIEC supports ERGEG's attempt to harmonise
More informationMemorandum. This memorandum requires Board action. EXECUTIVE SUMMARY
California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Keith Casey, Vice President, Market & Infrastructure Development Date: May 21, 2014 Re: Decision on interconnection
More informationNew Challenges for DSO
New Challenges for DSO Johannes Brantl, Head of Assetmanagement, E.ON Bavaria IEA, Kassel, May 8th Power Grid of E.ON Bavaria Area MV-Grid 41.500 km² cables 23.000 km Overhead lines 21.400 km percentage
More informationOffice of Indian Energy Policy and Programs
DOE OFFICE OF INDIAN ENERGY Office of Indian Energy Policy and Programs NETWIG January 2016 Sarai Geary, Program Manager, Office of Indian Energy Office of Indian Energy Policy and Programs MISSION To
More informationElia Grid International Your expert in power system solutions
Elia Grid International Your expert in power system solutions 2 ELIA GRID INTERNATIONAL Your expert in power system solutions Backed by major grid operators Elia Grid International combines the best of
More informationSTCP22-1 Issue 003 Production of Models for GB System Planning
STCP22-1 Issue 003 Production of Models for GB System Planning STC Procedure Document Authorisation Company Name of Party Representative Signature Date National Grid Electricity Transmission plc SP Transmission
More informationSRI LANKA STANDARD CODE OF PRACTICE FOR GRID CONNECTED PHOTOVOLTAIC POWER SYSTEMS SLS 1522:2016
SRI LANKA STANDARD CODE OF PRACTICE FOR GRID CONNECTED PHOTOVOLTAIC POWER SYSTEMS SLS 1522:2016 BY H S W Karunaratne Assistant Director - Engineering Sri Lanka Standards Institution. 1 DEFINITIONS Ac module:
More informationEuropean Aspects of Wind Energy Integration into Liberalised Markets Euro-CASE Workshop, 14 November 2003 Düsseldorf, Germany
European Aspects of Wind Energy Integration into Liberalised Markets Euro-CASE Workshop, 14 November 2003 Matthias Luther E.ON Netz GmbH, Bayreuth 1 European Aspects of Wind Energy Integration into Liberalised
More informationRegulating and pricing network access
Regulating and pricing network access László Szabó ERRA Training 5-8 March, 2013, Budapest Lecture outline Network: an essential infrastructure Getting connected Pricing the use of existing electricity
More informationENTSO-E connection network codes Implementation guidance documents. Joint DSO response paper
ENTSO-E connection network codes Implementation guidance documents Joint DSO response paper August 2016 Dépôt légal: D/2016/12.105/45 Questionnaire Rate-of-change- of- frequency withstand capability (RoCoF)
More informationCONCLUSIONS AND RECOMMENDATIONS
Chapter 4 CONCLUSIONS AND RECOMMENDATIONS UNDP and the Special Unit have considerable experience in South-South cooperation and are well positioned to play a more active and effective role in supporting
More informationStudies Overview and Data Requirements. Robert Pan
Studies Overview and Data Requirements Robert Pan Outline 1. Introduction 2. BC Transmission System 3. BCTC Studies for Clean Power Call 4. Data Requirements for Interconnection Studies 5. Application
More informationFinancing resilience at the subnational 22 JUNE 2014 STANDING COMMITTEE ON FINANCE FORUM, MONTEGO BAY, JAMAICA
Financing resilience at the subnational level in South Africa 22 JUNE 2014 STANDING COMMITTEE ON FINANCE FORUM, MONTEGO BAY, JAMAICA My key takeaways from 21 June 2014 1. Improve access to finance through
More informationGREEN BUILDINGS MARKET INTELLIGENCE GHANA COUNTRY PROFILE
GREEN BUILDINGS MARKET INTELLIGENCE GHANA COUNTRY PROFILE 60 40 20 - MARKET GROWTH GHANA: COUNTRY SUMMARY Building Stock (million m2) Residential Office & Retail Other Commercial % new green buildings
More informationExperiences and inspiration from Denmark
Enabling the Private Sector to Power its Operations with Renewable Energy: Side event on the CEM Corporate Sourcing Experiences and inspiration from Denmark Kim Møller Porst/ Special Advisor Danish Ministry
More informationResolution adopted by the General Assembly. [on the report of the Second Committee (A/56/561/Add.2)]
United Nations A/RES/56/195 General Assembly Distr.: General 21 January 2002 Fifty-sixth session Agenda item 98 (b) Resolution adopted by the General Assembly [on the report of the Second Committee (A/56/561/Add.2)]
More informationCOMMUNICATION STRATEGY
COMMUNICATION STRATEGY STEERING COMMITTEE MEETING 2017 FIVE PRINCIPLES FOR GOOD COMMUNICATION 1. We see communication as an integral part of our daily tasks 2. We give priority to each other and communicate
More informationPLANNING FOR THE TRANSMISSION NETWORK
PLANNING FOR THE TRANSMISSION NETWORK Page 1 of 1 TABLE OF CONTENTS 1. CONTEXT.... PLANNING METHOD OF THE TRANSMISSION NETWORK....1 Design and Planning of the Transmission Network.... Planning Process
More informationTechnology Innovation Delivering Value to BPA Organized, Disciplined, Focused
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Technology Innovation Delivering Value to BPA Organized, Disciplined, Focused Keeping the Lights on for the Long Term The Basics Bonneville Power
More informationContractor Alliancing Sean Mooney Programme Manager
1 Contractor Alliancing Sean Mooney Programme Manager Today s Agenda Introduction Background Contractor Alliancing The Process Alliance Electricity Alliance North (EAN) Optimise Water (LLP) JV Benefits
More informationNASPI Work Group meeting April 24-26, 2018 Albuquerque, NM
NASPI Work Group meeting April 24-26, 2018 Albuquerque, NM Pavel Kovalenko Viktor Litvinov from data to action Premium Information Services from Data to Action Design, Develop and Deploy digital transformation
More informationMONITORING SOLUTIONS FOR Power & Utilities
MONITORING SOLUTIONS FOR Power & Utilities SMART MONITORING SOLUTIONS FOR THE INTELLIGENT GRID Informed decision making from integrated monitoring at all points on the network and critical infrastructure
More information20 December All TSOs of the Capacity Calculation Region Hansa, taking into account the following: Page 1 of 7
Capacity Calculation Region Hansa TSOs Proposal for Coordinated Redispatching and Countertrading methodology in accordance with Article 35 of Commission Regulation (EU) 2015/1222 of 24 July 2015 establishing
More informationHigh Level Group on Interconnections for South-West Europe. Progress Report (March - December 2015)
High Level Group on Interconnections for South-West Europe Progress Report (March - December 2015) I - Introduction This Progress Report provides information on the state-of-play and milestones achieved
More informationContacts. CEDEC Marc Malbrancke, Coordinator CEDEC WG Network Code
DSO associations response to ENTSO-E public consultation on the Common Grid Model Methodology and the Generation and Load Data Provision Methodology March 2016 Contacts CEDEC Marc Malbrancke, Coordinator
More informationTRANSMISSION ENGINEERING STANDARDS SUBSTATIONS
This standard was reviewed and approved by key managers on. Officer approval of this revision is not required. 1.0 SCOPE 1.1 This guide applies to the interconnection of a generating plant with the Oncor
More informationArkona Offshore Wind Project
Holger Matthiesen 04.12.2017 Arkona Offshore Wind Project Norwegian offshore wind delegation E.ON strategy Global trends like sustainability and climate protection, digitalization and technological innovation
More informationInternational cooperation on power interconnection: Mongolian Regulatory perspective
4 th Northeast Asia Energy Security Forum International cooperation on power interconnection: Mongolian Regulatory perspective ENKHTUVSHIN Ganbaatar Ph.D. candidate Energy and Environmental Department,
More informationExhibit to Agenda Item #1a
Exhibit to Agenda Item #1a Sandra Kopp Wednesday, Board Finance September & Audit 28, Committee 2011 Meeting and Special SMUD Board of Directors Meeting Budget 2018 Wednesday,, scheduled to begin at 5:00
More informationSustainable Energy for All (SEforALL)
AFRICAN UNION UNION AFRICAINE UNIÃO AFRICANA P. O. Box 3243, Addis Ababa, ETHIOPIA Tel.: (251-11) 5182402 Fax: (251-11) 5182400 Website: www.au.int Sustainable Energy for All (SEforALL) 1. Background/Context
More informationEuropean Activities towards Cooperative Mobility
European Activities towards Cooperative Mobility CARS 21 WG1 MEETING Brussels, 21 February 2011 Juhani Jääskeläinen Head of Unit, ICT for Transport European Commission Directorate General Information Society
More information3M Sensored Cable Accessories for Underground Medium Voltage Distribution System
3M Sensored Cable Accessories for Underground Medium Voltage Distribution System 3M Electronics & Energy Business 1 Introduction The focus on enhancing reliability and efficiency of the power grid has
More informationWireless Network (Neutral Host) Request for Proposals Update
Finance, Administration and Oversight Committee Action Item III-B March 13, 2008 Wireless Network (Neutral Host) Request for Proposals Update Washington Metropolitan Area Transportation Authority Board
More informationThe Efficient Way. SVC PLUS Innovation meets experience. Answers for energy.
The Efficient Way SVC PLUS Innovation meets experience Answers for energy. Enhancement of Grid Efficiency Improved dynamic stability and power quality of power systems in a new, highly economical manner
More informationSE4All Nexus Initiative TAPSIC SE4All Nexus Workshop: Vienna, 22 February, 2016
SE4All Nexus Initiative TAPSIC SE4All Nexus Workshop: Vienna, 22 February, 2016 SE4All Country Action Programme Accelerating Country Action, by helping mobilize ideas, actions and investment, and facilitating
More informationBEMIP implementation WG. Interconnectors Market development
BEMIP implementation WG Interconnectors Market development Estlink 2 The EstLink 2 project is supported by the EU: 100 M EUR Conditions set by Fingrid for construction of Estlink 2, autumn 2009: Estonia:
More informationGrid Interconnection of Renewable Generation
Grid Interconnection of Renewable Generation Randy Rismiller August 14, 2013 Generator Interconnection Rule Responsibility In the United States, the responsibility for establishing generator interconnection
More informationInternational Smart Grid Action Network TCP (ISGAN)
"THE UTILITIES OF THE FUTURE: THE NEW MARKET AND REGULATION MODELS FOR THE TECHNOLOGICAL TRANSITION AND DISTRIBUTED ENERGY RESOURCES INTEGRATION ON GROWING SCALE". Opening Panel of the Smart Grid World
More informationPlanning and investing in critical utility infrastructure with public consultation
Planning and investing in critical utility infrastructure with public consultation Pacific Northwest Economic Region Annual Summit Bob Rowe CEO NorthWestern Energy Building on a Strong Theility Foundation
More informationServer room guide helps energy managers reduce server consumption
Server room guide helps energy managers reduce server consumption Jan Viegand Viegand Maagøe Nr. Farimagsgade 37 1364 Copenhagen K Denmark jv@viegandmaagoe.dk Keywords servers, guidelines, server rooms,
More informationDeveloping a Roadmap for A Smart(er) and Strong Transmission Grid
Developing a Roadmap for A Smart(er) and Strong Transmission Grid By: Navin Bhatt Manager, Advanced Transmission Studies & Technologies American Electric Power (AEP) PSERC 2009 Summer Workshop Breckenridge,
More informationCountry Report : Bhutan. Organization: Disaster Management Division, Ministry of Home and Cultural Affairs. Minister. Secretary
I. Name: Karma Doma Tshering Country Report : Bhutan II. III. IV. Organization: Disaster Management Division, Ministry of Home and Cultural Affairs Professional Status: Sr. Program Officer Organization
More informationExecutive summary. Natural disasters including bushfires, floods, storms and cyclones have destructive and devastating consequences for Australia
Natural disasters including bushfires, floods, storms and cyclones have destructive and devastating consequences for Australia The impacts of these disasters to businesses, properties and people have been
More informationCost and performance implications of infrastructure investment options in the Eskom Distribution network
Cost and performance implications of infrastructure investment options in the Eskom Distribution network Dr Clinton Carter-Brown Industry Association Resource Centre Eskom Holdings Limited Martin Cameron
More information1. Keywords Abstract Machinery and Techonlogy Join the Technology Club... 4
1. Keywords... 2 2. Abstract... 2 3. Machinery and Techonlogy... 2 4. Join the Technology Club... 4 Russia, Trade Council Russia, machinery, technology, nanotechnology, electronics The machinery and technology
More informationPerspectives and actions for the implementation of Smart Grids into the internal energy market
Perspectives and actions for the implementation of Smart Grids into the internal energy market EUTC Annual meeting Budapest, 3-6 November 2009 EUROPEAN COMMISSION Dr. Manuel Sánchez Jiménez Policy Officer
More informationESB Networks. John Byrne Smart Networks Manager
ESB Networks John Byrne Smart Networks Manager Innovation ESBI ecars ESB CER NIE Eirgrid All Island system Operators SONI ESBN Smart Networks Government DCENR SEAI ESRI ITs ERC TCD Academia & Industrial
More informationHigh-Voltage Isolation Amplifiers / Shunt Isolators. VariTrans P 42000
Universal high-voltage isolator. Input voltages up to Vin = ±3600 V. The Task In high-voltage systems, unipolar or bipolar voltage signals ranging from 100 V to 3600 V must be galvanically isolated and
More informationT&D Challenges and Opportunities
T&D Challenges and Opportunities Mark McGranaghan Vice President, Power Delivery and Utilization Alberta Power Industry Consortium November 5, 2014 Tomorrow s Power System (vision) The Integrated Grid
More informationSmartNet Pilots: The demonstration of the different TSO-DSO coordination schemes and market structures
Smart TSO-DSO interaction schemes, market architectures and ICT Solutions for the integration of ancillary services from demand side management and distributed generation The Global Forum Electricity Ancillary
More informationTechnology evolution - March Eduardo Allison - Technical Bid Manager for Mexico, Central America and Caribbean
Technology evolution - March 2017 Eduardo Allison - Technical Bid Manager for Mexico, Central America and Caribbean Portfolio of wind solutions From siting to aftersales, our offering spans across turbines
More informationTransforming the Electric Grid
Transforming the Electric Grid - ORNL s role in supporting DOE s mission January 6 th, 2005 Tom King Program Manager, Power Technologies Oak Ridge National Laboratory kingtjjr@ornl.gov 865-675-4390 Office
More informationZambia National Standardization Organization Audit
Sixth SG13 Regional Workshop for Africa on Standardization of future networks: What opportunities for Africa? (Abidjan, Côte d Ivoire, 26-27 March 2018) Zambia National Standardization Organization Audit
More informationRTU560. CT/VT Interface 560CVT10. Meter Operation. Application. Characteristics. Data Sheet CT/VT Interface 560CVT10. Instantaneous Meter Values
CT/VT Interface 560CVT10 The fault current is measured up to 20 times nominal current. Therefore the current inputs withstand 50 times nominal current for 1 s. The CT/VT interface is equipped with one
More informationGE Technology Powers Scalable Microgrid for Rural Electrification
GE Energy Connections GE Technology Powers Scalable Microgrid for Rural Electrification An estimated 300 million people in India live in energy poverty, having little or no access to electricity. Villages
More information02/11/2015
DIN Rail Mount 22.5 mm ETM2 Part number 84874023 Version ETM : Controls temperature of machines using built-in PTC probes Line break or probe short-circuit detection Version ETM2 / ETM22 : Fault latching
More informationEvaluation of different solutions of faulted phase earthing technique for an earth fault current limitation
24th International Conference & Exhibition on Electricity Distribution (CIRED) 12-15 June 2017 Session 3: Operation, control and protection Evaluation of different solutions of faulted phase earthing technique
More informationAn Introduction to Network Codes & The Links Between Codes
An Introduction to Network Codes & The Links Between Codes April 2014 About ENTSO-E 41 TSOs from 34 countries 532 million citizens served 828 GW generation 305 Thousand Km of transmission lines Ten-Year
More informationECMWF press kit: Bologna to host ECMWF's new data centre
ECMWF press kit: Bologna to host ECMWF's new data centre ECMWF Statement of 22 June 2017 ECMWF s new data centre to be located in Bologna, Italy, by 2019 ECMWF Member States, gathered in Reading for the
More informationSTRATHCONA AREA TRANSMISSION UPGRADE PROJECT
STRATHCONA AREA TRANSMISSION UPGRADE PROJECT September 2017 ProjeCt InFormation You are receiving this information because you are a landowner, resident, business owner, or occupant of property near a
More informationCo-deployment Initiatives in Bangladesh and India
Asia-Pacific Information Superhighway (AP-IS) Steering Group Meeting Bangkok, 12 December 2017 Co-deployment Initiatives in Bangladesh and India Dr K M Baharul Islam Professor of Communications and Fellow,
More informationInnovative use of big data - Investing in the Danish smart city sector
Innovative use of big data - Investing in the Danish smart city sector The liveable city, Glasgow November 10, 2016 Practical Examples of Danish Smart City and IOT Deployments Jeanette Carlsson, CEO newmedia2.0
More informationNERC Transmission Availability Data System (TADS): Element Identifier Data Submission Addendum
Transmission Availability Data System (TADS) Element Identifier Data Submission Addendum May 28, 2013 3353 Peachtree Road NE NERC Transmission Availability Data System (TADS): Element Identifier Data Submission
More informationALLTEC PROTECTION PYRAMID TM FOR PHOTOVOLTAIC SOLAR FIELD
64 Catalyst Drive Canton, North Carolina, 28716 USA +1.828.646.9290 +1.828.646.9527 (Fax) +1.800.203.2658 (Toll Free) www.alltecglobal.com ALLTEC PROTECTION PYRAMID TM FOR PHOTOVOLTAIC SOLAR FIELD Photovoltaic
More informationDS3 Ambitious approach to future network requirements. Mo Cloonan Commission for Energy Regulation, Ireland
DS3 Ambitious approach to future network requirements Mo Cloonan Commission for Energy Regulation, Ireland 1 Overview Irish/N.Irish power system and policy objectives Operational challenges for Ireland-
More informationMaximising Energy Efficiency and Validating Decisions with Romonet s Analytics Platform. About Global Switch. Global Switch Sydney East
Maximising Energy Efficiency and Validating Decisions with Romonet s Analytics Platform Case Study - Global Switch Sydney East About Global Switch Global Switch is a leading owner, operator and developer
More informationNAMA Fair COP 21, Paris December 2, 2015
NAMA development in Thailand: key drivers for success NAMA Fair COP 21, Paris December 2, 2015 Office of Natural Resources and Environment (ONEP), Government of Thailand Outline 1. Overview of NAMA development
More informationMONTHLY REPORT March 2017 Issue No. R03-17
Southern African Power Pool Energising the region for economic development 1 MONTHLY REPORT March Issue No. R03-17 CONTENTS Meetings, Workshops and Conferences.. 1 Traders SAPP -MTP Certification Training...
More informationHundred and seventy-fifth session REPORT BY THE DIRECTOR-GENERAL ON THE IMPLICATIONS OF THE PROCLAMATION OF A WORLD DAY FOR AUDIOVISUAL HERITAGE
ex United Nations Educational, Scientific and Cultural Organization Executive Board Hundred and seventy-fifth session 175 EX/18 PARIS, 1 September 2006 Original: English Item 17 of the provisional agenda
More informationENTSO-E working to fulfill the 3 rd Package
ENTSO-E working to fulfill the 3 rd Package Regulators Role in Developing Infrastructure, Florence February 7 2012 Geoffrey Feasey, ENTSO-E Corporate Affairs Manager ENTSOE s role in implementing European
More informationGridEye FOR A SAFE, EFFICIENT AND CONTROLLED POWER GRID
FOR A SAFE, EFFICIENT AND CONTROLLED POWER GRID SMART GRID VISION To solve today s energy and pollution problems, DEPsys believes that the world should be powered entirely by renewable energy. By applying
More informationSOLAR ENERGY DEVELOPMENT IN MOROCCO
SOLAR ENERGY DEVELOPMENT IN MOROCCO Economic Forum Morocco / Portugal 20 th of April 2015 Avion solaire 1 AN AMBITIOUS RENEWABLE ENERGY STRATEGY 2 MOROCCO ENERGY CHALLENGES AND AMBITIONS Sustainable economic
More informationEquipment Strategy For High Voltage Circuit Breakers
Current version: 23/05/2018 EXTERNAL USE Page 1 of 7 Table of contents 1. Introduction... 3 1.1 Purpose... 3 1.2 Scope... 3 1.3 References... 3 1.4 Defined terms... 3 1.5 Monitoring and compliance... 3
More informationResolution adopted by the General Assembly. [on the report of the Second Committee (A/64/417)]
United Nations General Assembly Distr.: General 9 February 2010 Sixty-fourth session Agenda item 50 Resolution adopted by the General Assembly [on the report of the Second Committee (A/64/417)] 64/187.
More informationData and Forecasting Summary
Data and Forecasting Summary This article highlights the need for more integrated and aligned data systems within WPD and improved interfaces within the industry. It also looks at the increased need for
More informationDistribution Long Term Development Statement
Distribution November 2017 SP Distribution for the years 2017/18 to 2021/22 Distribution for the years 2017/18 to 2021/22 The information used to compile this Statement is derived from SP Distribution
More informationNetwork Configuration Document Selection for New Substations Framework
Network Configuration Document Selection for New Substations Current version: 20/06/2018 EXTERNAL USE Page 1 of 14 Table of contents 1. Introduction... 3 1.1 Purpose... 3 1.2 Scope... 3 1.3 References...
More informationENISA EU Threat Landscape
ENISA EU Threat Landscape 24 th February 2015 Dr Steve Purser ENISA Head of Department European Union Agency for Network and Information Security www.enisa.europa.eu Agenda ENISA Areas of Activity Key
More information