A Regulatory Perspective on Distributed Generation
|
|
- Margery Grant
- 5 years ago
- Views:
Transcription
1 A Regulatory Perspective on Distributed Generation Southwest Electrical Metering Association Spring Meeting Galveston June 10, 2015 Darryl Nelson Rates and Regulatory
2 Agenda Why Rules are Needed Texas Regulatory Overview Legislature / Statutes Public Utility Commission of Texas Substantive Rules DG Rules Interconnection Distributed Renewable Generation DRG Metering Reporting Current Issues Who should sign the interconnection agreement? Should the 10 MW cap be eliminated? 2
3 Example of the Need for DG Rules Solar Array on A-frame Structure 3
4 Example of the Need for DG Rules Solar Array on A-frame Structure 4
5 Example of the Need for DG Rules Meter 5
6 Example of the Need for DG Rules Disconnect 6
7 Example of the Need for DG Rules Solar Array to Serve this Trailer 7
8 Example of the Need for DG Rules Inverter Wiring 8
9 Example of the Need for DG Rules Solar Array Wiring to Inverter (over stove!) 9
10 Texas Regulatory Overview Tariffs TDSPs / Utilities Statutes Legislature Rules PUCT Interconnection Application Agreement Study Fees PURA 1999 Customer Safeguards Interconnection Energy Efficiency Renewables Metering 2 channel Interconnection Technical Requirements Registration Renewables Metering Distributed Generation Items Protocols ERCOT Registration Wholesale Settlement Metering Telemetry Markets / Services 10
11 Statutes Distributed Generation Public Utility Regulatory Act (PURA) Chapter 39 Restructuring of Electric Utility Industry Statute Subsection Title / Details Enacted (b)(3) Customer Safeguards SB "(b) A customer is entitled: (3) to have access to providers of energy efficiency services, to on-site distributed generation, and to providers of energy generated by renewable energy resources;" (a)(4)(A) Goal for Energy Efficiency SB "(4) each electric utility in the ERCOT region shall use its best efforts to encourage and facilitate the involvement of the region's retail electric providers in the delivery of efficiency programs and demand response programs under this section, including programs for demand-side renewable energy systems that: (A) use distributed renewable generation, as defined by Section ;" Interconnection of Distributed Renewable Generation (ERCOT) 2007 (a)(1) defines renewable DG as < 2 MW (a)(2) defines DRG owner (f) separate measurement of in-flow and out-flow (j) DRG must contract with retailer to buy out-flow Interconnection of Distributed Renewable Generation (Non-ERCOT) Distributed Natural Gas Generation Facilities
12 Public Utility Commission of Texas - Substantive Rules CHAPTER 25. SUBSTANTIVE RULES APPLICABLE TO ELECTRIC SERVICE PROVIDERS Purpose and Scope of Rules. (a) Mission of the Public Utility Commission of Texas (commission). The mission of the commission is to assure the availability of safe, reliable, high quality services that meet the needs of all Texans at just and reasonable rates. To accomplish this mission, the commission shall regulate electric and telecommunications utilities as required while facilitating competition, operation of the free market, and customer choice. (b) This chapter is intended to establish a comprehensive system to accomplish the mission of the commission with respect to electric service and to establish the rights and responsibilities of the electric utilities, including transmission and distribution utilities, nonutility wholesale and retail market participants, and electric customers. This chapter shall be given a fair and impartial construction to obtain these objectives and shall be applied uniformly regardless of race, creed, color, national origin, ancestry 12
13 PUCT Rules Distributed Generation Public Utility Commission of Texas Substantive Rules Chapter 25 - Substantive Rules Applicable to Electric Service Providers Rule 25.5(32) Definitions Section Title / Details "(32) Distributed resource A generation, energy storage, or targeted demand-side resource, generally between one kilowatt and ten megawatts, located at a customer's site or near a load center, which may be connected at the distribution voltage level (below 60,000 volts), that provides advantages to the system, such as deferring the need for upgrading local distribution facilities." Interconnection of On-Site Distributed Generation The purpose of this section includes stating the terms and conditions that govern the interconnection and parallel operation of both on-site distributed generation in order to implement Public Utility Regulatory Act (PURA) (b)(3) and a natural gas distributed generation facility in order to implement PURA Technical Requirements for Interconnection and Parallel Operation of Distributed Generation The purpose of this section is to describe the requirements and procedures for safe and effective connection and operation of distributed generation. 13
14 PUCT Rules Distributed Generation, cont d Public Utility Commission of Texas Substantive Rules Chapter 25 - Substantive Rules Applicable to Electric Service Providers Rule Section Title / Details Metering for Distributed Renewable Generation (b)(1) < 50 kw DRG - in-flow and out-flow consumption (b)(2) 50 kw to 2,000 kw DRG - in-flow and out-flow interval data (b)(3) Customer option to not measure out-flow (b)(9) ERCOT must account for in-flow and out-flow in settlements Distributed Renewable Generation (b)(1) Defines DRG (b)(2) Defines DRG Owner (b)(3) Independent School District - Solar Generation - no capacity limit (c) Interconnection - 5-year warranty of DRGO (d) Renewable Energy Credits (RECs) ownership (m)(1)(E) Energy Efficiency Goal "(1) Standard offer, market transformation, and self-delivered programs: (E) may permit the use of distributed renewable generation, geothermal, heat pump, solar water heater and combined heat and power technologies, involving installations of ten megawatts or less;" 14
15 Definitions 25.5(32) Distributed resource A generation, energy storage, or targeted demand-side resource, generally between one kilowatt and ten megawatts, located at a customer's site or near a load center, which may be connected at the distribution voltage level (below 60,000 volts), that provides advantages to the system, such as deferring the need for upgrading local distribution facilities (c)(10) On-site distributed generation (or distributed generation) -- An electrical generating facility located at a customer s point of delivery (point of common coupling) of ten megawatts (MW) or less and connected at a voltage less than 60 kilovolts (kv) which may be connected in parallel operation to the utility system (b)(1) Distributed renewable generation (DRG) -- Electric generation equipment with a capacity of not more than 2,000 kilowatts provided by a renewable energy technology, as defined by Public Utility Regulatory Act (d), installed on a retail electric customer s side of the meter. 15
16 Renewable Installations at Oncor Facilities 1,800 1,600 1,400 1,200 1, Number of Facilities 8 6 1, Wind Solar PV Installed Capacity (kw) 18,000 16, Capacity (kw) 14,000 12,000 10,000 8,000 6,000 4,000 2, , ,405 2,744 7,901 6,387 4,924 2, Wind Solar PV
17 DG Reporting Requirements (n) Reporting requirements. Data Maintained for each Applicant Name Business address Location by county Capacity rating of facility Renewable (Y/N) Date application received Processing documents Correspondence Final disposition Annual Report File by March 30 List each interconnected DG, including previous year o Change in DG ownership o Capacity rating of facility o Renewable (Y/N) o Feeder List all applications from previous year and final disposition 2014 Distributed Generation Interconnection Report Docket No
18 Current Issues Project No Rulemaking Related to Distributed Generation This rulemaking on distributed generation (DG) was initiated to address an issue that arose in the last DG rulemaking: ownership of distributed renewable generation (DRG) by an entity other than the retail customer The following utilities filed joint comments in this rulemaking: AEP-Texas Central AEP-Texas North CenterPoint Energy El Paso Electric Entergy Texas Oncor Electric Delivery Sharyland Utilities Southwestern Electric Power Southwestern Public Service Texas-New Mexico Power 18
19 Current Issues Project No Rulemaking Related to Distributed Generation Questions which the Staff asked guidance from the Commission: 1. Which types of entities should be permitted or required to be signatories to an interconnection agreement for DG? 2. Should the word "on-site" with regard to DG be retained in the DG rule? If so, how should it be defined? 3. Should the Commission eliminate the 10 megawatt (MW) cap in the DG rule? 19
20 Current Issues Project No Rulemaking Related to Distributed Generation Questions which the Staff asked guidance from the Commission: 1. Which types of entities should be permitted or required to be signatories to an interconnection agreement for DG? Only the retail customer. The utility s tariffed relationship and physical connection is to the customer. 2. Should the word "on-site" with regard to DG be retained in the DG rule? If so, how should it be defined? Yes. The Commission has explicitly been given authority over all DG facilities, but only when they are on-site. 3. Should the Commission eliminate the 10 megawatt (MW) cap in the DG rule? No. If rules are adopted addressing DG > 10 MW, then interconnection should be at the discretion of the utility. 20
21 Summary Texas Regulatory Overview Statutes / PUCT Rules / Utility Tariffs / ERCOT Protocols SB7 in 1999 began current DG structure Public Utility Commission of Texas Substantive Rules DG Rules Interconnection Distributed Renewable Generation DRG Metering Reporting Current Issues Who should sign the interconnection agreement? Only the retail customer Should the 10 MW cap be eliminated? No, > 10 MW DG needs special considerations 21
22 Questions? 22
SOUTH TEXAS ELECTRIC COOPERATIVE, INC.
SOUTH TEXAS ELECTRIC COOPERATIVE, INC. P.O. Box 119 Nursery, Texas 77976 (361) 575-6491 Fax (361) 576-1433 Transmission Interconnection Requirements Table of Contents I. Introduction II. Interconnection
More informationCenterPoint Energy P O Box 1700 Houston, TX
CenterPoint Energy P O Box 1700 Houston, TX 77251-1700 IF YOU ARE APPLYING FOR DISTRIBUTED GENERATION, PLEASE FOLLOW THE INSTRUCTIONS IN THE PARAGRAPHS BELOW. YOU WILL NEED TO COMPLETE AND SIGN AND THEN
More informationTRANSMISSION ENGINEERING STANDARDS SUBSTATIONS
This standard was reviewed and approved by key managers on. Officer approval of this revision is not required. 1.0 SCOPE 1.1 This guide applies to the interconnection of a generating plant with the Oncor
More informationERCOT MARKET. PNUCC Larry Weis June 2, 2017
ERCOT MARKET PNUCC Larry Weis June 2, 2017 1 AGENDA Overview Evolution ERCOT Wholesale Market/COUs Business Change Questions and Wrap-up 2 ELECTRIC RELIABILITY COUNCIL OF TEXAS (ERCOT) Manages the flow
More informationOncor Application for Interconnection of Distributed Generation
Oncor Application for Interconnection of Distributed Generation Operating Mode: Parallel Operation Longer than 100 milliseconds (07/11/2018) This application is for generator systems that synchronously
More informationRenewable Energy Interconnection Manual for Small Size Systems ( 10kW in NM 20kW in TX) Renewables and Emergent Technologies Group
Renewable Energy Interconnection Manual for Small Size Systems ( 10kW in NM 20kW in TX) Renewables and Emergent Technologies Group Table of Contents 1. Introduction... 1 2. Purpose... 1 3. Customer Eligibility...
More informationUNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION NOTICE INVITING POST-TECHNICAL CONFERENCE COMMENTS. (June 3, 2016)
UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Review of Generator Interconnection Agreements and Procedures American Wind Energy Association Docket No. RM16-12-000 Docket No. RM15-21-000
More informationUtility Interconnection. Highlights of the New Fast Track Process Proposed by FERC and Changes to IEEE 1547
Utility Interconnection Highlights of the New Fast Track Process Proposed by FERC and Changes to IEEE 1547 1 4/16/2013 Agenda Review of Status of Distributed Energy Resources Standards Changes Review of
More informationSmall Hydro Regulatory and Permitting Requirements California
Small Hydro Regulatory and Permitting Requirements California Lon W. House, Ph.D. 530.409.9702 Water & Energy Small Hydro Regulatory and Compliance FERC QF, Small Hydro License or Exemption EIA Generator
More informationState Perspectives on the Midwest ISO regional Stakeholder Process: The Indiana Utility Regulatory Commission
State Perspectives on the Midwest ISO regional Stakeholder Process: The Indiana Utility Regulatory Commission October 21, 2010 Dave Johnston Beth Krogel Roads Indiana Utility Regulatory Commission (IURC)
More informationIllinois Adjustable Block Program DG Consumer Disclosure Form Portal Reference Guide
Illinois Adjustable Block Program DG Consumer Disclosure Form Portal Reference Guide Overview By participating in Illinois Shines, an installer or other vendor is required to provide customers with disclosure
More informationGrid Interconnection of Renewable Generation
Grid Interconnection of Renewable Generation Randy Rismiller August 14, 2013 Generator Interconnection Rule Responsibility In the United States, the responsibility for establishing generator interconnection
More informationONCOR INFRASTRUCTURE DEVELOPMENT
ONCOR INFRASTRUCTURE DEVELOPMENT Ellen Buck Presentation to Leadership North Texas March 27, 2015 ONCOR: 100 YEARS AND COUNTING Largest Texas regulated utility More than 3,000 employees 10 million living
More informationDistributed Generation Interconnection in Illinois
Distributed Generation Interconnection in Illinois David Rearden January 31, 2014 1a In the beginning Electricity system was vertically integrated: the utility generated the electricity, transmitted to
More informationTexas Reliability Entity, Inc. Strategic Plan for 2017 TEXAS RE STRATEGIC PLAN FOR 2017 PAGE 1 OF 13
Texas Reliability Entity, Inc. Strategic Plan for 2017 TEXAS RE STRATEGIC PLAN FOR 2017 PAGE 1 OF 13 I. Vision A highly reliable and secure bulk power system in the Electric Reliability Council of Texas
More informationGeneration, Transmission, and End User Facilities
Procedures for Interconnection of Generation, Transmission, and End User To the Grand River Dam Authority Transmission System Table of Contents GRDA/SPP Interaction... 3 Standards... 3 Generation... 3
More informationWestern Spirit Clean Line Project. Non Tariff Interconnection Facilities Study
Western Spirit Clean Line Project Non Tariff Interconnection Facilities Study September 2017 Work Performed by: Public Service Company of New Mexico Foreword This technical report is prepared for Clean
More informationIntegrated Resource Planning April 20, 2010
Integrated Resource Planning April 20, 2010 Judy Stokey, Executive Government and External Affairs Jack McGinley, Development Director, Renewables Gary Smith, Project Director-Smart Technologies Presentation
More informationWN U-60 Original Sheet No. 152
WN U-60 Original Sheet No. 152 Table of Contents INTERCONNECTION WITH ELECTRIC GENERATORS 1) Introduction Sheet 152-A 2) Attachments Sheet 152-A 3) Definitions Sheet 152-B 4) Applicability Sheet 152-H
More informationNARUC. Winter Committee Meetings. Staff Subcommittee On Gas
NARUC Winter Committee Meetings Staff Subcommittee On Gas February 12, 2017 { NARUC Staff Subcommittee on Gas Who is NAESB and what does it do? Background Origin and Scope: The North American Energy Standards
More informationOncor Installer Portal Training Guide
Oncor Installer Portal Training Guide 1 Index 1 Introduction to Portal 2 3 Project Workflow 4 5 Introduction to Tabs in Portals 6 All Web Pages Navigation, Buttons, Features & Functionalities New Installer
More informationStem Beach Solar 1041 Application
Stem Beach Solar 1041 Application September 18 th, 2018 By: Stem Beach Solar LLC, Invenergy LLC 1401 17 th Street, Ste 1100 Denver, Colorado 80202 For: Pueblo County Agenda 1. About Invenergy 2. Project
More informationAC-DC ERCOT. Bill Bojorquez Dejan J. Sobajic ERCOT Grid Engineering LLC. June 6, 2005 Les Diablerets, Switzerland
The 8 th Electric Power Control Centers Workshop June 5-8, 2005, Les Diablerets, Switzerland Panel Session "Monitoring and Control of Large Interconnections under Normal and Emergency Operating Conditions"
More informationJanuary 22, The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.
California Independent System Operator Corporation January 22, 2013 The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Re: California
More informationBEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA
BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA Order Instituting Rulemaking to Develop a Successor to Existing Net Energy Metering Tariffs Pursuant to Public Utilities Code Section 2827.1,
More informationMemorandum. This memorandum requires Board action. EXECUTIVE SUMMARY
California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Keith Casey, Vice President, Market & Infrastructure Development Date: May 21, 2014 Re: Decision on interconnection
More informationSmall Generator Interconnection Facilities Study Report. Completed for. ( Interconnection Customer ) Proposed Interconnection Pavant substation
Small Generator Interconnection Facilities Study Report Completed for ( Interconnection Customer ) Proposed Interconnection Pavant substation Original report dated February 17, 2016 Revised March 11, 2016
More informationMinnesota DER Interconnection Process Kristi Robinson, P.E.
Minnesota DER Interconnection Process Kristi Robinson, P.E. 6841 Power Lane SW Alexandria, Minnesota Tel 320.762.1697 Fax 320.762.1479 www.star-energy.com eee@star-energy.com Spring 2017: Petition made
More informationSMALL GENERATING FACILITY PRE-APPLICATION REPORT REQUEST FORM
SMALL GENERATING FACILITY PRE-APPLICATION REPORT REQUEST FORM 1. Instructions By completing this request form, an Interconnection Customer may request a preapplication report from the NYISO regarding the
More informationGenerator Interconnection Process. Wholesale Transmission Overview
1 Generator Interconnection Process Wholesale Transmission Overview 2 This presentation summarizes the FERC-approved Generator Interconnection Procedures (GIP) in Appendix Y of the California Independent
More informationILLINOIS DISTRIBUTED GENERATION PROCUREMENT PROGRAM APPLICATION INSTRUCTIONS
ILLINOIS DISTRIBUTED GENERATION PROCUREMENT PROGRAM APPLICATION INSTRUCTIONS AGENDA Company Overview Program Overview SRECTrade Registration and Bidding Process Summary and Q&A This document is protected
More informationCreate a planet run by the sun.
Create a planet run by the sun. Sunrun & Comcast Agreement August 24, 2017 Safe Harbor & Forward Looking Statements This presentation contains forward-looking statements within the meaning of Section 27A
More informationSOUTHERN COMPANY DISTRIBUTION INTERCONNECTION POLICY
SOUTHERN COMPANY DISTRIBUTION INTERCONNECTION POLICY Inverter Based Generators 25 kw and This document contains the interconnection requirements for inverter based generators, 25 kw and smaller, that operate
More informationBEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA
BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA Order Instituting Rulemaking Regarding Policies, Procedures and Rules for the California Solar Initiative, the Self-Generation Incentive
More informationCode of Conduct Compliance Plan Attachment 6 Page 1 of 9 TEXAS CUSTOMER INFORMATION REQUEST & CONSENT PROCESS
Code of Conduct Compliance Plan Attachment 6 Page 1 of 9 TEXAS CUSTOMER INFORMATION REQUEST & CONSENT PROCESS I. Regulated Utility Customer/Retail Electric Provider (REP) requests that the Utility provide
More informationUser Guide. March 2017
User Guide March 2017 Alberta Utilities Commission efiling System User Guide Fifth Avenue Place Fourth Floor, 425 First Street S.W. Calgary, Alberta T2P 3L8 Phone: 403-592-4500 Email: info@auc.ab.ca www.auc.ab.ca
More informationSummary. Registration RULE 21 ONLINE PORTAL PILOT PG&E CONTACT DETAILS
PG&E Interconnection Portal Contents List Summary... 1 Registration... 1 Account Details... 2 Starting a New Application... 3 Select Program... 3 Enter Generators... 4 Form Builder... 5 Tab Options...
More informationERO Enterprise Registration Practice Guide: Distribution Provider directly connected Determinations Version 2: July 5, 2018
ERO Enterprise Registration Practice Guide: Distribution Provider directly connected Determinations Version 2: July 5, 2018 Purpose The purpose of this Practice Guide is provide a reference to be used
More informationDISTRIBUTED ENERGY RESOURCES NEM PLUS APPLICATION MANUAL
DISTRIBUTED ENERGY RESOURCES NEM PLUS APPLICATION MANUAL Reference Guide for the NEM Plus Application This guide is intended to help customers and contractors complete and submit an application for the
More informationLEGAL AND REGULATORY FRAMEWORK AND OPPORTUNITIES FOR OFF-GRID POWER GENERATION IN NIGERIA
LEGAL AND REGULATORY FRAMEWORK AND OPPORTUNITIES FOR OFF-GRID POWER GENERATION IN NIGERIA Ifedayo Adeoba Senior Associate Detail Commercial Solicitors October, 2017 0 OUTLINE On-grid power generation Off-grid
More informationDLA Energy Installation Energy
DEFENSE LOGISTICS AGENCY AMERICA S COMBAT LOGISTICS SUPPORT AGENCY WARFIGHTER FOCUSED, GLOBALLY RESPONSIVE SUPPLY CHAIN LEADERSHIP DLA Energy Installation Energy Kevin Ahern Sept. 1, 2010 WARFIGHTER SUPPORT
More informationInterconnection and Transmission
Interconnection and Transmission Gary L. Brown, P.E. Director of Energy Development Gary@ZGlobal.biz 916-985-9461 Kevin Coffee Energy Management Committee Meeting Irvine, California August 26, 2015 Interconnection
More informationEnergy.
Briggs and Morgan provides full-service representation to a broad range of energy providers, public utilities, independent power producers, regional entities and other energy-sector participants. We work
More informationIntroduction to the NYISO
Introduction to the NYISO Power Control Center Guilderland, NY July 21, 2011 1 Today s Topics NYISO History NYISO Roles & Governance NYISO Markets Building Reliability Emerging Trends 2 Evolution of the
More informationAnnual Report for the Utility Savings Initiative
Report to the North Carolina General Assembly Annual Report for the Utility Savings Initiative July 1, 2016 June 30, 2017 NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY http://portal.ncdenr.org Page
More informationREAL-TIME MONITORING DATA SPECIFICATION
REAL-TIME MONITORING DATA SPECIFICATION Version 1 December 9, 2016 Revision History Version Date Reviewer Revisions 1 11/1/16 Mansion Hudson Initial document 1 Contents 1. DOCUMENT REVIEW... 3 2. DEFINITIONS...
More informationSuperseding SHEET NO. 34C-51 REVISED SHEET NO. 34C-51 Effective May 27, 2010 Effective December 3, 2011
Superseding SHEET NO. 34C-51 REVISED SHEET NO. 34C-51 INTERCONNECTION APPLICATION FOR ALL BUT UL1741 CERTIFIED INVERTER BASED SYSTEMS LESS THAN 10 KW In addition to the information provided below, a complete
More informationSmall Generator Interconnection Facilities Study Report. Completed for Q0314 ( Interconnection Customer ) A Qualified Facility
Small Generator Interconnection Completed for Q0314 ( Interconnection Customer ) A Qualified Facility Proposed Interconnection PacifiCorp s 34.5-kV West Cedar Substation December 29, 2010 TABLE OF CONTENTS
More informationNorth Carolina Utilities Commission Public Staff. Christopher J. Ayers Executive Director
North Carolina Utilities Commission Public Staff Christopher J. Ayers Executive Director 1 Public Staff Established in 1977 by N.C. Gen. Stat. 62-15 Represents the using and consuming public in North Carolina
More informationGuideline for the Connection of Micro Embedded Generators to the TasNetworks Distribution Network
Tasmanian Networks Pty Ltd ABN 24 167 357 299 Guideline for the Connection of Micro Embedded Generators to the TasNetworks Distribution Network (AS4777 Compliant) NG R PD 09 Version 2.0 July 2014 TABLE
More informationEvaluation of Business Cases for Smart Grid Solutions Kenny Mercado, Senior VP Electric Operations
Evaluation of Business Cases for Smart Grid Solutions Kenny Mercado, Senior VP Electric Operations April 21, 2015 CenterPoint Energy (CNP) Headquartered in Houston, Texas Serving 5.7 million electric &
More informationBulletin Installation of solar photovoltaic systems Rules , , , , and
Bulletin 64-5-0 Installation of solar photovoltaic systems Rules 64-060, 64-200, 64-214, 84-020, 84-024 and 84-030 Scope (1) Introduction (2) Disconnecting means (a) Disconnecting means for solar photovoltaic
More informationMFC Power General Partner Ltd.,
Decision 21950-D01-2016 Preferential Sharing of Records Between, MFC Power Limited Partnership, URICA Energy Real Time Ltd., and URICA Asset Optimization Ltd. October 12, 2016 Alberta Utilities Commission
More informationCONDITIONS OF SERVICE
3.4 UNMETERED CONNECTIONS This section pertains to the conditions of service and supply of electrical energy for unmetered connections. Unmetered connections are categorized as equal to GS < 50 kw class
More informationFrom: Laura Manz, Vice President of Market & Infrastructure Development
California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Laura Manz, Vice President of Market & Infrastructure Development Date: May 8, 2009 Re: Decision for Conditional
More informationAppendix 1 Interconnection Request INTERCONNECTION REQUEST
Appendix 1 Interconnection Request INTERCONNECTION REQUEST NO HARD COPY REQUIRED FOR INTERCONNECTION REQUESTS SUBMITTED ELECTRONICALLY VIA RIMS 5 Provide one hard copy of this completed form pursuant to
More informationComments by the Northeast Power Coordinating Council FERC Reactive Power Technical Conference
Introduction The Northeast Power Coordinating Council 1 (NPCC) is an international electric regional reliability council formed shortly after the 1965 Northeast Blackout to promote the reliability and
More informationWisconsin Public Utility Institute
Wisconsin Public Utility Institute March 1, 2018 Highlights on the Public Service Commission of Wisconsin s Work on Grid Modernization Public Service Commission of Wisconsin Ellen Nowak, Chairperson Agenda
More informationBulletin Installation of Solar Photovoltaic Systems Section 50; Rules: , , ; Tables 11 and 19 Issued July 2010
Ontario Electrical Safety Code - Bulletins 50-1-0 Bulletin 50-1-0 Installation of Solar Photovoltaic Systems Section 50; Rules: 84-020, 84-024, 84-030; Tables 11 and 19 Issued July 2010 Scope (1) Introduction
More informationLex Mundi Telecommunications Regulation Multi-Jurisdictional Survey
Lex Mundi Telecommunications Regulation Multi-Jurisdictional Survey CONTACT INFORMATION Alexandros Georgiades Dr. K. Chrysostomides & Co 1 Lampousas Street 1095 Nicosia Cyprus +357 22 777000 a.georgiades@chrysostomides.com.cy
More informationExpanding Metering and Telemetry Options Technical Stakeholder Initiative
Expanding Metering and Telemetry Options Technical Stakeholder Initiative April 24, 2013 Todays Agenda Time Topic Presenter 10:00 10:10 Opening Comments/Introductions Khaled Abdul-Rahman 10:10 10:20 Stakeholder
More informationG. Larry Clark Principal Engineer Power Delivery Alabama Power Company, A Southern Company
2014 IEEE PES T&D Conference & Exposition Chicago, IL April 15, 2014 Panel Session: Technologies for Advanced Volt/VAR Control Implementation Volt/VAR Control as Part of an Integrated Distribution Management
More informationAn Illinois Perspective
Other State Models: An Illinois Perspective SADZI M. OLIVA, ACTING COMMISSIONER ILLINOIS COMMERCE COMMISSION JULY 21, 2017 Disclaimers Any views, statements, and opinions expressed in this presentation
More informationBROADBAND STATUTES AND RECENT LEGISLATION
kslegres@klrd.ks.gov 68-West Statehouse 300 SW 10th Ave. Topeka, Kansas 66612-1504 (785) 296-3181 January 15, 2019 kslegislature.org/klrd BROADBAND STATUTES AND RECENT LEGISLATION Statutes Forty-three
More informationStandards Authorization Request Form
Standards Authorization Request Form When completed, email this form to: sarcomm@nerc.com NERC welcomes suggestions to improve the reliability of the bulk power system through improved reliability standards.
More informationPlanning for the Future
Gas/Electric Partnership Conference Planning for the Future February 1, 2018 Entergy Texas, Inc. Entergy Texas, Inc. Staci Meyer Manager, Resource Planning Jeff Dicharry Manager, Transmission Planning
More informationITC HOLDINGS, CORP. Edison Electric Institute 9
ITC HOLDINGS, CORP. Company Background: ITC Holdings, Corp. is in the business of investing in electricity transmission infrastructure as a means to improve electric reliability, connect renewable energy
More informationINTERACTION BETWEEN RPS AND SBC POLICIES
INTERACTION BETWEEN RPS AND SBC POLICIES May 19, 2001 INTRODUCTION Numerous countries and U.S. states have begun to explore and implement the Renewables Portfolio Standard (RPS) as a new mechanism to promote
More informationElectric Sample Form No Agreement for Unmetered Low Wattage Equipment Connected to Customer-Owned Street Light Facilities
Pacific Gas and Electric Company San Francisco, California U 39 Revised Cal. P.U.C. Sheet No. 32135-E Cancelling Revised Cal. P.U.C. Sheet No. 27053-E Electric Sample Form No. 79-1048 Agreement for Unmetered
More informationAgreements and Queue Management
Agreements and Queue Management Infrastructure Contracts and Management Joanne Bradley, Queue Management Shoukat Ansari, Contract Negotiation PJ Topping, Regulatory Contracts February 27, 2019 Interconnection
More informationPHASE I ENERGY STORAGE: LESSONS LEARNED
PHASE I ENERGY STORAGE: LESSONS LEARNED ESAG Meeting, June 28, 2018 Innovation Research and Development Table of Contents 1. History and Background 2. Pre-Commissioning: Challenges experienced 3. Project
More informationCAISO RIG Acceptance Test Procedure
CAISO RIG Acceptance Test Procedure TABLE OF CONTENTS 1.0 PURPOSE... 3 2.0 INTRODUCTION... 3 3.0 TEST PROCEDURE... 8 Market Services/ EDAS CAISO Public Revision History 1.0 PURPOSE The procedure is intended
More informationTexas Smart Energy v1.0 HAN Deployment. Larry Kohrmann Oncor Electric Delivery
Texas Smart Energy v1.0 HAN Deployment Larry Kohrmann Oncor Electric Delivery Who is Oncor? Transmission/Distribution Service Provider serving North Texas 3.4 million meters Deploying approx. 16,000 SEP
More informationEXHIBIT A: PROJECT SCOPE AND SCHEDULE The Project consists of the activities and delivery dates identified in this Exhibit A, implemented in accordance with the Agreement. The Parties have included a schedule
More informationAgreements and Queue Management
Agreements and Queue Management Infrastructure Contracts and Management Emilee Plouff, Contract Negotiation and Regulatory Contracts Joanne Bradley, Queue Management March 6, 2018 Interconnection Process
More informationCAISO Metering & Telemetry Requirements. Jeremy Laundergan - Director, EnerNex November 8, 2012
CAISO Metering & Telemetry Requirements Jeremy Laundergan - Director, EnerNex November 8, 2012 Background and Overview Both federal and state regulatory authorities are advocating the participation of
More informationApril 11, 2016 VIA ELECTRONIC FILING
April 11, 2016 VIA ELECTRONIC FILING The Honorable Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Re: Southwest Power Pool, Inc., Docket No.
More informationJim Brenton Regional Security Coordinator ERCOT Electric Reliability Council of Texas
Jim Brenton Regional Security Coordinator ERCOT Electric Reliability Council of Texas Facts expressed in this presentation are Facts Opinions express in this presentation are solely my own The voices I
More informationChapter 5A Embedded Generation Information Pack United Energy s guide to the Embedded Generation connection process for of Chapter 5A
Chapter 5A Embedded Generation Information Pack United Energy s guide to the Embedded Generation connection process for of Chapter 5A Public Table of contents 1 Connection Framework... 3 2 Connection Types...
More informationSOLAR ACADEMY. The Future of Solar Technology
SOLAR ACADEMY The Future of Solar Technology THE SOLAR ACADEMY: ALWAYS UP TO DATE The SMA Solar Academy offers a comprehensive range of seminars on photovoltaics and provides information on SMA products,
More informationQ2: Who is responsible for the maintenance of these central mailboxes? A2: The Home Owner s Association.
USPS Cluster Mailbox Policy Change Webinar February 9, 2017 Questions & Answers United States Postal Service, Southern Area North Central Texas Council of Governments Q1: If the Federal Bill (House Bill
More informationSilicon Valley Power:
Critical Facilities Roundtable Silicon Valley Power: Santa Clara s Hometown Advantage John Roukema Assistant Director Silicon Valley Power June 2, 2006 1 SVP: Santa Clara s Hometown Advantage High value
More informationCity of Azusa Light & Water Department. Interconnection and Net Metering Agreement For Generating Facility 10kW or Less
City of Azusa Light & Water Department Interconnection and Net Metering Agreement For Generating Facility 10kW or Less This Interconnection and Metering Agreement for Solar or Wind Turbine Electric Facilities
More informationA.I Task Order 1 - Technical and Analytical Services 1. SCOPE OF WORK. Deliverablc(s): CPUC Implementation Plan Filed. EXHIBIT A: Scope of Services
EXHIBIT A: Scope of Services A.I Task Order 1 - Technical and Analytical Services SMUD and VCEA agree to the following services, terms, and conditions described in this Task Order. This Task Order is for
More informationWritten Testimony of Rick Gonzales Senior Vice President and Chief Operating Officer New York Independent System Operator
Assembly Standing Committee on Energy Kevin A. Cahill, Chairman Assembly Standing Committee on Corporations, Authorities and Commissions James F. Brennan, Chairman Assembly Standing Committee on Cities
More informationDescription of the Application Process for Small Embedded Generators
Description of the Application Process for Small Embedded Generators This document describes the Application Process for Small Embedded Generators (as required under section 5.3.3A of the National Electricity
More information2009 SPP TransCanada Pipeline Study Report
2009 SPP TransCanada Pipeline Study Report SPP Engineering Department, Planning Section PUBLISHED: 7/9/2009 LATEST REVISION: 7/9/2009 Copyright 2009 by Southwest Power Pool, Inc. All rights reserved. Table
More informationFLORIDA STATE UNIVERSITY MASTER PLAN 10 Utilities
UTILITIES ELEMENT NOTE: Unless otherwise noted, the goals, objectives and policies contained in this element shall guide development of the Main Campus and Southwest Campus in Tallahassee as well as the
More informationTARIFF DISTRIBUTION. DATE: January 23, 2012
FILE PACKAGE NO.: LA-11-0090 TARIFF DISTRIBUTION DATE: January 23, 2012 STATE: EFFECTIVE DATE: 01/23/2012 TYPE OF DISTRIBUTION: Approved PURPOSE: VoIP TARIFF SECTION PAGE NUMBER PAGE REVISION E002 9.1
More informationWELCOME. Draft Energy Storage Roadmap. Draft Matrix Stakeholder Call. November 3, 2014 San Francisco SAFER, SMARTER, GREENER
WELCOME Draft Energy Storage Roadmap Draft Matrix Stakeholder Call November 3, 2014 San Francisco SAFER, SMARTER, GREENER Alignment of Proposed Actions to Storage Configuration and Use Cases Robert Anderson,
More informationState of Minnesota Interconnection Process for Distributed Generation Systems
State of Minnesota Interconnection Process for Distributed Generation Systems Introduction This document has been prepared to explain the process established in the State of Minnesota, to interconnect
More informationChecklist for Submission to Utility
Simplified Interconnection Application Persons interested in applying for the interconnection of a distributed energy resource (DER) to the Utility s distribution system through the Simplified Process
More informationEU Code of Conduct on Data Centre Energy Efficiency
EUROPEAN COMMISSION DIRECTORATE-GENERAL JRC JOINT RESEARCH CENTRE Institute for Energy Renew able and Energy Efficiency Unit EU Code of Conduct on Data Centre Energy Efficiency Introductory guide for all
More informationUNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. REPLY BRIEF OF SOUTHERN CALIFORNIA EDISON COMPANY (March 19, 2009)
UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Southern California Edison Company ) Docket No. ER07-1034-002 REPLY BRIEF OF SOUTHERN CALIFORNIA EDISON COMPANY (March 19, 2009)
More informationI. Tariff language for Transmission Losses Applied to Monthly Reported Network Loads: (for tariff)
I. Tariff language for Transmission Losses Applied to Monthly Reported Network Loads: (for tariff) * MISO will add the underlined text provided by the Owners Committee to Section 34.2 of the Tariff with
More informationClean Power Call BC Transmission Corporation & BC Hydro Joint Information Session July 8, 2008
Clean Power Call BC Transmission Corporation & BC Hydro Joint Information Session July 8, 2008 Agenda 1:30pm Welcome & Introduction Rohan Soulsby 1:40pm Transmission Interconnection Process I Ryan Hefflick
More informationElectric Access System Enhancement (EASE)
Electric Access System Enhancement (EASE) Robert Sherick T-D Operations Interface Working Group More Than Smart August 2 nd, 2017 1 AGENDA ENERGISE Program EASE Project Objectives Approach Expected Outcomes
More informationProject DINAR Pooled BEMI (Bidirectional Energy Management Interface), Germany
Project DINAR Pooled BEMI (Bidirectional Energy Management Interface), Germany 1 Undertaken by CIRED, Centre International de recherche sur l Environnement et le Développement and ISET, Institut für Solare
More informationInterconnection Re-MAT September 11, 2013
Interconnection Re-MAT September 11, 2013 2013 San Diego Gas & Electric Company. All copyright and trademark rights reserved. Distribution System Interconnection Processes Rule 21 - Governed by CPUC Wholesale
More informationState of Minnesota Interconnection Process for Distributed Generation Systems
State of Minnesota Interconnection Process for Distributed Generation Systems Introduction This document has been prepared to explain the process established in the State of Minnesota, to interconnect
More information