1 ALAMO AREA COUNCIL OF GOVERNMENTS CAMS 501, 502, 503, 504, 505, 506 Prepared by: Jim McCraw Partner Ben White Partner Annual Ambient Air Quality Monitoring Report 2015 Dios Dado Environmental Ltd Corporate Drive, Suite 301 Selma, Texas (210) Date: January 7, 2016 Project: # Ltd. Alamo Area Council of Governments Dios Dado Environmental

2 TABLE OF CONTENTS EXECUTIVE SUMMARY 1 TAB DATA RETURN REPORTS 2 MAINTENANCE/CALIBRATION REPORTS 3 SITE OPERATOR LOGS 4 EQUIPMENT INVENTORY 5 Alamo Area Council of Governments Dios Dado Environmental

3 EXECUTIVE SUMMARY Alamo Area Council of Governments Dios Dado Environmental

4 EXECUTIVE SUMMARY This report summarizes the quality of the monitoring data from the Continuous Air Monitoring Stations (CAMS) 501, 502, 504, 503, 505 and 506, owned by Alamo Area Council of Governments (AACOG), and operated by Dios Dado Environmental, for the year of 2015 (The months of April 2015 through October 2015). The objectives of this report are to provide and assess the following: The actual data gathered during the monitoring period The quality of the monitored data The data validation performed The amount of data captured for the year of 2015 The incidents that may have led to data loss Assessment of the data quality indicates that the monitoring data collected during the year 2015 met all of the TCEQ regulatory guidelines for Ozone only sites. The monitoring results did suggest exceedances of the National Ambient Air Quality Standards (NAAQS) on a short-term basis, however, these sites do not meet the regulatory requirements for NAQS as set forth by the EPA. These sites are close enough to be excellent sources of ambient data for mapping and research purposes. Pollutants: Ozone (O3), Meteorology: Wind speed, Resultant wind speed, Resultant wind direction, Maximum wind gust, Standard deviation of horizontal wind direction, Outdoor temperature, Indoor temperature, Precipitation events The data collected at the sites this Year was fully representative of ambient conditions in the area. The monitoring instruments all functioned properly or were repaired quickly enough to prevent any data loss this year. Normal calibration and maintenance procedures, which are noted in the logs and all relevant tables, resulted in a loss of some data but not enough to fall below the 75 required. All equipment operations conformed to TCEQ criteria and passed our calibrations during the season. A data return rate of greater than 96.3 (average) was achieved on all the Ozone instruments at the sites for the entire reporting period. AACOG equipment concerns for the 2016 ozone season are as follows: The Thermo Fisher 49C O3 units are passed their useful lifetime and we will no longer be able to obtain spare parts after this ozone season. New units must be budgeted for future site operations. The C502, Fair Oaks Ranch, site will need to be relocated due to building expansion and flora and fauna overgrowth. The school will no longer be able to house the equipment. The C503, Bulverde, site met gear is still on the ground and not installed. The tower is ready to put in when the school gives AACOG the green light for the location. The met gear all needs to be cleaned and overhauled before the next season as well. The AACOG spare unit was deployed at C501 and the C501 unit needs maintenance, then the spare unit got taped by a storm and we had to replace the nose cone with the one from C503, so it needs repaired as well. We are so very pleased to be of service to AACOG and our community, and are pleased with the success of this season operation. Thank you for the opportunity to serve. Alamo Area Council of Governments Dios Dado Environmental

5 DATA RETURN/COMPLETENESS REPORTS Alamo Area Council of Governments Dios Dado Environmental

6 Alamo Area Council of Governments Dios Dado Environmental Data Return Report 00:00 LST April 1, 2015 through 00:00 LST May 1, 2015 >>> One or more monitors had planned shutdowns during the selected reporting period. See below for details. Regio n CAM S Location Pollution Data O3 Poll WDR Meteorological Data WSR Out Temp Met Elm Creek Elementary C Fair Oaks Ranch C Bulverde Elementary C * * * * New Braunfels Airport C * * * * City of Garden Ridge C * * * * Seguin Outdoor Learning Center C * * * * Region 13 Averages * -- Parameter not monitored. Lowest Allowable Data Return O3 Poll WDR WSR Out Temp Met Network Averages Lowest allowable data return for pollution data: 75 Lowest allowable data return for meteorological data: 75

7 Alamo Area Council of Governments Dios Dado Environmental Data Return Report 00:00 LST May 1, 2015 through 00:00 LST June 1, 2015 Region CAMS Location Pollution Data O3 Poll WDR Meteorological Data WSR Out Temp Met Elm Creek Elementary C Fair Oaks Ranch C Bulverde Elementary C * * * * New Braunfels Airport C * * * * City of Garden Ridge C * * * * Seguin Outdoor Learning Center C * * * * Region 13 Averages * -- Parameter not monitored. Lowest Allowable Data Return O3 Poll WDR WSR Out Temp Met Network Averages Lowest allowable data return for pollution data: 75 Lowest allowable data return for meteorological data: 75

8 Alamo Area Council of Governments Dios Dado Environmental Data Return Report 00:00 LST June 1, 2015 through 00:00 LST July 1, 2015 Regio n CAM S Location Pollution Data O3 Poll WDR Meteorological Data WSR Out Temp Met Elm Creek Elementary C Fair Oaks Ranch C Bulverde Elementary C * * * * New Braunfels Airport C * * * * City of Garden Ridge C * * * * Seguin Outdoor Learning Center C * * * * Region 13 Averages * -- Parameter not monitored. Lowest Allowable Data Return O3 Poll WDR WSR Out Temp Met Network Averages Lowest allowable data return for pollution data: 75 Lowest allowable data return for meteorological data: 75

9 Alamo Area Council of Governments Dios Dado Environmental Data Return Report 00:00 LST July 1, 2015 through 00:00 LST August 1, 2015 Region CAMS Location Pollution Data O3 Poll WDR Meteorological Data WSR Out Temp Met Elm Creek Elementary C Fair Oaks Ranch C Bulverde Elementary C * * * * New Braunfels Airport C * * * * City of Garden Ridge C * * * * Seguin Outdoor Learning Center C * * * * Region 13 Averages * -- Parameter not monitored. O3 Poll WDR WSR Out Temp Met Network Averages Lowest Allowable Data Return Lowest allowable data return for pollution data: 75 Lowest allowable data return for meteorological data: 75

10 Alamo Area Council of Governments Dios Dado Environmental Data Return Report 00:00 LST August 1, 2015 through 00:00 LST September 1, 2015 Region CAMS Location Pollution Data O3 Poll WDR Meteorological Data WSR Out Temp Met Elm Creek Elementary C Fair Oaks Ranch C Bulverde Elementary C * * * * New Braunfels Airport C * * * * City of Garden Ridge C * * * * Seguin Outdoor Learning Center C * * * * Region 13 Averages * -- Parameter not monitored. Lowest Allowable Data Return O3 Poll WDR WSR Out Temp Met Network Averages Lowest allowable data return for pollution data: 75 Lowest allowable data return for meteorological data: 75

11 Alamo Area Council of Governments Dios Dado Environmental Data Return Report 00:00 LST September 1, 2015 through 00:00 LST October 1, 2015 Region CAMS Location Pollution Data O3 Poll WDR Meteorological Data WSR Out Temp Met Elm Creek Elementary C Fair Oaks Ranch C Bulverde Elementary C * * * * New Braunfels Airport C * * * * City of Garden Ridge C * * * * Seguin Outdoor Learning Center C * * * * Region 13 Averages * -- Parameter not monitored. O3 Poll WDR WSR Out Temp Met Network Averages **The Data return percentage for CAMS 503-Bulverde was lower this month due to communication issues at the site. Lowest Allowable Data Return Lowest allowable data return for pollution data: 75 Lowest allowable data return for meteorological data: 75

12 Alamo Area Council of Governments Dios Dado Environmental Data Return Report 00:00 LST October 1, 2015 through 00:00 LST November 1, 2015 Region CAMS Location Pollution Data O3 Poll WDR Meteorological Data WSR Out Temp Met Elm Creek Elementary C Fair Oaks Ranch C Bulverde Elementary C * * * * New Braunfels Airport C * * * * City of Garden Ridge C * * * * Seguin Outdoor Learning Center C * * * * Region 13 Averages * -- Parameter not monitored. Lowest Allowable Data Return O3 Poll WDR WSR Out Temp Met Network Averages Lowest allowable data return for pollution data: 75 Lowest allowable data return for meteorological data: 75

13 Alamo Area Council of Governments Dios Dado Environmental Data Return Report AACOG Sites 2015 Season Average 00:00 LST April 1, 2015 through 00:00 LST November 1, 2015 >>> One or more monitors had planned shutdowns during the selected reporting period. See below for details. Region CAMS Location Pollution Data O3 Poll WDR Meteorological Data WSR Out Temp Met Elm Creek Elementary C Fair Oaks Ranch C Bulverde Elementary C * * * * New Braunfels Airport C * * * * City of Garden Ridge C * * * * Seguin Outdoor Learning Center C * * * * Region 13 Averages * -- Parameter not monitored. Lowest Allowable Data Return O3 Poll WDR WSR Out Temp Met Network Averages Lowest allowable data return for pollution data: 75 Lowest allowable data return for meteorological data: 75

14 MAINTENANCE / CALIBRATION REPORTS Alamo Area Council of Governments Dios Dado Environmental

15 AACOG Ozone and Meteorological Network, Region of San Antonio, TX Preventative Maintenance Schedule for 2015 CAMS Elm Creek Description Mar Apr May Jun Jul Aug Sep Oct Nov Analyzer Sample Inlet Filter (PMI 04-14) 1st Site Visit Analyzer Sample Inlet Filter (PMI 04-14) 2nd/3rd Site Visit Ambient Sample Line (PMI ) 25 Replace/Check Met Gear (PMI ) 25 3-Point Calibrations Point Calibrations *Miscellaneous : Site start-up : Entered station to check on W/S sensor on tower. Dropped tower and checked wiring and unit could not find anything wrong with unit. went and replaced unit with rebuilt unit or spare unit. Checked status of unit and found that unit is doing the same thing.we ruled out that the unit is bad. Will have to come back and check zeno program next and placed unit back in K/code for now. BDW and BBW : Dialed into station remotely and worked on zeno program while tech on site. jmccraw : Site Shut-Down

16 AACOG Ozone and Meteorological Network, Region of San Antonio, TX Preventative Maintenance Schedule for 2015 CAMS City of Fair Oaks Ranch Description Mar Apr May Jun Jul Aug Sep Oct Nov Analyzer Sample Inlet Filter (PMI 04-14) 1st Site Visit Analyzer Sample Inlet Filter (PMI 04-14) 2nd/3rd Site Visit Ambient Sample Line (PMI ) 23 Replace/Check Met Gear (PMI ) 23 3-Point Calibrations Point Calibrations *Miscellaneous : Site start-up 5-24 & : Entered station both days to check on coms problem came back today with equipment to check on phone line, found telephone line to be dead. Data logger collecting data and instruments running good. Will have AACOG make phone call to AT&T tomorrow for service repair. BDW : Entered station to perform 3-point calibration and inspect O3 instrument and change filter. Q-coded O3 unit and started. Found O3 unit running low on Pressure and rebuilt pump with new diaphragm. Performed 3-Point Calibration after pump rebuild. Calibration ok. BDW : Entered station to shutdown for 2015 ozone season. Took site ozone and zeno serial numbers for site inventory. BBW

17 AACOG Ozone and Meteorological Network, Region of San Antonio, TX Preventative Maintenance Schedule for 2015 CAMS Bulverde Elementary School Description Mar Apr May Jun Jul Aug Sep Oct Nov Analyzer Sample Inlet Filter (PMI 04-14) 1st Site Visit Analyzer Sample Inlet Filter (PMI 04-14) 2nd/3rd Site Visit Ambient Sample Line (PMI ) 1 Replace/Check Met Gear (PMI ) N/A 3-Point Calibrations Point Calibrations - 1& *Miscellaneous : Site start-up : Entered Station yesterday could not communicate with data logger pulled equipment out and repaired at our shop but replaced all ptfe tubing : Entered station to trouble shoot reporting problem. the Zeno does not transport data to the modem, the modem connects, the Zeno is powered on and data is collecting, the com port may be out on Zeno further equipment required to complete this task : Entered station to replace the site zeno, the com port on installed unit stopped working. All previous data points and log entries will be uploaded to TCEQ in file format when coms to zeno can be restored. O3 unit operations never effected or changed, no calibration required. left site safe and secure. jmccraw/dca : Arrived at site and checked if data logger was collection data. Everything seems to be working great but Wireless modem acting up will not transfer data. Will take to shop and may have to replace. Made log entry and left site safe and secure. BDW : Entered station to download data off zeno and change filter in station. Left site safe and secure. BBW : Entered station to download data off of zeno. Left site safe and secure. BBW : Entered station and pulled data from zeno for end of month to deliver to TCEQ.jmccraw : Entered station to retrieve data off of Zeno. Changed particulate filter, made log entry and left site safe and secure. Left site safe and secure. BBW : Entered station to work on station communication problems, replaced modem and connected to tower then lost signal, tried to reboot unit no go, removed all modems to shop for replacement of SIM cards and verify operation. pulled data from to upload to Laura. left site safe and secure. jmccraw : Entered station to download data from Zeno. left site safe and secure. BBW : Entered station to download data off of ZENO. Left site safe and secure BBW : Notified school ac unit out, alarms going off and water is flooding out of floor drain : Entered station to download data from the zeno, also changed particulate filters for the ozone unit. left site safe and secure. BBW : Entered station to perform 3pt inspection and download data from the zeno. Left site safe and secure. BBW : Entered station to pull all data, and shut down all equipment. left site safe and secure. DCA

18 AACOG Ozone and Meteorological Network, Region of San Antonio, TX Preventative Maintenance Schedule for 2015 CAMS National Weather Service Station - New Braunfels Description Mar Apr May Jun Jul Aug Sep Oct Nov Analyzer Sample Inlet Filter (PMI 04-14) 1st Site Visit Analyzer Sample Inlet Filter (PMI 04-14) 2nd/3rd Site Visit Ambient Sample Line (PMI ) 16 Replace/Check Met Gear (PMI ) N/A 3-Point Calibrations Point Calibrations *Miscellaneous : Site start-up : Entered station to perform periodic maintenance items. This unit pump is getting noisy will schedule a replacement unit be ready. jmccraw : Site Shut-Down

19 AACOG Ozone and Meteorological Network, Region of San Antonio, TX Preventative Maintenance Schedule for 2015 CAMS City of Garden Ridge Description Mar Apr May Jun Jul Aug Sep Oct Nov Analyzer Sample Inlet Filter (PMI 04-14) 1st Site Visit Analyzer Sample Inlet Filter (PMI 04-14) 2nd/3rd Site Visit Ambient Sample Line (PMI ) 24 Replace/Check Met Gear (PMI ) N/A 3-Point Calibrations Point Calibrations *Miscellaneous : Site start-up : Entered station to shut down Ozone unit for end of season. Checked all parameters, one parameter is in alarm: Intensity B is Low showing Hz. Lower limit is Hz. KONeal

20 AACOG Ozone and Meteorological Network, Region of San Antonio, TX Preventative Maintenance Schedule for 2015 CAMS Seguin Outdoor Learning Center Description Mar Apr May Jun Jul Aug Sep Oct Nov Analyzer Sample Inlet Filter (PMI 04-14) 1st Site Visit Analyzer Sample Inlet Filter (PMI 04-14) 2nd/3rd Site Visit Ambient Sample Line (PMI ) 16 Replace/Check Met Gear (PMI ) N/A 3-Point Calibrations Point Calibrations *Miscellaneous : Site start-up; Alarm showing for low flow on Flow B sensor but O3 unit is running properly :. Alarm on bench temp. at 40.9' C : Entered station to conduct bi-monthly maintenance and 3 pt calibration on O3 unit. Also to replace the Flow B Sensor. Koneal : Entered station to conduct bi-monthly maintenance. Bench temp in alarm at 40.5'C. Acceptable range is 15'C to 40'C. All other perameters are ok. KONeal : Entered station to conduct bi-weekly maintenance. Checked flows, temps, pressures and intensities. Temp was in alarm at 41.2'C With the limit being 40'C. All other parameters ok. koneal : Entered station to perform bi-weekly maintenance and 5-point calibration. Checked flows, pressures, intensities and temperatures. All ok except "Bench Temp." was in alarm at 40.9'C when the max, according to instrument is 40'C. koneal : Site Shut-Down

21 OPERATOR LOGS Alamo Area Council of Governments Dios Dado Environmental

22 Operator Logs for Elm Creek Elementary C501 Date Time (CST) Wed Mar 25, :20:51 Fri Mar 27, :21:48 Operator Visit Date Wed Apr 01, :56:07 leadsadmin 04/01/2015 Sat Apr 04, :43:34 Automatic time sync Tue Apr 07, :43:33 Automatic time sync Sat Apr 11, :43:33 Automatic time sync Tue Apr 14, :43:34 Automatic time sync Sat Apr 18, :43:35 Automatic time sync Tue Apr 21, :43:34 Automatic time sync Mon Apr 27, :29:56 Log Entry 01/01/ /30/2015 Elm Creek Elementary C501 (48_029_0501) Entered station to replace PTFE Tubing and check bearings in w/s w/d equipment for 2015 ozone season. Placed Os unit in P code and left w/s w/d inst in k code. Will come back later and perform 5 point calibration for start of 2015 ozone season Made log entry and left site safe and secure. BDW/DA Entered Station to perform start of year 5 Point Calibration and perform biweekly filter change. Q coded O3 unit and started. O3 unit calibrated with Thermo Model 165C S/N 165C calibrated using TCEQ primary standard S/N 116 API T703 on 01/26/15. Changed filter and Placed unit back in k code. Calibration Ok..400= PPB.300= PPB.200= PPB.090= PPB.000= PPb made log entry and left Area Safe And Secure. BDW Monitor shutdown date cleared for: Ozone == 44201_1 Wind Speed == 61101_1 Resultant Wind Speed == 61103_1 Resultant Wind Direction == 61104_1 Maximum Wind Gust == 61105_1 Standard Deviation of Horizontal Wind Direction == 61106_1 Outdoor Temperature == 62101_1 Internal Station Temperature == 62107_1 Precipitation == 65102_ Entered station to perform 3 point calibration and inspect O3 instrument and change filter. Q coded O3 unit and started. Performed 3 Point Calibration with Thermo Model 165C S/N 165C calibrated using TCEQ primary standard N S/N 116 API T703 on 01/26/15.inspect O3 instrument and change filter.checked Flows ok, intensities ok, temps ok Calibration Ok made log entry..400= PPB.090= PPB.000= PPB Placed unit in k code.left Area Safe And Secure. BDW

23 Tue Apr 28, :43:35 Automatic time sync Sat May 02, :43:34 Automatic time sync Mon May 04, :08:44 Tue May 05, :43:34 Automatic time sync Sat May 09, :43:34 Automatic time sync Tue May 12, :43:34 Automatic time sync Wed May 13, :45:43 Sat May 16, :43:33 Automatic time sync Wed May 20, :49:19 Sat May 23, :43:33 Automatic time sync Tue May 26, :43:42 Automatic time sync Wed May 27, :17:46 Sat May 30, :43:43 Automatic time sync Tue Jun 02, :43:34 Automatic time sync Sat Jun 06, :43:35 Automatic time sync Sat Jun 13, :43:34 Automatic time sync Tue Jun 16, :43:33 Automatic time sync Tue Jun 16, :54:24 Sat Jun 27, :43:36 Automatic time sync Entered station to check on W/S sensor on tower. Placed W/S, W/D, Temp, and Precip in P code and started. Dropped tower and checked wiring and unit could not find anything wrong with unit. went and replaced unit with rebuilt unit or spare unit. checked status of unit and found that unit is doing the same thing.we ruled out that the unit is bad. will have to come back and check zeno probram next and placed unit back in K/code for now. Made log entry and left site safe and secure. BDW and BBW Entered station to inspect O3 instrument and change filter. Flows ok, intensities ok, temps ok changed filter. Area safe and secure BDW.. dialed into station remotely and worked on zeno program while tech on site. jmccraw Entered station to perform 3 point calibration and inspect O3 instrument and change filter. Q coded O3 unit and started. Performed 3 Point Calibration with Thermo Model 165C S/N 165C calibrated using TCEQ primary standard N S/N 116 API T703 on 01/26/15.inspect O3 instrument and change filter.checked Flows ok, intensities ok, temps ok Calibration Ok made log entry..400= PPB.090= PPB.000= PPB Placed unit in k code.left Area Safe And Secure. BDW Entered station to inspect O3 instrument and change filter. Flows ok, intensities ok, temps ok changed filter. Left area safe and secure BDW.

24 Mon Jun 29, :01:33 Tue Jun 30, :43:34 Automatic time sync Sat Jul 04, :43:34 Automatic time sync Tue Jul 07, :43:35 Automatic time sync Sat Jul 11, :43:35 Automatic time sync Tue Jul 14, :43:35 Automatic time sync Tue Jul 14, :44:40 Sat Jul 18, :43:35 Automatic time sync Tue Jul 21, :43:34 Automatic time sync Sat Jul 25, :43:35 Automatic time sync Mon Jul 27, :20:40 Tue Jul 28, :43:33 Automatic time sync Thu Jul 30, :53:41 CCarrasco 07/30/2015 Check site status online Fri Jul 31, :44:31 CCarrasco 07/31/2015 Checked site status online Sat Aug 01, :43:34 Automatic time sync Mon Aug 03, :07:00 CCarrasco Entered station to perform 3 point calibration and inspect O3 instrument and change filter. Q coded O3 unit and started. Performed 3 Point Calibration with Thermo Model 165C S/N 165C calibrated using TCEQ primary standard N S/N 116 API T703 on 01/26/15.inspect O3 instrument and change filter. Checked Flows ok, intensities ok, temps ok Calibration Ok made log entry..400= PPB.090= PPB.000= PPB Placed unit in k code. Left Area Safe And Secure. BDW Entered station to perform bi weekly maintenance. Changed particulate filter and checked flows, temps, frequencies, pressures. All OK. Made log entry left Area safe and secure. BDW Entered station to perform 5pt calibration and replace particulate filter. lefte safe and secure. BBW 08/03/2015 Checked site status online Tue Aug 04, :43:34 Automatic time sync Tue Aug 04, :12:29 CCarrasco 08/04/2015 Checked site status online Wed Aug 05, :58:56 CCarrasco 08/05/2015 Checked site status online Thu Aug 06, :52:05 CCarrasco 08/06/2015 Checked site status online Fri Aug 07, :00:35 CCarrasco 08/07/2015 Checked site status online Mon Aug 10, :17:15 CCarrasco 08/10/2015 Checked site status online Tue Aug 11, :43:34 Automatic time sync Tue Aug 11, :04:49 CCarrasco 08/11/2015 Checked site status online Wed Aug 12, :45:38 CCarrasco 08/12/2015 Check site status online

25 Thu Aug 13, :50: Entered station to perform bi weekly maintenance. Changed particulate filter and checked flows, temps, frequencies, pressures. All OK. Made log entry left Area safe and secure. BDW Sat Aug 15, :43:35 Automatic time sync Mon Aug 17, :20:45 CCarrasco 08/17/2015 Checked site status online Tue Aug 18, :47:27 CCarrasco 08/18/2015 Checked site status online Wed Aug 19, :14:35 CCarrasco 08/19/2015 Check site status online Thu Aug 20, :00:35 CCarrasco 08/20/2015 Checked site status online Fri Aug 21, :30:34 CCarrasco 08/21/2015 Checked site status online Mon Aug 24, :20:25 CCarrasco 08/24/2015 Check site status online Tue Aug 25, :02:19 CCarrasco 08/25/2015 Checked site status online Tue Aug 25, :18:05 Wed Aug 26, :25:30 CCarrasco Entered station to perform 3 point calibration and inspect O3 instrument and change filter. Q coded O3 unit and started. Performed 3 Point Calibration with Thermo Model 165C S/N 165C calibrated using TCEQ primary standard N S/N 116 API T703 on 01/26/15.inspect O3 instrument and change filter. Checked Flows ok, intensities ok, temps ok Calibration Ok made log entry..400= PPB.090= PPB.000= PPB Placed unit in k code. Left Area Safe And Secure. BDW 08/26/2015 Checked site status online Thu Aug 27, :14:36 CCarrasco 08/27/2015 Checked site status online Fri Aug 28, :00:59 CCarrasco 08/28/2015 Checked site status online Sat Aug 29, :43:35 Automatic time sync Mon Aug 31, :41:34 CCarrasco Wed Sep 02, :39:32 CCarrasco 08/31/2015 Checked site status online 09/02/2015 Checked site status online Thu Sep 03, :40:26 CCarrasco 09/03/2015 Checked site status online Fri Sep 04, :23:38 CCarrasco 09/04/2015 Checked site status online Sat Sep 05, :43:34 Automatic time sync Tue Sep 08, :43:34 Automatic time sync Tue Sep 08, :13:31 CCarrasco 09/08/2015 Checked site status online Wed Sep 09, :33:22 CCarrasco 09/09/2015 Checked site status online Thu Sep 10, :28:43 CCarrasco 09/10/2015 Checked site status online Fri Sep 11, :07:24 CCarrasco 09/11/2015 Checked site status online Sat Sep 12, :43:35 Automatic time sync Mon Sep 14, :00:33 CCarrasco 09/14/2015 Checked site status online Tue Sep 15, :43:34 Automatic time sync

26 Tue Sep 15, :18:47 CCarrasco 09/15/2015 Checked site status online Tue Sep 15, :18:27 Wed Sep 16, :56:39 koneal Entered station to perform bi weekly maintenance. Changed particulate filter and checked flows, temps, frequencies, pressures. All OK. Made log entry left Area safe and secure. BDW 09/16/2015 Checked site status online Thu Sep 17, :34:26 CCarrasco 09/17/2015 Checked site status online Fri Sep 18, :08:32 CCarrasco 09/18/2015 Checked site status online Sat Sep 19, :43:34 Automatic time sync Mon Sep 21, :00:37 CCarrasco 09/21/2015 Checked site status online Tue Sep 22, :43:35 Automatic time sync Tue Sep 22, :22:03 CCarrasco 09/22/2015 Checked site status online Wed Sep 23, :35:12 CCarrasco 09/23/2015 Checked site status online Thu Sep 24, :18:46 CCarrasco 09/24/2015 Checked site status online Fri Sep 25, :07:44 CCarrasco 09/25/2015 Checked site status online Sat Sep 26, :43:35 Automatic time sync Mon Sep 28, :53:38 Tue Sep 29, :43:34 Automatic time sync Tue Sep 29, :28:57 CCarrasco 09/29/2015 Checked site status online Wed Sep 30, :37:01 CCarrasco Entered station to perform 3 point calibration and inspect O3 instrument and change filter. Q coded O3 unit and started. Performed 3 Point Calibration with Thermo Model 165C S/N 165C calibrated using TCEQ primary standard N S/N 116 API T703 on 01/26/15.inspect O3 instrument and change filter. Checked Flows ok, intensities ok, temps ok Calibration Ok made log entry..400= PPB.090= PPB.000= PPB Placed unit in k code. Left Area Safe And Secure. BDW 09/30/2015 Checked site status online Thu Oct 01, :56:34 CCarrasco 10/01/2015 Checked site status online Fri Oct 02, :49:05 CCarrasco 10/02/2015 Checked site status online Mon Oct 05, :10:45 CCarrasco 10/05/2015 Checked site status online Tue Oct 06, :43:36 Automatic time sync Tue Oct 06, :53:11 CCarrasco 10/06/2015 Checked site status online Wed Oct 07, :57:48 CCarrasco 10/07/2015 Checked site status online Thu Oct 08, :25:45 koneal 10/08/2015 Checked site status online. koneal Sat Oct 10, :43:34 Automatic time sync Tue Oct 13, :43:34 Automatic time sync

27 Tue Oct 13, :22:58 Wed Oct 14, :10:15 CCarrasco 10/14/2015 Checked site status online Thu Oct 15, :54:21 CCarrasco 10/15/2015 Checked site status online Fri Oct 16, :07:31 CCarrasco 10/16/2015 Checked site status online Sat Oct 17, :43:34 Automatic time sync Mon Oct 19, :46:55 CCarrasco 10/19/2015 Checked site status online Tue Oct 20, :43:34 Automatic time sync Tue Oct 20, :40:13 CCarrasco 10/20/2015 Checked site status online Wed Oct 21, :28:18 CCarrasco 10/21/2015 Checked site status online Thu Oct 22, :30:51 CCarrasco 10/22/2015 Checked site status online Fri Oct 23, :33:31 CCarrasco 10/23/2015 Checked site status online Mon Oct 26, :26:52 CCarrasco 10/26/2015 Checked site status online Mon Oct 26, :38:01 Tue Oct 27, :43:34 Automatic time sync Tue Oct 27, :04:49 CCarrasco 10/27/2015 Checked site status online Wed Oct 28, :59:53 CCarrasco 10/28/2015 Checked site status online Thu Oct 29, :40:52 CCarrasco 10/29/2015 Checked site status online Fri Oct 30, :09:52 CCarrasco 10/30/2015 Checked site status online Sat Oct 31, :43:34 Automatic time sync Mon Nov 02, :48:30 CCarrasco Entered station to perform bi weekly maintenance. Changed particulate filter and checked flows, temps, frequencies, pressures. All OK. Made log entry left Area safe and secure. BDW Entered Station to perform end of year 5 Point Calibration and perform biweekly filter change. Q coded O3 unit and started. O3 unit calibrated with Thermo Model 165C S/N 165C calibrated using TCEQ primary standard S/N 116 API T703 on 01/26/15. Changed filter and Placed unit back in k code. Calibration Ok..400= PPB.300= PPB.200= PPB.090= PPB.000= PPb Inspect O3 instrument checked Flows ok, intensities ok, temps ok. Made log entry and left Area Safe And Secure 11/02/2015 Checked site status online Tue Nov 03, :43:34 Automatic time sync Tue Nov 03, :36:18 CCarrasco 11/03/2015 Checked site status online Wed Nov 04, :33:40 CCarrasco 11/04/2015 Checked site status online Thu Nov 05, :19:58 CCarrasco 11/05/2015 Checked site status online Thu Nov 05, :10:36 Entered station to turn off Ozone unit and site for 2015 ozone season. Also took inventory of Ozone monitor and zeno. Left site safe and secure. BBW Fri Nov 06, :46:49 CCarrasco 11/06/2015 Could not check site status online

28 Mon Nov 09, :26:24 CCarrasco Mon Nov 09, :37:26 leadsadmin 11/09/ /09/2015 Could not check site status online Monitor shutdown date set to ,13:00 for: Ozone == 44201_1 Wind Speed == 61101_1 Resultant Wind Speed == 61103_1 Resultant Wind Direction == 61104_1 Maximum Wind Gust == 61105_1 Standard Deviation of Horizontal Wind Direction == 61106_1 Outdoor Temperature == 62101_1 Internal Station Temperature == 62107_1 Precipitation == 65102_1

29 Operator Logs for Fair Oaks Ranch C502 Date Time (CST) Operator Visit Date Sat Mar 21, :28:30 Automatic time sync Mon Mar 23, :43:12 Tue Mar 24, :28:31 Automatic time sync Sat Mar 28, :28:30 Automatic time sync Sun Mar 29, :27:39 Mon Mar 30, :42:50 leadsadmin 03/30/2015 Mon Mar 30, :43:30 leadsadmin 03/30/2015 Log Entry 01/01/ /30/2015 Fair Oaks Ranch C502 (48_029_0502) Entered station to replace PTFE Tubing and check bearings in w/s w/d equipment for 2015 ozone season. Placed units in q code and back to k code. Will come back later and perform 5 point calibration for start of 2015 ozone season Made log entry and left site safe and secure. BDW/BBW Entered Station to perform start of year 5 Point Calibration and perform biweekly filter change. Q coded O3 unit and started. O3 unit calibrated with Thermo Model 165C S/N 165C calibrated using TCEQ primary standard S/N 116 API T703 on 01/26/15. Changed filter and Placed unit back in k code. Calibration Ok..400= PPB.300= PPB.200= PPB.090= PPB.000= PPb made log entry and left Area Safe And Secure. BDW This entry was automatically generated by the Shutdown Range Editor web page. Instrument Shutdown Range modified. CAMS 502 (Fair Oaks Ranch C502), Site: 48_029_0502 Parameter: Ozone, POC 1 Updated by: leadsadmin Action taken: New shutdown range added. New shutdown range: Start Date: November 5, :00:00 CST End Date: March 29, :00:00 CST Monitor shutdown date cleared for: Ozone == 44201_1 Tue Mar 31, :28:30 Automatic time sync Sat Apr 04, :28:31 Automatic time sync Tue Apr 07, :28:30 Automatic time sync Sat Apr 11, :28:31 Automatic time sync Wed Apr 15, :50:00 Sat Apr 25, :28:30 Automatic time sync Tue Apr 28, :28:30 Automatic time sync Entered station to change particulate filters and reset site modem. Left site safe and secure. BBW 1

30 Tue Apr 28, :56:37 Sat May 02, :28:30 Automatic time sync Sat May 09, :28:31 Automatic time sync Tue May 12, :51:31 Sat May 16, :28:31 Automatic time sync Tue May 19, :28:31 Automatic time sync Mon May 25, :38:49 Wed May 27, :55:36 Sat May 30, :28:33 Automatic time sync Tue Jun 02, :28:31 Automatic time sync Sat Jun 06, :28:30 Automatic time sync Sat Jun 13, :28:31 Automatic time sync Tue Jun 16, :28:30 Automatic time sync Tue Jun 16, :25:10 Sat Jun 20, :28:35 Automatic time sync Tue Jun 23, :28:30 Automatic time sync Entered station to perform 3 point calibration and inspect O3 instrument and change filter. Q coded O3 unit and started. Performed 3 Point Calibration with Thermo Model 165C S/N 165C calibrated using TCEQ primary standard N S/N 116 API T703 on 01/26/15.inspect O3 instrument and change filter.checked Flows ok, intensities ok, temps ok Calibration Ok made log entry..400= PPB.090= PPB.000= PPB Placed unit in k code.left Area Safe And Secure. BDW : Entered station to change particulate filter. Made journal entry and left site safe and secure. BBW 5 24/25 15 Entered station both days to check on coms problem came back today with equipment to check on phone line. found telephone line to be dead. Data logger collecting data and instruments running good. Will have AACOG make phone call to AT&T tomorrow for service repair. Made log entry and left site safe and secure. BDW Entered station to perform 3 point calibration and inspect O3 instrument and change filter. Q coded O3 unit and started. Performed 3 Point Calibration with Thermo Model 165C S/N 165C calibrated using TCEQ primary standard N S/N 116 API T703 on 01/26/15.inspect O3 instrument and change filter. Checked Flows ok, intensities ok, temps ok Calibration Ok made log entry..400= PPB.090= PPB.000= PPB Placed unit in k code. Left Area Safe And Secure. BDW Entered station to inspect O3 instrument and change filter. Flows ok, intensities ok, temps ok changed filter. Left area safe and secure BDW.. 2

31 Fri Jun 26, :09:21 Sat Jun 27, :28:34 Automatic time sync Tue Jun 30, :28:31 Automatic time sync Sat Jul 04, :28:31 Automatic time sync Tue Jul 07, :28:31 Automatic time sync Sat Jul 11, :28:36 Automatic time sync Tue Jul 14, :28:30 Automatic time sync Tue Jul 14, :31:30 Tue Jul 21, :28:31 Automatic time sync Sat Jul 25, :28:31 Automatic time sync Wed Jul 29, :20:01 Thu Jul 30, :54:10 CCarrasco 07/30/2015 Check site status online Fri Jul 31, :44:49 CCarrasco 07/31/2015 Checked site status online Sat Aug 01, :28:32 Automatic time sync Mon Aug 03, :07:34 CCarrasco Entered station to perform 3 point calibration and inspect O3 instrument and change filter. Q coded O3 unit and started. Performed 3 Point Calibration with Thermo Model 165C S/N 165C calibrated using TCEQ primary standard N S/N 116 API T703 on 01/26/15.inspect O3 instrument and change filter. Checked Flows ok, intensities ok, temps ok Calibration Ok made log entry..400= PPB.090= PPB.000= PPB Placed unit in k code. Left Area Safe And Secure. BDW Entered station to perform bi weekly maintenance. Changed particulate filter and checked flows, temps, frequencies, pressures. All OK. Made log entry left Area safe and secure. BDW Entered station to perform 5pt inspection to Ozone unit. Also replaced filter. Left site safe and secure. BBW 08/03/2015 Checked site status online Tue Aug 04, :12:52 CCarrasco 08/04/2015 Checked site status online Wed Aug 05, :59:16 CCarrasco 08/05/2015 Checked site status online Thu Aug 06, :52:38 CCarrasco 08/06/2015 Checked site status online Fri Aug 07, :01:10 CCarrasco 08/07/2015 Checked site status online Mon Aug 10, :17:47 CCarrasco 08/10/2015 Checked site status online Tue Aug 11, :05:07 CCarrasco 08/11/2015 Checked site status online Wed Aug 12, :45:55 CCarrasco 08/12/2015 Check site status online Thu Aug 13, :29:33 BBWhite 08/13/2015 Entering station to change particulate filter. BBW Mon Aug 17, :21:04 CCarrasco 08/17/2015 Checked site status online Tue Aug 18, :28:32 Automatic time sync Tue Aug 18, :47:45 CCarrasco 08/18/2015 Checked site status online Wed Aug 19, :14:51 CCarrasco 08/19/2015 Check site status online 3

32 Thu Aug 20, :00:53 CCarrasco 08/20/2015 Checked site status online Fri Aug 21, :30:53 CCarrasco 08/21/2015 Checked site status online Sat Aug 22, :28:31 Automatic time sync Mon Aug 24, :20:44 CCarrasco 08/24/2015 Check site status online Tue Aug 25, :28:31 Automatic time sync Tue Aug 25, :02:39 CCarrasco 08/25/2015 Checked site status online Tue Aug 25, :14:26 Wed Aug 26, :25:50 CCarrasco Entered station to perform 3 point calibration and inspect O3 instrument and change filter. Q coded O3 unit and started. Found O3 unit running low on Pressure and rebuilt pump with new diaphragm. Performed 3 Point Calibration after pump rebuild. We calibrated using Thermo Model 165C S/N 165C calibrated using TCEQ primary standard N S/N 116 API T703 on 01/26/15.inspect O3 instrument and change filter. Checked Flows low rebuilt pump, intensities ok, temps ok Calibration Ok made log entry..400= PPB.090= PPB.000= 0.08 PPB Placed unit in k code. Left Area Safe And Secure. BDW 08/26/2015 Checked site status online Thu Aug 27, :14:54 CCarrasco 08/27/2015 Checked site status online Fri Aug 28, :01:17 CCarrasco 08/28/2015 Checked site status online Mon Aug 31, :42:16 CCarrasco 08/31/2015 Could not check site status online Tue Sep 01, :28:31 Automatic time sync Wed Sep 02, :39:52 CCarrasco 09/02/2015 Checked site status online Thu Sep 03, :40:43 CCarrasco 09/03/2015 Checked site status online Fri Sep 04, :24:02 CCarrasco 09/04/2015 Checked site status online Sat Sep 05, :28:30 Automatic time sync Tue Sep 08, :28:33 Automatic time sync Tue Sep 08, :13:50 CCarrasco 09/08/2015 Checked site status online Wed Sep 09, :33:42 CCarrasco 09/09/2015 Checked site status online Thu Sep 10, :29:00 CCarrasco 09/10/2015 Checked site status online Fri Sep 11, :07:40 CCarrasco 09/11/2015 Checked site status online Sat Sep 12, :28:31 Automatic time sync Mon Sep 14, :00:53 CCarrasco Mon Sep 14, :13:10 09/14/2015 Checked site status online Tue Sep 15, :28:31 Automatic time sync Tue Sep 15, :19:08 CCarrasco 09/15/2015 Checked site status online Wed Sep 16, :56:28 koneal entered station to change ozone particulate filter. Left site safe and secure. BBW 09/16/2015 Checked site status online 4

33 Thu Sep 17, :34:44 CCarrasco 09/17/2015 Checked site status online Fri Sep 18, :08:49 CCarrasco 09/18/2015 Checked site status online Sat Sep 19, :28:30 Automatic time sync Mon Sep 21, :00:56 CCarrasco 09/21/2015 Checked site status online Tue Sep 22, :28:30 Automatic time sync Tue Sep 22, :25:09 CCarrasco 09/22/2015 Checked site status online Wed Sep 23, :35:28 CCarrasco 09/23/2015 Checked site status online Thu Sep 24, :19:21 CCarrasco 09/24/2015 Checked site status online Fri Sep 25, :08:02 CCarrasco 09/25/2015 Checked site status online Sat Sep 26, :28:30 Automatic time sync Tue Sep 29, :28:34 Automatic time sync Tue Sep 29, :29:13 CCarrasco 09/29/2015 Checked site status online Tue Sep 29, :16:11 Wed Sep 30, :37:21 CCarrasco Entered station to perform 3 point calibration and inspect O3 instrument and change filter. Q coded O3 unit and started. Performed 3 Point Calibration with Thermo Model 165C S/N 165C calibrated using TCEQ primary standard N S/N 116 API T703 on 01/26/15.inspect O3 instrument and change filter.checked Flows ok, intensities ok, temps ok Calibration Ok made log entry..400= PPB.090= PPB.000= PPB Placed unit in k code.left Area Safe And Secure. BDW 09/30/2015 Checked site status online Thu Oct 01, :56:52 CCarrasco 10/01/2015 Checked site status online Fri Oct 02, :49:23 CCarrasco 10/02/2015 Checked site status online Mon Oct 05, :11:03 CCarrasco 10/05/2015 Checked site status online Tue Oct 06, :28:31 Automatic time sync Tue Oct 06, :53:28 CCarrasco 10/06/2015 Checked site status online Wed Oct 07, :58:09 CCarrasco 10/07/2015 Checked site status online Thu Oct 08, :25:35 koneal 10/08/2015 Checked site status online. koneal Sat Oct 10, :28:30 Automatic time sync Tue Oct 13, :28:30 Automatic time sync Wed Oct 14, :10:42 CCarrasco 10/14/2015 Checked site status online Wed Oct 14, :27:03 Thu Oct 15, :59:35 CCarrasco 10/15/2015 Checked site status online Entered station to perform bi weekly maintenance. Changed particulate filter and checked flows, temps, frequencies, pressures. All OK. Made log entry left Area safe and secure. BDW Thu Oct 15, :00:18 CCarrasco 10/15/2015 Could not check site status online 5

34 Fri Oct 16, :08:02 CCarrasco 10/16/2015 Checked site status online Sat Oct 17, :28:30 Automatic time sync Mon Oct 19, :47:12 CCarrasco 10/19/2015 Checked site status online Tue Oct 20, :28:29 Automatic time sync Tue Oct 20, :40:33 CCarrasco 10/20/2015 Checked site status online Wed Oct 21, :28:36 CCarrasco 10/21/2015 Checked site status online Thu Oct 22, :31:09 CCarrasco 10/22/2015 Checked site status online Fri Oct 23, :33:49 CCarrasco 10/23/2015 Checked site status online Sat Oct 24, :28:31 Automatic time sync Sat Oct 24, :04:06 Mon Oct 26, :27:10 CCarrasco 10/26/2015 Checked site status online Tue Oct 27, :28:30 Automatic time sync Tue Oct 27, :05:07 CCarrasco 10/27/2015 Checked site status online Wed Oct 28, :00:14 CCarrasco 10/28/2015 Checked site status online Thu Oct 29, :41:09 CCarrasco 10/29/2015 Checked site status online Fri Oct 30, :10:20 CCarrasco 10/30/2015 Checked site status online Mon Nov 02, :48:46 CCarrasco Entered Station to perform end of year 5 Point Calibration and perform biweekly filter change. Q coded O3 unit and started. O3 unit calibrated with Thermo Model 165C S/N 165C calibrated using TCEQ primary standard S/N 116 API T703 on 01/26/15. Changed filter and Placed unit back in k code. Calibration Ok..400= PPB.300= PPB.200= PPB.090= PPB.000= 0.66 PPB Inspect O3 instrument checked Flows ok, intensities ok, temps ok. Made log entry and left Area Safe And Secure. BDW 11/02/2015 Checked site status online Tue Nov 03, :28:30 Automatic time sync Tue Nov 03, :36:04 CCarrasco 11/03/2015 Checked site status online Wed Nov 04, :33:27 CCarrasco 11/04/2015 Checked site status online Thu Nov 05, :19:43 CCarrasco 11/05/2015 Checked site status online Thu Nov 05, :50:44 Entered station to shutdown for 2015 ozone season. Took site ozone and zeno serial numbers for site inventory. left site safe and secure. BBW Fri Nov 06, :47:24 CCarrasco 11/06/2015 Could not check site status online Mon Nov 09, :26:39 CCarrasco 11/09/2015 Could not check site status online 6

35 Mon Nov 09, :37:44 leadsadmin 11/09/2015 Monitor shutdown date set to ,10:00 for: Ozone == 44201_1 Wind Speed == 61101_1 Resultant Wind Speed == 61103_1 Resultant Wind Direction == 61104_1 Maximum Wind Gust == 61105_1 Standard Deviation of Horizontal Wind Direction == 61106_1 Outdoor Temperature == 62101_1 Internal Station Temperature == 62107_1 Precipitation == 65102_1 7

36 Operator Logs for Bulverde Elementary C503 Date Time (CST) Wed Apr 01, :35:17 Operator Visit Date Wed Apr 01, :18:41 leadsadmin 04/01/2015 Wed Apr 01, :09:45 leadsadmin 04/01/2015 Wed Apr 01, :10:27 leadsadmin 04/01/2015 Sat Apr 04, :13:12 Automatic time sync Mon Apr 06, :52:48 jmccraw 04/06/2015 Log Entry 01/01/ /30/2015 Bulverde Elementary C503 (48_091_0503) Entered Station yesterday could not communicate with data logger pulled equipment out and repaired at our shop but replaced all ptfe tubing. Arrived today to perform start of year 5 Point Calibration and perform biweekly filter change. Q coded O3 unit and started. O3 unit calibrated with Thermo Model 165C S/N 165C calibrated using TCEQ primary standard S/N 116 API T703 on 01/26/15. Changed filter and Placed unit back in k code. Calibration Ok..400= PPB.300= PPB.200= PPB.090= PPB.000= PPb made log entry and left Area Safe And Secure. BDW Monitor shutdown date cleared for: Ozone == 44201_1 Internal Station Temperature == 62107_1 This entry was automatically generated by the Shutdown Range Editor web page. Instrument Shutdown Range modified. CAMS 503 (Bulverde Elementary C503), Site: 48_091_0503 Parameter: Ozone, POC 1 Updated by: leadsadmin Action taken: New shutdown range added. New shutdown range: Start Date: November 5, :00:00 CST End Date: April 1, :00:00 CST This entry was automatically generated by the Shutdown Range Editor web page. Instrument Shutdown Range modified. CAMS 503 (Bulverde Elementary C503), Site: 48_091_0503 Parameter: Internal Station Temperature, POC 1 Updated by: leadsadmin Action taken: New shutdown range added. New shutdown range: Start Date: November 5, :00:00 CST End Date: April 1, :00:00 CST Entered station to trouble shoot reporting problem. the Zeno does not transport data to the modem, the modem connects, the Zeno is powered on and data is collecting, the com port may be out on Zeno further equipment required to complete this task. 1

37 Wed Apr 08, :40:29 Wed Apr 08, :40:29 Wed Apr 08, :40:29 Thu Apr 09, :58:35 Thu Apr 09, :58:35 Thu Apr 09, :58:35 Tue Apr 14, :36:52 Tue Apr 14, :36:52 Tue Apr 14, :36:52 Tue Apr 21, :42:00 Tue Apr 21, :42:00 Tue Apr 21, :42:00 Entered station to replace the site zeno, the com port on installed unit stopped working. All previous data points and log entries will be uploaded to TCEQ in file format when coms to zeno can be restored. O3 unit operations never effected or changed, no calibration required. left site safe and secure. jmccraw/dca Entered station to replace the site zeno, the com port on installed unit stopped working. All previous data points and log entries will be uploaded to TCEQ in file format when coms to zeno can be restored. O3 unit operations never effected or changed, no calibration required. left site safe and secure. jmccraw/dca Entered station to replace the site zeno, the com port on installed unit stopped working. All previous data points and log entries will be uploaded to TCEQ in file format when coms to zeno can be restored. O3 unit operations never effected or changed, no calibration required. Left site safe and secure. jmccraw/dca : Arrived at site and checked if data logger was collection data. Everything seems to be working great but Wireless modem acting up will not transfer data. Will take to shop and may have to replace. Made log entry and left site safe and secure. BDW : Arrived at site and checked if data logger was collection data. Everything seems to be working great but Wireless modem acting up will not transfer data. Will take to shop and may have to replace. Made log entry and left site safe and secure. BDW : Arrived at site and checked if data logger was collection data. Everything seems to be working great but Wireless modem acting up will not transfer data. Will take to shop and may have to replace. Made log entry and left site safe and secure. BDW 04/14/2015: Entered station to download data off zeno and change filter in station. Left site safe and secure. BBW 04/14/2015: Entered station to download data off zeno and change filter in station. Left site safe and secure. BBW 04/14/2015: Entered station to download data off zeno and change filter in station. Left site safe and secure. BBW Entered station to download data off of zeno. Left site safe and secure. BBW Entered station to download data off of zeno. Left site safe and secure. BBW Entered station to download data off of zeno. Left site safe and secure. BBW 2

AIMMS Function Reference - Date Time Related Identifiers

AIMMS Function Reference - Date Time Related Identifiers AIMMS Function Reference - Date Time Related Identifiers This file contains only one chapter of the book. For a free download of the complete book in pdf format, please visit www.aimms.com Aimms 3.13 Date-Time

More information

AQS (Air Quality System) General Overview

AQS (Air Quality System) General Overview AQS (Air Quality System) General Overview CARB PQAO Training January 25, 2017 Jennifer Williams EPA Region 9 1 AQS (Air Quality System) Overview What is AQS? Database that contains: Ambient air pollution

More information

Scheduling. Scheduling Tasks At Creation Time CHAPTER

Scheduling. Scheduling Tasks At Creation Time CHAPTER CHAPTER 13 This chapter explains the scheduling choices available when creating tasks and when scheduling tasks that have already been created. Tasks At Creation Time The tasks that have the scheduling

More information

ASSOCIATION OF CHARTERED CERTIFIED ACCOUNTANTS

ASSOCIATION OF CHARTERED CERTIFIED ACCOUNTANTS E CENT R LI CB E NSE D CE 1 April 2017 31 March 2018 ASSOCIATION OF CHARTERED CERTIFIED ACCOUNTANTS THE BRITISH COUNCIL IN UAE ADMINISTERS COMPUTER BASED EXAMS ON BEHALF OF ACCA www.britishcouncil.ae LIC

More information

CIMA Certificate BA Interactive Timetable

CIMA Certificate BA Interactive Timetable CIMA Certificate BA Interactive Timetable 2018 Nottingham & Leicester Version 3.2 Information last updated 09/03/18 Please note: Information and dates in this timetable are subject to change. Introduction

More information

NMOSE GPCD CALCULATOR

NMOSE GPCD CALCULATOR NMOSE CALCULATOR It should be noted that all the recorded data should be from actual metered results and should not include any estimates. Gallons per Capita - v2.4 Beta Release Date: Mar, 16, 29 This

More information

Conditional Formatting

Conditional Formatting Microsoft Excel 2013: Part 5 Conditional Formatting, Viewing, Sorting, Filtering Data, Tables and Creating Custom Lists Conditional Formatting This command can give you a visual analysis of your raw data

More information

INFORMATION TECHNOLOGY SPREADSHEETS. Part 1

INFORMATION TECHNOLOGY SPREADSHEETS. Part 1 INFORMATION TECHNOLOGY SPREADSHEETS Part 1 Page: 1 Created by John Martin Exercise Built-In Lists 1. Start Excel Spreadsheet 2. In cell B1 enter Mon 3. In cell C1 enter Tue 4. Select cell C1 5. At the

More information

MONITORING REPORT ON THE WEBSITE OF THE STATISTICAL SERVICE OF CYPRUS DECEMBER The report is issued by the.

MONITORING REPORT ON THE WEBSITE OF THE STATISTICAL SERVICE OF CYPRUS DECEMBER The report is issued by the. REPUBLIC OF CYPRUS STATISTICAL SERVICE OF CYPRUS MONITORING REPORT ON THE WEBSITE OF THE STATISTICAL SERVICE OF CYPRUS DECEMBER The report is issued by the Monitoring Report STATISTICAL DISSEMINATION AND

More information

San Francisco Housing Authority (SFHA) Leased Housing Programs October 2015

San Francisco Housing Authority (SFHA) Leased Housing Programs October 2015 San Francisco Housing Authority (SFHA) Leased Housing Programs October 2015 Table of Contents Program Utilization Summary 3 PIC Reporting Rate 4-5 Operational Updates Recertifications and Inspections 6-7

More information

Centralized Controller Model: AG-150A

Centralized Controller Model: AG-150A Air-conditioner Network System Centralized Controller Model: AG-150A Instruction Book (Web browser for System maintenance engineer) Contents 1 Introduction... 1 1-1 Terms Used in This Manual...1 1-2 Computer

More information

CIMA Asia. Interactive Timetable Live Online

CIMA Asia. Interactive Timetable Live Online CIMA Asia Interactive Timetable 2018 Live Online Information version 8 last updated 04/05/18 Please note information and dates are subject to change. Premium Learning Partner 2018 CIMA Cert BA Course Overview

More information

Excel Functions & Tables

Excel Functions & Tables Excel Functions & Tables SPRING 2016 Spring 2016 CS130 - EXCEL FUNCTIONS & TABLES 1 Review of Functions Quick Mathematics Review As it turns out, some of the most important mathematics for this course

More information

Commonwealth of the Northern Mariana Islands

Commonwealth of the Northern Mariana Islands Commonwealth of the Northern Mariana Islands ~ FISCAL YEAR ~ 2017 2018 % change ~ CALENDAR YEAR ~ 2016 2017 % change YTD OCT NOV DEC JAN FEB MAR APR MAY JUN JUL AUG SEP TOTAL 147,729 41,910 47,261 58,558

More information

Troop calendar

Troop calendar Troop 546 2013-2014 calendar For questions and information please visit www.troop546peoriaaz.com or email troop546info@googlegroups.com August Court of honor Tue Aug 27, 2013 6pm - 7:30pm Award scouts

More information

Freedom of Information Act 2000 reference number RFI

Freedom of Information Act 2000 reference number RFI P. Norris By email to: xxxxxxxxxxxxxxxxxxxxxx@xxxxxxxxxxxxxx.xxm 02 November 2011 Dear P. Norris Freedom of Information Act 2000 reference number RFI20111218 Thank you for your request under the Freedom

More information

2014 Bond Technology Update Progress of the Technology Network Infrastructure Upgrades Long Range Planning Committee March 4, 2015

2014 Bond Technology Update Progress of the Technology Network Infrastructure Upgrades Long Range Planning Committee March 4, 2015 2014 Bond Technology Update Progress of the Technology Network Infrastructure Upgrades Long Range Planning Committee March 4, 2015 2014 Bond Technology Update Progress of the Technology Network Infrastructure

More information

3. EXCEL FORMULAS & TABLES

3. EXCEL FORMULAS & TABLES Winter 2019 CS130 - Excel Formulas & Tables 1 3. EXCEL FORMULAS & TABLES Winter 2019 Winter 2019 CS130 - Excel Formulas & Tables 2 Cell References Absolute reference - refer to cells by their fixed position.

More information

Contents:

Contents: Contents: Conventional/REO/Short Sale Single Family Sold Sold Properties by Cities - Properties Sold Supply Inventory Median Price Comparison by Year www.swflrealtors.com Page #. Single Family & Condo

More information

CIMA Asia. Interactive Timetable Live Online

CIMA Asia. Interactive Timetable Live Online CIMA Asia Interactive Timetable 2017 2018 Live Online Version 1 Information last updated 09 October 2017 Please note: Information and dates in this timetable are subject to change. CIMA Cert BA Course

More information

REPORT ON TELECOMMUNICATIONS SERVICE QUALITY WINDSTREAM FLORIDA, INC.

REPORT ON TELECOMMUNICATIONS SERVICE QUALITY WINDSTREAM FLORIDA, INC. REPORT ON TELECOMMUNICATIONS SERVICE QUALITY For WINDSTREAM FLORIDA, INC. Alachua, Brooker, High Springs, Melrose, and Waldo s February 4 March 14, 2008 Division of Service, Safety & Consumer Assistance

More information

I I. I I Wed 28-Jan-I WW1 - External Data I. EPF 29.5 Water Results. Consent of copyright owner required for any other use.

I I. I I Wed 28-Jan-I WW1 - External Data I. EPF 29.5 Water Results. Consent of copyright owner required for any other use. ~ EPF 29.5 Water Results 2. WW1 - External Data Frequency Parameter Week Day Date 2Mon 05-Jan-5. 1 06-Jan-5 [Wed ] 07-Jan-5 [Thu 1 08-Jan-5 Fri 09-Jan-5 O-Jan- 5 1 -Jan- 5 3 Mon 12-Jan- 5 ]Tue 13-Jan-5

More information

CHAPTER/REGIONAL TECHNOLOGY AWARD - SHORT FORM

CHAPTER/REGIONAL TECHNOLOGY AWARD - SHORT FORM CHAPTER/REGIONAL TECHNOLOGY AWARD - SHORT FORM 1. Category (Check one and indicate New or Existing, if applicable) Commercial Buildings New or Existing Institutional Buildings: Educational Facilities New

More information

PMx Sequential Samplers Giano & Gemini

PMx Sequential Samplers Giano & Gemini PMx Sequential Samplers Giano & Gemini Description PMx Sequential Samplers The PMx sequential samplers Mod. Giano and Gemini were designed and realized by Dado lab to be more practical, easier to transport

More information

Undergraduate Admission File

Undergraduate Admission File Undergraduate Admission File June 13, 2007 Information Resources and Communications Office of the President University of California Overview Population The Undergraduate Admission File contains data on

More information

GB/UK. Operating manual. Data logger EBI USB

GB/UK. Operating manual. Data logger EBI USB GB/UK Operating manual Data logger EBI 300 - USB 292055 Table of Contents Overview... 2 Safety Instructions... 3 Unpacking / Package Contents... 3 First Start... 3 Display... 4 Recording Indicators...

More information

UC DAVIS THERMAL ENERGY STORAGE (TES) TANK OPTIMIZATION INVESTIGATION MATTHEW KALLERUD, DANNY NIP, MIANFENG ZHANG TTP289A JUNE 2012

UC DAVIS THERMAL ENERGY STORAGE (TES) TANK OPTIMIZATION INVESTIGATION MATTHEW KALLERUD, DANNY NIP, MIANFENG ZHANG TTP289A JUNE 2012 UC DAVIS THERMAL ENERGY STORAGE (TES) TANK OPTIMIZATION INVESTIGATION MATTHEW KALLERUD, DANNY NIP, MIANFENG ZHANG TTP289A 004 11 JUNE 2012 TABLE OF CONTENTS Abstract...3 Introduction...3 Methodology...4

More information

LONG-TERM SITE WIND DATA REPORT. Thompson Island

LONG-TERM SITE WIND DATA REPORT. Thompson Island LONG-TERM SITE WIND DATA REPORT Thompson Island January 1, 2005 December 31, 2005 Prepared for Massachusetts Technology Collaborative 75 North Drive Westborough, MA 01581 By Christopher N. Elkinton Anthony

More information

DOWNLOAD OR READ : YEAR PLANNER 2014 WORD DOCUMENT VIEW PDF EBOOK EPUB MOBI

DOWNLOAD OR READ : YEAR PLANNER 2014 WORD DOCUMENT VIEW PDF EBOOK EPUB MOBI DOWNLOAD OR READ : YEAR PLANNER 2014 WORD DOCUMENT VIEW PDF EBOOK EPUB MOBI Page 1 Page 2 year planner 2014 word document view year planner 2014 word pdf year planner 2014 word document view 2014 Calendar.

More information

Energy Engineering: Tools and Trends

Energy Engineering: Tools and Trends Energy Engineering: Tools and Trends AEE Northeast Ohio Chapter Meeting March 27, 2008 1 Introduction Background and Experience Energy Engineer for Trane 20 years in HVAC Industry Equipment design and

More information

Introducing your new ACH ALERT USER GUIDE. Updated

Introducing your new ACH ALERT USER GUIDE. Updated Introducing your new ACH ALERT USER GUIDE Updated 03.09.18 Table of Contents DASHBOARD 3 General...3 Viewing the Dashboard...4 Viewing the Dashboard After EOD with Additional File Load...9 USER PRIVILEGES

More information

DATE OF BIRTH SORTING (DBSORT)

DATE OF BIRTH SORTING (DBSORT) DATE OF BIRTH SORTING (DBSORT) Release 3.1 December 1997 - ii - DBSORT Table of Contents 1 Changes Since Last Release... 1 2 Purpose... 3 3 Limitations... 5 3.1 Command Line Parameters... 5 4 Input...

More information

Energy Step Code Implementation Strategy. March 26, 2018

Energy Step Code Implementation Strategy. March 26, 2018 Energy Step Code Implementation Strategy March 26, 2018 About the BC Energy Step Code Climate Leadership Plan call for: Net zero energy ready buildings by 2032; Development of the Energy Step Code to get

More information

What future changes are planned to improve the performance and reliability of the Wairarapa Connection?

What future changes are planned to improve the performance and reliability of the Wairarapa Connection? By email 27 February 2017 File Ref: OIAP-7-3039 Shed 39, 2 Fryatt Quay Pipitea, Wellington 6011 PO Box 11646 Manners Street Wellington 6142 T 04 384 5708 F 04 385 6960 www.gw.govt.nz Iain Palmer fyi-request-5300-1f924c94@requests.fyi.org.nz

More information

Is Something Wrong with Texas Home Prices?

Is Something Wrong with Texas Home Prices? Is Something Wrong with Texas Home Prices? Finding Shelter: Affordability Squeeze in a Tight Texas Housing Market Dallas Federal Reserve February 23, 2018 Constrained supply plus strong demand = accelerated

More information

TOWN MANAGER S WEEKLY REPORT

TOWN MANAGER S WEEKLY REPORT TOWN MANAGER S WEEKLY REPORT UPCOMING MEETINGS & EVENTS Town Council Meeting: Wednesday, May 10, 7:00 PM, Regular Meeting, Town Hall Planning Commission: Wednesday, May 17, 6:00 PM, Town Hall 1. Public

More information

Single Family Months of Inventory. Condo Months of Inventory. May calgary regional housing market statistics

Single Family Months of Inventory. Condo Months of Inventory. May calgary regional housing market statistics May 211 calgary regional housing market statistics INNER CITY HOUSING MARKET LEADS IN SALES Buyers find value in inner city communities Total Single Family Months of Inventory Calgary, June 1, 211 According

More information

TOWN MANAGER S WEEKLY REPORT

TOWN MANAGER S WEEKLY REPORT TOWN MANAGER S WEEKLY REPORT UPCOMING MEETINGS & EVENTS Planning Commission Meeting: Wednesday, February 15, 6:00 PM, Town Hall 1. Shops of College Park Retail and Hotel 2. VA Clinic Additional Signage

More information

where we are, where we could be, how we can get there. 12/14/2011

where we are, where we could be, how we can get there. 12/14/2011 Central Plant Optimization ASHRAE National Capitol Chapter - PES Wednesday, Nov 7, 2011 Dave Klee, LEED AP Director, Optimized Building Solutions Johnson Controls, Inc. 1 1 J o http://www.johnsoncontrols.com/cpo

More information

V0STAT51P-2 Programmable Wired Controller

V0STAT51P-2 Programmable Wired Controller PRODUCT SPECIFICATIONS VARIABLE REFRIGERANT FLOW SYSTEMS VRF V0STAT51P-2 Programmable Wired Controller Bulletin No. 210766 March 2016 Grouping - Controller can control up to 16 indoor units on the same

More information

Pennington County Government Justice Center. Schematic Design - October 27, 2015

Pennington County Government Justice Center. Schematic Design - October 27, 2015 Government Schematic Design - October 27, 2015 N Architecture 2 Proposed - Site Plan Proposed Jail / LEC Addition Proposed Addition 3 County Board Room Public Entrance County Attorney Proposed - Ground

More information

BEAM TILTED CORRELATIONS. Frank Vignola Department of Physics University of Oregon Eugene, OR

BEAM TILTED CORRELATIONS. Frank Vignola Department of Physics University of Oregon Eugene, OR BEAM TILTED CORRELATIONS Frank Vignola Department of Physics University of Oregon Eugene, OR 9743-1274 fev@uoregon.edu ABSTRACT A model is described and evaluated that calculates beam irradiance from tilted

More information

User Guide for the WegenerNet Data Portal

User Guide for the WegenerNet Data Portal User Guide for the WegenerNet Data Portal (v9/18feb2010) The WegenerNet Data Portal provides access to measurement data from the climate stations as well as detailed information about the project. Quality-checked

More information

SANS Vendor Events. SANS offers a variety of events which bring you in touch with the highly qualified SANS community.

SANS Vendor Events. SANS offers a variety of events which bring you in touch with the highly qualified SANS community. SANS Vendor Events SANS offers a variety of events which bring you in touch with the highly qualified SANS community. SANS National Events over 1200 profession IT Security attendees and over 45 SANS classes

More information

LONG-TERM SITE WIND DATA REPORT. Mt. Tom

LONG-TERM SITE WIND DATA REPORT. Mt. Tom LONG-TERM SITE WIND DATA REPORT Mt. Tom January 1, 2005 December 31, 2005 Prepared for Massachusetts Technology Collaborative 75 North Drive Westborough, MA 01581 By Melissa L. Ray Anthony L. Rogers Anthony

More information

WoTRS Master Calendar

WoTRS Master Calendar Day Date Time Program Location September Wed Sep 5 9:30 am-12 pm WoTRS Open Board Meeting TRS NW Wed Sep 5, 12 1-4 pm Drop in Mah Jongg- new & experienced players TRS NW Sep 26 Thu Sep 6, 13 10 am-1 pm

More information

Indirect Outside Air-cooling Unit

Indirect Outside Air-cooling Unit Indirect Air-cooling Unit G1--21b is an air-cooling system that cools in introduce outside air directly into indoor areas. By taking advantage of outside air energy all throughout the year, F-COOL O operations

More information

ARA FTS Flow Calibrator. Operation Manual August 1, 2016

ARA FTS Flow Calibrator. Operation Manual August 1, 2016 ARA FTS Flow Calibrator Operation Manual August 1, 2016 TABLE OF CONTENTS SECTION PAGE 1. INTRODUCTION 1 2. GETTING STARTED 1 2.1. Navigation 1 2.2. Charge Battery 1 2.3. Set Date and Time 2 2.4. Plug-In

More information

Att uverse router broadband 2 blinking red

Att uverse router broadband 2 blinking red Att uverse router broadband 2 blinking red The Borg System is 100 % Att uverse router broadband 2 blinking red Click the ATT Uverse nvg589 broadband 1 flashing red light. This is very frustrating how I

More information

June 2, If you have questions, please do not hesitate to contact me at (517) Sincerely,

June 2, If you have questions, please do not hesitate to contact me at (517) Sincerely, RICK SNYDER GOVERNOR STATE OF MICHIGAN DEPARTMENT OF LICENSING AND REGULATORY AFFAIRS PUBLIC SERVICE COMMISSION GREG R. WHITE JOHN D. QUACKENBUSH SALLY A. TALBERG COMMISSIONER CHAIRMAN COMMISSIONER MIKE

More information

For personal use only. Update Event & nearmap Solar

For personal use only. Update Event & nearmap Solar Update Event & nearmap Solar Update Event and nearmap Solar Paul Peterson Senior VP Product & Engineering 2 Current Clear Change Current What s on the ground now Clear Unrivalled clarity Change Monitor

More information

BEAR NEWSLETTER. March Choice Enrollment Round 2 Now Open! Hello Colorow Families, Dates to Remember

BEAR NEWSLETTER. March Choice Enrollment Round 2 Now Open! Hello Colorow Families, Dates to Remember BEAR NEWSLETTER TOGETHER - Empowering, Inspiring, Learning - for the FUTURE! March 2017 Dates to Remember Friday, March 3 Report Cards go home Mon. Mar. 6 Texas Roadhouse: PTA fundraiser 4:00-10:00pm Thurs.

More information

User Guide. Online.

User Guide. Online. www.thermia.com The English language is used for the original instructions. Other languages are a translation of the original instructions. (Directive 2006/42/EC) Copyright Thermia Värmepumpar Table of

More information

WHOIS Accuracy Reporting System (ARS): Phase 2 Cycle 1 Results Webinar 12 January ICANN GDD Operations NORC at the University of Chicago

WHOIS Accuracy Reporting System (ARS): Phase 2 Cycle 1 Results Webinar 12 January ICANN GDD Operations NORC at the University of Chicago WHOIS Accuracy Reporting System (ARS): Phase 2 Cycle 1 Results Webinar 12 January 2016 ICANN GDD Operations NORC at the University of Chicago Webinar Agenda 1 2 3 WHOIS ARS Background Phase 2 Cycle 1:

More information

Your Local Family Bus Company The Bus Garage, Bromyard, HR7 4NT

Your Local Family Bus Company The Bus Garage, Bromyard, HR7 4NT JANUARY 208 Mon Bank holiday Week 2 Tue 3 Wed Schools Start 4 Thu 5 Fri 6 Sat 7 Sun 8 Mon Week 2 9 Tue 0 Wed Thu 2 Fri 3 Sat 4 Sun 5 Mon Week 3 6 Tue 7 Wed 8 Thu 9 Fri 20 Sat 2 Sun 22 Mon Week 4 23 Tue

More information

San Joaquin County Emergency Medical Services Agency

San Joaquin County Emergency Medical Services Agency San Joaquin County Emergency Medical Services Agency http://www.sjgov.org/ems Memorandum TO: All Interested Parties FROM: Rick Jones, EMS Analyst DATE: January, 19 Mailing Address PO Box French Camp, CA

More information

DNG-200 LOW FOG GENERATOR USER MANUAL DNG-200 低煙機使用說明書

DNG-200 LOW FOG GENERATOR USER MANUAL DNG-200 低煙機使用說明書 DNG-200 LOW FOG GENERATOR USER MANUAL DNG-200 低煙機使用說明書 Read and save these insturctions 2008 Antari Lighting & Effects Ltd. User Manual Antari DNG-200 Low fog Generator Congratulations on the purchase

More information

AppKit: Using the DS1302 Trickle Charge Timekeeping Chip

AppKit: Using the DS1302 Trickle Charge Timekeeping Chip AppKit: Using the DS1302 Trickle Charge Timekeeping Chip This AppKit shows how to use the Dallas Semiconductor DS1302 Trickle Charge Timekeeping Chip with the Parallax BASIC Stamp II single-board computer

More information

Implementation of a PC-based data-logger software for air pollution monitoring networks

Implementation of a PC-based data-logger software for air pollution monitoring networks Air Pollution XIII 455 Implementation of a PC-based data-logger software for air pollution monitoring networks G. Latini 1, L. Magnaterra 1, S. Tascini 1 & G. Cencioni 2 1 Dipartimento di Energetica Università

More information

Training of BRs/NCs reviewers and experts for Biennial Update Reports technical analysis. 5 th BRs and NCs lead reviewers meeting

Training of BRs/NCs reviewers and experts for Biennial Update Reports technical analysis. 5 th BRs and NCs lead reviewers meeting Training of BRs/NCs reviewers and experts for Biennial Update Reports technical analysis 5 th BRs and NCs lead reviewers meeting Kyoko Miwa, Haike Stephen Mitigation Data Analysis programme, UNFCCC secretariat

More information

Regional Group Nordic GRID DISTURBANCE AND FAULT STATISTICS

Regional Group Nordic GRID DISTURBANCE AND FAULT STATISTICS Regional Group Nordic GRID DISTURBANCE AND FAULT STATISTICS Table contents Table contents Page 1 INTRODUCTION... 4 1.1 Contact persons... 5 1.2 Guidelines the statistics... 5 1.3 Voltage levels in the

More information

NHS Health Checks Quality Control testing guide

NHS Health Checks Quality Control testing guide NHS Health Checks Quality Control testing guide Contents HbA1c Quality Control Page 2-3 (Hybrid Internal and External) Lipid Quality Control Page 4 (Hybrid Internal and External) QC Schedule (June November

More information

Streamlining Utility Billing Analysis and Reporting. Dagoberto Rodriguez, Energy Manager Marlene Z Rosenboom, Utility Analyst

Streamlining Utility Billing Analysis and Reporting. Dagoberto Rodriguez, Energy Manager Marlene Z Rosenboom, Utility Analyst Streamlining Utility Billing Analysis and Reporting Dagoberto Rodriguez, Energy Manager Marlene Z Rosenboom, Utility Analyst Who We Are Founded by the Texas Legislature in 1969 The University of Texas

More information

2018 CALENDAR OF ACTIVITIES

2018 CALENDAR OF ACTIVITIES 2018 CALENDAR OF ACTIVITIES WHO WE ARE AND WHAT WE OFFER Ý Public Trainings Technical Sessions Reviews GMM Other Chapter Activities Conferences Professionals Night ISACA was incorporated by individuals

More information

PrairieCat Governing Bodies, Committees and Meetings for FY2019

PrairieCat Governing Bodies, Committees and Meetings for FY2019 DELEGATES ASSEMBLY This body approves the budget, contracts, new members and other major decisions for PrairieCat. Consists of a representative from each Fully Participating and Basic Online member as

More information

Threat and Hazard Identification and Risk Assessment (THIRA) In Progress Review (IPR) July 2012

Threat and Hazard Identification and Risk Assessment (THIRA) In Progress Review (IPR) July 2012 Threat and Hazard Identification and Risk Assessment (THIRA) In Progress Review (IPR) 2 13 July 2012 1 Roll Call Region A Region B Region C Region D Region E Region F Region G Region H Region I STL UASI

More information

AEROTRAK PORTABLE AIRBORNE PARTICLE COUNTER MODEL 9310/9350/9510/9550/9500 QUICK START GUIDE

AEROTRAK PORTABLE AIRBORNE PARTICLE COUNTER MODEL 9310/9350/9510/9550/9500 QUICK START GUIDE AEROTRAK PORTABLE AIRBORNE PARTICLE COUNTER MODEL 9310/9350/9510/9550/9500 QUICK START GUIDE Thank you for purchasing a TSI AeroTrak Portable Airborne Particle Counter (particle counter). This guide will

More information

The Scheduler & Hotkeys plugin PRINTED MANUAL

The Scheduler & Hotkeys plugin PRINTED MANUAL The Scheduler & Hotkeys plugin PRINTED MANUAL Scheduler & Hotkeys plugin All rights reserved. No parts of this work may be reproduced in any form or by any means - graphic, electronic, or mechanical, including

More information

Grade 4 Mathematics Pacing Guide

Grade 4 Mathematics Pacing Guide Jul 2014 ~ August 2014 ~ Sep 2014 1 2 3 4 5 6 7 8 9 10 11 12 14 15 16 17 Routines 19 Routines 20 Routines BOY 22 BOY 23 24 11 12 14 29 15 30 31 Notes: Found Online @ wwweverydaymathonlinecom 1 More Calendars

More information

ecoenergy Innovation Initiative Research and Development Component Public Report

ecoenergy Innovation Initiative Research and Development Component Public Report ecoenergy Innovation Initiative Research and Development Component Public Report Project: Integrated Approach to Development of a High Efficiency Energy Recovery and Intelligent Ventilation System Contents

More information

COUNCIL MEETINGS July 2017 to June 2018

COUNCIL MEETINGS July 2017 to June 2018 COUNCIL MEETINGS Name 03-Jul 24-Jul 07-Aug 21-Aug 04-Sep 18-Sep 02-Oct 23-Oct 06-Nov 20-Nov 04-Dec 18-Dec 22-Jan 05-Feb 19-Feb 05-Mar 19-Mar 09-Apr 23-Apr 07-May 21-May 04-Jun 18-Jun Christie LA Sexton

More information

Aon Hewitt. Facts & Figures. March 2016 Update. Risk. Reinsurance. Human Resources. Empower Results

Aon Hewitt. Facts & Figures. March 2016 Update. Risk. Reinsurance. Human Resources. Empower Results Aon Hewitt Facts & Figures Risk. Reinsurance. Human Resources. Empower Results Facts & Figures Contents In this document... This button normally prints the whole document. If you want to print just the

More information

Fair City Plaza. Task: Diagnose problems, recommend improvements for small municipal district cooling system

Fair City Plaza. Task: Diagnose problems, recommend improvements for small municipal district cooling system Fair City Plaza Task: Diagnose problems, recommend improvements for small municipal district cooling system The Fair City Plaza district cooling system provides chilled water to five buildings in a downtown

More information

iserv Overview Dr Ian Knight April 2012 Inspection of HVAC systems through continuous monitoring and benchmarking

iserv Overview Dr Ian Knight April 2012 Inspection of HVAC systems through continuous monitoring and benchmarking iserv Overview Inspection of HVAC systems through continuous monitoring and benchmarking Dr Ian Knight April 2012 www.iservcmb.info The sole responsibility for the content of this presentation lies with

More information

Audit Report Chacaltaya, Bolivia

Audit Report Chacaltaya, Bolivia Audit Report Chacaltaya, Bolivia Global Atmospheric Watch Station Chacaltaya, Bolivia Auditor: Kay Weinhold Date: June 24 to July 5, 2013 The second official audit on the mountain station Chacaltaya. General

More information

SAWS SSO Program Achievements

SAWS SSO Program Achievements SAWS SSO Program Achievements Jeff Haby, P.E. Vice President Production & Treatment September 21, 2018 September 21, 2018 Page 2 Path Forward Overview SAWS by the Numbers Consent Decree Key Elements Innovation

More information

FMEDA Report Failure Modes, Effects and Diagnostic Analysis and Proven-in-use -assessment KF**-CRG2-**1.D. Transmitter supply isolator

FMEDA Report Failure Modes, Effects and Diagnostic Analysis and Proven-in-use -assessment KF**-CRG2-**1.D. Transmitter supply isolator FMEDA Report Failure Modes, Effects and Diagnostic Analysis and Proven-in-use -assessment Device Model Number: Transmitter supply isolator Pepperl+Fuchs GmbH Mannheim Germany Mannheim norm sheet 1 of 10

More information

LeakDAS Version 4 The Complete Guide

LeakDAS Version 4 The Complete Guide 1 LeakDAS Version 4 The Complete Guide SECTION 3 SCHEDULING, ROUTES AND EOP Second Edition - 2014 Copyright InspectionLogic 2 Table of Contents END OF PERIOD PROCESSING... 3 How Frequently Should I run

More information

MHA LPI Date Correction Request Process

MHA LPI Date Correction Request Process MHA LPI Date Correction Request Process Description & Purpose In order to facilitate Servicer requests to update the Last Paid Installment (LPI) Date for a loan in the System of Record, MHA as Program

More information

Microsoft Office Project and Project Server Reporting. June 24 th, 2009 Rich Weller, MBA, PMP, MCTS, MCITP Principal Consultant, Pcubed

Microsoft Office Project and Project Server Reporting. June 24 th, 2009 Rich Weller, MBA, PMP, MCTS, MCITP Principal Consultant, Pcubed Microsoft Office Project and Project Server Reporting June 24 th, 2009 Rich Weller, MBA, PMP, MCTS, MCITP Principal Consultant, Pcubed Agenda Reporting with Microsoft Project Views Static Reports Visual

More information

Next Steps for WHOIS Accuracy Global Domains Division. ICANN June 2015

Next Steps for WHOIS Accuracy Global Domains Division. ICANN June 2015 Next Steps for WHOIS Accuracy Global Domains Division ICANN 53 24 June 2015 Agenda: Next Steps for WHOIS Accuracy Reporting System 1 2 3 Introduction and Implementation Approach Pilot Project and Lessons

More information

Internet Threat Detection System Using Bayesian Estimation

Internet Threat Detection System Using Bayesian Estimation Internet Threat Detection System Using Bayesian Estimation Masaki Ishiguro 1 Hironobu Suzuki 2 Ichiro Murase 1 Hiroyuki Ohno 3 Abstract. We present an Internet security threat detection system 4 using

More information

COOLING WHAT ARE THE OPTIONS AND THE PROS AND CONS FOR THE VARIOUS TYPES OF DATACENTRES SERVER AND COMMS ROOMS

COOLING WHAT ARE THE OPTIONS AND THE PROS AND CONS FOR THE VARIOUS TYPES OF DATACENTRES SERVER AND COMMS ROOMS COOLING WHAT ARE THE OPTIONS AND THE PROS AND CONS FOR THE VARIOUS TYPES OF DATACENTRES SERVER AND COMMS ROOMS Dr Jon Summers Scientific Leader in Data Centers Part-time Academic in Thermofluids at the

More information

Council, 26 March Information Technology Report. Executive summary and recommendations. Introduction

Council, 26 March Information Technology Report. Executive summary and recommendations. Introduction Council, 26 March 2014 Information Technology Report Executive summary and recommendations Introduction This report sets out the main activities of the Information Technology Department since the last

More information

2014 FALL MAILING SEASON Update for the Mailing Industry. August 18, 2014

2014 FALL MAILING SEASON Update for the Mailing Industry. August 18, 2014 2014 FALL MAILING SEASON Update for the Mailing Industry August 18, 2014 Agenda Service Actions Taken in 2014 Fall Mailing Season 2013 Review Drop Ship Profile Machine Utilization FSS Holiday Preparedness

More information

#30: setup new ESX nodes

#30: setup new ESX nodes 30: setup new ESX nodes https://rt.cuesta.edu/cs/ticket/display.html?id=30 of 11 5/1/2013 2:28 PM RT for CompServ Ticket 30: setup new ESX nodes [Reply] [Comment] [Show] New messages There are unread messages

More information

IT Services Executive Summary May 2017 1631 Incidents KPI As expected, the trend for a majority (1631) (4365) Incidents 78% Volumes Requests Requests 94% (4) (158) P1 Inc. 50% 4365 P2 Inc. 88% 2211 Phone

More information

2045 DEMOGRAPHIC FORECAST SURFACE TRANSPORTATION TECHNICAL COMMITTEE APRIL 28, 2017

2045 DEMOGRAPHIC FORECAST SURFACE TRANSPORTATION TECHNICAL COMMITTEE APRIL 28, 2017 2045 DEMOGRAPHIC FORECAST SURFACE TRANSPORTATION TECHNICAL COMMITTEE APRIL 28, 2017 BACKGROUND The demographic forecasts provide a common base for regional planning and resource allocations. The forecasts

More information

EACH MONTH CUTTING EDGE PEER REVIEW RESEARCH ARTICLES ARE PUBLISHED

EACH MONTH CUTTING EDGE PEER REVIEW RESEARCH ARTICLES ARE PUBLISHED EACH MONTH 14 16 CUTTING EDGE PEER REVIEW RESEARCH ARTICLES ARE PUBLISHED 2017 Advertising Rate Card Rate Card Effective Date: November 2015 2017 Closing Dates Month Ad Material Deadline January November

More information

PRODUCT CONFORMITY CERTIFICATE

PRODUCT CONFORMITY CERTIFICATE PRODUCT CONFORMITY CERTIFICATE This is to certify that the T200, T204 & 200E Chemiluminescent NOx Analyser manufactured by: Teledyne API 9480 Carroll Park Drive San Diego California 92121-5201 USA has

More information

ERS IT Portfolio Report

ERS IT Portfolio Report Administration and Operations Committee ERS IT Portfolio Report January 21 st, 2014 1 Agenda Information Technology Projects Summary 2013 End of Year Metrics Project Management Office CMERS Website Applications

More information

TOSHIBA. Semiconductor company Ref. : H Asia Pacific Satelite Industries TO : APPROVAL SHEET FOR TC7SH04FU(T5L,JF,T.

TOSHIBA. Semiconductor company Ref. : H Asia Pacific Satelite Industries TO : APPROVAL SHEET FOR TC7SH04FU(T5L,JF,T. Date : 18 July'06 Semiconductor company Ref. : H06183007 TO : Asia Pacific Satelite Industries APPROVAL SHEET FOR TC7SH04FU(T5L,JF,T Contents : 1. Specification Data 2. General Specification 3. Marking

More information

CM-1 Firmware Update Instructions Rev A

CM-1 Firmware Update Instructions Rev A CM-1 Firmware Update Instructions 57-6041 Rev A DYACON CM-1 Manual This page intentionally left blank. Page 2/8 DYACON CM-1 Manual Introduction 1.0 Introduction Dyacon provides free updates to the CM-1

More information

Temporal Allocation Using the Emissions Modeling Framework (EMF) Overview

Temporal Allocation Using the Emissions Modeling Framework (EMF) Overview Temporal Allocation Using the Emissions Modeling Framework (EMF) EMF User s Guide https://www.cmascenter.org/emf/internal/guide.html Temporal Allocation User s Guide https://www.cmascenter.org/emf/internal/temporal_a

More information

LAKEWOOD INSTRUMENTS REMOTE WINDOWS SOFTWARE

LAKEWOOD INSTRUMENTS REMOTE WINDOWS SOFTWARE LAKEWOOD INSTRUMENTS REMOTE WINDOWS SOFTWARE USER S MANUAL Lakewood Instruments 7838 North Faulkner Road, Milwaukee, WI 53224 USA Phone (800) 228-0839 Fax (414) 355-3508 http://www.lakewoodinstruments.com

More information

New Concept for Article 36 Networking and Management of the List

New Concept for Article 36 Networking and Management of the List New Concept for Article 36 Networking and Management of the List Kerstin Gross-Helmert, AFSCO 28 th Meeting of the Focal Point Network EFSA, MTG SEAT 00/M08-09 THE PRESENTATION Why a new concept? What

More information

Advancing the Art of Internet Edge Outage Detection

Advancing the Art of Internet Edge Outage Detection Advancing the Art of Internet Edge Outage Detection ACM Internet Measurement Conference 2018 Philipp Richter MIT / Akamai Ramakrishna Padmanabhan University of Maryland Neil Spring University of Maryland

More information

Central Controller G-50A/GB-50 Web Browser Operation Manual (For Managers)

Central Controller G-50A/GB-50 Web Browser Operation Manual (For Managers) Mitsubishi Electric Building Air-conditioner Control System Central Controller G-50A/GB-50 Web Browser Operation Manual (For Managers) Contents 1 Introduction...1 1-1 Conventions Used in This Manual...1

More information

Instruction Book (Web browser for System maintenance engineer)

Instruction Book (Web browser for System maintenance engineer) Air-conditioner Network System Centralized Controller AG-150A GB-50ADA-A GB-50ADA-J Instruction Book (Web browser for System maintenance engineer) Contents 1 Introduction... 1 1-1 Terms Used in This Manual...1

More information

EBR Application for Review Request to Review Environmental Compliance Approval Cruickshank Construction Limited Elginburg Quarry, Kingston

EBR Application for Review Request to Review Environmental Compliance Approval Cruickshank Construction Limited Elginburg Quarry, Kingston EBR Application for Review Request to Review Environmental Compliance Approval Cruickshank Construction Limited Elginburg Quarry, Kingston Decision Summary EBRO File No.: 16EBR001.R Issue: The Ministry

More information