2 INTRODUCTION PROJECT BACKGROUND FEED AND OPTIONS SELECTION OF FF DESIGN CRITERIA PROJECT EXECUTION ASSET MGMT AND DIAGNOSTICS FF ISSUES IN ME QP BENEFITS Slide 2 of 38

3 Slide 3 of 38

4 Qatar Petroleum, a National Oil & Gas major owns and operates PS-2 and PS-3 Offshore Oil Production Facilities. QP is responsible for all phases of the Oil & Gas industry in Qatar. QP Covers exploration, drilling, production, storage and transport and sale of crude oil, natural gas liquids, LNG, refined products, petrochemicals and fertilizers. The Corporation is committed to utilize the latest technology. Slide 4 of 38

5 Slide 5 of 38

6 Slide 6 of 38

7 Slide 7 of 38

8 Project initiated in October FEED in-house completed by QP in April Awarded EPIC to Yokogawa in January Detail Design completed in November Construction started in July Commissioned and handed over in March Slide 8 of 38

9 Slide 9 of 38

10 PS-3Q CONTROL ROOM Slide 10 of 38

11 PS-3G EXISTING CCR 11 Slide 11 of 38

12 1. TO ARRIVE AT A STRATEGY FOR PS-2/3 CONTROL SYSTEM UPGRADE PROJECT 2. TO FINALIZE THE TECHNOLOGY AND PROJECT SCOPE ANALYSIS IS DONE BASED ON 4 OPTIONS Option-1 Re-use of existing instrument + existing cables Option-2 Re-use of existing instrument + new cables (Conventional DCS) Option-3 All new instrument + new cables (Conventional DCS) Option-4 All new instruments (Fieldbus) Slide 12 of 38

13 Slide 13 of 38

14 OPTION-1 RE-USE EXISTING INSTRUMENTS + RE-USE EXISTING CABLES Carry out Installation, Cabling and System installation pre-shutdown. Demolish existing Cabinets and Consoles during shutdown. Construct the new facilities and connection. Loop check and Commission. MERITS Existing investment (instruments, cables, cable trays, junction boxes) are retained. DEMERITS Minimum of 4 weeks shutdown of facility is required (cold changeover) A separate marine spread required Scattered cable termination occupies more space and additional junctions Not a good installation Maintenance difficulty Slide 14 of 38

15 OPTION-2 RE-USE EXISTING INSTRUMENTS + INSTALL NEW CABLES Carry out system installation, new instruments and cabling. Lay the cables upto the existing instruments, coil them up and leave. Power on and simulate all loops and check Changeover 5 to 10 loops per day For critical tie-in take a week shutdown MERITS Existing investment (instruments, tubing & fittings) are retained Less shutdown (only a week) Neat and good installation Use of existing LQ accommodation (35 beds). Hence marine spread cost is reduced.. Easy maintenance DEMERITS Additional cable cost and installation cost of QR. 4.0MM Outdated DCS technology NoAsset Management possible (Limited Asset Management) Few old cables will be existing permanently Slide 15 of 38

16 OPTION-3 ALL NEW INSTRUMENTS + ALL NEW CABLES Carry out installation of instruments, cables and system. Loop check and Commission DCS. Changeover loop by loop by demolishing impulse tubing and installing new tubing. MERITS Less shutdown (only a week) Neat and good installation Use of existing LQ accommodation (35 beds). Hence marine spread cost is reduced Easy maintenance Latest equipment, negates some of the maintenance replacements Asset Management possible using HART (but limited) DEMERITS Existing investment (instruments, cables, cable trays, junction box) are not utilized. Additional instrument and installation cost QR. 6.0MM Disruption to platform due to hot works Slide 16 of 38

17 OPTION-4 ALL NEW INSTRUMENTS + ALL NEW CABLES (FIELDBUS) Install all new instruments, cables and system. Commission the system. Loop by loop change impulse tubing. MERITS Less shutdown (only a week) Neat and good installation Use of existing LQ accommodation (35 beds). Hence marine spread cost is reduced Easy maintenance Latest equipment, negates some of the maintenance replacements Asset Management possible using Fieldbus DEMERITS PS-2 Oil Station will be with Conventional instrument and NGL will be Fieldbus (which in our opinion is not a problem) Slide 17 of 38

18 PS-3A PS-3B PS-3C PS-3D PS-3E PS-3G PS-3Q 4 Segments 35 Segments 34 Segments 29 Segments 12 Segments 6 Segments 4 Segments Slide 18 of 38

19 BUL HANINE FIELD PS-3 (Contd.) Field Instrumentation Summary (All Facilities) Description OPTION-1 Re-use Instr Reuse Cable OPTION-2 Re-use Instr New Cables OPTION-3 All New Instr New Cables OPTION-4 FIELDBUS All new Instr New Cables New Instrument required Existing Instrument re-used N/A N/A New Junction Boxes required Existing Junction Boxes reused 50 N/A N/A N/A Single pair Cable required mtrs mtrs mtrs mtrs New Multicore Cable Required 9000 mtrs mtrs mtrs 4500 mtrs Existing Multicore Cable reused mtrs N/A N/A N/A Cost Summary (MM QR) Slide 19 of 38

20 Description OPTION-1 Re-use Instr Reuse Cable OPTION-2 Re-use Instr New Cables OPTION-3 All New Instr New Cables OPTION-4 FIELDBUS All new Instr New Cables Field Instruments Cables System Cost Installation Cost Marine Spread Detail Design FEED Contingency 15% Third party system upgrade cost TOTAL TOTAL BUDGET = QR MM (IN MM QR.) Slide 20 of 38

21 Install FF based DCS for PS-2/3. Shift existing Control Room to new CCR. Integrate ESD, FGS, Telemetry & HVAC with DCS. Replace all existing field instruments (FF Instrs). Install new Closed Circuit Television System. Demolition and Removal of Redundant Equipment. Minimize shutdown requirement. Slide 21 of 38

22 Slide 22 of 38

23 Reasons for Fieldbus Technology: Existing control technology is 15 to 30 years old. New technology was required for next 20 years. Savings on cabling, cable tray and space. Savings in construction and commissioning. Initial savings in Capital Expenditure (CAPEX). Maintenance and Operational Savings (OPEX). Plant Asset Management. Achieving Enterprise KPI. Slide 23 of 38

24 Growth FF Saturation Conventional A Successful extension strategy could increase sales Launch Maturity Decline Slide 24 of 38

25 Slide 25 of 38

26 Resulting Design: Over 10,000 I/O FF Devices 1024 Segments 225 DCS Non FF I/O 1800 Avg FF Dev per Segment 4.7 DESIGN CRITERIA High Power trunk with barriers at Field. One sec. max macrocycle time. Eight devices max in segments. Three final control elements max in a segment. Critical loops shall be assigned to dedicated segments. Parallel equipment I/O shall not reside in same segment. Multivariable transmitters for flow totalizer with compensation application. Slide 26 of 38

27 Slide 27 of 38

28 Slide 28 of 38

29 Exist. LER/Comp. Room TX, L/ Panel / S.S. LER Ex-Panel Comp Room New DCS Cab & M/C New DCS CCR New DCS Slide 29 of 38

30 Slide 30 of 38

31 Slide 31 of 38

32 Slide 32 of 38

33 NE107 defines 4 status signal or level for diagnosis: The classification and association of a diagnosis event to one of the 4 level of diagnosis must be configurable by the user. Slide 33 of 38

34 Slide 34 of 38

35 1. Ability to display and interact with the Maintenance and Diagnostic Software package of ANY FF Instrument from ANY Manufacture via ANY Host using standard, open protocols. 2. Expand Interoperability Test for hosts. 3. FF Training center in the Middle East. 4. Engineering Contractor and package Unit Support of FF. 5. Availability of FF expertise with Vendors in Middle East is low. Slide 35 of 38

36 Provide solutions for TCO reduction in plant lifecycle Planning Construction Operation Maintenance Improvement Plant Construction Phase Reduced Hardware Cost - I/O modules, Field Devices - Reduction of Wiring - Reduction of control room space (No Marshaling) Reduced Project Lead Time - Design & Engineering Tools - Design Guidelines and Documents 9% reduction of Installation cost (By ARC) Plant Operation Phase Reduced Operating Cost - Minimum Manning - Minimum Cost for Upgrading Reduced Maintenance Cost - Condition based, Predictive Maintenance - Tool based Maintenance - Automatic Maintenance Reduced Safety Cost - Remote Maintenance - Higher plant availability 20% reduction of Operation cost (By ARC) Slide 36 of 38

37 CABLING TERMINATIONS PANEL SPACE COMMISSIONING OVERALL COST SAVING BENEFITS 25% Reduction 35% Reduction 50% Savings 50% Savings 21% Savings Slide 37 of 38

38 Contact No address: Slide 38 of 38

Design Benefits. Teo Puay Yong Pepperl+Fuchs. On Behalf of FF Marketing Society. The Future is Digital. 1 The Future is Digital

Design Benefits. Teo Puay Yong Pepperl+Fuchs. On Behalf of FF Marketing Society. The Future is Digital. 1 The Future is Digital Design Benefits The Future is Digital Teo Puay Yong Pepperl+Fuchs On Behalf of FF Marketing Society 1 The Future is Digital Design Benefits from Applying Foundation Fieldbus Bus structure and Wiring Loop

More information

FIELDBUS IN ONGC C2C3 PLANT

FIELDBUS IN ONGC C2C3 PLANT FIELDBUS IN ONGC C2C3 PLANT Agenda - FF Technology Conference GNFC, Bharuch on 4th February, 2011 MITHUN BISWAS AEE(I) ONGC PMC : Foster Wheeler Energy EPC : Toyo Engineering i India Limitedit DCS Vendor

More information

Sustain.Ability. Tony Alexander Universal Process IO Honeywell Users Group EMEA

Sustain.Ability. Tony Alexander Universal Process IO Honeywell Users Group EMEA Sustain.Ability. Tony Alexander Universal Process IO 2012 Honeywell Users Group EMEA Agenda Introduction Features Benefits Applications What s Different? Road map Summary Questions 2 What Changed in the

More information

LEAP into the New Project Paradigm

LEAP into the New Project Paradigm 2014 Honeywell Users Group Europe, Middle East and Africa LEAP into the New Project Paradigm New Technologies to Reduce Risk Jack Gregg, Honeywell Project Execution in the 21 st Century Honeywell.com What

More information

FF Physical Layer Components

FF Physical Layer Components FF Physical Layer Components Best Practices Binoy Kamath AGM Project Pursuit Pepperl+Fuchs India Pvt. LTd.,Bangalore Agenda Introduction to FF and FF Physical Layer FF Physical Layer Components FF Wiring

More information

FOUNDATION Fieldbus Fieldbus Basics

FOUNDATION Fieldbus Fieldbus Basics FOUNDATION Fieldbus Fieldbus Basics Nik Suzaimi Berkat Honeywell Sdn Bhd, MALAYSIA On behalf of Fieldbus Foundation TM End User Seminar 25 Oct 2010 Kuala Lumpur, MALAYSIA Agenda H1 Basic Review. What is

More information

How Emerson s I/O on Demand Is Changing the Automation Infrastructure

How Emerson s I/O on Demand Is Changing the Automation Infrastructure ARC VIEW MARCH 25, 2010 How Emerson s I/O on Demand Is Changing the Automation Infrastructure By Larry O Brien Summary Many factors at work today are radically changing the world of conventional I/O. Fieldbus

More information

S900 Remote I/O System Intrinsic safety in the field ABB

S900 Remote I/O System Intrinsic safety in the field ABB S900 Remote I/O System Intrinsic safety in the field ABB 2 S900 REMOTE I/O SYSTEM INTRINSIC SAFETY IN THE FIELD The S900 Remote I/O System 01 Example of Field housing FH660S in stainless steel with complete

More information

LEAP into the New Project Paradigm

LEAP into the New Project Paradigm 2014 Honeywell Users Group Americas LEAP into the New Project Paradigm New Technologies to Reduce Risk Jack Gregg, Director Experion Product Marketing LEAP Lean Execution of Automation Projects 2 Project

More information

Safety Instrumented System (SIS)

Safety Instrumented System (SIS) Instrumented System (SIS) Independent system composed of sensors, logic solvers, and final control elements for the purpose of: SIS 1) Shutdown: Automatically taking the process to a safe state when predetermined

More information

MTL8000-2/x Series Modular I/O

MTL8000-2/x Series Modular I/O -2/x Series Modular Overview Modules Modules - Overview - 2/2 components Use this option for general purpose or nonhazardous applications, or where the equipment and/or field wiring has to be mounted in

More information

2.03 ADGAS. Company. P r ofile. Vision: Mission: About ADGAS

2.03 ADGAS. Company. P r ofile. Vision: Mission: About ADGAS Oil & Gas Directory Middle East - 2013 15 Vision: we will play a key role in the LNG and natural gas industry, creating wealth and value, implementing the National Energy Strategy and serving our valued

More information

remote I/O future inside

remote I/O future inside remote I/O future inside Remote I/O solutions for today and tomorrow Systems with PROFIBUS DP and Ethernet Asset Management Level Control Level Ex-Interface Level Fieldbus Isolating Repeater Field Level

More information

Fast Control Response Requirement

Fast Control Response Requirement DeltaV Distributed Control System White Paper October 2016 Fast Control Response Requirement This document describes how fast loop control is achieved by using FOUNDATION Fieldbus with Control in the Field.

More information

and Emerging Instrument Technologies

and Emerging Instrument Technologies FLUOR and Emerging Instrument Technologies SmartPlant Implementation Team By John Dressel The Challenge of Emerging Technologies New and emerging technologies bring new challenges to the Instrumentation

More information

H1 + HSE FFB Integrated Architecture Demonstration

H1 + HSE FFB Integrated Architecture Demonstration WHITE PAPER FOUNDATION Fieldbus H1 + HSE FFB Integrated Architecture Demonstration International Specialty Products (ISP) Lima, Ohio Abstract What End Users have asked for The challenge facing industry

More information

Electrical Equipment and Comprehensive Power Grid Solutions

Electrical Equipment and Comprehensive Power Grid Solutions Integration into the future Electrical Equipment and Comprehensive Power Grid Solutions About us Joint-Stock Company Rusatom Automated Control Systems (JSC RASU) is a subsidiary of State Atomic Energy

More information

Today s Webcast starts at 1:00 p.m. Eastern. You will not hear audio until the Webcast begins

Today s Webcast starts at 1:00 p.m. Eastern. You will not hear audio until the Webcast begins Today s Webcast starts at 1:00 p.m. Eastern. You will not hear audio until the Webcast begins Today's Moderator Ed Sulivan Editor Today's Presenter Steve Maling Director, US Field Services Marketing, Schneider

More information

System Integration of Fieldbus Electric Actuators

System Integration of Fieldbus Electric Actuators November 2013 - Page01 System Integration of Fieldbus Electric Actuators Electric actuators or more commonly addressed in the field as Motor Operated Valves (MOV) were traditionally integrated to the system

More information

Diederik Mols, Business Leader Industrial Wireless Maureen Butler, Director, Wireless Global Marketing New Applications Enabled by OneWireless

Diederik Mols, Business Leader Industrial Wireless Maureen Butler, Director, Wireless Global Marketing New Applications Enabled by OneWireless 2013 Honeywell Users Group Americas 2013 Honeywell Users Group Europe, Middle East and Africa Diederik Mols, Business Leader Industrial Wireless Maureen Butler, Director, Wireless Global Marketing New

More information

Exploring Full Benefits of a Foundation Fieldbus Control System

Exploring Full Benefits of a Foundation Fieldbus Control System Exploring Full Benefits of a Foundation Fieldbus Control System FFEUC Middle East Multaqa 2007 Bahrain Alexandre Peixoto System302 Business Development Manager 1 Overview Interoperability Flexible Function

More information

Smart Manufacturing in the Food & Beverage Industry

Smart Manufacturing in the Food & Beverage Industry Smart Manufacturing in the Food & Beverage Industry PUBLIC Copyright 2016 Rockwell Automation, Inc. All Rights Reserved. 1 Rockwell Automation at a Glance $5.9B FISCAL 2016 SALES 22,000 EMPLOYEES 80+ COUNTRIES

More information

Safe & available...vigilant!

Safe & available...vigilant! Safe & available...vigilant! Why not have the best of both worlds? The vigilant approach delivers uptime and peace of mind. Operators now have an all-in-one interface to effectively handle both control

More information

Foundation Fieldbus - Working Today, Preparing for tomorrow

Foundation Fieldbus - Working Today, Preparing for tomorrow Foundation Fieldbus - Working Today, Preparing for tomorrow Standards Certification Ian Verhappen Director, Industrial Networks MTL Instrument Group Education & Training Publishing Conferences & Exhibits

More information

10 Mb/s Single Twisted Pair Ethernet Process Industry Requirements Steffen Graber Pepperl+Fuchs

10 Mb/s Single Twisted Pair Ethernet Process Industry Requirements Steffen Graber Pepperl+Fuchs 10 Mb/s Single Twisted Pair Ethernet Process Industry Requirements Steffen Graber Pepperl+Fuchs IEEE802.3 10 Mb/s Single Twisted Pair Ethernet Study Group 9/8/2016 1 Overview Introduction Current bus Infrastructure

More information

Comprehensive Energy Management & Utility Master Plan

Comprehensive Energy Management & Utility Master Plan Comprehensive Energy Management & Utility Master Plan OVERVIEW University of Utah & Health Science Campus Overview Campus Transformation Value Drivers and Challenges Integrated Energy Planning Approach

More information

FOUNDATION Fieldbus Fieldbus Basics & its Benefits

FOUNDATION Fieldbus Fieldbus Basics & its Benefits FOUNDATION Fieldbus Fieldbus Basics & its Benefits James Loh Yokogawa Engineering Asia On behalf of Fieldbus Foundation TM Vietnam FF Seminar Fieldbus Basics - Agenda 1. H1 Basic Review. 2. H1 Benefits.

More information

Challenges of Multivendor Systems in Implementation of IIoT-ready PLCs. ISA/Honeywell Webinar 10 November 2016

Challenges of Multivendor Systems in Implementation of IIoT-ready PLCs. ISA/Honeywell Webinar 10 November 2016 Challenges of Multivendor Systems in Implementation of IIoT-ready PLCs ISA/Honeywell Webinar 10 November 2016 2 Before we begin: Challenges of Multivendor Systems in Implementation of IIoT-ready PLCs Listen

More information

Annual Training plan 2018

Annual Training plan 2018 Annual Training plan 2018 Leadership,, HR, Creativity, Secretary Courses Sr. No. Course Name Date Venue Fees U.S $ January 1. Time & Stress 7-11/1/2018 Abu Dhabi 2600 2. Legal Writing Skills 7-11/1/2018

More information

T103 PlantPAx System Fundamentals

T103 PlantPAx System Fundamentals T103 PlantPAx System Fundamentals PUBLIC INFORMATION Rev 5058-CO900E Copyright 2014 Rockwell Automation, Inc. All Rights Reserved. PUBLIC INFORMATION Copyright 2014 Rockwell Automation, Inc. All Rights

More information

Breaking the Limits of Analog Technology. Key attributes of the technology that makes FOUNDATION fieldbus suitable for process control

Breaking the Limits of Analog Technology. Key attributes of the technology that makes FOUNDATION fieldbus suitable for process control Breaking the Limits of Analog Technology Key attributes of the technology that makes FOUNDATION fieldbus suitable for process control FOUNDATION Fieldbus Started with a Few Simple Ideas: Reduce cabling

More information

What Changed in the Real World?

What Changed in the Real World? 2013 Honeywell Users Group Europe, Middle East and Africa Tony Alexander Flexibility and Efficiency with Universal Channel Technology for Process I/O 1 What Changed in the Real World? Universal Device

More information

New NAMUR Recommendations

New NAMUR Recommendations Fieldbus Foundation Freedom to choose. Power to integrate New NAMUR Recommendations Sven Seintsch Part 1 NAMUR Recommendation NE 105 Specifications for Integrating Fieldbus Devices in Engineering Tools

More information

remote I/O future inside

remote I/O future inside remote I/O future inside Remote I/O solutions for today and tomorrow Systems with PROFIBUS DP and Ethernet Asset Management Level Control Level Ex-Interface Level Fieldbus Isolating Repeater Field Level

More information

Wireless Field Data Backhaul

Wireless Field Data Backhaul Service Data Sheet Wireless Field Data Backhaul Scalable Reduced cost Safer deployment Secure and reliable communications Full support service An Emerson Smart Wireless Field Data Backhaul Solution integrates

More information

Sustain.Ability Honeywell Users Group EMEA. Adriano Canale How Universal I/O Can Help Save Design Cost and Project Execution Time

Sustain.Ability Honeywell Users Group EMEA. Adriano Canale How Universal I/O Can Help Save Design Cost and Project Execution Time Sustain.Ability. 2012 Honeywell Users Group EMEA Adriano Canale How Universal I/O Can Help Save Design Cost and Project Execution Time Customer Needs Challenges: - Project becoming increasingly complex

More information

Commissioning Benefits

Commissioning Benefits Freedom to Choose. Power to Integrate. Commissioning Benefits Andreas Agostin MTL Instruments On behalf of Fieldbus Foundation Marketing Committee Freedom to Choose. Power to Integrate. Commissioning Benefits?

More information

Endress+Hauser your competent partner for EtherNet/IP

Endress+Hauser your competent partner for EtherNet/IP Products Solutions Services Endress+Hauser your competent partner for EtherNet/IP EtherNet/IP is leveraging your process needs! Slide 1 EtherNet/IP facts EtherNet/IP (Ethernet Industrial Protocol) is an

More information

Chris Peters 26 September 2017 EXPERION UNIT OPERATIONS SUITE INTRODUCTION AND ROAD MAP

Chris Peters 26 September 2017 EXPERION UNIT OPERATIONS SUITE INTRODUCTION AND ROAD MAP Chris Peters 26 September 2017 EXPERION UNIT OPERATIONS SUITE INTRODUCTION AND ROAD MAP Batch Architecture & Execution Old Paradigm Automation Database Recipe Database Batch Server Operator Station Operator

More information

Introduction to Fieldbus Foundation Physical Layer

Introduction to Fieldbus Foundation Physical Layer Introduction to Fieldbus Foundation Physical Layer Fazi Hashim MTL Muhammad Syafiq bin Hamid KLAESB Product Sales /Application Engineer Email: muhammad.syafiq@klaesb.com Fieldbus What is fieldbus Benefits

More information

Products Services Projects

Products Services Projects Products Services Projects www.hvac-refrigeration.co.uk Company Profile HVAC & Refrigeration Engineering Ltd is an Aberdeen based specialist international provider of heating, ventilation, air conditioning

More information

Introduction. Delivers four ports to provide increased input/ output per card. Takes advantage of all smart device capabilities

Introduction. Delivers four ports to provide increased input/ output per card. Takes advantage of all smart device capabilities DeltaV Distributed Control System M-series Foundation TM Fieldbus Product Data Sheet Series 2 Plus I/O Use DeltaV state-of-the-art Foundation Fieldbus Series 2 Plus redundant I/O for your process control

More information

Front End Engineering and Design (FEED)

Front End Engineering and Design (FEED) Front End Engineering and Design (FEED) Freedom to Choose. Power to Integrate. Yeo Hwee Khoen Honeywell On behalf of Fieldbus Foundation 1 Freedom to Choose. Power to Integrate. FEED Benefits Applying

More information

Standard CIP-006-4c Cyber Security Physical Security

Standard CIP-006-4c Cyber Security Physical Security A. Introduction 1. Title: Cyber Security Physical Security of Critical Cyber Assets 2. Number: CIP-006-4c 3. Purpose: Standard CIP-006-4c is intended to ensure the implementation of a physical security

More information

M-series Foundation Fieldbus I/O

M-series Foundation Fieldbus I/O DeltaV Distributed Control System Product Data Sheet M-series Foundation Fieldbus I/O Use DeltaV state-of-the-art FOUNDATION Fieldbus redundant I/O for your process control system. Increases input/output

More information

ARC VIEW. Honeywell s New PLC Brings Digital Transformation to the ControlEdge. Keywords. Summary. The Edge and IIoT.

ARC VIEW. Honeywell s New PLC Brings Digital Transformation to the ControlEdge. Keywords. Summary. The Edge and IIoT. ARC VIEW AUGUST 3, 2017 Honeywell s New PLC Brings Digital Transformation to the ControlEdge By Craig Resnick Keywords IIoT, PLC, DCS, Digital Transformation, Mobility, OPC UA, Cybersecurity Summary IIoT

More information

Online Interfaces and Optional Features

Online Interfaces and Optional Features AMS Device Manager Product Data Sheet Online Interfaces and Optional Features Fully implement predictive diagnostics to improve plant availability and reduce maintenance costs Gain enhanced information

More information

Advanced Fieldbus Diagnostics, Without Fieldbus

Advanced Fieldbus Diagnostics, Without Fieldbus Advanced Fieldbus Diagnostics, Without Fieldbus 2005 ExperTune, Inc. Tom Kinney ExperTune, Inc. Advanced Fieldbus Diagnostics, Without Fieldbus Tom Kinney, ExperTune Inc. 2005 ExperTune Inc Summary Digital

More information

Roy Tanner - Extended Automation Product Group, Sept 2012 System 800xA Feature Pack 3 Update. ABB Group 3BSE en B September 25, 2012 Slide 1

Roy Tanner - Extended Automation Product Group, Sept 2012 System 800xA Feature Pack 3 Update. ABB Group 3BSE en B September 25, 2012 Slide 1 Roy Tanner - Extended Automation Product Group, Sept 2012 System 800xA Feature Pack 3 Update September 25, 2012 Slide 1 The concept of Feature Packs More value to Sentinel subscribers Time Release of new

More information

Micro Motion Model 2200S 2-Wire Transmitter with MVD Technology

Micro Motion Model 2200S 2-Wire Transmitter with MVD Technology Product Data Sheet PS-001094, Rev. C September 2009 Micro Motion Model 2200S 2-Wire Transmitter with MVD Technology The Micro Motion Model 2200S 2-wire transmitter enables the use of reliable and accurate

More information

AUMA 50 YEARS OF ELECTIC ACTUATON

AUMA 50 YEARS OF ELECTIC ACTUATON AUMA 50 YEARS OF ELECTIC ACTUATON Motor controls and remote communication Werner Laengin, AUMA Germany ONCE UPON A TIME. 2 THE HISTORY OF COMMUNICATION All these communication protocols are now standardised

More information

Gas Well Deliquification Workshop. David J Southern, P. Eng. Control Microsystems, Inc. Gas Well Deliquification Workshop

Gas Well Deliquification Workshop. David J Southern, P. Eng. Control Microsystems, Inc. Gas Well Deliquification Workshop Gas Well Deliquification Workshop Sheraton Hotel, Denver, Colorado February 27 March 2, 2011 Presentation Title: Multi-Wellpad Distributed Production Optimization Architecture David J Southern, P. Eng.

More information

Electrical Products Group Conference

Electrical Products Group Conference Electrical Products Group Conference David Farr Chairman and CEO May 20, 2015 Safe Harbor Statement Our commentary and responses to your questions may contain forward-looking statements, including our

More information

Project Execution Best Practices

Project Execution Best Practices Project Execution Best Practices Tips & Tricks based on lessons learnt 1 Successful Implementation & Improved Operation Temporary vs. Permanent Communication Ad-hoc Communication: Handheld field communicators

More information

Foundation Fieldbus optimized for FPSO - CAPEX. Jonas Berge, Emerson Process Management

Foundation Fieldbus optimized for FPSO - CAPEX. Jonas Berge, Emerson Process Management Foundation Fieldbus optimized for FPSO CAPEX Jonas Berge, Emerson Process Management 1 Topics System architecture review FOUNDATION fieldbus architecture advantages 2 3 System Architectures Conventional

More information

6/5/ Michael Hojnicki Chief of Technology and Administrative Services

6/5/ Michael Hojnicki Chief of Technology and Administrative Services Technology Update 6/5/2018 - Michael Hojnicki Chief of Technology and Administrative Services Projects Completed in 2017 Open Checkbook Published Network & Phone Upgrade High Level Design Competitive Bid

More information

A. DCS-PLC ADD-ON AT DHDS and PH1A UNIT

A. DCS-PLC ADD-ON AT DHDS and PH1A UNIT A. DCS-PLC ADD-ON AT DHDS and PH1A UNIT 1.0 INTRODUCTION: BPCL Mumbai Refinery, Mahul intends to implement the new process I/O s related to a new Dry Gas Seal System to the existing C300_2 controller in

More information

Foundation Fieldbus. actuator control. Established Leaders in Actuation Technology. Foundation Fieldbus. Freedom to Choose, Power to Integrate

Foundation Fieldbus. actuator control. Established Leaders in Actuation Technology. Foundation Fieldbus. Freedom to Choose, Power to Integrate Established Leaders in Actuation Technology Foundation Fieldbus actuator control Freedom to Choose, Power to Integrate Foundation Fieldbus Serial communication and control of Rotork actuators Publication

More information

DCS and Fieldbus Foundation. Shivaji Day Process Automation, ABB

DCS and Fieldbus Foundation. Shivaji Day Process Automation, ABB DCS and Fieldbus Foundation Shivaji Day Process Automation, B Foundation Fieldbus Specification FOUNDATION Fieldbus HSE - Server Integration - HSE is the Open Common interface for access to the server

More information

PAST PRESENT & FUTURE TRENDS IN INDUSTRIAL AUTOMATION

PAST PRESENT & FUTURE TRENDS IN INDUSTRIAL AUTOMATION PAST PRESENT & FUTURE TRENDS IN INDUSTRIAL AUTOMATION Dr. J. PRAKASH ASSISTANT PROFESSOR IN INSTRUMENTATION ENGINEERING Madras Institute of Technology ANNA UNIVERSITY DATA ACQUISITION SYSTEM (DAS) SUPERVISORY

More information

PlantPAx for Separation Facilities

PlantPAx for Separation Facilities PlantPAx for Separation Facilities Poza Rica X - PEMEX Alejandro Lupiañez ISI Mustang - Commercial Manager Nov 5th, 2012, Philadelphia, PA. USA Copyright 2012 Rockwell Automation, Inc. All rights reserved.

More information

DeltaV SX Controller. DeltaV SX Controller. Introduction. DeltaV Product Data Sheet. Scalable controllers. Quick Assembly.

DeltaV SX Controller. DeltaV SX Controller. Introduction. DeltaV Product Data Sheet. Scalable controllers. Quick Assembly. August 2010 Page 1 The and the DeltaV I/O subsystem make rapid installation easy Scalable controllers Quick Assembly Easy to use Field Proven architecture Designed for Digital Marshalling Advanced Controls

More information

Special Documentation Proline Promag 400 HART

Special Documentation Proline Promag 400 HART SD01847D/06/EN/01.16 71340791 Valid as of version 02.00.zz (Device firmware) Products Solutions Services Special Documentation Proline Promag 400 HART Heartbeat Verification + Monitoring application package

More information

Georgia Institute of Technology Advanced Computing Technology Building. Draft Program. Vision Program Outline

Georgia Institute of Technology Advanced Computing Technology Building. Draft Program. Vision Program Outline Georgia Institute of Technology Advanced Computing Technology Building Draft Program Vision Program Outline Issued April 2, 2001 I N T R O D U C T I O N Scope This document is a summary of the Vision Session

More information

High performance monitoring & Control ACE3600 Remote Terminal Unit

High performance monitoring & Control ACE3600 Remote Terminal Unit High performance monitoring & Control ACE3600 Remote Terminal Unit Empower Your SCADA Network Utilities, now more than ever, are facing newer and greater hurdles. Multiple wired and wireless communication

More information

DeltaV SX Controller. Introduction. Benefits. Scalable controllers. Quick assembly. Easy to use. Field proven architecture

DeltaV SX Controller. Introduction. Benefits. Scalable controllers. Quick assembly. Easy to use. Field proven architecture DeltaV Distributed Control System Product Data Sheet January 2018 DeltaV SX Controller Scalable controllers Quick assembly Easy to use Field proven architecture Designed for Electronic Marshalling Advanced

More information

Solution Oil & Gas. tgood.com

Solution Oil & Gas. tgood.com Solution Oil & Gas tgood.com TGOOD Introduction TGOOD is the global leader in prefabricated electric power distribution solutions. It is the company that first comes to mind when cost-effective electric

More information

Joe Bastone 27 September EXPERION PKS ORION The Future of Automation is Here

Joe Bastone 27 September EXPERION PKS ORION The Future of Automation is Here Joe Bastone 27 September 2017 EXPERION PKS ORION The Future of Automation is Here Experion PKS R500 Overview 1 Lean Project Execution Control & IO Industry Standards & Interoperability SCADA and RTU New

More information

GE Intelligent Platforms PAC8000 RTU

GE Intelligent Platforms PAC8000 RTU GE Intelligent Platforms PAC8000 RTU A ruggedized, reliable RTU PAC8000 Remote Terminal Unit (RTU) thrives in the desert heat of the Arabian Peninsula and the arctic cold of Siberian oil fields delivering

More information

TENGIZ PROJECT - FIELD SUBSTATION REPLACEMENT

TENGIZ PROJECT - FIELD SUBSTATION REPLACEMENT TENGIZ PROJECT - FIELD SUBSTATION REPLACEMENT / KAZAKHSTAN >>> TENGIZ PROJECT - FIELD SUBSTATION REPLACEMENT / KAZAKHSTAN Tengiz is one of the largest oil fields in the world, and is located in western

More information

The NIS Directive and Cybersecurity in

The NIS Directive and Cybersecurity in The NIS Directive and Cybersecurity in ehealth Dr. Athanasios Drougkas Officer in NIS Belgian Hospitals Meeting on Security Brussels 13 th October European Union Agency For Network And Information Security

More information

The background. Industrializing regions Strategic areas focused upon Less focus on efficiency and performance. Employment

The background. Industrializing regions Strategic areas focused upon Less focus on efficiency and performance. Employment The background 2 1947 Dawn of Independence- agrarian economy Industrial Policy Resolution 1948- certain areas reserved for Government PEs- Commanding Heights of the Economy Emphasized: Employment Industrializing

More information

Premium Integration How easy integration can be

Premium Integration How easy integration can be Products Solutions Services Premium Integration How easy integration can be Slide 1 Subject How easy integration can be Would it not be nice to have your devices connected to a digital bus (e.g. EtherNet/IP)

More information

MONITORING SOLUTIONS FOR Power & Utilities

MONITORING SOLUTIONS FOR Power & Utilities MONITORING SOLUTIONS FOR Power & Utilities SMART MONITORING SOLUTIONS FOR THE INTELLIGENT GRID Informed decision making from integrated monitoring at all points on the network and critical infrastructure

More information

High Availability Fieldbus Networks New Physical Layer Technologies. : Nagesha Nayak : Manager Project Pursuit

High Availability Fieldbus Networks New Physical Layer Technologies. : Nagesha Nayak : Manager Project Pursuit High Availability Fieldbus Networks New Physical Layer Technologies Name Job Title Company : Nagesha Nayak : Manager Project Pursuit : Cooper -MTL What could possibly go wrong? Host H1 Card Control Room

More information

DeltaV Connect Solution for Siemens TELEPERM M Systems

DeltaV Connect Solution for Siemens TELEPERM M Systems Distributed Control System Product Data Sheet December 2016 Connect Solution for Siemens TELEPERM M Systems Operate your process easily and intuitively from a state-of-the-art operator interface Integrate

More information

Type 9160 / Transmitter supply unit / Isolating repeater. Safety manual

Type 9160 / Transmitter supply unit / Isolating repeater. Safety manual Type 9160 / 9163 Transmitter supply unit / Isolating repeater Safety manual Safety manual English Content 1 General information... 3 1.1 Manufacturer... 3 1.2 Information regarding the Safety Manual...

More information

ELECTRICAL, INSTRUMENTATION & CONTROL SYSTEMS

ELECTRICAL, INSTRUMENTATION & CONTROL SYSTEMS ELECTRICAL, INSTRUMENTATION & CONTROL SYSTEMS Presentation by: RANA NASIR ALI General Manager, Power Plants Projects, at PITCO November 02, 2017 ELECTRICAL PLANT CONCEPT The electrical equipment, depending

More information

Preferred Industry: EPC / Oil & Gas / Energy sector/cement & Steel Industry

Preferred Industry: EPC / Oil & Gas / Energy sector/cement & Steel Industry TANVEER HUSSAIN Qualified B.Sc. (Electronics and Instrumentation ing) Graduate with expertise in Field Instrumentation and Control System Maintenance and Project Management. Preferred Industry: EPC / Oil

More information

18.0 CONTROLS PLATFORM AND AUTOMATION

18.0 CONTROLS PLATFORM AND AUTOMATION SEWPCC Upgrading/Expansion Conceptual Design Report SECTION 18 - Table of Contents 18.0 CONTROLS PLATFORM AND AUTOMATION...18.1 18.1 INTRODUCTION...18.1 18.2 SYSTEM INFORMATION...18.1 18.3 FUNCTIONAL REQUIREMENTS

More information

Fieldbus Design and Project Execution for FPSO Projects. Murali Krishnan T and Kaustubh Deshpande Emerson Process Management, Asia Pacific

Fieldbus Design and Project Execution for FPSO Projects. Murali Krishnan T and Kaustubh Deshpande Emerson Process Management, Asia Pacific Fieldbus Design and Project Execution for FPSO Projects Murali Krishnan T and Kaustubh Deshpande Emerson Process Management, Asia Pacific 1 FPSO s using Foundation Fieldbus Project Name Owner/ End User

More information

HART COMMUNICATION. A Digital Upgrade For Existing Plants

HART COMMUNICATION. A Digital Upgrade For Existing Plants HART COMMUNICATION 1. The majority of smart field devices installed worldwide today are HART-enabled. But some new in the automation field may need a refresher on this powerful technology. Simply put,

More information

Critical Infrastructure Security Vulnerability Assessment. A New Approach. Norman Bird - Senior Technical Lead - Nuclear Security

Critical Infrastructure Security Vulnerability Assessment. A New Approach. Norman Bird - Senior Technical Lead - Nuclear Security Critical Infrastructure Security Vulnerability Assessment A New Approach Norman Bird - Senior Technical Lead - Nuclear Security Critical Infrastructure Protection and Resilience Europe (CIPRE) Securing

More information

Engineering SCADA (Introduction) Dr. Sasidharan Sreedharan

Engineering SCADA (Introduction) Dr. Sasidharan Sreedharan Engineering SCADA (Introduction) Dr. Sasidharan Sreedharan www.sasidharan.webs.com Contents What is a SCADA System Simple SCADA System lay out and working Components of a SCADA System Levels of SCADA -

More information

Fieldbus Foundation TM Physical Design. Joseph Khoo AP Regional Sales Director R.Stahl

Fieldbus Foundation TM Physical Design. Joseph Khoo AP Regional Sales Director R.Stahl Fieldbus Foundation M Physical Design Joseph Khoo AP Regional Sales Director R.Stahl 1 Fieldbus How is fieldbus different to 4-20mA? Wiring and Interconnection Components opologies Design tools Installation

More information

BAHX Core performance monitoring using ISA a compliant wireless Temperature Transmitters

BAHX Core performance monitoring using ISA a compliant wireless Temperature Transmitters BAHX Core performance monitoring using ISA 100.11a compliant wireless Temperature Transmitters Presenter : C. B. Chakradhaar Ras Gas Date : 14 th Feb 2013 RasGas Company Limited 2013 1 BAHX core performance

More information

Project Life Cycle Support (SCADA)

Project Life Cycle Support (SCADA) Project Life Cycle Support (SCADA) Texas Association of Clean Water Agencies Garland, TX March 26, 2010 Yehuda Morag CH2M HILL, Austin TX WBG030410171936AUS Agenda Introduction to SCADA Utility Managers

More information

ARC VIEW. Leveraging New Automation Approaches Across the Plant Lifecycle. Keywords. Summary. By Larry O Brien

ARC VIEW. Leveraging New Automation Approaches Across the Plant Lifecycle. Keywords. Summary. By Larry O Brien ARC VIEW JUNE 22, 2017 Leveraging New Automation Approaches Across the Plant Lifecycle By Larry O Brien Keywords Operational Excellence, Cloud, Virtualization, Operations Management, Field Commissioning,

More information

HABERSHAM COUNTY BOARD OF COMMISSION EXECUTIVE SUMMARY

HABERSHAM COUNTY BOARD OF COMMISSION EXECUTIVE SUMMARY HABERSHAM COUNTY BOARD OF COMMISSION EXECUTIVE SUMMARY SUBJECT: County Dark Fiber Expansion Project DATE: March 7, 2017 (X) RECOMMENDATION ( ) POLICY DISCUSSION BUDGET INFORMATION: ( ) STATUS REPORT ANNUAL

More information

General. Remote I/O A4/1.

General. Remote I/O A4/1. www.stahl.de > Intrinsically safe Ex ia IIC, Ex e, Ex na or Ex nl inputs and outputs > Fieldbus communication: Modbus RTU, Profibus DP V0 and DP V1 HART, Industrial Ethernet, Modbus TCP, EtherNet/IP, PROFINET

More information

Accelerating High Performance Manufacturing

Accelerating High Performance Manufacturing Copyright 2013 Rockwell Automation, Inc. All Rights Reserved. Accelerating High Performance Manufacturing John Nesi Vice President Market Development Copyright 2013 Rockwell Automation, Inc. All Rights

More information

Discrete I/O connected direct onto. Input and Output Function Blocks, including Flexible Function Block (FFB) for logic execution

Discrete I/O connected direct onto. Input and Output Function Blocks, including Flexible Function Block (FFB) for logic execution Discrete I/O connected direct onto Profibus-PA Input and Output Function Blocks, including Flexible Function Block (FFB) for logic execution Power, Control and I/O integrated in the same hardware Mix Profibus

More information

Asia Clean Energy Forum, Manila

Asia Clean Energy Forum, Manila JUNE, 2018 Opportunities for Digitalization in Power Sector Asia Clean Energy Forum, Manila Yogendra Patwardhan Digitalization Field to Board room The need for faster decisions and increased business agility

More information

Factsheet. Power Generation Service Energy efficiency in power generation and water

Factsheet. Power Generation Service Energy efficiency in power generation and water Factsheet Power Generation Service Energy efficiency in power generation and water Opportunity identification Opportunity identification overview The opportunity identification phase of Industrial Energy

More information

One Release. One Architecture. One OS. High-Performance Networking for the Enterprise with JUNOS Software

One Release. One Architecture. One OS. High-Performance Networking for the Enterprise with JUNOS Software Solution Brochure High-Performance Networking for the Enterprise with JUNOS Software Using the Network to Achieve Higher Availability, Lower OPEX and Improved Productivity for Your Business Core Branch

More information

TFR5. Room or outdoor temperature sensor. Operating instructions for temperature sensor. English page 1...5

TFR5. Room or outdoor temperature sensor. Operating instructions for temperature sensor. English page 1...5 EN/2018-03-14 Design and specifications subject to change without notice Operating instructions for temperature sensor English page 1...5 Field of application CombiTemp is a temperature sensor, based on

More information

12 Approval of a New PRESTO Agreement Between York Region and Metrolinx

12 Approval of a New PRESTO Agreement Between York Region and Metrolinx Clause 12 in Report No. 7 of Committee of the Whole was adopted, without amendment, by the Council of The Regional Municipality of York at its meeting held on April 20, 2017. 12 Approval of a New PRESTO

More information

Smart Grid Objective 6.1 in WP2013

Smart Grid Objective 6.1 in WP2013 ICT Proposers' Day Warsaw 26-27 September 2012 Smart Grid Objective 6.1 in WP2013 Mercè Griera i Fisa Smart Cities and Sustainability Communication Networks, Content and Technology European Commission

More information

SPOS (Station Point of Sale) 200. SFTP (Station Fare Transaction Processor) 35. CQD (Card Query Device) 35. HCR (Handheld Card Reader) Cradles 120

SPOS (Station Point of Sale) 200. SFTP (Station Fare Transaction Processor) 35. CQD (Card Query Device) 35. HCR (Handheld Card Reader) Cradles 120 DESIGN GUIDELINES PRESTO INSTALLATION & CONNECTIVITY PAGE 1 of 4 ELECTRICAL CONNECTIVITY AND WIRING Communications Conduits Conduits designated for Presto equipment data wiring shall be clearly identified

More information

Sustain.Ability. Soroush Amidi and Andrew Nolan Advantages of a Plant-wide Wireless Network with Experion Integration

Sustain.Ability. Soroush Amidi and Andrew Nolan Advantages of a Plant-wide Wireless Network with Experion Integration Sustain.Ability. 2012 Honeywell Users Group Americas Soroush Amidi and Andrew Nolan Advantages of a Plant-wide Wireless Network with Experion Integration 1 Agenda Today s Challenges Why Choose a Plant-wide

More information